Loading...
HomeMy WebLinkAboutRes - 1989.141 - Dedication of Water Distribution System RECORD REQUEST OF AND MAIL TO: East Valley Water District P. O. Box 3427 San Bernardino, CA 92413 RESOLUTION 1989. 141 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE EAST VALLEY WATER DISTRICT ACCEPTING DEDICATION OF WATER DISTRIBUTION SYSTEM PHASE III, TRACT 12307 AND 12307-2 BE IT HEREBY RESOLVED by the Board of Directors of the East Valley Water District, as follows: WHEREAS, the water distribution system and appurtenant structures constructed in accordance with specifications of the East Valley Water District within Phase III, Tract 12307 and Tract 12307-2 , built for public use, have been dedicated to said District by EAST HIGHLANDS RANCH, INC. NOW, THEREFORE, BE IT HEREBY RESOLVED, that the Dedication of Water Distribution System executed by EAST HIGHLANDS RANCH, INC. dated August 11, 1988, be accepted and all rights, title and interest in and to said water system be vested in the East Valley Water District, and that the Secretary of this District be, and is hereby authorized and directed to record this Resolution with said Dedication of • Water Distribution System attached hereto, in the office of the County Recorder of the County of San Bernardino, State of California. * * * * * * * * The foregoing resolution was duly adopted at a meeting of the Board of Directors of the East Valley Water District, upon motion duly made, seconded and carried on July 10, 1989 . AYES: Directors: Stoops, Lightfoot, Douglas, Schnarre, Disch NOES: None ABSENT: None EAST VALLEY ffAT1 DISTRICT Phili A. Disch, President Attest: Sandra Shepherd,Shepherd, Assistant Board Secretary DEDICATION OF WATER DISTRIBUTION SYSTEM, PHASE III, TRACT 12307 AND 12307-2 EAST HIGHLANDS RANCH PROJECT Board of Directors East Valley Water District San Bernardino, California 92413 We hereby declare that the Water Distribution System, Phase III , East Highlands Ranch Project, including Structures and Appurtenances, located in San Bernardino County and as outlined in Exhibit "A", Scope and Location of Water Distribution System, installed in Phase III , Tract 12307 & 12307-2 , East Highlands Ranch Project, attached hereto, were constructed in accordance with all the requirements of the East Valley Water District ("District") , are intended for public use, and that upon their acceptance by District, all right, title, and interest of the undersigned in and to said Improvements shall thereupon vest in District. The within dedication shall be binding upon the successors and assignees of the undersigned. The undersigned further declares and hereby certifies that there are no liens or debts of any nature presently due or outstanding against or upon said Water Distribution System for labor or materials or for any other cause relating to their construction, and that the undersigned will hold District free and harmless from any and all such claims or liens asserted against said Improvements should any such claims or liens arise. (Corporate Seal) EAST HIGHLANDS RANCH, INC. • By: AA�� R.E. Christoarson, President By: / 60 in) - . C, igan STATE OF CALIFORNIA ) )ss COUNTY OF SAN BERNARDINO) On August 11. 1988 , 1988, before me, the undersigned, a Notary Public in and for the said County and State, personally appearedR,E. Christofferson personally known to me to be the President and T. C. Harrigan personally known to me to be the Vice President , of East Highlands Ranch, Inc. , the Corporation that executed the within Instrument, on behalf of the Corporation herein named, and acknowledged to me that such Corporation executed the within Instrument. Witness my hand and official seal. OFFICIAL SEAL 4, o L.A. PAULI( NOTARY PUBLIC-CALIFORNIA 4ift SAN BERNARDINO COUNTY of ry Public in and for said o My Comm.Expires July 22,1992 County and State EVWD-PH3 EXHIBIT "A" SCOPE AND LOCATION OF WATER DISTRIBUTION SYSTEM. INSTALLED IN PHASE III, TRACT 12307 & 12307-2. EAST HIGHLANDS RANCH PROJECT A. Scope of Work Unit Total Item of Work Price Quantity Cost Join Existing 6" Water $ 110.00 2 EA $ 220.00 Main Stub 6" Waterline $ 11.22 2,536 L.F. $28,453.92 6" Gate Valve $ 330.00 6 EA $ 1,980.00 Blow-Off $ 880.00 1 EA $ 880.00 Fire Hydrant Assembly $2,090.00 5 EA $10,450.00 3/4" Service (New Main) $ 269.50 56 EA $15,092.00 3/4" Service (Tap Existing $ 324.50 16 EA $ 5,192.00 Main) TOTAL: $62,267.92 B. Location: Tract No. 12307 and 12307-2 generally located north of Base Line Road along the east side of Cloverhill Drive in Highland, CA. C. Improvement Plans: Prepared by LUDWIG ENGINEERING , signed by Engineer, Larry Rowe of East Valley Water District, dated November 14, 1984 consisting of Sheet 1 of 1 to 1 inclusive and entitled WATER DISTRIBUTION MAP, TRACT 12307. • EVWD-PH3