HomeMy WebLinkAboutRes - 1989.141 - Dedication of Water Distribution System RECORD REQUEST OF AND MAIL TO:
East Valley Water District
P. O. Box 3427
San Bernardino, CA 92413
RESOLUTION 1989. 141
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE EAST VALLEY WATER DISTRICT
ACCEPTING DEDICATION OF WATER DISTRIBUTION SYSTEM
PHASE III, TRACT 12307 AND 12307-2
BE IT HEREBY RESOLVED by the Board of Directors of the
East Valley Water District, as follows:
WHEREAS, the water distribution system and appurtenant
structures constructed in accordance with specifications of
the East Valley Water District within Phase III, Tract 12307
and Tract 12307-2 , built for public use, have been dedicated
to said District by EAST HIGHLANDS RANCH, INC.
NOW, THEREFORE, BE IT HEREBY RESOLVED, that the
Dedication of Water Distribution System executed by EAST
HIGHLANDS RANCH, INC. dated August 11, 1988, be accepted and
all rights, title and interest in and to said water system
be vested in the East Valley Water District, and that the
Secretary of this District be, and is hereby authorized and
directed to record this Resolution with said Dedication of
• Water Distribution System attached hereto, in the office of
the County Recorder of the County of San Bernardino, State
of California.
* * * * * * * *
The foregoing resolution was duly adopted at a meeting
of the Board of Directors of the East Valley Water District,
upon motion duly made, seconded and carried on July 10,
1989 .
AYES: Directors: Stoops, Lightfoot, Douglas, Schnarre, Disch
NOES: None
ABSENT: None
EAST VALLEY ffAT1 DISTRICT
Phili A. Disch, President
Attest: Sandra Shepherd,Shepherd, Assistant
Board Secretary
DEDICATION OF WATER DISTRIBUTION SYSTEM, PHASE III, TRACT 12307 AND 12307-2
EAST HIGHLANDS RANCH PROJECT
Board of Directors
East Valley Water District
San Bernardino, California 92413
We hereby declare that the Water Distribution System, Phase III , East
Highlands Ranch Project, including Structures and Appurtenances, located in
San Bernardino County and as outlined in Exhibit "A", Scope and Location of
Water Distribution System, installed in Phase III , Tract 12307 & 12307-2 ,
East Highlands Ranch Project, attached hereto, were constructed in accordance
with all the requirements of the East Valley Water District ("District") , are
intended for public use, and that upon their acceptance by District, all
right, title, and interest of the undersigned in and to said Improvements
shall thereupon vest in District. The within dedication shall be binding upon
the successors and assignees of the undersigned.
The undersigned further declares and hereby certifies that there are no
liens or debts of any nature presently due or outstanding against or upon said
Water Distribution System for labor or materials or for any other cause
relating to their construction, and that the undersigned will hold District
free and harmless from any and all such claims or liens asserted against said
Improvements should any such claims or liens arise.
(Corporate Seal) EAST HIGHLANDS RANCH, INC.
•
By: AA��
R.E. Christoarson, President
By: / 60 in)
-
. C, igan
STATE OF CALIFORNIA )
)ss
COUNTY OF SAN BERNARDINO)
On August 11. 1988 , 1988, before me, the undersigned, a Notary
Public in and for the said County and State, personally appearedR,E. Christofferson
personally known to me to be the President and T. C. Harrigan
personally known to me to be the Vice President , of East Highlands
Ranch, Inc. , the Corporation that executed the within Instrument, on behalf of
the Corporation herein named, and acknowledged to me that such Corporation
executed the within Instrument.
Witness my hand and official seal. OFFICIAL SEAL
4, o L.A. PAULI(
NOTARY PUBLIC-CALIFORNIA
4ift SAN BERNARDINO COUNTY
of ry Public in and for said o My Comm.Expires July 22,1992
County and State
EVWD-PH3
EXHIBIT "A"
SCOPE AND LOCATION OF WATER DISTRIBUTION SYSTEM.
INSTALLED IN PHASE III, TRACT 12307 & 12307-2.
EAST HIGHLANDS RANCH PROJECT
A. Scope of Work
Unit Total
Item of Work Price Quantity Cost
Join Existing 6" Water $ 110.00 2 EA $ 220.00
Main Stub
6" Waterline $ 11.22 2,536 L.F. $28,453.92
6" Gate Valve $ 330.00 6 EA $ 1,980.00
Blow-Off $ 880.00 1 EA $ 880.00
Fire Hydrant Assembly $2,090.00 5 EA $10,450.00
3/4" Service (New Main) $ 269.50 56 EA $15,092.00
3/4" Service (Tap Existing $ 324.50 16 EA $ 5,192.00
Main)
TOTAL: $62,267.92
B. Location:
Tract No. 12307 and 12307-2 generally located north of Base Line Road
along the east side of Cloverhill Drive in Highland, CA.
C. Improvement Plans: Prepared by LUDWIG ENGINEERING , signed
by Engineer, Larry Rowe of East Valley Water District, dated
November 14, 1984 consisting of Sheet 1 of 1 to 1 inclusive
and entitled WATER DISTRIBUTION MAP, TRACT 12307.
•
EVWD-PH3