HomeMy WebLinkAboutAgenda Packet - EVWD Board of Directors - 06/13/2012 East Valley
too'Water District
3694 HIGHLAND AVE., SUITE#30, HIGHLAND, CA
BOARD MEETING June 13, 2012 5:30 P.M.
AGENDA
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
"In order to comply with legal requirements for posting of agenda, only those items filed with the
District Secretary by 12:00 p.m. on Wednesday prior to the following Wednesday meeting not
requiring departmental investigation, will be considered by the Board of Directors".
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
CALL TO ORDER
PLEDGE OF ALLEGIANCE
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
PUBLIC COMMENTS - At this time, members of the public may address the Board of Directors
regarding any items within the subject matter jurisdiction of the East Valley Water District. The
Board of Directors may BRIEFLY respond to statements made or questions posed. Comments are
limited to three minutes per speaker.
Presentation from Roger Light (Cajon High School)regarding the recent H2O Solar Races
AGENDA - This agenda contains a brief general description of each item to be considered. Except
as otherwise provided by law, no action shall be taken on any item not appearing on the following
agenda unless the Board of Directors makes a determination that an emergency exists or that a need
to take immediate action on the item came to the attention of the District subsequent to the posting
of the agenda.
1. Approval of Agenda
2. CONSENT CALENDAR-All matters listed under the Consent Calendar are considered by
the Board of Directors to be routine and will be enacted in one motion. There will be no
discussion of these items prior to the time the board considers the motion unless members of
the board, the administrative staff, or the public request specific items to be discussed and/or
removed from the Consent Calendar.
a. Approval of the board meeting minutes for May 23, 2012
b. Resolution 2012.06 — A Resolution of the Board of Directors of the East Valley
Water District accepting Notice of Completion by Eastwood Farms Mutual Water
District
c. Directors' fees and expenses for May 2012
1
d. Award of contract for the District's annual landscape maintenance to Excel
Landscaping
e. Award of contract for implementation of the Itron Automated Meter Reading to
Inland Water Works Supply Company
f Accounts Payable Disbursements: Accounts Payable Checks 232731 through 232968
which were distributed during the period of May 17, 2012 through June 6, 2012 in
the amount of$1,283,247.33. Payroll and benefit contributions for the period ended
June 6, 2012 and included checks and direct deposits, in the amount of$136,639.34.
Total Disbursements for the period $1,419,886.67.
NEW BUSINESS
3. Discussion and possible action regarding approval of Mitigated Negative Declaration for
Plant 143
4. Review and discussion regarding the proposed expenditures for the fiscal year 2012/2013
REPORTS
5. General Manager/ Staff Reports
6. Legal Counsel Report
7. Committee Report
Legislative & Public Affairs Committee
8. Oral comments from Board of Directors
ADJOURN
PLEASE NOTE:
Materials related to an item on this agenda submitted to the Board after distribution of the agenda packet are
available for public inspection in the District's office located at 3654 E. Highland Ave, Suite 18, Highland,
during normal business hours. Also, such documents are available on the District's website at
www.eastvalley.org subject to staff s ability to post the documents before the meeting.
Pursuant to Government Code Section 54954.2(a), any request for a disability-related modification or
accommodation, including auxiliary aids or services, that is sought in order to participate in the above-
agendized public meeting should be directed to the District's Administrative Manager at (909) 885-4900 at
least 72 hours prior to said meeting.
2
SA ct to approval
EAST VALLEY WATER DISTRICT MAY 23, 2012
REGULAR BOARD MEETING
MINUTES
The Chairman of the Board called the meeting to order at 5:30 p.m. Mr. Ron Coats led the
flag salute.
PRESENT: Directors: Coleman, LeVesque, Morales, Sturgeon, Wilson
ABSENT: Directors: None
STAFF: John Mura, General Manager/CEO; John Vega, Assistant General
Manager, John Vega; Brian Tompkins, Chief Financial Officer;
Kathleen Burke, Accounting Specialist II; Mike Henderson,
Production Superintendent; (Jerald Sievers, Field Superintendent,
Andrew Theisen, Water Quality Technician; Martha Duran,
Engineering Executive Assistant; Becky Kasten, Accounting
Supervisor; Cecilia Contreras, Executive Assistant; Justine
Hendricksen, Administrative Manager
LEGAL COUNSEL: Steve Kennedy
GUFST(s): Members of the public
APPROVAL OF AGENDA
M/S/C (Wilson-Coleman) that the May 23, 2012 agenda be approved as submitted.
PUBLIC PARTICIPATION
Chairman LeVesque declared the public participation section of the meeting open at 5:31
p.m.
Mr. Coats commended staff and their efforts for making the recent District tour a success.
There being no further written or verbal comments, the public participation section was
closed.
Minutes: 05/23/12 jph
APPROVAL OF BOARD MEETING MINUTES FOR MAY 9, 2012
M/S/C (Sturgeon-Wilson) that the board meeting minutes for May 9, 2012 be
approved as submitted.
APPROVE 16 CONVEYANCE OF PIPELINE EASEMENTS TO EAST VALLEY
WATER DISTRICT (EASTWOOD FARMS PROJECT)
M/S/C (Sturgeon-Wilson) that the 16 conveyance of pipeline easements to East
Valley Water District (Eastwood Farms Project) be approved.
RESOLUTION 2012.08 — BANK DEPOSITOR AGREEMENT TO ADD/REMOVE
SIGNATORIES ON DISTRICT CHECKING ACCOUNT
M/S/C (Sturgeon-Wilson) that Resolution 2012.08 be approved.
DISBURSEMENTS
M/S/C (Sturgeon-Wilson) that General Fund Disbursements #232560 through
#232730 distributed during the period of May 9, 2012 through May 16, 2012 in the
amount of $623,287.66 and Payroll Fund Disbursements for the period May 16, 2012 in
the amount of$139,091.80 totaling $762,379.46 be approved.
DISCUSSION AND POSSIBLE ACTION REGARDING CLAIM FOR DAMAGES
AT 7511 PEACOCK AVE, HIGHLAND, FROM JOSEPHINE COSIO
Mr. Kennedy stated that the claim was received by the District on May 7, 2012, the
receipts that accompany the claim are dated in 2009, and the claim is outside the six
month or for certain types of claims the one year statute of limitations and suggests that
the Board reject the claim.
M/S/C (Wilson-Coleman) that the claim for damages at 7511 Peacock Ave,
Highland, from Josephine Cosio be rejected and referred to the District's legal counsel
and insurance carrier.
DISCUSSION REGARDING THE PROPOSED REVENUE PROJECTIONS FOR
THE FISCAL YEAR 2012/2013
Mr. Tompkins provided a detailed report and presentation to the Board regarding the
revenue projections for the fiscal year 2012-13. Mr. Tompkins discussed a number of
items including but not limited to:
• Organization direction established by the Board of Directors
• Strategic Initiatives and Strategic Staffing Plan
• Departmental budgets, responsibility and accountability
2 Minutes: 05/23/12 j ph
• Water Fund
• Water Sales
• Meter Charges
• Sewer Fund
• Sewer System Charges
• Financial Resources
Mr. Tompkins stated that the expenditure projections for the fiscal year 2012/13 will be
presented at the June 13`s board meeting.
lnfomEation only.
GENERAL MANAGER/STAFF REPORTS
The General Manager reported on the following items:
• Draft Consumer Confidence Report
• Request for Proposals
o Landscape Services
o Sewer Master Plan
• H2O Solar Race Event
• Employee Retirement
Information only
LEGAL REPORT
No report at this time.
COMMITTEE REPORT
a. Legislative & Public Affairs Committee — Vice Chairman Morales stated that are
no changes to the District's legislative positions; that the committee will be
meeting next week to review requests from local legislators regarding pending
legislation. Vice Chairman Morales also stated that the committee discussed the
District's website and branding efforts.
Information only.
ORAL COMMENTS FROM THE BOARD OF DIRECTORS
Board member Wilson apologized for not. being able to attend the recent tour.
Board member Coleman listed a number of items he would like the District to investigate.
3 Minutes: 05/23/12 jph
Board member Sturgeon attended Haaker Equipment's open house and training sessions
on May 22nd and was very impressed with the facility.
Chairman LeVesque stated that he and Board member Sturgeon attended the recent H2O
Solar Race event.
Vice Chairman Morales thanked staff for their continued support and for attending the
recent board meetings. Vice Chairman Morales also stated that the County of San
Bernardino Workforce Investment Board will be honoring veterans on Flag Day,
Thursday, June 14°i at the Mojave Narrows Regional Park.
Information only.
The Board took a break at 6:19 pm.
The Board returned to session at 6:25 pm.
CLOSED SESSION
The Board entered into Closed Session at 6:25 p.m. as provided in the California Open
Meeting Law, Government Code Section 54945.9(a), to discuss the items listed on the
agenda.
ANNOUNCEMENT OF CLOSED SESSION ACTIONS
The Board returned to regular session at 7:00 p.m. The items listed on the agenda were
discussed in closed session with no reportable action being taken.
The meeting adjourned at 7:01 p.m.
Matt LeVesque, President
John J. Mura, Secretary
4 Minutes: 05/23/12jph
BOARD AGENDA STAFF REPORT
Meeting Date: June 13,2012
East Valley
Water District Public Hearing: ❑
--- — Discussion Item: ❑
Consent Item:
May IS, 2012.
TO: GOVERNING BOARD MEMBERS
FROM: GENERAL MANAGER/CEO
SUBJECT: EASTWOOD FARMS ASSESSMENT DISTRICT
RECOMMENDATION:
Staff recommends that the Board of Directors adopt Resolution 2012.06.
BACKGROUND/ANALYSIS:
Eastwood Farms, Tract No. 2439, was originally recorded in June of 1930. The water supply
system consisted of service mains, two wells and a hydropneumatic booster system serving both
residential and commercial connections. The system remained operational until 1996 when its
two potable water supply wells had positive detections for groundwater contamination.
Consequently., the system was no longer able to meet the State water quality compliance
standards and the two wells were ordered to be shut down by the California Department of
Public Elealth (DPH). In response, DPH requested of the East Valley Water District to supply
potable water, to the Eastwood Farms residents, through an emergency connection that was
located adjacent to the Eastwood Farms service area.
On March 11, 2008, W.J. McKeever Inc. prepared a preliminary study for the Eastwood Farms
Assessment District that was initially presented to the East Valley Water District's Board of
Directors.
On September 15, 2010, the East Valley Water District's Board of Directors approved the
formation of the Eastwood Farms Assessment District (Resolution 2010.23), which effectively
incorporated the Eastwood Farms system with the East Valley Water system. The Project was
bid out and awarded to EI-Co Contractors, Inc. on October 25, 2011. Project construction
consisted of the installation of new mainlines, hydrants and services connecting to active 75
meters.
Pagel
SR#0106
AGENDA DATE: JUNE 13, 2012
SUBJECT: EASTWOOD FARMS ASSESSMENT DISTRICT
On March 23, 2012 EI-Co Contractors, Inc. completed the construction of the Eastwood Fauns
Assessment District. Staff has completed all inspections, backflow and pressure tests to the
permanent connections to the EV WD system.
REVIEW BY OTHERS:
This agenda item was reviewed by engineering staff.
FISCAL IMPACT:
There is no fiscal impact associated with this agenda item.
Respectfully submitted Recommended by:
John Mura, Eliseo Ochoa,
General Manager/CEO Engineering Manager
ATTACHMENTS:
Notice of Completion for El-Co Contractors, Inc.
Resolution 2012.06
Page 12
SR#0106
EXHIBIT "A"
RESOLUTION 2012.06
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE EAST VALLEY WATER DISTRICT
ACCEPTING NOTICE OF COMPLETION
Eastwood Farms Mutual Water District
BE IT HEREBY RESOLVED by the Board of Directors of the East Valley Water District, as
follows:
WHEREAS, the water line system and appurtenant structures constructed in accordance
with specifications of the East Valley Water District at East of Tippecanoe Avenue, North of 3rd
Street, South of 6th Street and West of Marilyn Avenue in the City of Highland, has been
dedicated to East Valley Water District by Eastwood Farms Mutual Water District.
NOW THEREFORE, BE IT HEREBY RESOLVED, that the Board of Directors hereby
determine that said contract is completed and all rights, title, interest in and to said water system
be vested in the East Valley Water District, and that the President and Secretary are hereby
authorized to execute a Notice of Completion on behalf of the District, and the Secretary is
hereby authorized and directed to record said Notice of Completion in the office of the County
Recorder, County of San Bernardino, State of California.
The foregoing resolution was duly adopted at a meeting of the Board of Directors of the
East Valley Water District, upon motion duly made, seconded and carried on June 13, 2012.
AYES: Directors
NOES:
ABSENT:
EAST VALLEY WATER DISTRICT
Matt Le Vesque,
Board President
Attest:
John J. Mura,
Board Secretary
w24ah
0�/IUI12din
RECORDING REQUESTED BY j
AND WHEN RECORDED MAIL TO I
1
Name East Valley Water District I
Street PO Box 3427 j
Address San Bernardino,CA 92413 I
Alln_Engineering Department j
City& W-2448 j
State
FEE EXEMPT PURSUANT TO GOVERNMENT CODE
SECTION 6103
SPACE ABOVE THIS LINE FOR RECORDER'S USE
NOTICE OF COMPLETION
Notice pursuant to Civil Code Section 3093,must be filed within 10 days after completion. (See reverse side for Complete
requirements.)
Notice i:a hereby given that:
1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property
hereinafter described
2. The full name of the owner is East Valley Water District
3. The full address of the owner is PO Box 3427 San Bernardino.CA 92413 San Bernardino County
4. The nature of the interest or estate of the owner is,in fee.
None
;If other than fee,strike In fee'and insert,for example,"purchaser under contract of purchase,"or lessee')
5. The full names and full addresses of all persons,if any,who hold Etle with the undersigned as joint tenants or as tenants
in common are
NAME ADDRESS
East Valley Water District,A County District 3654 Highland Ave. Suite 18 Highland CA 92346
6. A work of improvement on the property hereinafter described was completed on March 23 2012 The work done
was :
Construction of 1 029 feet of 8"water main and 3,570 feet of 12"water main,120 new services and all appurtenances for
the consolidation of Eastwood Farms Mutual Water District into East Valley_Water District.
7. The name of the contractor,if any,for such work of improvement was
EL-CO Contractors,Inc. 10/2712011
(If no contractor for work of improvement as a whole,insert"none" (Date of Contract)
8. The property on which said work of improvement was completed is in the city of Highland
County of San Bernardino ,State of California,and is described as follows:
East of Tippecanoe Avenue North of 3i°Street South of Sir Street and West of Marilyn Avenue.
9. The street address of said property is Tract 2439 Recorded in Book 34 of Maps pace 7 records of San Bernardino County.
California and Assessor's Parcels Numbers 279-123-012 279123-021 and 279-123-019
(If no street address has been difficulty assigned,insert,"none'.)
Date-_June 13 2012
Verification for Individual Owner
Signature of owner or corporate officer of owner
named in paragraph 2 or his agent
Matt Le Vesque,Board President
East Valley Water District
VERIFICATION
I,the undersigned.say: I am the Board Secretes the declarant of the foregoing
('President of',"Manager or,"A partner of',"Owner of'.Etc.)
notice of completion;I have read said notice of completion and know the contents thereof;the same is true of my knowledge.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on June 13 2012 ,at_Highland ___ ,California.
(Date of signature.) (Cny.whor. lgni
/
(Personal signature of the indi idual who is swearing that the contents of the
notice of completion are true.)
John J.Mara,Board Secretary
East Valley Water District
BOARD AGENDA STAFF REPORT
Meeting Date: June 13, 2012
EastValley
Water District Public Hearing: O
Discussion Item:
Consent Item:
June 4, 2012
TO: GOVERNING BOARD MEMBERS
FROM: GENERAL MANAGER/CEO
SUBJECT: BOARD COMPENSATION/ BOARD MEMBER FEES AND EXPENSES FOR
MAY 2012
RECOMMENDATION:
Approve the Governing Board members' fees and expenses for May 2012.
BACKGROUND/ANALYSIS:
The Board has instructed staff to list all director fees and expenses as a separate agenda item to
show full fiscal transparency. Only after Board review and approval, the expenses will be paid.
REVIEW BY" OTHERS:
This agenda item has been reviewed by the administrative staff.
FISCAL IMPACT:
The fiscal impact associated with this agenda item is $6,679.15, which is included in the current
fiscal budget.
Respect tfully submitted: Recommended by:
ltll,;1
John Mura ( u rw endric sen,
General Manager/CEO Administrative Manager
ATTACHMENTS:
Monthly summary report
May 2012 fees and expense reports
Page d
SR#0104
ncrnin-
BOARD OF DIRECTORS
2011 2012
PRESIDENT LEVESQUE DIRECTOR MALMBERG DIRECTOR MORALES DIRECTOR STURGEON DIRECTOR WILSON DIRECTOR COLEMAN
FEES EXPENSES FEES EXPENSES FEES EXPENSES FEES EXPENSES FEES EXPENSES FFFS EXPENSES
-UL! '.5CC.00 350.00 407.97 1050.00 -663.72 1750.00 1218.53
AUG 1350.00 9.48 1050.00 14.69 1350.00 19.69 105000 15.00 1400.00
SEPT 1500.00 50.49 1400.00 56.42 1350.00 1253.43 1350.00 876.71 1050.00 1115
OCT 1500.00 616.52 1400.00 72.72 600.00 700.00 63.05
NOV 1500.00 232.58 1225.00 11.73 1500.00 750.00 6.78 525.00
DEC 1350.00 119.90 450.00 600.00 21.50 350.00
JAN 1500.00 352.13 1200.00 15.37 1350.00 75.00 525.00 11.80 1750.00 284.38
FEB 1500.00 81.41 1200.00 10.00 1200.00 85.00 1225.00 11.34 1750.00 33908
MAR 1500.00 533.18 1200.00 684.86 1575.00 1399.59 1225.00 8.00 1750.00 85.88
APRIL 1500.00 140.70 900.00 0.00 1225.00 820.00 1125.00 1750.00 850.00
MAY
JUNE
TOTAL
REIMB 14700.00 2228.16 5075.00 155.56 10500.00 2391.32 10750 00 2635.86 9875.00 1349.84 7000.00 1559.34
TOTAL
EXPS 14700.00 2228.16 5075.00 155.56 10500.00 2391.32 10750 00 2635.86 9875.00 1349.84 7000.00 1559.34
BOARD OF DIRECTOR EXPENSES
DRAFT FISCAL YEAR 2011 -2012 MATT LE VESOUE
DATE CONFERENCE CARFARE MILEAGE
NAME OF MEETING FEES AIRFARE PARKING LODGING MEALS EDUCATION MISC
Independence Flag 7/3/2011 12.64
Inland Action 7/12/2011 11.10
Succession Plan 7/14/2011 16.10
LAFCO 7/14/2011 16.65
SBVMWD 7/19/2011 12.21
Meeting w/Robert Deloach 7/21/2011 23.07
Meeting w/Robert Deloach 8/17/2011 9.48
Succession Plan 9/3/2011 26.64
Meeting w/Robert Deloach 9/21/2011 8.31
SBVMWD 9/30/2011 15.54
Meeting w/Robert Deloach 10/2/2011 19.72
Meeting w/Robert Deloach 10/5/2011 16.01
Meeting w/Robert Deloach 10/11/2011 14.80
Green Tech Expo 10/17/2011 9.00
Succession Plan 10/18/2011 26.64 16.38
Meeting w/Deloach 10/20/2011 12.38
State of Community 10/25/2011 30.00
Facilities Expo 10/27/2011 421.40 50.19
Meeting w/Shorett 11/1/2011 31.06
Meeting w/Robert Deloach 11/3/2011 7.49
Meeting w/B Reeb 8 Sturgeon 11/8/2011 73.51
Succession Plan 11/4/2011 26.64
Meeting w/Robert Deloach 11/16/2011 12.88
GETS Wireless Priority Sery 11/30/2011 81.00
Meeting w/Robert Deloach 12/15/2011 11.38
Meeting W/John Mura 12/8/2012 27.00
Chino Hills City Yard 12/9/2012 45.51 36.01
Calif Special District Assoc 1/12/2012 225.00 51.06
Mig w/Dr Mathis 1/19/2012 32.77
Meeting w/John Mura 1/20/2012 13.33
ASBCSD 1123/2012 29.97
Meeting w/Dr.Mathis,J Mura 2/6/2012 15.54 13.66
Meeting w/John Mura 2/13/2012 10.00
Meeting w/Dr. Mathis,J Mura 2/28/2012 15.54
Highland Chamber 2/28/2012 15.00
Meeting W1 John M 2/28/2012 11.67
Meeting W/John M 316/2012 25.30
ACWA 3/6112-317/12 190.00 215.60 36.00 9.95
Meeting W/John Mura 3/712012 23.33
Highland Chamber 3/27/2012 20.00
Meeting W/John M 3/28/2012 13.00
Highland Chamber 4/12/2012 5.00
Meeting W/John M 4/13/2012 8.50
Meeting W/Or Mathis 4/23/2012 15.54 27.66
Highland Chamber 4/24/2012 69.00 15.00
TOTAL 539.00 637.00 465.97 0.00 482.60 81.00 22.59
BOARD OF DIRECTOR EXPENSES
DRAFT FISCAL YEAR 2011 -2012 LARRY MALMBERG
DATE CONFERENCE CARFARE MILEAGE
NAME OF MEETING FEES AIRFARE PARKING LODGING MEALS MISC
Meeting w/Robert Deloach 8/22/2011 14.69
Succession Planning 9/3/2011 21.42
ASBCSD 9/26/2011 35.00
Meeting w/Robert Deloach 10/2/2011 19.72
Meeting w/Robert Deloach 10/5/2011 16.01
Meeting w/Robert Deloach 10/11/2011 14.79
Succession Planning 10/21/2011 22.20
Meeting w/Robert Deloach 11/14/2011 11.73
TOTAL 35.00 0.00 43.62 0.00 76.94 0.00
BOARD OF DIRECTOR EXPENSES
DRAFT FISCAL YEAR 2011 -2012 JAMES MORALES
DATE CONFERENCE CARFARE MILEAGE
NAME OF MEETING FEES AIRFARE PARKING LODGING MEALS EDUCATION MISC
Meeting w/Robert Deloach 6/27/2011 11.74
Ca State University Sac 7/1/2011 63.55
Main Event Mngmt Corp 7/14/2011 150.00
Meeting w/Deloach 7/21/2011 23.08
Meeting w/Deloach 7/27/2011 9.60
GFOA Membership 7/27/2011 150.00
Meeting w/Robert Deloach 8/25/2011 19.69
ACWA Conference 9/22/11-9/23/11 675.00 199.65 316.44 43.79
Meeting w/Robert Deloach 9/26/2011 18.55
Meeting w/Robert Deloach 1/6/2012 15.37
Meeting w/John Mura 2/3/2012 10.00
Meeting w/John Mura 3/6/2012 13.25
Meeting w/John Mura 3/7/2012 23.34
ACWA Conference 3/7112-318112 68.19 156.48
ACWA Conference 3117/12-3/18/12 190.00 233.60
Golf Tournament 4/19/2012 75.00
Invoiced for golf tournament 4/19/2012 -75.00
TOTAL 865.00 233.60 267.84 472.92 188.41 150.00 213.55
BOARD OF DIRECTOR EXPENSES
DRAFT FISCAL YEAR 2011 -2012 KIP STURGEON
SATE CONFERENCE RAILFARE MILEAGE
NAME OF MEETING FEES AIRFARE PARKING LODGING MEALS MISC
WEF Tour 4/13/11-4/15/11 -695.00
Meeting w/Robert Deloach 7/19/2011 11.28
Highland Chamber Comm 7/26/2011 20.00
Highland Chamber Comm 8/23/2011 15.00
Water Education Foundation 9/8/2011 450.00 123.75 172.47
Meeting w/Robert Deloach 9/12/2011 14.45
Route 66 9/17/2011 21.04
UCLA Inland Empire Conf 9/22/2011 95.00
Meeting w/Robert Deloach 11/14/2011 6.78
TED 12/3/2012 8.38 5.00
Meeting w/Robert Deloach 12/15/2011 8.12
SBCSDA 1/23/2012 35.00
IEEAC 1/31/2012 40.00
San Bndo County 2/9/2012 50.00
ASBCSD 2/28/2012 35.00
neetiing w/.io'nn M 3/6/2012 18.25
ACWA 3/6/12-317112 190.00 7.50 312.96
Water Education Foundation 3/13/12-3/16/12 695.00 115.88
Highland Chamber Comm 3/27/2012 20.00
IEEAC 3/28/2012 40.00
Water Education Foundation 4/10112-4/13/12 695.00
SAW PA 4/25/2012 125.00
TOTAL 1818.38 7.50 5.00 552.59 58.88 193.51
BOARD OF DIRECTORS EXPENSES
DRAFT FISCAL YEAR 2011 -2012 GEORGE WILSON
DATE CONFERENCE CARFARE MILEAGE
NAME OF MEETING FEES AIRFARE PARKING LODGING MEALS MISC
SAS Congressional Briefing 7/9/11-7/13/11 515.00 689.64
Meeting w/Robert Deloach 7/29/2011 13.89
Meeting w/Robert Deloach 8/2/2011 11.77
Meeting w/Robert Deloach 8/17/2011 12.20
Meeting w/Robert Deloach 9/2/2011 13.15
Meeting w/Robert Deloach 1014/2011 13.05
ACWA Conf 11/29/2011 635.00
ACWA Conf refund 11/29/2011 -585.00
Meeting w/Robert Deloach 1/4/2012 11.80
Meeting w/John Mura 2/21/2012 11.34
Meeting w/John Mura 3/2/2012 8.00
TOTAL 50.00 515.00 0.00 689.64 95.20 0.00
BOARD OF DIRECTORS EXPFNSES
DRAFT FISCAL YEAR 2011 - 2012 BEN COLEMAN
DATE CONFERENCE CARFARE MILEAGE
NAME 0 F —EET!NG --ES A,IRE P,RE PARKING LOUGIN'v IfCALJ tviiSC
Calendar for EVWD notes 1/5/2012 19,38
CSDA 1/12/2012 225.00
IEEAC 1/31/2012 40.00
Meeting w/John Mura 2/212012 7,87
CSDA Training 2/17/2012 225.00 27.92
ASBCSD 2/27/2012 35.00 43.29
ASBCSD 3/19/2012 26.00 30.41
W M W D 3/21/2012 29.47
Model Netics Web Course 4/13/2012 850.00
TOTAL 1401.00 0.00 131.09 0.00 7.87 19.38
EAST VALLEY WATER DISTRICT
DIRECTOR'S FEES AND EXPENSE REPORT
DIF'SiCTOR Ben Coleman MONTH May 2012
Boa-d Meetings 9, 23
Conferences and Other Meetings
DATE ORGANIZATION PURPOSE
3-Ma y_ SBVMW'D Meeting of the Water Advisory Commission on Water Policy
8-May___ Highland City Council City Council Meeting
11-f,ate EVWD Behind the dam tour
15-t,lay EVWD Solar Challenge meeting
5/15'2012.?NC) Highland Planning Commission Highland City Planning commission meeting
17-Maw E\/WD Meeting with Bill Mathis
21-Dray ASBCSD Meeting in Hisperia
5/22f2012 Highland City Council City Council Meeting
5/24x2012 (NC) HAHS Highland Area Historical Society
25-Nl2:L 6vc) EVWD Retirement Program
30-Nlay EVWD Meet with John Mura and Matt Le Vesque
TOTAL#OF MEETINGS 10 @ $175.00 each $ 1,750.00
Travel Expenses: (Details on Back) $ 38.85
Total Director's Meetings& Expenses$ 1,788.85
j
Direc:or's Signature �J � „�G! Less Any Advance Payments$
Date of
Boar:l Approval i _ TOTAL DUE DIRECTOR$ 1,788.85
Administrative
Manager
MiscAlaneous
Note:, Attended Model-Netics webinars on May 4, 11, 18, 25.
Harassment Prevention Seminar 1-3 pm M/!r 2,
TRAVEL EXPENSES
Lodgings: (Detailed receipts attached*)
DATE FUNCTION ATTENDED AMOUNT
21-May
TOTAL LODGING $
Personal Auto: (Detailed receipts attached*) PARKING
DATE FUNCTION ATTENDED MILES FEES
21-May ASBCSD Meeting 70 $
TOTAL FEES $
CURRENT RATE: $0.555 TOTAL MILES 70 $ 38.85
Meals: (Detailed receipts attached*)
DATE FUNCTION ATTENDED AMOUNT
TOTAL MEALS $
Other: (Detailed receipts attached*)
DATE FUNCTION/ NATURE OF EXPENSE AMOUNT
TOTAL OTHER $
EAST VALLEY WATER DISTRICT
DIRECTOR'S FEES AND EXPENSE REPORT
DIF iCTOR Matt Le Vesque MONTH MAY 2011
Board Meetings 9-May, 23-May
Conferences and Other Meetings
DATE ORGANIZATION PURPOSE
1-M ay EVWD Mtg_ w/J. Morales, J. Mura
3-May_ EVWD Mtg. w/ B. Mathis
9-M,)L _ Highland Chamber Board Meeting
10 Maw__ City of Highland Trails Committee _
11_I,lay_ EVWD Seven Oaks Dam
14_1.1ay_ EVWD Legislative & Community Affairs Committee
15_G1ay_ EVWD Solar Challenge Team
16_May US DOE Alternative Clean Transportation Expo
17_P lay_ Microsoft Cloud Based ERP
20-May_ Valley District H2O Solar Boat Races
22-Away Highland Chamber Monthly Luncheon
24-N ay NBS Revenue/Cost Seminar(CVWD)
25-1\'ay EVWD Mtg. w. G. Clum mer, J. Mura
TOTAL#OF MEETINGS 10 @ $150.00 each $ 1,500.00
Travel Expenses: (Details on Back) $ 142.08
Total Director's Meetings & Expenses $ 1,642.08
Dire::tor's Signature Less Any Advance Payments $
Date cf
Bca J Approval TOTAL DUE DIRECTOR$ 1,642.08
Adm nistrative
Manager
Miscellaneous
Notes
EAST VALLEY WATER DISTRICT
DIRECTOR'S FEES AND EXPENSE REPORT
DIRECTOR Matt Le Vesque MONTH May 2012
Board Meetings
Conferences and Other Meetings
DATE ORGANIZATION PURPOSE
25-May EVWD M. Bolls Retirement Lunch
30-May EVWD Meeting w/ B Coleman J Mura
TOTAL# OF MEETINGS—@ $150.00 each $
Travel Expenses: (Details on Back) $
Total Director's Meetings & Expenses $
Director's Signature Less Any Advance Payments $
Date of
Board Approval TOTAL DUE DIRECTOR $
Administrative
Manager
Miscellaneous
Notes
TWMEL. EXPENSES
Loc 3mgs, (Detailed receipts attached*)
DATE FUNCTION ATTENDED AMOUNT
TOTAL LODGING $
Personal Auto. (Detailed receipts attached*)
PARKING
DATE FUNCTION ATTENDED MILES FEES_
3-IV Mtg. w/ IVlathis - Fontana 28 $ _
16_gpL—_ 'Expo - Long Beach 170 $
2441ay __ NBS - Rancho Cucamonga 58 $
TOTAL FEES $
CURRENT RATE: $0.555 TOTAL MILES 256 $ 142.08
Meets; (Detailed receipts attached*)
DA'I E FUNCTION ATTENDED AMOUNT
$
$
TOTAL MEALS $
Oth< r_ (Detailed receipts attached*)
DA'I E FUNCTION / NATURE OF EXPENSE AMOUNT
TOTAL OTHER $
0 tIGMAL RECEIPTS REQUIRED TRAVEL EXPENSES $ 142.08
EAST VALLEY WATER DISTRICT
DIRECTOR'S FEES AND EXPENSE REPORT
D. RECTOR Morales MONTH May 2012
Bcard Meetings 8,22
Cr nferences and Other Meetinos
_ DATE ORGANIZATION PURPOSE
,144ay Meet with General Manager Organizational Structure
11 M District Tour Meet with Distrct ratepayers
14:May Legislative & Public Affairs Committee Meeting
31 !May._ ACWA State Legislative Committee (agenda/bill review)
TOTAL#OF MEETINGS 6 @ $150.00 each $ 900.00
Travel Expenses: (Details on Back) $
Total Director's Meetings & Expenses$ 900.00
J
Director's Signature /� � Less Any Advance Payments $
Dalp of
Board Approval TOTAL DUE DIRECTOR$ 900.00
Adi iinistrative
Manager
Miscellaneous
Nodes
TRAVEL EXPENSES
Lodgings: (Detailed receipts attached*)
DATE FUNCTION ATTENDED AMOUNT
TOTAL LODGING $
Personal Auto: (Detailed receipts attached*)
PARKING
DATE FUNCTION ATTENDED MILES FEES
TOTAL FEES $
CURRENT RATE: $0.555 TOTAL MILES $
Meals: (Detailed receipts attached*)
DATE FUNCTION ATTENDED AMOUNT
TOTAL MEALS $
Other: (Detailed receipts attached*)
DATE FUNCTION/NATURE OF EXPENSE AMOUNT
TOTAL OTHER $
* ORIGINAL RECEIPTS REQUIRED TRAVEL EXPENSES $
EAST VALLEY WATER DISTRICT
DIRECTOR'S FEES AND EXPENSE REPORT
DIRECTOR Sturgeon MONTH May 2012
Bcird Meetings 9 & 23
Cg iferences and Other Meetings
DATE ORGANIZATION PURPOSE
04/27 EVWD Meet with CEO
03 MWD Water Conservation Expo
07 EVWD Meet with CEO
09 EVWD Meet with CEO
15 EVWD Meet with CEO -- H2O Solar Races
15 EVWD H2O Solar Races Presentation
15 CVWD Facility Tour
20 H2O Solar Races Race Day Work
21 ASBCSD Meeting
16 Alternative Clean Transportation Expo
22 Haaker Equipment Open House and Training
24 Ener'Voc Economic Demand Response Program Seminar
30 Ener'Voc Demand Response Summer Update Seminar
Highland C of C Meeting
TOTAL#OF MEETINGS 9 @ $175.00 each $ 1 ,575 . 00
Travel Expenses: (Details on Back) $ 73 . 22
Total Director's Meetings & Expenses$ 1 , 648 . 22
Director's Signature ��C Less Any Advance Payments $
Dato of
Boar 'c Approval June 13 , 2012 TOTAL DUE DIRECTOR$ 1 , 648 . 22
Administrative
Manager
Misi:ellaneous
Notes
TRAVEL EXPENSES
Lodgings: (Detailed receipts attached*)
DATE FUNCTION ATTENDED AMOUNT
TOTAL LODGING $
Personal Auto: (Detailed receipts attached*)
PARKING
DATE FUNCTION ATTENDED MILES FEES
16 ACT $ 10 . 00
22 Haaker — Fuel Receipt $37 . 22 $
TOTAL FEES $ 10 . 00
CURRENT RATE: $0.555 TOTAL MILES $ 37 . 22
Meals: (Detailed receipts attached*)
DATE FUNCTION ATTENDED AMOUNT
Reimburse District $ 58 . 00 —
TOTAL MEALS $ 58 . 00 —
Other: (Detailed receipts attached*)
DATE FUNCTION/NATURE OF EXPENSE AMOUNT
03 MWD — Rail Fare $27 x 2 $ 54 . 00
03/28 Meal for Robert Reeb $ 15 . 00
22 Highland Chamber Meeting $ 15 . 00
TOTAL OTHER $ 84 . 00
* ORIGINAL RECEIPTS REQUIRED TRAVEL EXPENSES $ 73 . 22
EAST VALLEY WATER DISTRICT
DIRECTOR'S FEES AND EXPENSE REPORT
DIRECTOR Wilson MONTH May 12012
Board Meetings 5/915/23
Conferences and Other Meetings
DATE _ ORGANIZATION PURPOSE
2_Ilgl EVWD Mtg w/Gen Mgr
8 M� EVWD Mtg w/Gen Mgr
TOTAL#OF MEETINGS 4 @ $175.00 each $ 700.00
Travel Expenses: (Details on Back) $
Total Director's Meetings & Expenses$ 700.00
Din:!ctor's Signature Less Any Advance Payments$
Da:-of
Bo; rd Approval TOTAL DUE DIRECTOR$ 700.00
Administrative
Ma r iager
Mis,:ellaneous
Noll m
BOARD AGENDA STAFF REPORT
Meeting Date: June 13,2012
East Valley
Water District Public Hearing: ❑
- Discussion Item: ❑
Consent Item:
May 29, 2012
TO: GOVERNING BOARD MEMBERS
FROM: GENERAL MANAGER/CEO
SUBJECT: ANNUAL CONTRACT FOR LANDSCAPE MAINTENANCE SERVICES
RECOMMENDATION:
Staff' recommends that the Board of Directors award a contract for the District's annual
landscaping services to Excel Landscape.
BACKGROUND/ANALYSIS:
In the past, the District has used multiple contracts to provide the landscape maintenance for its
facilities. By consolidating the landscape services into a single annual contract, the District will
have fifty-six (56) locations being maintained at regular intervals by one contractor at a reduced
monthly rate. The District is currently paying a total of$11,000/month for landscape services.
Landscape Maintenance services are included in the budget for Fiscal Year 2012/2013 with a
budget of$135,000. The budget can now be revised to accommodate the contract amount.
The District's Engineering Department developed the Request for Proposals (RFP), soliciting
five qualified landscaping companies, listed below:
1. David 011is Landscape Development
2. Excel Landscape
3. 1'icotone Landscaping
4. Rafael's Landscaping
5. Schubert Landscaping
Of the five RFP's that were delivered, only two companies responded with qualified bids. One
came fiom Excel Landscape in the amount of $10,180/month and one from David 011is
Landscape Development in the amount of$14,185/month.
Page d
#0101
AGENDA DATE: June 13, 2012
SUBJECT: ANNUAL CONTRACT FOR LANDSCAPE MAINTENANCE SERVICES
REVIEW BY OTHERS:
This agenda item has been reviewed by the Engineering Department.
FISCAL IMPACT:
The fiscal impact associated with this agenda item is $122,160 which will be included in the
budget for 2012/2013.
Respectfully submitt d: Recom ed by:
p
�J r
John Mura, Eliseo Ochoa,
General Manager/CEO Engineering Manager
Page 12
#0101
BOARD AGENDA STAFF REPORT
Meeting Date: June 13, 2012
East Valley
Water District Public Hearing: ❑
—"--'— Discussion Item: ❑
Consent Item:
May 30, 2012
TO: GOVERNING BOARD MEMBERS
FROM: GENERAL MANAGER/CEO
SUBJECT: CONTRACT FOR AUTOMATED METER READING SYSTEM (AMR) AND
DOMESTIC COLD WATER METER PROPOSAL
RECOMMENDATION:
Staff recommends that the Board of Directors award a contract for implementation of the Itron
Automated Meter Reading System (AMR) to Inland Water Works Supply Company.
BACKGROUND/ANALYSIS:
On Tuesday, \lay 15, the District opened bids from three vendors who proposed to supply the
District with the Itron Automated Meter Reading System (AMR) and `radio ready' meters of
various sizes. The three bids were the only responses from RFPs sent to the following qualified
companies:
I. Ferguson
I. Inland Water Works Supply Company
3. Measurement Control Systems (National Meter and Automation, Inc.)
4. James Jones Company
5. The BEST Meter Company Inc.
6. Mueller Systems
7. Badger Meter
Qualified bids were submitted by: Inland Water Works Supply Company, Measurement Control
System;; and Mueller Systems. After careful review, staff has determined that Inland Water
Works ; uppl.y Company was the lowest responsible bidder for both the AMR System
implementation and on meter pricing.
Page! 1
#0103
AGENDA DATE: June 13, 2012
SUBJECT: CONTRACT FOR AUTOMATED METER READING SYSTEM (AMR) AND
DOMESTIC COLD WATER METER PROPOSAL
Automated Meter Reading System (AMR)
System Costs:
• 5 Handhelds with SRead Radio and Bluetooth capabilities.
• Docking Station and Installation of Software.
• Software Installation that will be installed on the District's Network. This software will
assist with the District's Harris Northstar Billing System, in the creation of an interface
between it and the Software.
• Training: handheld usage; transfer files or account information with Northstar.
• Customer Support Services: assistance with software installation; troubleshooting and
reconciling failed devices; network growth and the addition of new devices; training
needs; software upgrades.
Me as ore me at Control
Inland Wate r Works Mueller Systems Systems
Unit Extended Extended Extended
Description Otv Price Price Unit Price Price Unit Price Price
Itron FC300SR FC3-0004-001 5 $4,500.00 $ 22,500.00 $ 7,721.00 $ 38,605.00 $12,000.00 $ 60,000.00
Itron Five Bay Multi Docking Station
FC3004MLTDOCK (Include AC
Power Cord 9000OA066CBLPW RAC 1 $2,000.00 $ 2,000.00 $ 3,200.00 $ 3,200.00 $ 5,335.00 $ 5,335.00
Itron MV-RS Software MV-RS B 1 $2575.00 $ 2,575.00 $ 4025.00 $ 4,025.00 $ 6,710.00 $ 6,710.00
Handheld Setup,Software Installation,
and Training on their use 1 $3,200.00 $ 3,200.00 $12,000.00 $ 12,000.00 $16,750.00 $ 161750.00
8% Sales Tax I $2 166.00 $ 2,166.00 $ 3,666.40 $ 3,666.40 $ 5,763.60 1 $ 5,763.60
Total $32,441.00 $ 61,496.40 $ 94,558.60
Although the District has not decided on exactly how many Radio Transmitters will be
purchased, for bidding purposes, the District has agreed upon 1,000.
Costs for Radio Transmitters
Measurement Control
Inland Water Works Mueller Systems Systems
Unit Extended I Extended Extended
Descri tian t Price Price UnitPrice Price Unit Price Price
Itron 100W ERT ERW-1300-203 1000 $ 75.00 $ 75,000.00 $ 153.00 $ 153,000.00 $ 255.00 $ 255,000.00
8% Sales Tax I $ 6000.00 $ 6000.00 $12240.00 $ 12,240.00 $20,400.00 $ 20,400.00
Total $81,000.00 $165,240.00 $275,400.00
Page 12
#0103
AGENDA DATE: June 13, 2012
SUBJECT: CONTRACT FOR AUTOMATED METER READING SYSTEM (AMR) AND
DOMESTIC COLD WATER METER PROPOSAL
Meter Proposals
For bidding purposes, the District requested that each company provide a per unit cost for
various types of/", 1", 1 %z° and 2" Domestic Cold Water Meters.
Inland Water MeasurementControl
Works MuellerSystems Systems
Unit Extended Extended Extended
Descri tion t Price Price Unit Price Price Unit Price Price
3/4 x 7 1!2"Positive Displacement Meter 1 $155.00 $ 155.00 $ 218.00 $ 218.00 $ 364.00 $ 364.00
314 x-7.-].,-,"Class I Vertical Turbine 1 $210.00 $ 210.00 $ 294.00 $ 294.00 $ 490.00 $ 490.00
314 x 9"Positive Displacement Meter 1 $155.00 $ t55.00 $ 218.00 $ 218.00 $ 364.00 $ 364.00
374 x 9"(:'lass I Vertical Turbine Meter 1 $210.00 $ 210.00 $ 303.00 $ 303.00 S 644.00 $ 644.00
Ix 10 3/4"Positive Displacement Meter l $205.00 $ 205.00 $ 286.00 $ 286.00 $ 477.00 $ 477.00
Is 10 3/4"Class 1 Vertical Turbine Meter 1 $285.00 $ 285.00 $ 403.00 $ 403.00 $ 672.00 $ 672.00
1.5 x 13' Positive Displacement Meter 1 $335.00 $ 335.00 $ 550.00 $ 550.00 $ 884.00 $ 884.00
L5 x 13"Class I Vertical Turbine Meter I $405.00 $ 405.00 $ 574.00 $ 574.00 S 957.00 $ 957.00
2 x 17"Positive Displacement Meter 1 $425.00 $ 425.00 $ 703.00 $ 703.00 $ 1,172.00 $ 1,172.00
2 x 17"Class 1 Vertical Turbine Meter 1 $505.00 $ 505.00 $ 763.00 $ 763.00 $ 1 271.00 $ 1 271.00
8% $ales Tax I $231.20 $ 231.20 344.96 $ 344.96 S 583.60 $ 583.60
Total $3,121.20 $4,656.96 $7,878.60
REVIEW BY OTHERS:
"The Engineering and Finance Departments have reviewed this item.
FISCAL IMPACT:
Funding for this project is included in the approved Fiscal Year 2011-12 budget.
Respectfully submitte R ded by
John Mttra, Brian Tompki s,
General Manager/CEO Chief Financial Officer
Page 13
#0103
BOARD AGENDA STAFF REPORT
Meeting Date: June 13,2012
East Valley
Water District Public Hearing: 1]
--- Discussion Item: D
Consent: Item:
June 6. 2012
TO: GOVERNING BOARD MEMBERS
FROM: CHIEF FINANCIAL OFFICER
SUBJECT: DISBURSEMENTS
RECOMMENDATION:
Approve the attached list of accounts payable checks and payroll issued.
BACKGROUND/ANALYSIS:
Listings of accounts payable checks, and the total fbr payroll and benefits costs incurred, are
submitted to the board of directors for review and approval with each board packet. The attached
check register, and the total for payroll cited below, were disbursed during the period May 17,
2012 through June 6, 2012.
Accounts payable checks for the period included check numbers 232731 through 232968 for a
total of$1,283,247.33.
The source of funds for this amount is as follows:
Unrestricted Funds $957,151.38
Bond P nancing $
State Financing $ 326,095.95
Payroll and benefit contributions paid for this period totaled $136,639.34.
Total disbursed during the period $1,419,886.67
REVIEW BY OTHERS:
This agenda item has been reviewed by the Chief Financial Officer and the Accounting
Supervisor.
Pagel
SR#0100
AGENDA DATE: June 13, 2012
SUBJECT: DISBURSEMENTS
FISCAL IMPACT:
$1,419,886.67(budgeted expenditures)
Respectfully submitted: Recommended by:
1 /J
'\—AL t4dP � 7
John Mura r Bnan W. Tompki4is
General Manager/CEO Chief Financial Officer
ATTACHMENTS:
List of Accounts Payable checks
Page 12
SR#0100
Data Wednesday,June 0E..2012
..,- viSiPW �w�a :n9:cj �:n1oi ia'ieGi Re"; APGHK.rpt
Check Register-EVWD Check Register
Use, KA1HY --.-a^.y _„,,.,
Check Nbr Tvce Date Id Name ProiedlD Project Description Discount On.-DocAmt DrCr
232731 CK 05/23/2012 AFF006 ROSIE AFFATATI 6341
088092 VO 22210 Customer Refunds 63.41 D
232732 --K , ,20,c nn1%ip i
"i. JHIN%;kA.DB.A^ASH'.,'K K. 12.836.90
088504 VO 74500 Engineering Consultants 8,496,00 D
088506 VO 74500 Engineering Consultants 4,340.90 D
232733 CK 05/23/2012 ALT006 ALTISOURCE SOLUTIONS 81.93
088093 VO 22210 Customer Refunds 37.35 D
088447 VO 22210 Customer Refunds 44.58 D
232734 CK 05/23/2012 ARRO09 ARROWHEAD UNITED WAY 45.00
088432 VO 23191 United Way Deduction 45.00 D
232735 CK 05/2312012 ASS001 ASBCSD 200.00
088482 VO 71400 Memberships and Dues 200.00 D
232736 CK 05/23/2012 ATT007 AT&T 306.56
088492 VO 71015 Telephone 27173 D
088493 VO 71015 Telephone 34.83 D
232737 CK 05/23/2012 BAR074 BARRY'S SECURITY SERVICES, INC 5,466.18
088403 VO 72500 Security Services 1,355.01 D
066404 VO 72500 Security Services 1,378.08 D
098494 VO 72500 Security Services 1,378.08 D
OGa495 VO 72500 Security Services 1,355.01 D
232738 CK 05/23/2012 BIL003 BILL&WAGS INC. 343.13
088415 VO 71725 Vehicle Repairs/Maintenance 343.13 D
232739 CK 05123/2012 BLA033 BLAIS&ASSOCIATES, INC 2,901.72
088477 VO 74900 Miscellaneous Consultants 76348 D
088,183 VO 74900 Miscellaneous Consultants 830.91 D
088,184 VO 74900 Miscellaneous Consultants 1,307.33 D
232740 CK 05/23/2012 CAL128 CALIFORNIA UTILITY EXECUTIVE M 35.00
088465 VO 77100 Education/Seminars/Conference 35.00 D
232741 CK 05/23/2012 CAN032 LLC^CANTERBURY LOTS-68 59.68
088094 VO 22210 Customer Refunds 59.68 D
232742 CK 05/23/2012 CIT021 S.B.M.W.D. 572.35
08,178 VO 71010 Utilities 279.86 D
NiPi79 VO 71010 Utilities 119.18 D
Date: Wednesday,June 06,2012 Page: 2 of 18
Time: 01 31PM East Valley Water District Peron APCHK of
Check Resister-EVWD Check Resister
Use, KATHY Company EVWD
Check Nbr Type Date Id Name ProiectlD Protect Description Discount OrioDocAmt DrCr
088480 VO 71010 Utilities 173.31 D
232743 CK 05/23/2012 CIT029 CITY NATIONAL BANK 32,609.60
088,131 VO 22275 Retention Payable 32,609.60 D
232744 CK 05/23/2012 CRIO06 JANIE CRISAFI 77.99
088095 VO 22210 Customer Refunds 27.22 D
088096 VO 22210 Customer Refunds 50.77 D
232745 CK 05/23/2012 CVS001 STRATEGIES—CV 18,190.64
088496 VO 74200 Public Relations Consultants 18,190.64 D
232746 CK 05/23/2012 DIA037 DIAZ—ALEJANDOR 42.79
088065 VO 22210 Customer Refunds 42.79 D
232747 CK 05/23/2012 EAS003 East Valley Water District 1,038.63
088433 VO 23195 FSA Withholding 1,038.63 D
232748 CK 05123/2012 FA1002 FAIRVIEW FORD SALES,INC 65.62
088411 VO 71720 Vehicle Parts/Supply 65.62 D
232749 CK 05123/2012 FAR001 FARMER BROS CO 406.82
088438 VO 71503 Kitchen Supplies 208.93 D
088507 VO 71503 Kitchen Supplies 197.89 D
232750 CK 05123/2012 FER009 FERGUSON ENTERPRISES INC 1350 208.37
088439 VO 61000 Materials&Supplies-Oper. 208.37 D
232751 CK 05/23/2012 FIE014 FIELD ASSET SERVICES,INC 25.30
088452 VO 22210 Customer Refunds 25.30 D
232752 CK 05123/2012 GRA054 REAL EST—GRAND TERRACE 66.16
088097 VO 22210 Customer Refunds 66.16 D
232753 CK 05123/2012 GR0001 GRUMET—KENNETH 48.71
088418 VO 22210 Customer Refunds 48.71 D
232754 CK 05/23/2012 HAC001 HACH COMPANY 505.10
088440 VO 65100 Treatment Chemicals 505.10 D
232755 CK 05/23/2012 HDS001 HD SUPPLY WATERWORKS,LTD 607.77
088499 VO 14310 Inventory-Constr.Materials 607.77 D
232756 CK 05/23/2012 HEN148 JOHN HENRY 13.86
Dale: Wednesday,June 09 2019 pay.: -,o118 n East Vallay Wator fticnjgs
♦...,.. ..�1 ^.1'" nep0lti AwUHK.lpl
Cheri Reuister-EVWD Gbec%Repiste:
-- KATHY Company Eyy,/p
Check Nbr Type Date Id Name ProiectlD Proiect Descdotion Discount OngDocAmt DrCr
088098 VO 22210 Customer Refunds 13.86 D
232757 CK 05/23;2n12 HU9001 11UB CONSTRUCTION SPECIALTIES 927.12
088500 Vn 51000 Materials&Supplies-Oiler. 1587 41 C
u865u1 VO 61100 small Tools 339.71 D
232758 CK 05/23/2012 INI-003 INLAND EMPIRE EAC 40.00
u8848e VO 77100 Education/Seminars/Conference 40.00 D
232759 CK 05123/2012 INL005 INLAND WATER WORKS SUPPLY CO 1,154.50
088406 VO 61000 Materials&Supplies-Oper. -7.88 393.98 D
088407 VO 61000 Materials&Supplies-Oper. -13.39 669.60 D
088408 VO 14310 Inventory-Constr.Materials -2.29 114.48 D
232760 CK 05/23/2012 JA0002 JAQUEZ-LESLIE S 19.07
088099 VO 22210 Customer Refunds 19.07 D
232761 CK 05/23/2012 JOH089 CHARRONE JOHNSON 10.04
088100 VO 22210 Customer Refunds 10.04 D
232762 CK 05123/2012 JRF001 J.R.FREEMAN CO., INC 30.78
088474 VO 71570 Computer Supplies 30.78 D
232763 CK 05/23/2012 KIR015 KIRCHNAVY ENTERPRISE 38.27
088101 VO 22210 Customer Refunds 38.27 D
232764 CK 05/23/2012 KON004 KONICA MINOLTA BUSINESS 633.25
088487 VO 71550 Office Equipment MaintContract 633.25 D
232765 CK 05/23/2012 LES002 LESLIE'S POOL SUPPLIES,INC 104.11
088415 VO 65100 Treatment Chemicals 104.11 D
232766 CK 05123/2012 L00006 LOUDEN LLC 129.18
088103 VO 22210 Customer Refunds 20.30 D
088458 VO 22210 Customer Refunds 50.52 D
088459 VO 22210 Customer Refunds 58.36 D
232767 CK 05123/2012 L00007 EVAGELINA LOUGHRAN 45.79
088109 VO 22210 Customer Refunds 45.79 D
232768 CK 0512312012 MUN030 MUNICIPAL WTR DIST OF ORANGE C 4,120.00
088488 VO 22700 CalWARN Contributions 4,120.00 D
232769 CK 05/23/2012 NAP007 NAPA AUTO PARTS/BOSS MOSS 112.49
Date. Wednesday,June 06,2012 East Valley Water District RPage e'. APCHK` t
Time 01 31P Check Register-EVWD Check Register n
User KATHY Company. EVWD
Check Nbr Toe Date Id Name ProiectlD Project Description Discount OrigDocAmt DrCr
088412 VO 71727 Garage Supplies/Small Tools 44.01 D
088441 VO 71720 Vehicle Parts/Supply 37.45 D
088442 VO 71727 Garage Supplies/Small Tools 31.03 D
232770 CK 05/2312012 NGU129 TUNG NGUYEN 27.18
088104 VO 22210 Customer Refunds 27.18 D
232771 CK 05/2312012 OFF007 OFFICETEAM 659.20
088427 VO 51700 Temporary Labor 659.20 D
232772 CK 0512312012 PAT001 PATTON'S SALES CORP 12247
088503 VO 61000 Materials&Supplies-Open. 122.47 D
232773 CK 05/23/2012 PRE028 PROPERTIES—PREFERRED GROUP 19A4
088067 VO 22210 Customer Refunds 19.44 D
232774 CK 05/23/2012 PR1031 PRIETO—EDWARD 6299
088464 VO 22210 Customer Refunds 62.99 D
232775 CK 05123/2012 REE017 RELATION,LLC—REEB GOVERNMENT 5,400.00
088476 VO 74210 Legislative Consultants 5,400.00 D
232776 CK 05/23/2012 RON005 RONEY—BUFFY 23.04
088462 VO 22210 Customer Refunds 23.04 D
232777 CK 05/23/2012 R00001 ROQUET PAVING 8,559.65
088481 VO 62000 Maintenance 8,559.65 D
232778 CK 05/23/2012 R00008 ROUTE 66 RENDEZVOUS 80.00
088489 VO 77600 Public Education/Outreach 80.00 D
232779 CK 05/23/2012 RRT001 R&R TIRE SERVICE 423.89
088445 VO 71725 Vehicle Repairs/Maintenance 423.89 D
232780 CK 05/23/2012 RYA001 FLOW SOLUTIONS—RYAN HERCO 110.48
088437 VO 61010 Materials&Supplies-Maint. 110.48 D
232781 CK 05/23/2012 SAF005 COMPANY—SAFETY COMPLIANCE 200.00
088417 VO 74400 Safety Consultants 200.00 D
232782 CK 05/2312012 SAL053 OSCAR SALAZAR 57.50
088426 VO 22210 Customer Refunds 57.50 D
232783 CK 05/23/2012 SAL054 RONALD ADHEMAR SALGADO 48.07
Dare. n i u 0 6. 12 F'cf\/olln_.W�4n.r);Str R.00 AP"�qK(s rage oor 1-
M1. t
"""'" tk Register EVWD Check Register _ _a)
User Kpiu
Y Company EVWO
Check Nbr Tvoe Date Id Name ProiectlD Protect Description Discount O npocAmt DrCr
088105 VO 22210 Customer Refunds 48.07 D
232784 CK 0 5112'1120 12 SAid007 SAN BDNO PUBLIC EMPLOYEES ASSN 722.07
088434 VO 23170 11-on Dues
i(Lil 7 L,
232785 CK 0523/2012 SAN038 SAN BERNARDINO COUNTY RECORDER 99.00
088428 VO 22218 Lien Release Fee Pavable 99.00 D
232786 CK 0 512 312 01 2 SAU020 JEFFERY SAUERWEIN 11.66
088106 VO 22210 Customer Refunds 11.66 D
232787 CK 05/23/2012 SEE003 SEEBER—CRISTINE 200.00
088467 VO 22210 Customer Refunds 200.00 D
232788 CK 05/23/2012 SEN001 SENTRY-TECH SYSTEMS,L.L.C. 1,475.00
088405 VO 72500 Security Services 1,475.00 D
232789 CK 05/23/2012 SHA025 CYNTHIA SHAIKH 14.31
088107 VO 22210 Customer Refunds 14.31 D
232790 CK 05/23/2012 SKY004 EQUiTiES—SKYLINE VISTA 53.69
088470 VO 22210 Customer Refunds 53.69 D
232791 CK 0512312012 S00002 SO CAL GAS COMPANY 92.43
088490 VO 71010 Utilities 92.43 D
232792 CK 0 5/2 312 01 2 S00005 SOUTH COAST A.Q.M.D. 227.76
088409 VO 77500 Regulatory Fees 113.88 D
088,110 VO 77500 Regulatory Fees 113.88 D
232793 CK 0523!2012 SSC001 SSC CONSTRUCTION, INC. 293,48635
088430 AD 22275 Retention Payable -32,609.60 C
088429 VO 11200 Construction in Progress WA002292 Plant 134 Upgrade 326,095.95 D
232794 CK 05/23/2012 STA041 STAR AUTO PARTS 26.37
088413 VO 71727 Garage Supplies/Small Tools 8.95 D
088414 VO 71720 Vehicle Parts/Supply 13.11 D
088443 VO 71727 Garage Supplies/Small Tools 4.31 D
232795 CK 05/23/2012 STA055 STATE DISBURSEMENT UNIT 3,751.27
088435 VO 23190 Miscellaneous Deductions 2,342.77 D
088436 VO 23190 Miscellaneous Deductions 1,408.50 D
232796 CK 0512312012 SWRO01 SWRCB 466.00
Page. 6 of 18
Date Wednesday,June 06,2012 East Valley Water District Report. A CHK.r 1
rme. 01,31pm Check Register-EVWD Check Register p
User KATHY
Company E\/WD
Check No Type Date Id Name ProiecllD Proiecl Descdotion Discount OrigDocAmt DrCr
088505 VO 11200 Construction in Progress WA002487 PLT151 TO PLT40 PIPELINE DES 466.00 D
232797 CK 05123/2012 TAF005 TAFOYA-ALFONSO 23.71
088108 VO 22210 Customer Refunds 23.71 D
232798 CK 05/23/2012 TAY013 KEN TAYLOR 90.00
088497 VO 77400 Licenses and Certifications 90.00 D
232799 CK 05/23/2012 TRA022 TRANS WEST TRUCK 301.35
088444 VO 71725 Vehicle Repairs/Maintenance 301.35 D
232800 CK 05123/2012 VER004 VERIZON CALIFORNIA 297.95
088491 VO 71010 Utilities 91.99 D
088491 VO 71015 Telephone 162.36 D
088498 VO 71015 Telephone 43.60 D
232801 CK 05/2312012 VUL001 VULCAN MATERIALS COMPANY 859.82
088502 VO 61000 Materials R Supplies-Oper. 859.82 D
232802 CK 0 5/2 312 01 2 WIL096 WILLDAN FINANCIAL SERVICES 920.00
088446 VO 74900 Miscellaneous Consultants 920.00 D
232803 CK 05/2312012 WJM001 W.J.MCKEEVER 2,150.00
088416 VO 11200 Construction in Progress WA002448 EASTWOOD FARMS MUTUAL WATER 2,150.00 D
232804 CK 05/2312012 W00004 WOODHOUSE-ERNIE 50.03
088473 VO 22210 Customer Refunds 50.03 D
232805 CK 05/30/2012 123002 KEY-123 HOME 74.14
088257 VO 22210 Customer Refunds 74.14 D
232806 CK 0 513 0/2 01 2 ABB004 ABBCO SERVICES, INC. 3,007.50
088529 VO 62000 Maintenance 3,007.50 D
232807 CK 05/30/2012 ADM002 ADMIRAL CONSULTING GROUP 370.00
088557 VO 71560 Computer System MaintContrac 370.00 D
232808 CK 05/30/2012 ADP004 ADP,INC 132.67
088530 VO 77300 Employee Programs 132.67 D
232809 CK 05/3012012 ALL049 ALLIANT CONSULTING,INC 1,616.00
088531 VO 11200 Construction in Progress WA002292 Plant 134 Upgrade 1,616.00 D
232810 CK 05/30/2012 ALT006 ALTISOURCE SOLUTIONS 288.16
Date: Wednesday.June 06.2012 Page 7of!d
1, „..,,,., East Valley Watar nlsrhht
Check Register-F'VWD Check Register ” ""'pt
Use- r 'Hr Go pany: EVWp
Check Nbr Type Date Id Name ProiectlD Protect Description Discount Ony_D_ocAmt DrCr
086243 Vn 22210 CUStpnler Refunds 288.16 D
232811 CK 0513012012 ARR032 ,ARROYOS-REYNALDO 38.52
088161 VO 222 10 Customer Refunds 38_52 D
232812 CK 05/30/2012 ATT007 AT&T 241.52
088548 VO 71015 Telephone 35.21 D
088599 VO 71015 Telephone 137.92 D
088550 VO 71015 Telephone 68.39 D
232813 CK 05/30/2012 AVA005 AVAYA FINANICIAL SERVICES 1.212.00
088551 VO 22503 LTD due within 1 year 922.51 D
088551 VO 85100 Interest Expense 289.49 D
232814 CK 05130/2012 BAR074 BARRY'S SECURITY SERVICES, INC 2,733.09
088552 VO 72500 Security Services 1,378.08 D
088553 VO 72500 Security Services 1,355.01 D
232815 CK 05130/2012 BON014 BONAFEDE-JACK 65.38
088258 VO 22210 Customer Refunds 65.38 D
232816 CK 05/3012012 BPRO02 GROUP LLC-BPR 38.06
088183 VO 22210 Customer Refunds 38.06 D
232817 CK 05130/2012 BRA059 BRADFORD-ROZALYNN 25.06
088244 VO 22210 Costumer Refunds 25.06 D
232818 CK 05130/2012 CAV003 CAVINESS-JOHN 62.63
088200 VO 22210 Customer Refunds 62.63 D
232819 CK 0513012012 CH.4115 CHAKMA-ARUNABHA 46.38
088188 VO 22210 Customer Refunds 46.38 D
232820 CK 05130/2012 CHA116 CHAVEZ-MARIA A TORRES 22.12
088245 VO 22210 Customer Refunds 22.12 D
232821 CK 05/30/2012 CHE007 CHEM-TECH INTERNATIONAL INC 5,256.61
088508 VO 65100 Treatment Chemicals 5,256.61 D
232822 CK 05/30/2012 CHH003 CHHAN-VALERIE 8121
088184 VO 22210 Customer Refunds 36.42 D
088449 VO 22210 Customer Refunds 46.79 D
232823 CK 05/30/2012 CH0003 CHOWDHURY-MUSSADDEQ 27.50
Date. Wednesday,June 06,2012 East Valle Water District Page 8 0118
. 01:31PM y Report. APCHICrpt
Time
Check Register-EVWD Check Register company_ EVWD
User KATHY
Check Nbr Type Date Id Name ProiectlD Proiect Description Discount OrigDocAmt DrCr
088181 VO 22210 Customer Refunds 27.50 D
232824 CK 05/30/2012 CON002 CONSOLIDATED ELECTRICAL DIST 49.01
088524 VO 71615 Building Repairs/Maintenance 49.01 D
232825 CK 05130/2012 DAN022 DANG-THOUNG 2684
088189 VO 22210 Customer Refunds 26.84 D
232826 CK 05/30/2012 DAV050 DAVIS-LINDA J 56.01
088450 VO 22210 Customer Refunds 56.01 D
232827 CK 05130/2012 DEGO06 MARY DEGEETER 46.79
088451 VO 22210 Customer Refunds 46.79 D
232828 CK 05/3012012 DEL072 VICTOR DELEON 61.15
088520 VO 77400 Licenses and Certifications 61.15 D
232829 CK 05130/2012 FAI002 FAIRVIEW FORD SALES,INC 105.21
088534 VO 71720 Vehice Parts/Supply 105.21 D
232830 CK 05/30/2012 GUS007 REALTORS-GUSHUE FAMILY 51.25
088246 VO 22210 Customer Refunds 51.25 D
232831 CK 05/3012012 HAP102 GROUP INC-HAPPY FINANCIAL 42.66
088259 VO 22210 Customer Refunds 42.66 D
232832 CK 05/30/2012 HAT001 HATFIELD BUICK 45.78
088558 VO 71720 Vehicle Parts/Supply 45.79 D
232833 CK 05/3012012 HEN004 HENDRICKSEN-JUSTINE 138.00
088532 VO 77100 Education/Seminars/Conference 138.00 D
232834 CK 05130/2012 HER149 HERNANDEZ-SAUL 7.75
088201 VO 22210 Customer Refunds 7.75 D
232835 CK 05/30/2012 HIG032 INFORMATION TECH-HIGHROAD 19772
088521 VO 74900 Miscellaneous Consultants 197.72 D
232836 CK 05130/2012 INT005 INTERSTATE BATTERY 209.81
088535 VO 71727 Garage Supplies/Small Tools 209.81 D
232837 CK 05/3012012 JAC038 JACK HENRY&ASSOCIATES INC 2,540.00
068554 VO 14420 Prepaid Expense 2,540.00 D
_o_ ..adn.ad. ,JUne.r6,2012 Page Soria
❑��4\h IL...111h�..�rli..��i..�
rock Register-EV D Check Register =epo.:: AIZ:11 .pl
llse. KATHY Company EVVJD
Check No Type Date Id Name ProiectlD Proiect Description Discount OngDocAmt DrCr
232838 CK 05/30/2012 JAC048 JACINTO FARMING, INC-LARRY 575.00
088509 VO 71705 Grounds Repairs/Maintenance 575.00 D
232839 CK 05130/2012 .10H042 P'WER SlYSIENIS 1 6.37 01
088536 VO 71755 Equipment Repairs/Maintenance 7,837.01 D
232840 CK 05/3012012 KEN020 RFAI_ FSTATF-KFN q_COTT 3;4.97
088247 VO 22210 Customer Refunds 369.85 D
088456 VO 22210 Customer Refunds 25.12 D
232841 CK 05130/2012 KH0001 KHUTH-SAMANTH 265.24
088203 VO 22210 Customer Refunds 130.36 D
088204 VO 22210 Customer Refunds 134.88 D
232842 CK 05/30/2012 KIN002 KING-ED 150.00
088522 VO 79100 Safety Equipment 150.00 D
232843 CK 05/30/2012 LAN024 CONSULTANTS-LAND ENGINEERING 9,325.00
088572 VO 11200 Construction in Progress WA002487 PLT151 TO PLT40 PIPELINE DES 8,484.00 D
088573 VO 11200 Construction in Progress WA002487 PLT151 TO PLT40 PIPELINE DES 841.00 D
232844 CK 05130/2012 LAW003 LAWSON PRODUCTS,INC 327.49
088559 VO 61000 Materials&Supplies-Oper. -1.67 192.88 D
088563 VO 61000 Materials&Supplies-Oper. -1.16 137.44 D
232845 CK 05;30;204.2 LE0037 LE-KHAI 23.91
088210 VO 22210 Customer Refunds 23.91 D
232846 CK 05/3012012 LEGO06 COLLIER DBA-KEITH 16,736.00
088525 VO 62000 Maintenance 16,736.00 D
232847 CK 05/3012012 LUC015 LUCERO-ROBIN 25.80
088190 VO 22210 Customer Refunds 25.80 D
232848 CK 05130/2012 MA1002 MAINTENANCE SOLUTIONS INC 4,316.74
088560 VO 71625 Janitorial Supplies 105.84 D
088565 VO 61000 Materials&Supplies-Oper. 4,210.90 D
232849 CK 05/30/2012 MAR209 MARQUEZ-SCOTT 88.51
088260 VO 22210 Customer Refunds 88.51 D
232850 CK 05/30/2012 MIL001 MILOBEDZKI-JACEK 800.00
088533 VO 74100 Computer Consultants 800.00 D
Dale: Wednesday,June 06,2012 Page: 10,418
Tnne 01 31PM East Valley Water District W Ro,.q APCHK.rpl
Check Register-EVD Check Register
User KATHY Company EVWD
Check Nbr Type Date to Name ProiectlD Proiect Description Discount OrigDocAmt DrCr
232851 CK 05/30/2012 MIL061 MILLER SPATIAL SERVICES, LLC 2,331.00
088567 VO 51700 Temporary Labor 2,331.00 D
232852 CK 05/3012012 MIS011 DEVELOPMENT-MISSION COUNTIES 31.79
088191 VO 22210 Customer Refunds 31.79 D
232853 CK 05/30/2012 MPP001 2010-3-MPP 82.86
088248 VO 22210 Customer Refunds 10.15 D
088461 VO 22210 Customer Refunds 72.71 D
232854 CK 05130/2012 MUR030 MURRAY-PATRICIA 61.14
088185 VO 22210 Customer Refunds 61.14 D
232855 CK 05/3012012 NAP007 NAPA AUTO PARTS/BOSS MOSS 36.64
088561 VO 71720 Vehicle Pads/Supply 36.64 D
232856 CK 05/30/2012 NAZ001 NAZCA SIGNS&DESIGNS 42.64
088526 VO 77600 Public Education/Outreach 42.64 D
232857 CK 0 513 0/2 01 2 NER006 NERI-GUADALUPE 2.26
088261 VO 22210 Customer Refunds 2.26 D
232858 CK 05/30/2012 NGU130 NGUYEN-XUAN 38.06
088213 VO 22210 Customer Refunds 38.06 D
232859 CK 05/3012012 NGU131 NGUYEN-TRANG THUY 1.92
088211 VO 22210 Customer Refunds 1.92 D
232860 CK 05/30/2012 NOR002 NORTH FORK WATER CO 76,173.37
088523 VO 61050 Water Stock Asses. 76,173.37 D
232861 CK 05/30/2012 ONL001 ONLINE RESOURCES CORPORATION 49.55
088555 VO 66250 Payment/Collection Fees 49.55 D
232862 CK 05/30/2012 OR0016 OROPEZA-CLAUDIA 2146
088249 VO 22210 Customer Refunds 23.46 D
232863 CK 05/30/2012 PAC005 PACIFIC COAST TOOL&SUPPLY 5,263.92
088537 VO 71755 Equipment Repairs/Maintenance 5,263.92 D
232864 CK 05/3012012 PAL035 PALOMARES-FRANK 2,331.00
088564 VO 51700 Temporary Labor 2,331.00 D
232865 CK 05130/2012 PEA005 PEARPOINT,INC 1,949.63
Dal.. vveonesuay.June 06.2012 rave I.
_....r.. Check Register-EVWD Check Register
UEer KATHY Company: EVWL
Check Nbr Type Date Id Name Pro iectlD Protect Description Discount OnaDocAmt DrCr
088566 VO 71725 Vehicle Repairs/Maintenance 1,949.63 D
232866 CK 05/30/2012 PER1i1 PEREZ-MONA 67.70
088214 V(J 2)210 1_7,tnrncr RefiJndc _7.70 D
232867 CK 05/30/2012 PRE028 PROPERTIES-PREFERRED GROUP 22.43
088262 VO 22210 Cngtnmer Rpfiyndc
<2.43 D
232868 CK 0 5/3 012 01 2 REE024 REES-DEBORAH 69,43
088192 VO 22210 Customer Refunds 69.43 D
232869 CK 0 5/3 012 01 2 RE1010 REICHERT-GARY 16.23
088216 VO 22210 Customer Refunds 16.23 D
232870 CK 05/3012012 REM012 ADVANTAGE-REMAX 77.42
088182 VO 22210 Customer Refunds 77.42 D
232871 CK 05/3012012 ROS056 LLC-ROSECOMP 64.34
088466 VO 22210 Customer Refunds 64.34 D
232872 CK 05/3012012 SAF005 COMPANY-SAFETY COMPLIANCE 200.00
088526 VO 74400 Safety Consultants 200.00 D
232873 CK 0513012012 SAN013.1 JAMES STEVEN SANTINI 763.75
068540 VO 11200 Construction in Progress WA002508 Wal-Mart Expansion 763.75 D
232874 CK 05130/2012 SAN265 SANCHEZ-MAGDA REY 46.54
088263 VO 22210 Customer Refunds 46.54 D
232875 CK 05/30/2012 SER023 SERNA-SUSANA 23.43
088193 VO 22210 Customer Refunds 23.43 D
232876 CK 05/30/2012 SOT023 SOTO-JULIE N 57.39
088186 VO 22210 Customer Refunds 57.39 D
232877 CK 05/30/2012 STA041 STAR AUTO PARTS 46.87
088538 VO 71720 Vehicle Parts/Supply 14.89 D
088539 VO 71755 Equipment Repairs/Maintenance 29.43 D
088562 VO 71727 Garage Supplies/Small Tools 2.55 D
232878 CK 05/30/2012 STY002 ENTERPRISES INC-STYNER 25.41
088218 VO 22210 Customer Refunds 25.41 D
232879 CK 05/30/2012 TET004 OPAI-TETTEH-DAVID 76.72
Date: Wednesday,June 06,2012 East Valley Water District Page. 14 0118
Tme: 01.31 PM Check Register-EVWD Check Register Revort. ppCHK rp�
User KATHY Company: EVWp
Check Nbr TVpe Date Id Name ProiectlD Project Description Discount OrigDocAmt DrCr
088250 VO 22210 Customer Refunds 76.72 D
232880 CK 05/30/2012 THE021 EMBROIDERY C—THE COMPUTERIZED 1,151.76
088527 VO 77300 Employee Programs 177.79 D
088574 VO 77300 Employee Programs 111.97 D
088575 VO 76800 Uniforms 662.00 D
232881 CK 05/30/2012 TOP001 TOP PRODUCERS REALTY&REO 87.46
088251 VO 22210 Customer Refunds 53.73 D
088253 VO 22210 Customer Refunds 33.73 D
232882 CK 05/30/2012 VER004 VERIZON CALIFORNIA 30.43
088556 VO 71015 Telephone 30.43 D
232883 CK 05/30/2012 WIR004 WIRZ&COMPANY PRINTING,INC 394.17
088519 VO 71500 Office Supplies 394.17 D
232884 CK 05/31/2012 HIG028 HIGHLAND STAR LLC 14,102.40
088601 VO 71950 Facilities Rent 9,040.00 D
088602 VO 71950 Facilities Rent 5,062.40 D
232885 CK 06/0612012 ADP002 ADP,INC 326.28
088595 VO 71200 Payroll Processing Service-ADP 326.28 D
232886 CK 06106/2012 ADVO01 ADVANCED TELEMETRY SYS INTL 1,600.00
088605 VO 62500 Maintenance Telemetry 1,600.00 D
232887 CK 06/0612012 ALVO62 ALVAREZ—BIANEY 42.92
088291 VO 22210 Customer Refunds 42.92 D
232888 CK 06/06/2012 AP0007 APODACA—MICHAEL 24.15
088292 VO 22210 Customer Refunds 24.15 D
232889 CK 06/0612012 ARRO09 ARROWHEAD UNITED WAY 45.00
088673 VO 23191 United Way Deduction 45.00 D
232890 CK 06/06/2012 ASS009 PS AMERICA, INC 18,095.00
088596 VO 11200 Construction in Progress WA002533 NEW DISTRICT OFFICES 18,095.00 D
232891 CK 06/06/2012 BAR074 BARRY'S SECURITY SERVICES,INC 2,733.09
088670 VO 72500 Security Services 1,355.01 D
088671 VO 72500 Security Services 1,378.08 D
232892 CK 06106/2012 BAR092 BARAJAS—ARNIE 42.21
Date: Wednesday,June 06,2012
*ime a•:3;nra Check Register EVvVD Check Register
✓ IHY
Ccmoanv: EVWD
Check Nbr Type Date Id Name ProiectlD Protect Description Discount OngF)or.Amt DrCr
088345 VO 22210 Customer Refunds 42.21 D
232893 CK 06/06/2012 BAT002 BATTEEN-JOHN W 3,92n.00
088660 VO 7?7 ,, _;uu;;Js'Ma,,.cnanua Contracts ,920,00 C
232894 CK 06/06/2012 BAX002 MARY BAXTER 476.16
088620 An 765n() uealth;nental lnsuronoc -73.84 C
088619 VO 76600 OPEB-Retiree Medical 550.00 D
232895 CK 06106/2012 BOA001 BOARD OF WATER COMMISSIONERS 255.96
088638 VO 22310 Sewer Trunk Charges 255.96 D
232896 CK 06/0612012 BR0001 BROWNING-JAMES 1,972.96
088611 AD 76500 Health/Dental Insurance -56.76 C
088613 AD 76500 Health/Dental Insurance -56.76 C
088616 AD 76500 Health/Dental Insurance -56.76 C
088623 AD 76500 Health/Dental Insurance -56.76 C
088610 VO 76600 OPEB-Retiree Medical 550.00 D
088612 VO 76600 OPEB-Retiree Medical 550.00 D
086615 VO 76600 OPEB-Retiree Medical 550.00 D
088622 VO 76600 OPEB-Retiree Medical 550.00 D
232897 CK 06/06/2012 BR0001 BRUNICK,MCELHANEY&BECKETT 9,237.50
088668 VO 11200 Construction in Progress WA002516 GREENSPOT RD&BRIDGE PROJECT 1,468.75 D
088668 VO 11200 Construction in Progress WA002533 NEW DISTRICT OFFICES 531.25 D
088668 VO 72400 Legal Fees 7,237.50 D
232898 CK 06/06/2012 BUR022 BURGESS MOVING&STORAGE 837.70
088618 VO 71910 Outside Storage Rental 837.70 D
232899 CK 06/06/2012 CAN032 LLC-CANTERBURY LOTS-68 72.84
088448 VO 22210 Customer Refunds 72.84 D
232900 CK 06/0612012 CHAT 17 CHAMP-TODD 52.35
088340 VO 22210 Customer Refunds 52.35 D
232901 CK 06/06/2012 COL047 COLONIAL LIFE,PREMIUM 285.86
088684 VO 23132 Life Insurance-Phoenix Hm Life 285.86 D
232902 CK 06/06/2012 COM019 COMMUNITY DEVELOPMENT 5,895.26
088597 VO 62100 Pennit Fees 5,895.26 D
232903 CK 06/06/2012 CON002 CONSOLIDATED ELECTRICAL DIST 48.17
088586 VO 61000 Materials&Supplies-Oper. 4817 D
Date: Wednesday,June 06,2012 ime Page: 14 of to
T : 01:31PM East Valley Water District Repon: APCHK rpt
Check Resister-EVWD Check Resister
User KATHY Company: EVWD
Check Nhr Type Date Id Name ProiectlD Project Description Discount OrioDocAmt DrCr
232904 CK 06/06/2012 CR0019 CROWN PRINTERS 263.52
088598 VO 71500 Office Supplies 263.52 D
232905 CK 06/06/2012 EAS003 East Valley Water District 1,038.63
088674 VO 23195 FSA Withholding 1,038.63 D
232906 CK 06/06/2012 ENVO05 ENVIROGEN TECHNOLOGIES, INC 46,702.97
088661 VO 65000 Contracted Treatment-Vendors 29,372.11 D
088662 VO 65000 Contracted Treatment-Vendors 5,901.59 D
088667 VO 65000 Contracted Treatment-Vendors 11,429.27 D
232907 CK 06/0612012 ESR001 ESRI 1,197.66
088607 VO 11200 Construction in Progress WA002374 GIS SYSTEM 1,197.66 D
232908 CK 06/06/2012 FAR002 FARRINGTON-STEVEN 550.00
088624 VO 76600 OPEB-Retiree Medical 550.00 D
232909 CK 06/06/2012 FOX001 FOX-JANA 364.65
088626 AD 76500 Health/Dental Insurance -35.35 C
088625 VO 76600 OPEB-Retiree Medical 400.00 D
232910 CK 06/06/2012 GIP002 GIPSON-JESSATHINA 12.92
088341 VC, 22210 Customer Refunds 12.92 D
232911 CK 06/06/2012 GRA003 GRANT-GORDON 1,650.00
088614 VO 76600 OPEB-Retiree Medical 550.00 0
088617 VO 76600 OPEB-Retiree Medical 550.00 D
088627 VO 76600 OPEB-Retiree Medical 550.00 D
232912 CK 0 6/0 612 01 2 GUN004 GUNN-MATTHEW 66.19
088342 VO 22210 Customer Refunds 66.19 D
232913 CK 06/06/2012 HAA001 HAAKER EQUIPMENT COMPANY 2,215.93
088637 VO 71720 Vehicle Parts/Supply 2,215.93 D
232914 CK 0610612012 HAR102 HARDING ENT-EDWARD 1,788.21
088334 VO 22210 Customer Refunds 1,741.21 D
088335 VO 22210 Customer Refunds 47.00 D
232915 CK 06106/2012 HIG021 HIGHLAND EQUIPMENT RENTAL 25.13
088639 VO 61000 Materials&Supplies-Oper. 25.13 D
232916 CK 06/06/2012 HS0001 HsuBu 550.00
oat. Wednesday. tune0g 2012 ,
_ Fact Valln�r VU +e,IllN.i-t ==ye ':,+1`
"" rtBDOrt: ..L I_HK_rel
Check Register-EVWD Check Register
Use, KATHY Company EVWD
Check Nbr Type Date Id Name ProiectlD Project Description Discount OngDocAmt DrCr
088666 VO 74950 Other Contracted Services 550.00 D
232917 CK 06,106,12012 1U13001 HUB CONSTRUCTION SPECIALTIES 770.66
088587 VO 61000 Materials&Sopones-Oper. -
7%fi.6F L%
232918 CK 06/06/2012 INL005 INLAND WATER WORKS SUPPLY CO 226.08
088679 VO 61000 Materials&Supplies-Oyer. —.,,,, 230.69 D
232919 CK 0 6/0 612 01 2 JAN005 JANEWAY—SYSYA 73.83
088455 VO 22210 Customer Refunds 73.83 D
232920 CK 06/06/2012 KAT001 KATZ LANDSCAPING 6,728.00
088608 VO 71700 Grounds Maintenance Contracts 6,728.00 D
232921 CK 06/06/2012 KEN018 KENNEDY—MICAH 200.00
088599 VO 77100 Education/Seminars/Conference 200.00 D
232922 CK 0610612012 KIN002 KING—ED 290.00
088600 VO 77100 Education/Seminars/Conference 290.00 D
232923 CK 06/0612012 LAN024 CONSULTANTS—LAND ENGINEERING 1,304.47
088581 VO 11200 Construction in Progress WA002487 PLT151 TO PLT40 PIPELINE DES 800.00 D
088582 VO 11200 Construction in Progress WA002515 Plant 24 Run to Waste 504.47 D
232924 CK 0 6/0 612 01 2 LAW003 LAWSON PRODUCTS,INC 224.25
088660 VO 61000 Materials&Supplies-Oyer. -1.95 226.20 D
232925 CK 06/0612012 LAW022 LAW—DEREK 57.09
088293 VO 22210 Customer Refunds 57.09 D
232926 CK 06106!2012 L10002 LIGHTHOUSE REAL ESTATE 60.60
088346 VO 22210 Customer Refunds 60.60 D
232927 CK 06/0612012 LUN010 LUNA—LORA 56.34
088347 VO 22210 Customer Refunds 56.34 D
232928 CK 06/06/2012 MAR149 MARLINK 864.00
088606 VO 79200 Disaster Emergency 864.00 D
232929 CK 06/0612012 MAT036 MATHIS—ROBERT W 4,075.00
088664 VO 74900 Miscellaneous Consultants 4,075.00 D
232930 CK 06/06/2012 MCM002 MCMASTER-CARR 49.88
088681 VO 61000 Materials&Supplies-Oper. -0.50 50.38 D
Page: 16 of 18
Date. Wednesday,June 06,2012 East Valley Water District Report: APCHK.rpt
Time 01:31PM Check Register-EVWD Check Register
User KATHY
Company EVWD
Check Nbr Tvpe Date Id Name ProiectlD Project Description Discount OrigDocAmt DrCr
232931 CK 06/06/2012 MET002 METROPOLITAN LIFE INS CO 326.88
088621 VO 23130 Life Insurance-Met Life 314.97 D
088621 VO 76500 Health/Dental Insurance 11.91 D
232932 CK 0 610 6/2 01 2 NAZ001 NAZCA SIGNS&DESIGNS 758.83
088586 VO 71615 Building Repairs I Maintenance 758.83 D
232933 CK 06/06/2012 NOR002 NORTH FORK WATER CO 65.00
088628 VO 61050 Water Stock Asses. 65.00 D
232934 CK 06/06/2012 OFF007 OFFICETEAM 65920
088583 VO 51700 Temporary Labor 659.20 D
232935 CK 06/06/2012 ONE009 PROPERTY MGMT—ONE STOP 68.88
088294 VO 22210 Customer Refunds 68.88 D
232936 CK 06/06/2012 PACO23 PACIFIC TREND PROP 69.99
088343 VO 22210 Customer Refunds 69.99 D
232937 CK 06/06/2012 PAT001 PATTON'S SALES CORP 73.00
088589 VO 61000 Materials&Supplies-Oper. 37.58 D
088682 VO 71727 Garage Supplies/Small Tools 35.42 D
232938 CK 06/06/2012 PCC001 CONNECTION—PC 1,981.73
088663 VO 990.85 D
088663 VO 11130 Office Equipment)Furniture 1,981.73 D
088663 VO 60950 Cost of Goods Variance Acct -990.85 D
232939 CK 0 610 6/2 01 2 PHA027 PHAN—HUNG THE 27.67
088336 V0 22210 Customer Refunds 27.67 D
232940 CK 06106/2012 PH0001 PHOENIX HOME LIFE 121.56
068629 VO 23132 Life Insurance-Phoenix Hm Life 121.56 D
232941 CK 06/06/2012 POR020 PORTILLO—SONIA 2.18
088337 VO 22210 Customer Refunds 2.18 D
232942 CK 06/06/2012 PUR005 PURCELL—MICHAEL 58.55
088344 VO 22210 Customer Refunds 58.55 D
232943 CK 06/06/2012 PVK001 PROPERTIES _LC—PVK 62.95
088465 VO 22210 Customer Refunds 62.95 D
Date: Wednestlay.June 06,2n12 ?age 7 of 18
East Valley Water Di;frirt
Check Register-EVW®Check Resister
KATHY v
ompanY: EMU
Check Nbr Type Date Id Name ProiectlD Project Description Discount OrigDocAmt DrCr
232944 CK 0610 6/2 01 2 REA002 REARDON-MICHAEL 293.77
088631 AD 76500 Health/Dental Insurance -33.48 C
088630 VO 16600 OPEB-Retiree Medical 327.25 D
232945 CK 06/06120i2 REC005 RECKARD JR-GALE D 49.63
088348 VO 22210 Customer Refunds 49.63 D
232946 CK 06/06/2012 SAN004 SAN BERNARDINO-CITY OF 560,506.57
088290 VO 64000 Contracted Treatment-City 560,506.57 D
232947 CK 06/06/2012 SAN007 SAN BDNO PUBLIC EMPLOYEES ASSN 712.82
088675 VO 23170 Union Dues 712.82 D
232948 CK 06/06/2012 SAN013 SANTINI-STEVE 400.00
088632 VO 76600 OPEB-Retiree Medical 400.00 D
232949 CK 06106/2012 SAN038 SAN BERNARDINO COUNTY RECORDER 594.00
088659 VO 22218 Lien Release Fee Payable 583.00 D
088659 VO 73100 Audit/Accounting Fees 11.00 D
232950 CK 0610,6/2012 SHA026 INVESTMENTS,LLC-SHARK 17.32
088338 VO 22210 Customer Refunds 17.32 D
232951 CK 06/06/2012 SIL036 SILVA-HELEN 23.55
088339 VO 22210 Customer Refunds - 23.55 D
232952 CK 0 6106/2 01 2 S00024 SOUTHERN CALIF OCCUPATIONAL 363.22
088672 VO 71540 Medical Fees 363.22 D
232953 CK 0 610 6/2 01 2 STA013 STAFFORD-FRED 476.16
088634 AD 76500 Health/Dental Insurance -73.84 0
088633 VO 76600 OPEB-Retiree Medical 550.00 D
232954 CK 06/06/2012 STA055 STATE DISBURSEMENT UNIT 3,751.27
088676 VO 23190 Miscellaneous Deductions 2,342.77 D
088677 VO 23190 Miscellaneous Deductions 1,408.50 D
232955 CK 06/0612012 ST0003 STURDIVAN-GARY 476.16
088636 AD 76500 Health/Dental Insurance -73.84 C
088635 VO 76600 OPEB-Retiree Medical 550.00 D
232956 CK 06106/2012 TOD002 TODD PETERS ELECTRICAL 150.00
088584 VO 71615 Building Repairs/Maintenance 150.00 D
Date. Wednesday.June 06.2012 East Valley Water District Page ,sm,e
Time: 01:31PM Reporc. APCHK rpt
Check Register-EVWD Check Resister
User KATHY
Company: EVWD
Check Nbr Type Date to Name ProiectlD Project Description Discount OrigDocAmt DrCr
232957 CK 06106/2012 TOM001 TOM DODSON&ASSOCIATES 536.90
088590 VO 11200 Construction in Progress WA002502 Plant 143 Fac Planing Study 536.90 D
232958 CK 0610612012 TWI002 IMAGES INK-TWISTED 1,430.32
088678 VO 53100 Uniforms 1,43032 D
232959 CK 06/06/2012 UNI021 UNITED SITE SERVICES 119.16
088585 VO 62000 Maintenance 119.18 D
232960 CK 06/06/2012 UT1001 UTILITY SUPPLY OF AMERICA 764.03
088683 VO 61000 Materials&Supplies-Oper. 349.74 D
088685 VO 61000 Materials&Supplies-Oper. 414.29 D
232961 CK 06/06/2012 VAL074 VALLEY OFFICE EQUIPMENT 199.06
088603 VO 71550 Office Equipment MaintContract 28.02 D
088604 VO 71550 Office Equipment MaintContract 171.04 D
232962 CK 06/06/2012 VER004 VERIZON CALIFORNIA 31.05
088665 VO 71015 Telephone 31.05 D
232963 CK 06/06/2012 VUL001 VULCAN MATERIALS COMPANY 2,610.10
088592 VO 11200 Construction in Progress WA002515 Plant 24 Run to Waste 1,304.96 D
088593 VO 11200 Construction in Progress WA002515 Plant 24 Run to Waste 1,305.14 D
232964 CK 06/06/2012 WESO41 SUPPLY CO-WEST COAST SAFETY 150.00
088609 VO 77100 Education/Seminars/Conference 150.00 D
232965 CK 06106/2012 WIL096 WILLDAN FINANCIAL SERVICES 1,800.00
088669 VO 74900 Miscellaneous Consultants 1,800.00 D
232966 CK 0610 6/2 01 2 WWG001 GRAINGER 18.95
088594 VO 71755 Equipment Repairs/MaintenancE 18.95 D
232967 CK 06/06/2012 ZEE001 ZEE MEDICAL INC. 47.70
088640 VO 71545 First Aid Suppllies 47.70 D
232968 CK 06/06/2012 AKDO01 DHINGRA DBA-ASHOK K. 15,255.90
088692 VO 74500 Engineering Consultants 9,440.00 D
088693 VO 74500 Engineering Consultants 5,815.90 D
Total 1,283,247.33
BOARD AGENDA STAFF REPORT
Meeting Date:June 13,2012
East Valley
Water District Public Hearing: 0
-------- Discussion Item:
Consent Item: O
May 30., 2012
TO: GOVERNING BOARD MEMBERS
FROM: GENERAL MANAGER/CEO
SUBJECT: EAST VALLEY WATER DISTRICT PLANT 143 IMPROVEMENT PROJECT
RECOMMENDATION:
Staff recommends that the Board of Directors adopt the Mitigated Negative Declaration for Plant
143.
BACKGROUND/ANALYSIS:
In recent years, Wells 143, 146, 146A and 147 have produced dissolved air that has entered the
distribution system. In most cases, the entrained air will dissipate and not become a nuisance.
Howcv,cr, during periods of high demand the air does not have enough time to dissipate,
resulting in high volumes of customer complaints.
To mitigate the dissolved air problem, a one million gallon break tank and booster station will be
constructed at Plant 143. The tank will serve as a break point for the wells, allowing the air to
dissipate before being pumped from the tank into the distribution system. Eliminating this
problem will allow staff to maximize well production as well as regulate flows from the facility
through the new booster station. The proposed project is located within the City of Highland on
Abbey Way south of Merris Street and east of Church Street. The construction of the new
facilities will be contained within the existing Plant 143 site.
In April 2012, the District commissioned an "Initial Study". The purpose of the study is to
comply with the California Environmental Quality Act (CEQA) to determine whether the project
would have a significant adverse effect on the environment. Results of the April study found that
there was no evidence of any adverse impact to the environment and therefore, a Mitigated
Negative: Declaration can be adopted.
Page d
SR#0105
AGENDA DATE: June, 13, 2012
SUBJECT: EVWD PLANT 143 IMPROVEMENT PROJECT
REVIEW BY OTHERS:
This agenda item has been reviewed by engineering staff.
FISCAL IMPACT:
There is no fiscal impact associated with this agenda item.
Respectfully submitted: Recomme ded by:
John Mu a Eliseo Ochoa
General Manager/Cio Engineering Manager
ATTACHMENTS
CEQA Mitigated Negative Declaration/Initial Study package.
Page 12
SR#0105
NOTICE OF DETERMINATION
To: Office of Planning and Research From: East Valley Water District
1400 Tenth Street, Room 121 3645 East Highland Avenue, Suite 18
Sacramento, CA 95814 Highland, CA 92346
and
San Bernardino County
C erk of the Board of Supervisors
385 N. Arrowhead Avenue, 2 n Floor
San Bernardino, CA 92415
Subject Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources
Code.
EAST VALLEY WATER DISTRICT
PLANT l<; PROJECT _
Project Title
SCH #2012041036 Mr. Eliseo Ochoa (909) 888-8986
State Clearinghouse Number Lead Agency Contact Person Area Code/Telephone/Extension
Project Location: The proposed project is located within the City of Highland. The project site is
generally located south of Merris Street and east of Church Street on Abbey Way.
Plant 143 is located in the Upper Pressure Zone and is located next to wells 143,
146, 146A, and 147. Well 143 has a production capacity of 1,500 gallons per
minute (gpm). Wells 146 and 146A are located northwest of well 143 near
Church Street and have production capacities of approximately 550 gpm and
1,500 gpm, respectively. Well 147 is located east of Well 143 and has a
production capacity of approximately 2,300 gpm.
Project Description: All of the well sites mentioned above are located in East Valley Water District's
(EVWD) Upper Pressure Zone and have a history of contributing dissolved air
into the distribution system. The purpose of the project is to mitigate excessive
dissolved air from EVWD's Upper Pressure Zone by aerating the water in a tank
at Plant 143 and in particular, Well 143.
In the 2008 EVWD Water Master Plan (WMP), the Plant 143 site was identified
and selected as the location for a 10 million gallon (MG) storage tank for the
Intermediate Pressure Zone and a booster pump station with a firm capacity of
6,500 gpm, and a backup capacity of 2,500 gpm. The WMP findings showed that
the 10 MG storage would be sufficient to balance the anticipated supplies in the
Lower and Immediate Pressure Zones at ultimate build out capacity. The pump
station is required to pump water from the Immediate Pressure Zone to the Upper
Pressure Zone.
The objectives of the project include (1) continued use of all wells at maximum
capacity; (2) decrease excessive dissolved air from wells 143, 146, 146A, and
147, and (3) additional water storage capacity to meet Master Plan design
requirements.
NOTICE OF DETERMINATION, Page 2
This is to advise that the East Valley Water District has approved the above described project on
■ Lead Agency ❑ Responsible Agency
and has made the following determination regarding the above described project:
(Date)
1. The project [❑ will ■ will not] have a significant effect on the environment.
2. ❑ An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA.
■ A Mitigated Negative Declaration was prepared for this project pursuant to the provisions of CEQA.
3. Mitigation measures [■ were ❑ were not] made a condition of the approval of the project and a
Mitigation Monitoring and Reporting Plan was adopted.
4. A Statement of Overriding Considerations [❑ was ■ was not) adopted for this project.
This is to certify that the Mitigated Negative Declaration/Initial Study and record of project approval is
available to the general public at:
East Valley Water District 3645 East Highland Avenue Ste. 18 Highland, CA 92346
Signature Title Date
EAST VALLEY WATER DISTRICT
MITIGATED NEGATIVE DECLARATION
Lead Agency: East Valley Water District Contact: Eliseo Ochoa
3645 East Highland Avenue, Suite 18 Phone: (909) 888-8986
Highland, CA 92346 Email: eochoa(a)evwd.org
Project Title: EAST VALLEY WATER DISTRICT
PLANT 143 IMPROVEMENT PROJECT
State Clearinghouse Number: SCH#2012041036
Project Location
and Setting: The proposed project is located within the City of Highland. The project site is
generally located south of Merris Street and east of Church Street on Abbey
Way. Plant 143 is located in the Upper Pressure Zone and is located next to
wells 143, 146, 146A, and 147. Well 143 has a production capacity of 1,500
gallons per minute (gpm). Wells 146 and 146A are located northwest of well
143 near Church Street and have production capacities of approximately
550 gpm and 1,500 gpm, respectively. Well 147 is located east of Well 143
and has a production capacity of approximately 2,300 gpm.
Project Description: All of the well sites mentioned above are located in East Valley Water District's
(EVWD) Upper Pressure Zone and have a history of contributing dissolved air
into the distribution system. The purpose of the project is to mitigate excessive
dissolved air from EVWD's Upper Pressure Zone by aerating the water in a
tank at Plant 143 and in particular, Well 143.
In the 2008 EVWD Water Master Plan (WMP), the Plant 143 site was identified
and selected as the location for a 10 million gallon (MG) storage tank for the
Intermediate Pressure Zone and a booster pump station with a firm capacity of
6,500 gpm, and a backup capacity of 2,500 gpm. The WMP findings showed
that the 10 MG storage would be sufficient to balance the anticipated supplies
in the Lower and Immediate Pressure Zones at ultimate build out capacity. The
pump station is required to pump water from the Immediate Pressure Zone to
the Upper Pressure Zone.
The objectives of the project include (1) continued use of all wells at maximum
capacity, (2) decrease excessive dissolved air from wells 143, 146, 146A, and
147; and (3) additional water storage capacity to meet Master Plan design
requirements.
Draft Mitigated Negative Declaration, page 2 of 2
Finding: East Valley Water District's decision to implement this proposed expansion
project is a discretionary decision or "project" that requires evaluation under the
California Environmental Quality Act (CEQA). Based on the information in the
project Initial Study, the East Valley Water District has made a preliminary
determination that a Mitigated Negative Declaration will be the appropriate
environmental determination for this project to comply with CEQA.
Initial Study: Copies of the Initial Study are available for public review at the East Valley
Water District office at 3654 East Highland Avenue, Suite 18, Highland, CA
92346. The public review period for the Initial Study began on April 13, 2012
and closed on May 14, 2012.
Mitigation Measures: All mitigation measures identified in the Initial Study are proposed for adoption
as conditions of the project and will be implemented through a mitigation
monitoring and reporting program if the Mitigated Negative Declaration is
adopted.
�AMI,P/ S/3o /IZ
ihP?/I mac, /
Signature Title Date CCC
TOM DODSON & ASSOCIATES
2150 N. ARROWHEAD AVENUE
SAN BERNARDINO, CA 92405 .
TEL(909) 882-3612 • FAX (909) 882-7015 ` I
E-MAIL tda@tdaenv.com
MEMORANDUM
May 29, 2012
From: Tom Dodson
To: Mr. Eliseo Ochoa
Subj: Completion of the Mitigated Negative Declaration for the EVWD Plant 143
Improvement Project
The East Valley Water District (District) received three written comments on the
proposed Mitigated Negative Declaration (MND) for the EVWD Plant 143
Improvement Project. CEQA requires a Negative Declaration to consist of the
Initial Study, copies of the comments, any responses to comments as compiled on
the following pages; and any other project related material prepared to address
issues evaluated in the Initial Study.
For this project, the original Initial Study will be utilized as one component of the
Final Negative Declaration package. The attached responses to comments,
combined with the Initial Study and the Mitigation Monitoring and Reporting
Program, constitute the Final MND package that will be used by the District to
consider the environmental effects of implementing the proposed project. The
following parties submitted comments. These letters are addressed in the
attached Responses to Comments:
1 . State Office of Planning and Research, State Clearinghouse
2. Native American Heritage Commission
3. California Department of Public Health
Because mitigation measures are required for this project to reduce potentially
significant impacts to a less than significant level, the Mitigation Monitoring and
Reporting Program (MMRP) provided as an attachment is required to be adopted
as part of this Final MND package. Tom Dodson will be attending the District
public meeting on June 13, 2012 on this project to address any questions that the
Board members or other parties may have regarding the adoption of the Mitigated
Negative Declaration for the proposed project.
Do not hesitate=_ to give me a call if you have any questions regarding the contents
of this package.
Tom Dodson
Attachments
COMMENT LLTrER #1
A71 OF CALIFORN72i',
<t�4 ai PL,tyyiyCy,
ti tl
I,
GO1rDP.1 x ,�, OFFICE of PLANNING AND RLs&kRCH �4
0LLARINCH0USE ANI:P:ANNING UN-'T
EDMIJNP G,uttOWA It- NSA Ab6>.
Otk=iN
crnec.wo,
May 15, 2012
Elisco Ochoa
East Valley Water District
3654 E.Highland Avenue,Suite Ig
Highland.CA 92346
Subject: Plant 143 Improvement Project
SCHk: 2012041036
Dear Elisco Ochoa:
The State Clearinghouse submitted the above named Mitigated Negative Declaration to selected state
agencies for review. On the enclosed Document Details Report please note that the Clearinghouse has
listed the state agencies that reviewed your document. The review period closed on May 14,2012,and the
comments from the responding agency(ies)is(are)enclosed. If this comment package is not in order,
please notify the State Clearinghouse immediately. Please refer to the project's ten-digit State
Clearinghouse number in future correspondence so that we may respond promptly,
Please note that Section 21104(c)of the California Public Resources Code states that:
1-1
"A responsible or other public agency shall only make substantive comments regarding those
activities involved in a project which are within an area of expertise of the agency or which are
required to be carried out or approved by the agency. Those comments shall be supported by
specific documentation."
These comments are forwarded for use in preparing your final environmental document. Should you need
more information or clarification of the enclosed comments,we recommend that you contact the
commenting agency directly.
This letter acknowledges that you have complied with the State Clearinghouse review requirements for
draft environmental documents,pursuant to the California Environmental Quality Act. Please contact the
State Clearinghouse at(916)445-0613 if you have any questions regarding the environmental review
process.
S"Inc/e�_re,.l���
Scott Morgan
Director, State Clearinghouse
Enclosures
cc: Resources Agency
14GB':OY,SIie°i ..?.ii�z3"_? Sa[ranleatq�aiiiorria °:i;�.'.nv
RESPONSES TO COMMENTS
LETTER #1
OFFICE OF PLANNING AND RESEARCH, STATE CLEARINGHOUSE
1 1 This is an acknowledgment letter verifying that the State Clearinghouse
submitted the Initial Study and proposed Mitigated Negative Declaration to
selected state agencies for review, and tnat two state agencies submitted
comments through the Clearinghouse by the close of the review period,
which occurred on May 14, 2012. The State assigned this project the
following tracking number,SCH#2012041036. This letter is for information
only and does not require additional formal response.
Document Details Report
State Clearinghouse Data Base
SCH# 2012041036
Project Title Plant 143 Improvement Project
Lead Agency East Valley Water District
Type MND Mitigated Negative Dedaration
Description The proposed project is located within the City of Highland. The project site is generally located south
of Merris Street and east of Church Street on Abbey Way. Plant 143 is located in the Upper Pressure
Zone and is located next to wells 143. 146, 146A,and 147. Al.of the well sites mentioned above are
located In East Valley Water Districts(EVWD)Upper Pressure Zone and have a history of contributing
dissolved air into the distribution system. The purpose of the project is to mitigate excessive dissolved
air from EVWD's Upper Pressure Zone by aerating the water in tank at Plant 143 and In particular,
Well 143. The objectives of the project include 1)continued use of alp wells at maximum capacity;2)
decrease excessive dissolved air from wells 143, 146, 146A, and 147; and 3)additional water storage
capacity to meet Master Plan design requirements.
Lead Agency Contact
Name EliseD Ochoa
Agency East Valley Water District
Phone (909)88 8-8986 Fax
email
Address 3654 E. Highland Avenue,Suite 18
City Highland State CA Zip 92346
Project Location
County San Bernardino
City San Bernardino
Region
Latl Long 34°T50"N 1 117° 15'7 1"W
Cross Streets Merris Street i Church Street 1 Abbey Way
Parcel No.
Township 1S Range 3W Section 2 Base SSB&M
Proximity to:
Highways No
Airports San Bernardino int'I
Railways No
Waterways Santa Ana River
Schools Yes
Land Use
Project Issues AestheGClVisual;Air Quality;ArcbaeoiogicmHisloric;Biological Resources; DrainageiAbsorption; Flood
Plain/Flooding;GeologWSeismic;Noise;Population/Housing Balance; Public Services;Soil
ErosionlCompaction/Grading;Solid Waste;ToxidHazardous;TrafficiCirculation;Vegetation;Water
Quality;Water Supply;Wildlife;Growth Inducing;Landuse;Cumulative Effects
Reviewing Resources Agency; Department of Fish and Game.Region 6;Office of Historic Preservation;
Agencies Department of Parks and Recreation;Department of Water Resources; Caltrans,Division of
Aeronautics;Caltrans District 8; CA Department of Public Health;State Water Resources Control
Board. D'wison of Financial Assistance; Regional Water Quality Control Board, Region 8;Native
American Heritage Commission
Dale Received 04/13/2012 Start o1 Revlew 04;13/2012 End of Review 0511412012
Note, Blanks in data fields result from insufficient information provided by lead agency.
COMNEW LETTER #2
5WJE OF,C.640oANtP,_ - -- -._ .........._ --, Etlmuut3 G,.9;gqn.-.�c..fin_-verntzr
NATIVE AMERICAN HERITAGE COMMISSION
915 CA.PrTOL MALL,RODM 364 \.
SACRAMENTD,GA 95614 \ \ f IMP
(916)6536261
F11(216)657-53i10 ! \ n•
�(
WsD 5 to wwa.rurnccn.9oe
dt_narcCvP9cb9J.no! � �, ;_......_.._..-
April 30, 2012 -
Mr. F,lseo Ochoa
East YaRey Water District sTAI E
G lOUSE�
3654 East Highland Avenue, Suite 18
Highland, CA 92346
1 Re: SCH#2012041036_CEQA Notice of Com-gletion,-pr000sed Mitigated_Negative
Decllaration for the for the "East Valley_Water District Plant No. 143 Improvements
Pro pct ' located near San Bernardino San Bernardino County. Calitorrna.
Dear W Cchoa:
The Native American Heritage Commission (NAHC), the State of California
'Trustee Agency' for the protection and preservation of Native American cultural resources
pursuant to California Public Resources Code §21070 and affirmed by the Third Appellate Court
in the case of EPIC v. Johnson (1985: 170 Cal App. 31d 604).
2-1 This letter includes state and federal statutes relating to Native American
historic properties of religious and cultural significance tc American Indian tribes and interested
Native American individuals as 'consulting parties' under both state and federal law. State law
also addresses the freedom of Native American Religious Expression in Public Resources Code
§509 9.
The California Environmental Quality Act(CEQA- CA Public Resources Code
21000-21177, amendments effective 3/1812010) requires that any project that causes a
substantial adverse change in the significance of an historical resource, that includes
archaeological resources, is a 'significant effect' requiring the preparation of an Environmental
mpact Repcn (EIR) per the CEQA Guidelines defines a significant impact on the environment
as 'a suostantial, or potenraiiy substantial, adverse change in any of physical conditions within
r=a le4,tGd b the p opus,,d N Jja, , in udittg . ob;ect,� or historic 0.r aestht;tir
9!gr1:i7G8nG° In ofrier iv ;erriply with th:z, �)rOvision. the 4sad agency 's required to assess
>/; Fiirtrar (lrq grn)ee'will h?vF an ariYergP impact nn th+?SEI fP..sourrr3c within the 'area of ipotenLal
eftect (APE), and if so, to mitigate that effect. The NAHC did not conduct a Sacred Lands File
(S_�� search within fhe'erea o`potential effect (APE) due to the absence of the United Stated
2-2 nlri,,i.^al Serviop (USGS) coordinates.
The NAHC "Sacred Sites,' as defined by the Native Americas HeciEagt Comnrssion and
the California Legislature in Califomia Puono Reseur s ^ode "u
!tams in the NAHC Sacred Lands Inventory ore rrnunPntia` and exern;' rn ; ,br
Rtv.) 1 5 Act Nu!'su2nl to CJaiifof le. Govei fitment Code ,62:•4 (r).
Early consultation with Native American tribes in your area is the bps' ^r„ ,r,.
unanticipated discoveries of cultural resources or burial Sites Once a project is underway.
(_ i!-L-?Ily aff hated i6b— and !!o ri_rgi.. -..1� f7aYC: .° v.-,.+.Ejt. 11C, r 4 -,1
signifcance of the historic properties in the project aroma fe g AOr71, (A+e
make contact with the list of Native American Corliacts on the atachcd list 17 iV;3ti',B nm
RESPONSES TO COMMENTS
LETTER #2
NATIVE AMERICAN HERITAGE COMMISSION
2-1 Your comment is noted and will be made available to the District Board
prior to a decision on the proposed project.
2-2 Your comment is noted and will be made available to the District Board
prior to a decision on the proposed project. Early consultation with local
Native American tribes was completed prior to release of the Initial Study.
No specific Native American resource issues were identified as a result of
this consultation. It is not clear why the NAHC was unable to conduct a
Sacred Lands File search. The Notice of Completion had both the longitude
and latitude coordinates and the section, township and range information.
Further, Appendix 3 contained a detailed cultural resources report,
including the referenced consultation letters with Native American tribes in
the region. No tribal resource issues were identified in Appendix 3.
contacts, to see if your proposed project might impact Native American cultural resources and to
Obtain their recommendations concerning the proposed project. Pursuant to CA Public
Resources Code § 5097.95.. the NAHC requests cooperation from other public agencies in order
2-2 that the Native Amercan consulting parties be provided pertinent project information.
cont'. Consultation with Native American communities is also a matter of environmental justice as
defined by California Government Code §65040.12(e). Pursuant to CA Public Resources Code
§5097.95, the NAHC requests that pertinent project information be provided consulting tribal
parties. The NAHC recommends avoidance as defined by CEQA Guidelines §15370(a) to
pursuing a project that would damage or destroy Native American cultural resources and
Section 218:3.2 that requires documentation, data recovery of cultural resources.
y Furthermore. the NAHC if the proposed project is under the jurisdiction of the statutes
and regulations of the National Environmental Policy Act(e.g. NEPA 42 U.S.C. 4321-43351).
Consultation with tribes and interested Native American consulting parties, on the NAHC list,
should be conducted in compliance with the requirements of federal NEPA and Section 106 and
4(0 o°federal NHPA (16 U.S.C. 470 et seq). 36 CFR Part 600.3 (f) (2) & .5, the President's
Council on Environmental Quality (CSQ, 42 U.S.0 4371 et seq. and NAGPRA (25 U.S.C. 3001-
30131 as appropriate. The 1992 Secretary of the Interiors Standards for the Treatment&2-3 Historic Properties were revised so that they could be applied to all historic resource types
included in the National Register of Historic Places and including cultural landscapes. Also
federal Executive Orders Nos. 11593 (preservation of cultural environment), 13175
(coordination& consultation) and 13007 (Sacred Sites) are helpful, supportive guides for
Section 106 consultation The aforementioned Secretary of the Interior's Standards include
recommendations for all 'lead agencies' to consider the historic context of proposed projects
and to "research" the cultural_landscape that might include the 'area of potential effect-'
Confidentiality of"historic properties of religious and cultural significance" should also be
considered as protected by California Government Code §6254( r) and may also be protected
under Sactlon 3304 0`he NHPA or at the Secretary of the Interior discretion if not eligible for
2-4 iistinv or. the National Register of Historic Places. The Secretary may also be advised by the
federal Indian Religious Freedom Act (cf. 42 U.S.C., 1996) in issuing a decision on whether or
no*tc disclose items of religious and/or cultural significance identified in or near the APES and
possibility threatened by proposed project activity.
Furthermore, Public Resources Code Section 5097.98.. California Government Code
L x Saf ery Cade Section 7050.5 provide for provisions for inadvertent
2-5 Lf-I , nur w a ns wiciate the processes to be followed in the event of a discovery
man remains in a project location other than a 'dedicated cemetery'.
To b 'effective, consultation on specific projects must be the result of an ongoing
[-- a ionship between Native American tribes and lead agencies, project proponents and their
-6 `e c;nini_n of the NAHC. Regarding tribai consultation, a relationship built
ar r;,e.�rn� sn� informal iovcivement with local tribes will lead to more qualitative
ultation ribal input on specific projects.
Finally, when Native American cultural sites and/or Native American burial sites are
2-7 prevaent within the project site, the NAHC recommends 'avoidance' of the site as referenced by
CEQA Guidelines Section 15370(a).
2-3 Your comment is noted and will be made available to the District Board
prior to a decision on the proposed project. Consultation as outlined in this
comment was completed prior to release of the Initial Study. The
consultation did not identify any unique Native American resources within
the project area.
2-4 Confidentiality regarding cultural resources has been maintained
throughout the review process for this project.
2-5 Mitigation measure 5-1 addresses the accidental discovery of subsurface
cultural resources and the Initial Study acknowledges the requirement to
initiate consultation if human remains are encountered,
2-6 Your comment is noted and will be made available to the District Board
prior to a decision on the proposed project. The District maintains an
ongoing relationship with the San Manuel Band of Mission Indians as
suggested in this comment.
2-7 Your comment is noted and will be made available to the District Board
prior to a decision on the proposed project. The Plant 143 site is a District
developed and maintained water facility and any potential to encounter
Native American cultural or burial sites is extremely low. Regardless,
mitigation has been identified to address the potential to encounter
unknown subsurface cultural resources.
! MJ'Y-2{-2012 13:11; STATE CLEARINGHOUSE ?.006
I 1
µ�ti
iyou have any questi s about this response to your request, please do not hesitate to
ntact eat(916)
Sin rely,
in letor
Program Analy
Cc: State C
I
i
Attachment! Native American Contact List
3
COnYMNT LF= #3
State of California—Health and Human, Services Agency
California Department of Public Health
RON CHAPMAN,MD,MPH � -``Ii- EDMUND G.BROWN JR.
�KPJO/ � '
� tiPh � P Zp1r.
April 20. 2012 •STn E C E aiN; ;1p�rc_
East Valley Water District
Eiiseo Ochoa
3645 East Highland Avenue, Suite 18
Highland, CA 92346
RE. EAST VALLEY WATER DISTRICT PLANT 143 IMPROVEMENT PROJECT-
SCH# NOT ASSIGNED YET
Dear Ms. Ochoa.
The California Department of Public Health (CDPH), Environmental Review Unit (ERU)
is in receipt of the Mitigated Negative Declaration for the above project. The CDPH,
Division of Drinking Water and Environmental Management is responsible for issuing
water supply permits administered under the Safe Drinking Water Program and will
3-1 need to issue a new or amended Water Supply Permit for the above referenced project.
A project triggers a permit if it includes changes to the water supply, storage, treatment
of drinking water, or consolidation of one or more public water systems. CDPH will be a
"responsible agency' pursuant to the California Environmental Quality Act (CEQA) and
considers the above referenced document as adequate to meet the CDPH CEQA
permit requirements.
The well sites in East Valley Water District's (EVWD) Upper Pressure Zone have a
history of contributing dissolved air into the distribution system. The purpose of the
project is to mitigate excessive dissolved air from EVWD's Upper Pressure Zone by
aerating the water in a tank at Plant 143 and in particular, Well 143 The project involves
the installation of a 10 million gallon (MG) storage tank for the Intermediate Pressure
Zone and the installation of a booster pump station with a firm capacity of 6,500 gpm,
and a backup capacity of 2,500 gpm. The 2008 EVWD Water Master Plan findings
3-2 showed that the 10 MG storage would be sufficient to balance the anticipated supplies
in the Lower and Immediate Pressure Zones at ultimate build out capacity. The pump
station is required to pump water from the Immediate Pressure Zone to the Upper
Pressure Zone. The objectives of the project include (1) continued use of all wells at
maximum capacity, (2) decrease excessive dissolved air from wells 143, 146, 146A,
and 147, and (3) additional water storage capacity to meet Master Plan design
requirements.
Division of Drinking Water and Environmental Management
P.D. Box 9973'7. MIS 7400. 1:16 Capi;ot Avenue. 2''' Fioo�, Sacramento, CA 95899?3?7
�916 j 449-5577 (916; 449-5575 Fax
RESPONSES TO COMMENTS
LETTER #3
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH
3-1 Your comment is noted and will be made available to the District Board
prior to a decision on the proposed project.
3-2 Your comment is noted and is hereby incorporated into the Final Mitigated
Negative Declaration (MND) package. This comment is an accurate
summary of the project the District proposes to implement.
When the review process has ended, please forward the following items with your
permit application to the CDPH San Bernardino District Office:
• Copy of the City Council Resolution/Minutes adopting and approving the
Mitigated Negative Declaration;
• Copy of the stamped Notice of Determination (NOD) filed at the San Bernardino
3-3 County Clerk's Office (Note: The NOD must be submitted to the State
Clearinghouse as well);
• Copy of the California Department of Fish and Game receipt issued by the San
Bernardino County Clerk's Office or State Clearinghouse'.
• Copies of any comment letters received locally or through the State
Clearinghouse.
Please contact Sean McCarthy at the San Bernardino District Office at (909) 383-4328,
for information on the water supply permit application process. If you have any
3-4 questions about this letter, please call me at (916) 445-2495 or email to
sara lowrvca)cdph.ca.gov.
Sincerely,
Sara Lowry
CDPH Environmental Review Unit
Cc: CDPH San Bernardino District Office
State Clearinghouse
3-3 Your comment is noted and will be made available to the District Board
prior to a decision on the proposed project. Copies of all requested
documentation will be forwarded to the Department when the CEQA review
process is completed.
3-4 Your comment is noted and will be made available to the District Board
prior to a decision on the proposed project.
EAST VALLEY WATER DISTRICT
PLANT 143 PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
Mitigation Measure Implementation Schedule Verification
Aesthetics
1-1 All above-ground structures shall be covered with neutral, non-reflective This measure shall be implemented when District field inspectors shall verify that future
coatings that blend with surrounding uses and color schemes, architectural coatings are applied to the above-ground structures are coated with
above-ground structures. neutral, non-reflective coatings at Plant 143.
Source Responsible Party Status/Date/Initials
Initial Study East Valley Water District(EVWD)
Mitigation Measure Implementation Schedule Verification
Aesthetics
1-2 All lighting shall be hooded and directionally focused so it does not spill This measure shall be implemented prior to District field inspectors shall verify that future
out onto adjacent light sensitive land uses. If complaints are received installing new night lighting at Plant 143. A lights at Plant 143 comply with the lighting
from adjacent property owners, the EVWD shall further control any spill of lighting plan shall demonstrate compliance design requirements of this measure. If
light to reduce light/glare on adjacent properties to an acceptable level with this measure and be implemented during complaints are received from adjacent
(typically 0.25 Lumen or less)or eliminate the light and glare at the light fixture installation. sensitive light receptors, the District shall
location. document how such complaint(s) are
managed.
Source Responsible Party Status/Date/Initials
_. Initial Study EVWD
Mitigation Measure r Implementation Schedule Verification
Air Quality
111-1 Using best available control measures during soil disturbance. The menu This measure shall be incorporated into the A copy of the construction contract shall be
of enhanced dust control measures includes the following: construction contract and implemented during retained in the project file. District field
construction. inspectors shall verify that the dust control
• Limit the disturbance"footprint"to as small an area as practical. measures are being implemented during
• Water all active construction areas at least twice daily. construction. Inspection notes verifying
Cover all off-site haul trucks or maintain at least 2 feet of freeboard. compliance shall be retained in the project file.
Pave or apply water up to four times daily to all unpaved parking or
staging areas.
• Sweep or wash any site access points within 30 minutes of any
visible dirt deposition on any public roadway.
• Cover or water twice daily any on-site stockpiles of debris, dirt or
other dusty material.
Suspend all operations on any unpaved surface if winds exceed 25
mph.
Source Responsible Party Status/Date/Initials
Initial Study EVWD
MMRP Table, Page 1
L-Aai i VALLEY WAT EK U!il F RiC r
PLANT 143 PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
Mitigation Measure Implementation Schedule Verification
Air Qua Quality
III-2 When feasible, limit allowable idling to 5 minutes for trucks and heavy These measures shall be incorporated into the A copy of the construction contract shall be
equipment before shutting the equipment down. construction contract and implemented during retained in the project file. District field
I construction. inspectors shall verifv that these measures are
III-3 Utilize equipment whose engines are equipped with diesel oxidation being implemented during construction.
catalysts if available. Inspection notes verifying compliance shall be
retained in the project file.
III-4 Utilize diesel particulate filter on heavy equipment where feasible,or
utilize Tier 3 rated diesel engines for large construction equipment.
III-5 Reservoir grading and pipeline installation during phases one and two
may not overlap.
III-6 Maximum area graded per day during phase three reservoir site grading
is limited to 0.50 acres per day.
III-7 Maximum area graded per day during phase three pipeline installation is
limited to 0.25 acres per day.
III-8 Mitigation required during phase three reservoir site grading and phase
three pipeline installation includes watering the site three times daily.
Source Responsible Party
Initial /Date/Initials
nitial Study EVWD
Mitigation Measure Implementation Schedule Verification
Cultural Resources
V-1 In the unlikely event cultural resources are encountered during This measure shall be incorporated into the A copy of the construction contract shall be
construction of these water facilities,activities in the immediate area of construction contract and implemented during retained in the project file. If cultural
the finds shall be halted and an onsite inspection shall be performed construction. resources are encountered, a report
immediately by a qualified archaeologist. This professional shall assess documenting all management actions taken
the find, determine its significance, and make recommendations for until the resources are properly curated shall
appropriate mitigation measures within the guidelines of the California be retained in the project file.
Environmental Quality Act and/or the federal National Environmental
Policy Act.
Source Responsible Party Status/Date/Initials
Initial Study EVWD
MMRP Table, Page 2
EAST VALLEY WATER DISTRICT
PLANT 143 PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
Mitigation Measure Implementation Schedule Verification
Cultural Resources
V-2 In the unlikely event paleontologic resources are encountered during This measure shall be incorporated into the A copy of the construction contract shall be
construction of these water facilities,activities in the immediate area of construction contract and implemented during retained in the project file. If paleontological
the finds shall be halted and an onsite inspection should be performed construction. resources are encountered, a report
immediately by a qualified paleontologist. This professional shall assess documenting all management actions taken
the find, determine its significance, and make recommendations for until the resources are properly curated shall
appropriate mitigation measures within the guidelines of the California be retained in the project file.
Environmental Quality Act and/or the federal National Environmental
Policy Act.
Source Responsible Party Status/Date/Initials
Initial Study EVWD
Mitigation Measure Implementation Schedule Verification
Geology and Soils
VI-1 Stored backfill material be covered with water resistant material during This measure shall be incorporated into the A copy of the construction contract shall be
periods of heavy precipitation to reduce the potential for rainfall erosion of construction contract and implemented during retained in the project file. District field
stored backfill material. If covering is not feasible,then measures such construction. inspectors shall verify that this measure is
as the use of straw bales or sand bags shall be used to capture and hold being implemented during construction.
eroded material on the project site for future cleanup. Inspection notes verifying compliance shall be
retained in the project file.
Source Responsible Party Status/Date/Initials
Initial Study EVWD
Mitigation Measure T Implementation Schedule Verification
Geology and Soils
VI-2 Excavated areas shall be properly backfilled and compacted. Paved This measure shall be incorporated into the A copy of the construction contract shall be
areas disturbed by this project will be repaved in such a manner that construction contract and implemented during retained in the project file. District field
roadways and other disturbed areas are returned to as near the pre- construction. inspectors shall verify that this measure is
project condition as is feasible. being implemented during construction.
Inspection notes verifying compliance shall be
retained in the project file.
Source Responsible Party Status/Date/Initials
_J
Initial Study EVWD
MMRP Table, Page 3
PLANT 143 PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
Mitigation Measure Implementation Schedule Verification
_ —
Geology and Soils T-
VI-3 Ail exposed, disturbed soil (trenches, stored backfiii, etc.)will be sprayed This measure shall be incorporated into the j A copy of the construction contract shall be
with water or soil binders twice a day or more frequently if fugitive dust is construction contract and implemented during retained in the project file. District field
observed migrating from the site within which the water facilities are being I construction. inspectors shall verify that this maagi irp Is
installed. being implemented during construction.
Inspection notes verifying compliance shall be
retained in the project file.
Source Responsible Party Status I Date I Initials
Initial Study EVWD
Mitigation Measure Implementation Schedule Verification
Geology and Soils
VI-4 The length of trench which can be left open at any given time will be This measure shall be incorporated into the A copy of the construction contract shall be
limited to that needed to reasonable perform construction activities. This construction contract and implemented during retained in the project file. District field
will serve to reduce the amount of backfill stored onsite at any given time. construction. inspectors shall verify that this measure is
being implemented during construction.
Inspection notes verifying compliance shall be
retained in the project file.
Source Responsible Party Status I Date I Initials
Initial Study EVWD
MMRP Table, Page 4
EAST VALLEY WATER DISTRICT
PLANT 143 PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
Mitigation Measure Implementation Schedule Verification
Hazards and Hazardous Materials
VIII-1 If petroleum products are accidentally released to the environment This measure shall be incorporated into the A copy of the construction contract shall be
during any phase of construction,the EVWD shall require the area or construction contract and implemented during retained in the project file. District field
contamination to be defined, shall require the removal of any construction. inspectors shall verity that this measure is
contaminated soil or material from the contaminated area; and ensure being implemented during construction.
that any area exposed to accidentally released contaminants are Inspection notes verifying compliance shall be
remediated to a threshold that meets regulatory requirements retained in the project file. A report
established by law or agencies overseeing the remediation. documenting final remediation shall be
prepared and retained in the project file.
Source Responsible Party Status/Date l Initials
Initial Study EVWD
Mitigation Measure Implementation Schedule Verification
Hazards and Hazardous Materials
VIII-2 A traffic management plan shall be prepared by EVWD or the This measure shall be incorporated into the A copy of the construction contract and traffic
contractor which includes measures to ensure emergency access to all construction contract and implemented during management plan shall be retained in the
properties that front on the roadways where the new pipeline will construction. project file. District field inspectors shall verify
be installed. This plan shall be reviewed and approved by the City that this measure is being implemented during
of Highland and coordinated with emergency responders for the construction. Inspection notes verifying
project area. compliance shall be retained in the project file.
Source Responsible Party Status/Date/Initials
Initial Study EVWD
MMRP Table, Page 5
PLANT 143 PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
Mitigation Measure Implementation Schedule verification
Hydrology and Water Quality f T
IX-1 DAVID shall require that the construction contractor prepare and This measure shall be incorporated into the A copy of the construction contract and
implement a Storm Water Pollution Prevention Plan (SWPPP)which construction contract and implemented during SWPPP shall be retained in the project file.
specifies Best Management Practices(BMPs)that will orevent all construction. nictrict fiPlri insnartnrc shall varifv fhnt this
construction pollutants from contacting stormwater and with the intent of measure is being implemented during
keeping all products of erosion from moving offsite into receiving waters. construction. Inspection notes verifying
The SWPPP shall include a Spill Prevention and Cleanup Plan that compliance shall be retained in the project file.
identifies the methods of containing, cleanup,transport and proper
disposal of hazardous chemicals or materials released during
construction activities that are compatible with applicable laws and
regulations. BMPs to be implemented in the SWPPP may include but not
be limited to:
• The use of silt fences;
• The use of temporary stormwater desilting or retention basins;
The use of water bars to reduce the velocity of stormwater runoff;
The use of wheel washers on construction equipment leaving the site
The washing or sweeping of silt from public roads at the access point
to the site to prevent the tracking of silt and other pollutants from the
site onto public roads.
The storage of excavated material shall be kept to the minimum
necessary to efficiently perform the construction activities required.
Fvr_.avated or stockpiled material shall not be stored in water courses
or other areas subject to the flow of surface water.
• Where feasible, stockpiled material shall be covered with water proof
material during rain events to control erosion of soil from the
stockpiles. -
Source Responsible Party Status/Date/Initials
Initial Study EVWD
MMRP Table, Page 6
EAST VALLEY WATER DISTRICT
PLANT 143 PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
Mitigation Measure Implementation Schedule Verification
Hydrology and Water Quality
IX-2 The District shall harden any facilities that must be protected and This measure shall be incorporated into the A copy of the construction contract shall be
operational after a major flood. This is a judgment decision that shall be construction contract and implemented during retained in the project file. District field
documented by the District prior to installing the proposed above ground. construction. inspectors shall verify that this measure is
being implemented during construction.
Inspection notes verifying compliance shall be
retained in the project file.
Source Responsible Party Status/Date/Initials
Initial Study EVWD
Mitigation Measure Implementation Schedule Verification
Noise
XII-1 EVWD shall require that construction activities be limited to the hours This measure shall be incorporated into the A copy of the construction contract shall be
from 7 a.m. to 7 p.m., Monday through Saturday. construction contract and implemented during retained in the project file. District field
construction. inspectors shall verify that this measure is
being implemented during construction.
Inspection notes verifying compliance shall be
retained in the project file.
Source Responsible Party Status 1 Date i Initials
Initial Study EVWD
Mitigation Measure Implementation Schedule Verification
Noise This measure shall be incorporated into the
XII-2 The EVWD will require construction staging areas to be as far from construction contract and implemented during A copy of the construction contract shall be
existing residences as possible. construction. retained in the project file. District field
inspectors shall verify that this measure is
being implemented during construction.
Inspection notes verifying compliance shall be
retained in the project file.
Source Responsible Party Status/Date/Initials
Initial Study EVWD
MMRP Table, Page 7
LA�i; Vi+LLL am? cri !!'J3 mil
PLANT 143 PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
Mitigation Measure I Implementation Schedule Verification
Noise _.... . _.._.. ....____
XII-3 The EVVVD will require that all construction equipment be operated with This measure shall be incorporated into the A copy of the construction contract shall be
mandated noise control equipment(mufflers or silencers). Enforcement construction contract and implemented during retained in the project file. District field
will be accomplished by random field inspections by District personnel construction. inspectors shall verify that this measure is
during construction activities to verify that noise control equipment is in being implemented during construction.
place and functioning. Inspection notes verifying compliance shall be
retained in the project file.
Source Responsible Party Status/Date/initials
Initial Study EVWD
Mitigation Measure Implementation Schedule Verification
Noise
XII-4 The EVWD will establish a noise complaint/response program and will This measure shall be incorporated into the A copy of the construction contract shall be
respond to any noise complaints received for this project by measuring construction contract and implemented during retained in the project file. District field
noise levels at the affected receptor. If the noise level exceeds an Ldn of construction, inspectors shall verify that this measure is
65 dBA exterior or an Ldn of 45 dBA interior at the receptor, the applicant being implemented during construction.
will implement adequate measures to reduce noise levels to the extent Inspection notes verifying compliance shall be
feasible, including scheduling specific construction activities to avoid retained in the project file.
conflict with adjacent sensitive receptors.
Source Responsible Party I Status/Date/Initials
Initial Study �— EVWD
Mitigation Measure Implementation Schedule Verification
Noise
XII-5 Pipeline construction shall be restricted to daylight hours, unless an This measure shall be incorporated into the A copy of the construction contract shall be
emergency exists. construction contract and implemented during retained in the project file. District field
construction. inspectors shall verify that this measure is
being implemented during construction.
Inspection notes verifying compliance shall be
retained in the project file.
Source Responsible Party Status I Date I Initials
Initial Study EVWD
MMRP Table, Page 8
EAST VALLEY WATER DISTRICT
PLANT 143 PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
Mitigation Measure Implementation Schedule Verification
Noise
XII-6 All mechanical construction equipment shall be equipped with proper This measure shall be incorporated into the A copy of the construction contract shall be
noise attenuation devices(mufflers,etc.). Project-related noise levels at construction contract and implemented during retained in the project file. District field
the nearest sensitive noise receptor during operations shall not exceed construction. inspectors shall verify that this measure is
background noise levels or 50 dBA CNEL whichever is greater. being implemented during construction by
measuring sound from mechanical equipment
prior to authorizing full time operation.
Inspection notes verifying compliance shall be
retained in the project file.
Source Responsible Party Status/Date/Initials
Initial Study EVWD
MMRP Table, Page 9
BOARD AGENDA STAFF REPORT
Meeting Date: June 13,2012
East Valley
Water District Public Hearing: ❑
---- Discussion Item: 'Er �
Consent Item: ❑
June 6, 2012
TO: GOVERNING BOARD MEMBERS
FROM: GENERAL MANAGER/CEO
SUBJECT: EXPENDITURE REQUESTS FOR FISCAL YEAR 2012-13
RECOMMENDATION:
RECOMMENDATION:
Staff recommends that the Board of Directors accept the attached expenditure plan for fiscal year
2012-13.
BACKGROUND/ANALYSIS:
On May 23, 2012, staff presented revenue projections for fiscal year 2012-13 to the Board of
Directors. Projections included water fund revenue with a total of$18,313,250, and sewer fund
revenue of$4,367,000.
Staff has now completed estimates of expenditures for fiscal year 2012-13, incorporating the
strategic initiatives adopted by the Board, and identifying key performance indicators that will
keep the District on track to achieve those initiatives. As previously discussed, a new budget
process was utilized in deriving the expenditure requests, building estimates from information
gathered by staff throughout the District, building departmental spending plans based on stated
goals and objective, and then compiling those departmental plans into a spending plan for the
District as a whole.
This report on projected expenditures is divided into the following sections:
Agency Wide
This section contains three tables. The first is Total Budgeted Revenues and Expenditures for
2012-13. This table presents total Operating Revenues, Operating Expenditures by department,
or work unit, and other sources and uses of funds necessary to accomplish goals and objectives
for the fiscal year. It presents separate columns for the water and sewer operating funds, and
Page d
SR#0107
AGENDA DATE: JUNE 13, 2012
SUBJECT: EXPENDITURE REQUESTS FOR FISCAL YEAR 2012-2013
also columns for water and sewer capital projects including funding sources. Based on
projections, the water fund will have $810,000 to place in reserves at year end while the sewer
fund is presented with a balance budget.
Other tables in the Agency Wide section include: 1) a summary of expenses by classification
with prior year comparisons, 2) a table showing how General and Administrative costs are
allocated to water and sewer, and 3) a table linking the Board's strategic initiatives to
departmental goals and objectives.
Departmental
Each of these sections give detailed descriptions of the responsibilities for a department,
significant changes during 2011-12, goals and objectives for the department that are tied to the
strategic initiatives, and the personnel included for 2012-13 based on the Strategic Staffing Plan
adopted on May 9, 2012. Finally, departmental expenditures requested for fiscal year 2012-13
are presented with prior year comparisons, and including projections of departmental labor and
burden that will be capitalized based on hours staff spends working on projects during the fiscal
year.
Capital Expenditures and Debt Service
The final section presents a summary of the five-year Capital Improvement Program prepared by
staff, the expenditures presented in the 2012-13 fiscal year column representing staff's proposed
capital expenditures budget for next fiscal year.
This section also includes tables showing the District's outstanding debt and the debt service
payments that will be paid from Trust accounts during the fiscal year. Transfers to the Trust
accounts are shown, in the Total Budgeted Revenues and Expenditures table in the first section
of this report, these tables show the scheduled payment to bondholders and other creditors from
the trust accounts.
Staff welcomes the Board's comments and suggestions regarding requested expenditures.
Following the budget expenditures workshop, staff will incorporate comments and
recommendations from the Board into the budget document. A final version of the fiscal year
2012-13 budget will be presented for adoption at the Board meeting on June 27`h
REVIEW BY OTHERS:
Not applicable
Page � 2
SR#0107
AGENDA DATE: JUNE 13, 2012
SUBJECT: EXPENDITURE REQUESTS FOR FISCAL YEAR 2012-2013
FISCAL IMPACT:
There is no fiscal impact associated with this agenda item.
Respectfully submitted Recommended by:
-�,j4x� �Jzltu&
John Mura, Brian Tompkin9,
General Manager/CEO Chief Financial Officer
Page 13
SR#0107
East Val ley
tooWater District
AGENCY WIDE
CH;i VALLEY VVA i ILK LAS I RIC I
Total Budgeted Revenues and Expenditures
For the Fiscal Year Ended June 30, 2013
Water Sewer Water Capital Sewer Capital
Operating Fund Ooerating Fund Proiects Projects Total
Operating Revenue
W a}cr Calae .nH Coniirec 1A ill 7Fr1 �o 31 01,250
Sewer System Charges 4,367,000 4,367,000
Sewer Treatment Charges 6,776,908 6,776,908
Other Charges 216,000 500 216,500
18,529,250 11,144,408 29,673,658
Operating Expenses
Administrative 1,620,666 937,414 10,000 2,568,080
Finance 816,082 593,291 1,409,373
Customer Service 819,063 801,931 5,000 1,625,994
Engineering 699,890 327,804 96,000 20,000 1,143,694
Operations 7,121,032 6,776,908 16,000 13,913,940
Maintenance 2,205,455 691,998 40,000 25,000 2,962,453
13,282,188 10,129,346 167,000 45,000 23,623,534
Non Operating Revenue
Interest Income 21,890 53,785 75,675
Government Grants/Loans 6,790,209 6,790,209
Bond Proceeds 9,276,239 199,100 9,475,339
Cooperative Agreements-Power 44,600 - 44,600
Other 16,500 16,500 1,069,893 1,102,893
82,990 70,285 17,136,341 199,100 17,488,716
Non Operating Expenses&Uses
Capital Improvement Program (18,731,870) (1,118,000) (19,849,870)
(18,731,870) (1,118,000) (19,849,870)
Transfers
Transfers for Capital Projects (1,762,529) (963,900) 1,762,529 963,900
Transfers to Trustee for Debt Service (2,757,523) (121,447) (2,878,970)
(4,520,052) (1,085,347) 1,762,529 963,900 (2,878,970)
Excess of Revenue Over Expenditures 810,000 - - 810,000
East Valley Water District
Summary of Operating Expenses-All Departments
2012-is Proposed
i 2u10-11 2011-12 Water Sewer .^Dater Sewer Cepartment
Actual Budget Operating Operating Capital Proj. Capital Proj. Total
Personnel
Wages&Salaries 4,684,919 4,762,400 3,311,700 1,387,300 - - 4,699,000
Overtime Labor 262,303 300,000 175,900 49,100 - - 225,000
Allocated Benefits 2,313,121 2,355,417 1,662,886 683,284 - 2,346,170
Directors Fees& Benefits 114,616 114,000 70,800 47,200 - - 118,000
CIP Labor/Burden Credits (501,293) (232,000) (167,000) (45,000) 167,000 45,000
6,873,666 7,299,817 5,054,286 2,121,884 167,000 45,000 7,388,170
Other Operating Costs
Purchased Water/Assessments 435,388 497,500 511,320 - - - 511,320
Materials and Supplies 555,626 809,100 866,260 36,000 - - 902,260
Outside Services 7,714,374 9,142,200 2,229,620 7,054,778 - - 9,284,398
Power 2,102,512 2,125,000 2,350,000 - - - 2,350,000
Vehicle& Equipment Fuel 176,222 186,000 121,180 30,520 - - 151,700
Office Supplies& Expenses 467,162 409,500 252,087 162,663 - - 414,750
Professional Development 206,607 174,000 144,154 52,848 - - 197,002
General Plant Maintenance 223.420 222,000 173,595 16,970 - - 190,565
Fleet Maintenance 216,502 180,000 165,600 18,400 - - 184,000
Rents& Leases 210,234 185,000 110,875 75,875 - - 186,750
Contractual Services 712,555 893,300 587,560 326,930 - - 914,490
Election Expenses - 105,000 - - - - -
Public Outreach/Education 24,113 20,000 42,010 8,290 - - 50,300
Insurance 260,944 230,000 144,000 36,000 - - 180,000
Office Equipment 156,809 127,000 83,869 61,986 - - 145,855
Regulatory Compliance 43,047 55,000 50,000 10,000 - - 60,000
Safety& Emergency Preparedness 57,000 22,272 10,200 - - 32,472
Capital Outlay 1,024,029 742,375 373,500 106,000 - - 479,500
14,529,544 16,159,975 8,227,902 8,007,460 - - 16,235,362
Total Operating Expenses 21,403,210 23,459,792 13,282,188 10,129,344 167,000 45,000 23,623,532
Summary
Allocation of General Administrative Costs by Department
Department Fund
Water Sewer
A A—;n;s+,-+;-- ano/ lino/n
f Ul 1I II ILIPUV� . .. ,.. ._ ._
Engineering 70% 30%
Finance
Accounting 50% 50%
Information Technology 50% 50%
Warehouse 90% 10%
Customer Service 50% 50%
Operations
Pumping 100%
Water Treatment 100%
Backflow Maintenance 100%
Maintenance
Water Pipeline 100%
Sewer Transmission Lines 100%
Fleet 90% 10%
• ldcntify I mt Cost for each Source of DPIivery Finance
• Address Current Constraints to System Flexibility Engineering
Provide Safe and Reliable Water Supply Meet Federal and State Regulatory Requirements Engineering
• Develop CIP Program Engineering
• Develo Cost Effective Water Supply Mix Operations
Create an Environment Conducive to more Consolidate Facilities Administration, Engineerin
Efficient and Effective Public Service Review District Reserve Investment Program Finance
Human Resources
Attract and Retain Quality Employees
• Maintain Appropriate Staffing Levels Administration
• Increase Employee Involvement
• Establish Accountability
District Resource Enhancement Efforts Provide Proactive Staff Development
Physical Resources
• Automated Meter Reading Customer Service
• Sewer Master Plan Engineering
• System Redundancy (Emergency Prep) Engineering
•
System Maintenance and Modernization Maintenance
Local Opportunities
• Community Outreach/Training/Education
• IT Capabilities/Web Presence Enhancement
• Conservation Program
Emergency Planning; Prep and Response
• Customer Service Improvement Initiatives Administration, Finance,
District Brand Development and Customer Service,
Community Involvement Regional Opportunities Engineering, Operations,
• Regional Water Partners Maintenance
• Basin Stakeholders
• Service Groups
• State and Federal Organizations
• Non-Profit Associations
•
Emergency Prep Mutual Aid
East Val ley
Water District
ADMINISTRATION DEPARTMENT
ADMINISTRATION DEPARTMENT
Responsibilities
The Administration Department, under direction of the General Manager, provides leadership in implementing the vision and direction
of the Board of Directors. The department provides highly responsible support to the Board, District employees, and to other
stakeholders.
Administrative Services: This section prepares Board and Committee meeting agenda packets and ancillary correspondence and is
responsible for the creation and maintenance of all public records as a result of business conducted by the Board. It also serves as a
liaison to other government agencies, and monitors state and federal legislation that may impact District operations, and ensures that
staff is trained and equipped to respond to local and regional emergencies.
Public Relations and Water Conservation: This office serves as the first point of contact for media representatives seeking
information about the District, and proactively develops and disseminates information in furtherance of District communication
objectives. This office also has oversight of the District's water conservation efforts, coordinating programs and communications by
all departments for public education and outreach regarding water use.
Human Resources and Risk Management: This section provides services and information to the District and its employees and helps
them conduct their personnel functions. Primary functions are to recruit, hire and retain high quality employees; compensation and
benefits administration; oversight of safety training, safety inspections, insurance claim reviews, workers' compensation issues, and
all other risk management items.
Significant Changes and Accomplishments during 2011-2012:
• Hired a new General Manager. tVWp
• Created and filled the Assistant General Manager and
HR/Safety and Risk Manager positions.
• Developed the Strategic Plan and Strategic Staffing Plan-
based on Board Strategic Initiatives.
Goals and Objectives with Key Performance Indicators for Fiscal Departmental Personnel
Year 2012-13:
Budgeted Positions:
• vvn SCiidatE Fa CiiitiES - `i^cadq UartCrS '.CmpieX
• Conduct Functional Needs Assessment General Manager/ CEO 1
• Adopt Project Concept Assistant General Manager 1
• Select location Administrative Manager 1
• Approve project
HR / Risk & Safety Manager 1
• Select architect
• Approve plans and construction contract Public Affairs/Water Conservation Officer 1
o Commence construction Executive Assistant 2
o Address consolidation/relocation logistics
• Attain and retain quality employees; maintain appropriate
staffing levels.
• Fill all vacancies by August 2012.
• Advertise vacancies in-house and via the Internet and local
newspapers.
• Increase employee involvement r
o Establish Employee Recognition Committee
• Establish Community Outreach and Conservation Program
o Hire Public Information Officer
• Emergency planning, preparation and response
o Certify managers/supervisors in ICS 200, 300 and 400.
• Regional opportunities for Brand Development
• Attend Board meetings of regional water partners.
• Hire grant writing firm to access state/federal funds. G
• Increase staff attendance at monthly ERNIE meetings.
East Valley Water District
Operating Expenses-Administration
2012-i3 Proposed
1 2011-12 '.Dater Sewer 'v^Dater Sewer
^Actual Budgeted Operating Operating Capital Proj. Capital Proj. Total
Personnel
Wages& Salaries 544,131 616,000 452,400 301,600 754,000
Overtime Labor 9,942 15,000 6,000 4,000 10,000
Allocated Benefits 314,852 279,554 216,132 143,751 359,883
Directors Fees& Benefits 114,616 114,000 70,800 47,200 118,000
CIP Labor/Burden Credits (3,234) (10,000) 10,000 -
980,307 1,024,554 735,332 496,551 10,000 - 1,241,883
Other Operating Costs
Purchased Water/Assessments - - - - - - -
Materials and Supplies - - - - - - -
Outside Services - - - - - - -
Power -
Vehicle Fuel 1,936 - 1,380 920 2,300
Office Supplies& Expenses 141,822 146,625 92,040 61,360 - - 153,400
Professional Development 174,102 120,800 106,689 34,833 141,522
General Plant Maintenance 53,092 50,000 24,180 16,120 40,300
Rents & Leases 197,072 175,000 105,000 70,000 175,000
Contractual Services 530,601 538,300 313,240 182,160 495,400
Election Expenses 105,000 - - -
Public Outreach/Education 24,113 20,000 41,160 7,440 48,600
insurance 260,944 230,000 144,000 36,000 180,000
Office Equipment 24,250 5,000 4,545 3,030 7,575
Regulatory Compliance 28,458 25,000 15,000 10,000 25,000
Safety&Emergency Preparedness 38,977 48,000 15,300 10,200 25,500
Capital Outlay 363,303 20,875 22,800 8,800 31,600
1,838,670 1,484,600 885,334 440,863 1,326,197
Total Operating Expenses 2,818,977 2,509,154 1,620,666 937,414 10,000 2,568,080
Administration
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Administration General &Admin
OBJECT NUMBER ACCOUNT TITLE Professional Development
TOTAL. BUDGET .REQUESTED 141,522 MANAGER APPROVED
This line item pays fees charged for attendance at educational meetings, meals
lodging and travel associated with meetings and conferences
FY 10/11 FY 11/12 FY 12/13
Conferences 9,161 7,000 14,082
Other Conferences 1,000
Lodging (C:onf) 14,475 7,000 13,000
Transportation 10,887 5,000 8,000
Meals 5,172 5,000 7,000
Emergency Training 8,000
Harrassment prevention training 1,000 1,000
MS office training (New Horizons) _ _ 2,200
Licenses& Certifications 240 300 300
Supervisor& Management Training 1,500
SDRMA Incentive Training _ - 1,000
Directors expenses ($6,000 x 5) 16,180 30,000 30,000
Organizational memberships(see dues/memberships) 117,987 50,500 54,440
Total 174,102 105,800 141,522
Note:the increase in the proposed budget for this item in Administration is due to the addition of an Assistant GM,
the HR manager, and the PIO, and a new focus on levels of staff training in accordance with strategic initiatives
Emergency Training: this budget item will allow the district to train staff in ICS 200, 300, and 400, these courses
are required in order to be eligible for FEMA funding
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
General Administration General&Admin
OBJECT NUMBER ACCOUNT TITLE Dues &Subscriptions
TOTAL.BUDGET REQUESTED 54,440 MANAGER APPROVED
This line item includes memberships in industry and professional organizations, subscriptions to periodcals, and
purchase of reference materials
FY 10/11 FY 11/12 FY 12/13
ACWA 18,500 18,500 18,500
ASBCSD 300 300 300
AWWA 3,500 4,000 4,500
AWWARF 16,000 -
CSDA 4,300 4,300 4,600
LAFCO 20,000 20,000 20,000
Water Education f=oundation 3,500 - -
Water Resources Institute 15,000 - -
Westcas 1,150 - -
CaIWARN 300
USGS 7,500 - -
Water Emir Fed 350 350 -
Liebert, Cassidy,Whitmore 3,190
Highland/SB COC 3,300 - -
Captal Track 1,000 1,500
CMUA 3,600 -
Miscellanc:ous 19,987 3,050 1,550
Carry forward to Professional Development 117,987 50,500 54,440
East Valley Water District BG 2012-13
ANNUALBUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Administration General&Admin
OBJECT NUMBER ACCOUNT TITLE Building/Grounds Maintenance
TOTAL BUDGET REQUESTED 40,300 MANAGER APPROVED
This line ilem includes janitorial and maintenance services, repairs, and replacement of non-capital equipment
and fixtures
FY 10111 FY 11/12 FY 12113
Janitorial Suites 18&30 31,475 25,000 20,000
Repairs- Suite 1E.&30 13,074 14,000 15,700
Pest control-Suites 18& 30 1,975 5,000 1,000
A/C Maint Agrmt-Ste 18&30 - - 1,100
A/C Repairs 5,000 2,500
Grounds Maint-trans to Field 6,202 6,000 -
Total 52,726 55,000 40,300
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocaled Administration General&Admin
OBJECT NUMBER ACCOUNT TITLE Contractual Services
7"OTAL BUDGET REQUESTED 495,400 MANAGER APPROVED
7his line item includes professional services by consultants and vendors.
FY 10/11 FY 11/12 FY 12/13
Alarm monitoring &response 24,793 25,000 25,000
Legal-General Counsel 73,479 75,000 140,000
Legal-Water rights/contracts 19,667 31,000
Legislative- State 65,932 64,800 68,000
Legislative- Federal 48,546 4,500 -
Safety compliance 3,375 6,000 10,800
Santa Ana Sucker 27,000 80,000 -
Transitional management 31,186 131,000 -
Culture/Strategic Plan 92,417 50,000 45,000
City Creek Study 40,000 40,000
Public relations 144,207 25,000 25,000
Web site maintenance (estimated) 7,000 7,500
Grant writing assistance 30,000 83,100
Intern HR Department - - 10,000
Recruitment(Advertising, Background Checks&Testing materials) _ - 5,000
ADP- Online HR Management Solution _ - 5,000
Total 530,602 538,300 495,400
Note: proposed budget includes new costs related to attracting and retaining high quality staff in accordance with
strategic initiatives
East Valley Water District BG 2012-13
ANNUALBUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Administration General &Admin
OBJECT NUMBER ACCOUNT TITLE Public Outreach
TOTAL BUDGET REQUESTED 48,600 MANAGER APPROVED
This line item includes water conservation efforts, participation in community affairs, printed materials
about District
FY 10/11 FY 11/12 FY 12113
Solar Challenge- boat sponsor 2,500 3,000 3,100
Tours- plants tour, Edison tour 1,518 2,000 2,500
Water conservation materials (bill inserts, handouts) 7,629 7,000 7,000
Water conservation programs(regional- SBVMWD) - - 20,000
Newsletter 515 2,000 -
Promotional items 4,068 5,000 5,000
Community events (registration, etc.) 375 1,000 11,000
Water Education f=oundation 5,000 - -
ARK Storm Sponsorship 2,508
Total 24,113 20,000 48,600
Note: current year budget requests include an allocation to fund participation in regional conservation program efforts
through San Bernardino Valley Municipal Water District,such as a regional website; and increased funding for
community events to include a ceremony for the recommissioning of Plant 134 in the summer of 2012
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Administration General&Admin
OBJECT NUMBER ACCOUNT TITLE Safety I Emergency Response
TOTAL BUDGET REQUESTED 25,500 MANAGER APPROVED
This line item includes non-capital equipment and supplies, and vendor services, that are monitored to ensure
staff is prepared and equipped to respond to emergencies
FY 10/11 FY 11/12 FY 12113
AED Pads - 3,200 300
Emergency Response-staging area items 9,322 10,000 10,000
Employee Emergency Kits 1,117 1,000 3,000
Yearly S'atelite Fee 1,200 1,200 1,200
Employee ID Cards - 2,500 3,500
Air Monitoring Equip(supply&repair) - 3,000 2,500
Respirators(supply& repair) 1,244 5,000 5,000
Employee MREs 15,000 15,000 -
Emergencv Water 9,879 4,000 -
Safety Fair 500
Other 1,215 2,600 -
Total 38,977 48,000 25,500
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Administration Capital
OBJECT NUMBER ACCOUNT TITLE Capital Outlay
TOTAL BUDGET REQUESTED 31,600 MANAGER APPROVED
This line itom includes purchase of vehicles, equipment(incl software)and other capital assets
FY 10/11 FY 11/12 FY 12113
North Fork Stock - 875 14,000
Furniture - 17,000 15,000
Visio software 600
Suite 30 Improvements 357,528
Suite 30 Signage 1,500
Copier/Printer 5,775
ADP HR software 1,500
HAM Radios
2,000
Total 363,303 20,875 31,600
Furniture: [he amount requested includes furniture in anticipation of new hires
North Fork Stock: this amount is requested in the event that North Fork Stock becomes available for purchase
East Valley Water District BG 2012-13
East Valley
Water District
FINANCE DEPARTMENT
FINANCE DEPARTMENT
Responsibilities
Accounting: The Accounting department performs all financial related services for the District, which include general ledger
functions, payroll and benefit processing, accounts payable, accounts receivable, investment and cash management, annual budget
preparation, rate analysis, Comprehensive Annual Financial Report (CAFR) preparation, and Capital Improvement Program (CIP)
reporting.
Information Technology: This division provides information technology support for the District's computer network, including the
operation, maintenance, and repair of network hardware and employee workstations. Its primary responsibilities include day-to-day
network center operation, including the provision of a safe and secure environment for centralized data libraries and equipment. It is
also responsible for the phone systems, office machines, software solutions, and the radio network.
Purchasing: This section operates as the main purchasing unit for the District, including the operation of a full service warehouse.
Purchasing is responsible for the acquisition, and physical protection of, supplies needed to maintain the District's water distribution
and wastewater collection facilities. This section is staffed by trained individuals focused on enhanced supply management,
accountability, and cost savings to the District.
Significant Changes and Accomplishments during 2011-2012:
• Added an Office Specialist II (re-purpose) in accordance
with the Strategic Staffing Plan. ,
• Both information Systems Specialists retired; implemented
a transitional IT Plan, utilizing consultants, pending
adoption of an IT Strategic Plan.
• Changed audit firms; redesigned the Annual Financial
Report toward implementation of Best Practices.
• Implemented the new budget process and budget format.
Goals and Objectives with Key Performance Indicators for Fiscal Year 2012-13:
• Identify _snit cost for each source of water delivery.
o Make changes to chart of accounts to capture pertinent information.
• Review District Reserve Investment Program
o Increase investment portfolio yields to 3% while maintaining safety.
• Regional District Brand Development
o Complete audit by September; submit comprehensive Annual Financial
Report to GFOA for consideration of award for reporting excellence by
December.
• Local District Brand Development
o Complete IT Strategic Plan
Departmental Personnel
Budgeted Positions:
Chief Financial Officer 1
Accounting Supervisor 1
Budget Analyst 1
Lead Storekeeper/Buyer 1
Network Administrator (Contracted) 1
Database Administrator (Contracted) 1
Storekeeper/Buyer II 1
Accounting Specialist II 2
Office Specialist 11 1 �pil):P
East Valley Water District
Operating Expenses -Finance
2012-13 Proposed
-011-12 `trva.e! Sewer V'vate! _ewer D, a! ettt
Actual Budgeted Operating Operating Capital Pro. Capital Proj. Total
Personnel
Wages& Salaries 570,760 574,000 416,700 314,300 731,000
Overtime Labor 8,857 15,000 4,700 2,300 7,000
Allocated Benefits 251,299 257,380 171,558 117,160 288,718
CIP Labor/Burden Credits (1,843)
829,073 846,380 592,958 433,760 1,026,718
Other Operating Costs
Purchased Water/Assessments -
Materials and Supplies -
Outside Services - - - - - -
Power -
Vehicle Fuel 4,657 2,000 540 60 600
Office Supplies&Expenses 46,580 36,100 22,832 21,168 - - 44,000
Professional Development 8,348 12,100 8,258 7,658 - - 15,915
General Plant Maintenance 926 1.000 -
Rents& Leases 13,162 5,000 5,875 5,875 11;750
Contractual Services 65,770 96,500 91,070 88,520 - - 179,590
Election Expenses - -
Public Outreach/Education -
Insurance -
Office Equipment 49,793 25,000 18,000 18,000 36,000
Regulatory Compliance -
Safety& Emergency Preparedness 120 300 300
Capital Outlay 64,000 35,000 76,250 18,250 94,500
253,356 212,700 223,125 159,531 - - 382,655
Total Operating Expenses 1,082,429 1,059,080 816,082 593,291 1,409,373
Finance
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Finance General&Admin
OBJECT NUMBER ACCOUNT TITLE Professional Development
TOTAL BUDGET REQUESTED 15,915 MANAGER APPROVED
i his line korn pays fees charged for attendance at educational meetings, meals
lodging acid travel associated with meetings and conferences
FY 10111 FY 11112 FY 12113
Seminars
New Horizons(9 classes @$220) - 2,200 1,980
AICPA- CPE Classes 1,120 1,120 1,120
GFOA-CPE Classes 685 1,685 2,775
Self Study 1,620
Governmental Tax Update 250 250 250
CALPers 300 300 600
ADP 300 300
Warehouse- Inventory Controls - - 500
AP Certification Classes - - 350
Meals, Lodging &Travel
Airfare,Hotels and Meals 1,375 3,542 5,000
Luncheos 509 500 500
Memberships (GFOA, CSMFO) 160 310 590
ICWA 50 25 50
License;Certifications 200 120 400
Memberships, Dues(next page) 1,779 1,748 1,800
Total 8,348 12,100 15,915
Note: the increase:in the proposed budget for this itern is due to a new focus on levels of staff training
in accordance with strategic initiatives
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Finance General&Admin
OBJECT NUMBER ACCOUNT TITLE Dues&Subscriptions
TOTAL BUDGET REQUESTED 1,800 MANAGER APPROVED
This line item includes memberships in industry and professional organizations, subscriptions to periodcals, and
purchase of reference materials
FY 10111 FY 11/12 FY 12/13
Dunn & Bradstreet-credit monitoring 799 799 800
Fringe Benefits Guide 429 376 400
Government GAAP (Generally Accepted Accounting Principles)Guide 272 333 350
Misc Books 280 240 250
Carried Forward To Previous Page 1,779 1,748 1,800
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Finance General&Admin
ACCOUNT NUMBER 72000 ACCOUNT TITLE Contractual Services
TOTAL BUDGET REQUESTED 179,590 MANAGER APPROVED
This line item includes professional services by consultants and vendors to the Accounting and IT departments.
FY 10/11 FY 11112 FY 12/13
Financial Audit 34,570 30,200 32,000
Trustee, 2010 Bonds- Union Bank 3,400 3,400 3,500
Truster:, SRF loans-Cal Bank&Trust - 3,100
Investment Mgt Svcs-CBB 5,150 5,100 6,540
Accounting Software Support - 11,000 11,000
Arbitrage calculation-2010 Bonds 4,000 1,800 1,300
Assess Dist Acctg-Eastwood Farms _ - 2,550
GASB 45 actuarial update (not needed 2012-13) 5,000 6,000 -
Data offsite backup and recovery services 7,300 30,000 15,000
IT Strategic Plan 30,000
Programmer 6,350 9,000 9,600
Rate study update-review tiered rates - 50,000
Email hosting (cloud) - 15,000
Total 65,770 96,500 179,590
Note:current year budget requests include a new Trustee relationship for servicing of SRF loans; a new contract
for assessment district accounting services; hiring a consulting firm to help District staff determine long-term
IT neecls;; hiring a consulting firm to update the District's rate study with a focus on tiered rates, and predicting
and smoothing future rate adjustments; and contracting for hosting of District email services
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Finance General&Admin
OBJECT NUMBER ACCOUNT TITLE Office Equipment
TOTAL BUDGET REQUESTED 36,000 MANAGER APPROVED
This line item includes replacement of non-capital items, and repairs and maintenance on large items,
including maint agreements on department specific software
FY 10/11 FY 11/12 FY 12/13
MS Dynamics Software Maint& repairs 15,340 8,000 9,000
Minolta Copier Maintenance 5,183 5,300 5,500
Laserfiche Maintenance 6,180 7,000 7,000
Server Maint- NelBackup, Symantic 1,955 2,400 4,500
Metropolis Office Watch (move to c/s) 6,980 - -
Northrup Giummond (move to c/s) 700 - -
Pipelogic 950 - -
Internet fire Wall 4,412 - -
Barracuda spam filter 417 - -
Repairs on comp equipment 13,025 - 10,000
Total 55,142 22,700 36,000
Note: maintenance agreements on department specific software, such as Engineering's autocad,were once
paid out Df the IT budget. Those agreements are now paid for by the user departments.
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allccated Finance Various
ACCOUNT NUMBER 89200 ACCOUNT TITLE Capital Outlay
TOTAL. BUDGET REQUESTED 94,500 MANAGER APPROVED
This line item includes purchase of vehicles,equipment(incl software)and other capital assets
FY 10/11 FY 11/12 FY 12/13
Warehouse Heating&AC Unit 1,300
G/L Multi company Upgrade 20,000
Computer Hardware Upgrades 27,700 25,000
MS Office 2010 10,000
Laserfiche: quickfields 5,000
Enterprise Anti Virus 10,000
15 Workstations w/Windows 7 15,000
External backup storage-duplicate 8,000
New GIS Server 12,000
Forklift 58,000
NexVue Keychange 1,500
Total 64,000 35,000 94,500
Note: Replacement of 27 year old fork lift and
the Windows 7 upgrade,allows the district to continue to upgrade to newer operating systems
East Valley Water District BG 2012-13
East Valley
Water District
CUSTOMER SERVICE DEPARTMENT
CUSTOMER SERVICE DEPARTMENT
Responsibilities
The Customer Service Department is the first point of contact for the District's 22,000 customers. As such, great care is taken in
hiring and retaining individuals with an attitude toward service while at the same time, possessing the ability to thrive in an
increasingly automated environment.
Customer Service provides all call center activity, walk-up counter payment service, Interactive Voice Response (IVR)/Internet
payment service, customer billing, new account processing, work order generation and delinquent account processing, including
collections. The Department also handles all field service requests that include turning on/off accounts, water consumption
investigations and consultations, and meter reading, which includes traditional and Automated Meter Reading (AMR).
Significant Changes and Accomplishments during 2011-12:
• One Customer Service Lead position eliminated
Customer Service reduced to 6 staff positions.
• With re-organization of the Meter Shop, 4 Field Service
Representative positions with primary responsibility for
meter reading and turn on/offs were added.
• Completed implementation of ebilling-customer receives
their bill by email; paper copy of bill eliminated.
• Implemented lock box processing, whereby payments
n up;r
mailed by customers are received and processed by �d „
third party.
Goals and Objectives with Key Performance Indicators for Fiscal Year 2012-13:
• Customer Service Irpgrover')ent Initiatives
• Establish alternate third party payment center (retail center/ kiosk).
• Reduce the number of customers locked off for non-payment, by researching and
implementing a more efficient way to give customers 48 hours' notice.
• Implement continuous service agreements for establishing service (tenant back to
landlord).
• Implement website solution to allow customers to turn on-off service without calling or
visiting the District Office.
• Enhance District Physical Resources
o Convert 15-20% of the District to AMR.
i
Departmental Personnel
Budgeted Positions:
Customer Operations Supervisor 1 VOL
Sr. Customer Service Representative 1
Lead Field Service Representative 1
Field Service Representative II 5
Customer Service Representative II 3 r. - d
Customer Service Representative 1 1
East Valley Water District
Operating Expenses-Customer Service
6012-13 Proposed
i -iG eater cwci bai81 .Cicwci "al-`
I Actual' Budgeted Operating Operating Capital Proj. Capital Proj. ?otal
IF Personnel
Wages& Salaries 598,518 541,000 326,000 326,000 652,000
Overtime Labor 39,303 60,000 30,000 30,000 60,000
Allocated Benefits 187,263 256,207 186,256 186,256 372,511
CIP Labor/Burden Credits (5,000) 5,000 -
825,084 857,207 537,256 542,256 5,000 - 1,084,511
Other Operating Costs
Purchased Water/Assessments -
Materials and Supplies 2,500 8,100 1,260 1,260
Outside Services 177,026 218,600 137,870 117,870 - - 255,740
Power
Vehicle Fuel - - 21,000 21,000 42,000
Office Supplies & Expenses 214,317 141.525 65,075 65,075 - - 130,150
Professional Development 2,514 3,400 3,450 3,450 6,900
General Plant Maintenance - - - - -
Rents & Leases - - - - -
Contractual Services - - - - - - -
Election Expenses - - - - -
Public Outreach/ Education - - 850 850 1,700
Insurance - - - -
Office Equipment 43,117 46,000 26,430 26.430 52.860
Regulatory Compliance - - - - -
Safety& Emergency Preparedness 872 872 872
Capital Outlay 47,000 9,000 25,000 25,000 50,000
487,346 426,625 281,807 259,675 - - 541,482
Total Operating Expenses 1,312,430 1,283,832 819,063 801,931 5,000 - 1,625,993
Customer Service
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Customer Service Customer Accounts
OBJECT NUMBER ACCOUNT TITLE Outside Services
TOTAL BUDGET REQUESTED 255,740 MANAGER APPROVED
This line item includes professional services by consultants and vendors.
FY 10/11 FY 11/12 FY 12/13
Third party(Infosend) bill print&mailing services:
Regular bills 30,816 39,200 30,650
Delinquent bills 8,692 11,400 8,750
e-billing 3,100 3,400 3,600
Credit card payment interchange fees (visa/mc, amex) 107,591 129,000 127,000
Lock box services(Citizens Bus Bank) 15,560 20,500
Web based payment processing (Online Resources) 573 700 700
Customer check imaging and processing fee (ProfitStarz) 17,057 9,000 7,300
Credit Reporting Fee (Experian) 1,227 1,500 1,500
Property owner info. research tools(Corelogic, PIMS) 3,780 4,040 4,040
After hours answering service (Inland Desert) 4,189 4,700 4,700
Large Meter Testing - - 20,000
Third park; bill payment center fees - - 27,000
Total 177,026 218,500 255,740
Note-current year budget requests include funding to perform tests on large meters,to ensure they are reading
at acceptable efficiency levels, and funding to set up authorized payment centers throughout the District for
customer convenience, and to limit walk-in traffic at the District to eliminate pressure to increase staff levels
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
General Customer Service Customer Accounts
OBJECT NUMBER ACCOUNT TITLE Professional Development
TOTAL BUDGET REQUESTED 6,900 MANAGER APPROVED
This line item pay=.,fees charged for attendance at educational meetings, meals
lodging and travel associated with meetings and conferences
FY 10/11 FY 11/12 FY 12/13
AWWA Cust Svc Training-Denver 1,095 700
C/S Training/educational Seminars 1,250 1,800
Class E Renewal
Meals 468 500 1,000
Lodging/Travel 924 750 2,650
Harris UC - - 750
Certifications 500 -
Dues, Membership& subs (see next page) 27 400
Total 2,514 3,400 6,900
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Customer Service Customer Accounts
OBJECT NUMBER ACCOUNT TITLE. Dues&Subscriptions
TOTAL BUDGET REQUESTED 0 MANAGER APPROVED
This line item includes memberships in industry and professional organizations, subscriptions to periodcals, and
purchase of reference materials
FY 10/11 FY 11/12 FY 12/13
ICWA 27 25 -
Misc ref materials 375
Carried forward to previous page 27 400
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Customer Service Customer Accounts
OBJECT NUMBER ACCOUNT TITLE Office Equipment
TOTAL BUDGET REQUESTED 52,860 MANAGER APPROVED
This line item includes replacement of non-capital items, repairs and maintenance, including maint agreements
on department specific software
FY 10/11 FY 11/12 FY 12/13
Billing system annual maintenance agreement 30,295 33,700 35,000
Pitney Bowes 1,420 405 405
Check imaging software maintenance agreement 2,542 2,540 2,600
Mail Machine Renlal 1,030 1,025 1,025
Agent Watch Maintenance - 500 500
Itron meter reading handheld units- maintenance agrnt _ _ 5,500
Automated pay-by-phone system maintenance agrmt 7,830 7,830 7,830
Total 43,117 46,000 52,860
Note: purchase of a new Itron meter reading system will require payment of an annual maintenance agreement-
the previous system had been converted to time and materials for maintenance costs
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Customer Service Customer Accounts
OBJECT NUMBER ACCOUNT TITLE Capital Outlay
TOTAL BUDGET REQUESTED 50,000 MANAGER APPROVED
This line item includes purchase of vehicles, equipment(incl software) and other capital assets
FY 10/11 FY 11112 FY 12/13
Billing system upgrade 40,000 20,000
Enhanced Call Center(phone system) 7,000
Additional Ports for IVR 9,000
Truck(s)- Fuel efficient 30,000
Total 47,000 9,000 50,000
Note: Staff is requesting current year funding to purchase a small truck or electric vehicle for use in the Field Services
section (meter reading). Options for good, used vehicles will be explored.
East Valley Water District BG 2012-13
East Valley
Water District
ENGINEERING DEPARTMENT
ENGINEERING DEPARTMENT
Responsibilities
The Engineering Department implements the Capital Improvement Program (CIP), overseeing design and construction of capital
oroiects included in each fiscal year budget, as well as, additional projects as emergency needs arise. In addition, Engineering
provides plan review and project over-site for water and sewer infrastructure development. The Engineering Department also
provides inspection of public works improvements funded by development, as well as, within the CIP; oversight of rough grading for
development; and monitoring the NPDES and WQMP during construction. Inspection includes ensuring that the improvements are
constructed to District approved plans and specifications, ensuring the public's safety during construction and providing guidance to
the construction contractor.
Significant Changes and Accomplishments during 2011-2012:
• District Engineer position was eliminated and replaced by the
Assistant General Manager.
• Completed Conejo Drive Sewer Improvements which included r{V Ip(
replacement of approximately 2,500 lineal feet of 110" water main.
• Completed Hilview, Bruce, Crest and Cunningham Streets' 8" water
main replacements.
FpSI '
• Completed design and awarded construction contract for Plant 143 '
Blending Tank and connector pipelines. �i
s°
• Designed and constructed 1,100' of 8" pump line from Plant 24. k,
• Consolidated Eastwood Farms Water Company into District, which -
included 4,514 lineal feet of distribution mains and 75 new
�A-
customers.
Goals and Objectives with Key Performance Indicators for Fiscal Year Departmental Personnel
2012-13:
Rudgeted Positions:
• Address Current Constraints to System Flexibility Engineering Manager 1
• Complete 30" Pipeline from Plant 40 to Plant 151 which will Executive Assistant 1
allow transmission of water from lower zones in the District's
west end to higher zones in the east end. Senior Engineering Technician 1
• Complete Plant 40 Booster Station which will allow the District Engineering Technician II 3
to boost water from the intermediate pressure zone to the upper Engineering Technician 1 1
zone. Office Specialist II 1
Meet Federal and State Regulatory Requirements
c Complete Baseline Gardens Mutual Water Company Project.
This project is a State Revolving Fund project and upon the
State's Notice of Acceptance of the grant application will include
designing and constructing a new water distribution system,
and consolidate Baseline Gardens with EVWD.
• Enhance District Physical Resources
o Plant 143. This project consists of installing a one million gallon
storage tank and plumbing to Plants 143, 146 and 147 to the y
new reservoir to dissipate excessive air in the distribution
Y
system.
o Complete 10 year update of Sewer Master Plan. In order to
identify deficiencies in the system and help develop the CIP. `
M°IF v '� .✓
East Valley Water District
Operating Expenses- Engineering
2012-13 Proposed
201,1-12 Water :Sewer /ate, :Sewer
Actual Budgeted Operating Operating Capital Proj. Capital Proj. Total
Personnel
Wages& Salaries 742,548 743,000 389,900 167,100 557,000
Overtime Labor 1,152 5,000 3,500 1,500 5,000
Allocated Benefits 355,531 352,460 195,828 83,921 - - 279,749
CIP Labor/Burden Credits (219,388) (162,000) (96,000) (20,000) 96,000 20,000 -
879,843 938,460 493,228 232,521 96,000 20,000 841,749
Other Operating Costs
Purchased Water/Assessments - - - - - - -
Materials and Supplies - - - - - - -
Outside Services - - - - - - -
Power - - - - - - -
Vehicle Fuel 13,134 - 4,760 2,040 6,800
Office Supplies& Expenses 11,799 40,200 25,340 10,860 - - 36,200
Professional Development 13,374 22,300 10,868 4,658 - - 15,525
General Plant Maintenance -
Rents& Leases 5,000 -
Contractual Services 22,467 172,500 113,050 48,450 - - 161,500
Election Expenses -
Public Outreach/Education -
Insurance -
Office Equipment 33,013 40,000 26,894 11,526 - - 38,420
Regulatory Compliance 20,000 20,000 20,000
Safety& Emergency Preparedness -
Capital Outlay 12,000 17,000 5,750 17,750 23,500
105.787 317,000 206,662 95,284 - - 301,945
Total Operating Expenses 985,630 1,255,460 699,890 327,804 96,000 20,000 1,143,694
Engineering
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Engineering General&Admin
OBJECT NUMBER ACCOUNT TITLE Professional Development
TOTAL BUDGET REQUESTED 15,525 MANAGER APPROVED
This line item pays fees charged for attendance at educational meetings, meals
lodging and travel associated with meetings and conferences
FY 10/11 FY 11/12 FY 12113
Contact Hours 7,863 7,250 3,500
GIS Training 10,000 6,000
ESRI GIS technical conference 1,800
Meals 825 1,000 800
Lodging 2,038 1,100 1,000
Transportation 682 1,000 700
Licenses 275 500 300
Dues& Subscriptions (from next page) 1,691 1,450 1,425
Total 13,374 22,300 15,525
Note:aln011nts requested include and increased level of training but for fewer employees-the District Engineer
training is included in prior year costs; training costs for the AGM are included in the current year Administration
budget
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Engineering General&Admin
OBJECT NUMBER ACCOUNT TITLE Dues&Subscriptions
TOTAL BUDGET REQUESTED 1,425 MANAGER APPROVED
This line item includes memberships in industry and professional organizations, subscriptions to periodcals, and
purchase of reference materials
FY 10/11 FY 11/12 FY 12/13
ICWA 75 75 75
Foundation Cross Connection Control 1,000 1,000 1,000
Southwest Membrane Operator 50 50 50
Calif Water Environment Federation 402
Books 164 325 300
Carried forward to previous page 1,691 1,450 1,425
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Engineering General &Admin
OBJECT NUMBER ACCOUNT TITLE Contractual Services
TOTAL BUDGET [REQUESTED 161,500 MANAGER APPROVED
This line item includes professional services by consultants and vendors.
FY 10111 FY 11112 FY 12113
Computer Consulting 1,800 1,000 -
RMC Water& Environment 17,366 1,125 -
Consultant - Regn] Urban Water Mgt Plan 1,715 25,000 10,000
Prof Engineering Svcs-On call services - 143,875 130,000
GIS strategic planning- integration &on-call support - - 20,000
Underground Service Alert 1,587 1,500 1,500
Total 22,468 172,500 161,500
Note: E ngineering will circulate RFPs to engage an engineering firm on an on-call basis, and whose services will be
used to supplement in-house staff. GIS consultants will also be used to continue integration of our, now completed,
GIS database, to other District software applications
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Engineering General&Admin
OBJECT NUMBER ACCOUNT TITLE Regulatory Compliance
TOTAL.BUDGET REQUESTED 20,000 MANAGER APPROVED
This line item includes costs incurred to meet regulatory permitting, testing, and reporting requirements
FY 10/11 FY 11112 FY 12/13
CC -printing& mailing 20,000 20,000
Total - 20,000 20,000
Note: staff anticipates using CV Strategies again, in a limited capacity,to help produce the 2012-13 Consumer
Confidence Report
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Engineering Capital
OBJECT NUMBER ACCOUNT TITLE Capital Outlay
TOTAL. BUDGET REQUESTED 23,500 MANAGER APPROVED
This line item includes purchase of vehicles, equipment(incl software)and other capital assets
FY 10/11 FY 11/12 FY 12/13
Ricoh scanner converter 2,000
Furnitwe-Eng Tech 10,000
GPS data ;oggers 17,000
Info Sewer Modeling Program 12,000
HP Plotter 4,500
Laptops(2)-GIS 7,000
Total 12,000 17,000 23,500
Notes:
The HP FI%Xter will provide the ability to print larges sheets and maps, in letter quality, and with more permanent
inks. Thc: cost to repair the old plotter is almost as expensive as purchasing a new HP-which staff is recommending
The two laptops requested will be rugged use machines (eg. Toughbooks), used in the field to access District
maps and data. They will also be loaded with the iWater work order system, allowing work order updates to be
shared in real-time between customer service, and operations and maintenance personnel
East Valley Water District BG 2012-13
East Valley
Water District
OPERATIONS DEPARTMENT
OPERATIONS DEPARTMENT
R.-spon--ibilities
The Operations Department is responsible for providing our customers with a reliable flow of safe and clean drinking water 365 days
a year. This involves ensuring the smooth operation and maintenance of the District's Source of Supply, Pumping and Treatment
facilities and expansion of those facilities to meet current and future demand.
Water Quality, groundwater and storage levels are monitored 24 hours per day, 7 days a week. Adequate water levels require
constant monitoring of wells and pumps, and boosters must be highly maintained in order to ensure efficient distribution of water
throughout the system. Various treatment techniques, such as Granular Activated Carbon treatment, ion exchange, and blending
and corrosion control are maintained by the Operations' staff, in order to ensure that this water is safe for consumption. In addition,
the District is required to complete water and sewer regulatory reports that are submitted to the State of California Department of
Public Health on a monthly, quarterly and annual basis.
Significant Changes and Accomplishments T
during 2011-2012:
• Plant 9 and Well 142 - Efficiency
rehabilitation. MCI
• Plant 28 - GAC change out. r "
• Eliminated scheduled overtime in
Production. #
• Water Quality Department revised the
i
Water Quality Monitoring Plan, which was
approved by CDPH.
F.
Goals and Objectives with Key Performance Indicators for
Fiscal Year 2012-13:
• Develop Cost Effective Water Supply Mix
• Complete treatment technology upgrade and expansion
to Plant 134, from 4 to 8 MGD.
• Complete efficiency rehabilitation of Well 39.
• Complete 8 Booster efficiency rehabilitations.
• Increase energy rebate incentives.
• Establish accountability
o Hire and utilize Office Specialist for reporting and r
administrative functions at Del Rosa facility.
Departmental Personnel
Budgeted Positions:
Water Production Superintendent 1
Water Production Supervisor 1
Water Quality Supervisor 1
Lead Water Treatment Plant Operator 1
L
Lead Water Production Operator 1
Water Production Operator II 3
Water Quality Technician II 1
Water Production Operator I 1
Office Specialist 1 0.5 ��
East Valley Water District
Operating Expenses-Operations(Production)
2012-13 Proposed
2010-11 201112 `plater Sewer Water Sewer Decartment
Actual Budgeted Operating Operating Capital Proj- Capital Proj. Total
Personnel
Wages& Salaries 756,385 778,000 859,500 - 859,500
Overtime Labor 97,917 115,000 75,000 75,000
Allocated Benefits 352,978 372,964 422,597 - 422,597
CIP Labor/Burden Credits (44,523) (16,000) 16,000 -
1,162,757 1,265,964 1,341,097 - 16,000 - 1,357,097
Other Operating Costs
Purchased Water/Assessments 435,388 497,500 511,320 511,320
Materials and Supplies 221,280 390,000 595,000 595,000
Outside Services 7,223,795 8,523,600 1,866,750 6,776,908 8,643,658
Power 2,102,512 2;125,000 21350,000 2.350.000
Vehicle Fuel 42,708 41,000 35,000 35,000
Office Supplies& Expenses 15,555 5,700 9,000 - 9,000
Professional Development 2,165 5,600 8,000 8,000
General Plant Maintenance 151,367 159,000 141,765 141,765
Fleet Maintenance - - - - -
Rents& Leases - - - - -
Contractual Services - - - -
Election Expenses - - - - -
Public Outreach/Education - - - - -
Insurance - - - - -
Offce Equipment 3,479 6,000 6,000 - 6,000
Regulatory Compliance 14,487 10,000 15,000 15,000
Safety& Emergency Preparedness 6,615 2,000 2,000 2,000
Capital Outlay 345,000 260,000 240,100 240,100
10,564,351 12,025,400 5,779,935 6,776,908 - - 12,556,843
Total Operating Expenses 11,727,108 13,291,364 7,121,032 6,776,908 16,000 - 13,913,940
Operations
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Water Operations(Production) Source of Supply
OBJECT" NUMBER ACCOUNT TITLE Water Costs
TOTAL. BUDGET REQUESTED 511,320 MANAGER APPROVED
This line item includes assessments by third parties for delivery and/or pumping of water
FY 10/11 FY 11112 FY 12/13
Purch Wtr, rechrg from SBVMWD (600 AF @$75) 170,000 112,500 45,000
Purch Wlr, Tier 1 from SBVWMD (1,230 AF @ $125.80) 90,000 155,000
SBVWCD assess(18,500 AF @ 11.28) 143,475 185,000 208,680
Nothe Fork Water Company assessments(5,849 sh @ $17.50) 75,913 110,000 102,640
Total 389,388 497,500 511,320
Notes: SBVWCD assessments increasing from$9.81 to$11.28 per acre foot
NF`INC assessments assumed to increase from$13.00 to$17.50 per share to begin funding replacement
reserve
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Water Operations(Production) Various
OBJECT NUMBER ACCOUNT TITLE Materials&Supplies
TOTAL BUDGET REQUESTED 595,000 MANAGER APPROVED
This item includes chemicals, lubricants, and other supplies for operating production facilites
FY 10/11 FY 11/12 FY 12113
Chemicals-Wells 148,369 165,000 168,000
Plant 28 activated carbon (GAC)filter media - 100,000
Plant 134
Chemicals- PI 134 36,872 50,000
Ferric Chloride 198,000
Caustic Soda 138,000
Other Chemicals 21,000
Other supplies 35,886 75,000 70,000
Total 221,127 390,000 595,000
Notes: The new treatment technology at Plant 134 requires use of new chemicals- Ferric Chloride, Caustic Soda
Amounts requested are based on CDM estimated annual usage
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Water Operations(Production) Source, Pumping, Treatment
OBJECT NUMBER ACCOUNT TITLE Outside Services-Water
TOTAL BUDGET REQUESTED 1,866,750 MANAGER APPROVED
This line item includes third party services utilized for operating, mairtaining, and reporting on, production facilites
and treatment facilities
FY 10/11 FY 11112 FY 12/13
Laboratory testing 96,938 189,500 130,000
Online tracking of water test results and reporting 13,335 14,000 14,100
DPH Compliance tracking/monitor. 9,305 12,500 12,500
Security- Plant 134 87,551 85,600 89,000
Water Supply/Mg1.Studies 46,000 40,000 -
Envirogen- 107 (1500/AF) 397,413 751,000 625,000
Envirogen -27 ($600/AF) 93,085 -
Envirogen-40 Uranium ($130/AF) 70,503 91,500 180,700
Envirogen-40 Nitrate($300/AF) 138,711 175,220 361,500
Envirogen-Take or Pay($165/AF) 87,482 182,280 123,750
GE Service Contr- Plant 134 - - 60,000
Pump repairs 86,447 220,000 150,000
Treat Plant Repairs 28,081 25,000 30,000
Backflow Maint 19,582 35,000 35,000
Telemetry Maint. 27,238 25,000 30,000
Well Ecuip Repairs 10,000 10,000
Cathodic Frotection 3,000 3,200
CLA Val&PRV Maint 12,000 12,000
Total 1,201,671 1,871,600 1,866,750
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Sewer Operations Sewer Treatment
OBJECT NUMBER ACCOUNT TITLE Outside Services-Sewer
TOTAL BUDGET REQUESTED 6,776,908 MANAGER APPROVED
This line item inlcudes an estimate of fees to be collected from EVWD customers on behalf of the City of
San Bernardino for wastewater treatment
FY 10111 FY 11/12 FY 12113
City of San Bernardino 5,995,720 6,640,000 6,776,908
Total 5,995,720 6,640,000 6,776,908
Notes: Se,aer Treatment fees collected and remitted to the City will increase during 2012-13 due to the fact that
the C:ity's rale increase that became effective 1/1/12 will be in effect for the entire fiscal year, as opposed
to half of a year as in 2011-12
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Water Operations (Production) Pumping,Treatment
OBJECT NUMBER ACCOUNT TITLE Electrical Power
TOTAL.BUDGET REQUESTED 2,350,000 MANAGER APPROVED
This item includes power purchased to run well pumps and boosters,and treatment facilities
FY 10/11 FY 11/12 FY 12113
Electrical-Wells& Boosters 63000 1,987,973 2,000,000 2,100,000
Electrical- Plant 134 63000 114,539 125,000 250,000
Total 2,102,512 2,125,000 2,350,000
Note: CDM estimates that annual power costs to run Plant 134 at 4mgd will more than double -CDM estimates are
usual'y extremely conservative. As the new system at the plant will not be fully functional during the hottest part of
summer, staff feels that$250,000 is a conservative estimate for fiscal year 2012-13.
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Water Operations(Production) General&Admin
OBJECT NUMBER ACCOUNT TITLE Vehicle Fuel
TOTAL BUDGET REQUESTED 35,000 MANAGER APPROVED
This item includes both gasoline and diesel fuel purchases for trucks and general equipment
FY 10111 FY 11112 FY 12113
Vehicle Fuel 42,708 41,000 35,000
Total 42,708 41,000 35,000
Notes: Staff is researching vehicle software technology to mor accurately predict fuel needs and a related cost
based on mileage for each unit attached to the department
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
General Operations(Production) General&Admin
ACCOUNT NUMBER ACCOUNT TITLE Professional Development
TOTAL BUDGET REQUESTED 8,000 MANAGER APPROVED
This line item pays fees charged for attendance at educational meetings, meals
lodging and travel associated with meetings and conferences
FY 10/11 FY 11112 FY 12/13
Education, Training 77100 396 2,000 3,500
Meals 71105 884 2,000 1,500
Lodging,-Transportation 71105 380 850
Treatment Certs 75500 405 1,000 1,500
Memberships:
AWWA, 71400 100 300 300
Inland Counties Water Assoc 71400 350 350
Total 2,165 5,650 8,000
Note: the increase in the proposed budget for this item is due to a new focus on levels of staff training
in accordance with strategic initiatives
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Water Operations(Production) General &Admin
OBJECT NUMBER ACCOUNT TITLE Building I Grounds Maintenance
TOTAL BUDGET REQUESTED 141,765 MANAGER APPROVED
This line item includes maintenance for structures and grounds at plants
FY 10/11 FY 11/12 FY 12113
Building repairs, plants 4,949 13,000 10,000
Janitorial-Plant 134 4,580 5,000 4,580
Plant 134 Grnds Contr 72,662 74,000
Wells Grnds Contr 47,040 49,000
Weed /brush abatement 12,526 11,000
Landscaping at plants 6,945 1,500
All inclusive Landscaping 122,160
Tree removal 1,715 2,000 2,000
Fence repairs 950 2,000 1,500
Pest Control Plant 134 1,500 1,525
Total 151,367 159,000 141,765
Notes: Landscape maintenance contracts were consolidated and put out to bid in April 2012. This
competetive bidding,which included all 56 plant sites, resulted in a $900 per month savings
East Valley Water District BG 2012-13
ANNUALBUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Water Operations(Production) Capital
OBJECT NUMBER ACCOUNT TITLE Capital Outlay
TOTAL. BUDGET REQUESTED 240,100 MANAGER APPROVED
This line item includes purchase of capital equipment and other assets
FY 10/11 FY 11/12 FY 12/13
Cat generators (3) 85,000
Booster, Electrical (25, 56B) 30,000
Well Rehabs 230,000
Well Rehab- 142 80,000
Well Rehab- 11A 80,000
Well Rehab- 120 100,000
Well Rehab-Plant 39 75,000
Booster Pump Rehabs-Plants 33, 56, 39, 108(2), 99, 131(2) 59,000
CI,Analyzers- Plants 9, 28, 39, 125, 132, 141, 142, 151 40,000
Transfer Switch -F'lant 151 9,000
Upgrade Turbidimeter- Plant 134 2,500
Tablet-dataloggers to GPS water production facilites 1,600
Scada Radio Upgrade 53,000
Total 345,000 260,000 240,100
Note: The SCADA Radio upgrade is due to a new FCC regulation requiring businesses to begin operating
radios at 12.5 kHz or narrower band beginning January 1, 201:3
East Valley Water District BG 2012-13
East Valley
,L)r#oWater District
MAINTENANCE DEPARTMENT
MAINTENANCE DEPARTMENT
Responsibilities
Field Maintenance is responsible for ensuring the integrity of the District's water Transmission and Distributions mains, customer
service lines and meters, and Wastewater Collection mains.
The District's Transmission and Distribution system covers all underground and above ground pipes from our Storage tanks to each
service connection. The current system includes 250 miles of water mains and 22,000 service connections.
The Wastewater Collection system includes 200 miles of gravity-flow sewer mains that collect wastewater at each customer's
property and carry it to the City of San Bernardino's trunk lines at various locations within the District.
Fleet Maintenance is responsible for ensuring the safety and maintenance of the District's 68 vehicles in accordance with
Department of Transportation and OSHA guidelines. This includes daily inspections and monthly vehicle service.
Significant Changes and Accomplishments during 2011-12:
• Completed the Plant 24 Reservoir Drain Line which allows
the District to flush Wells 24A and 24B without flooding_ the
intersection of Lynwood Drive and Harrison Street.
Y
• Repaired Water Facilities: "M'
o 162 Main Leaks, 22 Fire Hydrants and 3 Sink Holes.
• Replaced Water Facilities:
o 71 Services and 13 Fire Hydrants.
• Relocated Water Facilities:
o 46 Services, 2 Fire Hydrants and 2 Backflow Units.
East Valley Water District
Operating Expenses -Maintenance(Field)
2012-13 Proposed
010-11 2011-12 4`\rater SBwer 'Water $cover ^epartm-nt
Actual Budgeted Operating Operating Capital Proj. Capital Proj. Totals
Personnel
Wages& Salaries 1,472,577 1,510,400 867,200 278,300 1,145,500
Overtime Labor 105,132 90,000 56,700 11,300 68,000
Allocated Benefits 851,198 836,852 470,515 152,198 - 622,713
CIP Labor/Burden Credits (232,305) (70,000) (40,000) (25,000) 40,000 25,000
2,196,602 2,367,252 1,354,415 416,798 40,000 25,000 1,836,213
Other Operating Costs
Purchased Water/Assessments -
Materials and Supplies 331,846 411,000 270,000 36,000 306,000
Outside Services 313,553 400,000 225,000 160,000 385,000
Power - -
Vehicle Fuel 113,787 143,000 58,500 6,500 65,000
Office Supplies& Expenses 37,089 39,350 37,800 4,200 42,000
Professional Development 6,104 9,800 6,890 2,250 9,140
General Plant Maintenance 18.035 12,000 7,650 850 8,500
Flee',Maintenance 216,502 180,000 165,600 18,400 184.000
Rents& Leases - - -
Contractual Services 93,717 86,000 70,200 7,800 78,000
Election Expenses -
Public Outreach/Education -
Insurance -
Office Equipment 3,157 5,000 2,000 3,000 5,000
Regulatory Compliance 102 -
Safety& Emergency Preparedness 17,817 7,000 3,800 3,800
Capital Outlay 192,726 400,500 3,600 36,200 39,800
1,344,435 1,693,650 851,040 275,200 - 1,126,240
Total Operating Expenses 3,541,037 4,060,902 2,205,455 691,998 40,000 25,000 2.962,453
Maintenance
Goals and Objectives with Key Performance Indicators for Fiscal Departmental Personnel
Year 2012-13: Budgeted Positions:
• Identify Unit Cost for Service Delivery Water Service Superintendent 1
o Determine price for prospective sewer line maintenance Water Service Supervisor 1
program with Patton State Hospital.
Lead Water Service Worker 3
• Enhance System Maintenance and Modernization Efforts Lead Equipment Mechanic 1
Sewer Maintenance Heavy Equipment Operator 2
• Repair cracks and small holes identified by Sewer Video Equipment Mechanic II 1
Program utilizing new repair sleeve technology. Water Service Worker II 8
• ID sewer flow capacities through Sewer System Flow Office Specialist 1 0.5
Monitoring.
• Develop unit cost for Sewer Cleaning Services.
• Continue Sewer Video Inspection (63 Miles annually.
Water Maintenance r
• implement Valve Exercising Program - 2,500 system valves
annually.
• Implement Flushing Program - 2,780 hydrants annually.
• Take Advantage of Regional Opportunities.
o Update and maintain inventory of equipment for Mutual Aid
Agreements with neighboring utilities.
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Water Maintenance(Field) Distribution
OBJECT NUMBER ACCOUNT TITLE Water Materials,Supplies&Small Tools
TOTAL BUDGET REQUESTED 270,000 MANAGER APPROVED
This line item includes materials used (usually standard stock issues)for distributions system repairs
FY 10/11 FY 11/12 FY 12/13
Clamps, couplings,tubing 219,235 258,000 222,000
(standard stock issues)
Meter Repair parts 53,930 60,000 40,000
(standard stock issues)
Small Tools 7,120 20,000 8,000
Total 280,285 338,000 270,000
Note: budget amounts requested for the fiscal year are based on historical number of leaks. Meter repair
costs are expected to decline with a large increase in District investment in AMR.
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Sewer Maintenance(Field) Collections
OBJECT NUMBER ACCOUNT TITLE Sewer Materials&Supplies
TOTAL. BUDGET REQUESTED 36,000 MANAGER APPROVED
This line item includes materials used for maintaining the sewer lines
FY 10111 FY 11/12 FY 12113
Maintenance supplies 35,986 46,000 25,700
(degreasers. roach killers& mist supplies)
Repairs sewer equip 1,500 6,000 6,000
Camera tractor 13,000
Small tools 1,270 3,000 1,000
Manhole cover, rings& locking pins 12,805 5,000 3,300
Total 51,561 73,000 36,000
Note: need for supplies such as roach killers are expected to decrease with the expansion of the manhole
cover treatment program
East Valley Water District BG 2012-13
ANNUALBUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Water/Sewer Maintenance(Field) Distribution/Collection
OBJECT NUMBER ACCOUNT TITLE Outside Svcs-Pipeline Maintenance
TOTAL. BUDGET REQUESTED 385,000 MANAGER APPROVED
This line item includes outside services related to non-capital repairs and maintenance for water
and wastewater pipelines
FY 10/11 FY 11/12 FY 12113
Water Distribution System:
Paving services 118,394 190,000 200,000
Misc grading 6,320 - -
City permits-street cuts 49,188 50,000 50,000
Sewer Collection System: - -
Contracted sewer main'spot' repairs 139,650 150,000 100,000
includes repairs, permits and paving
Manhole cover treatment- roach deterrent - 10,000 35,000
Total 313,552 400,000 385,000
Note: amounts request in the budget are based on unit costs developed from historical occurrences.
Paving services for fiscal 2012-13 are going out to bid- savings should be realized as a result of this
competetive process.
Staff is requesting funding to expand the manhole treatment program from 420 units, to 1,850 units, at
$18.53 per unit
East Valley Water District BG 2012-13
ANNUAL BUDGET
N014-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Maintenance(Field) General&Admin
OBJECT NUMBER ACCOUNT TITLE Vehicle Fuel
TOTAL BUDGET REQUESTED 65,000 MANAGER APPROVED
This itern includes both gasoline and diesel fuel purchases for trucks and general equipment
FY 10/11 FY 11112 FY 12113
Vehicle Fuel-Field 65,389 75,000 55,500
Vehicle Fuel -Meter Shop 37,852 48,000 -
Vehicle Fuel-Garage 10,546 20,000 9,500
Total 113,787 143,000 65,000
Notes. Staff is researching vehicle software technology to mor accurately predict fuel needs and a related cost
based on mileage for each unit attached to the department
The meter shop was reorganized in 2011-12 and as a result, part of the fuel costs previously reported here
are now,budgeted for the meter readers in Customer Service
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Maintenance (Field) General &Admin
OBJECT NUMBER ACCOUNT TITLE Professional Development
TOTAL BUDGET REQUESTED 9,140 MANAGER APPROVED
This line item pays fees charged for attendance at educational meetings, meals, lodging and travel associated with
education, licenses &certifications, and subscriptions and manuals for purposes of technical knowledge
FY 10/11 FY 11112 FY 12113
Class B License Trng
Class B License Renewals 500 280
Pipelogix 495 700
Emerg Preparedness 100 350 1,000
Vactor school 150
Distrib Classes & Exams 1,231 1,000 1,000
Dist/TrmtCerts 1,118 2,000 230
Meals 1,070 2,000 2,425
Lodging
Transportation
Shop Key 1,608 1,700 2,000
Camera Trcuk Certification Training 1,000 1,005
Memberships & Dues :
Inland Counties Water Association 50 50 50
California Water Environment Association 265 500 1,000
Misc Books 17 150
Total 6,104 9,800 9,140
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Maintenance (Field) General &Admin
OBJECT NUMBER ACCOUNT TITLE General Plant Maintenance
TOTAL BUDGET REQUESTED 8,500 MANAGER APPROVED
This line item includes janitorial and maintenance services, repairs, and replacement of non-capital equipment
and fixtures, on the field trailers,warehouse, and garage
FY 10/11 FY 11/12 FY 12113
Del Rosa grounds maintenance contract 8,074 7,250 1,200
Pest control 1,116 1,200 1,200
Del Rosa property enhancements 5,107 500 4,000
Garage roll up door 3,738 - -
Emergency Generator Hook Up - 3,050 -
A/C Repairs 1,100
A/C Maint Contr-CSR - - 1,000
Total 18,035 12,000 8,500
Note: Del (Rosa property enhancements include minor repairs such as painting the warehouse interior, gravel,
Slurry, ceiling tiles, and exterior repairs
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Maintenance (Field) General&Admin
OBJECT NUMBER ACCOUNT TITLE Fleet Maintenance
TOTAL.BUDGET REQUESTED 184,000 MANAGER APPROVED
This line item includes non-capital repairs and maintenance for vehicles and general equipment,
FY 10/11 FY 11112 FY 12/13
Paint, seats, glass& misc 20,378 20,000 20,000
(outside repairs)
Tires& alignment 20,203 20,000 20,000
Monthly car washes 2,767 3,000 3,000
Major repairs > $500 25,584 30,000 30,000
Vactor repairs 38,029 10,000 20,000
Parts& Supplies 64,845 56,000 50,000
Garage Supplies& Small Tools 23,903 25,000 25,000
Equipment Repairs 20,793 16,000 16,000
Total 216,502 180,000 184,000
Note: Fleet maintenance numbers are based on previous years; staff is researching, and has requested funding for,
a fleet maintenance software program that will track actual costs by unit to provide mor direct and accurate
costs to the fleet
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Allocated Maintenance(Field) Distribution/Collection
OBJECT NUMBER ACCOUNT TITLE Contract Services
TOTAL BUDGET REQUESTED 78,000 MANAGER APPROVED
This line item includes outside services related to security of the Del Rosa site
FY 10/11 FY 11/12 FY 12113
Barry's Security- Del Rosa 82,316 72,000 78,000
Total 82,316 72,000 78,000
East Valley Water District BG 2012-13
ANNUAL BUDGET
NON-PERSONNEL EXPENSE - DETAILED EXPLANATION
FISCAL YEAR 2012-13
Fund Department Cost Center
Water.'Sewer Maintenance(Field) Various
OBJECT NUMBER ACCOUNT TITLE Capital Outlay
TOTAL BUDGET REQUESTED 39,800 MANAGER APPROVED
This line item includes purchase of vehicles,equipment(incl software)and other capital assets
FY 10111 FY 11/12 FY 12113
Mobile Restrooms 46,365 -
Cat Generators 59,797 -
Hydraulic Broom 36,145
Gate valve machine 50,000
Vactor 306,000
Vactor rehab work 24,000
Dump Trailers 10,019 13,500
Wackers 7,000
Sewer Camera w/ 'ractor 33,200
Copier for Del Rosa offices 600
Vehicle Maintenance Software 6,000
Evaporative coolers 10,400
Total 162,726 400,500 39,800
East Valley Water District BG 2012-13
East Valley
Water District
CAPITAL EXPENDITURES
DEBT SERVICES
CAPITAL IMPROVEMENT PROGRAM (CIP)
Long term capital planning is a dynamic process and is part of the District's overall strategic plan. Because strategic planning is a
process and its activities are continually changing, long-term capital planning must be subject to periodic review and revisions.
Capital planning involves identifying current and future needs, and prioritizing them based on certain operating assumptions. The
primary objective of the planning effort for the District is to create a stable long-range plan to support an orderly, efficient program of
improvement, expansion, and replacement. It is the goal of the capital planning process to develop an independent Capital
Improvement Program using a mixture of financial resources.
The long-term Capital Improvement Program is developed by staff by asking and answering the following questions:
• What facilities must be built or replaced?
• When must the facilities be built of replaced?
• How much will the facilities cost?
• Where will the financing be obtained and does the financing have a limited period of availability?
The Capital Improvement Program is intended to serve as a living document that can be updated as the District's priorities change
and as the requirements for improvements and replacements become more certain.
CHANGES IN THE CAPITAL IMPROVEMENT PROGRAM
Projects listed in the CIP are reviewed annually by District's staff to allow the program to be more responsive to changing priorities,
particularly with respect to charges in regulation and in demand projections. The changes sometimes result in the addition of
projects and in the acceleration or delay of projects. Additionally, annual review of all near-term projects provides on-going updates
on project cost estimates as detailed design information becomes available.
CAPITAL PROJECTS BUDGET
The District's Capital Projects Budget is the first year of the longer term Capital Improvement Program. The Projects included in the
2012-13 Capital Projects Budget were given high priority because they, 1) address a regulatory concern, 2) will provide operational
efficiencies, or 3) both. All of the projects will be performed by contractors with limited input from District staff for project planning and
management.
Significant capital projects included in the 2012-13 Capital Projects Budget include:
Plant 143 - current plans include construction of a 1 MG blending tank to collect water from Canal zone wells. This tank will serve two
purposes: 1) to dilute naturally occurring water quality concerns, and 2) allow air in the system to off-gas before water is distributed to
customers.
Plant 150 — this plant will serve as a treatment hub for Lower Zone wells which are experiencing a variety of water quality issues,
including Perchlorate. The plant design was completed in 2012 with SRF funding assistance, and an application for SRF
construction funding will be submitted for review at the beginning of the fiscal year.
6th Street 30" Pipeline — this 30" pipeline between Plant 151 on 6'h street, and Plant 40 at 5 t and Palm, will complete a transmission
line between planned Plant 150 in the lower zone, and Plant 40 in the intermediate zone, greatly enhancing system capabilities of
pumping water to upper zones.
Baseline Gardens Assessment District — this lone mutual water company still serving residents within the District's sphere of
influence cannot produce water after it well developed water quality issues. SRF applications seeking funding for distribution system
replacement have been submitted and, if approved, will require consolidation of Baseline Gardens into EVWD.
The following schedules provide a summary of the District's CIP, with the Capital Projects Budget shown for the 2012-13 fiscal year.
EAST VALLEY WATER DISTRICT
Five Year Capital improvement Program (Including 2012-13 Capital Budget)
Proposed
2012.13 Beyond Project
Budget 2013.14 2014-15 2015.16 2016.17 2017-18 Year 6 Totals
Source of Supply
Plant 150 Wells 825,000 1,100,000 - 1.925,000
Lower Zone Wells (2) - - 3,300,000 3,300,000
Harmony Wells (4) _ - - 4,400,000 4,400,000
Total Source of Supply Projects 825,000 1,100,000 7,700,000 9,625,000
Pumping Fal tlit►es
Plant 9 - Rehab Forebay & Booster Station 305,000 - - - 305,000
Plant 40 - Inter to Upper Zone Transfer 620,000 620,000
Plant 134 - Upper to Canal Zone Boosters 310,000 320,000 - 630,000
Plant 143 - inter to Upper Zone Boosters 2,520,000 560.000 - 1,400,000 4 480;000
Plant 12 - Replace Boosters I Well - 510,000 510,000 - 1,020,000
Plant 127 - Lower to Inter Zone Boosters - - 300,000 - - 300,000
Plant 25 - Inter to Upper Zone Boosters - - 400,000 - - 400,000
Plant 39 - Inter to Upper Zone Boosters - - - 2,200,000 - 2,200,000
Total Pumping Projects 3,755,000 1,390,000 810,000 400,000 2,200,000 1,400,000 9,955,000
Treatment faclJON 'i
Plant 134 - Uoprade Technology 1,204,469 - - - - - 1,204,469
Plant 134 - Bridge Replacement 648,468 - - - - 648,468
Plant 150 - Lower Zn Perch Treat. - Ph 1 1,510,000 7,320,000 7,520,000 1,310,000 - - 17,660,000
Plant 150 - Lower Zn Perch Treat. - Ph 2 - - - 5.050.000 2.850.000 - 7.900.000
Plant 134 - Membrane Replacement - - 460,000 460,000
Plant 152 - Inter. Zn Perch Treat. - - - - - - 19,160,000 19,160,000
Total Treatment Projects 3,362,937 7,320,000 7,520,000 6,360,000 2,850,000 - 19,620,000 47,032,937
Transmission & pistriplut ou System
6th St 20" Pipeline - Plants 11 & 12 to 150 505,000 - - - - - - 505,000
Live Oak Main Replacement 245,000 - 100,000 345,000
Harlan Lane Main Replacement 160,000 - - 160,000
EAST VALLEY WATER DISTRICT
Five Year Capital Improvement Program (Including 2012-13 Capital Budget)
Proposed
2012-13 Bevond Proiect
Budget 2013-14 2014.15 2015-16 2016.17 2017-18 Year 6 Totals
6th St 30" Pipeline - PI 151 to PI 40 3,560,000 - 3,560,000
Plant 59 Recoating 282,000 - 282,000
Baseline Gardens 5,198,933 - - - - - - 5,198,933
AMR Meter Replacement Program 980,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 - 5,980,000
Reloc. of Facilities for Other Agencies 250,000 150,000 150,000 150,000 150,000 150,000 - 1,000,000
6th St 30" Pipeline - PI 40 to PI 143 - - - 1,300,000 1,000,000 - 5,400,000 7,700,000
9th St 12" Pipeline - Del Rosa to Sterling - - - 700,000 - - - 700.000
Plant 143 - 10mg Inter Zone Storage - - - - - 10,700,000 10,700,000
Reservoir-Greenspot Rd S Curve - - - - - 10,700,000 10,700,000
Reservoir-Seven Oaks Dam Rd - - - - - 10.700.000 10,700,000
Total Trans & Distribution Projects 11,180,933 11150,000 1,250,000 3,150,000 2,150,000 1,150,000 37,500,000 57,530,933
General Projects'
GIS Implementation 100,000 - - - - - - 100,000
Headquarters Building 1,500.000 14 500,000 - 16,000,000
Total General Projects 1,600,000 14,500,000 - 16,100,000
W a stew a t1r r Cotlectla n System
Sewer System Studies I Planning 250,000 - - - - - - 250.000
Sewer Main Lining 225,000 225,000 225,000 225,000 225,000 225,000 1,800,000 3,150,000
Del Rosa Main Replacement 238,000 638,000 - - - - - 876.000
Lankershim Main Replacement 450,000 - - - - - - 450,000
Total Wastewater Collection Projects 1,163,000 863,000 225,000 225,000 225,000 225,000 1,800,000 4,726,000
TOTAL CIP PROJECTS 21,061,870 25,223,000 9,805,000 10,135,000 8,250,000 2,475,000 68,020,000 144,969,870
FUNDING SOURCES FOR 2012-13 CAPITAL BUDGET
, unding Sources ,for thee L012-i3 CaF:tSi Budge, . .clud2 transfer of a portion or current year ;parat,in a revenue generated In the
water and sewer funds, state revolving fund (SRF) grants and loans, proceeds from the District's issue of 2010 Revenue Bonds,
Capcapacity fees collected s.,.... oriel oceacemante anninet nrnnarty nkAinarc within Raeelina (:amens to the aYtpnt RRF
aury �cca wucuwu IMP, Ci,V UF. . ,,.. .............,,.. ,... ,.y.....,, r...,r... .� ....,.,,... ......... _..-_..- _. ..
Funding will not cover replacement of that water distribution system. Following is a schedule of the funding sources by projects for
2012-13.
Operating Government Bond Property Owner Development
water Projects Revenue Grants, Loans Proceeds Assessments Fees Total
Plant 9 Rehab Forebay 5,000 - 300,000 - - 305,000
Plant 40 Boosters 20,000 - 600,000 - - 620,000
Plant 134 Boosters 10,000 - 300,000 - - 310,000
Plant 143 Blending Tank 20,000 - 2,500,000 - - 2,520,000
Plant 134 Upgrade / Expansion 10,000 1,003,230 191,239' - 1,204,469
Plant 134 Bridge Repacement 40,529 607,939 - 648,468
Plant 150 Construction 10,000 1,000,000 500,000 - - 1,510,000
GIs Implementation 100,000 - - - - 100,000
Admin & Operations Facility - - 1,500,000 - - 1,500,000
Wells 11 & 12 to Plant 150 5,000 500,000 - - - 505.000
Live Oak ".lain Replacement 15,000 - 230,000 - - 245000
Harlan Lane Main Replacement 5,000 - 155,000 - - 160,000
6th Street Pipeline - PI 151 to PI 40 10,000 - 3,000,000 - 550,000 3,560,000
Facilities Relocations (City Projects) 250,000 - - - - 250,000
AMR Implementation 980,000 - - - - 980,000
Plant 59 Hydro Tank Recoating 282,000 - - - - 282,000
Baseline Gardens Distrib System - 4,679,040 - 519,893 - 5,198,933
1,762,529 7,790.209 9,276,239 519,893 550,000 19,898,870
Sewer Projects
Sewer Master Plan 250,000 - - - - 250,000
Sewer Main Lining 225,000 - - - - 225,000
Del Rosa Main-Pacific to Baseline 38,900 - 199,100 - - 238,000
Lankershim Main-Cypress to 6th 450,000 - - - - 450,000
963,900 - 199,100 - - 1,163,000
Total Capital Projects - 2,726,429 7,790,209 9,476,339 619,693 660,000 21,061,870
DEBT MANAGEMENT
The District is not subiect to statutory or legal debt limitation, however. the District's future borrowing capability is limited by the debt
service coverage ratio required by existing debt covenants. Those covenants require that the District maintain a ratio of 1.20. the
2012-13 budget projects coverage of 1.70 for water debt service of $2,710,412 and 8.50 for sewer debt service requirements of
$115,100. The District's debt service obligations are related to 2010 Refunding Revenue Bonds, and a State Revolving Fund loan
from the California Department of Water Resources.
DEBT SERVICE
The District's debt service obligations for 2012-13 are related to 2010 Refunding Revenue Bonds, and a State Revolving Fund (SRF)
loan from the California department of Water Resources. The exact amount of the SRF loan, and corresponding debt service, will
not be known until completion of the Plant 134 upgrade/expansion project in August 2012, therefore, for purposes of developing debt
service projections for the 2012-13 budget, staff has assumed that the full amount of the SRF loan funding available to the District
will be utilized.
Loan obligations to the Department of Water Resources for the Arroyo Verde and Eastwood Farms assessment districts are not
included in the following schedules. Debt service on those loans will be fully satisfied by assessments on property owners within
those assessment districts rather than by financial resources of the East Valley Water District.
Principal Balance at
F Debt Issue Use of Proceeds June 30, 2012
Refund three existing debt issues, provide funds to
2010 Revenue Bonds increase water treatment, and water transmission and 32,490,000
wastewater collection capacity
DW R Contract SRF10CX119 Upgrate treatment technology at District's water
treatment plant no. 134 7,001,964
39,491 ,964
The following table discloses the District principal and interest payments, on existing debt, for fiscal year 2012-13 through retirement.
Year ended 2010 Bond 2010 Bond SRF Principal
June 30, Principal Interest Only Total
2013 1 ,175,000 1 ,417,112 233,400 2,825,512
2014 1 ,205,000 1 ,381 ,262 233,400 2,819,662
2015 1 ,265,000 1 ,331 ,862 233,400 2,830,262
2016 1 ,315,000 1 ,273,687 233,400 2,822,087
2017 1 ,380,000 1 ,213,212 233,400 2,826,612
2018-22 7,195,000 5,025,588 1 ,167,000 13,387,588
2023-27 4,780,000 3,726,475 1 ,167,000 9,673,475
2028-32 4,110,000 2,878,931 1 ,167,000 8,155,931
2033-37 5,055,000 1 ,892,550 1 ,167,000 8,114,550
Thereafter 5,010,000 516,000 1 ,166,964 6,692,964
Total 32,490,000 20,656,679 7,001 ,964 60,148,643