HomeMy WebLinkAboutRes - 1989.44 - Establishing Water Rates RESOLUTION 1989.44
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE EAST VALLEY WATER DISTRICT
AMENDING RESOLUTION 1988.20
ESTABLISHING WATER RATES, RULES AND REGULATIONS FOR WATER
SERVICE BY THE EAST VALLEY WATER DISTRICT
BE IT HEREBY RESOLVED, by the Board of Directors of the
East Valley Water District as follows:
WHEREAS, the Board of Directors of the East Valley
Water District desires to establish rates, rules and
regulations for water service by the East Valley Water
District.
NOW, THEREFORE, BE IT RESOLVED, that the Board of
Directors of the East Valley Water District does hereby
resolve, determine and order that Resolution 1988. 20
entitled "ESTABLISHING WATER RATES, RULES AND REGULATIONS
FOR WATER SERVICE BY THE EAST VALLEY WATER DISTRICT" be
amended as follows:
SECTION 1. SYSTEM CHARGE
The system charge is a monthly availability charge
applicable to all metered water services and are hereby
established as follows:
METER SIZE AVAILABILITY CHARGE
5/8" X 3/4" $ 4.50 per month
3/4" $ 5.50 "
1" $ 7.50 "
1-1/2" $ 16. 50 " "
2" $ 22.50 " " , M
3" $ 37.00 " " 4.1
�..:
4" $ 63. 00 "
6" $121. 00 " "
8" $174 .00 " "
Flat Rate $ 17 .50 per month
SECTION 2. CONSUMPTION CHARGE
The consumption charge is the charge per hundred cubic
feet (HCF) for all water registered by the customer's water
service meter and is hereby established as follows:
Consumption Charge = $0.59 per hundred cubic feet
1
SECTION 10. INSPECTION CHARGE
Where a customer service connection or facility
requires inspection by District personnel, the customer
shall be charged for such inspection at the rate of $250. 00
per day.
SECTION 11. WATER SYSTEM DESIGN CHARGE
1
A non-refundable water system design charge shall be
required for all main extensions, service connections and/or
special facilities requiring the preparation of engineering
plans and drawings. The water system design charge is
hereby established as follows:
1. Water main extensions for pipeline to be installed
where a field topographic survey is necessary to
design a proper alignment and profile grade shall
be charged $1,200.00 plus $2. 15 per lineal foot.
2 . Water main extensions for pipelines within new
sub-divisions where recent 40 scale street improve-
ment plans and profiles are available and no field
survey work is necessary shall be charged $600. 00
plus $0.75 per lineal foot.
This Resolution shall take effect April 1, 1989.
ADOPTED this 27th day of March 1989.
ROLL CALL VOTE:
AYES: Directors Stoops , Lightfoot, Douglas , Schnarre, Disch
NOES: None
ABSENT: None � \
Philip A. Disch
President
ATTEST:
L W. 1weetary
2