HomeMy WebLinkAboutAgenda Packet - EVWD Board of Directors - 04/12/2023BOARD OF DIRECTORS
APRIL 12, 2023
East Valley Water District was formed in 1954 and provides water and wastewater services to
104,000 residents within the cities of San Bernardino and Highland, and portions of San
Bernardino County.
EVWD operates under the direction of a 5member elected Board.
GOVERNING BOARD EXECUTIVE MANAGEMENT
Phillip R. Goodrich
Chairman of the Board
Michael Moore
General Manager/CEO
James Morales, Jr.
ViceChairman
Brian W. Tompkins
Chief Financial Officer
Chris Carrillo
Governing Board Member
Jeff Noelte
Director of Engineering & Operations
Ronald L. Coats
Governing Board Member
Kelly Malloy
Director of Strategic Services
David E. Smith
Governing Board Member
Kerrie Bryan
Director of Administrative Services
Justine Hendricksen
District Clerk
Patrick Milroy
Operations Manager
Rocky Welborn
Water Reclamation Manager
Board of Directors Regular Meeting
April 12, 2023 5:30 PM
31111 Greenspot Road, Highland, CA 92346
www.eastvalley.org
PLEASE NOTE:
Materials related to an item on this agenda submitted to the Board after distribution of the
agenda packet are available for public inspection in the District’s office located at 31111
Greenspot Rd., Highland, during normal business hours. Also, such documents are available
on the District’s website at eastvalley.org and are subject to staff’s ability to post the
documents before the meeting.
Pursuant to Government Code Section 54954.2(a), any request for a disabilityrelated
modification or accommodation, including auxiliary aids or services, that is sought in order
to participate in the above agendized public meeting should be directed to the District Clerk
at (909) 8854900 at least 72 hours prior to said meeting.
In order to comply with legal requirements for posting of agenda, only those items filed
with the District Clerk by 12:00 p.m. on Wednesday prior to the following Wednesday
meeting not requiring departmental investigation, will be considered by the Board of
Directors.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL OF BOARD MEMBERS
PUBLIC COMMENTS
Any person wishing to speak to the Board of Directors is asked to complete a Speaker
Card and submit it to the District Clerk prior to the start of the meeting. Each speaker is
limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State
of California Brown Act, the Board of Directors is prohibited from discussing or taking
action on any item not listed on the posted agenda. The matter will automatically be
referred to staff for an appropriate response or action and may appear on the agenda at a
future meeting.
1.AGENDA
This agenda contains a brief general description of each item to be considered.
Except as otherwise provided by law, no action shall be taken on any item not
appearing on the following agenda unless the Board of Directors makes a
determination that an emergency exists or that a need to take immediate action on
the item came to the attention of the District subsequent to the posting of the
agenda.
a.Approval of Agenda
2.APPROVAL OF CONSENT CALENDAR
All matters listed under the Consent Calendar are considered by the Board of
Directors to be routine and will be enacted in one motion. There will be no
discussion of these items prior to the time the board considers the motion unless
members of the board, the administrative staff, or the public request specific items
to be discussed and/or removed from the Consent Calendar.
a.Approve the March 8, 2023 Regular Board Meeting Minutes
b.Approve the February 22, 2023 Regular Board Meeting Minutes
c.Approve the March 22, 2023 Regular Board Meeting Minutes
d.Approval of Directors' Fees and Expenses for March 2023
e.February 2023 Disbursements: Accounts payable disbursements for the period
include check numbers 260726 through 260872, bank drafts, and ACH
payments in the amount of $9,493,280.70 and $419,736.49 for payroll
f.Adopt Resolution 2023.06 Investment Policy
3.INFORMATIONAL ITEMS
a.FY 202324 Program Goals and Objectives Workshop
b.Total Dissolved Solids and Water Recycling
4.DISCUSSION AND POSSIBLE ACTION ITEMS
a.Sterling Natural Resource Center Contract Amendments for Balfour Beatty,
AKD Consulting, and Group Delta Consultants Contracts
5.REPORTS
a.Board of Directors’ Reports
b.General Manager/CEO Report
Water Supply Dashboard
c.Legal Counsel Report
d.Board of Directors’ Comments
ADJOURN
BOARD OF DIRECTORSAPRIL 12, 2023East Valley Water District was formed in 1954 and provides water and wastewater services to104,000 residents within the cities of San Bernardino and Highland, and portions of SanBernardino County.EVWD operates under the direction of a 5member elected Board.GOVERNING BOARD EXECUTIVE MANAGEMENTPhillip R. GoodrichChairman of the Board Michael MooreGeneral Manager/CEOJames Morales, Jr.ViceChairman Brian W. TompkinsChief Financial OfficerChris CarrilloGoverning Board Member Jeff NoelteDirector of Engineering & OperationsRonald L. CoatsGoverning Board Member Kelly MalloyDirector of Strategic ServicesDavid E. SmithGoverning Board Member Kerrie BryanDirector of Administrative ServicesJustine HendricksenDistrict ClerkPatrick Milroy
Operations Manager
Rocky Welborn
Water Reclamation Manager
Board of Directors Regular Meeting
April 12, 2023 5:30 PM
31111 Greenspot Road, Highland, CA 92346
www.eastvalley.org
PLEASE NOTE:
Materials related to an item on this agenda submitted to the Board after distribution of the
agenda packet are available for public inspection in the District’s office located at 31111
Greenspot Rd., Highland, during normal business hours. Also, such documents are available
on the District’s website at eastvalley.org and are subject to staff’s ability to post the
documents before the meeting.
Pursuant to Government Code Section 54954.2(a), any request for a disabilityrelated
modification or accommodation, including auxiliary aids or services, that is sought in order
to participate in the above agendized public meeting should be directed to the District Clerk
at (909) 8854900 at least 72 hours prior to said meeting.
In order to comply with legal requirements for posting of agenda, only those items filed
with the District Clerk by 12:00 p.m. on Wednesday prior to the following Wednesday
meeting not requiring departmental investigation, will be considered by the Board of
Directors.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL OF BOARD MEMBERS
PUBLIC COMMENTS
Any person wishing to speak to the Board of Directors is asked to complete a Speaker
Card and submit it to the District Clerk prior to the start of the meeting. Each speaker is
limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State
of California Brown Act, the Board of Directors is prohibited from discussing or taking
action on any item not listed on the posted agenda. The matter will automatically be
referred to staff for an appropriate response or action and may appear on the agenda at a
future meeting.
1.AGENDA
This agenda contains a brief general description of each item to be considered.
Except as otherwise provided by law, no action shall be taken on any item not
appearing on the following agenda unless the Board of Directors makes a
determination that an emergency exists or that a need to take immediate action on
the item came to the attention of the District subsequent to the posting of the
agenda.
a.Approval of Agenda
2.APPROVAL OF CONSENT CALENDAR
All matters listed under the Consent Calendar are considered by the Board of
Directors to be routine and will be enacted in one motion. There will be no
discussion of these items prior to the time the board considers the motion unless
members of the board, the administrative staff, or the public request specific items
to be discussed and/or removed from the Consent Calendar.
a.Approve the March 8, 2023 Regular Board Meeting Minutes
b.Approve the February 22, 2023 Regular Board Meeting Minutes
c.Approve the March 22, 2023 Regular Board Meeting Minutes
d.Approval of Directors' Fees and Expenses for March 2023
e.February 2023 Disbursements: Accounts payable disbursements for the period
include check numbers 260726 through 260872, bank drafts, and ACH
payments in the amount of $9,493,280.70 and $419,736.49 for payroll
f.Adopt Resolution 2023.06 Investment Policy
3.INFORMATIONAL ITEMS
a.FY 202324 Program Goals and Objectives Workshop
b.Total Dissolved Solids and Water Recycling
4.DISCUSSION AND POSSIBLE ACTION ITEMS
a.Sterling Natural Resource Center Contract Amendments for Balfour Beatty,
AKD Consulting, and Group Delta Consultants Contracts
5.REPORTS
a.Board of Directors’ Reports
b.General Manager/CEO Report
Water Supply Dashboard
c.Legal Counsel Report
d.Board of Directors’ Comments
ADJOURN
BOARD OF DIRECTORSAPRIL 12, 2023East Valley Water District was formed in 1954 and provides water and wastewater services to104,000 residents within the cities of San Bernardino and Highland, and portions of SanBernardino County.EVWD operates under the direction of a 5member elected Board.GOVERNING BOARD EXECUTIVE MANAGEMENTPhillip R. GoodrichChairman of the Board Michael MooreGeneral Manager/CEOJames Morales, Jr.ViceChairman Brian W. TompkinsChief Financial OfficerChris CarrilloGoverning Board Member Jeff NoelteDirector of Engineering & OperationsRonald L. CoatsGoverning Board Member Kelly MalloyDirector of Strategic ServicesDavid E. SmithGoverning Board Member Kerrie BryanDirector of Administrative ServicesJustine HendricksenDistrict ClerkPatrick Milroy Operations ManagerRocky Welborn Water Reclamation ManagerBoard of Directors Regular MeetingApril 12, 2023 5:30 PM31111 Greenspot Road, Highland, CA 92346www.eastvalley.orgPLEASE NOTE:Materials related to an item on this agenda submitted to the Board after distribution of theagenda packet are available for public inspection in the District’s office located at 31111Greenspot Rd., Highland, during normal business hours. Also, such documents are availableon the District’s website at eastvalley.org and are subject to staff’s ability to post thedocuments before the meeting.Pursuant to Government Code Section 54954.2(a), any request for a disabilityrelatedmodification or accommodation, including auxiliary aids or services, that is sought in orderto participate in the above agendized public meeting should be directed to the District Clerkat (909) 8854900 at least 72 hours prior to said meeting.
In order to comply with legal requirements for posting of agenda, only those items filed
with the District Clerk by 12:00 p.m. on Wednesday prior to the following Wednesday
meeting not requiring departmental investigation, will be considered by the Board of
Directors.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL OF BOARD MEMBERS
PUBLIC COMMENTS
Any person wishing to speak to the Board of Directors is asked to complete a Speaker
Card and submit it to the District Clerk prior to the start of the meeting. Each speaker is
limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State
of California Brown Act, the Board of Directors is prohibited from discussing or taking
action on any item not listed on the posted agenda. The matter will automatically be
referred to staff for an appropriate response or action and may appear on the agenda at a
future meeting.
1.AGENDA
This agenda contains a brief general description of each item to be considered.
Except as otherwise provided by law, no action shall be taken on any item not
appearing on the following agenda unless the Board of Directors makes a
determination that an emergency exists or that a need to take immediate action on
the item came to the attention of the District subsequent to the posting of the
agenda.
a.Approval of Agenda
2.APPROVAL OF CONSENT CALENDAR
All matters listed under the Consent Calendar are considered by the Board of
Directors to be routine and will be enacted in one motion. There will be no
discussion of these items prior to the time the board considers the motion unless
members of the board, the administrative staff, or the public request specific items
to be discussed and/or removed from the Consent Calendar.
a.Approve the March 8, 2023 Regular Board Meeting Minutes
b.Approve the February 22, 2023 Regular Board Meeting Minutes
c.Approve the March 22, 2023 Regular Board Meeting Minutes
d.Approval of Directors' Fees and Expenses for March 2023
e.February 2023 Disbursements: Accounts payable disbursements for the period
include check numbers 260726 through 260872, bank drafts, and ACH
payments in the amount of $9,493,280.70 and $419,736.49 for payroll
f.Adopt Resolution 2023.06 Investment Policy
3.INFORMATIONAL ITEMS
a.FY 202324 Program Goals and Objectives Workshop
b.Total Dissolved Solids and Water Recycling
4.DISCUSSION AND POSSIBLE ACTION ITEMS
a.Sterling Natural Resource Center Contract Amendments for Balfour Beatty,
AKD Consulting, and Group Delta Consultants Contracts
5.REPORTS
a.Board of Directors’ Reports
b.General Manager/CEO Report
Water Supply Dashboard
c.Legal Counsel Report
d.Board of Directors’ Comments
ADJOURN
BOARD OF DIRECTORSAPRIL 12, 2023East Valley Water District was formed in 1954 and provides water and wastewater services to104,000 residents within the cities of San Bernardino and Highland, and portions of SanBernardino County.EVWD operates under the direction of a 5member elected Board.GOVERNING BOARD EXECUTIVE MANAGEMENTPhillip R. GoodrichChairman of the Board Michael MooreGeneral Manager/CEOJames Morales, Jr.ViceChairman Brian W. TompkinsChief Financial OfficerChris CarrilloGoverning Board Member Jeff NoelteDirector of Engineering & OperationsRonald L. CoatsGoverning Board Member Kelly MalloyDirector of Strategic ServicesDavid E. SmithGoverning Board Member Kerrie BryanDirector of Administrative ServicesJustine HendricksenDistrict ClerkPatrick Milroy Operations ManagerRocky Welborn Water Reclamation ManagerBoard of Directors Regular MeetingApril 12, 2023 5:30 PM31111 Greenspot Road, Highland, CA 92346www.eastvalley.orgPLEASE NOTE:Materials related to an item on this agenda submitted to the Board after distribution of theagenda packet are available for public inspection in the District’s office located at 31111Greenspot Rd., Highland, during normal business hours. Also, such documents are availableon the District’s website at eastvalley.org and are subject to staff’s ability to post thedocuments before the meeting.Pursuant to Government Code Section 54954.2(a), any request for a disabilityrelatedmodification or accommodation, including auxiliary aids or services, that is sought in orderto participate in the above agendized public meeting should be directed to the District Clerkat (909) 8854900 at least 72 hours prior to said meeting.In order to comply with legal requirements for posting of agenda, only those items filedwith the District Clerk by 12:00 p.m. on Wednesday prior to the following Wednesdaymeeting not requiring departmental investigation, will be considered by the Board ofDirectors.CALL TO ORDERPLEDGE OF ALLEGIANCEROLL CALL OF BOARD MEMBERSPUBLIC COMMENTSAny person wishing to speak to the Board of Directors is asked to complete a SpeakerCard and submit it to the District Clerk prior to the start of the meeting. Each speaker islimited to three (3) minutes, unless waived by the Chairman of the Board. Under the Stateof California Brown Act, the Board of Directors is prohibited from discussing or takingaction on any item not listed on the posted agenda. The matter will automatically bereferred to staff for an appropriate response or action and may appear on the agenda at afuture meeting.1.AGENDAThis agenda contains a brief general description of each item to be considered.Except as otherwise provided by law, no action shall be taken on any item notappearing on the following agenda unless the Board of Directors makes adetermination that an emergency exists or that a need to take immediate action onthe item came to the attention of the District subsequent to the posting of theagenda.a.Approval of Agenda2.APPROVAL OF CONSENT CALENDARAll matters listed under the Consent Calendar are considered by the Board ofDirectors to be routine and will be enacted in one motion. There will be nodiscussion of these items prior to the time the board considers the motion unlessmembers of the board, the administrative staff, or the public request specific itemsto be discussed and/or removed from the Consent Calendar.a.Approve the March 8, 2023 Regular Board Meeting Minutesb.Approve the February 22, 2023 Regular Board Meeting Minutesc.Approve the March 22, 2023 Regular Board Meeting Minutesd.Approval of Directors' Fees and Expenses for March 2023
e.February 2023 Disbursements: Accounts payable disbursements for the period
include check numbers 260726 through 260872, bank drafts, and ACH
payments in the amount of $9,493,280.70 and $419,736.49 for payroll
f.Adopt Resolution 2023.06 Investment Policy
3.INFORMATIONAL ITEMS
a.FY 202324 Program Goals and Objectives Workshop
b.Total Dissolved Solids and Water Recycling
4.DISCUSSION AND POSSIBLE ACTION ITEMS
a.Consider Approval of Sterling Natural Resource Center Contract Amendments
for Balfour Beatty, AKD Consulting, and Group Delta Consultants Contracts
5.REPORTS
a.Board of Directors’ Reports
b.General Manager/CEO Report
Water Supply Dashboard
c.Legal Counsel Report
d.Board of Directors’ Comments
ADJOURN
Agenda Item
#2a
March 22, 20231
Meeting Date: March 22, 2023
Agenda Item #2a
Consent Item
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Approve the March 8, 2023 Regular Board Meeting Minutes
RECOMMENDATION
That the Board of Directors approve the March 8, 2023 regular Board meeting minutes.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
B. Utilize Effective Communication Methods
REVIEW BY OTHERS
This agenda item has been reviewed by Administration.
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Justine Hendricksen
District Clerk
ATTACHMENTS
Draft March 8, 2023 Regular Board Meeting Minutes
Regular Board Meeting
Meeting Date: March 8, 2023
CALL TO ORDER
The Chairman of the Board called the meeting to order at 5:30 p.m.
PLEDGE OF ALLEGIANCE
Director Coats led the flag salute.
ROLL CALL OF BOARD MEMBERS
PRESENT
Directors: Carrillo, Coats, Goodrich, Morales, Smith
ABSENT
None
STAFF
Michael Moore, General Manager/CEO; Brian Tompkins, Chief Financial Officer; Jeff
Noelte, Director of Engineering and Operations; Kelly Malloy, Director of Strategic
Services; Rocky Welborn, Water Reclamation Manager; William Ringland, Public
Affairs/Conservation Manager; Ryan Ritualo, IT Manager; Shayla Antrim, Administrative
Specialist
LEGAL COUNSEL
Marty Cihigoyenetche
GUESTS
Members of the public
PUBLIC COMMENTS
Chairman Goodrich declared the public participation section of the meeting open at 5:31
p.m.
Draft Pending Approval
6
4
8
The Administrative Specialist announced that one written public comment was received
by email from Amelia Erika and Ricardo Velarde. The letter was read aloud and the
General Manager/CEO announced that he will follow up with the customer.
There being no further written or verbal comments, the public participation section was
closed at 5:34 p.m.
1.APPROVAL OF AGENDA
a.Approval of Agenda
A motion was made by Director Coats, seconded by Director Carrillo, that the Board
approve the March 8, 2023 agenda as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
2.APPROVAL OF CONSENT CALENDAR
a.February 8, 2023 Regular Board Meeting Minutes
b.Approval of Directors Fees and Expenses for February 2023
A motion was made by Vice Chairman Morales, seconded by Director Smith, that the
Board approve the Consent Calendar items as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
3.INFORMATIONAL ITEMS
a. Septic-to-Sewer Conversion
The Director of Engineering and Operations updated the Board on the progress of the
Septic-to-Sewer conversion project. He provided an overview of what a septic system
entails and the benefits of transitioning to sewer. He stated that $350 million has been
allocated at the State level towards converting septic systems to sewer systems, mainly
targeting disadvantaged communities and discussed factors that may determine how
the grant funds are allocated. That staff is currently in the process of developing a
grant application with the support of a consultant. He discussed the steps needed to
accomplish the conversion of septic systems to the District’s sewer system, permitting,
cost allocations, obligations of the ratepayers, and the role the County plays in the
conversion process.
The Director of Engineering and Operations identified areas on a map that are on septic
systems and where the District first plans to focus on septic to sewer conversions.
6
4
8
The Director of Engineering and Operations responded to a question from a member of
the public, Wayne Brown, in regard to slide #4 referring to what costs will be covered.
He stated that he expects all costs to be covered with grant funds, but with the possible
exception of city permitting costs.
The Director of Engineering and Operations responded to a question from a member of
the public, Mark Falcone. He stated that a key factor of the grant funding is to pursue
those in disadvantaged areas. He stated that the District is hoping that there will be
more State funding in the future to cover the remaining 900+ parcels that are on septic
that will not be covered under this first round of conversions.
The Director of Engineering and Operations responded to a question from a member of
the public, Fred Yauger, in regard to slide #13 referring to an area of new development
and how the developer plans to proceed with wastewater. He stated that more research
needs to be done to determine how that area will be handled.
The Director of Engineering and Operations responded to a question from a member of
the public, Dr. Alan Kay, in regard to how the District will handle properties that are on
septic, that are tenant-occupied versus owner-occupied; how will tenants be ensured
that they are not negatively impacted. He stated that there is no way to force owners to
convert to the sewer system. He added that if a property owner’s septic system fails
and needs a new septic system, if they are within 200 feet of the sewer line, the County
will not issue a new permit for septic.
The Director of Engineering and Operations responded to a question from Director
Coats. He stated that a ratepayer that converts to sewer may not want to pay the
monthly fee; in that case, staff will use outreach efforts to educate the public on the
benefits of conversion. If a large amount of property owners in a specific area do not
want to participate in the conversion program, they will move on to another area within
the District.
The Director of Engineering and Operations responded to a question from Chairman
Goodrich. He estimates that it will take approximately 4-5 years to convert 600
ratepayers from septic to sewer, depending on the conditions of the grant funding.
The General Manager/CEO and staff responded to questions from the Board.
For information only.
4.DISCUSSION AND POSSIBLE ACTION ITEMS
6
4
8
a. Consider Sterling Natural Resource Center – Fourth Amendment to the
Regional Recycled Water Facilities Reimbursement Agreement
The General Manager/CEO provided an overview of the Regional Recycled Water
Facilities Reimbursement Agreement with San Bernardino Valley Municipal Water
District (Valley District) for reimbursements of costs associated with the Regional
Recycled Water Pipeline (RRWP) and Weaver Basin.
The Director of Engineering and Operations provided an update on the progress of the
Regional Recycled Pipeline construction taking place between the Sterling Natural
Resource Center and the Weaver Basin.
The Director of Engineering and Operations discussed details of the fourth amendment
to the Regional Recycled Water Facilities Reimbursement Agreement with Valley
District. He stated that the reimbursement budget in the Agreement was based on a
30% design of the RRWP. That several changes to the RRWP were necessary due to
permitting requirements. That permitting requirements resulted in additional costs due
to cost escalation, delays, and construction constraints based on permit conditions. An
additional cost of $6,779,216 is required to complete the RRWP. The proposed
reimbursement from Valley District will be $44,429,216. He added that on February 14,
2023, Valley District Board of Directors approved the Fourth Amendment to the
Agreement.
The General Manager/CEO stated that the next step will be to give an amendment to
the contractor which will be brought to the Board at a later date.
A motion was made by Director Coats, seconded by Vice Chairman Morales, that the
Board of Directors authorize the General Manager/CEO to execute the Fourth
Amendment to the Regional Recycled Water Facilities Reimbursement Agreement with
the San Bernardino Valley Municipal Water District, as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
b. Consider Memorandum of Understanding, Cost Share Agreement and
Letter of Funding Commitment for the Bunker Hill Basin Regional Recycled
Water Feasibility Study
The General Manager/CEO stated that in order to discharge from the Sterling Natural
Resource Center a permit is needed from the Regional Water Quality Control Board. An
engineering study needs to be performed in order to ensure that discharge will not
degrade the groundwater basin. He stated that the engineering study will not only
cover the Sterling Natural Resource Center, but all those that are part of the entire
Regional Recycled Water Project.
6
4
8
The Director of Engineering and Operations provided details on documents needed to
begin the collaborative effort with the potential recycled water agencies and San
Bernardino Valley Municipal Water District to evaluate mitigation alternatives: 1)
Memorandum of Understanding; 2) Cost Share Agreement; and 3) Letter of Funding
Commitment. He stated that this effort will work together with agencies to ensure salt
loading to the groundwater basin does not impact water supplies.
A motion was made by Director Coats, seconded by Vice Chairman Morales, that the
Board of Directors authorize the General Manager/CEO to execute a Memorandum of
Understanding, Cost Share Agreement and Letter of Funding Commitment related to
Mitigation of Salt Loading in the Bunker Hill-B Groundwater Basin, as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
5.REPORTS
a.Board of Directors’ Reports
Director Carrillo reported on the following: February 23 he attended the Community
Heritage and Education Foundation Board of Directors meeting; February 24 he toured
the Sterling Natural Resource Center with the General Manager/CEO; and March 7 he
met with the General Manager/CEO to review the agenda.
Director Coats reported on the following: February 23 he attended the Community
Heritage and Education Foundation Board of Directors meeting; February 28 he
attended the San Bernardino Municipal Water Department’s Board meeting; February
28 he attended the Highland Chamber of Commerce meeting; March 1 he met with the
General Manager/CEO to discuss District business; March 2 he attended the San
Bernardino Valley Municipal Water District Policy & Administration Workshop; and March
7 he met with the General Manager/CEO to review the agenda.
Director Smith reported on the following: February 28 he attended the Highland
Chamber of Commerce meeting; March 7 he met with the General Manager/CEO to
review the agenda; and March 8 he attended the San Bernardino Valley Water
Conservation District Board meeting with nothing to report.
Vice Chairman Morales reported on the following: February 28 he participated in a
meeting with State legislators and delegates in Sacramento, where they discussed
septic to sewer grant applications and provided an update on the Sterling Natural
Resource Center; March 7 he attended the San Bernardino Valley Municipal Water
District Board meeting where they approved a $65 million project to build additional
water storage infrastructure and discussed holding a workshop in the future to decide
how they approach legislative activities.
6
4
8
Chairman Goodrich reported on the following: February 23 he attended the Community
Heritage and Education Foundation Board of Directors meeting; February 28 he
participated in a meeting with State legislators and delegates in Sacramento; and March
2 he met with the General Manager/CEO to review the agenda and discuss District
business.
For information only.
b.General Manager/CEO Report
The General Manager/CEO announced the following:
•March 2 the Employee Events Association (EEA) held the Spring Drive to raise
money for Jefferson Elementary School students to attend Science Camp where
they received approximately $800 in donations. The EEA donated $500, bringing
the total to $1,300. He read an email from the Principal regarding the students’
time at Science Camp and thanking the EEA for their donations.
•Next week is National Ground Water Week. Just as a reminder, items like
cleaners, pesticides, paint, fertilizers, chlorine, and motor oil should never be
dumped down the drain, trash or ground. Instead, take them to a hazardous
waste collection site.
•The Finance and Human Resources Committee will be meeting on Tuesday,
March 14th at 3:30 p.m.
•March 17th, East Valley Water District will be hosting a pop-up booth at Indian
Springs High School during the school’s lunch to engage with students and
provide conservation information.
•He provided current photos of the Seven Oaks Dam with snow-capped
mountains in the background.
•On Tuesday, staff met with Metropolitan Water District and provided a tour of
the Sterling Natural Resource Center.
•Last week he went on a Legislative Trip with staff to Sacramento and met with
several delegates. They provided updates on the Sterling Natural Resource
Center, and stated that trip it was very productive. He thanked delegates for
their contributions and for getting septic to sewer added to the budget.
The General Manager/CEO introduced the Director of Engineering and Operations to
present the Water Supply Dashboard. Mr. Noelte reviewed key highlights of the
Dashboard. Director Carrillo and Chairman Goodrich both commented that they
appreciate the Water Supply Dashboard update and asked that they continue in the
future.
6
4
8
For information only.
c.Legal Counsel Report
No report at this time.
d.Board of Directors’ Comments
Director Carrillo thanked the General Manager/CEO for meeting with Metropolitan Water
District and said that it was impressive that they came to us to learn about the District’s
project. He thanked the General Manager/CEO, Chairman and Vice Chairman for
meeting with state legislators and for being a voice for the region.
Director Coats thanked the Director of Engineering and Operations for his reports and
thanked staff for all they do.
Vice Chairman Morales echoed Director Carrillo’s comments about Metropolitan Water
District. He stated that it is a testament to staff of where we are and who we are. He
expressed his appreciation to Customer Service for working with customers and that he
appreciates the Employee Events Association.
Chairman Goodrich stated that we have taken many things for granted, and as a
District, we need to take care of groundwater by recharging it and monitoring the salt.
For information only.
ADJOURN
Chairman Goodrich adjourned the meeting at 6:55 p.m.
Phillip R. Goodrich, Board President
Michael Moore, Board Secretary
Agenda Item
#2b
April 12, 20231
Meeting Date: April 12, 2023
Agenda Item #2b
Consent Item
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Approve the February 22, 2023 Regular Board Meeting Minutes
RECOMMENDATION
That the Board of Directors approve the February 22, 2023 regular Board meeting
minutes.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
B. Utilize Effective Communication Methods
REVIEW BY OTHERS
This agenda item has been reviewed by Administration.
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Justine Hendricksen
District Clerk
ATTACHMENTS
Draft February 22, 2023 Regular Board Meeting Minutes
Regular Board Meeting
Meeting Date: February 22, 2023
CALL TO ORDER
The Chairman of the Board called the meeting to order at 5:30 p.m.
PLEDGE OF ALLEGIANCE
Captain Casey Jiles led the flag salute.
PRESENTATIONS AND CEREMONIAL ITEMS
a.Certificate of Appreciation to Deputy Zachary Twardowski for his Service
to the Community
The General Manager/CEO presented Deputy Twardowski with a Certificate of
Appreciation for his service to the community.
b.Vehicle Donation to Highland Senior Center
Ms. Penny Lilburn, Executive Director of the Highland Senior Center, accepted a
vehicle donation from the District. She stated that she appreciates the donation and
that it will be put to good use, delivering thousands of pounds of food to over 800
senior citizens.
ROLL CALL OF BOARD MEMBERS
PRESENT
Directors: Carrillo, Coats, Goodrich, Morales, Smith
ABSENT
None
STAFF
Michael Moore, General Manager/CEO; Brian Tompkins, Chief Financial Officer; Jeff
Noelte, Director of Engineering and Operations; Kerrie Bryan, Director of Administrative
Draft Pending Approval
9
4
3
Services; Kelly Malloy, Director of Strategic Services; Rocky Welborn, Water
Reclamation Manager; William Ringland, Public Affairs/Conservation Manager; Justine
Hendricksen, District Clerk; Ryan Ritualo, IT Manager; Shayla Antrim, Administrative
Specialist
LEGAL COUNSEL
Jean Cihigoyenetche
GUESTS
Members of the public
PUBLIC COMMENTS
Chairman Goodrich declared the public participation section of the meeting open at 5:40
p.m.
There being no written or verbal comments, the public participation section was closed.
1.APPROVAL OF AGENDA
a.Approval of Agenda
A motion was made by Director Smith, seconded by Director Coats, that the Board
approve the February 22, 2023 agenda as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
2.APPROVAL OF CONSENT CALENDAR
a.Financial Statements for December 2022
b.Financial Statements for January 2023
c.January 2023 Disbursements: Accounts payable disbursements for the
period include check numbers 260611 through 260725, bank drafts, and
ACH payments in the amount of $3,758,246.03 and $436,002.62 for
payroll
d.Investment Transaction Report for Month Ended January 31, 2023
e.Resolution 2023.02 - Authorizing the Grant Application, Acceptance, and
Execution for the East Valley Water District Groundwater Supply
Resiliency - New Well Construction Project
f.Resolution 2023.03 - Designation of Applicant's Agent Resolution for Non-
State Agencies
g.Resolution 2023.04 - Designating an Authorized Representative or
Designee to carry out the responsibilities under the Financing Agreement
for the State Water Resources Control Board
h.Approve the Cancellation of the May 10, 2023 Regular Board Meeting
9
4
3
A motion was made by Director Coats, seconded by Director Smith, that the Board
approve the Consent Calendar items as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
3.INFORMATIONAL ITEMS
a. 2022 Top Workplace Program
The Director of Administrative Services provided information regarding the District’s
participation and placement in the Press Enterprise Top Workplace Program. She stated
this is the District’s 8th year participating in the program. She stated that staff fills out
an anonymous survey and results are provided to the District as a summary.
The Director of Administrative Services responded to Mr. Kielhold’s question stating that
there are 66 staff members currently employed at the District.
The General Manager/CEO and staff responded to questions from the Board.
For information only.
4.DISCUSSION AND POSSIBLE ACTION ITEMS
a. Consider Approval of Administrative Policy 2.4 - Telework Policy
The Director of Administrative Services provided information regarding Administrative
Policy 2.4 – Telework Policy. She stated that 75% similar agencies have implemented a
telework policy. She discussed the benefits to the District and staff and described how
the policy will work once implemented. She added that the policy has been reviewed by
the Finance & Human Resources Committee and will be reviewed periodically.
The Director of Administrative Services responded to several questions from the Board.
A motion was made by Director Coats, seconded by Director Carrillo, that the Board
approve Administrative Policy 2.4 – Telework Policy, as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
b. Consider Approval of Fiscal Year 2022-23 Mid-Year Budget Revisions
The Chief Financial Officer provided a presentation of FY 2022-23 mid-year Budget
revisions: he reviewed the operating budget, program summaries, discussed staffing
9
4
3
changes, presented an overview of revisions and adjustments to the Capital Budget, and
reviewed accomplishments and District awards. He discussed details of adjustments to
expenses and revenues due to the delay in the commissioning of the Sterling Natural
Resource Center. He stated that the revisions to the Budget were reviewed by the Finance
& Human Resources Committee.
The Chief Financial Officer responded to several questions from the Board.
A motion was made by Director Coats, seconded by Director Smith, that the Board
approve amendments to the FY 2022-23 Operating and Capital Budgets as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
c. Consider Approval of the FY 2023-24 Five-Year Work Plan
The General Manager/CEO reviewed key elements of the District’s 2023-24 Five-Year
Work Plan. He provided background information on the development of the Plan and
discussed minor adjustments made from previous years. He stated that during a series
of meetings with staff and the Community Advisory Commission, an updated Five-Year
Work Plan has been prepared. He reviewed organizational priorities and provided
details on goals and objectives contained in the Plan.
A motion was made by Vice Chairman Morales, seconded by Director Carrillo, that the
Board approve the Fiscal Year 2023-24 Five-Year Work Plan, as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
5.REPORTS
a.Board of Directors’ Reports
Director Smith reported that on February 14 he attended the Finance & Human
Resources Committee meeting.
Director Carrillo reported on the following: February 9 he attended the Inland Action
meeting where Assemblyman Essayli was in attendance; February 14 he attended the
Inland Action meeting where Sheriff Dicus and District Attorney Anderson were the
speakers and provided a report on crime within the County; and February 17 he met
with the General Manager/CEO to review the agenda and discuss District business.
9
4
3
Director Coats reported on the following: February 9 he attended the San Bernardino
Valley Municipal Water District Board meeting where they reviewed and discussed mid-
year general fund budget; February 14 he attended the City of San Bernardino Water
Department Board meeting where they discussed Covid 19 and adding additional wells;
February 14 he attended the Finance and Human Resources Committee meeting where
they reviewed Top Workplace survey results, Telework Policy, and went reviewed the
mid-year budget; February 15 he met with the General Manager/CEO to discuss District
business; February 20 he attended the Association of San Bernardino County Special
Districts Board meeting where they discussed their in-coming general meeting and
unveiled their new Special Districts web site for the local association; and February 21
he met with the General Manager/CEO to review the agenda and discuss District
business.
Vice Chairman Morales reported on the following: February 9 he attended the
Legislative & Public Outreach Committee meeting; February 10 he attended the
Association of California Water Agencies (ACWA) State Legislative Committee meeting;
February 14 he attended the San Bernardino Valley Municipal Water District’s
Engineering Committee meeting where they discussed the contract to finish the
Regional Recycled Water Pipeline; February 16 he met with the General Manager/CEO
to discuss District business; February 17 he attended the ACWA Region 9 Board
meeting where they discussed education for upcoming conferences; and February 21
he attended the San Bernardino Valley Municipal Water District Board meeting.
Chairman Goodrich reported on the following: February 9 he attended the Legislative &
Public Outreach Committee meeting; February 14 he attended the Highland City Council
meeting where they discussed airport development activity and the 210 freeway
project; February 16 he met with the General Manager/CEO to review the agenda and
discuss District business.
For information only.
b.General Manager/CEO Report
The General Manager/CEO announced the following:
•February 18 the District held a Conservation Workshop at the Sterling Natural
Resource Center. There were approximately 35 community members in
attendance. The workshop discussed how to address common leaks in the home.
•February 23 at 10am the District will be holding the annual Community Heritage
and Education Foundation (CHEF) Board of Directors meeting in the Boardroom.
•The Employee Events Association assembled 90 backpacks for Hunt Elementary
students attending Science Camp. The backpacks will be delivered to students
later this week.
9
4
3
•He provided information regarding the Governor’s Executive Order made on
February 13, 2023 regarding climate action; he stated that this will help expedite
permits for projects.
•The Department of Water Resources announced an increase in the State Water
Project Table A allocation from 30% to 35%.
For information only.
c.Legal Counsel Report
No report at this time.
d.Board of Directors’ Comments
Director Smith stated that he spent some of his best years at Jefferson Hunt Elementary
School; and he recognized George Washington’s birthday.
Director Coats shared the Association of San Bernardino County Special Districts’ new
website: asbcsd.specialdistrict.org. He stated that there will be many improvements
coming over the next couple of weeks.
Vice Chairman Morales stated that he received a compliment from a customer who had
a great time at the District’s Conservation Workshop over the weekend; he is pleased
that the Community Advisory Commission is going strong; and that he’s impressed with
the Employee Events Association.
Chairman Goodrich stated that he appreciates Mr. Tompkins and staff for their hard
work on the budget and Five-Year Work Plan.
For information only.
ADJOURN
Chairman Goodrich adjourned the meeting at 7:30 p.m.
Phillip R. Goodrich, Board President
Michael Moore, Board Secretary
Agenda Item
#2c
April 12, 20231
Meeting Date: April 12, 2023
Agenda Item #2c
Consent Item
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Approve the March 22, 2023 Regular Board Meeting Minutes
RECOMMENDATION
That the Board of Directors approve the March 22, 2023 regular Board meeting
minutes.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
B. Utilize Effective Communication Methods
REVIEW BY OTHERS
This agenda item has been reviewed by Administration.
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Justine Hendricksen
District Clerk
ATTACHMENTS
Draft March 22, 2023 Regular Board Meeting Minutes
Regular Board Meeting & Public Hearing
Meeting Date: March 22, 2023
CALL TO ORDER
The Chairman of the Board called the meeting to order at 5:30 p.m.
PLEDGE OF ALLEGIANCE
Director Coats led the flag salute.
ROLL CALL OF BOARD MEMBERS
PRESENT
Directors: Carrillo, Coats, Goodrich, Smith
ABSENT
Director Morales
STAFF
Michael Moore, General Manager/CEO; Brian Tompkins, Chief Financial Officer; Jeff
Noelte, Director of Engineering and Operations; Kerrie Bryan, Director of Administrative
Services; Kelly Malloy, Director of Strategic Services; Rocky Welborn, Water
Reclamation Manager; Patrick Milroy, Operations Manager; Justine Hendricksen, District
Clerk; William Ringland, Public Affairs/Conservation Manager; Ryan Ritualo, IT
Manager; Shayla Antrim, Administrative Specialist
LEGAL COUNSEL
Jean Cihigoyenetche
GUESTS
Members of the public
PUBLIC COMMENTS
Chairman Goodrich declared the public participation section of the meeting open at 5:32
p.m.
Draft Pending Approval
6
4
8
There being no written or verbal comments, the public participation section was closed.
1.APPROVAL OF AGENDA
a.Approval of Agenda
A motion was made by Director Coats, seconded by Director Carrillo, that the Board
approve the March 22, 2023 agenda as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Smith
Noes: None
Absent: Director Morales
2.APPROVAL OF CONSENT CALENDAR
a.Investment Transaction Report for Month Ended February 28, 2023
b.Financial Statements for February 2023
A motion was made by Director Smith, seconded by Director Coats, that the Board
approve the Consent Calendar items as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Smith
Noes: None
Absent: Morales
3.INFORMATIONAL ITEMS
a. Water and Wastewater Pathway and Educational Partnership Update
The Director of Administrative Services provided an update on the District’s Pathway
Program and other educational partnership opportunities. She provided an overview of
the history of the pathway program. She discussed details of the program, including but
not limited to challenges faced during previous years and how the program was
restructured, the Harbor Freight Fellowship Initiative trades-related internship,
integration with Arroyo Valley High School’s Core Academy and San Gorgonio High
School Construction Trades Pathway program, and the District’s Summer Internship
Program.
The Director of Administrative Services provided further details on the Summer
Internship Program. She stated that this will be the first year of the program and that
the majority of the program will be held at the Sterling Natural Resource Center.
Students will be required to fill out an application to apply for the internship program.
Once completed, the students will receive a certificate of completion. She added that
interns will be given priority over interviews for job openings at the District.
For information only.
6
4
8
4.DISCUSSION AND POSSIBLE ACTION ITEMS
a. Consider Adoption of Sewer Ordinance No. 404 East Valley Water District
Sewer Regulations and Service Change Ordinance, Public Hearing
The General Manager/CEO stated that the purpose of the update to the sewer
ordinance is to establish a source control and pretreatment program.
The Water Reclamation Manager discussed revisions to the District’s Sewer Rules and
Regulations ordinance. He stated that Title 40 of the code of federal regulations
requires that any agency that operates a publicly owned treatment works is required to
implement national pretreatment standards to control pollutants that can pass through
or interfere with treatment processes at wastewater treatment plants. Historically, the
District has relied on the City of San Bernardino to run the program due to being the
agency that has treated the District’s wastewater. He stated that regulators have
requested that the program be in place before they issue permits. He provided details
of the District’s proposed wastewater pretreatment program and stated that updates to
the ordinance are necessary to establish policies and procedures for non-compliance by
creating enforcement programs. He also reviewed fines and penalties associated with
non-compliance.
CHAIRMAN GOODRICH OPENED THE PUBLIC HEARING AT 6:14 P.M.
Chairman Goodrich declared the public participation section of the meeting open at 6:14
p.m.
No public comments received.
CHAIRMAN GOODRICH ANNOUNCED THE PUBLIC HEARING CLOSED AND
ADJOURNED TO THE REGULAR BOARD MEETING AT 6:15 P.M.
Director Smith asked a question regarding the third-party inspector process. The Water
Reclamation Manager responded that the third-party inspector will be brought back as a
separate item at a future meeting and that a Request for Proposal will be required.
Director Coats asked if the Sterling Natural Resource Center will be used as a dump
station. The Water Reclamation Manager responded that it will not.
A motion was made by Director Coats, seconded by Director Smith, that the Board of
Directors adopt Sewer Ordinance No. 404 to update the existing ordinance to establish
a Source Control/Pretreatment Program required for wastewater treatment at Sterling
Natural Resources Center, as submitted.
The motion was carried by the following roll call vote:
Ayes: Coats, Smith, Carrillo, Goodrich
Noes: None
Absent: Director Morales
6
4
8
b. Consider Adoption of the 2023 Enforcement Response Plan and Resolution
2023.05 – Updating the Schedule of Water and Wastewater Rates and
Charges and Certain Miscellaneous Fees, Public Hearing
The General Manager/CEO stated that this is the second of three items that are needed
to enable the District to meet the regulations that are required by the State to operate a
wastewater treatment plant and collection system.
The Water Reclamation Manager stated that following the adoption of Ordinance No. 404,
the District is required to develop a mechanism to address non-compliance with the
ordinance. The unique nature of the Sterling Natural Resource Center requires that the
District obtain a Waste Discharge Requirement (WDR), which means that the District will
be required to develop an Enhanced Source Control Program. It has been determined
that an Enforcement Response Plan (ERP) is an appropriate mechanism to satisfy that
requirement, which lays out the policies and procedures on how the District will address
non-compliance. He stated that rates and penalties are included as part of the ERP, which
are consistent with other local agencies. He reviewed the various violations that are
outlined in the ERP.
CHAIRMAN GOODRICH OPENED THE PUBLIC HEARING AT 6:26 P.M.
Chairman Goodrich declared the public participation section of the meeting open at 6:26
p.m.
No public comments received.
CHAIRMAN GOODRICH ANNOUNCED THE PUBLIC HEARING CLOSED AND
ADJOURNED TO THE REGULAR BOARD MEETING AT 6:27 P.M.
Chairman Goodrich asked whether the penalty for non-compliance can reach a point
where violator’s sewer access will get blocked. The Water Reclamation Manager stated
that there are several enforcement actions before it can reach that point, which makes
it a rare occurrence.
Legal Counsel provided input from experience of two cases in which a violator was
blocked from the sewer connection due to significant violations.
A motion was made by Director Coats, seconded by Director Carrillo, that the Board of
Directors: 1. Adopt 2023 Enforcement Response Plan (ERP) to establish policies and
procedures to address non-conformance to the District’s Sewer Ordinance by permitted
dischargers; and, 2. Adopt Resolution 2023.05 - Establishing a Schedule of Water and
Wastewater Rates and Charges, and miscellaneous fees related to the provision of
those services.
6
4
8
The motion was carried by the following roll call vote:
Ayes: Coats, Carrillo, Smith, Goodrich
Noes: None
Absent: Director Morales
c. Consider Adoption of the 2023 Sewer System Management Plan (SSMP)
The General Manager/CEO stated that this is the final governance needed which relates
to the Sewer System Management Plan.
The Water Reclamation Manager stated that following the establishment of the District’s
Pretreatment Program, the District needs to update the Sewer System Management
Plan. An update has been requested by the Sterling Natural Resource Center permitters.
He stated that SSMP’s are typically updated on a five-year cycle and that the last
update was in 2019. He described what is included in the SSMP, updates made and why
it is necessary.
The Water Reclamation Manager responded to a question from Chairman Goodrich. He
stated that flow transitions from the City of San Bernardino to the Sterling Natural
Resource Center are outlined in the framework agreement.
A motion was made by Director Smith, seconded by Director Coats, that the Board of
Directors adopt the 2023 Sewer System Management Plan (SSMP) and replace the
Overflow Emergency Response Plan with a new Spill Emergency Response Plan.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Smith
Noes: None
Absent: Director Morales
5.REPORTS
a.Board of Directors’ Reports
Director Carrillo reported on the following: March 15 he attended the City of San
Bernardino City Council meeting where Mayor Tran voted in favor of AB 349; and March
20 he met with the General Manager/CEO to discuss District business and review the
agenda.
Director Smith reported on the following: March 14 he attended the Finance & Human
Resources Committee meeting where they reviewed the Investment Policy; March 20 he
attended the Association of San Bernardino County Special Districts monthly meeting;
March 21 he attended the San Bernardino County Local Agency and Formation
Commission meeting; and March 21 he met with the General Manager/CEO to review
the agenda and discuss District business.
6
4
8
Director Coats reported on the following: March 13 he attended the Association of San
Bernardino County Special Districts monthly Board meeting to discuss Association
business, held election of officers and welcomed their newest board member; March 14
he attended the City of San Bernardino Water Department where they approved several
Professional Services Agreements; modifications to approval of SRF Funding for 10
various pipeline replacement projects totaling 9,800 feet of pipeline; March 14 he
attended the Finance and Human Resources Committee Meeting where they reviewed
the Investment Policy and Pathway Education Partnership Update; March 15 he met
with the General Manager/CEO to discuss District business; March 20 he attended the
Association of San Bernardino County Special Districts monthly meeting where the topic
discussed was Innovative and Sustainable Water Supply Solutions Supporting the Inland
Empire Today and Tomorrow; March 22 he met with the General Manager/CEO to
review the agenda and discussed District business; and March 22 he attended the San
Bernardino Valley Municipal Water District Board meeting where they passed resolutions
relating to grant funding and water rights and announced that they will buy an
additional 5,000 acre-feet of water through the State Water Project under Article 21.
Chairman Goodrich reported on the following: March 14 he attended the City of
Highland City Council meeting; March 16 he met with the General Manager/CEO to
review the agenda and discussed District business; and March 20 he attended the
Association of San Bernardino County Special Districts monthly meeting where Steve
Elie was the guest speaker.
For information only.
b.General Manager/CEO Report
The General Manager/CEO announced the following:
•On December 14, 2022, the Board authorized surplus equipment and
vehicles. The cement mixers were sold at auction in February for $2700 and the
vehicles will be sold at auction in April. We received a letter from the Highland
Senior Center thanking the District for donating one vehicle to their non-profit
organization.
•The State DDW issued a non-compliance order for THM violations in 2016. With
the completion of the GAC project at Plant 134, THM’s will be greatly reduced in
the distribution system and the District can utilize more North Fork water supply.
On March 16, we received a letter from DDW that we have returned to
compliance. Thank you to our staff and design-build team for getting the project
completed.
6
4
8
•April 6 at 11:00 a.m. the District will be holding a ribbon-cutting ceremony at
Plant 134 to celebrate the newly installed Granular Activated Carbon.
•On March 17th the District hosted a pop-up booth at Indian Springs High School
during the school’s lunch to engage with students and provide conservation
information.
•Director Carrillo and the Employee Events Association donated to mountain
residents affected by the recent weather events.
•The District restarted the Flatland Tour on March 20. Trial tours were provided to
employees, but will eventually open to the public to view District operations to
have a better understanding of how water is delivered.
For information only.
c.Legal Counsel Report
No report at this time.
d.Board of Directors’ Comments
Director Smith thanked staff for their presentations.
Director Carrillo thanked Ms. Antrim and the Employee Events Association for their
donations to the mountain communities.
Director Coats stated that he is continually amazed at all of the other entities that take
a tour of the SNRC. He stated that this just re-enforces what a great operation and
organization the District has, with such talented employees and he is proud to be
associated with such a group.
Chairman Goodrich thanked staff for their work on all the items for this even’s meeting.
For information only.
ADJOURN
Chairman Goodrich adjourned the meeting at 6:52 p.m.
Phillip R. Goodrich, Board President
Michael Moore, Board Secretary
Agenda Item
#2d
April 12, 20231
Meeting Date: April 12, 2023
Agenda Item #2d
Consent Item
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Approval of Directors' Fees and Expenses for March 2023
RECOMMENDATION
That the Board of Directors approve the Directors' Fees and Expenses for March 2023
as submitted.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by Administration.
FISCAL IMPACT
The fiscal impact associated with this agenda item is $10,570.95 which is included in
the current fiscal year budget.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Justine Hendricksen
District Clerk
ATTACHMENTS
March 2023 Director Expense Reports
Name: Month / Year:2023
Meeting
No.Stipend Written Oral
1 3 /01 225
2 3 /07 225
3 3 /08 225
4 3 /15 225
5 3 /20 225
6 3 /22 225
7 3 /28 225
8
9
10
11
12
13
14
15
16
17
18
19
20
Meetings
0.655/mi
No.
1
2
3
4
5
6
7
8
9
10
Subtotal
TOTAL PAYMENT
Date of Approval
Chris Carrillo March /
0.00 X
( 7 )
Report Provided
Subtotal Meetings' Stipend
Mileage
Administration Signature
I certify that the above is correct and accurate to the best of my knowledge.
Chris Carrillo
Date Meeting / Event Description
Date
City of San Bernardino Council Meeting
Meeting with General Manager/CEO or Designee
Regular Board Meeting
$1,575.00
$1,575.00
$0.00
Reimbursement
Mileage
Miscellaneous Reimbursement Description
City of San Bernardino Council Meeting
Meeting with General Manager/CEO or Designee
Regular Board Meeting
Chamber of Commerce Event
Expense Type
$0.00
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
1
Name: Month / Year:2023
1
2
3
4
5
Event Description:Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
Met with General Manager/CEO to review agenda and discuss district business.
Brief Description of Meeting/Event Value to EVWD
Attended EVWD board meeting.
Meeting Date:3 / 15 / 2023
Event Description:City of San Bernardino Council Meeting
Brief Description of Meeting/Event Value to EVWD
Attended City of San Bernardino Council Meeting via Zoom.
Meeting Date:3 / 20 / 2023
Meeting Date:3 / 7 / 2023
Event Description:Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
Meeting Date:3 / 8 / 2023
Event Description:Regular Board Meeting
Met with General Manager/CEO to review agenda and discuss district business.
Chris Carrillo March /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Meeting Date:
Event Description:
Attended City of San Bernardino Council Meeting via Zoom.
3 / 1 / 2023
City of San Bernardino Council Meeting
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
2
Name: Month / Year:2023
6
7
8
9
10
Chris Carrillo March /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Meeting Date:
Event Description:
Brief Description of Meeting/Event Value to EVWD
Event Description:
Brief Description of Meeting/Event Value to EVWD
Meeting Date:
Event Description:
Brief Description of Meeting/Event Value to EVWD
Attended EVWD board meeting.
Meeting Date:3 / 28 / 2023
Event Description:Chamber of Commerce Event
Brief Description of Meeting/Event Value to EVWD
Attended Highland Chamber of Commerce Luncheon: Guest Speaker CEO Moore.
Meeting Date:
Meeting Date:3 / 22 / 2023
Event Description:Regular Board Meeting
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
3
Name: Month / Year:2023
Meeting
No.Stipend Written Oral
1 3 /01 225
2 3 /02 0
3 3 /07 0
4 3 /08 225
5 3 /13 225
6 3 /14 225
7 3 /14 0
8 3 /15 225
9 3 /20 225
10 3 /22 0
11 3 /22 0
12 3 /22 225
13 3 /26 225
14 3 /27 225
15 3 /28 225
16 3 /28 0
17
18
19
20
Meetings
0.655/mi
No.
1 3 /
2 3 /27
3
4
5
6
7
8
9
10
Subtotal
TOTAL PAYMENT
Date of Approval
Ronald L. Coats March /
200.00 X
( 10 )
68.00
64.00
68.00
Report Provided
Subtotal Meetings' Stipend
Mileage
ACWA Event Region 9 Tour
ASBCSD
Administration Signature
I certify that the above is correct and accurate to the best of my knowledge.
Ronald L. Coats
Date Meeting / Event Description
San Bernardino Board of Water Commissioners
Highland Chamber Event
Date
Meeting with General Manager/CEO or Designee
San Bernardino Valley MWD Workshop
Agenda Review
$2,920.95
$2,250.00
$131.00
Reimbursement
22.22
Lodging 517.73
Misc. - Other
Mileage
Miscellaneous Reimbursement Description
Agenda Review
San Bernardino Valley MWD
Regular Board Meeting
ACWA Event Region 9 Tour
Regular Board Meeting
ASBCSD Board Meeting
San Bernardino Board of Water Commissioners
Finance & Human Resources Committee Meeting
Meeting with General Manager/CEO or Designee
Expense Type
$539.95
Lyft fee for Sacramento Airport to Hotel February 2, 2023
Region 9 Tour
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
1
Name: Month / Year:2023
1
2
3
4
5
Event Description:ASBCSD Board Meeting
Brief Description of Meeting/Event Value to EVWD
Held our monthly board meeting to discuss association business, held election of officers and welcomed
our newest board member Rebecca Kujawa (pronounced "Kuyava")
Brief Description of Meeting/Event Value to EVWD
Had an agenda review meeting with Michael Moore
Meeting Date:3 / 8 / 2023
Event Description:Regular Board Meeting
Brief Description of Meeting/Event Value to EVWD
See official board meeting minutes
Meeting Date:3 / 13 / 2023
Meeting Date:3 / 2 / 2023
Event Description:San Bernardino Valley MWD Workshop
Brief Description of Meeting/Event Value to EVWD
Meeting Date:3 / 7 / 2023
Event Description:Agenda Review
They received a State Legislative update; approved a right-of-way application with the Bureau of Land
Management for enhanced recharge project; Amendment to Riparian Bird Monitoring consulting
agreement; and the annual review of the state water project.
Ronald L. Coats March /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Meeting Date:
Event Description:
Held a meeting with the general manager to discuss district business
3 / 1 / 2023
Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
2
Name: Month / Year:2023
6
7
8
9
10
Ronald L. Coats March /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Steve Elie VP of IEUA Board of Directors and Brandon Goshi were guest speakers. Their topic was
Innovative and Sustainable Water Supply Solutions Supporting the Inland Empire Today and Tomorrow
Meeting Date:3 / 22 / 2023
Event Description:Agenda Review
Brief Description of Meeting/Event Value to EVWD
Reviewed the agenda for tonight's meeting and discussed other district business
Event Description:Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
Met with the general manager to discuss district business
Meeting Date:3 / 20 / 2023
Event Description:ASBCSD
Brief Description of Meeting/Event Value to EVWD
They approved several Professional Services Agreements; modifications to approval of SRF Funding for
10 various pipeline replacement projects totaling 9,800 feet of pipeline. Original SRF Loan was for
$3,405,990 in 2019 which has now grown to $11,234,350 because of inflation, Supply Chain and Build
American Buy American.
Meeting Date:3 / 14 / 2023
Event Description:Finance & Human Resources Committee Meeting
Brief Description of Meeting/Event Value to EVWD
Reviewed Investment Policy; Pathway Education Partnership Update; finance and human resources
activities
Meeting Date:3 / 15 / 2023
Meeting Date:3 / 14 / 2023
Event Description:San Bernardino Board of Water Commissioners
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
3
Name: Month / Year:2023
11
12
13
14
15
Ronald L. Coats March /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
They had a presentation by Valley District about the Delta Conveyance Project, Sites Reservoir Project
and the status of the drought; They approved a contract for Emergency Drying Beds Lining Project for
$6,716,300; and awarded several other contracts for pumps and bulk liquid ferric chloride, which has
doubled in price recently.
Event Description:ACWA Event Region 9 Tour
Brief Description of Meeting/Event Value to EVWD
Attended ACWA, Region 9 of the Salton Sea. Toured the Species Conservation Project, which will make
4,100 acres of new wetlands for the Pacific Flyway. Also toured parts of the Imperial Valley and much of
the rest of the Salton Sea. A very educational event of the entire Sea.
Meeting Date:3 / 28 / 2023
Event Description:San Bernardino Board of Water Commissioners
Brief Description of Meeting/Event Value to EVWD
See official board meeting minutes
Meeting Date:3 / 26 / 2023
Event Description:ACWA Event Region 9 Tour
Brief Description of Meeting/Event Value to EVWD
Attended ACWA, Region 9 of the Salton Sea. Toured the Species Conservation Project, which will make
4,100 acres of new wetlands for the Pacific Flyway. Also toured parts of the Imperial Valley and much of
the rest of the Salton Sea. A very educational event of the entire Sea.
Meeting Date:3 / 27 / 2023
Event Description:San Bernardino Valley MWD
Brief Description of Meeting/Event Value to EVWD
Passed a resolution to apply for a grant of $3 million for a Habitat Restoration Project at Hidden Valley
Creek; Passed a resolution to join a coalition opposing the Water Rights Bill and AB 460, AB 1337 and SB
389; They will buy an additional 5,000 acre feet of water through the State Water Project under Article 21;
Lake Oroville at 82%, San Luis Reservoir at 92%; Delta Conveyance Final EIR will be done by end of
Meeting Date:3 / 22 / 2023
Event Description:Regular Board Meeting
Brief Description of Meeting/Event Value to EVWD
Meeting Date:3 / 22 / 2023
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
4
Name: Month / Year:2023
16
17
18
19
20
Event Description:
Brief Description of Meeting/Event Value to EVWD
Ronald L. Coats March /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Meeting Date:
Event Description:
Brief Description of Meeting/Event Value to EVWD
Meeting Date:
Event Description:
Brief Description of Meeting/Event Value to EVWD
Meeting Date:
Event Description:
Brief Description of Meeting/Event Value to EVWD
Meeting Date:3 / 28 / 2023
Event Description:Highland Chamber Event
Brief Description of Meeting/Event Value to EVWD
Guess speaker was our own Michael Moore who spoke about the water district, the Sterling recycled water
pipeline project and it expected completion date and the drought.
Meeting Date:
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
5
Name: Month / Year:2023
Meeting
No.Stipend Written Oral
1 3 /02 225
2 3 /08 225
3 3 /14 225
4 3 /16 225
5 3 /20 225
6 3 /22 225
7 3 /23 225
8 3 /27 225
9 3 /28 225
10
11
12
13
14
15
16
17
18
19
20
Meetings
0.655/mi
No.
1
2
3
4
5
6
7
8
9
10
Subtotal
TOTAL PAYMENT
Date of Approval
$0.00
Mileage
Miscellaneous Reimbursement Description
Agenda Review
ASBCSD
Regular Board Meeting
Chamber of Commerce Event
Engineering & Operations Committee Meeting
Expense Type
$2,025.00
$0.00
Reimbursement
Administration Signature
I certify that the above is correct and accurate to the best of my knowledge.
Phillip R. Goodrich
Date Meeting / Event Description
Date
Agenda Review
Regular Board Meeting
City of Highland Council Meeting
$2,025.00
Phillip R. Goodrich March /
0.00 X
( 9 )
Report Provided
Subtotal Meetings' Stipend
Mileage
Chamber of Commerce Event
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
1
Name: Month / Year:2023
1
2
3
4
5
Phillip R. Goodrich March /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Meeting Date:
Event Description:
Meet with both GM and vice chair for review of current agenda and discuss District affairs
3 / 2 / 2023
Agenda Review
Brief Description of Meeting/Event Value to EVWD
Meeting Date:3 / 8 / 2023
Event Description:Regular Board Meeting
Brief Description of Meeting/Event Value to EVWD
Meeting Date:3 / 14 / 2023
Event Description:City of Highland Council Meeting
Attend Regular Board meeting Ref. Mins. For this day
Brief Description of Meeting/Event Value to EVWD
Represent District at this Monthly City Council meeting
Meeting Date:3 / 16 / 2023
Event Description:Agenda Review
Brief Description of Meeting/Event Value to EVWD
Meet with CEO and Vice chair for review of current agenda
Meeting Date:3 / 20 / 2023
Event Description:ASBCSD
Brief Description of Meeting/Event Value to EVWD
Attend local chapter of CSDA updates from LAFCO and Met Water
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
2
Name: Month / Year:2023
6
7
8
9
10
Meeting Date:3 / 22 / 2023
Event Description:Regular Board Meeting
Brief Description of Meeting/Event Value to EVWD
Attend Regular board meeting Ref. Mins. This day
Meeting Date:3 / 23 / 2023
Event Description:Chamber of Commerce Event
Brief Description of Meeting/Event Value to EVWD
Rep. District at Chamber regional mixer
Meeting Date:3 / 27 / 2023
Event Description:Engineering & Operations Committee Meeting
Brief Description of Meeting/Event Value to EVWD
Attend standind Eng. And ops. Committee meeting updates on those depts.
Meeting Date:3 / 28 / 2023
Event Description:Chamber of Commerce Event
Brief Description of Meeting/Event Value to EVWD
Attend Monthly Chamber luncheon East Valley CEO featured speaker updates on water system in this
Valley
Meeting Date:
Event Description:
Brief Description of Meeting/Event Value to EVWD
Phillip R. Goodrich March /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
3
Name: Month / Year:2023
Meeting
No.Stipend Written Oral
1 3 /02 225
2 3 /03 225
3 3 /07 225
4 3 /08 225
5 3 /10 225
6 3 /14 225
7 3 /16 225
8 3 /27 225
9 3 /30 225
10 3 /31 225
11
12
13
14
15
16
17
18
19
20
Meetings
0.655/mi
No.
1
2
3
4
5
6
7
8
9
10
Subtotal
TOTAL PAYMENT
Date of Approval
James Morales, Jr.March /
0.00 X
( 10 )
Report Provided
Subtotal Meetings' Stipend
Mileage
Meeting with General Manager/CEO or Designee
Administration Signature
I certify that the above is correct and accurate to the best of my knowledge.
James Morales, Jr.
Date Meeting / Event Description
Date
Meeting with General Manager/CEO or Designee
ACWA Event
ACWA Event
$2,250.00
$2,250.00
$0.00
Reimbursement
Mileage
Miscellaneous Reimbursement Description
Meeting with General Manager/CEO or Designee
Regular Board Meeting
East Valley Association of Realtors
San Bernardino Valley MWD
Meeting with General Manager/CEO or Designee
Engineering & Operations Committee Meeting
Expense Type
$0.00
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
1
Name: Month / Year:2023
1
2
3
4
5
Event Description:East Valley Association of Realtors
Brief Description of Meeting/Event Value to EVWD
District update, local legislative update. Board report assignment.
Brief Description of Meeting/Event Value to EVWD
Water rights legislative discussion.
Meeting Date:3 / 8 / 2023
Event Description:Regular Board Meeting
Brief Description of Meeting/Event Value to EVWD
Please refer to public agenda.
Meeting Date:3 / 10 / 2023
Meeting Date:3 / 3 / 2023
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Meeting Date:3 / 7 / 2023
Event Description:ACWA Event
ACWA state board of directors State legislative meeting.
James Morales, Jr.March /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Meeting Date:
Event Description:
District update and business operations.
3 / 2 / 2023
Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
2
Name: Month / Year:2023
6
7
8
9
10
James Morales, Jr.March /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Teleconference. Legislative update.
Meeting Date:3 / 31 / 2023
Event Description:Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
Legislative platform, SMBMI.
Event Description:Engineering & Operations Committee Meeting
Brief Description of Meeting/Event Value to EVWD
Please refer to public agenda.
Meeting Date:3 / 30 / 2023
Event Description:Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
Engineering committee meeting. Board report assignment.
Meeting Date:3 / 16 / 2023
Event Description:Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
District update and business operations.
Meeting Date:3 / 27 / 2023
Meeting Date:3 / 14 / 2023
Event Description:San Bernardino Valley MWD
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
3
Agenda Item
#2e
April 12, 20231
Meeting Date: April 12, 2023
Agenda Item #2e
Consent Item
7
5
0
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: February 2023 Disbursements: Accounts payable disbursements for the
period include check numbers 260726 through 260872, bank drafts, and ACH payments
in the amount of $9,493,280.70 and $419,736.49 for payroll
RECOMMENDATION
That the Board of Directors approve the District's expense disbursements for the period
February 1, 2023 through February 28, 2023 in the amount of $9,913,017.19.
BACKGROUND / ANALYSIS
In the continued effort to be fiscally transparent, the payment register for supplies,
materials, services, and payroll for February 2023 is attached for review and approval.
This process provides the Board of Directors and the public an opportunity to review the
expenses of the District. Accounts Payable is processed weekly, while payroll is
processed bi-weekly. Information to justify each expenditure is available through the
Finance Department.
Accounts payable disbursements for the period include check numbers 260726 through
260872, bank drafts, and ACH Payments in the amount of $9,493,280.70 and
$419,736.49, for payroll. Significant expenses greater than or equal to $50,000 are
further explained below:
Agenda Item
#2e
April 12, 20232
Meeting Date: April 12, 2023
Agenda Item #2e
Consent Item
7
5
0
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by the Finance Department.
Agenda Item
#2e
April 12, 20233
Meeting Date: April 12, 2023
Agenda Item #2e
Consent Item
7
5
0
FISCAL IMPACT
This item is funded in the current fiscal year budget.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Brian Tompkins
Chief Financial Officer
ATTACHMENTS
February 2023 Payment Register
PAYMENT REGISTER
FEBRUARY 1, 2023 - FEBRUARY 28, 2023
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
2/2/2023 260726
ACS SUPPORT 26.00
2/2/2023 260727 AIR CHIEF, INC.520.85
2/2/2023 260728 AMERICAN FIDELITY ASSURANCE COMPANY (FSA)1,126.22
2/2/2023 260729 ANAERGIA TECHNOLOGIES LLC 203,300.00
2/2/2023 260730
APPLEONE EMPLOYMENT SERVICE 2,313.05
2/2/2023 260731 AT&T 2,033.69
2/2/2023 260732 BALFOUR BEATTY INFRASTRUCTURE, INC 6,274,910.75
2/2/2023 260733
CAEATFA 40,034.03
2/2/2023 260734 CalPERS- FRAS 332,001.00
2/2/2023 260735
CHEM-TECH INTERNATIONAL INC 6,629.64
2/2/2023 260736 COLONIAL LIFE, PREMIUM 491.64
2/2/2023 260737
DIB'S SAFE & LOCK SERVICE 45.68
2/2/2023 260738 DIRECTV 258.98
2/2/2023 260739
ECOTECH SERVICES, INC 12,433.00
2/2/2023 260740 EVERSOFT, INC 569.60
2/2/2023 260741
EXPERIAN 353.44
2/2/2023 260742 FRANCHISE TAX BOARD 50.00
2/2/2023 260743
GEOSCIENCE SUPPORT SERVICES, INC 127,200.56
2/2/2023 260744 HARPER & ASSOCIATES ENGINEERING, INC 1,690.00
2/2/2023 260745
HYDROTECH ELECTRIC 21,051.00
2/2/2023 260746 INLAND WATER WORKS SUPPLY CO 61,628.13
2/2/2023 260747
K & L HARDWARE 22.34
2/2/2023 260748 METLIFE SMALL BUSINESS CENTER (Dental)11,011.14
2/2/2023 260749
METROPOLITAN LIFE INS CO 93.30
2/2/2023 260750 PACIFIC HYDROTECH CORPORATION 125,339.05
2/2/2023 260751
PETTY CASH 341.27
2/2/2023 260752 SAN BERNARDINO MUNICIPAL WATER DEPARTMENT 13,966.30
2/2/2023 260753
SO CAL GAS 3,194.31
2/2/2023 260754 SWRCB 2,524.00
2/2/2023 260755
UNIFIRST CORPORATION 592.14
2/2/2023 260756 US BANCORP SERVICE CENTER 31,434.66
2/2/2023 260761
VALLEY OFFICE EQUIPMENT 3.37
2/2/2023 260762 WATER SYSTEMS CONSULTING, INC 5,843.01
2/2/2023 260763
YARDLEY ORGILL CO. INC. YO FIRE 10,291.20
2/2/2023 260764 CELESTE KEMPKA 3,795.45
2/2/2023 260765
BRECKENRIDGE PROPERTY FUND 2016 LLC 77.27
2/2/2023 260766
ALBERT RUBALCABA 82.69
2/2/2023 260767
AMANDA LI 300.00
2/2/2023 260768 BEVERLY MCCARTHY 150.00
2/2/2023 260769
CHRISTOPHER LUTTER 150.00
2/2/2023 260770 DARLENE BARENTS 300.00
2/2/2023 260771
DAVID GRAVES 400.00
2/2/2023 260772 DENISE LINDSEY 200.00
2/2/2023 260773
DIANE COLLINS 100.00
PAYMENT REGISTER
FEBRUARY 1, 2023 - FEBRUARY 28, 2023 Page 1 of 7
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
2/2/2023 260774 DONNA GIFFORD 30.00
2/2/2023 260775 ERIC PETERS 200.00
2/2/2023 260776
HOLLY GARCIA 200.00
2/2/2023 260777 JANICE PASSMORE 179.43
2/2/2023 260778
JOSE VALENCIA 100.00
2/2/2023 260779 JOSEPH JONDREAU 200.00
2/2/2023 260780
KAREN LICHTENBERG 200.00
2/2/2023 260781 LIWAYWAY LUCILLE CASTRO 200.00
2/2/2023 260782
LUIS ROBLES 99.00
2/2/2023 260783 MARIA MENDOZA 150.00
2/2/2023 260784
NADER SHAHATIT 150.00
2/2/2023 260785 NANCY HUNT 100.00
2/2/2023 260786
NANCY SMITH 120.00
2/2/2023 260787 Oscar Medellin 150.00
2/2/2023 260788
PAUL WEGNER 200.00
2/2/2023 260789 PHYLLIS DINWIDDIE 200.00
2/2/2023 260790
RAMIRO RAMIREZ 150.00
2/2/2023 260791 RICHARD REYES 100.00
2/2/2023 260792
ROBERT CALVERT 66.13
2/2/2023 260793 SHELLEY MORGAN 178.69
2/2/2023 260794
VIVIAN CARDENAS 150.00
2/9/2023 260795 MV 18013 LLC 150.00
2/9/2023 260796
MV 18013 LLC 113.97
2/9/2023 260797 OPENDOOR LABS INC 116.31
2/9/2023 260798
D.R. HORTON 112.08
2/9/2023 260799 DMDS GROUP LLC 2,413.51
2/9/2023 260800
AMERICAN FIDELITY ASSURANCE COMPANY 3,073.43
2/9/2023 260801
APPLEONE EMPLOYMENT SERVICE 908.96
2/9/2023 260802 BUDGET TRANSMISSIONS II INC 2,854.38
2/9/2023 260803 COUTS HEATING AND COOLING, INC.760.00
2/9/2023 260804
D&H WATER SYSTEMS 2,846.07
2/9/2023 260805 Genuine Parts Company 99.16
2/9/2023 260806
INLAND WATER WORKS SUPPLY CO 7,673.02
2/9/2023 260807 LIEBERT CASSIDY WHITMORE LCW 648.00
2/9/2023 260808
LOGICALIS, INC 4,463.38
2/9/2023 260809 SOUTHERN CALIFORNIA EDISON COMPANY 311,535.85
2/9/2023 260810
SOUTHERN CALIFORNIA EMERGENCY
MEDICINE/COLTON/REDLANDS 60.00
2/9/2023 260811 Texas Life Insurance Company 646.71
2/9/2023 260812 Wilson Towing LLC 100.00
2/9/2023 260813 FYAD ENTERPRISES INC 67.67
2/9/2023 260814 FAMILY HABITAT INC 135.24
2/9/2023 260815
PATRICK FRAIRE 65.09
2/9/2023 260816
ANGIE PRICE 101.81
2/15/2023 260817 ACS SUPPORT 26.00
2/15/2023 260818 FRANCHISE TAX BOARD 50.00
2/15/2023 260819
WESTBOUND COMMUNICATIONS, INC.150.00
2/16/2023 260820
AFFORDABLE AUTO SERVICE, RAHIB ELAWAR 58.00
2/16/2023 260821 AMERICAN FIDELITY ASSURANCE COMPANY (FSA)1,126.22
2/16/2023 260822
APPLEONE EMPLOYMENT SERVICE 1,141.60
2/16/2023 260823 BURRTEC WASTE/ 5455 Industrial pkwy 722.16
2/16/2023 260824 BURRTEC WASTE/ E. 111 MILL ST 2,029.41
PAYMENT REGISTER
FEBRUARY 1, 2023 - FEBRUARY 28, 2023 Page 2 of 7
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
2/16/2023 260825 CAL VALVE-JAQUELYN ROMERO 830.00
2/16/2023 260826 COUNTY OF SAN BERNARDINO, DEPT OF PUBLIC WORKS 2,912.00
2/16/2023 260827
CSMFO, CALIFORNIA SOCIETY OF MUNICIPAL FINANCE OFFICERS 125.00
2/16/2023 260828 CULLIGAN OF ONTARIO 158.43
2/16/2023 260829
DIB'S SAFE & LOCK SERVICE 12.07
2/16/2023 260830 EUCLID MANAGERS, INSURANCE SERVICES INC.360.00
2/16/2023 260831
EYE MED VISION CARE 1,505.04
2/16/2023 260832 FIRST CHOICE SERVICES 1,367.87
2/16/2023 260833
FLEET MANAGEMENT DEPARTMENT 565.05
2/16/2023 260834 INLAND DESERT SECURITY & COMMUNICATIONS, INC 900.40
2/16/2023 260835
INLAND WATER WORKS SUPPLY CO 4,540.82
2/16/2023 260836 JESSE MCCONNAHA/MACS SPRING SHOP 704.00
2/16/2023 260837
K & L HARDWARE 292.70
2/16/2023 260838 KONICA MINOLTA 1,158.04
2/16/2023 260839
POWER PLUS AUTO GLASS 461.75
2/16/2023 260840 ROSEMOUNT , INC 4,408.27
2/16/2023 260841
SOUTHERN CALIFORNIA EDISON COMPANY 21,702.71
2/16/2023 260842 SPECTRUM 6,090.00
2/16/2023 260843
UNIFIRST CORPORATION 604.56
2/16/2023 260844 US BANCORP SERVICE CENTER 30,701.66
2/16/2023 260849
VALLEY OFFICE EQUIPMENT 2.74
2/16/2023 260850 WESTERN MUNICIPAL WATER DISTRICT 750.00
2/16/2023 260851
SAN GORGONIO HIGH SCHOOL 100.00
2/17/2023 260852 KAA PROPERTIES LP #6550 268.13
2/17/2023 260853
PIC & SAVE #44303 16.80
2/17/2023 260854 O GLENN DYER 67.67
2/23/2023 260855
ANAERGIA TECHNOLOGIES LLC 130,150.00
2/23/2023 260856
APPLEONE EMPLOYMENT SERVICE 1,162.87
2/23/2023 260857 AWWA 4,660.00
2/23/2023 260858 DREW METZGER 560.00
2/23/2023 260859
ECOTECH SERVICES, INC 4,322.50
2/23/2023 260860 FedEx 149.07
2/23/2023 260861
GENOVEVA L ARELLANO 756.62
2/23/2023 260862 Genuine Parts Company 83.92
2/23/2023 260863
GEOSCIENCE SUPPORT SERVICES, INC 10,016.50
2/23/2023 260864 GLOBAL EQUIPMENT COMPANY, INC 994.93
2/23/2023 260865
INLAND WATER WORKS SUPPLY CO 2,260.60
2/23/2023 260866 K & L HARDWARE 26.88
2/23/2023 260867
PILAR ONATE 4,725.00
2/23/2023 260868 SO CAL GAS 37.20
2/23/2023 260869
SOUTH COAST AQMD 620.61
2/23/2023 260870 THE SHERWIN WILLIAMS CO.125.37
2/23/2023 260871
Wyatt's Paint & Body Shop, Inc.3,995.62
2/23/2023 260872 JALISE HART 1,500.00
BANK DRAFTS
2/2/2023 DFT0004817 GLOBAL PAYMENTS 16,020.66
2/3/2023 DFT0004805 CALPERS/ RETIREMENT 51,774.26
2/3/2023 DFT0004806
CA SDI Tax 2,708.75
2/3/2023 DFT0004808 CALPERS/ DEFERRED COMPENSATION 22,597.74
2/3/2023 DFT0004809
CALPERS/ MEDICAL 109,643.90
2/3/2023 DFT0004810 Federal Payroll Tax 33,017.37
PAYMENT REGISTER
FEBRUARY 1, 2023 - FEBRUARY 28, 2023 Page 3 of 7
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
2/3/2023 DFT0004811 Medicare 8,728.20
2/3/2023 DFT0004812 Social Security 194.92
2/3/2023 DFT0004813
State Payroll Tax 13,125.51
2/3/2023 DFT0004814 STATE DISBURSEMENT UNIT 322.15
2/3/2023 DFT0004818
MERCHANT BANKCD 447.82
2/10/2023 DFT0004819 PayNearMe, Inc.254.72
2/10/2023 DFT0004828
FORTE, ACH DIRECT INC, ACH FEES 5,099.76
2/17/2023 DFT0004820 CALPERS/ DEFERRED COMPENSATION 22,361.27
2/17/2023 DFT0004821
CALPERS/ RETIREMENT 51,411.37
2/17/2023 DFT0004822 CA SDI Tax 2,791.05
2/17/2023 DFT0004823
Federal Payroll Tax 32,704.46
2/17/2023 DFT0004824 Medicare 9,010.54
2/17/2023 DFT0004825
Social Security 1,406.96
2/17/2023 DFT0004826 STATE DISBURSEMENT UNIT 908.77
2/17/2023 DFT0004827
State Payroll Tax 12,621.24
2/21/2023 DFT0004829 PayNearMe, Inc.254.72
2/22/2023 DFT0004830
CBB 257.34
2/28/2023 DFT0004832 PayNearMe, Inc.167.16
ACH PAYMENTS
2/2/2023 10012020 ACI PAYMENTS INC.51.75
2/2/2023 10012021
ADVANCED TELEMETRY SYSTEMS INTERNATIONAL, INC.15,125.01
2/2/2023 10012022 ALBERT A. WEBB ASSOCIATES 35,986.75
2/2/2023 10012023
ALLISON MECHANICAL, INC 6,795.00
2/2/2023 10012024 AMAZON CAPITAL SERVICES, INC 2,111.97
2/2/2023 10012026
APPLIED MAINTENANCE SUPPLIES & SOLUTIONS 1,106.79
2/2/2023 10012027 BARRY'S SECURITY SERVICES, INC 9,372.18
2/2/2023 10012028 CALIFORNIA TOOL & WELDING SUPPLY 546.99
2/2/2023 10012029
CHEMSEARCH 422.33
2/2/2023 10012030 COMPUTERIZED EMBROIDERY COMPANY, INC 115.62
2/2/2023 10012031
CORE & MAIN LP 10,025.75
2/2/2023 10012032 DANGELO CO INC 1,702.97
2/2/2023 10012033
EVWD EMPLOYEES EVENTS ASSOC 280.50
2/2/2023 10012034 EXCEL LANDSCAPE, INC 21,284.50
2/2/2023 10012035
EZEQUIEL ELECTRIC, INC.2,865.37
2/2/2023 10012036 FIELDMAN, ROLAPP & ASSOCIATES, INC 1,500.00
2/2/2023 10012037
FRONTIER COMMUNICATIONS 825.38
2/2/2023 10012038 GENESIS INDUSTRIAL SUPPLY, INC 3,956.97
2/2/2023 10012039
GRAINGER 2,021.02
2/2/2023 10012040 GROUP DELTA CONSULTANTS, INC 121,141.88
2/2/2023 10012042
HACH COMPANY 11,475.00
2/2/2023 10012043 HARRINGTON INDUSTRIAL PLASTIC 464.83
2/2/2023 10012044
INDUSTRIAL RUBBER & SUPPLY 670.54
2/2/2023 10012045 INFOSEND, INC 111,820.16
2/2/2023 10012047
KRIEGER & STEWART, INCORPORATED 23,895.39
2/2/2023 10012048 LEVERAGE INFORMATION SYSTEMS, INC.4,947.94
2/2/2023 10012049
LINCOLN NATIONAL LIFE INS CO.2,428.83
2/2/2023 10012050 MCMASTER-CARR 321.52
2/2/2023 10012051
MINUTEMAN PRESS OF RANCHO CUCAMONGA 2,103.27
2/2/2023 10012052 NATIONAL CONSTRUCTION RENTALS 178.49
2/2/2023 10012053
PARKHOUSE TIRE, INC 1,824.95
2/2/2023 10012054 PLUS 1 PERFORMANCE 34.25
PAYMENT REGISTER
FEBRUARY 1, 2023 - FEBRUARY 28, 2023 Page 4 of 7
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
2/2/2023 10012055 QUADIENT, INC 407.62
2/2/2023 10012056 QUINN COMPANY 610.44
2/2/2023 10012057
RK VENTURE LLC 4,287.50
2/2/2023 10012058 SAFETY KLEEN SYSTEMS, INC.359.67
2/2/2023 10012059
SAN BERNARDINO VALLEY MUNICIPAL WATER DISTRICT 300,000.00
2/2/2023 10012060 SCN, SECURITY COMMUNICATION NETWORK, INC 105.00
2/2/2023 10012061
STAPLES BUSINESS ADVANTAGE 1,448.82
2/2/2023 10012064 TOTAL SAFETY SUPPLIES & SOLUTIONS 1,076.03
2/2/2023 10012065
TYLER TECHNOLOGIES, INC 1,445.09
2/2/2023 10012067
VULCAN MATERIALS CO/ CALMAT CO 8,349.58
2/2/2023 10012068 WAXIE SANITARY SUPPLY 476.69
2/2/2023 10012069 WESTBROOK FENCE, INC 1,900.00
2/9/2023 10012070
ADVANCED TELEMETRY SYSTEMS INTERNATIONAL, INC.750.00
2/9/2023 10012071
AMAZON CAPITAL SERVICES, INC 1,027.03
2/9/2023 10012072 APPLIED MAINTENANCE SUPPLIES & SOLUTIONS 1,228.14
2/9/2023 10012073 BARRY'S SECURITY SERVICES, INC 9,270.69
2/9/2023 10012074
BOOT BARN, INC 800.00
2/9/2023 10012075 CINTAS CORPORATION (FIRST AID)911.45
2/9/2023 10012076
CLEARFLY COMMUNATIONS 967.10
2/9/2023 10012077 CLINICAL LAB OF S B 5,025.00
2/9/2023 10012078
CORELOGIC SOLUTIONS, LLC 380.63
2/9/2023 10012079 COUNTY OF SAN BERNARDINO, RECORDER- CLERK 100.00
2/9/2023 10012080
DALE BRENDT MARSDEN, dba TOMORROW'S TALENT, LLC 2,500.00
2/9/2023 10012081 FRONTIER COMMUNICATIONS 82.74
2/9/2023 10012082
GOLDEN STATE LABOR COMPLIANCE, LLC 4,990.00
2/9/2023 10012083 JOSE MILLAN 140.00
2/9/2023 10012084
KELLAR CONSULTING, LLC 15,000.00
2/9/2023 10012085 LEGEND PUMP AND WELL SERVICES 3,696.65
2/9/2023 10012086
LESLIE'S POOL SUPPLIES, INC.69.59
2/9/2023 10012087 MANAGED HEALTH NETWORK 228.48
2/9/2023 10012088
MCMASTER-CARR 185.69
2/9/2023 10012089 MIKE J. ROQUET CONSTRUCTION INC 26,055.86
2/9/2023 10012090
MINUTEMAN PRESS OF RANCHO CUCAMONGA 935.98
2/9/2023 10012091 MissionSquare Retirement 250.00
2/9/2023 10012092
MOBILE OCCUPATIONAL SERVICES, INC 360.00
2/9/2023 10012093 PLUMBERS DEPOT INC.3,329.90
2/9/2023 10012094
PLUS 1 PERFORMANCE 2,153.71
2/9/2023 10012095 QUADIENT, INC 264.00
2/9/2023 10012096
SG CREATIVE, LLC 6,050.00
2/9/2023 10012097 SSCI, INC. DBA-SAFETY COMPLIANCE COMPANY 800.00
2/9/2023 10012098
STAPLES BUSINESS ADVANTAGE 624.51
2/9/2023 10012100 STEVE A. FILARSKY, ATTORNEY AT LAW 612.50
2/9/2023 10012101
UNDERGROUND SERVICE ALERT 288.25
2/9/2023 10012102
VALERO FLEET, WEX BANK 14,856.17
2/9/2023 10012103 VIRTUAL GRAFFITI, INC.14,400.00
2/9/2023 10012104 Water On Wheels Mobile Detail 53.00
2/15/2023 10012105
CAROL CALES 555.99
2/15/2023 10012106 DANIEL DAVIS 663.92
2/15/2023 10012107
DAVID HERNANDEZ 505.94
2/15/2023 10012108 ED KING 850.00
2/15/2023 10012109
ELISEO OCHOA 562.73
2/15/2023 10012110 EVWD EMPLOYEES EVENTS ASSOC 378.50
PAYMENT REGISTER
FEBRUARY 1, 2023 - FEBRUARY 28, 2023 Page 5 of 7
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
2/15/2023 10012111 JOHN MURA 730.10
2/15/2023 10012112 MARTHA T DURAN 850.00
2/15/2023 10012113
MICHAEL HENDERSON 737.18
2/15/2023 10012114 REBECCA KASTEN 639.46
2/15/2023 10012115
RICHARD BECERRA 737.18
2/16/2023 10012152 MINUTEMAN PRESS OF RANCHO CUCAMONGA 494.55
2/16/2023 10012153
ADCOMP SYSTEMS, INC 100.00
2/16/2023 10012154 AMAZON CAPITAL SERVICES, INC 790.24
2/16/2023 10012156 AMERICAN RENTALS, INC 3,087.50
2/16/2023 10012157
ANTHESIS 9,593.88
2/16/2023 10012158 ASBCSD 108.00
2/16/2023 10012159 BARRY'S SECURITY SERVICES, INC 9,275.87
2/16/2023 10012160
BURGESS MOVING & STORAGE 1,233.30
2/16/2023 10012161 CINTAS CORPORATION (FIRST AID)468.44
2/16/2023 10012162
CLARK PEST CONTROL 51.00
2/16/2023 10012163 CLA-VAL CO 9,176.83
2/16/2023 10012164
ELEPHANT FIRE EXTINSUISHER 1,291.13
2/16/2023 10012165 FERGUSON ENTERPRISES, INC.4,157.80
2/16/2023 10012166
FIELDMAN, ROLAPP & ASSOCIATES, INC 1,250.00
2/16/2023 10012167 FMB TRUCK OUTFITTERS, INC 2,372.63
2/16/2023 10012168
FRONTIER COMMUNICATIONS 1,494.40
2/16/2023 10012169 HARRINGTON INDUSTRIAL PLASTIC 417.94
2/16/2023 10012170
INFOSEND, INC 659.00
2/16/2023 10012171 LANDS END INC 253.42
2/16/2023 10012172
MANAGED MOBILE, INC.2,366.76
2/16/2023 10012173 MINUTEMAN PRESS OF RANCHO CUCAMONGA 6,323.09
2/16/2023 10012174
NATIONAL CONSTRUCTION RENTALS 178.49
2/16/2023 10012175 PARKHOUSE TIRE, INC 246.81
2/16/2023 10012176
POWERSTRIDE BATTERY CO.498.94
2/16/2023 10012177 QUADIENT, INC 1,974.90
2/16/2023 10012178
RESOLUTE 4,200.00
2/16/2023 10012179 STAPLES BUSINESS ADVANTAGE 135.98
2/16/2023 10012180
STERICYCLE, INC DBA SHRED-IT 554.42
2/16/2023 10012181 SYRINIX, INC.876.37
2/16/2023 10012182
Troy A. Yergens 250.00
2/16/2023 10012183 USA BLUE BOOK, HD SUPPLY FACILITIES MAINT, LTD 1,384.92
2/16/2023 10012184
VISTA PAINTS 617.84
2/16/2023 10012185
VULCAN MATERIALS CO/ CALMAT CO 5,590.21
2/16/2023 10012186 Water On Wheels Mobile Detail 609.50
2/16/2023 10012187 WAXIE SANITARY SUPPLY 72.54
2/16/2023 10012188
WESTBROOK FENCE, INC 64,293.00
2/23/2023 10012153-1
ADVANCED TELEMETRY SYSTEMS INTERNATIONAL, INC.4,800.00
2/23/2023 10012154-1 AMAZON CAPITAL SERVICES, INC 1,358.00
2/23/2023 10012156-1
APPLIED MAINTENANCE SUPPLIES & SOLUTIONS 108.47
2/23/2023 10012157-1 BARRY'S SECURITY SERVICES, INC 8,084.76
2/23/2023 10012158-1 CALIFORNIA TOOL & WELDING SUPPLY 979.95
2/23/2023 10012159-1
CLARK PEST CONTROL 303.00
2/23/2023 10012160-1 CORE & MAIN LP 60,851.61
2/23/2023 10012161-1
DANGELO CO INC 559.25
2/23/2023 10012162-1 EXCEL LANDSCAPE, INC 278.46
2/23/2023 10012163-1
FERGUSON ENTERPRISES, INC.10,892.02
2/23/2023 10012164-1 FMB TRUCK OUTFITTERS, INC 2,372.63
PAYMENT REGISTER
FEBRUARY 1, 2023 - FEBRUARY 28, 2023 Page 6 of 7
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
2/23/2023 10012165-1 GENESIS INDUSTRIAL SUPPLY, INC 485.59
2/23/2023 10012166-1 GRAINGER 188.11
2/23/2023 10012167-1
INFOSEND, INC 40,599.82
2/23/2023 10012168-1 JC LAW FIRM 19,837.00
2/23/2023 10012169-1
Jeffrey Ordaz 1,300.00
2/23/2023 10012170-1 JOSE MILLAN 3,890.00
2/23/2023 10012171-1
JOSE TORRES 349.98
2/23/2023 10012172-1 KRIEGER & STEWART, INCORPORATED 60,902.32
2/23/2023 10012173-1
MANAGED MOBILE, INC.2,613.95
2/23/2023 10012174-1 MCCRAY ENTERPRISES 324.75
2/23/2023 10012175-1
MINUTEMAN PRESS OF RANCHO CUCAMONGA 1,127.57
2/23/2023 10012176-1 Water On Wheels Mobile Detail 265.00
2/23/2023 10012177-1
WILLIAM RINGLAND 56.27
TOTAL 9,493,280.70$
PAYMENT REGISTER
FEBRUARY 1, 2023 - FEBRUARY 28, 2023 Page 7 of 7
Agenda Item
#2f
April 12, 20231
Meeting Date: April 12, 2023
Agenda Item #2f
Consent Item
7
5
2
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Adopt Resolution 2023.06 - Investment Policy
RECOMMENDATION
That the Board of Directors adopt Resolution 2023.06 - Investment Policy.
BACKGROUND / ANALYSIS
The Finance and Human Resources Committee recommended, at their March 14, 2023
meeting, that the Board of Directors (Board) adopt Resolution 2023.06 – Investment
Policy.
California Government Code section 53646(a) requires that the CFO/Treasurer of a local
agency annually render to the legislative body a Statement of Investment Policy for
consideration at a public meeting. Accordingly, a proposed Statement of Investment
Policy for fiscal year 2023-24 is attached.
The proposed policy is very close to the version that was approved by the Board on
April 27, 2022 – there have been just minor modifications including: 1) a change to the
acronym referring to the District’s annual financial report (ACFR) to comply with
industry standards, and 2) clean-up of the Glossary of Terms to remove terms that are
not referenced anywhere in the policy. Staff recommends adoption of Resolution
2023.06 and updated Policy 7.6 including the changes referenced above and redlined in
the attached policy.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by the Finance Department and Finance and
Human Resources Committee.
Agenda Item
#2f
April 12, 20232
Meeting Date: April 12, 2023
Agenda Item #2f
Consent Item
7
5
2
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Brian Tompkins
Chief Financial Officer
ATTACHMENTS
1. Resolution 2023.06
2. Exhibit A - Statement of Investment Policy 7.6
East Valley Water District
Resolution 2023.06
Page 1 of 2
RESOLUTION NO. 2023.06
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE EAST VALLEY WATER DISTRICT
ESTABLISHING AN INVESTMENT POLICY FOR PUBLIC FUNDS
WHEREAS, the Board of Directors of the East Valley Water District (the “District”)
desires to maintain a formal policy regarding the investment of public funds pursuant to the
requirements of Government Code Sections 5921 and 53600 et seq.; and
WHEREAS, the Board of Directors of the District has employed qualified staff to invest
those funds in accordance with the law and the terms of the District’s investment policy , as well
as in a manner that advances the District’s investment objectives of safety, liquidity and yield; and
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the District that
the East Valley Water District Investment Policy attached hereto as Exhibit “A” and incorporated
in full herein by this reference is hereby adopted as the formal investment policy of the District;
and
BE IF FURTHER RESOLVED that the General Manager/CEO and the Treasurer/Chief
Financial Officer of the District are hereby authorized and directed to invest the District’s funds in
a manner consistent with the terms hereof and in accordance with any further directions of the
District’s Board of Directors; and
BE IT FURTHER RESOLVED that this Resolution supersedes Resolution No. 2022.05
adopted by the Board of Directors of the District on April 27, 2022.
This Resolution shall take effect on July 1, 2023.
ADOPTED this 12th day of April 2023.
ROLL CALL:
Ayes:
Noes:
Absent:
Abstain:
Phillip R. Goodrich,
Board President
East Valley Water District
Resolution 2023.06
Page 2 of 2
ATTEST:
Michael Moore,
Secretary, Board of Directors
April 12, 2023
I HEREBY CERTIFY that the foregoing is a full, true and correct copy of Resolution 2023.06
adopted by the Board of Directors of East Valley Water District at its Regular Meeting held April
12, 2023.
Michael Moore,
Secretary, Board of Directors
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
1 of 15
Purpose
The purpose of this policy is to establish guidelines for the prudent investment of East Valley
Water District (District) funds in conformance with California Government Code
requirements. Funds will be managed to provide for daily cash flow requirements and to
meet the objectives of this policy.
Policy
It is the policy of the District to invest public funds in a manner which ensures the safety and
preservation of capital while meeting reasonably anticipated operating needs, achieving a
reasonable rate of return, and conforming to all state and local statutes governing the
investment of public funds.
Scope
This policy applies to the investment of all operating funds; it does not apply to investments
held in trust for the District retirement plan, or post-employment health benefits, as these
investments are subject to policies established by the plan trustees. Indenture agreements
specify how bond proceeds will be invested, but generally they will be invested in securities
permitted by this policy. Invested funds are accounted for, and are identified in, the District’s
Comprehensive Annual Comprehensive Financial Report.
Objectives
As specified in CGC §53600.5, when investing and managing public funds, the primary
objectives, in priority order, of the District’s investment activities shall be:
1.Safety: Safety of principal is the foremost objective of the investment program.
Investments of the East Valley Water District shall be undertaken in a manner that
seeks to ensure the preservation of capital in the overall portfolio by mitigating certain
risks. Some of those risks are:
A.Interest Rate Risk – the District will minimize the risk that the market value of
securities in the portfolio will fall due to changes in general interest rates by:
Exhibit A
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
2 of 15
Structuring the investment portfolio so that securities mature to meet
cash requirements for ongoing operation and avoiding the need to sell
securities on the open market prior to maturity.
Investing operating funds primarily in short-term securities, money
market mutual funds, or investment pools.
B.Credit Risk – the risk that an issuer or other counterparty to an investment will
not fulfill its obligations, will be reduced by:
Limiting investments to higher rated securities as further described in
this policy.
Diversifying the investment portfolio so that potential losses on
individual securities will be reduced.
2.Liquidity: The investment portfolio will remain sufficiently liquid to enable the East
Valley Water District to meet all operating requirements that might be reasonably
anticipated.
3.Return on Investments: The investment portfolio shall be designed with the
objective of attaining the best yield or returns on investments, taking into account the
investment risk constraints and liquidity needs. Return on investment is of secondary
importance compared to the safety and liquidity objectives.
Prudence
The standard of prudence to be used by District officials involved in the investment program
shall be the “prudent investor” standard and shall be applied in the context of managing the
overall portfolio. The meaning of the standard of prudent investor is explained in CGC Section
53600.3, which states that “when investing, reinvesting, purchasing, acquiring, exchanging,
selling, or managing public funds, a trustee shall act with care, skill, prudence, and diligence
under the circumstances then prevailing, including, but not limited to, the general economic
conditions and the anticipated needs of the agency, that a prudent person acting in a like
capacity and familiarity with those matters would use in the conduct of funds of a like
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
3 of 15
character and with like aims, to safeguard the principal and maintain the liquidity needs of
the agency.”
The CFO/Treasurer and delegated investment officers, acting in accordance with written
procedures and this Policy and exercising due diligence, shall be relieved of personal
responsibility for an individual security’s credit risk or market price changes, provided
deviations from expectations are reported in a timely fashion and appropriate action is taken
to control adverse developments.
Delegation of Authority
The authority of the District’s Board of Directors to invest District funds is derived from
California Government Code (CGC) section 53601. Section 53607 of the CGC grants the Board
the authority to delegate that authority to the District’s Chief Financial Officer
(CFO)/Treasurer. The authority to invest District funds is hereby delegated to the
CFO/Treasurer.
The CFO/Treasurer shall be responsible for all transactions undertaken and shall establish a
system of controls to regulate the activities of subordinate officials in the absence of the
Treasurer. All transactions will be reviewed by the Treasurer on a regular basis to ensure
compliance with this Policy. No Person may engage in an investment transaction except as
provided under the terms of this Investment Policy and the procedures established by the
Treasurer.
Ethics and Conflicts of Interest
Officers and employees involved in the investment process shall refrain from personal
business activity that could conflict with proper execution of the investment program or which
could impair their ability to make impartial investment decisions. Employees and investment
officials shall disclose to the District’s General Manager/CEO any material financial interest in
financial institutions that conduct business within the District, and they shall further disclose
any large personal financial/investment positions that could be related to the performance
of the District.
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
4 of 15
All bond issue participants, including but not limited to, underwriters, bond counsel, financial
advisors, brokers, and dealers will disclose any fee sharing arrangements or fee splitting to
the CFO/Treasurer prior to the execution of any transaction.
Authorized Broker-Dealers
The CFO/Treasurer will maintain a list of approved financial institutions authorized to provide
investment services to the District. These may include primary dealers authorized to buy and
sell government securities in direct dealings with the Federal Reserve Bank of New York, or
regional dealers that qualify under Securities and Exchange Commission Rule 15C3-1
(uniform net capital rule). The list of approved financial institutions will be reviewed by the
CFO/Treasurer on an annual basis.
All Broker Dealers who desire to conduct investment transactions with the District must
supply the CFO/Treasurer with the following:
Audited Financial Statements
Proof of Financial Industry Regulatory Authority (FINRA) certification
Proof of State of California registration
Completed broker/dealer questionnaire (except Certificate of Deposit counterparties)
Certification of having read the District’s investment policy and depository contracts
Authorized and Suitable Investments
The East Valley Water District as empowered by California Government Code (CGC) §53600,
et. Seq., establishes the following as authorized investments:
A. Local Agency Investment Fund (LAIF). The District may invest in the Local
Agency Investment Fund established by the State Treasurer for the benefit of local
agencies (CGC §16429.1). The fund must have 24-hour liquidity. There is no limitation
on the percentage of the District portfolio that may be invested with LAIF, however,
LAIF does impose a maximum deposit of $75 million.
B. United States Treasury Securities. United States Treasury notes, bonds, or bills
for which the full faith and credit of the United States is pledged for the payment of
principal and interest (CGC §53601(b)). There is no limitation as to the percentage of
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
5 of 15
the District’s portfolio that may be invested in these securities, however, maximum
investment maturities are limited to five years from the date of purchase.
C. Federal Agency Obligations. The District is permitted to invest in federal agency
or United States government sponsored enterprise obligations, participations,
mortgage backed securities or other instruments, including those issued by or fully
guaranteed as to principal and interest by Federal agencies or United States
government sponsored enterprises (CGC §53601(f)). Maximum maturity is limited to
five years from the date of purchase. There is no limitation as to the percentage of
the District’s portfolio that may be invested in agencies.
D. Bank Depository Accounts. The District may invest in insured or collateralized
certificates of deposit, savings accounts, market rate accounts, or other bank deposits
issued by a state or national bank, savings and loan associations, or state or federal
credit unions located in California (CGC §53630 et. Seq.). A written depository contract
is required with all institutions that hold District deposits requiring that deposits be
collateralized in accordance with the CGC. Under provisions of the Code, California
banks and savings and loan associations are required to secure the District’s deposits
by pledging government securities with a value of 110% principal and accrued
interest. State law also allows financial institutions to secure the District deposits by
pledging first trust deed mortgage notes having a value of 150% of the District’s total
deposits. The Treasurer may waive collateral requirement for the portion of any
deposit insured pursuant to federal law. Securities placed in a collateral pool must
provide coverage for at least 110% of all deposits that are placed in the institution.
Acceptable pooled collateral is governed by CGC §53651. Real estate mortgages are
not considered acceptable collateral by the District, even though they are permitted
in CGC §53651(m).
All financial institutions holding District deposits are required to provide the District
with a regular statement of pooled collateral. This report will state that they are
meeting the 110% collateral rule, a listing of all collateral with location and market
value, plus an accountability of the total amount of deposits secured by the pool.
Deposits are allowable in any institution that insures its deposits with the Federal
Deposit Insurance Corporation (FDIC) or the National Credit Union Administration
(NCUA), and a maximum deposit of up to the federal insurance limits may be
deposited in any one institution without collateral. No bank shall receive District
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
6 of 15
deposits in excess of the federal insurance limits that has a long-term debt rating by
Moody’s investors Service, Standard & Poor’s, or Fitch Ratings of less that ‘A’. The
maximum maturity is restricted to three years.
In accordance with CGC §53638, no deposit shall exceed the shareholder’s equity of
any depository bank, nor shall a deposit exceed the total net worth of any institution.
No deposits shall be made at a state or federal credit union if a member of the Board
of Directors or the General Manager/CEO or CFO/Treasurer of the District serves on
the Board of Directors or a committee of the credit union.
E. Municipal Securities. Registered treasury notes or bonds issued by the State of
California or any of the other 49 states, including bonds payable solely out of the
revenues from a revenue producing property owned, controlled, or operated by a
state or by a department, board, agency, or authority of any states (CGC §53601
(c)(d)).
Bonds, notes, or other evidence of debt issued by a local agency within the State of
California, including issues by East Valley Water District if allowed under the bond
indenture. This includes bonds payable solely out of revenue form a revenue-
producing property owned, controlled, or operated by the local agency, or by an
authority of the local agency (CGC §53601 (a)(e)).
Securities must have a debt rating of at least ‘AA’ by a Nationally Recognized Statistical
Rating Organization (NRSRO). Maximum maturity is limited to five years from the date
of purchase, and holdings of this type of security are limited to a maximum of 20%
of the District’s investment portfolio.
F. Commercial Paper. Commercial paper of ‘prime’ quality of the highest ranking of
the highest letter and number rating as provided for by a NRSRO and must be issued
only by general corporations that are organized and operating within the United States
and have total assets in excess of $500 million. The general corporation must have
an ‘A’ rating or better on debt other than commercial paper, if any, assigned by an
NRSRO (CGC §53601(h)).
Purchases shall not exceed 5% of the outstanding paper of the issuing corporation,
and maximum maturity is restricted to 270 days. This type of investment shall not
exceed 15% of the District’s investment portfolio.
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
7 of 15
G. Placement Service Deposits. The District may invest in Certificates of Deposit
placed with a private sector entity that assists in the placement of deposits with
eligible financial institutions located in the United States (CGC §53601.8). The full
amount of the principal and the interest that may be accrued during the maximum
term of each deposit shall at all times be insured by federal deposit insurance.
Placement Service Deposits, in combination with bank certificates of deposit shall not
exceed 25% of the value of the District’s investments at any time. The maximum
investment maturity will be restricted to three years.
H. Medium Term Notes. The District may invest in corporate and depository institution
debt securities issued by corporations organized and operating within the United
States, or by depository institutions licensed by the United States or any state and
operating within the United States (CGC §53601(k)).
Securities eligible for investment under this section shall be rated ‘AA’ or better by an
NRSRO. The maximum maturity is restricted to five years, and investment in this
category of security shall not exceed 30% of the District’s investible funds, and not
more than 5% from a single issuer.
I. Money Market Funds. Shares of beneficial interest issued by diversified
management companies that are money market funds registered with the Securities
and Exchange Commission (CGC §53601(l)(2)).
The Company shall either 1) have attained the highest ranking or the highest letter
and numerical rating provided by not less than two NRSROs or 2) retained an
investment adviser registered or exempt from registration with the Securities and
Exchange Commission with not less than five years of experience managing money
market mutual funds with assets under management in excess of five hundred million
dollars ($500,000,000). A maximum of 15% of the District’s investible funds can be
invested in Money Market Mutual funds.
J. Local Government Investment Pools. Shares of beneficial interest in an
investment pool created by a joint powers authority organized pursuant to CGC
§6509.7 and that invest in securities and obligations authorized in the California
Government Code (CGC §53601(p)). Investment is limited to pools that seek to
maintain a stable Net Asset Value (NAV) and must be rated at least ‘AA’ or better by
a NRSRO. A maximum of 25% of the District’s portfolio may be invested in Local
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
8 of 15
Government Investment Pools.
K. Prohibited Investments. Under the provision of CGC §53601.6 and §53631.5, the
District shall not invest any funds covered by this Investment Policy in inverse floaters,
range notes, interest-only strips derived from mortgage pools or any investment that
may result in a zero-interest accrual if held to maturity. Notwithstanding the
prohibition above, the District may invest in securities issued by, or backed by, the
United States government that could result in zero or negative-interest accrual if held
to maturity, in the event of, and for the duration of, a period of negative market
interest rates (CA SB 998).
Review of Investment Portfolio
The securities held by East Valley Water District must be in compliance with the above section
‘Authorized and Suitable Investments’ at the time of purchase. If a security falls out of
compliance with this section subsequent to the date of purchase, the CFO/Treasurer shall
report this change to the District’s Board of Directors with the following monthly Investment
Transaction report. Discussion in the monthly report will include the reasons for the change,
prognosis for recovery, and a recommended course of action.
Investment Pools / Mutual Funds
When the District’s investment portfolio includes Investment Pools and Mutual Funds, as
permitted in the section ‘Authorized and Suitable Investments’, the CFO/Treasurer shall as a
matter of due diligence, monitor the assets held by the pools/funds. At least quarterly, the
CFO/Treasurer will conduct an investigation to determine the following:
1. A description of eligible investment securities, and a written statement of investment
policy and objectives.
2. A description of interest calculation and how it is distributed, and how gains and losses
are treated.
3. A description of how the securities are safeguarded (including the settlement
processes), and how often the securities are priced, and the program audited.
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
9 of 15
4. A description of who may invest in the program, how often, what size deposit and
withdrawal are allowed.
5. A schedule for receiving statements and portfolio listings.
6. Are reserves, retained earnings, etc. utilized by the pool/fund?
7. A fee schedule, and when and how it is assessed.
8. Is the pool/fund eligible for bond proceeds and/or will it accept such proceeds?
Safekeeping and Custody Agreements
To protect against potential losses caused by collapse of individual securities dealers, all
securities owned by the East Valley Water District shall be kept in safekeeping by a third-
party bank trust department, acting as agent for the District under the terms of a custody
agreement executed by the bank and the District. All securities will be received and delivered
using standard delivery versus payment (DVP) procedures with the District’s custodial bank,
and evidenced by safekeeping receipts.
Diversification and Maximum Maturities
The District will diversify its investment by security type and institution. With the exception
of the US Government, its agencies and instrumentalities, and the Local Agency Investment
Fund, no more than 5% of the District’s total investment portfolio will be invested in a single
security type with a single financial institution.
To the extent possible, East Valley Water District will attempt to match its investments with
anticipated cash flow requirements. Unless matched to a specific cash flow, the District will
not directly invest in securities maturing more than 5 years from the date of purchase.
Reserve funds may be invested in securities exceeding 5 years if the maturity of such
investments is made to coincide as nearly as practicable with the expected use of the funds.
Internal Controls
The CFO/Treasurer is responsible for establishing and maintaining an internal control
structure designed to ensure that the assets of the District are protected from loss, theft, or
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
10 of 15
misuse. The internal control structures shall be designed to provide reasonable assurance
that these objectives are met. Internal controls shall be in writing and shall address the
following: separation of transaction authority from accounting and record keeping,
safekeeping of assets and written confirmation of telephone transactions for investments and
wire transfers.
The external auditors will annually review the investments and general activities associated
with the investment program. This review will provide internal control by assuring compliance
with the Investment Policy and District policies and procedures.
Performance Standards
The investment portfolio will be designed with the objective of obtaining a rate of return
throughout budgetary and economic cycles, commensurate with the investment risk
constraints, and the cash flow needs.
The District’s investment strategy is passive. The performance of the District’s investment
portfolio will be evaluated and compared to an appropriate benchmark in order to assess the
success of the investment portfolio relative to the District’s Safety, Liquidity, and Return on
Investments’ objectives.
Investment Reporting
In accordance with California Government Code §53607, the CFO/Treasurer will submit a
monthly report to the Board of Directors showing all investment transactions occurring in the
previous month.
Further, in accordance with California Government Code §53646, the CFO/Treasurer will also
prepare a quarterly Investment Report and render the report to the Board of Directors no
later than 30 days after the close of each calendar quarter.
The report shall provide the type of investment, issuers, the date of maturity, par values and
market values of each investment, transactions occurring during the reporting period, and
identification of funds managed by third party managers. The report will also include 1)
certification that all investment transactions have been made in compliance with the District’s
Investment Policy, and 2) a statement that the District has the ability to meet all of its
expenditure requirements during the next six months.
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
11 of 15
Policy Adoption
Adoption. This policy shall be reviewed annually with the Board of Directors and adopted
by Board Resolution.
Amendments. Any changes to the policy, or persons charged with maintaining internal
controls over investments, must be approved by the Board.
Glossary of Terms
(Note: All words of a technical nature should be included. Following is an example of common
treasury terminology.)
Agencies: Federal agency securities and/or Government-sponsored enterprises.
Benchmark: A comparative base for measuring the performance or risk tolerance of the
investment portfolio. A benchmark should represent a close correlation to the level of risk
and the average duration of the portfolio’s investments.
Broker: A broker brings buyers and sellers together for a commission.
Certificate of Deposit (CD): A time deposit with a specific maturity evidenced by a
Certificate. Large-denomination CDs are typically negotiable.
Collateral: Securities, evidence of deposit or other property, which a borrower pledges to
secure repayment of a loan. Also refers to securities pledged by a bank to secure deposits
of public monies.
Comprehensive Annual Comprehensive Financial Report (CAFRACFR): The official
annual report of the (East Valley Water District). It includes four combined financial
statements prepared in conformity with Generally Accepted Accounting Principles (GAAP). It
also includes supporting schedules necessary to demonstrate compliance with finance-
related legal and contractual provisions, extensive introductory material, and a detailed
Statistical Section.
Coupon: (a) The annual rate of interest that a bond’s issuer promises to pay the bondholder
on the bond’s face value. (b) A certificate attached to a bond evidencing interest due on a
payment date.
Dealer: A dealer, as opposed to a broker, acts as a principal in all transactions, buying and
selling for his own account.
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
12 of 15
Delivery versus Payment (DVP): There are two methods of delivery of securities:
delivery versus payment and delivery versus receipt. Delivery versus payment is delivery of
securities with an exchange of money for the securities. Delivery versus receipt is delivery of
securities with an exchange of a signed receipt for the securities.
Derivatives: (1) Financial instruments whose return profile is linked to, or derived from,
the movement of one or more underlying index or security, and may include a leveraging
factor, or (2) financial contracts based upon notional amounts whose value is derived from
an underlying index or security (interest rates, foreign exchange rates, equities, or
commodities).
Discount: The difference between the cost price of a security and its maturity when quoted
at lower than face value. A security selling below original offering price shortly after sale also
is considered to be at a discount.
Diversification: A Dividing investment funds among a variety of securities offering
independent returns.
Duration: A measure of the sensitivity of the price (the value of principal) of a fixed-income
investment to a change in interest rates. Duration is expressed as a number of years. Rising
interest rates mean falling bond prices, while declining interest rates mean rising bond prices.
Federal Credit Agencies: Agencies of the Federal government set up to supply credit to
various classes of institutions and individuals (e.g., S & L’s, small business firms, students,
farmers, farm cooperatives, and exporters).
Federal Deposit Insurance Corporation (FDIC): A federal agency that insures bank
deposits, currently up to $250,000 per entity.
Federal Funds Rate: The rate of interest at which Federal funds are traded. This rate is
currently pegged by the Federal Reserve through open-market operations.
Federal Home Loan Banks (FHLB): Government sponsored wholesale banks (currently
12 regional banks), which lend funds and provide correspondent banking services to member
commercial banks, thrift institutions, credit unions, and insurance companies. The mission of
the FHLBs is to liquefy the housing related assets of its members who must purchase stock
in their district Bank.
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
13 of 15
Federal Reserve System: The central bank of the United States created by Congress and
consisting of a seven-member Board of Governors in Washington, D.C., 12 regional banks,
and about 5,700 commercial banks that are members of the system.
Liquidity: A liquidity asset is one that can be converted easily and rapidly into cash without
a substantial loss of value. In the money market, a security is said to be liquid if the spread
between bid and asked prices is narrow and reasonable size can be done at those quotes.
Local Government Investment Pool (LGIP): The aggregate of all funds from political
subdivisions that are placed in the custody of the State Treasurer for investment and
reinvestment.
Market Value: The price at which a security is trading and could presumably be purchased
or sold.
Maturity: The date upon which the principal or stated value of an investment becomes due
and payable.
Money Market: The marker in which short-term debt instruments (bills, commercial paper,
bankers’ acceptances, etc.) are issued and traded.
Offer: The price asked by a seller of securities. (When you are buying securities, you ask
for an offer.) See Asked and Bid.
Portfolio: Collection of securities held by an investor.
Primary Dealer: A group of government securities dealers who submit daily reports of
market activity and positions and monthly financial statements to the Federal Reserve Bank
of New York and are subject to its informal oversight. Primary dealers include Securities and
Exchange Commission (SEC)-registered securities broker-dealers, banks, and a few
unregulated firms.
“Prudent Investor” Standard: A standard of responsibility which applies to fiduciaries.
In California, the rule is stated as “Investments shall be managed with the care, skill,
prudence and diligence, under the circumstances then prevailing, that a prudent person,
acting in a like capacity and familiar with such matters, would use in the conduct of an
enterprise of like character and with like aims to accomplish similar purposes.”
Rate of Return: The yield obtainable on a security based on its purchase price or its current
market price. This may be the amortized yield to maturity on a bond the current income
return.
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
14 of 15
Safekeeping: A service to customers rendered by banks for a fee whereby securities and
valuables of all types and descriptions are held in the bank’s vaults for protection.
Secondary Market: A market made for the purchase and sale of outstanding issues
following the initial distribution.
Securities & and Exchange Commission: Agency created by Congress to protect
investors in securities transactions by administering securities legislation.
Sec Rule 15(C)3-1: See Uniform Net Capital Rule.
Treasury Bills: A non-interest bearing discount security issued by the U.S. Treasury to
finance the national debt. Most bills are issued to mature in three months, six months, or
one year.
Treasury Bonds: Long-term coupon-bearing U.S. Treasury securities issued as direct
obligations of the U.S. Government and having initial maturities of more than 10 years.
Treasury Notes: Medium-term coupon-bearing U.S. Treasury securities issued as direct
obligations of the U.S. Government and having initial maturities from two to 10 years.
Uniform Net Capital Rule: Securities and Exchange Commission requirement that
member firms as well as nonmember broker-dealers in securities maintain a maximum ratio
of indebtedness to liquid capital of 15 to 1; also called net capital rule and net capital ratio.
Indebtedness covers all money owed to a firm, including margin loans and commitments to
purchase securities, one reason new public issues are spread among members of
underwriting syndicates. Liquid capital includes cash and assets easily converted into cash.
Yield: The rate of annual income return on an investment, expressed as a percentage. (a)
Income Yield is obtained by dividing the current dollar income by the current market price
for the security. (b) Net Yield or Yield to Maturity is the current income yield minus any
premium above par or plus any discount from par in purchase price, with the adjustment
spread over the period from the date of purchase to the date of maturity of the bond.
EAST VALLEY WATER DISTRICT
Administrative Policies & Programs
Policy Title: Investment Policy
Original Approval Date:
July 22, 2015
Last Revised:
April 27, 2022
Policy No:
7.6
Page
15 of 15
Revised 4/27/16
Revised 4/12/17
Revised 4/25/18
Revised 4/24/19
Revised 5/13/20
Revised 3/24/21
Agenda Item
#3a
April 12, 20231
Meeting Date: April 12, 2023
Agenda Item #3a
Informational Item
7
4
9
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: FY 2023-24 Program Goals and Objectives Workshop
RECOMMENDATION
This agenda item is for informational purposes only, no action required.
BACKGROUND / ANALYSIS
East Valley Water District is a performance-based organization, focused on achievement
of goals derived from the Strategic Plan and Five-Year Work Plan adopted by the Board
of Directors (Board). The Five-Year Work Plan is the framework of long-term goals
related to District infrastructure improvements, operations, administration, and
community engagement. Each year the Five-Year Plan is referenced to develop an
annual work plan for the upcoming fiscal year.
With the fiscal year 2023-24 annual work plan as guidance, Program Managers and
staff have been working for the last six weeks on development of Program Goals and
Objectives. Each of the Objectives either directly support the annual work plan for the
upcoming year or are designed to enhance the effectiveness and/or efficiency of service
delivery to District ratepayers.
In addition, staff remained cognizant of the following key considerations that could
have an impact on operations and the way the District delivers services to ratepayers:
•Rates & Reserves
•Funding
•Staffing Plan / Retirements
•Inflation / Supply Chain Delays
•Commissioning of the Sterling Natural Resource Center (SNRC)
•Water Supply and Quality
This year, Program Managers are pleased to present their Goals and Objectives to the
Board and to answer questions.
Agenda Item
#3a
April 12, 20232
Meeting Date: April 12, 2023
Agenda Item #3a
Informational Item
7
4
9
AGENCY GOALS AND OBJECTIVES
I - Implement Effective Solutions Through Visionary Leadership
D. Encourage Performance Based Results through Staff Empowerment
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by all Departments and will be presented to the
Finance and Human Resources Committee.
FISCAL IMPACT
There is no fiscal impact associated with this agenda item. Program goals and
objectives will be used to support funding requests submitted in the proposed 2023-24
fiscal year budget, which will be submitted for Board review at a future workshop.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Brian Tompkins
Chief Financial Officer
ATTACHMENTS
Presentation
Brian Tompkins, Chief Financial Officer
GOALS & OBJECTIVES FY 2023-24
April 12, 2023
2
DEVELOPMENT OF PERFORMANCE MEASURES
3
I.Implement Effective Solutions
•Facility Alternative Energy Resources
•Succession Planning / Recruitment
II.Sustainability, Transparency, and Accountability
•Pension Unfunded Actuarial Liability
•Document Management
III.Embrace Continuous Growth
•Water Reservoir Rehabilitation Program
•Water Main Replacement Program
IV.Preserve District Resources
•Update Strategic Plan
•Water Reclamation Operations
4
ORGANIZATIONAL PRIORITY HIGHLIGHTS
5
KEY CONSIDERATIONS
•Rates & Reserves
•Funding
•Staffing Plan / Retirements
•Inflation / Supply Chain Delays
•Commissioning of the Sterling Natural
Resource Center (SNRC)
•Water Supply and Quality
PROGRAM SUMMARIES
6
7
GOVERNING BOARD
The legislative body of the organization.
Comprised of five members elected at-large
to four-year staggered terms of office.
Governing Board members are responsible
for providing leadership, direction, and
serving as the organizational policy makers.
Board Chairman
Vice-Chairman
Board Member (3)
Total Employees: 5
ACCOMPLISHMENTS
Provided Organizational
Direction and Set
Expectations through Policy
Decisions Consistent with
the Five-Year Work Plan
•Completed professional recruitment
campaign for a new General
Manager/CEO
•Approved Administrative Policy 2.4 –
Telework Policy
•Conducted the General Manager/CEO
annual evaluation, including
establishment of FY 2023-24 Goals
Addressed Policy Decisions Related to the SNRC
•Approved the Balfour Beatty contract
amendment
•Participated in the soft opening for the
SNRC Administrative building and
Weaver Basin groundbreaking ceremony
Conducted All Activities
Required for the Board of
Directors Election
•Coordinated with the San Bernardino
County Registrar of Voters to hold the
2022 elections
•Updated and posted electoral
information on the District’s website, in
accordance with statutory requirements
•Reviewed and updated the Candidate
Orientation Program
8
GOALS & OBJECTIVES
•Consider actions to acquire outstanding shares of the North Fork Water Company
•Consider City Creek Mutual Water Company dissolution
•Convene a City Creek Mutual Water Company Board Meeting to update officers
•Conduct General Manager/CEO annual evaluation
•Engage in a strategic planning session to establish District goals and objectives
Provide Organizational Direction and Set Expectations through Policy Decisions Consistent with the Five-Year Work Plan
•Consider agenda items related to project completion and commencement of the SNRC
•Participate in activities that encourage community engagement for the SNRC
Address Policy Decisions Related to the SNRC
•Evaluate and develop a legislative platform
•Engage with legislators to promote the legislative platform
•Engage community of strategic plan and goals and objectives
Engage Elected Officials and Community on the District’s Strategic Priorities and Legislative Priorities
9
10
GENERAL ADMINISTRATION
Ensures the District’s business and daily
operation activities are performed following
federal, state, and District Board-approved
policies.
The General Manager provides daily oversight
for interagency relations for advancing the
District’s initiatives, implements strategic
planning for future operations and capital
improvement funding requirements, and
resource allocation.
Administration is responsible for:
•Implementing the District’s Vision
•Maintaining Official Records
•Promoting Public Trust and Ensuring Transparency
Compliance
Total Employees: 3
General
Manager / CEO
District Clerk
Administrative
Specialist
Completed Consolidation /
Dissolution of North Fork Water
Company (NFWC)
•Entered eminent domain
proceedings to acquire
remaining nine shares of
NFWC, not owned by the
District
•Maintained NFWC annual
compliance review
Developed
Document
Management
Process
•Developed naming
convention for efficient
document retrieval
•Began process for scanning
vital documents and
incorporating them into the
electronic document
repository
•Completed training for
Customer Service and
Finance on document
repository systems
•Initiated destruction of 800
boxes in compliance with
the Records Retention
Policy
Developed District
Clerk Handbook
•Evaluated and identified
best practices to be
included in the new
Handbook
•Coordinated with relevant
staff and incorporated
comments and suggestions
into the Handbook
•Prepared a draft Handbook
Community
Heritage Education Foundation (CHEF)
•Held a Committee Meeting
to discuss long-term action
priorities
•General Manager/CEO held
an annual Board Meeting to
discuss operations,
financials, and a donation
policy
11
ACCOMPLISHMENTS
•Continue with eminent domain proceedings until court ruling is issued
•Perform annual review of prior NFWC shareholders’ water allocation agreement with East Valley Water District
•Consult with legal counsel to determine how the NFWC will operate in the future
•Work with legal counsel toward dissolution of City Creek Mutual Water Company, and schedule Board Meeting if
required
Complete Consolidation / Dissolution of Mutual Water
Companies
•Continue to scan vital documents and incorporate them into the electronic document repository
•Coordinate and train remaining District staff to ensure the document repository system is used consistently
•Continue destruction of documents in compliance with the Records Retention Policy
Implement Document Management Process
•Review and revise overall District Strategic Plan
•Complete District Clerk Handbook and present to the Finance and Human Resources Committee
•Continue working with Community Heritage and Education Foundation (CHEF) Board and Committee members to
finalize scope of project
Document / Update Organizational Priorities and Philosophies
12
GOALS & OBJECTIVES
13
HUMAN RESOURCES
Responsible for administering programs to
attract and retain a diverse and qualified
workforce. To remain an industry leader, this
Program analyzes compensation and benefits
packages against the market and implements
new initiatives based upon market demands.
Additionally:
•Supports a successful workforce by
acknowledging the need to build a
work-life balance
•Creates programs focused on the health and
wellness of all employees
•Administers the Risk Management Program to
mitigate personnel injuries, property damage,
and financial loss for the District
•Administers the Pathway Program
Total Employees: 2
Director of
Administrative Services
Human Resources
Coordinator
Implemented Workforce Programs in Support of the SNRC
•Recruited and onboarded Wastewater
Treatment Operators for the SNRC
team
•Facilitated a transition plan to relocate
staff to the SNRC site
Promoted a Positive Organizational Culture that Maintained a Supportive and Encouraging Work
Environment
•Implemented training and development
programs for staff at all levels
throughout the organization
•Ensured connection between the new
General Manager/CEO with staff by
continuing the Breakfast with the Boss
program, conducting annual staff focus
group meetings, and prioritizing
interactions with individual
departments
•Implemented Telework Policy that
maintains District work expectations
while allowing scheduling flexibility
•Negotiated a three-year MOU that
considered both long-term financial
commitments and employee morale
Promoted Regional
Involvement and Provided
Workforce Experience and Educational Opportunities
•Enhanced the District’s Water and
Resource Management Pathway
Program to be more accessible to
students within their current class
structure
•Modified current internship program for
local youth to a summer internship
program that provides more convenient
work experience opportunities
•Created a marketing campaign to
recruit and onboard Customer Service
and administrative volunteers
14
ACCOMPLISHMENTS
•Continue to recruit and onboard quality candidates to join the SNRC team
•Create administrative policies regarding work schedules and standby responsibilities for SNRC maintenance and
operations
•Identify opportunities to ensure collaboration between staff located at District Headquarters and the SNRC
Implement Workforce Programs in Support of the SNRC
•Update the District’s Succession Plan to identify organizational growth, prepare for future retirements, and continue
to provide training and development opportunities for staff
•Ensure salaries, benefits, and related programs are executed as adopted in the Memorandum of Understanding
(MOU) effective July 1, 2023 -June 30, 2026
•Implement the Onboarding module of our current NeoGov Recruitment Suite to enhance the new-hire onboarding
and transition process
Promote a Positive Organizational Culture that Maintains a
Supportive and Encouraging Work Environment
•Engage schools within the District’s service area to promote participation in water industry workforce experiences
•Monitor progress of summer internship program and report on program’s success to the Board
•Develop educational and interactive tours of the SRNC with hands on lab experiments for students to understand
wastewater physical and biological processes
Promote Regional Involvement and Provide Workforce
Experience and Educational Opportunities
15
GOALS & OBJECTIVES
16
PUBLIC AFFAIRS
Oversees internal and external communication
programs consistent with the District’s Vision
and guiding principles.
Through community and media relations, the
Program provides effective and strategic
communications to various stakeholders.
This program is responsible for:
•Grant Writing
•Emergency Preparedness
•Facility Rental Programs
Total Employees: 4.5
Director of
Strategic
Services
Public Affairs/
Conservation
Manager
Public Affairs
Coordinator
Part-Time
Community
Relations
Representative
(0.5)
Public Affairs
Specialist
Advanced Construction of
the SNRC and
Implemented Facility
Operations
•Hosted community activities to
maximize the SNRC public space
including facility rentals and hosted
events
•Implemented the Wildlife Management
Plan training and monitoring program
•Identified and engaged community
stakeholders regarding SNRC
construction and commissioning
Utilized Communication
Methods that Enhanced the District’s Brand
•Re-engaged with community members
and organizations as post COVID-19
activities resumed in-person
•Highlighted the District’s premier
agency standards through
presentations / engagements with
national and regional organizations
such as ACWA, CMUA, WateReuse,
CSDA, and PRSA
•Enhanced digital outreach tools to
increase customer engagement and
online presence of the District
Advanced the District’s
Emergency Preparedness Program
•Held annual review of the Emergency
Response and Hazard Mitigation Plans
•Implemented the updated emergency
response training program following
plans established by the District and
participated in a tabletop exercise
•Monitored grant funding opportunities
to construct mitigation measures
identified in the District’s emergency
plans
17
ACCOMPLISHMENTS
•Host a ribbon cutting event for SNRC operations
•Partner with third parties to offer community activities to maximize the SNRC public space
Implement Community Based Activities at the SNRC
•Engage with community members and organizations through pop-ups, presentations, and local events
•Enhance the District’s digital presence through a website redesign and continue to increase social media
engagement
•Facilitate and update the District’s Strategic Plan
Utilize Communication Methods that Enhance the District’s
Priorities
•Conduct formal update of the Emergency Response and Hazard Mitigation Plans
•Partner with local and regional agencies for advanced emergency response trainings
•Continue monitoring grant funding opportunities to construct mitigation measures identified in the District’s
emergency plans and critical infrastructure projects
Advance the District’s Emergency Preparedness Program
18
GOALS & OBJECTIVES
19
CONSERVATION
Oversees programs that facilitate and
encourage sustainable water use throughout
the District.
Additionally, this program is responsible for:
•Communicating conservation benchmarks to
various regulatory agencies
•Preparing regulatory compliance documents
•Monitoring legislative affairs
Total Employees: 1
Director of Strategic
Services
Conservation
Coordinator
Public Affairs /
Conservation
Manager
Coordinated Necessary Program Working Groups to Complete Conservation Reports
•Facilitated working group meetings for
the purpose of tracking informational
data requests for State mandated
reports
•Prepared and submitted required
regulatory reports such as the Supply
and Demand Assessment and the
Drought Risk Assessment
Evaluated Rebate Program Success and Implemented Program Enhancements
•Enhanced the rebate program to assist
customers increase outdoor efficiency
with the implementation of the Parkway
Transformation and Irrigation Retrofit
Program (Parkway and irrigation retrofit)
•Developed digital material and other
educational elements to provide
customers with conservation resources,
free community events (Earth Day
Festival), and four workshops
Participated in the Legislative Process as it Related to Changes in Conservation Regulations
•Actively participated in the legislative
and regulatory process, (AB 2449, SB
1157, SB 222, etc.) and updated District
stakeholders on relevant impacts to
District programs
•Monitored legislation related to low-
income rate assistance, residential water
use standards, and communicate
changes affecting District operations
•Completed semi-annual Conservation
and legislative updates to staff, the
Governing Board, and quarterly updates
to the Legislative and Public Outreach
Committee and Community Advisory
Commission
•Following the Governor’s Executive
Order, implemented Stage 2 of the
District’s Water Shortage Contingency
Plan
20
ACCOMPLISHMENTS
•Maintain working group meetings for the purpose of tracking informational data requests for State mandated reports
and identifying data inputs for new reporting requirements
•Prepare and submit required water use efficiency reports such as the Drought Contingency Plan, Drought Risk
Assessment, Urban Water Use Objectives, and Commercial, Industrial, Institutional (CII) classifications
Coordinate Necessary Program Working Groups to Complete
Conservation Reports
•Streamline rebate programs to maximize customer water savings in line with new State objectives
•Analyze water consumption data to better understand historical conservation responses to forecast trends
Evaluate Rebate Program Success and Implement Program Modifications
•Assess industry standards on educational programming and current tactics used by peer agencies
•Participate in quarterly educational activities with schools located within the District’s service area
•Develop digital material and other educational elements to provide customers with conservation resources, free
community events, and four workshops
Engage and Educate Students on Water Resources
Consistent with State Curriculum
21
GOALS & OBJECTIVES
22
FINANCE & ACCOUNTING
Oversees the business operations of the
District in order to provide accountability
and adequate control over the use of
District funds.
This Program also maintains financial
systems and records in accordance with
Generally Accepted Accounting Principles
(GAAP) as well as applicable laws,
regulations, and District policies.
Total Employees: 6
Chief Financial
Officer
Finance
Supervisor
Business
Services
Coordinator
Accountant Accounting
Technician
Sr. Accounting
Technician
Ensured Financial Stability with Full Understanding of
Operational Complexities
•Completed final billing for City of
Highland and Urban Greening Grant
external funding for the SNRC
•Met with Water Reclamation staff and
the General Manager/CEO to update
cost estimates in the SNRC financial
model
•Completed selection of a rate consultant
for updating cost of service estimates as
a result of inflation and construction
delays
Fully Understood the Cost
and Accounting Complexities Associated
with New Funds
•Completed setup of the Water
Reclamation Fund in the District’s
financial accounting software
•Completed setup of CFD 2021-1
(Mediterra) in the Tyler software
•Worked with consultant to place
property assessments on tax rolls for
the Mediterra development
Maximized the Utility and Security of Financial
Software and Data
•Considered moving the Tyler Enterprise
Resource Planning (ERP) software to a
hosted environment but determined to
keep systems in-house at least through
fiscal year 2023-24
•Worked with IT to develop / identify link
between Tyler and Geographic
Information System (GIS) for projects
closed in Fiscal Year 2022-23
23
ACCOMPLISHMENTS
•Establish SNRC debt service and other reserves required to comply with agreements and ensure fiscal sustainability
•Complete Rate Study and schedule Public Hearing to consider rate adjustments if necessary
•Work with PERS staff to determine if the current “level pay” amount is adequate to pay down Unfunded Actuarial
Liability (UAL) in 15 years as planned
•Work with consultant to complete pension Unfunded Accrued Liability Policy and present policy to the Board
Ensure Financial Stability with Full Understanding of Operational Complexities
•Determine placed-in-service date and finalize total project costs
•Closeout State Revolving Fund (SRF) funding including payment of retention
•Allocate total project costs to physical plant components in sufficient detail to facilitate recording in the accounting
system, future replacements and reasonable depreciation estimates
Fully Understand the Cost and Accounting Associated with Placing the SNRC in Service
•Develop standard procedures for linking capital improvements in the District’s accounting software to the GIS
mapping software
•Conduct informal review of financial software being used by other water agencies; schedule product demonstrations
if potential replacements for Tyler are identified
•Identify pros and cons for moving Tyler (or new ERP) to a hosted environment
Maximize the Utility and Security of Financial Software and Data
24
GOALS & OBJECTIVES
25
INFORMATION TECHNOLOGY
Manages the District’s technology
infrastructure to support essential business
and operational functions, including:
•Installing and updating software utilized by
other programs
•Implementing cybersecurity measures
including staff training to help ensure the
prevention of data loss
Proactively schedules hardware replacements
as components near end-of-life in order to
reduce the risk of downtime and security
threats.
Coordinates and implements agency-wide
technology by facilitating vendor access and
support for technology focused projects.
Total Employees: 3
Chief Financial
Officer
Information
Technology
Manager
Network
Administrator
Information
Technology
Analyst
Ensured Reliability
of Technology
Infrastructure for Primary Business
and Operation Requirements
•Upgraded software, servers
and SCADA radios at Plants
25, 39, 99, 131, and 132
•Replaced remaining end-of-
life servers and switches at
the SNRC and District
Headquarters
•Installed new SCADA virtual
host servers and updated
virtual software licensing at
District Headquarters and
Plant 134
•Ordered valve exercise
equipment
•Did not pursue installation of
malware software due to
conflict with antivirus
software
Improved Systems
and Cybersecurity
Measures for
Response Functions
•Continued monthly email
phishing campaign and
reduced click rate and
educated staff on security
risk
•Established and equipped an
Emergency Operations
Center (EOC) at the SNRC
•Implemented CISCO
umbrella DNS security to add
a layer of security to the
District network
Analyzed Current
Systems to Enhance
Reporting and
Automate Processes
•Implemented Tyler’s EnerGov
Asset Management System
•Finalized the transition from
Cityworks to a new software
solution
•Assisted Administration with
implementing a new naming
convention within Laserfiche
•Reviewed the pros and cons
for transitioning Tyler Incode
from On-Premise to their
hosted solution
Other
Accomplishments
•Replaced backup batteries at
District Headquarters to align
with the Emergency
Response Plan
26
ACCOMPLISHMENTS
•Upgrade all server operating systems to comply with Microsoft server life cycle
•Begin working on updating active directory and group policy cleanup
•Install hardware and software for the SNRC solids, headworks, and main electrical building
•Upgrade District firewalls to comply with standardization best-practice
Ensure Reliability of Technology Infrastructure for Primary
Business and Operation Requirements
•Continue monthly email phishing campaign to reduce click rate and educate staff on security risk
•Implement multi-factor authentication software
•Replace current email security with email cloud security
•Contract for network penetration test
Improve Systems and Cybersecurity Measures for Response Functions
•Work with General Manager/CEO and Department heads to identify data-based decisions and source of supporting data
•Work with Administration, Customer Service, and Finance staff to implement naming conventions for the District’s
electronic document repository
•Work with Tyler and Customer Service revise and streamline the utility billing packet processing workflow process, and
reconfigure payment contract, conservations reports, disconnection door hangers, and arrearage report
Analyze Current Systems to Enhance Reporting and Automate
Processes
27
GOALS & OBJECTIVES
28
CUSTOMER SERVICE
Provides the community with prompt, courteous,
and world-class customer relations.
As the primary contact point with residents, this
program explores opportunities to provide:
•Thorough and accurate responses to billing
inquiries
•Convenient locations and methods for payment
•Resolve customer concerns about service
delivery by coordinating assistance from Field
personnel
•Follow up with customers regarding the
resolution to their concern
Additionally, staff also downloads meter read
data, audits data, and submits data files to a
third-party vendor for bill printing and mailing.
Total Employees: 7.5
Chief Financial
Officer
Customer
Service
Supervisor
Part-Time
Customer
Service
Rep I (0.5)
Customer
Service
Rep III (2)
Customer
Service
Rep I (2)
Customer
Service
Rep II (2)
Developed Strategies to Address Organizational Service Needs
•Worked with IT to implement Tyler’s
mobile work order application in
EnerGov Asset Management
•Reviewed new vendor contracts with
potential expansion of capabilities and
determined existing processes are
more efficient
•Gave Customer Service Supervisor
administrative permissions to provide
staff access to transaction processing
tools
Modified Processes to Comply with Changes in Legislation and Agreements While Maintaining Financial
Stability
•Met quarterly with Conservation to
assist with changing drought
regulations mandated by the State of
California
•Researched collection procedure
options (in practice at other agencies)
to avoid service disconnection as a tool
for collection of delinquent account
balances and determined not a suitable
option for the District
•Continued throughout fiscal year to run
wastewater billing under both SNRC
and City rates, pending transition of all
wastewater flows to the SNRC
Fully Understood and Utilized Smart Meter Capabilities
•Coordinated with Public Affairs to
increase the use of AMI data to
support conservation efforts
•Reviewed routes and billing dates for
possible changes to accommodate
timing of bills to customers on fixed
incomes, and determined that
enhancements will need to be made to
billing software
29
ACCOMPLISHMENTS
•Implement new payment options for District customers that are already supported by the District’s billing software
•Work with Public Affairs to address Customer Service needs for the District’s new web portal
Develop Strategies to Address Organizational Service Needs
•Develop and propose a fee for recovery of costs associated with clearing obstructions preventing access to District meters
•Develop and propose penalties or fees to discourage defaults on payment plan contracts
•Research costs associated with credit card charges and propose a fee/charge for cost recovery
•Prepare revisions to ordinance and fee schedule and incorporate them into Public Hearing process for rates
Work with other Departments to Recover Costs That Are Not Currently Captured by the District Fee Schedule
•Work with Tyler and IT to reconfigure Tyler revenue codes to accommodate new time requirements under SB 998
•Coordinate with Tyler and IT to revise and streamline utility billing packet processing workflow process
Identify and Implement Software Adjustments Needed Due to SB 998 and other Legislation
30
GOALS & OBJECTIVES
31
METER SERVICES
Maintains a network of approximately 23,000
Advanced Metering Infrastructure (AMI)
meters. The AMI meter program provides the
District and its customers with near real-time
consumption information.
This program also conducts routine
maintenance, testing, and replacement of
meters to ensure billing accuracy.
Total Employees: 2
Director of
Engineering and
Operations
Meter
Technician II
(2)
Field Service
Supervisor
Operations
Manager
Implemented Inspection
Program for AMI Meters
•Identified the need of five vault lid
replacements and created replacement
schedule
•Visually inspected meter boxes where
read problems occurred and
responded to 1,000 units monthly and
made 70 repairs on average per
month
Worked with Customer
Service to Address
Coverage Issues with the
AMI Network
•Confirmed accuracy of two MIUs
(meter interface unit) and meter reads
per month
•Decided not to install additional
registers on meters in routes 44 and
123, that utilize cell towers for data
transmission
Continued Meter Testing
Programs in Compliance
with State Water Audits
Best Practices
•Conducted an audit of 10% of large
meters for accuracy to ensure
compliance with AWWA standards
32
ACCOMPLISHMENTS
•Identify additional necessary vaults in need of lid replacements by utilizing replacement schedule
•Visually inspect necessary meter boxes in routes where read problems are occurring
Implement Inspection Program for AMI Meters
•Confirm and correct MIU (meter interface unit) and meter numbers on meters that are not transmitting reliable
read data
•Install additional data collector near Plant 132 to address unreliable transmission of reads in routes 8, 155, 92,
and 101
Work with Customer Service to Address Coverage Issues with the AMI Network
•Conduct an audit of 10% of large meters for accuracy to ensure compliance with AWWA standards
•Replace large meters that do not meet AWWA standards
Continue Meter Testing Programs in Compliance with State Water Audits Best Practices
33
GOALS & OBJECTIVES
34
ENGINEERING
Responsibilities include infrastructure planning,
maintaining a safe and reliable water supply,
and ensuring compliance with federal and state
regulations.
This program oversees wastewater collection
and treatment capital projects.
Additionally, coordinates and supports new
development within the District’s service area
by streamlining plan checking and inspection
efforts.
Total Employees: 4
Director of Engineering
& Operations
Associate Engineer Sr. Engineer (2)
Developed and Implemented the District’s
Capital Improvement Program to Address
Rehabilitation and Maintenance Needs While
Preparing for New
Development
•Completed construction work for
rehabilitation of the reservoir at Plant
108
•Completed design and construction of
the grant-funded stationary generator
at Plant 101
•Completed design work for
rehabilitation of the booster pump
system at Plant 101
•Initiated preliminary design of a Canal
3 Zone reservoir at the Applewood site
Developed Plans to
Optimize District
Utilization of Surface
Water and Groundwater Sources
•Completed construction of process
improvements related to Granular
Activated Carbon at Plant 134
•Initiated groundwater master planning
efforts to consider short-term and
long-term actions related to
groundwater production capacity
Completed Construction
and Commissioning of the
SNRC
•Completed construction of the
emergency storage basin at the
Weaver Basins Recharge Facility site
35
ACCOMPLISHMENTS
•Complete construction work for rehabilitation of reservoir at Plant 56
•Complete construction work for rehabilitation of booster pump system at Plant 101
•Complete preliminary design of Canal 3 Zone reservoir at the Applewood site
•Complete design and start replacement of 6.5 miles of District water mains
•Monitor the Baseline Bridge replacement project and associated water main relocation
•Design a Plunge Creek under-crossing for the North Fork Water Company Pipeline
Develop and Implement the District’s Capital Improvement Program to Address
Rehabilitation and Maintenance Needs While Preparing for New Development
•Complete a study to evaluate alternatives to optimize surface water treatment capacity within the District
•Complete groundwater master planning efforts to consider short-term and long-term actions related to groundwater
production capacity
•Conduct analysis of alternative energy sources
•Complete design of new groundwater well at Plant 129
Develop Plans to Optimize District Water and Energy Resources
•Complete construction of the regional recycled water pipeline and Weaver Basins
•Participate in the feasibility study for salt mitigation related to recharging groundwater with recycled water
Complete Construction and Commissioning of the SNRC
36
GOALS & OBJECTIVES
BREAK
37
38
WATER PRODUCTION
Responsible for the daily monitoring and
operations of the entire water production
system to ensure preventative maintenance
of all pumps, motors, wells, boosters,
reservoirs, pressure regulating valves
(PRVs), hydro-pneumatic plants, and the
Supervisory Control and Data Acquisition
(SCADA) system.
This program is responsible for water
delivery for the North Fork Water Company.
Total Employees: 7
Director of
Engineering and
Operations
Operations
Manager
Administrative
Assistant
Sr. Water
Production
Operator
Water
Production
Operator II (2)
Water
Production
Operator III (2)
Water
Production
Supervisor
Implemented a Plan to Identify and Enhance Water
Sources’ Requirements Due to the SNRC Discharge
Location
•Completed coordination with contractor
to rehabilitate booster at Plant 125 to
accommodate increased well capacity
•Worked with Engineering to determine
best utilization of water produced by
Well 120
•Identified and prioritized making Well
120 operational with electrical, SCADA,
and required permitting
Enhanced the SCADA
System to Achieve Water Production Requirements
•Investigated and temporarily deferred
installation of SCADA tower to improve
radio communications at District
Headquarters or alternate sites
•Worked with IT to complete ClearScada
software update
•Completed SCADA radio updates at
Plants 25, 33, 37, and 38
Rehabilitated Plant
Components to Ensure Water Production
•Completed replacement of isolation
valves to repair critical PRV
(Baseline/Sterling, N Church, and
Central/Mansfield) Stations 309, 305,
and 325
•Completed Plant 108 rehabilitation
project
39
ACCOMPLISHMENTS
•Install pressure regulating valve (PRV) at Plant 129 to connect plant to the upper zone distribution system
•Contract for repairs and upgrades to Well 120 to ensure its operational readiness for summer 2023 production
•Support work of contractor to complete rehabilitation of Plant 101
Implement a Plan to Identify and Enhance Water Sources’ Requirements Due to the SNRC Discharge Location
•Work with IT to install SCADA tower to improve radio communications at District Headquarters or alternative site
•Work with contractor to inspect and enhance communication and telemetry
Enhance the SCADA System to Achieve Water Production Requirements
•Coordinate with Water Maintenance for replacement of isolation valves to repair critical PRV (Baseline/Sterling)
•Work with Engineering for rehabilitation of reservoir at Plant 56
•Solicit proposals and finalize new master agreements for pump and motor maintenance
Rehabilitate Plant Components to Ensure Water Production
40
GOALS & OBJECTIVES
41
WATER TREATMENT
Responsible for water treatment management
of three different sources of supply used by the
District: surface water, groundwater, and
imported state project water.
The District operates Plant 134, which is a
Surface Water Treatment Plant that can treat
Santa Ana River water and imported State
Project Water.
Staff also operates two unique groundwater
treatment facilities:
•Plant 28 uses Granular Activated Carbon (GAC)
•Plant 39 is a blending facility
Total Employees: 2
Director of
Engineering and
Operations
Sr. Treatment
Plant
Operator
Water
Production
Supervisor
Operations
Manager
Supported Construction of
GAC at Plant 134
•Developed an operating plan for Plant
134 while construction is ongoing
•Amended Permit with the State Water
Resources Control Board (SWRCB)
•Provided final performance data to the
SWRCB and closed-out the compliance
order
Completed Plant 134
Membrane Replacements
Using a Five-Phase
Replacement Schedule
•Deferred to allow use of funds for
other projects and rolled forward to
FY 2023-24 objectives
Evaluated and
Rehabilitated Existing
Clean-in-Place Equipment
at Plant 134
•Replaced primary pump and scheduled
remaining pumps for replacement next
fiscal year
42
ACCOMPLISHMENTS
•Develop flow standards to meet water quality objectives
•Determine frequency of carbon filtration media changeouts to maintain water quality
•Implement data collection requirements identified in the permit amendment
Maximize Plant 134 Water Production While Utilizing GAC
Facilities
•Procure the necessary membrane modules from the manufacturer in accordance with the District’s Purchasing Policy
•Coordinate and schedule in-house installation of new membranes in the fifth and final train
Complete Plant 134 Membrane Replacements Using a Five-
Phase Replacement Schedule
•Inspect existing equipment and establish prioritized replacement schedule
•Purchase and install necessary parts and materials to complete the clean-in-place equipment project
Evaluate and Rehabilitate Existing Clean-in-Place Equipment at Plant 134
43
GOALS & OBJECTIVES
44
WATER QUALITY
Ensures the District’s compliance with State and
Federal Drinking Water Regulations.
This program manages:
•Backflow prevention
•Water sampling
•Fire hydrant flushing program
Water Quality is also assisting in the
development and launch of the Fats, Oils, and
Grease (FOG) program for SNRC pre-treatment.
Total Employees: 2.5
Director of
Engineering and
Operations
Water
Production
Supervisor
Water Quality
Coordinator
Operations
Manager
Water Quality
Technician
Part-Time
Water Quality
Worker
Evaluated Water Quality Regulations and Improved
Process Efficiencies to Enhance Water Quality
Compliance
•Implemented sampling programs to
maximize surface water treatment
process efficiencies
•Monitored EPA requirements for
Unregulated Contaminant Monitoring
Rule 5 (UCMR5) sampling
Re-Routed Outdated Fire
Service Backflows to Aboveground
•Replaced outdated Fire Service
backflows at Stater Bros, Safety Kleen,
and two apartment complexes
Assisted in Launching
Fats, Oils, and Grease
(FOG) Program Transition
and Software Procurement
•Worked with Engineering and IT
during software implementation
•Assisted with program transition and
compliance
45
ACCOMPLISHMENTS
•Implement Updated Sampling Requirements outlined in the District’s latest Permit amendment
•Complete EPA registration for Unregulated Contaminant Monitoring Rule (UCMR5) sample schedule
•Identify sample requirements for US EPA’s Revised Lead and Copper Rule, effective summer 2024
Evaluate Water Quality Regulations and Improve Process
Efficiencies to Enhance Water Quality Compliance
•Complete backflow software migration and implementation for cloud-based service
•Provide customer and private tester training for accessing and updating customer device information via cloud-based
software
•Work with customers to update outdated and unapproved backflow devices
Implement Backflow Program Enhancement Modifications
•Conduct customer outreach and vendor training for cloud-based compliance reporting
•Create customer Best Management Practices campaign to maintain program standards
•Assist Water Reclamation with procurement and management of contract for FOG compliance inspection
Implement Customer / Vendor FOG Program Requirements
and Training Campaign
46
GOALS & OBJECTIVES
47
WATER MAINTENANCE
Responsible for the repair and
replacement of the District’s 300 miles of
water pipeline.
This program coordinates with
Engineering and Water Production to
install water service lines, fire hydrants,
meters, valves, and all related equipment.
Staff members remain on-call during
non-business hours to respond to
customer afterhours requests and
emergencies.
Total Employees: 16
Field Service
Worker I (3)
Field Service
Worker II (4)
Field Service
Supervisor
Sr. Field Service
Worker
Storekeeper /
Buyer
Director of
Engineering and
Operations
Operations
Manager
Field Service
Worker III (6)
Administrative
Assistant
Prioritized Preventative
Maintenance Schedules to
Ensure Equipment
Readiness for Emergency
Response
•Ordered valve exercise equipment and
software
•Inspected, maintained, and replaced
900 of 3,025 hydrants on a three-year
cycle
Completed Evaluation of
Service Order / Asset
Management Software
•Worked with IT to hold product
demonstrations
•Incorporated feedback from staff to
finalize decision and procure Tyler’s
Asset Management software
•Provided training for staff on use of
new software
Continued Replacement
Program for Mains and Inground Fire Service
Devices
•Replaced undersized main in Pleasant
Hill Drive, west of Palm Avenue
•Coordinated with Water Quality to
develop a replacement schedule for
outdated fire services; and replaced
three inground fire services with new
“N’’ shaped aboveground devices
48
ACCOMPLISHMENTS
•Replace 40 identified inoperable gate valves on west side of the District; Conduct at least 20 in-house and supplement
efforts to replace up to 20 more using outside contractors
•Coordinate with Production to perform valve replacements to isolate crucial PRV stations in Baseline/Sterling, North
Church, and Central/Mansfield
•Inspect, maintain, and replace, as needed, 3,000 hydrants on a three-year cycle
•Solicit proposals and finalize new master agreement for pipeline repair services
Prioritize Preventative Maintenance Schedules to Ensure Equipment Readiness for Emergency Response
•Continue training all staff on use of new software
•Begin documenting and tracking all labor, equipment, and materials for water maintenance activities
Assess Operation of Tyler’s EnerGov Asset Management
Software
•Replace 1,500 feet of water main in both Elmwood Drive north of Lynwood and Valaria Court east of Valaria Drive
•Coordinate with Water Quality to replace identified outdated fire services
Continue Replacement Program for Mains and Inground Fire
Service Devices
49
GOALS & OBJECTIVES
50
WASTEWATER COLLECTION
Routinely inspects, cleans, repairs, and
conducts replacements of the District’s 230
miles of collection pipelines to prevent spillage
and leak of wastewater.
The pipeline inspection program uses a sewer
inspection Camera/Transporter and Closed-
circuit Television (CCTV) technology to
document pipeline condition attributes for
maintenance or replacement consideration.
Additionally, this Program conducts a weekly
sewer cleaning program using specialized
equipment. The program ensures the entire
system is cleaned within 24 months, with high
maintenance areas cleaned more regularly.
Total Employees: 4
Field Service
Worker II (2)
Field Service
Worker III
Director of
Engineering and
Operations
Operations
Manager
Sr. Field Service
Worker
Administrative
Assistant
Field Service
Supervisor
Continued Wastewater
Collection System
Maintenance and
Management
•Video inspected and assessed all
District sewer mains between the
northern and southern District
boundaries, and west of Victoria (75
miles)
•Cleaned 230 miles of sewer main
Provided Support for New
Fats, Oils, and Grease (FOG) Program
•FOG program is on hold until the SNRC
is operational and a FOG inspector is
contracted
Assisted with Updating the
Sewer System Management Plan (SSMP)
•Provided collection data for the SSMP
•Updated collection system assets listed
in the next SSMP
51
ACCOMPLISHMENTS
•Video inspect and assess 75 miles of District sewer mains between the northern and southern District boundaries,
and east of Victoria
•Clean 230 miles of sewer main
•Develop communication protocols for Collection staff to notify SNRC staff of specialized maintenance activities (tree
root chemicals, insects, etc.)
Continue Wastewater Collection System Maintenance and
Management
•Identify high maintenance areas within the collection system for the new contracted FOG inspector
•Assist FOG inspector in prioritizing correction efforts
Provide Support for New Fats, Oils, and Grease (FOG) Program
•Video sewer mains to identify root intrusions
•Schedule foam blasting of identified areas to control roots
•Schedule spraying of 2,500 manholes for insect control
Keep Sewer Mains Clear of Pest and Obstructions
52
GOALS & OBJECTIVES
53
WATER RECLAMATION
Responsible for treating and disinfecting
8 million gallons of wastewater per day (MGD).
Reclamation of wastewater generated by
District customers will transition from a service
contracted with the City of San Bernardino
Water Department, to in-house operations at
the newly completed Sterling Natural Resource
Center (SNRC) during the 2022-23 Fiscal Year.
SNRC operations include anaerobic digestion
for energy generation to help offset the cost of
power needed to operate the facility.
Total Employees: 9
Director of
Engineering and
Operations
Water
Reclamation
Manager
Administrative
Analyst
Wastewater
Treatment Plant
Mechanic
Electrical and
Instrumentation
Controls
Technician
Sr. Wastewater
Treatment Plant
Operator
Wastewater
Treatment Plant
Operator III (4)
Completed Staffing and Training for New
Wastewater Treatment Operations
•Hired Wastewater Treatment Plant
Operator III
•Solicited for three more staff
•Updated staffing plan to hire
remaining staff next year
•Staff participated in several training
events by different vendors
Met and Exceeded Compliance Requirements
for the SNRC
•Implemented HachWIMS compliance
software
•Negotiated all AQMD and water quality
permits
•Held Title 22 hearing for Effluent
permit
•Updated Sewer Ordinance to establish
legal authority to enforce pre-
treatment program; includes FOG
Commenced Operations at
the SNRC
•Completed seed sludge investigations
•Finalized agreement with Anaergia for
biosolid residual disposal
•Implemented a preventative
maintenance schedule within Tyler
Energov Asset Management software
54
ACCOMPLISHMENTS
•Continue to hire staff in accordance with staffing plan finalized by Human Resources
•Ensure new employees are trained for operations and maintenance for the SNRC
•Work with Water Quality to procure a contract for the FOG program compliance inspector
Complete Staffing and Training for New Wastewater Treatment
Operations
•Implement and manage pre-treatment program.
•Comply with Air Quality Management District (AQMD) emissions requirements.
•Comply with recycled water quality requirements
Meet and Exceed Compliance Requirements for the SNRC
•Complete transition:
•of wastewater flows to the SNRC over a three-month period
•to discharge water to Weaver Basins
•to generate on-site renewable energy
•to dispose residual solids
•Perform optimization of the Aeration system
•Manage new preventative maintenance program
Commence Operations at the SNRC
55
GOALS & OBJECTIVES
56
FACILITIES MAINTENANCE
Oversees the maintenance of all District
facilities located throughout the 30.1 square
mile service area for operating the utility
systems.
The program’s oversight includes these facility
types:
•Administration buildings
•Water facilities
•Sterling Natural Resource Center
•District-owned vacant properties
•Easements
Staff’s focus is to mitigate expenses by
maintaining a complex facilities management
system to achieve department goals.
Total Employees: 2
Director of
Engineering and
Operations
Facilities & Fleet
Supervisor
Operations
Manager
Facilities
Maintenance
Worker II
Completed
Long-Term Site
Improvements at
Plant 39
•Upgraded asphalt roads
around storage tanks
•Deferred construction of
restroom for staff-use at
Plant 39 due to increase
scope of improvements
•Painted pump house exterior
Continued Phased
Upgrades and
Rehabilitation of
District Facilities
•Deferred scheduled
rehabilitation projects at
various Plants due to
unanticipated expenditures
for SNRC
•Installed fire suppression
system at SNRC
Tracked Inventory
at Del Rosa Location
•Deferred inventory tracking
at Del Rosa location due to
pending relocation of
inventory storage
Implemented New
Facilities
Maintenance
Tracking Software
•Worked with IT to select
Tyler’s Energov Asset
Management program
•Transferred existing Facilities’
data into new software
•Worked with IT to develop
custom fields for service
order requests
57
ACCOMPLISHMENTS
•Complete concept, design, and construction of inventory warehouse including automated inventory tracking system
•Install automated access system
•Construct storage bays for bulk class II base and cold mixed asphalt
•Re-roof pump house
Complete Long-Term Site Improvements at Plant 39
•Develop a comprehensive site improvement project list
•Contract for painting building at Plant 33
•Insulate Plant 59 Building
•Complete HVAC project by removing swamp coolers and sealing wall openings at Plants 39, 142, and 149
•Continue to improve energy efficiency of pump houses and other Plant buildings through lighting upgrades, insulation,
and weatherstripping
Continue Phased Upgrades and Rehabilitation of District
Facilities
•Determine most cost-effective solution for physical security at all three sites
Assess Security Needs at SNRC, District Headquarters, and Plant 134
58
GOALS & OBJECTIVES
59
FLEET MAINTENANCE
Manages the preventative maintenance
program for all District vehicles and heavy
equipment, including the procurement of fleet
items and ensuring compliance with State and
Federal air quality rules and regulations.
The District’s fleet is comprised of light and
heavy-duty utility trucks. Light utility trucks are
used by water and wastewater staff to
maintain the infrastructure.
Heavy equipment fleet includes large
specialized equipment used for routine
maintenance and inspection of the water
distribution and wastewater collection systems.
Total Employees: 1
Director of
Engineering and
Operations
Fleet
Maintenance
Coordinator
Facilities & Fleet
Supervisor
Operations
Manager
Assessed Future
Operations of Fleet Management
•Transferred Fleet Maintenance
reporting to the new Facilities & Fleet
Supervisor
•Created a new Fleet Maintenance
Coordinator position upon retirement
of the Equipment Mechanic III
•Fulfilled the Fleet Maintenance
Coordinator position with assistance
from Human Resources
Continued to Implement
the Air Quality Management Program
•Hired a consultant to manage all air
quality regulations for AQMD and the
California Air Resources Board (CARB)
•Transmitted emissions data to the
Bureau of Automotive Repair (BAR),
using new Network Fleet devices
Enhanced the Vendor-
Managed Fleet Maintenance Program
•Deferred enhancement of the Vendor-
Managed Fleet Maintenance Program
due to pending fulfilment of Fleet
Maintenance Coordinator position
60
ACCOMPLISHMENTS
•Train new Fleet Maintenance Coordinator
•Enhance service orders in the Fleet Maintenance Module within Tyler’s Energov Asset Management (EAM) software
•Complete and distribute a Request for Proposal (RFP) for fuel delivery
•Continue installation of EV charging stations
Assess Future Operations of Fleet Management
•Manage all air quality regulations for AQMD and California Air Resources Board (CARB)
•Transmit emissions data to the Bureau of Automotive Repair (BAR) using new Network Fleet devices
Continue to Implement the Air Quality Management Program
•Complete an RFP for mobile maintenance
•Provide a list of pre-approved safety repairs and replacements for the RFP
•Contract with a vendor to provide detailing for specialized equipment
Enhance the Vendor-Managed Fleet Maintenance Program
61
GOALS & OBJECTIVES
DISCUSSION
Agenda Item
#3b
April 12, 20231
Meeting Date: April 12, 2023
Agenda Item #3b
Informational Item
7
5
4
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Total Dissolved Solids and Water Recycling
RECOMMENDATION
This agenda item is for informational purposes only, no action required.
BACKGROUND / ANALYSIS
At the March 8, 2023 meeting, the Board authorized a Memorandum of Understanding
(MOU) between East Valley Water District (EVWD), San Bernardino Valley Municipal
Water District (Valley District), San Bernardino Municipal Water Department and City of
Redlands to establish total dissolved solids (TDS), or salt, mitigation commitments
necessary for the Regional Board to issue permits for the discharge of recycled water by
EVWD and the other parties for the purpose of recharging the groundwater basin. The
impact of recycled water on TDS concentrations in groundwater is relevant because
recycled water has higher TDS than the allowable level for the effected groundwater
basin. The MOU contemplates a feasibility study to identify a sustainable and cost-
effective strategy for managing the TDS in the groundwater basin, which may include a
regional desalter to remove TDS from recycled water. The strategy would also include
seeking grant funding to support TDS mitigation efforts.
The regulations associated with TDS in groundwater are important for the District and
regional water agencies that rely on the groundwater basin. A presentation will provide
perspective on typical TDS levels in water, regulations on TDS, and mitigation options
that will be evaluated. Staff will bring back to the Board the results of the study that will
be performed over the next year.
AGENCY GOALS AND OBJECTIVES
I - Implement Effective Solutions Through Visionary Leadership
A. Identify Opportunities to Optimize Natural Resources
IV - Promote Planning, Maintenance and Preservation of District Resources
A. Develop Projects and Programs to Ensure Safe and Reliable Services
Agenda Item
#3b
April 12, 20232
Meeting Date: April 12, 2023
Agenda Item #3b
Informational Item
7
5
4
REVIEW BY OTHERS
This agenda item has been reviewed by the Executive Management Team.
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Jeff Noelte
Director of Engineering and Operations
ATTACHMENTS
Presentation
Total Dissolved Solids & Water
Recycling
April 12, 2023
•Total Dissolved Solids (TDS), or salinity is the concentration of dissolved mineral salts in water
•Typically in the form of:
•Sources of Dissolved Solids
•Natural weathering process in storm water runoff
•Household uses discharged to sewer
•Chemical addition at treatment plants
•Specifically, chlorine in the form of sodium hypochlorite (bleach)
•Self-regenerating water softeners
2
INTRODUCTION TO DISSOLVED SOLIDS
3
TDS OF VARIOUS WATERS
Water Type Typical TDS
(mg/L)
Santa Ana River
Water 140 -240
Imported Water 230 -330
Drinking Water 200 -500
EVWD Recycled
Water (estimated)530
Brackish Water 500 –17,000
Sea Water 35,000
Reverse Osmosis
Treated Water 25 -150
•EPA developed Maximum Containment Levels (MCLs) for drinking
water to ensure public health
4
REGULATORY REQUIREMENTS FOR TDS
Primary MCLs Secondary MCLs
Primary MCLs are standards specifically for constituents
that are immediately hazardous and selected to protect
public health.
Secondary MCLs are standards that contribute to a lack
of trust in drinking water and have potential or have the
potential to accumulate over long time periods.
•Taste
•Odor
•Smell
•Scaling/Corrosion
TDS in EVWD Water
Chemical Secondary MCL
(mg/L)Detection Level Average Level
Detected Unit of Measure Range of
Detection
Likely Source of
Contamination
Total Dissolved
Solids (TDS)1000 5 296 mg/L 170-510
Runoff/ leaching
from natural
deposits
•Indirect Potable Water Reuse (i.e., Groundwater Recharge) carries salt
from daily uses into the ground water
•State Water Resources Control Board regulates water quality for
groundwater
5
GROUNDWATER IMPACTS -REGULATIONS
Water Quality Objectives Bunker Hill A 310 mg/L
Bunker Hill B 330 mg/L*
2018 Ambient Levels
Note: Assimilative capacity is available
Bunker Hill A 330 mg/L
Bunker Hill B 280 mg/L*
•Assimilative capacity allows the discharge of a contaminant at higher
levels if the basin remains below the objective
•Elevated TDS loading over time increases TDS of groundwater basin
6
GROUNDWATER IMPACTS –TDS INCREASES
7
GROUNDWATER IMPACTS –MODEL RESULTS
•Modeled flow paths of recycled water from Weaver Basins
Legend
Active municipal well
Inactive municipal well
Monitoring well
Private well, active
Recycled Water Flow Paths
8
GROUNDWATER IMPACTS –MODEL RESULTS (CONTINUED)
•Projected TDS Concentrations
250
275
300
325
350
250
275
300
325
350
1995 2000 2005 2010 2015 2020 2025 2030 2035 2040 2045
TD
S
(
m
g
/
L
)
Historical
Baseline (Includes Redlands 3.5 MGD)
Baseline + SNRC
Bunker Hill -B Water Quality Objective for TDS = 330 mg/L
Treatment
Technology Description Cost Pros Cons
Reverse
Osmosis
Liquids are pushed under high
pressure through a semipermeable
membrane, reject particles are
collected on the membrane and
removed as a high strength waste
Capital
$ $ $
Ops
$ $ $
Highly Effective At
Removing TDS
Proven Track Record
High Energy Costs
Includes A Reject
Waste Stream
Ion Exchange
Liquid flows through a substrate
that will exchange molecules that
cause salinity with other non-salinity
causing molecules
Capital
$ $
Ops
$ $ $
Proven Technology
Waste Resin Disposal
Includes A Reject
Waste Stream
Frequent Media
Change Outs
9
TREATMENT OPTIONS
DISCUSSION
Agenda Item #4a April 12, 20231
Meeting Date: April 12, 2023
Agenda Item #4a
Discussion Item
7
5
3
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Consider Approval of Sterling Natural Resource Center Contract
Amendments for Balfour Beatty, AKD Consulting, and Group Delta Consultants
Contracts
RECOMMENDATION
That the Board of Directors authorize the General Manager/CEO to execute contract
amendments as follows:
1. Balfour Beatty Amendment Number 9 for Regional Recycled Water Pipeline
Extension Additional Cost for a not to exceed amount of $7,516,583 (Valley
District reimbursable);
2. Balfour Beatty Amendment Number 10 for Weaver Basins Frontage
Improvements for a not to exceed amount of $429,950 (Valley District
reimbursable);
3. Balfour Beatty Amendment Number 11 for added scope items for the SNRC
Administration Center and Treatment Plant for a not to exceed amount of
$2,500,000;
4. AKD Consulting Amendment Number 2 for additional program management
services for the SNRC Project for a not to exceed amount of $128,200; and,
5. Group Delta Consultants Amendment Number 2 for additional material testing
and inspection services for the Sterling Natural Resource Center for a not to
exceed amount of $50,000.
In addition, it is recommended that the Board of Directors authorize the release of half
of the retention for the SNRC Administration Building work since the District has taken
beneficial use of the facility. This will allow Balfour Beatty to pay subcontractors in full
so that final lien releases can be obtained.
BACKGROUND / ANALYSIS
Additional work is needed to accommodate the change in the Sterling Natural Resource
Center (SNRC) discharge location from Redlands Basins to Weaver Basins, and to
complete some elements of the SNRC Administration Center and Treatment Plant. The
additional work requires contract amendments with the District’s design-build partner
and consultants. Specifically, contract amendments are recommended for Balfour
Beatty, AKD Consulting, and Group Delta Consultants.
Agenda Item #4a April 12, 20232
Meeting Date: April 12, 2023
Agenda Item #4a
Discussion Item
7
5
3
Balfour Beatty Amendments
On March 8, 2023, the Board authorized the fourth amendment to the Regional
Recycled Water Facilities Reimbursement Agreement with Valley District that increased
the total reimbursable amount to $44,429,216 to cover the additional cost
associated with the Regional Recycled Water Pipeline and Weaver Basins. It is
recommended that two amendments to the Balfour Beatty contract be used to provide
a mechanism for Balfour Beatty to execute this work that will be reimbursed by Valley
District. Amendment Number 9 for $7,516,583 would address Regional Recycled Water
Pipeline work, and Amendment Number 10 for $429,950 would address Weaver Basins
work. A third amendment (Number 11) for work related to the SNRC Administration
Center and Treatment Plant is recommended for a not to exceed amount of $2,500,000.
This work involves additional paving rehabilitation, piping insulation, membrane
cassette upgrade, sewer lateral work in Base Line, electrical trim plate upgrade, and
HVAC modifications for the Administration Center.
AKD Consulting Amendment
The existing scope of the program management services being provided by AKD
Consulting was based upon project completion at the end of 2022. Re-scoping work by
the Program Manager has allowed the authorized funds to stretch through April
2023. Additional program management services by AKD Consulting are recommended
to be extended through January 2024 based on time and material for an additional
amount of $128,200. A portion of this, $32,200, is reimbursable by Valley District
under the fourth amendment to the reimbursement agreement.
Group Delta Amendment
Group Delta Consultants have been providing material testing and inspection services
for construction of the SNRC. To support the remaining construction, additional
material testing and inspection services are recommended through an amendment with
Group Delta Consultants for a not to exceed amount of $50,000. The additional work
primarily involves anchor bolt inspection, masonry inspection, and concrete testing for
pipe supports at the recycled water pump station.
AGENCY GOALS AND OBJECTIVES
I - Implement Effective Solutions Through Visionary Leadership
A. Identify Opportunities to Optimize Natural Resources
C. Strengthen Regional, State and National Partnerships
IV - Promote Planning, Maintenance and Preservation of District Resources
A. Develop Projects and Programs to Ensure Safe and Reliable Services
B. Enhance Planning Efforts that Respond to Future Demands
Agenda Item #4a April 12, 20233
Meeting Date: April 12, 2023
Agenda Item #4a
Discussion Item
7
5
3
REVIEW BY OTHERS
This agenda item has been reviewed by the Executive Management Team.
FISCAL IMPACT
The contract amendments for work that is reimbursable by Valley District do not have a
fiscal impact. The reimbursable work amounts to $7,978,733. The remaining contract
amendments for $2,646,000 will be funded from the Water Reclamation Fund and be
reimbursed through an amendment to the District’s State Revolving Fund loan.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Jeff Noelte
Director of Engineering and Operations
ATTACHMENTS
Balfour Beatty Amendment 9
Balfour Beatty Amendment 10
Balfour Beatty Amendment 11
AKD Consulting Letter Proposal
Group Delta Consultant Letter Proposal
East Valley Water District
Sterling Natural Resource Center
Amendment Number 9
Balfour Beatty Progressive Design-Build Contract
Item 1: RRWP Extension Additional Cost
a) Price Escalation – Labor Wage Increase and Materials Escalation.
b) Delays in Production due to Permit Working Hour Restrictions.
c) City of Highland Encroachment Permits Traffic Control Restrictions and Caltrans
Restrictions.
d) Changes due to Final Design Alignment and Potholing of Existing Utilities along the
Pipeline Route.
e) Additional Inspection for Arcadis
f) ADL Testing per Caltrans Permit.
g) Extension of Builder Risk Insurance, General Liability Insurance, Bond & Bond
Extension Premium
h) General Conditions & General Requirement Extension (Allowance for 233 days)
i) Hydrostatic Testing of approximately 1,000 LF of Existing 36” Repurposed Pipeline
on 6th Street.
j) Credit for Work not Performed on Phase 1 Pipeline Segment.
Total Amount of Amendment 9: $ 7,516,583.00
EVWD Owners Approval:
Owner Acceptance: _________________________ Date: ______________
Balfour Beatty_________________
(Company)
_____________________________
(Signature)
Brian Cahill – President__________
(Title)
_____________________________
(Date)
East Valley Water District
Sterling Natural Resource Center
Amendment Number 10
Balfour Beatty Progressive Design-Build Contract
Item 1: Weaver Basin Frontage Improvements
a) Provide and Install Frontage Landscaping for Landscape design drawings.
b) Grade 4,805 SF of sidewalk and 6,426 SF of Landscape
c) Construct 4” Concrete Sidewalk, per City of Highland Std Plan 208 Approximately
5,485 SF
Item 2: Weaver Basin Entrance Gate Improvements Modifications per Arcadis design for Old
Greenspot Entrance Drawings_2022 09 16 per City of Highland Comments
a) Grading / Import / Excavation
b) Concrete
c) Electrical
d) Fencing
e) Communications
Total Amount of Amendment 10: $429, 950.00
EVWD Owners Approval:
Owner Acceptance: Date:
Balfour Beatty
(Company)
(Signature)
Brian Cahill – President
(Title)
(Date)
East Valley Water District
Sterling Natural Resource Center
Amendment Number 11
Balfour Beatty Progressive Design-Build Contract
Item 1: SNRC Enhancements
a) Additional Paving Rehabilitation
b) Membrane Cassette Upgrade
c) Additional Piping Insulation
d) Electrical Trim Plate Upgrade
e) MPR Wood Ceiling Upgrade in Multi-Purpose Room
f) 5th Street Slurry Seal Coating & Road Striping
g) SCE Service Upgrades
h) Wellness Center HVAC
i) Additional Sewer Laterals on Base Line
Amendment 11 Enhancements $2,300.000.00
*Contingency for the Remaining Project $ 200,000.00
Total Amount of Amendment 11: $2,500,000.00
*Contingency for Remaining Project is District Controlled
EVWD Owners Approval:
Owner Acceptance: _________________________ Date: ______________
Balfour Beatty_________________
(Company)
_____________________________
(Signature)
Brian Cahill – President__________
(Title)
_____________________________
(Date)
AKD CONSULTING
3 Coral Cove Way, Dana Point, California 92629-2735
T 949.388.0232 C 909.224.3160 www.akdconsulting.com
April 2, 2023
Mr. Jeff Noelte
Director of Engineering & Operations
East Valley Water District
31111 Greenspot Road
Highland, California 92346
Subject: Request for Contract Amendment No.2 to Provide Program Management Services
for Sterling Natural Resource Center (SNRC)
Dear Mr. Noelte,
Pursuant to our recent conversations with you AKD Consulting is pleased to submit this proposal
for a contract amendment to provide the subject services. Since the original agreement with the
District on December 12, 2018 and the subsequent Amendment No.1 of November 26, 2021
several changes in the Scope of Work have taken place. Furthermore, the agreement and
Amendment No. 1 was based on the scope of work for a duration until December 2022. With
your assistance and our mutually agreed division of responsibilities the budget has been
effectively managed to last until April 2023. As you are aware, the project is anticipated to be
completed by the end of the year 2023. Following that tasks related to project closeout and
completion of tasks required by the contract from the Design Builder and project financing
paperwork completion with adherence to the SRF requirements will need to be completed.
Based on our discussions and the tasks remaining in the project for which services will be
provided, the following scope of services briefly outlines the project the services required to
complete the tasks.
Scope of Work
A. Remaining Program Management Services
1. Coordination with Anaergia related to two Anaergia digesters, including the work done
by Balfour Beatty on behalf of Anaergia and the processing of invoices related to that
work.
2. Coordination with Woodard & Curran and Rincon Consultants for the preparation of
revised Title 22 report as well as revised antidegradation analysis in support of the
Regional Water Quality Control Board permit.
3. Coordinate the reimbursement agreement for the construction of Weaver Basins and
extension of pipelines with San Bernardino Valley Municipal Water District and the
payment of invoices with supporting data from Valley District.
2
4. Coordinate with Fibracast relative to delivery of membranes and prior to that all the
fixtures required for installation.
5. Provide support as requested with commissioning and startup of the plant.
6. Provide overall coordination to control schedule and budget issues related to the changes
to the project.
7. Provide support in project closeout with requiring the Design Builder to submit all the
paperwork required as well as the paperwork required for SRF funding in compliance
with their requirements.
Fee
Based on our understanding and scope of work above and an average involvement of about 12
hours per week, with the schedule now projected for completion of recharge basins to be
complete to receive water by the end of August 2022 and site work and project closeout later, we
respectfully request that our contract amount be increased by $ 128,200 from $ 839,000 to a fee
amount not to exceed sum of $967,200. Of the amount of $128,000, $32,200 will be reimbursed
by Valley District for the services already provided.
AKD Consulting appreciates this opportunity to submit this proposal for contract amendment
and we look forward to providing these services to East Valley Water District. If you require any
additional information, please do not hesitate to contact me on my mobile phone at 909-224-
3160 or by email at ash@akdconsulting.com
Thank you for the opportunity to be of continued service to the District.
Sincerely,
Ashok K. Dhingra
Principal
AKD Consulting
ACCEPTED
By: _____________________________ Date: ___________________________
East Valley Water District
Title: ___________________
October 5, 2020
East Valley Water District
31111 Greenspot Road
Highland, CA 92346
Attention: Ash Dhingra
Subject: Change Order Request to Provide Materials Testing and Inspection Services
Sterling Natural Resource Center Project
Highland, California
GDC Project No. MT3220
Dear Mr. Dhingra,
Group Delta would like to respectfully request a change order for Material Inspection and Testing
for the subject project. This estimate was prepared using the approved SNRC – July 2020
remaining activities schedule along with the expansion of our original scope. The scope expansion
includes but is not limited to; Grading and compactive efforts in and around the facility, concrete
placement observation/ sampling & laboratory testing and construction of the digester facilities.
We are requesting the amount of $294,221.65.
Please provide written authorization to proceed.
GROUP DELTA CONSULTANTS, INC.
Nicholas Turner QCM, QSP
Regional Director of Inspection &Testing
March 30, 2023
Group Delta would like to respectfully request a change order for Material Inspection and
Testing for the subject project. The scope expansion includes anchor bolt inspection, masonry
inspection, and inspection and testing associated with concrete pipe supports. The estimated
effort is 400 hours of technician labor at $125 per hour for a total of $50,000.
Water Supply Update
Northern California 8 Station
59.6 inches Updated 4/6/23
Big Bear
22.99 inches Updated 3/17/23
Annual Average: 18.5''
WATER YEAR
Highland October 1- September 30
18.29 inches Updated 4/6/23
ACRONYMS
CFS = cubic feet per second mAF = million Acre-Feet
75%
Annual Average: 11.9''
29% of Capacity
STATE WATER PROJECT
ALLOCATION
WATER SHORTAGE STAGE
STATE WATER PROJECT
Lake Mead & Powell Updated
2/28/23
DISTRICT WATER SUPPLIES
Annual Average: 53.2''
GROUNDWATER SURFACE
COLORADO RIVER STORAGE
OTHER INDICATORS
RAINFALL
Current Available CapacityAvailable Capacity Current
4.9
mAF
82% of Capacity
Bunker Hill Basin
2.94 mAF
83% of Capacity
Lake Oroville Updated 4/5/23
16.1
24.3 25.8
Santa Ana River (CFS) USGS SAR Supp Gage
Updated 4/6/23
Last YearLast Year
15.5 mAF
Historic Avg
2014-2022 Monthly
Average
2023-Monthly
Flow Average