Loading...
HomeMy WebLinkAboutRes - 1989.44 - Establishing Water Rates RESOLUTION 1989.44 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE EAST VALLEY WATER DISTRICT AMENDING RESOLUTION 1988.20 ESTABLISHING WATER RATES, RULES AND REGULATIONS FOR WATER SERVICE BY THE EAST VALLEY WATER DISTRICT BE IT HEREBY RESOLVED, by the Board of Directors of the East Valley Water District as follows: WHEREAS, the Board of Directors of the East Valley Water District desires to establish rates, rules and regulations for water service by the East Valley Water District. NOW, THEREFORE, BE IT RESOLVED, that the Board of Directors of the East Valley Water District does hereby resolve, determine and order that Resolution 1988. 20 entitled "ESTABLISHING WATER RATES, RULES AND REGULATIONS FOR WATER SERVICE BY THE EAST VALLEY WATER DISTRICT" be amended as follows: SECTION 1. SYSTEM CHARGE The system charge is a monthly availability charge applicable to all metered water services and are hereby established as follows: METER SIZE AVAILABILITY CHARGE 5/8" X 3/4" $ 4.50 per month 3/4" $ 5.50 " 1" $ 7.50 " 1-1/2" $ 16. 50 " " 2" $ 22.50 " " , M 3" $ 37.00 " " 4.1 �..: 4" $ 63. 00 " 6" $121. 00 " " 8" $174 .00 " " Flat Rate $ 17 .50 per month SECTION 2. CONSUMPTION CHARGE The consumption charge is the charge per hundred cubic feet (HCF) for all water registered by the customer's water service meter and is hereby established as follows: Consumption Charge = $0.59 per hundred cubic feet 1 SECTION 10. INSPECTION CHARGE Where a customer service connection or facility requires inspection by District personnel, the customer shall be charged for such inspection at the rate of $250. 00 per day. SECTION 11. WATER SYSTEM DESIGN CHARGE 1 A non-refundable water system design charge shall be required for all main extensions, service connections and/or special facilities requiring the preparation of engineering plans and drawings. The water system design charge is hereby established as follows: 1. Water main extensions for pipeline to be installed where a field topographic survey is necessary to design a proper alignment and profile grade shall be charged $1,200.00 plus $2. 15 per lineal foot. 2 . Water main extensions for pipelines within new sub-divisions where recent 40 scale street improve- ment plans and profiles are available and no field survey work is necessary shall be charged $600. 00 plus $0.75 per lineal foot. This Resolution shall take effect April 1, 1989. ADOPTED this 27th day of March 1989. ROLL CALL VOTE: AYES: Directors Stoops , Lightfoot, Douglas , Schnarre, Disch NOES: None ABSENT: None � \ Philip A. Disch President ATTEST: L W. 1weetary 2