HomeMy WebLinkAboutAgenda Packet - EVWD Board of Directors - 02/22/2017REGULAR BOARD MEETING
Closed Session Begins at 4:30 PM
February 22, 2017 - 5:30 PM
31111 Greenspot Road, Highland, CA 92346
AGENDA
"In order to comply with legal requirements for posting of agenda, only those items filed
with the District Clerk by 12:00 p.m. on Wednesday prior to the following Wednesday
meeting not requiring departmental investigation, will be considered by the Board of
Directors".
CALL TO ORDER
ROLL CALL OF BOARD MEMBERS
PUBLIC COMMENTS
Any person wishing to speak to the Board of Directors is asked to complete a Speaker
Card and submit it to the District Clerk prior to the start of the meeting. Each speaker is
limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State
of California Brown Act, the Board of Directors is prohibited from discussing or taking
action on any item not listed on the posted agenda. The matter will automatically be
referred to staff for an appropriate response or action and may appear on the agenda at a
future meeting.
AGENDA - This agenda contains a brief general description of each item to be
considered. Except as otherwise provided by law, no action shall be taken on any item not
appearing on the following agenda unless the Board of Directors makes a determination
that an emergency exists or that a need to take immediate action on the item came to the
attention of the District subsequent to the posting of the agenda.
1.Approval of Agenda
RECESS INTO CLOSED SESSION
CLOSED SESSION
2.CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
[Government Code Section 54956.9(d) (1)]
Name of Case: Socal Environmental Justice Alliance v. San Bernardino Valley
Municipal Water District, et al.,
San Diego Superior Court Case No. 37-2016-00032816-CU-TT-CTL
3.CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
[Government Code Section 54956.9(d) (1)]
Name of Case: City of San Bernardino v. East Valley Water District, et al.,
San Diego Superior Court Case No. 37-2016-00038119-CU-WM-CTL
5:30 PM RECONVENE MEETING
PLEDGE OF ALLEGIANCE
ROLL CALL OF BOARD MEMBERS
ANNOUNCEMENT OF CLOSED SESSION ACTIONS ITEMS
PRESENTATIONS AND CEREMONIAL ITEMS
Present Resolution 2017.04 to the family of Lois Hendricksen-Heflin
PUBLIC COMMENTS
4.APPROVAL OF CONSENT CALENDAR
All matters listed under the Consent Calendar are considered by the Board of
Directors to be routine and will be enacted in one motion. There will be no
discussion of these items prior to the time the board considers the motion unless
members of the board, the administrative staff, or the public request specific items to
be discussed and/or removed from the Consent Calendar.
a.January 30, 2017 special meeting minutes
b.January 2017 Disbursements: Accounts payable disbursements for the period
include check numbers 249347 through 249530, bank drafts, and ACH
Payments in the amount of $2,901,792.66 and $336,515.50 for payroll.
c.Financial Statements for January 2017
INFORMATIONAL ITEMS
5.FY 2016-17 Mid-Year Budget Review
REPORTS
6.Board of Directors' Reports
7.General Manager/CEO Report
8.Legal Counsel Report
9.Board of Directors' Comments
ADJOURN
P LEASE NOT E:
Materials related to an item on this agenda s ub mitted to the Board after dis trib utio n of the agenda pac ket
are available for p ublic inspec tio n in the Dis tric t's offic e loc ated at 31111 G reens pot Rd., Highland , during
no rmal bus iness ho urs. Als o, s uc h d o c uments are availab le o n the District's web s ite at www.eas tvalley.o rg
sub ject to s taff's ab ility to post the d o cuments b efo re the meeting.
P ursuant to Go vernment Co d e S ectio n 54954.2(a), any reques t fo r a dis ability-related modific ation or
ac commod ation, inc luding auxiliary aids or s ervic es , that is s ought in order to participate in the abo ve-
agendized p ublic meeting sho uld b e direc ted to the Dis tric t Clerk at (909) 885-4900 at leas t 72 hours prior
to said meeting.
1
Minutes 1/30/2017 smg
Draft Pending Approval
EAST VALLEY WATER DISTRICT January 30, 2017
SPECIAL BOARD MEETING
MINUTES
The Chairman of the Board called the meeting to order at 1:30 p.m.
PRESENT: Directors: Carrillo, Coats, Morales, Shelton, Smith
ABSENT: None
STAFF: John Mura, General Manager/CEO; Steven Nix, Director of
Engineering and Operations; Kelly Malloy, Public
Affairs/Conservation Manager; Shayla Gerber, Administrative
Assistant
LEGAL COUNSEL: Jean Cihigoyenetche
GUEST(s): Members of the public
PUBLIC COMMENTS
Chairman Coats declared the public participation section of the meeting open at 1 :30
p.m.
There being no written or verbal comments, the public participation section was closed.
Ms. Malloy led the flag salute.
ROLL CALL
PRESENT: Directors: Carrillo, Coats, Morales, Shelton, Smith
ABSENT: None
BOARD COMMUNICATION TRAINING
Idea Hall consultants provided an exercise for the Board, where they practiced giving a
Sterling Natural Resource Center presentation, “Protecting & Enhancing our
Groundwater”, as part of an ongoing board communication program; they were
provided with Sterling Natural Resource Center messaging and a scenario; each board
member had approximately 20 minutes to practice and review the material; and they
were critiqued after each presentation by Idea Hall consultants and fellow board
members.
Information only.
2
Minutes 1/30/2017 smg
The Board took a break at 2:40 p.m.
The Board returned to session at 2:48 p.m.
GENERAL MANAGER/CEO REPORT
No report at this time.
LEGAL COUNSEL REPORT
No report at this time.
BOARD OF DIRECTORS’ COMMENTS
No comments at this time.
ADJOURN
The meeting adjourned at 3:29 p.m.
___________________________
Ronald L. Coats, Board President
__________________________
John Mura, Secretary
BOARD AGENDA STAFF REPORT
Agend a Item #4.b.
Meeting Date: Feb ruary 22, 2017
Co nsent Item
To: Governing Bo ard Memb ers
From: General Manager/CEO
Subject: January 2017 Dis burs ements: Ac counts p ayable dis bursements for the p eriod inc lud e c heck
numb ers 249347 thro ugh 249530, b ank d rafts , and ACH Payments in the amount o f $2,901,792.66
and $336,515.50 fo r payroll.
RECOMMENDATION:
Staff rec o mmend s that the Bo ard of Direc tors review and appro ve the Dis trict’s expense dis bursements fo r the
p eriod January 1, 2017 thro ugh January 31, 2017 in the amo unt o f $3,238,308.16.
BACKGROUND / ANALYSIS:
In the c o ntinued effort to be fisc ally trans p arent, the payment register fo r s upplies , materials , servic es , and
p ayro ll fo r January 2017 is attac hed for review and app ro val. This proc es s p ro vid es the Board and the pub lic an
o pportunity to review the exp ens es of the Dis tric t. Acc o unts P ayab le is p roc es s ed weekly, while payroll is
p roc es s ed b i-weekly. Information to justify eac h exp enditure is availab le thro ugh the Finance Dep artment.
Acc o unts payable d is b urs ements fo r the perio d inc lude c hec k numbers 249347 through 249530, bank drafts , and
ACH Payments in the amount o f $2,901,792.66 and $336,515.50 for payroll. Significant exp ens es greater than o r
equal to $50,000 are further explained b elo w:
Recommended by:
Jo hn Mura
General Manager/CEO
Res p ec tfully s ub mitted :
Brian To mpkins
Chief Financial Offic er
AGENCY IDEALS AND ENDEAVORS:
Ideals and Endeavor II - Maintain An Enviro nment Committed To Elevated P ublic Servic e
(E) - Practice transparent & acc o untab le fis cal management
FISCAL IMPACT :
Sufficient funds have been budgeted in the adopted FY 2016-17 Budget.
ATTACHMENTS:
Description Type
January 2017 P ayment Register Backup Material
PAYMENT REGISTER
JANUARY 1, 2017 - JANUARY 31, 2017
PAYMENT DATE NUMBER VENDOR NAME AMOUNT
01/03/2017 249347 1,442.17$
01/04/2017 249348 200.00
01/04/2017 249349 150.00
01/04/2017 249350 150.00
01/04/2017 249351 200.00
01/04/2017 249352 21.00
01/04/2017 249353 11.24
01/04/2017 249354 49.39
01/04/2017 249355 45.82
01/04/2017 249356 42.86
01/04/2017 249357 82.80
01/05/2017 249358 1,549.51
01/05/2017 249359 70.00
01/05/2017 249360 667.91
01/05/2017 249361 4,360.38
01/05/2017 249362 34,500.00
01/05/2017 249363 270.00
01/05/2017 249364 947.84
01/05/2017 249365 1,291.40
01/05/2017 249366 558.10
01/05/2017 249367 236.97
01/05/2017 249368 197.86
01/05/2017 249369 552.24
01/05/2017 249370 52.42
01/05/2017 249371 547.98
01/05/2017 249372 721.61
01/05/2017 249373 547.98
01/05/2017 249374 27.03
01/05/2017 249375 24.81
01/05/2017 249376 10,584.00
01/05/2017 249377 155.37
01/05/2017 249378 150.87
01/05/2017 249379 464.78
01/05/2017 249380 15.11
01/05/2017 249381 59,971.37
01/05/2017 249382 216.60
01/05/2017 249383 66.74
01/05/2017 249384 2,175.25
01/05/2017 249385 2,716.00
01/05/2017 249386 105.00
01/05/2017 249387 926.47
01/05/2017 249388 13,817.50
01/05/2017 249389 103.04
01/05/2017 249390
US POSTAL SERVICE
BARRY ESKIN
CHARLES P. WILLIAMS
MAXIM A SATTAROV
PAULA GOODERUM
USA National Title Company
EDITH GAYTAN
BROWN K L & B J 2016 TRUST
VITA WILLETT
MATHEW CHAN
FRANK SOTTILE for US BANK
APPLEONE EMPLOYMENT SERVICE
ASBCSD
AT&T
C&M ELECTRIC
CHARLES A SIMPSON, CHARLES FENCE COMPANY
CITY OF HIGHLAND
COLONIAL LIFE, PREMIUM
CSR AIR CONDITIONING & HEATING
DENTAL HEALTH SERVICES
DIRECTV
EVERSOFT, INC
EXPERIAN
FRONTIER COMMUNICATIONS
GARY YOUNG
HATFIELD BUICK
HENRY SOWLE
HIGHLAND EQUIPMENT RENTAL
K & L HARDWARE
KONICA MINOLTA BUSINESS SOLUTIONS
LAWSON PRODUCTS,INC
METROPOLITAN LIFE INS CO
MICHAEL REARDON
NAPA AUTO PARTS
NATIONAL AUTO FLEET GROUP, CHEVROLET OF
WATSONVILLE
OMEGA INDUSTRAIL SUPPLY, INC.
PHOENIX LIFE INSURANCE COMPANY
POMONA VALLEY WORKSHOP
PRO HOME CARE, JNS777 INC.
SCN, SECURITY COMMUNICATION NETWORK, INC
THE GAS COMPANY
TYLER TECHNOLGIES
VALLEY OFFICE EQUIPMENT
WILLDAN FINANCIAL SERVICES 953.59
PAYMENT REGISTER
JANUARY 1, 2017 - JANUARY 31, 2017 Page 1 of 7
PAYMENT DATE NUMBER VENDOR NAME AMOUNT
01/11/2017 249391 UNIVERSAL SELF STORAGE HIGHLAND 1,650.00
01/11/2017 249392 DIANE MIRANDA 138.80
01/11/2017 249393 DONALD MCRUNNEL 200.00
01/11/2017 249394 DUANE MARLOW 100.00
01/11/2017 249395 MICHAEL CARROLL 230.00
01/11/2017 249396 NINA SERNA 150.00
01/11/2017 249397 OMESHAM INAM 200.00
01/11/2017 249398 RUBI F. AMAYA 966.00
01/11/2017 249399 THOMAS WILSON 150.00
01/11/2017 249400 CHRISTINE M HANAFI 177.95
01/11/2017 249401 DIANE COLLINS 114.51
01/11/2017 249402 AECOM 1,351.91
01/11/2017 249403 L & S CHRISTMAS TREES 1,409.19
01/11/2017 249404 SHANAE FOX 31.52
01/11/2017 249405 LUIS ALVAREZ 288.20
01/11/2017 249406 CELENA CORTEZ 3.09
01/11/2017 249407 STEPHANIE HERNANDEZ 44.90
01/12/2017 249408 APPLIED MAINTENANCE SUPPLIES & SOLUTIONS LLC 447.97
01/12/2017 249409 BOYLIN MANAGEMENT INSTITUTE 75.00
01/12/2017 249410 BURRTEC WASTE (GROUP) INDUSTRIES, INC. 272.12
01/12/2017 249411 CHEM-TECH INTERNATIONAL INC 4,005.41
01/12/2017 249412 COUNTY OF SAN BERNARDINO, DEPT OF PUBLIC WORKS 1,350.00
01/12/2017 249413 CSR AIR CONDITIONING & HEATING 1,400.00
01/12/2017 249414 CULLIGAN OF ONTARIO 50.00
01/12/2017 249415 DIB'S SAFE & LOCK SERVICE 392.08
01/12/2017 249416 EYE MED VISION CARE 1,166.88
01/12/2017 249417 FIRST CHOICE SERVICES 61.56
01/12/2017 249418 FLEET MANAGEMENT DEPARTMENT 770.05
01/12/2017 249419 FRONTIER COMMUNICATIONS 48.97
01/12/2017 249420 HATFIELD BUICK 475.62
01/12/2017 249421 HIGHLAND COMMUNITY NEWS 3,211.26
01/12/2017 249422 HIGHLAND DISTRICT COUNCIL ON AGING 1,440.00
01/12/2017 249423 HIGHLAND EQUIPMENT RENTAL 60.41
01/12/2017 249424 HILLCREST CONTRACTING, INC. 4,400.00
01/12/2017 249425 HUMBERTO ALARCON 41.03
01/12/2017 249426 I.C.W.A. 75.00
01/12/2017 249427 IAPMA-HR 25.00
01/12/2017 249428 IDEA HALL 61,062.64
01/12/2017 249429 IMG/INLAND MEDIA GROUP, STEVE SWITZER 160.00
01/12/2017 249430 INLAND DESERT SECURITY & COMMUNICATIONS, INC 670.10
01/12/2017 249431 INLAND WATER WORKS SUPPLY CO 840.24
01/12/2017 249432 K & L HARDWARE 61.06
01/12/2017 249433 KING, ED 85.00
01/12/2017 249434 KONICA MINOLTA 215.48
01/12/2017 249435 LIEBERT CASSIDY WHITMORE LCW 70.00
01/12/2017 249436 MICHAEL HURST 803.88
01/12/2017 249437 NAPA AUTO PARTS 296.49
01/12/2017 249438 NATIONAL CONSTRUCTION RENTALS 158.60
01/12/2017 249439 NATIONAL NOTARY ASSOCIATION 179.00
01/12/2017 249440 PALENCIA CONSULTING ENGINEERS 3,480.00
01/12/2017 249441 PARTY PLUS RENTALS 712.26
01/12/2017 249442 POMONA VALLEY WORKSHOP 638.00
01/12/2017 249443 PRUETTS PRECISION ALIGNMENT 246.28
01/12/2017 249444 RICARDO UGUES 165.00
PAYMENT REGISTER
JANUARY 1, 2017 - JANUARY 31, 2017 Page 2 of 7
PAYMENT DATE NUMBER VENDOR NAME AMOUNT
01/12/2017 249445 ROSEMOUNT ANALYTICAL, INC 1,385.64
01/12/2017 249446 RUHNAU RUHNAU CLARK & ASSOCIATES 1,492.50
01/12/2017 249447
SAN BERNARDINO VALLEY MUNICIPAL WATER
DEPARTMENT 402,343.96
01/12/2017 249448
SAN BERNARDINO VALLEY WATER CONSERVATION
DISTRICT 83,250.43
01/12/2017 249449 SOUTHERN CALIFORNIA EDISON COMPANY 117,495.75
01/12/2017 249450 STAPLES BUSINESS ADVANTAGE 843.50
01/12/2017 249452 TYLER TECHNOLGIES 1,062.50
01/12/2017 249453 UNITED PARCEL SERVICE, INC. 37.55
01/12/2017 249454 V.I.P. DOORS & GATES INC 1,050.00
01/12/2017 249455 VALERO MARKETING & SUPPLY COMP 6,065.81
01/12/2017 249456 WATER EDUCATION FOUNDATION 1,749.00
01/18/2017 249457 SOL INVESTMENTS & SOLUTIONS 116.57
01/18/2017 249458 JANE A MILENDER-LATAS 23.78
01/18/2017 249459 BINH NGUYEN 105.85
01/18/2017 249460 ANGEL MORENO 11.86
01/18/2017 249461 MICHELLE M SANDO 40.66
01/19/2017 249462 BILL & WAGS INC. 73.13
01/19/2017 249463 BURGESS MOVING & STORAGE 892.62
01/19/2017 249464 BURRTEC WASTE (GROUP) INDUSTRIES, INC. 714.24
01/19/2017 249465 DANIELS TIRE SERVICE, INC 353.60
01/19/2017 249466 FIRST CHOICE SERVICES 597.94
01/19/2017 249467 FRONTIER COMMUNICATIONS 968.10
01/19/2017 249468 GLADWELL GOVERNMENTAL SERVICES INC 480.00
01/19/2017 249469 GOVERNMENT FINANCE OFFICERS ASSOCIATION 70.00
01/19/2017 249470 HATFIELD BUICK 175.09
01/19/2017 249471 I.C.W.A. 225.00
01/19/2017 249472 INLAND WATER WORKS SUPPLY CO 1,156.07
01/19/2017 249473 LOUIE CHECK 320.00
01/19/2017 249474 NAPA AUTO PARTS 277.65
01/19/2017 249475 NEOPOST USA INC 902.00
01/19/2017 249476 NEOPOST USA INC 366.79
01/19/2017 249477 PETTY CASH 500.59
01/19/2017 249478 POMONA VALLEY WORKSHOP 882.75
01/19/2017 249479 RONALD C. BRAATZ, LIFTOFF, LLC 695.20
01/19/2017 249480 SAN BERNARDINO MUNICIPAL WATER DEPARTMENT 14,431.54
01/19/2017 249481 U.S. BANCORP SERVICE CENTER 25,678.83
01/19/2017 249486 YARDLEY ORGILL CO. INC. 416.63
01/24/2017 249487 ERIC BREWER 100.00
01/24/2017 249488 JAFET ERAZO 279.00
01/24/2017 249489 JEFF SAKS 120.14
01/24/2017 249490 JUAN GARCIA 400.00
01/24/2017 249491 MICHAEL PACE 309.95
01/24/2017 249492 PALASH HALDER 150.00
01/24/2017 249493 ROBERT FLECHTNER 89.10
01/24/2017 249494 THANH DAM 100.00
01/24/2017 249495 FRANCISCO VELARDE 561.00
01/24/2017 249496 MELISSA MURRAY 100.00
01/24/2017 249497 STEVEN TRACY 600.00
01/24/2017 249498 SPSSM INVESTMENTS IX #5710 47.24
01/24/2017 249499 GRACEILA GONZALEZ 20.01
01/24/2017 249500 CLARENCE PHILLIPS 10.91
01/24/2017 249501 JESUS SANCHEZ 4.16
PAYMENT REGISTER
JANUARY 1, 2017 - JANUARY 31, 2017 Page 3 of 7
PAYMENT DATE NUMBER VENDOR NAME AMOUNT
01/24/2017 249502 MARIA SEGOVIA 82.20
01/24/2017 249503 NORMA DUARTE-LEMBO 27.39
01/24/2017 249504 D & A INVESTMENTS 74.80
01/25/2017 249505 ADVANCED INDUSTRIAL SOLUTIONS, INC. 2,568.00
01/25/2017 249506 ALEX LARIOS-RIVAS 73.00
01/25/2017 249507 AMAZON.COM, LLC 288.51
01/25/2017 249508 APPLEONE EMPLOYMENT SERVICE 851.82
01/25/2017 249509 APPLIED BEST PRACTICES, LLC 1,500.00
01/25/2017 249510 APPLIED MAINTENANCE SUPPLIES & SOLUTIONS LLC 852.86
01/25/2017 249511 AT&T 667.93
01/25/2017 249512 BRADEN HEYWOOD DBA GENESIS INDUSTRIAL SUPPLY 83.69
01/25/2017 249513 DENTAL HEALTH SERVICES 356.85
01/25/2017 249514 DIB'S SAFE & LOCK SERVICE 46.68
01/25/2017 249515 DLT SOLUTIONS, LLC 3,394.37
01/25/2017 249516 EWING IRRIGATION PRODUCTS INC 278.53
01/25/2017 249517 FEDERAL EXPRESS CORPORATION 88.34
01/25/2017 249518 FRONTIER COMMUNICATIONS 419.83
01/25/2017 249519 HD SUPPLY WATERWORKS, LTD 35.93
01/25/2017 249520 HIGHLAND EQUIPMENT RENTAL 40.00
01/25/2017 249521 K & L HARDWARE 53.93
01/25/2017 249522 PATTON'S SALES CORP 16.93
01/25/2017 249523 PHOENIX LIFE INSURANCE COMPANY 66.74
01/25/2017 249524 POMONA VALLEY WORKSHOP 1,006.25
01/25/2017 249525 SAN BERNARDINO MUNICIPAL WATER DEPARTMENT 630,593.91
01/25/2017 249526 SOUTH COAST A Q M D 479.21
01/25/2017 249527 SOUTHERN CALIF OCCUPATIONAL HEALTH SERVICES 20.00
01/25/2017 249528 TYLER TECHNOLGIES 3,318.75
01/25/2017 249529 VEHICLE REGISTRATION COLLECTIONS 597.00
01/26/2017 249530 DONVEY MCKINLEY 252.70
BANK DRAFTS
01/03/2017 DFT0001832 MERCHANT BANKCD 7,685.88$
01/03/2017 DFT0001836 PayNearMe, Inc. 15.92
01/04/2017 DFT0001831 CALPERS/ MEDICAL 85,143.97
01/04/2017 DFT0001848 PayNearMe, Inc. 27.86
01/05/2017 DFT0001849 PayNearMe, Inc. 11.94
01/06/2017 DFT0001850 PayNearMe, Inc. 1.99
01/09/2017 DFT0001851 PayNearMe, Inc. 13.93
01/10/2017 DFT0001839 FORTE, ACH DIRECT INC, ACH FEES 385.66
01/10/2017 DFT0001847 TRANSFIRST DISCOUNT 9,943.33
01/10/2017 DFT0001852 PayNearMe, Inc. 47.76
01/11/2017 DFT0001867 PayNearMe, Inc. 63.68
01/12/2017 DFT0001841 CALPERS/ DEFERRED COMPENSATION 14,490.42
01/12/2017 DFT0001845 STATE DISBURSEMENT UNIT 3,248.97
01/12/2017 DFT0001853 CALPERS/ RETIREMENT 808.19
01/12/2017 DFT0001854 CALPERS/ RETIREMENT 153.05
01/12/2017 DFT0001855 CALPERS/ RETIREMENT 2,794.97
01/12/2017 DFT0001856 CALPERS/ RETIREMENT 12,844.48
01/12/2017 DFT0001857 CALPERS/ RETIREMENT 230.02
01/12/2017 DFT0001858 CALPERS/ RETIREMENT 62.31
01/12/2017 DFT0001859 CALPERS/ RETIREMENT 2,858.20
01/12/2017 DFT0001860 CALPERS/ RETIREMENT 19,366.38
01/12/2017 DFT0001868 PayNearMe, Inc. 23.88
01/13/2017 DFT0001840 CA SDI Tax 2,210.26
PAYMENT REGISTER
JANUARY 1, 2017 - JANUARY 31, 2017 Page 4 of 7
PAYMENT DATE NUMBER VENDOR NAME AMOUNT
01/13/2017 DFT0001842 Federal Payroll Tax 26,115.69
01/13/2017 DFT0001843 Medicare 6,975.90
01/13/2017 DFT0001844 Social Security 58.40
01/13/2017 DFT0001846 State Payroll Tax 8,700.01
01/13/2017 DFT0001861 CA SDI Tax 90.92
01/13/2017 DFT0001862 Federal Payroll Tax 642.88
01/13/2017 DFT0001863 Medicare 292.96
01/13/2017 DFT0001864 State Payroll Tax 382.20
01/13/2017 DFT0001869 PayNearMe, Inc. 9.95
01/17/2017 DFT0001865 VERIFONE INC 22.00
01/17/2017 DFT0001866 PayNearMe, Inc. 29.85
01/18/2017 DFT0001881 PayNearMe, Inc. 27.86
01/18/2017 DFT0001902 STATE BOARD OF EQUALIZATION 9,517.00
01/19/2017 DFT0001880 PayNearMe, Inc. 17.91
01/20/2017 DFT0001882 PayNearMe, Inc. 15.92
01/22/2017 MISC0001389 3100 CALPERS/RETIREMENT ADJUSTMENT 0.05
01/23/2017 DFT0001883 PayNearMe, Inc. 19.90
01/24/2017 DFT0001879 PayNearMe, Inc. 59.70
01/24/2017 DFT0001892 CBB 2,665.89
01/25/2017 DFT0001872 CALPERS, UAL PAYMENT 36,902.01
01/25/2017 DFT0001873 CALPERS/ DEFERRED COMPENSATION 14,441.49
01/25/2017 DFT0001877 STATE DISBURSEMENT UNIT 3,248.97
01/25/2017 DFT0001884 CALPERS/ RETIREMENT 2,825.34
01/25/2017 DFT0001885 CALPERS/ RETIREMENT 153.05
01/25/2017 DFT0001886 CALPERS/ RETIREMENT 12,652.08
01/25/2017 DFT0001887 CALPERS/ RETIREMENT 61.38
01/25/2017 DFT0001888 CALPERS/ RETIREMENT 19,093.46
01/25/2017 DFT0001889 CALPERS/ RETIREMENT 808.19
01/25/2017 DFT0001890 CALPERS/ RETIREMENT 2,889.24
01/25/2017 DFT0001891 CALPERS/ RETIREMENT 230.02
01/25/2017 DFT0001897 PayNearMe, Inc. 19.90
01/26/2017 DFT0001898 PayNearMe, Inc. 11.94
01/27/2017 DFT0001871 CA SDI Tax 2,097.79
01/27/2017 DFT0001874 Federal Payroll Tax 27,986.36
01/27/2017 DFT0001875 Medicare 6,613.56
01/27/2017 DFT0001876 Social Security 686.06
01/27/2017 DFT0001878 State Payroll Tax 9,054.81
01/27/2017 DFT0001893 CALPERS,GASB & 1959 SURVIVOR BENEFITS 3,560.40
01/27/2017 DFT0001899 PayNearMe, Inc. 17.91
01/30/2017 DFT0001895 VERIFONE INC 22.00
01/30/2017 DFT0001896 VERIFONE INC 22.00
01/30/2017 DFT0001900 PayNearMe, Inc. 45.77
01/31/2017 DFT0001901 PayNearMe, Inc. 29.85
ACH PAYMENTS
01/05/2017 10002230 #1 SON PLUMBING 200.00$
01/05/2017 10002231 ADS ENVIRONMENTAL SERVICES 7,750.00
01/05/2017 10002232 CLEARFLY COMMUNATIONS 1,326.25
01/05/2017 10002233 DAVID HERNANDEZ 280.23
01/05/2017 10002234 EUROFINS EATON ANALYTICAL, INC 700.00
01/05/2017 10002235 FERGUSON ENTERPRISES, INC. 456,024.60
01/05/2017 10002236 FRED STAFFORD 564.90
01/05/2017 10002237 G & K SERVICES, CO. 595.88
01/05/2017 10002238 GARY STURDIVAN 564.90
PAYMENT REGISTER
JANUARY 1, 2017 - JANUARY 31, 2017 Page 5 of 7
PAYMENT DATE NUMBER VENDOR NAME AMOUNT
01/05/2017 10002239 GONZALEZ, QUINTANA & HUNTER, LLC 4,000.00
01/05/2017 10002240 GORDON GRANT 484.34
01/05/2017 10002241 GSSI, GENERAL SECURITY SERVICES, INC. 4,051.50
01/05/2017 10002242 JANA FOX 504.55
01/05/2017 10002243 JEREMY SUBRIAR 139.30
01/05/2017 10002244 JOHNSON MACHINERY CO 41.37
01/05/2017 10002245 JOHNSON POWER SYSTEMS 5,271.17
01/05/2017 10002246 LINCOLN NATIONAL LIFE INS CO. 2,089.33
01/05/2017 10002247 MICHAEL HENDERSON 549.78
01/05/2017 10002248 MIKE J. ROQUET CONSTRUCTION INC 10,148.20
01/05/2017 10002249 MINUTEMAN PRESS OF RANCHO CUCAMONGA 13,275.08
01/05/2017 10002250 OFFICIAL PAYMENTS CORP. 37.45
01/05/2017 10002251 PRINCIPAL FINANCIAL GROUP 8,115.18
01/05/2017 10002252 REBECCA KASTEN 650.00
01/05/2017 10002253 SCHUBERT ENTERPRISES INC 110.00
01/05/2017 10002254 STEVEN FARRINGTON 650.00
01/05/2017 10002255 THOMAS P ORTON 402.83
01/05/2017 10002256 TROY ALARM, INC. 180.00
01/05/2017 10002257 UNDERGROUND SERVICE ALERT 109.50
01/05/2017 10002258 VAN LANT & FANKHANEL, LLP 24,700.00
01/12/2017 10002259 ANTHONY'S IRRIGATION 4,275.00
01/12/2017 10002260 CLIFF'S PEST CONTROL 363.00
01/12/2017 10002261 CORELOGIC SOLUTIONS INC. 315.00
01/12/2017 10002262 DIAMOND FENCE COMPANY 290.00
01/12/2017 10002263 EVWD EMPLOYEES EVENTS ASSOC 291.50
01/12/2017 10002266 EXCEL LANDSCAPE, ICN 12,200.00
01/12/2017 10002267 FILARSKY & WATT LLP 350.00
01/12/2017 10002268 FLEET SERVICES /COLTON TRUCK 13.01
01/12/2017 10002269 FSA Only/East Valley Water District 1,891.72
01/12/2017 10002272 G & K SERVICES, CO. 1,203.31
01/12/2017 10002274 GSSI, GENERAL SECURITY SERVICES, INC. 1,387.50
01/12/2017 10002275 HIGHLAND AREA CHAMBER 15.00
01/12/2017 10002276 INFOSEND, INC 34,603.49
01/12/2017 10002277 JC LAW FIRM 42,815.00
01/12/2017 10002279 LANDS END INC 121.51
01/12/2017 10002280 LEGEND PUMP AND WELL 403.25
01/12/2017 10002281 LESLIE'S POOL SUPPLIES, INC. 53.55
01/12/2017 10002282 MC CRAY ENTERPRISES 417.04
01/12/2017 10002283 MIKE J. ROQUET CONSTRUCTION INC 9,350.00
01/12/2017 10002284 MINUTEMAN PRESS OF RANCHO CUCAMONGA 6,151.73
01/12/2017 10002285 NETWORK FLEET, INC 124.75
01/12/2017 10002286 POWERSTRIDE BATTERY CO. 207.63
01/12/2017 10002287 SHRED-IT US JV LLC 100.76
01/12/2017 10002288 TELEPACIFIC COMMUNICATIONS 5,643.03
01/12/2017 10002289 TROY ALARM, INC. 264.00
01/12/2017 10002290 VERIZON WIRELESS 4,452.77
01/12/2017 10002292 VULCAN MATERIALS COMPANY 2,480.58
01/12/2017 10002293 WAXIE SANITARY SUPPLY 508.69
01/19/2017 10002294 AIRGAS, USA LLC 377.98
01/19/2017 10002295 ASHOK K. DHINGRA 18,682.89
01/19/2017 10002296 CLINICAL LAB OF S B 3,416.00
01/19/2017 10002297 DANGELO CO INC 788.97
01/19/2017 10002298 ELEPHANT FIRE EXTINSUISHER 1,701.18
01/19/2017 10002299 EZEQUIEL ELECTRIC, INC. 3,033.00
PAYMENT REGISTER
JANUARY 1, 2017 - JANUARY 31, 2017 Page 6 of 7
PAYMENT DATE NUMBER VENDOR NAME AMOUNT
01/19/2017 10002300 FERGUSON ENTERPRISES, INC. 17,353.79
01/19/2017 10002301 FMB TRUCK OUTFITTERS 1,998.90
01/19/2017 10002302 G & K SERVICES, CO. 595.88
01/19/2017 10002303 GERALD SIEVERS 164.70
01/19/2017 10002304 INFOSEND, INC 663.74
01/19/2017 10002305 KATZ & ASSOCIATES, INC 780.00
01/19/2017 10002306 KENNEDY/JENKS CONSULTANTS 200,040.78
01/19/2017 10002307 LANDS END INC 63.94
01/19/2017 10002308 MERCEDES KING 230.92
01/19/2017 10002309 MINUTEMAN PRESS OF RANCHO CUCAMONGA 117.98
01/19/2017 10002310 PLUS 1 PERFORMANCE 407.18
01/25/2017 10002311 ADP, LLC 214.95
01/25/2017 10002312 BOOT BARN, INC 194.84
01/25/2017 10002313 CINTAS CORPORATION 230.05
01/25/2017 10002314 EVWD EMPLOYEES EVENTS ASSOC 299.50
01/25/2017 10002318 EXCEL LANDSCAPE, ICN 44.83
01/25/2017 10002319 FSA Only/East Valley Water District 1,891.72
01/25/2017 10002322 G & K SERVICES, CO. 1,011.68
01/25/2017 10002323 GSSI, GENERAL SECURITY SERVICES, INC. 1,387.50
01/25/2017 10002324 JEREMY SUBRIAR 73.00
01/25/2017 10002325 JOSE MILLAN 80.00
01/25/2017 10002326 MANAGED HEALTH NETWORK 241.92
01/25/2017 10002327 MICHAEL BAFFA 141.45
01/25/2017 10002328 MILLER SPATIAL SERVICES, LLC 9,700.00
01/25/2017 10002329 MUSICK, PEELER & GARRETT LLP 31,256.40
01/25/2017 10002330 POWERSTRIDE BATTERY CO. 152.41
01/25/2017 10002331 PRINCIPAL FINANCIAL GROUP 8,273.14
01/25/2017 10002332 SAFETY COMPLIANCE COMPANY 800.00
01/25/2017 10002333 SCHUBERT ENTERPRISES INC 110.00
01/25/2017 10002334 THE WINNER INDUSTRIAL SUPPLY INC 2,870.40
TOTAL 2,901,792.66$
PAYMENT REGISTER
JANUARY 1, 2017 - JANUARY 31, 2017 Page 7 of 7
Recommended by:
Jo hn Mura
General Manager/CEO
Res p ec tfully s ub mitted :
Brian To mpkins
Chief Financial Offic er
BOARD AGENDA STAFF REPORT
Agenda Item #4.c.
Meeting Date: Feb ruary 22, 2017
Co nsent Item
To: Governing Bo ard Memb ers
From: General Manager/CEO
Subject: F inanc ial S tatements for January 2017
RECOMMENDATION:
Staff recommends that the Board of Direc tors ac cept and file the attached financial s tatements as of, and for the
p eriod end ed , January 31, 2017.
BACKGROUND / ANALYSIS:
Includ ed herewith for the Bo ard ’s review is a summary of East Valley Water Distric t’s financ ial results , as o f
January 31, 2017.
AGENCY IDEALS AND ENDEAVORS:
Ideals and Endeavor II - Maintain An Enviro nment Committed To Elevated P ublic Servic e
(E) - Practice transparent & acc o untab le fis cal management
FISCAL IMPACT :
T here is no fis c al imp ac t as s o c iated with this agenda item.
ATTACHMENTS:
Description Type
January 2017 Financial Statement Monthly Review Backup Material
January 2017 Financial Statements Backup Material
FINANCIAL STATEMENTS MONTHLY REVIEW
JANUARY 31, 2017
page | 1
The following is a highlight summary of the District’s financial results as of January 31, 2017.
Statement of Net Position
Total assets at January 31, 2017 are $181.7 million.
CLASSIFICATION WATER WASTEWATER DISTRICT TOTAL
Cash and Investments $ 14,733,302 $ 3,643,270 $ 18,376,573
Utility Plant, Net 109,262,912 20,172,493 129,435,405
Other Assets 21,466,789 12,427,958 33,894,747
Current Liabilities 5,258,846 381,943 5,640,789
Long Term Liabilities 50,503,815 6,830,120 57,333,935
Beginning Net Position 83,494,528 27,933,289 111,427,818
Change in Equity 6,205,815 1,098,370 7,304,185
Total Net Position $ 89,700,343 $ 29,031,659 $ 118,732,002
Below is a summary of the District’s net position as of January 31, 2017.
5%
45%
2%
17%
31%
WATER
5%
45%
1%
9%
40%
WASTEWATER
Current Assets
Non-Current Assets
Current Liabilities
Non-Current Liabilities
Net Position
FINANCIAL STATEMENTS MONTHLY REVIEW
JANUARY 31, 2017
page | 2
Cash and Investments are $18.3 million for the month of January, a decrease of $0.4 million
from the prior month. The decrease is primarily related to the District’s annual payment of
water from the San Bernardino Valley Municipal Water District for $402,000.
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
CASH & INVESTMENTS
Restricted Unrestricted
Comparing current assets to current liabilities, the District has a current ratio at January 31,
2017 of 3.07 to 1, with 2 to 1 being an indication of sound financial condition.
Statement of Revenues & Expenses
Operating results are presented in three ways in the attached financial statements for the
period ending January 31, 2017. First, is a one-page summary with monthly and year-to-
date totals for revenue, and expenses presented by Expense Category. Second is a one-
page summary with monthly and year-to-date totals for revenues and Expense by Program.
Third is a Budget to Actual presentation of program expense detail.
WATER WASTEWATER DISTRICT TOTAL
Revenue $ 15,391,557 $ 7,666,247 $ 23,057,804
Expense 9,185,742 6,567,877 15,753,619
FINANCIAL STATEMENTS MONTHLY REVIEW
JANUARY 31, 2017
page | 3
Water Sales for January were $816,296 ($54,296) (7%) over staff’s projections for the
month. The billing periods during the month of January experienced an average
temperature of 52 degrees, additionally the average Evapotranspiration Rates (ETo) for the
period was .84 inches which was 1.58 inches less compared to this time last year. Water
sales year-to-date are over projections $716,994.
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
Water Sale by Tier
Tier 1 Tier 2 Tier 3 FY 2016-17 Projection
FINANCIAL STATEMENTS MONTHLY REVIEW
JANUARY 31, 2017
page | 4
The chart below is a comparative illustration of current Water Revenue compared to last
year’s Water Revenue. As noted in the graph Water Sales and Meter Charges increase
over last year by 53,000 (7%).
$-
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
$1,600,000
$1,800,000
1/31/2016 1/31/2017
Comparative Monthly Water Revenue
(Water Sales & Meter Charge)
Meter Tier 1 Tier 2 Tier 3
FINANCIAL STATEMENTS MONTHLY REVIEW
JANUARY 31, 2017
page | 5
Water Fund Activities by Cost Center
The graph below provides a year-to-date comparison of the Water Fund operating cost
centers for FY 2015-16 and FY 2016-17. The variance in Source of Supply is due to the
District’s annual payment to San Bernardino Valley Municipal Water District for water. The
purchase was adopted with the FY2016-17 Operating Budget.
Administration,
$3,226,411
Source of
Supply,
$1,397,049
Pumps &
Boosters,
$364,015
Treatment,
$490,070
T & D,
$1,129,113
Customer
Service,
$771,051
FY 2015-16
Administration,
$3,495,669
Source of
Supply,
$1,867,455
Pumps &
Boosters,
$358,946
Treatment,
$461,832
T & D,
$1,311,213
Customer
Service,
$849,772
FY 2016-17
FINANCIAL STATEMENTS MONTHLY REVIEW
JANUARY 31, 2017
page | 6
Wastewater Fund Activities by Cost Center
The graph below provides a year-to-date comparison of the Wastewater Fund operating
cost centers for FY 2015-16 and FY 2016-17. The largest increase is in Treatment which
increased $467K compared to last year due to the new Wastewater Treatment rate
increases imposed by the City of San Bernardino effective July 1, 2016.
Administration,
$1,234,142
Customer
Service,
$224,601
Collection,
$218,454
Treatment,
$4,778,887
FY 2016-17
Administration,
$1,242,632
Customer
Service,
$270,612
Collection,
$210,481
Treatment,
$4,311,310
FY 2015-16
WATER WASTEWATER DISTRICT TOTAL
Assets:
Current Assets:
01 Cash and Cash Equivalents 6,649,572.99$ 1,289,143.49$ 7,938,716.48$
02 Investments 3,517,160.38 1,721,310.08 5,238,470.46
03 Accounts Receivable, Net 3,149,325.34 246,815.66 3,396,141.00
04 ‐Interest Receivable 5,951.06 3,377.19 9,328.25
14*05 Other Receivables 372,116.13 - 372,116.13
06 Due from other Governments 16,144.57 - 16,144.57
08 Inventory 256,133.74 6,721.16 262,854.90
09 Prepaid Expenses 77,117.54 20,754.28 97,871.82
14,043,521.75 3,288,121.86 17,331,643.61
Non-Current Assets:
10 Restricted Cash and Cash Equivalents 4,566,569.10 632,816.65 5,199,385.75
11 Capital Assets not being Depreciated 16,458,586.76 11,875,289.43 28,333,876.19
13 Capital Assets, Net 109,262,912.10 20,172,493.21 129,435,405.31
130,288,067.96 32,680,599.29 162,968,667.25
Total Assets:144,331,589.71 35,968,721.15 180,300,310.86
Deferred Outflow Of Resources
24*Deferred Charge on Refunding 156,417.49 - 156,417.49
25 Deferred Outflows - Pensions 974,996.65 275,000.35 1,249,997.00
145,463,003.85 36,243,721.50 181,706,725.35
Current Liabilities:
22 Accounts Payable and Accrued Expenses 646,886.40 29,959.97 676,846.37
23 Accrued Payroll and Benefits 316,763.10 85,834.82 402,597.92
15 Customer Service Deposits 1,629,246.08 - 1,629,246.08
16 Construction Advances and Retentions 106,000.00 3,500.00 109,500.00
17 Accrued Interest Payable 430,093.03 55,881.25 485,974.28
18 Current Portion of Compensated Absences 258,472.59 93,808.69 352,281.28
19 Current Portion of Long-Term Debt 1,871,384.61 112,958.00 1,984,342.61
5,258,845.81 381,942.73 5,640,788.54
Non-Current Liabilities:
20 Compensated Absences, less current portion 198,788.66 31,340.66 230,129.32
28 Net Pension Liability 6,183,974.30 1,744,198.70 7,928,173.00
21 Long Term Debt, Less Current Portion 43,455,535.63 4,753,655.80 48,209,191.43
27 Other Liabilities 7,135.80 115,227.00 122,362.80
Deferred Inflows Of Resources
26 Deferred Inflows - Pensions 658,380.29 185,697.71 844,078.00
50,503,814.68 6,830,119.87 57,333,934.55
55,762,660.49 7,212,062.60 62,974,723.09
31 Equity 83,494,528.37 27,933,289.18 111,427,817.55
83,494,528.37 27,933,289.18 111,427,817.55
Tot Total Revenue 15,391,556.66 7,666,246.90 23,057,803.56
Tot Total Expense 9,185,741.67 6,567,877.18 15,753,618.85
6,205,814.99 1,098,369.72 7,304,184.71
89,700,343.36 29,031,658.90 118,732,002.26
145,463,003.85$ 36,243,721.50$ 181,706,725.35$
Unaudited
As of January 31, 2017
Combining Schedule of Net Position
Total Equity and Current Surplus (Deficit):
Total Assets and Deferred Outflows of Resources:
Total Current Assets:
Total Non-Current Assets:
Total Liabilities, Equity and Current Surplus (Deficit):
Total Total Beginning Equity:
Equity:
Revenues Over/Under Expenses
Total Current Liabilities:
Total Non-Current and Deferred Inflows of Resources:
Total Liabilities and Deferred Inflows of Resources:
Page 1 of 8
ADOPTED AMENDED ADOPTED REMAINING
MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Revenue
41 Water Sales 816,296.39$ 9,292,994.41$ 13,500,000.00$ -$ -$ -$ 13,500,000.00$ 4,207,005.59$
42 Meter Charges 750,616.10 5,181,277.29 8,960,000.00 - - - 8,960,000.00 3,778,722.71
43 Penalties 54,544.50 350,439.34 635,000.00 3,702.05 25,303.47 50,000.00 685,000.00 309,257.19
44 Wastewater System Charges - - - 372,020.78 2,795,540.19 4,460,000.00 4,460,000.00 1,664,459.81
45 Wastewater Treatment Charges - - - 656,989.46 4,778,843.26 7,610,000.00 7,610,000.00 2,831,156.74
46 Other Operating Revenue 3,348.24 473,370.54 170,000.00 - 53,888.96 190,000.00 360,000.00 (167,259.50)
47 Non Operating Revenue 24,366.69 71,143.08 120,000.00 2,879.69 12,671.02 22,000.00 142,000.00 58,185.90
Revenue Total: 1,649,171.92 15,391,556.66 23,385,000.00 1,035,591.98 7,666,246.90 12,332,000.00 35,717,000.00 12,659,196.44
- - - - -
Expense by Category
51 Labor 344,604.04 2,667,749.48 4,520,900.00 73,320.97 773,040.23 1,325,100.00 5,846,000.00 2,405,210.29
56 Benefits 158,774.50 1,166,025.49 1,876,400.00 33,950.61 278,023.31 567,600.00 2,444,000.00 999,951.20
63 Contract Services 53,095.93 1,393,101.34 3,361,844.00 672,396.18 5,114,181.52 8,592,633.00 11,954,477.00 5,447,194.14
65 Professional Development 10,242.64 118,341.44 266,900.00 1,894.77 40,949.06 102,100.00 369,000.00 209,709.50
53 Overtime 30,512.42 191,361.39 258,700.00 599.01 8,587.02 17,300.00 276,000.00 76,051.59
62 Materials and Supplies 27,372.89 622,993.14 1,463,912.00 6,273.50 80,141.50 154,400.00 1,618,312.00 915,177.36
64 Utilities 13,276.24 1,089,414.37 2,364,575.00 3,628.09 71,507.33 175,300.00 2,539,875.00 1,378,953.30
52 Temporary Labor 957.47 31,484.54 20,300.00 410.35 11,657.37 8,700.00 29,000.00 (14,141.91)
67 Other 6,610.88 178,422.55 208,900.00 2,761.23 76,177.43 89,100.00 298,000.00 43,400.02
54 Standby 3,868.19 21,876.75 33,000.00 293.91 1,849.91 2,000.00 35,000.00 11,273.34
61 Water Supply 402,343.96 864,310.37 1,245,000.00 - - - 1,245,000.00 380,689.63
71 -Debt Service - 840,660.81 4,007,000.00 - 111,762.50 317,000.00 4,324,000.00 3,371,576.69
81 -Capital Improvement - - 1,070,000.00 - - 210,000.00 1,280,000.00 1,280,000.00
82 -Capital Outlay - - 266,269.00 - - 77,567.00 343,836.00 343,836.00
83 -Accounting Income Add back - - - - - - - -
Expense Total: 1,051,659.16 9,185,741.67 20,963,700.00 795,528.62 6,567,877.18 11,638,800.00 32,602,500.00 16,848,881.15
Total Surplus (Deficit): 597,512.76$ 6,205,814.99$ -$ 240,063.36$ 1,098,369.72$ -$ -$ -$
Unaudited
Revenue and Expense Budget-to-Actual by Category
Month Ended January 31, 2017
WATER WASTEWATER DISTRICT WIDE
Page 2 of 8
ADOPTED AMENDED ADOPTED REMAINING
MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Revenue
41 Water Sales 816,296.39$ 9,292,994.41$ 13,500,000.00$ -$ -$ -$ 13,500,000.00$ 4,207,005.59$
42 Meter Charges 750,616.10 5,181,277.29 8,960,000.00 - - - 8,960,000.00 3,778,722.71
43 Penalties 54,544.50 350,439.34 635,000.00 3,702.05 25,303.47 50,000.00 685,000.00 309,257.19
44 Wastewater System Charges - - - 372,020.78 2,795,540.19 4,460,000.00 4,460,000.00 1,664,459.81
45 Wastewater Treatment Charges - - - 656,989.46 4,778,843.26 7,610,000.00 7,610,000.00 2,831,156.74
46 Other Operating Revenue 3,348.24 473,370.54 170,000.00 - 53,888.96 190,000.00 360,000.00 (167,259.50)
47 Non Operating Revenue 24,366.69 71,143.08 120,000.00 2,879.69 12,671.02 22,000.00 142,000.00 58,185.90
Revenue Total: 1,649,171.92 15,391,556.66 23,385,000.00 1,035,591.98 7,666,246.90 12,332,000.00 35,717,000.00 12,659,196.44
Progra 1000 - Board of Directors 8,581.50 55,983.04 148,400.00 3,403.96 22,611.21 63,600.00 212,000.00 133,405.75
Progra 2000 - General Administration 43,318.15 496,826.26 940,924.00 16,924.16 202,506.62 404,700.00 1,345,624.00 646,291.12
Progra 2100 - Human Resources 25,093.17 357,874.30 512,812.00 10,754.15 151,322.93 220,500.00 733,312.00 224,114.77
Progra 2200 - Public Affairs 16,710.62 183,941.64 506,570.00 14,212.43 179,828.46 508,900.00 1,015,470.00 651,699.90
Progra 2300 - Conservation 21,486.86 301,632.12 1,020,156.00 - - - 1,020,156.00 718,523.88
Progra 3000 - Finance 47,409.48 516,558.10 758,356.00 19,611.73 224,368.58 324,582.00 1,082,938.00 342,011.32
Progra 3200 - Information Technology 30,843.09 268,681.07 540,112.00 13,218.37 120,300.55 232,200.00 772,312.00 383,330.38
Progra 3300 - Customer Service 49,505.85 654,782.41 1,317,395.00 21,185.03 217,770.92 401,895.00 1,719,290.00 846,736.67
Progra 3400 - Meter Service 23,341.56 194,989.77 348,000.00 149.90 6,830.37 - 348,000.00 146,179.86
Progra 4000 - Engineering 47,175.50 488,168.23 842,656.00 21,745.90 197,229.42 371,281.00 1,213,937.00 528,539.35
Progra 5000 - Water Production 479,206.52 2,399,402.55 4,402,875.00 - - - 4,402,875.00 2,003,472.45
Progra 5100 - Water Treatment 27,613.86 415,046.77 827,000.00 - - - 827,000.00 411,953.23
Progra 5200 - Water Quality 21,991.69 207,028.95 407,000.00 - - - 407,000.00 199,971.05
Progra 6000 - Field Maintenance Administration 13,363.35 100,955.45 194,400.00 2,342.67 21,595.82 21,600.00 216,000.00 93,448.73
Progra 6100 - Water Maintenance 141,023.57 1,106,487.61 1,759,000.00 - (21.00) - 1,759,000.00 652,533.39
Progra 6200 - Wastewater Maintenance - - - 661,079.66 4,997,362.14 8,231,875.00 8,231,875.00 3,234,512.86
Progra 7000 - Facilities Maintenance 27,186.94 352,142.72 604,275.00 7,811.07 79,771.56 198,600.00 802,875.00 370,960.72
Progra 7100 - Fleet Maintenance 27,807.45 244,579.87 490,500.00 3,089.59 34,637.10 54,500.00 545,000.00 265,783.03
Progra 8000 - Capital - 840,660.81 5,343,269.00 - 111,762.50 604,567.00 5,947,836.00 4,995,412.69
Total Surplus (Deficit):597,512.76$ 6,205,814.99$ -$ 240,063.36$ 1,098,369.72$ -$ -$ -$
Revenue and Expense Budget-to-Actual by Program
Month Ended January 31, 2017
Unaudited
WATER WASTEWATER DISTRICT WIDE
Page 3 of 8
ADOPTED AMENDED ADOPTED REMAINING
MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Revenue
41 Water Sales 816,296.39$ 9,292,994.41$ 13,500,000.00$ -$ -$ -$ 13,500,000.00$ 4,207,005.59$
42 Meter Charges 750,616.10 5,181,277.29 8,960,000.00 - - - 8,960,000.00 3,778,722.71
43 Penalties 54,544.50 350,439.34 635,000.00 3,702.05 25,303.47 50,000.00 685,000.00 309,257.19
44 Wastewater System Charges - - - 372,020.78 2,795,540.19 4,460,000.00 4,460,000.00 1,664,459.81
45 Wastewater Treatment Charges - - - 656,989.46 4,778,843.26 7,610,000.00 7,610,000.00 2,831,156.74
46 Other Operating Revenue 3,348.24 473,370.54 170,000.00 - 53,888.96 190,000.00 360,000.00 (167,259.50)
47 Non Operating Revenue 24,366.69 71,143.08 120,000.00 2,879.69 12,671.02 22,000.00 142,000.00 58,185.90
Revenue Total: 1,649,171.92 15,391,556.66 23,385,000.00 1,035,591.98 7,666,246.90 12,332,000.00 35,717,000.00 12,659,196.44
Program: 1000 - Board of Directors - - -
51 Labor 3,899.35$ 39,299.87$ 73,500.00$ 1,671.12$ 16,842.85$ 31,500.00$ 105,000.00$ 48,857.28$
56 Benefits 4,098.63 6,084.36 28,700.00 1,704.15 2,538.78 12,300.00 41,000.00 32,376.86
63 Contract Services - 1,057.00 7,700.00 - 453.00 3,300.00 11,000.00 9,490.00
65 Professional Development 583.52 9,541.81 38,500.00 28.69 2,776.58 16,500.00 55,000.00 42,681.61
Program: 1000 - Board of Directors Total: 8,581.50 55,983.04 148,400.00 3,403.96 22,611.21 63,600.00 212,000.00 133,405.75
Program: 2000 - General Administration - - -
51 Labor 29,083.13 210,130.93 455,700.00 12,464.21 89,848.32 195,300.00 651,000.00 351,020.75
53 Overtime 56.57 887.32 - 24.24 380.25 - - (1,267.57)
56 Benefits 12,799.95 103,817.35 186,200.00 3,844.94 33,079.18 79,800.00 266,000.00 129,103.47
62 Materials and Supplies 49.53 1,429.05 7,000.00 21.22 672.45 3,000.00 10,000.00 7,898.50
63 Contract Services - 123,967.85 206,624.00 - 54,271.93 90,000.00 296,624.00 118,384.22
64 Utilities 91.27 1,105.08 3,500.00 39.11 473.63 1,500.00 5,000.00 3,421.29
65 Professional Development 1,237.70 55,488.68 81,900.00 530.44 23,780.86 35,100.00 117,000.00 37,730.46
Program: 2000 - General Administration Total: 43,318.15 496,826.26 940,924.00 16,924.16 202,506.62 404,700.00 1,345,624.00 646,291.12
Program: 2100 - Human Resources - - - -
51 Labor 10,321.82 84,154.82 140,700.00 4,423.63 36,066.33 60,300.00 201,000.00 80,778.85
52 Temporary Labor 268.80 4,973.25 8,400.00 115.20 2,131.39 3,600.00 12,000.00 4,895.36
53 Overtime - 935.93 2,100.00 - 401.12 900.00 3,000.00 1,662.95
56 Benefits 5,027.37 42,224.13 58,800.00 2,154.53 16,793.01 25,200.00 84,000.00 24,982.86
62 Materials and Supplies 7.00 262.58 4,900.00 3.00 112.54 2,100.00 7,000.00 6,624.88
63 Contract Services 1,329.71 30,948.02 65,512.00 569.89 13,263.51 28,800.00 94,312.00 50,100.47
64 Utilities - 170.92 700.00 - 73.22 300.00 1,000.00 755.86
65 Professional Development 1,695.57 16,434.01 23,800.00 726.67 6,294.38 10,200.00 34,000.00 11,271.61
67 Other 6,442.90 177,770.64 207,900.00 2,761.23 76,187.43 89,100.00 297,000.00 43,041.93
Program: 2100 - Human Resources Total: 25,093.17 357,874.30 512,812.00 10,754.15 151,322.93 220,500.00 733,312.00 224,114.77
Program: 2200 - Public Affairs - - - -
51 Labor 10,408.27 90,719.28 148,000.00 8,988.20 72,452.39 148,000.00 296,000.00 132,828.33
52 Temporary Labor - 478.80 - - 205.20 - - (684.00)
53 Overtime 170.37 2,012.62 3,500.00 170.37 1,656.31 3,500.00 7,000.00 3,331.07
Month Ended January 31, 2017
Unaudited
Program Expense Detail Budget-to-Actual
WATER WASTEWATER DISTRICT WIDE
Page 4 of 8
ADOPTED AMENDED ADOPTED REMAINING
MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Month Ended January 31, 2017
Unaudited
Program Expense Detail Budget-to-Actual
WATER WASTEWATER DISTRICT WIDE
56 Benefits 3,839.94 33,194.21 53,000.00 2,761.81 20,680.51 53,000.00 106,000.00 52,125.28
62 Materials and Supplies 1,010.56 16,639.41 82,500.00 1,010.56 39,974.99 82,500.00 165,000.00 108,385.60
63 Contract Services 1,051.87 29,637.83 198,070.00 1,051.87 33,526.24 200,400.00 398,470.00 335,305.93
64 Utilities 49.72 8,896.71 11,500.00 49.72 8,964.46 11,500.00 23,000.00 5,138.83
65 Professional Development 179.89 2,362.78 10,000.00 179.90 2,368.36 10,000.00 20,000.00 15,268.86
Program: 2200 - Public Affairs Total: 16,710.62 183,941.64 506,570.00 14,212.43 179,828.46 508,900.00 1,015,470.00 651,699.90
Program: 2300 - Conservation - - - -
51 Labor 13,231.37 111,953.17 102,000.00 - - - 102,000.00 (9,953.17)
52 Temporary Labor - 4,284.00 - - - - - (4,284.00)
53 Overtime - 1,692.39 8,000.00 - - - 8,000.00 6,307.61
56 Benefits 2,635.10 22,256.22 31,000.00 - - - 31,000.00 8,743.78
62 Materials and Supplies 3,682.99 135,785.32 524,000.00 - - - 524,000.00 388,214.68
63 Contract Services 117.98 22,565.46 302,156.00 - - - 302,156.00 279,590.54
64 Utilities - 555.71 41,000.00 - - - 41,000.00 40,444.29
65 Professional Development 1,819.42 2,539.85 12,000.00 - - - 12,000.00 9,460.15
Program: 2300 - Conservation Total: 21,486.86 301,632.12 1,020,156.00 - - - 1,020,156.00 718,523.88
Program: 3000 - Finance - - - -
51 Labor 30,169.29 251,033.07 448,000.00 12,929.69 107,412.59 192,000.00 640,000.00 281,554.34
52 Temporary Labor - 13,939.00 9,800.00 - 5,973.85 4,200.00 14,000.00 (5,912.85)
53 Overtime 380.52 3,713.76 2,100.00 163.07 1,253.34 900.00 3,000.00 (1,967.10)
56 Benefits 14,048.66 112,863.89 178,500.00 6,020.53 48,294.12 76,500.00 255,000.00 93,841.99
62 Materials and Supplies 41.92 2,898.65 4,200.00 17.96 1,242.26 1,800.00 6,000.00 1,859.09
63 Contract Services 2,266.31 125,903.48 95,156.00 336.97 57,847.95 40,782.00 135,938.00 (47,813.43)
64 Utilities - 990.73 2,800.00 - 424.59 1,200.00 4,000.00 2,584.68
65 Professional Development 334.85 4,479.67 16,800.00 143.51 1,919.88 7,200.00 24,000.00 17,600.45
67 Other 167.93 735.85 1,000.00 - - - 1,000.00 264.15
Program: 3000 - Finance Total: 47,409.48 516,558.10 758,356.00 19,611.73 224,368.58 324,582.00 1,082,938.00 342,011.32
Program: 3200 - Information Technology - - - -
51 Labor 15,075.05 118,134.87 203,000.00 6,460.78 55,034.06 87,000.00 290,000.00 116,831.07
52 Temporary Labor - - - - - - - -
53 Overtime - - - - - - - -
56 Benefits 4,832.30 35,063.85 72,800.00 2,070.84 18,360.13 31,200.00 104,000.00 50,576.02
62 Materials and Supplies 2,983.03 24,165.11 19,312.00 1,278.44 7,815.45 9,000.00 28,312.00 (3,668.56)
63 Contract Services 7,612.64 83,874.07 225,400.00 3,262.56 35,900.97 96,600.00 322,000.00 202,224.96
64 Utilities - 1,555.64 3,500.00 - 666.71 1,500.00 5,000.00 2,777.65
65 Professional Development 340.07 5,887.53 16,100.00 145.75 2,523.23 6,900.00 23,000.00 14,589.24
Program: 3200 - Information Technology Total: 30,843.09 268,681.07 540,112.00 13,218.37 120,300.55 232,200.00 772,312.00 383,330.38
Program: 3300 - Customer Service - - - -
51 Labor 19,844.84 172,007.55 338,100.00 8,504.90 78,392.33 144,900.00 483,000.00 232,600.12
52 Temporary Labor 596.27 7,293.59 2,100.00 255.55 3,125.83 900.00 3,000.00 (7,419.42)
53 Overtime 224.16 1,355.54 3,500.00 96.08 580.96 1,500.00 5,000.00 3,063.50
56 Benefits 12,500.82 87,262.35 163,800.00 5,357.31 45,594.23 70,200.00 234,000.00 101,143.42
Page 5 of 8
ADOPTED AMENDED ADOPTED REMAINING
MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Month Ended January 31, 2017
Unaudited
Program Expense Detail Budget-to-Actual
WATER WASTEWATER DISTRICT WIDE
62 Materials and Supplies - 1,721.70 9,200.00 - 737.88 1,800.00 11,000.00 8,540.42
63 Contract Services 16,104.51 351,935.73 680,695.00 6,901.91 75,623.47 131,595.00 812,290.00 384,730.80
64 Utilities - 31,792.88 107,100.00 - 13,625.53 45,900.00 153,000.00 107,581.59
65 Professional Development 235.20 1,497.01 12,900.00 69.28 100.69 5,100.00 18,000.00 16,402.30
67 Other 0.05 (83.94) - - (10.00) - - 93.94
Program: 3300 - Customer Service Total: 49,505.85 654,782.41 1,317,395.00 21,185.03 217,770.92 401,895.00 1,719,290.00 846,736.67
Program: 3400 - Meter Service - - - -
51 Labor 15,226.79 130,885.85 210,000.00 - - - 210,000.00 79,114.15
53 Overtime 40.80 4,594.43 20,000.00 - - - 20,000.00 15,405.57
56 Benefits 7,749.70 51,841.94 104,000.00 149.90 6,830.37 - 104,000.00 45,327.69
62 Materials and Supplies - 183.85 4,000.00 - - - 4,000.00 3,816.15
63 Contract Services 324.27 7,026.56 8,000.00 - - - 8,000.00 973.44
64 Utilities - 457.14 2,000.00 - - - 2,000.00 1,542.86
65 Professional Development - - - - - - - -
Program: 3400 - Meter Service Total: 23,341.56 194,989.77 348,000.00 149.90 6,830.37 - 348,000.00 146,179.86
Program: 4000 - Engineering - - - -
51 Labor 27,105.36 230,821.09 377,200.00 14,924.46 116,567.76 171,800.00 549,000.00 201,611.15
52 Temporary Labor 92.40 515.90 - 39.60 221.10 - - (737.00)
53 Overtime - 1,415.85 1,400.00 - 606.78 600.00 2,000.00 (22.63)
56 Benefits 15,142.17 109,583.57 190,400.00 6,638.07 47,294.11 81,600.00 272,000.00 115,122.32
62 Materials and Supplies 47.05 2,787.16 16,100.00 - 133.74 6,900.00 23,000.00 20,079.10
63 Contract Services 3,559.07 82,214.04 152,556.00 - 19,675.50 65,381.00 217,937.00 116,047.46
64 Utilities 335.44 57,395.63 86,100.00 143.77 12,500.37 36,900.00 123,000.00 53,104.00
65 Professional Development 894.01 3,434.99 18,900.00 - 230.06 8,100.00 27,000.00 23,334.95
Program: 4000 - Engineering Surplus Total: 47,175.50 488,168.23 842,656.00 21,745.90 197,229.42 371,281.00 1,213,937.00 528,539.35
Program: 5000 - Water Production - - - -
51 Labor 46,687.91 377,777.88 626,000.00 - - - 626,000.00 248,222.12
53 Overtime 5,404.38 31,524.44 36,000.00 - - - 36,000.00 4,475.56
54 Standby 1,009.52 8,889.52 15,000.00 - - - 15,000.00 6,110.48
56 Benefits 18,828.70 160,319.30 239,000.00 - - - 239,000.00 78,680.70
61 Water Supply 402,343.96 864,310.37 1,245,000.00 - - - 1,245,000.00 380,689.63
62 Materials and Supplies 2,299.65 80,791.44 279,000.00 - - - 279,000.00 198,208.56
63 Contract Services 570.80 62,313.63 341,000.00 - - - 341,000.00 278,686.37
64 Utilities - 806,242.53 1,612,875.00 - - - 1,612,875.00 806,632.47
65 Professional Development 2,061.60 7,233.44 9,000.00 - - - 9,000.00 1,766.56
Program: 5000 - Water Production Total: 479,206.52 2,399,402.55 4,402,875.00 - - - 4,402,875.00 2,003,472.45
Program: 5100 - Water Treatment - - - -
51 Labor 16,242.98 130,754.68 217,000.00 - - - 217,000.00 86,245.32
53 Overtime 1,227.06 8,067.22 10,000.00 - - - 10,000.00 1,932.78
56 Benefits 6,587.82 54,901.96 69,000.00 - - - 69,000.00 14,098.04
62 Materials and Supplies 83.39 109,336.83 165,000.00 - - - 165,000.00 55,663.17
63 Contract Services 2,804.68 53,786.10 166,000.00 - - - 166,000.00 112,213.90
64 Utilities 667.93 58,199.98 200,000.00 - - - 200,000.00 141,800.02
Page 6 of 8
ADOPTED AMENDED ADOPTED REMAINING
MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Month Ended January 31, 2017
Unaudited
Program Expense Detail Budget-to-Actual
WATER WASTEWATER DISTRICT WIDE
Program: 5100 - Water Treatment Total: 27,613.86 415,046.77 827,000.00 - - - 827,000.00 411,953.23
Program: 5200 - Water Quality - - - -
51 Labor 12,015.74 97,292.71 162,000.00 - - - 162,000.00 64,707.29
53 Overtime 376.74 4,007.25 4,000.00 - - - 4,000.00 (7.25)
56 Benefits 4,430.93 37,812.59 60,000.00 - - - 60,000.00 22,187.41
62 Materials and Supplies 1,263.98 3,593.30 18,000.00 - - - 18,000.00 14,406.70
63 Contract Services 3,904.30 64,027.37 161,000.00 - - - 161,000.00 96,972.63
64 Utilities - 295.73 2,000.00 - - - 2,000.00 1,704.27
65 Professional Development - - - - - - - -
Program: 5200 - Water Quality Total: 21,991.69 207,028.95 407,000.00 - - - 407,000.00 199,971.05
Program: 6000 - Field Maintenance Administration - - - -
51 Labor 6,626.01 54,168.43 94,500.00 1,164.06 10,933.38 10,500.00 105,000.00 39,898.19
52 Temporary Labor - - - - - - - -
53 Overtime - - - - - - - -
54 Standby 2,858.67 12,987.23 18,000.00 293.91 1,849.91 2,000.00 20,000.00 5,162.86
56 Benefits 3,017.86 18,084.60 37,800.00 814.17 7,242.71 4,200.00 42,000.00 16,672.69
62 Materials and Supplies - 828.57 2,700.00 - 9.81 300.00 3,000.00 2,161.62
63 Contract Services - - - - - - - -
64 Utilities - 7,000.15 18,900.00 - 777.79 2,100.00 21,000.00 13,222.06
65 Professional Development 860.81 7,886.47 22,500.00 70.53 782.22 2,500.00 25,000.00 16,331.31
Program: 6000 - Field Maintenance Administration Total 13,363.35 100,955.45 194,400.00 2,342.67 21,595.82 21,600.00 216,000.00 93,448.73
Program: 6100 - Water Maintenance - - - -
51 Labor 72,556.85 436,078.74 727,000.00 - (156.00) - 727,000.00 291,077.26
53 Overtime 21,324.54 118,451.45 150,000.00 - - - 150,000.00 31,548.55
56 Benefits 35,074.31 236,541.72 316,000.00 - - - 316,000.00 79,458.28
62 Materials and Supplies 11,014.46 180,784.15 232,000.00 - - - 232,000.00 51,215.85
63 Contract Services 1,053.41 134,631.55 334,000.00 - - - 334,000.00 199,368.45
64 Utilities - - - - 135.00 - - (135.00)
Program: 6100 - Water Maintenance Total: 141,023.57 1,106,487.61 1,759,000.00 - (21.00) - 1,759,000.00 652,533.39
Program: 6200 - Wastewater Maintenance - - - -
51 Labor - - - - 170,743.48 242,000.00 242,000.00 71,256.52
53 Overtime - - - - 1,592.72 3,000.00 3,000.00 1,407.28
56 Benefits - - - 1,066.13 18,012.29 115,000.00 115,000.00 96,987.71
62 Materials and Supplies - - - 2,887.33 16,979.18 32,000.00 32,000.00 15,020.82
Wastewater Treatment - - - 656,989.46 4,778,843.26 6,861,600.00 6,861,600.00 2,082,756.74
63 Contract Services - - - 136.74 11,191.21 978,275.00 978,275.00 967,083.79
Program: 6200 - Wastewater Maintenance Total:- - - 661,079.66 4,997,362.14 8,231,875.00 8,231,875.00 3,234,512.86
Page 7 of 8
ADOPTED AMENDED ADOPTED REMAINING
MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Month Ended January 31, 2017
Unaudited
Program Expense Detail Budget-to-Actual
WATER WASTEWATER DISTRICT WIDE
Program: 7000 - Facilities Maintenance - - - -
51 Labor 5,911.33 48,344.11 62,300.00 656.80 7,124.71 26,700.00 89,000.00 33,531.18
53 Overtime 1,284.22 13,097.43 17,500.00 142.69 2,375.28 7,500.00 25,000.00 9,527.29
56 Benefits 3,691.00 24,259.43 25,900.00 871.74 7,440.48 11,100.00 37,000.00 5,300.09
62 Materials and Supplies 1,612.04 17,591.08 33,900.00 690.87 5,724.05 8,100.00 42,000.00 18,684.87
63 Contract Services 8,077.82 180,742.14 305,475.00 2,666.96 28,423.99 83,400.00 388,875.00 179,708.87
64 Utilities 6,610.53 68,108.53 159,200.00 2,782.01 28,683.05 61,800.00 221,000.00 124,208.42
65 Professional Development - - - - - - - -
Program: 7000 - Facilities Maintenance Total: 27,186.94 352,142.72 604,275.00 7,811.07 79,771.56 198,600.00 802,875.00 370,960.72
Program: 7100 - Fleet Maintenance - - - -
51 Labor 10,197.95 84,192.43 135,900.00 1,133.12 11,778.03 15,100.00 151,000.00 55,029.54
53 Overtime 23.06 541.69 2,700.00 2.56 141.38 300.00 3,000.00 2,316.93
56 Benefits 4,469.24 28,978.09 59,400.00 496.49 5,462.27 6,600.00 66,000.00 31,559.64
62 Materials and Supplies 3,277.29 44,194.94 62,100.00 364.12 6,739.15 6,900.00 69,000.00 18,065.91
63 Contract Services 4,318.56 38,470.51 112,500.00 479.82 5,160.49 12,500.00 125,000.00 81,369.00
64 Utilities 5,521.35 46,647.01 113,400.00 613.48 5,182.98 12,600.00 126,000.00 74,170.01
65 Professional Development - 1,555.20 4,500.00 - 172.80 500.00 5,000.00 3,272.00
Program: 7100 - Fleet Maintenance Total: 27,807.45 244,579.87 490,500.00 3,089.59 34,637.10 54,500.00 545,000.00 265,783.03
Program: 8000 - Capital - - -
71 -Debt Service - 840,660.81 4,007,000.00 - 111,762.50 317,000.00 4,324,000.00 3,371,576.69
81 -Capital Improvement - - 1,070,000.00 - - 210,000.00 1,280,000.00 1,280,000.00
82 -Capital Outlay - - 266,269.00 - - 77,567.00 343,836.00 343,836.00
83 -Accounting Income Add back - - - - - - - -
Program: 8000 - Capital Total:- 840,660.81 5,343,269.00 - 111,762.50 604,567.00 5,947,836.00 4,995,412.69
Total Surplus (Deficit): 597,512.76$ 6,205,814.99$ -$ 240,063.36$ 1,098,369.72$ -$ -$ -$
Page 8 of 8
BOARD AGENDA STAFF REPORT
Agend a Item #5.
Meeting Date: Feb ruary 22, 2017
Dis cus s io n Item
To: Governing Bo ard Memb ers
From: General Manager/CEO
Subject: F Y 2016-17 Mid -Year Budget Review
RECOMMENDATION:
Staff recommends that the Bo ard o f Direc tors review and ap prove amendments to the FY 2016-17 Op erating
and Cap ital Budget.
BACKGROUND / ANALYSIS:
T he Mid -Year Budget Review is p res ented for the Board o f Direc to rs ’ review and consideration. This p roc es s
p rovid es an o p p o rtunity to review the status of the Budget half way through the year and make ad justments to
the Distric t’s p lanned o p eratio ns. This rep o rt includ es an as s es s ment o f both o p erating and c apital budgets as
well as rec o mmend ed ad justments fo r the remainder of FY 2016-17.
In ac c o rd anc e with the Dis trict’s Financial Po licies , the FY 2016-17 b udget was b alanced with cons ervative
assump tio ns. No w at mid-year, we know a little mo re ab o ut whether the severe d ro ught will continue, and staff
p resents for c o nsideration revised forec asts pro viding a more ac curate fisc al p icture than could b e prep ared
when the FY 2016-17 Bud get was o riginally adopted. To the extent p o s s ible, trends and emerging items that were
no t includ ed in the Distric t’s Bud get have been id entified and the bud getary imp ac ts of these items have been
assessed. This s ix-month review proc ess inc ludes as sessments by program managers on their res p ec tive
b ud gets , whic h have been c o mpiled into c o mprehens ive review of revenues and expend itures fo r the firs t half o f
FY 2016-17.
Revenues
Water s ales were $662,000 o ver projectio n through Dec ember. By tier, s ales variances were $135,000 und er
p rojec tion fo r Tier 1, $597,000 over p ro jec tion for Tier 2, and $200,000 over p ro jec tion for Tier 3. The p rimary
reason fo r higher than exp ected s ales at mid -year was high water c o nsumptio n in S ep temb er.
Revenue p ro jec tions fo r the three tiers of water s ales were adjus ted to incorp o rate noticeab le trends at mid -year,
s o staff could develop new pro jectio ns thro ugh the remaind er o f the fisc al year. As a res ult of this wo rk, staff is
p ropos ing an inc reas e in b ud geted water s ales revenue of $300,000. T his amo unt rep resents les s than half of the
s ales variance through Decemb er, and is very conservative, b ut the c urrent winter has p ro duced higher than
average rainfall and could res ult in lo wer than expected c o ns umption during the mo nths of Feb ruary and Marc h.
Other p ro p o sed changes to water revenue are a dec rease in meter charges o f $50,000 d ue to the Board ap p roved
eliminatio n o f res idential fire servic e fees effective in F ebruary, and an increas e in o ther o p erating inc o me o f
$300,000 resulting from the Ed is o n energy c ons ervation reb ate rec eived at the December board meeting.
Staff p ro p o ses o ffs etting ad justments o f $120,000 to no n-operating revenue line items in the Wastewater budget,
b ut the net adjustment is a zero effec t o n the Was tewater budget overall.
T he tab le b elo w summarizes propos ed adjustments to Dis tric t-wide revenues by line item:
Description
FY 2016-17
Budget YTD Activity
FY 2016-17
Projected Difference
Water Sales -Tier 1 5,915,000 3,012,960 5,715,000 (200,000)
Water Sales -Tier 2 4,878,000 3,616,890 5,278,000 400,000
Water Sales -Tier 3 2,707,000 1,846,948 2,807,000 100,000
Meter Charges 8,960,000 4,430,661 8,910,000 (50,000)
Was tewater C ollec tion 4,460,000 2,423,520 4,460,000 -
Was tewater Treatment 7,610,000 4,121,854 7,610,000 -
Other Charges 1,045,000 841,717 1,225,000 180,000
Inves tment Inc o me 97,000 42,952 97,000 -
Mis cellaneous Revenue 45,000 35,180 45,000 -
Total 35,717,000 20,372,682 36,147,000 430,000
Expenditures
Dis tric t s taff c lo s ely monito rs program exp enditures , hold ing monthly budget review meetings between p ro gram
managers and a des ignated repres entative fro m the F inanc e Department. As a res ult of thos e meetings, growing
varianc es are id entified and analyzed, and if nec es sary, plac ed on the s c hedule for mo d ific ation at the mid -year
b ud get review with the Board. Several s mall variances were adjus ted b y transfers b etween two line items, but two
s ignific ant c o s t estimates need to b e ad jus ted in the b udget. The firs t is Labor & Benefits, which are tracking
o ver p rojec tion by about $81,000 due to a 2% COLA funded in July that was intend ed to c o ver an inc reas e in
b enefit c o s ts to emplo yees beginning in January 2017. T he sixth mo nths of wage increas e prior to January,
c o ntrib uted to the Labo r and Benefits cost varianc e.
T he sec ond s ignificant variance is in water s upply costs , whic h includ es d irect water purc has es , and asses s ments
o n s urface water diversion (No rth F o rk) o r gro undwater p ump ing. T hro ugh mid -year the District had spent les s
than antic ipated on purc has ed water, ins tead d rawing down on a p re-p urchas ed water ‘b ank’ that had been
estab lis hed with p ayments to SBVMWD in p rio r years . Staff als o believes that as s es s ments o n No rth Fork
d eliveries, and on ground water, will b e les s than o riginally b udgeted .
Pro jections for Expens es are s hown below:
Description
FY 2016-17
Budget YTD Activity
FY 2016-17
Projected Difference
Labor & Benefits 8,484,000 4,472,236 8,565,000 81,000
Water Supply 1,245,000 461,966 937,000 (308.000)
Elec tric ity 1,814,000 863,775 1,814,000 -
Treatment Servic es 7,610,000 4,121,875 7,610,000 -
Other Op erating Exp.7,537,000 3,054,359 7,334,000 (203,000)
Capital Exp ens es 4,168,000 2,850,510 7,327,000 3,159,000
Debt S ervice 4,324,000 2,788,012 4,324,000 -
Water Res erve Co ntrib.435,100 521,100 86,000
Was tewater R eserve
Contrib. (Bo rrowing)99,900 (2,285,100)(2,385,000)
Total 35,717,000 18,612,733 36,147,000 430,000
T he net effec t o f the exp ens e adjustments sho wn ab ove s hould allow the Dis tric t to contrib ute an additional
$86,000 to Water reserves. However, a d elay in o b taining S RF funding for the water recycling plant makes it
necess ary fo r the Dis trict to bo rro w from Wastewater res erves until the fund ing can be proc ured .
Capital Expenses
Staff has evaluated the Capital Budget and is req ues ting that the following ad jus tments b e fund ed out o f
increas ed revenue p ro jec tions and the o p erating expens es s avings identified above:
Business Intelligence Reporting – This p ro jec t was o riginally budgeted at $50,000 in o rd er to s o licit
c o nsultant sup p o rt for s taff efforts to harnes s data from vario us Dis tric t s ys tems , and other data wareho us es , fo r
p roduction of meaningful grap hics to fac ilitate Bo ard and management d ec is io n making ab o ut District
o peratio ns . Staff firs t developed proto type rep orts and then solic ited bids for c o nsultant as s is tance in des igning
final rep o rts , b ut feedbac k from pros p ective firms has sho wn that the original b udget is significantly
underes timated . Staff is req uesting ad d itional fund ing o f $100,000 for c o ns ulting, to b e fund ed fro m increas ed
s ales p rojec tions.
Unit 116 Conversion – The p urc has e o f a new Hydro-exc avator (Unit 316) in fis cal year 2015-16 has relegated
Unit 116, a 2002 s ewer vac tor that had been converted for use as a makeshift hydro -exc avator, to the fleet
p arking lo t. Unit 116 is mechanic ally s ound , and with the inves tment of $52,000 fo r rehabilitatio n, could b e
p lac ed bac k in s ervic e as a reliab le bac kup to Unit 216; the Dis tric t’s o nly sewer vac tor c urrently in s ervic e. Staff
reques ts $52,000 for rehab ilitation of Unit 116 to b e fund ed by deferral of the Was tewater rate c o s t o f s ervic e
analysis includ ed in the ad o p ted bud get.
Pool Vehicle – Staff currently drive mid -s ize or large S UVs fro m the vehic le poo l to run Dis tric t errands as there
o r no o ther o p tions available in the current p o o l. Staff reques ts autho rizatio n to s p end $30,000 to rep lac e a 2002
Chevy Suburb an with a fuel efficient, compact sedan o r S UV.
Recommended by:
Jo hn Mura
General Manager/CEO
Res p ec tfully s ub mitted :
Brian To mpkins
Chief Financial Offic er
Recycled Water Project – The ado p ted 2016-17 Bud get identified a State Revolving F und loan as the s o urc e
o f funding for c o s ts inc urred on the water recyc ling p lant. Through mid -year, the Distric t has inc urred c o ns ultant
c o s ts for p rep aratio n of d esign-build b ridging d o cuments, c ontinued permitting and legal effo rts, public
o utreac h, and program management. Ho wever, o utside funding has not b een s ec ured as the Dis tric t’s SRF
funding ap p lic ation is s till under review at the Department o f Water Resourc es . Acc o rd ingly, staff requests
formal approval to b o rrow up to $2.4 millio n from Wastewater res erves to cover costs thro ugh the end of the
fisc al year, o r receip t of S RF loan funding, whic hever oc curs first. S taff als o reques ts authorization to trans fer
$302,000 from the p ub lic affairs operating b ud get to the recycled water p ro jec t ac c o unt fo r outreach related to
the p ro jec t.
HQ Site Upgrades – After the ac tive s hooter event that unfolded in S an Bernard ino in 2015, s taff convened a
s ec urity committee to make recommendatio ns fo r up graded s ec urity meas ures at Dis trict fac ilities. The ad opted
2016-17 Bud get inc lud ed $50,000 for sec urity imp ro vements to the Cus tomer S ervice and Board R oom areas,
b ut s taff is p ro posing an increas e of $50,000 to comp lete improvements to various other entranc es and mo nitors.
T his adjustment would b e c o vered by inc reased revenue pro jections .
AGENCY IDEALS AND ENDEAVORS:
Ideals and Endeavor II - Maintain An Enviro nment Committed To Elevated P ublic Servic e
(E) - Practice transparent & acc o untab le fis cal management
FISCAL IMPACT :
After a c o mp lete evaluation o f the Op erating and C apital Budgets thro ugh Dec emb er 2016, the net imp act o f
rec o mmend ed c hanges will res ult in an additio nal c o ntrib ution to Water Fund reserves of $86,000 at year end,
and a balanc ed Was tewater fund b udget with the exceptio n that $2,385,000 will b e b o rrowed fro m Was tewater
reserves to fac ilitate the ongo ing effo rts fo r the Sterling Natural Res o urc e Center until permanent fund ing can b e
s ec ured.
ATTACHMENTS:
Description Type
Department Budget Reports Backup Material
Mid-Year Budge t Presentation Presentation
CIP Final Statement Mid-Year Backup Material
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
Revenue
4100 - Water Sales 13,500,000.00 8,476,798.54 300,000.00 13,800,000.00
4200 - Meter Charges 8,960,000.00 4,430,661.19 (50,000.00) 8,910,000.00
4301 - Penalties 685,000.00 317,496.26 - 685,000.00
4400 - Wastewater Collection 4,460,000.00 2,423,519.41 - 4,460,000.00
4500 - Wastewater Treatment 7,610,000.00 4,121,853.80 - 7,610,000.00
4600 - Other Operating Charges 360,000.00 524,221.21 180,000.00 540,000.00
4700 - Investment Income 97,000.00 42,951.97 - 97,000.00
4703 - Energy Incentive Rebates 45,000.00 35,179.76 - 45,000.00
4704 - Miscellaneous Revenue - - - -
35,717,000.00 20,372,682.14 430,000.00 36,147,000.00 1.20%
Program: 1000 - Board of Directors
d of 51 - Labor 105,000.00 50,572.25 - 105,000.00
d of 52 - Temporary Labor - - - -
d of 53 - Overtime - - - -
d of 54 - Standby - - - -
d of 56 - Benefits 41,000.00 2,820.36 - 41,000.00
d of 61 - Water Supply - - - -
d of 62 - Materials and Supplies 1,000.00 - - 1,000.00
d of 63 - Contract Services 11,000.00 1,510.00 - 11,000.00
d of 64 - Utilities - - - -
d of 65 - Professional Development 55,000.00 11,706.18 - 55,000.00
d of 67 - Other - - - -
d of Total 213,000.00 66,608.79 - 213,000.00 0.00%
Program: 2000 - General Administration
ral A51 - Labor 651,000.00 258,431.91 (80,000.00) 571,000.00
ral A52 - Temporary Labor - - - -
ral A53 - Overtime - 1,186.76 - -
ral A54 - Standby - - - -
ral A56 - Benefits 266,000.00 120,251.64 (10,000.00) 256,000.00
ral A61 - Water Supply - - - -
ral A62 - Materials and Supplies 10,000.00 2,030.75 - 10,000.00
ral A63 - Contract Services 300,000.00 178,239.78 36,600.00 336,600.00
ral A64 - Utilities 5,000.00 1,448.33 - 5,000.00
ral A65 - Professional Development 117,000.00 77,501.40 - 117,000.00
ral A67 - Other - - - -
ral A Total 1,349,000.00 639,090.57 (53,400.00) 1,295,600.00 -3.96%
Program: 2100 - Human Resources
an R51 - Labor 201,000.00 105,475.70 - 201,000.00
an R52 - Temporary Labor 12,000.00 6,720.64 - 12,000.00
an R53 - Overtime 3,000.00 1,337.05 - 3,000.00
an R54 - Standby - - - -
an R56 - Benefits 84,000.00 51,835.24 20,000.00 104,000.00
an R61 - Water Supply - - - -
an R62 - Materials and Supplies 7,000.00 365.12 - 7,000.00
an R63 - Contract Services 96,000.00 42,311.93 (1,700.00) 94,300.00
an R64 - Utilities 1,000.00 244.14 - 1,000.00
an R65 - Professional Development 34,000.00 20,306.15 - 34,000.00
an R67 - Other 297,000.00 244,753.94 - 297,000.00
an R Total 735,000.00 473,349.91 18,300.00 753,300.00 2.49%
DISTRICT WIDE
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
DISTRICT WIDE
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 2200 - Public Affairs
c Aff51 - Labor 296,000.00 143,941.20 (18,000.00) 278,000.00
c Aff52 - Temporary Labor - 684.00 - -
c Aff53 - Overtime 7,000.00 3,328.19 - 7,000.00
c Aff54 - Standby - - - -
c Aff56 - Benefits 106,000.00 47,272.97 (10,000.00) 96,000.00
c Aff61 - Water Supply - - - -
c Aff62 - Materials and Supplies 165,000.00 54,593.28 - 165,000.00
c Aff63 - Contract Services 401,000.00 61,060.33 (304,530.00) 96,470.00
c Aff64 - Utilities 23,000.00 17,761.73 - 23,000.00
c Aff65 - Professional Development 20,000.00 4,371.35 - 20,000.00
c Aff67 - Other - - - -
c Aff Total 1,018,000.00 333,013.05 (332,530.00) 685,470.00 -32.67%
Program: 2300 - Conservation
erva51 - Labor 102,000.00 98,721.80 96,000.00 198,000.00
erva52 - Temporary Labor - 4,284.00 - -
erva53 - Overtime 8,000.00 1,692.39 - 8,000.00
erva54 - Standby - - - -
erva56 - Benefits 31,000.00 19,621.12 8,000.00 39,000.00
erva61 - Water Supply - - - -
erva62 - Materials and Supplies 524,000.00 132,102.33 - 524,000.00
erva63 - Contract Services 303,000.00 22,447.48 (850.00) 302,150.00
erva64 - Utilities 41,000.00 555.71 - 41,000.00
erva65 - Professional Development 12,000.00 720.43 - 12,000.00
erva67 - Other - - - -
erva Total 1,021,000.00 280,145.26 103,150.00 1,124,150.00 10.10%
Program: 3000 - Finance
ce 51 - Labor 640,000.00 315,570.68 - 640,000.00
ce 52 - Temporary Labor 14,000.00 19,912.85 - 14,000.00
ce 53 - Overtime 3,000.00 4,423.51 - 3,000.00
ce 54 - Standby - - - -
ce 56 - Benefits 255,000.00 141,088.82 - 255,000.00
ce 61 - Water Supply - - - -
ce 62 - Materials and Supplies 6,000.00 4,081.03 - 6,000.00
ce 63 - Contract Services 141,000.00 180,086.82 88,550.00 229,550.00
ce 64 - Utilities 4,000.00 1,415.32 - 4,000.00
ce 65 - Professional Development 24,000.00 5,921.19 - 24,000.00
ce 67 - Other 1,000.00 567.92 - 1,000.00
ce Total 1,088,000.00 673,068.14 88,550.00 1,176,550.00 8.14%
Program: 3200 - Information Technology
matio51 - Labor 290,000.00 155,037.10 - 290,000.00
matio52 - Temporary Labor - - - -
matio53 - Overtime - - - -
matio54 - Standby - - - -
matio56 - Benefits 104,000.00 46,520.84 - 104,000.00
matio61 - Water Supply - - - -
matio62 - Materials and Supplies 30,000.00 27,719.09 (1,700.00) 28,300.00
matio63 - Contract Services 322,000.00 108,899.84 - 322,000.00
matio64 - Utilities 5,000.00 2,222.35 - 5,000.00
matio65 - Professional Development 23,000.00 7,924.94 - 23,000.00
matio67 - Other - - - -
matio Total 774,000.00 348,324.16 (1,700.00) 772,300.00 -0.22%
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
DISTRICT WIDE
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 3300 - Customer Service
me 51 - Labor 483,000.00 222,093.14 (20,000.00) 463,000.00
me 52 - Temporary Labor 3,000.00 9,567.60 - 3,000.00
me 53 - Overtime 5,000.00 1,616.26 - 5,000.00
me 54 - Standby - - - -
me 56 - Benefits 234,000.00 114,998.45 - 234,000.00
me 61 - Water Supply - - - -
me 62 - Materials and Supplies 6,000.00 2,459.58 - 6,000.00
me 63 - Contract Services 828,000.00 404,552.78 (10,820.00) 817,180.00
me 64 - Utilities 153,000.00 45,418.41 - 153,000.00
me 65 - Professional Development 18,000.00 1,293.22 - 18,000.00
me 67 - Other - (93.99) - -
me Total 1,730,000.00 801,905.45 (30,820.00) 1,699,180.00 -1.78%
Program: 3400 - Meter Service
Se 51 - Labor 210,000.00 115,705.06 - 210,000.00
Se 52 - Temporary Labor - - - -
Se 53 - Overtime 20,000.00 4,553.63 - 20,000.00
Se 54 - Standby - - - -
Se 56 - Benefits 104,000.00 50,772.71 - 104,000.00
Se 61 - Water Supply - - - -
Se 62 - Materials and Supplies 4,000.00 183.85 - 4,000.00
Se 63 - Contract Services 8,000.00 6,702.29 - 8,000.00
Se 64 - Utilities 2,000.00 457.14 - 2,000.00
Se 65 - Professional Development - - - -
eer 67 - Other - - - -
eer Total 348,000.00 178,374.68 - 348,000.00 0.00%
Program: 4000 - Engineering
eer 51 - Labor 549,000.00 320,257.03 50,000.00 599,000.00
eer 52 - Temporary Labor - 605.00 - -
eer 53 - Overtime 2,000.00 2,022.63 - 2,000.00
eer 54 - Standby - - - -
eer 56 - Benefits 272,000.00 135,097.44 - 272,000.00
eer 61 - Water Supply - - - -
eer 62 - Materials and Supplies 23,000.00 2,873.85 - 23,000.00
eer 63 - Contract Services 223,000.00 98,330.47 (5,100.00) 217,900.00
eer 64 - Utilities 123,000.00 20,750.91 - 123,000.00
eer 65 - Professional Development 27,000.00 2,771.04 - 27,000.00
eer 67 - Other - - - -
eer Total 1,219,000.00 582,708.37 44,900.00 1,263,900.00 3.68%
Program: 5000 - Water Production
r Pr 51 - Labor 626,000.00 333,464.97 - 626,000.00
r Pr 52 - Temporary Labor - - - -
r Pr 53 - Overtime 36,000.00 26,120.06 - 36,000.00
r Pr 54 - Standby 15,000.00 7,880.00 - 15,000.00
r Pr 56 - Benefits 239,000.00 141,490.60 45,000.00 284,000.00
r Pr 61 - Water Supply 1,245,000.00 461,966.41 (308,000.00) 937,000.00
r Pr 62 - Materials and Supplies 279,000.00 78,491.79 - 279,000.00
r Pr 63 - Contract Services 341,000.00 61,742.83 - 341,000.00
r Pr 64 - Utilities 1,614,000.00 806,242.53 (1,150.00) 1,612,850.00
r Pr 65 - Professional Development 9,000.00 5,171.84 - 9,000.00
r Pr 67 - Other - - - -
r Pr Total 4,404,000.00 1,922,571.03 (264,150.00) 4,139,850.00 -6.00%
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
DISTRICT WIDE
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 5100 - Water Treatment
r Tre51 - Labor 217,000.00 114,511.70 - 217,000.00
r Tre52 - Temporary Labor - - - -
r Tre53 - Overtime 10,000.00 6,840.16 - 10,000.00
r Tre54 - Standby - - - -
r Tre56 - Benefits 69,000.00 48,314.14 - 69,000.00
r Tre61 - Water Supply - - - -
r Tre62 - Materials and Supplies 165,000.00 109,253.44 - 165,000.00
r Tre63 - Contract Services 166,000.00 50,981.42 - 166,000.00
r Tre64 - Utilities 200,000.00 57,532.05 - 200,000.00
r Tre65 - Professional Development - - - -
r Tre67 - Other - - - -
r Tre Total 827,000.00 387,432.91 - 827,000.00 0.00%
Program: 5200 - Water Quality
r Qu51 - Labor 162,000.00 85,276.97 - 162,000.00
r Qu52 - Temporary Labor - - - -
r Qu53 - Overtime 4,000.00 3,630.51 - 4,000.00
r Qu54 - Standby - - - -
r Qu56 - Benefits 60,000.00 33,381.66 - 60,000.00
r Qu61 - Water Supply - - - -
r Qu62 - Materials and Supplies 18,000.00 2,329.32 - 18,000.00
r Qu63 - Contract Services 161,000.00 60,123.07 - 161,000.00
r Qu64 - Utilities 2,000.00 295.73 - 2,000.00
r Qu65 - Professional Development - - - -
r Qu67 - Other - - - -
r Qu Total 407,000.00 185,037.26 - 407,000.00 0.00%
Program: 6000 - Field Maintenance Administration
Mai 51 - Labor 105,000.00 57,311.74 - 105,000.00
Mai 52 - Temporary Labor - - - -
Mai 53 - Overtime - - - -
Mai 54 - Standby 20,000.00 11,684.56 - 20,000.00
Mai 56 - Benefits 42,000.00 21,495.28 - 42,000.00
Mai 61 - Water Supply - - - -
Mai 62 - Materials and Supplies 3,000.00 838.38 - 3,000.00
Mai 63 - Contract Services - - - -
Mai 64 - Utilities 21,000.00 7,777.94 - 21,000.00
Mai 65 - Professional Development 25,000.00 7,737.35 - 25,000.00
Mai 67 - Other - - - -
Mai Total 216,000.00 106,845.25 - 216,000.00 0.00%
Program: 6100 - Water Maintenance
r Ma51 - Labor 727,000.00 363,474.89 - 727,000.00
r Ma52 - Temporary Labor - - - -
r Ma53 - Overtime 150,000.00 97,126.91 - 150,000.00
r Ma54 - Standby - - - -
r Ma56 - Benefits 316,000.00 201,467.41 - 316,000.00
r Ma61 - Water Supply - - - -
r Ma62 - Materials and Supplies 232,000.00 169,769.69 - 232,000.00
r Ma63 - Contract Services 334,000.00 133,578.14 - 334,000.00
r Ma64 - Utilities - 48,800.88 - -
r Ma65 - Professional Development - - - -
r Ma67 - Other - - - -
r Ma Total 1,759,000.00 1,014,217.92 - 1,759,000.00 0.00%
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
DISTRICT WIDE
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 6200 - Wastewater Maintenance
ewa 51 - Labor 242,000.00 170,743.48 60,000.00 302,000.00
ewa 52 - Temporary Labor - - - -
ewa 53 - Overtime 3,000.00 1,592.72 - 3,000.00
ewa 54 - Standby - - - -
ewa 56 - Benefits 115,000.00 16,946.16 (60,000.00) 55,000.00
ewa 61 - Water Supply - - - -
ewa 62 - Materials and Supplies 32,000.00 14,091.85 - 32,000.00
ewa 63 - Contract Services 7,841,000.00 4,132,908.27 (1,150.00) 7,839,850.00
ewa 64 - Utilities - - - -
ewa 65 - Professional Development - - - -
ewa 67 - Other - - - -
ewa Total 8,233,000.00 4,336,282.48 (1,150.00) 8,231,850.00 -0.01%
Program: 7000 - Facilities Maintenance
ties 51 - Labor 89,000.00 48,900.69 - 89,000.00
ties 52 - Temporary Labor - - - -
ties 53 - Overtime 25,000.00 14,045.80 - 25,000.00
ties 54 - Standby - - - -
ties 56 - Benefits 37,000.00 27,137.17 - 37,000.00
ties 61 - Water Supply - - - -
ties 62 - Materials and Supplies 42,000.00 21,012.22 - 42,000.00
ties 63 - Contract Services 390,000.00 198,421.35 (1,150.00) 388,850.00
ties 64 - Utilities 221,000.00 87,399.04 - 221,000.00
ties 65 - Professional Development - - - -
ties 67 - Other - - - -
ties Total 804,000.00 396,916.27 (1,150.00) 802,850.00 -0.14%
Program: 7100 - Fleet Maintenance
Mai 51 - Labor 151,000.00 84,639.39 - 151,000.00
Mai 52 - Temporary Labor - - - -
Mai 53 - Overtime 3,000.00 657.45 - 3,000.00
Mai 54 - Standby - - - -
Mai 56 - Benefits 66,000.00 29,474.63 - 66,000.00
Mai 61 - Water Supply - - - -
Mai 62 - Materials and Supplies 69,000.00 47,292.68 - 69,000.00
Mai 63 - Contract Services 125,000.00 38,832.62 - 125,000.00
Mai 64 - Utilities 126,000.00 45,695.16 - 126,000.00
Mai 65 - Professional Development 5,000.00 1,728.00 - 5,000.00
Mai 67 - Other - - - -
Mai Total 545,000.00 248,319.93 - 545,000.00 0.00%
Total Operating Expenses 26,690,000.00 12,974,211.43 (430,000.00) 26,260,000.00
Other Expenses
al 71 - Debt Service 4,324,000.00 2,788,012.37 - 4,324,000.00
al 81 - Capital Improvement 3,425,000.00 2,312,753.97 2,857,000.00 6,282,000.00
al 82 - Capital Outlay 743,000.00 537,756.00 302,000.00 1,045,000.00
al 88 - Transfer from Reserves 535,000.00 - (2,299,000.00) (1,764,000.00)
al Total 9,027,000.00 5,638,522.34 860,000.00 9,887,000.00 9.53%
Net - 1,759,948.37 - -
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
Revenue
4100 - Water Sales 13,500,000.00 8,476,798.54 300,000.00 13,800,000.00
4200 - Meter Charges 8,960,000.00 4,430,661.19 (50,000.00) 8,910,000.00
4301 - Penalties 635,000.00 295,894.84 (120,000.00) 515,000.00
4400 - Wastewater Collection -
4500 - Wastewater Treatment -
4600 - Other Operating Charges 170,000.00 470,332.25 300,000.00 470,000.00
4700 - Investment Income 75,000.00 33,160.64 75,000.00
4703 - Energy Incentive Rebates 45,000.00 35,179.76 45,000.00
4704 - Miscellaneous Revenue - - -
23,385,000.00 13,742,027.22 430,000.00 23,815,000.00 1.84%
Program: 1000 - Board of Directors
d of 51 - Labor 73,500.00 35,400.52 - 73,500.00
d of 52 - Temporary Labor - - - -
d of 53 - Overtime - - - -
d of 54 - Standby - - - -
d of 56 - Benefits 28,700.00 1,985.73 - 28,700.00
d of 61 - Water Supply - - - -
d of 62 - Materials and Supplies 700.00 - - 700.00
d of 63 - Contract Services 7,700.00 1,057.00 - 7,700.00
d of 64 - Utilities - - - -
d of 65 - Professional Development 38,500.00 8,958.29 - 38,500.00
d of 67 - Other - - - -
d of Total 149,100.00 47,401.54 - 149,100.00 0.00%
Program: 2000 - General Administration
ral A51 - Labor 455,700.00 181,047.80 (50,000.00) 405,700.00
ral A52 - Temporary Labor - - - -
ral A53 - Overtime - 830.75 - -
ral A54 - Standby - - - -
ral A56 - Benefits 186,200.00 91,017.40 - 186,200.00
ral A61 - Water Supply - - - -
ral A62 - Materials and Supplies 7,000.00 1,379.52 - 7,000.00
ral A63 - Contract Services 210,000.00 123,967.85 36,600.00 246,600.00
ral A64 - Utilities 3,500.00 1,013.81 - 3,500.00
ral A65 - Professional Development 81,900.00 54,250.98 - 81,900.00
ral A67 - Other - - - -
ral A Total 944,300.00 453,508.11 (13,400.00) 930,900.00 -1.42%
Program: 2100 - Human Resources
an R51 - Labor 140,700.00 73,833.00 - 140,700.00
an R52 - Temporary Labor 8,400.00 4,704.45 - 8,400.00
an R53 - Overtime 2,100.00 935.93 - 2,100.00
an R54 - Standby - - - -
an R56 - Benefits 58,800.00 37,196.76 16,000.00 74,800.00
an R61 - Water Supply - - - -
an R62 - Materials and Supplies 4,900.00 255.58 - 4,900.00
an R63 - Contract Services 67,200.00 29,618.31 (1,700.00) 65,500.00
an R64 - Utilities 700.00 170.92 - 700.00
an R65 - Professional Development 23,800.00 14,738.44 - 23,800.00
an R67 - Other 207,900.00 171,327.74 - 207,900.00
an R Total 514,500.00 332,781.13 14,300.00 528,800.00 2.78%
WATER FUND
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
WATER FUND
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 2200 - Public Affairs
c Aff51 - Labor 148,000.00 80,477.01 - 148,000.00
c Aff52 - Temporary Labor - 478.80 - -
c Aff53 - Overtime 3,500.00 1,842.25 - 3,500.00
c Aff54 - Standby - - - -
c Aff56 - Benefits 53,000.00 29,354.27 - 53,000.00
c Aff61 - Water Supply - - - -
c Aff62 - Materials and Supplies 82,500.00 15,628.85 - 82,500.00
c Aff63 - Contract Services 200,600.00 28,585.96 (153,530.00) 47,070.00
c Aff64 - Utilities 11,500.00 8,846.99 - 11,500.00
c Aff65 - Professional Development 10,000.00 2,182.89 - 10,000.00
c Aff67 - Other - - - -
c Aff Total 509,100.00 167,397.02 (153,530.00) 355,570.00 -30.16%
Program: 2300 - Conservation
erva51 - Labor 102,000.00 98,721.80 96,000.00 198,000.00
erva52 - Temporary Labor - 4,284.00 - -
erva53 - Overtime 8,000.00 1,692.39 - 8,000.00
erva54 - Standby - - - -
erva56 - Benefits 31,000.00 19,621.12 8,000.00 39,000.00
erva61 - Water Supply - - - -
erva62 - Materials and Supplies 524,000.00 132,102.33 - 524,000.00
erva63 - Contract Services 303,000.00 22,447.48 (850.00) 302,150.00
erva64 - Utilities 41,000.00 555.71 - 41,000.00
erva65 - Professional Development 12,000.00 720.43 - 12,000.00
erva67 - Other - - - -
erva Total 1,021,000.00 280,145.26 103,150.00 1,124,150.00 10.10%
Program: 3000 - Finance
ce 51 - Labor 448,000.00 221,087.78 - 448,000.00
ce 52 - Temporary Labor 9,800.00 13,939.00 - 9,800.00
ce 53 - Overtime 2,100.00 3,333.24 - 2,100.00
ce 54 - Standby - - - -
ce 56 - Benefits 178,500.00 98,815.23 - 178,500.00
ce 61 - Water Supply - - - -
ce 62 - Materials and Supplies 4,200.00 2,856.73 - 4,200.00
ce 63 - Contract Services 98,700.00 87,458.59 26,100.00 124,800.00
ce 64 - Utilities 2,800.00 990.73 - 2,800.00
ce 65 - Professional Development 16,800.00 4,144.82 - 16,800.00
ce 67 - Other 1,000.00 567.92 - 1,000.00
ce Total 761,900.00 433,194.04 26,100.00 788,000.00 3.43%
Program: 3200 - Information Technology
matio51 - Labor 203,000.00 106,463.82 - 203,000.00
matio52 - Temporary Labor - - - -
matio53 - Overtime - - - -
matio54 - Standby - - - -
matio56 - Benefits 72,800.00 30,231.55 - 72,800.00
matio61 - Water Supply - - - -
matio62 - Materials and Supplies 21,000.00 21,182.08 (1,700.00) 19,300.00
matio63 - Contract Services 225,400.00 76,261.43 - 225,400.00
matio64 - Utilities 3,500.00 1,555.64 - 3,500.00
matio65 - Professional Development 16,100.00 5,547.46 - 16,100.00
matio67 - Other - - - -
matio Total 541,800.00 241,241.98 (1,700.00) 540,100.00 -0.31%
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
WATER FUND
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 3300 - Customer Service
me 51 - Labor 338,100.00 152,205.71 (20,000.00) 318,100.00
me 52 - Temporary Labor 2,100.00 6,697.32 - 2,100.00
me 53 - Overtime 3,500.00 1,131.38 - 3,500.00
me 54 - Standby - - - -
me 56 - Benefits 163,800.00 74,761.53 - 163,800.00
me 61 - Water Supply - - - -
me 62 - Materials and Supplies 4,200.00 1,721.70 - 4,200.00
me 63 - Contract Services 693,000.00 335,831.22 (7,320.00) 685,680.00
me 64 - Utilities 107,100.00 31,792.88 - 107,100.00
me 65 - Professional Development 12,900.00 1,261.81 - 12,900.00
me 67 - Other - (83.99) - -
me Total 1,324,700.00 605,319.56 (27,320.00) 1,297,380.00 -2.06%
Program: 3400 - Meter Service
Se 51 - Labor 210,000.00 115,705.06 - 210,000.00
Se 52 - Temporary Labor - - - -
Se 53 - Overtime 20,000.00 4,553.63 - 20,000.00
Se 54 - Standby - - - -
Se 56 - Benefits 104,000.00 44,092.24 - 104,000.00
Se 61 - Water Supply - - - -
Se 62 - Materials and Supplies 4,000.00 183.85 - 4,000.00
Se 63 - Contract Services 8,000.00 6,702.29 - 8,000.00
Se 64 - Utilities 2,000.00 457.14 - 2,000.00
Se 65 - Professional Development - - - -
eer 67 - Other - - - -
eer Total 348,000.00 171,694.21 - 348,000.00 0.00%
Program: 4000 - Engineering
eer 51 - Labor 377,200.00 218,613.73 50,000.00 427,200.00
eer 52 - Temporary Labor - 423.50 - -
eer 53 - Overtime 1,400.00 1,415.85 - 1,400.00
eer 54 - Standby - - - -
eer 56 - Benefits 190,400.00 94,441.40 - 190,400.00
eer 61 - Water Supply - - - -
eer 62 - Materials and Supplies 16,100.00 2,740.11 - 16,100.00
eer 63 - Contract Services 156,100.00 78,654.97 (3,550.00) 152,550.00
eer 64 - Utilities 86,100.00 8,394.31 - 86,100.00
eer 65 - Professional Development 18,900.00 2,540.98 - 18,900.00
eer 67 - Other - - - -
eer Total 846,200.00 407,224.85 46,450.00 892,650.00 5.49%
Program: 5000 - Water Production
r Pr 51 - Labor 626,000.00 333,464.97 - 626,000.00
r Pr 52 - Temporary Labor - - - -
r Pr 53 - Overtime 36,000.00 26,120.06 - 36,000.00
r Pr 54 - Standby 15,000.00 7,880.00 - 15,000.00
r Pr 56 - Benefits 239,000.00 141,490.60 45,000.00 284,000.00
r Pr 61 - Water Supply 1,245,000.00 461,966.41 (308,000.00) 937,000.00
r Pr 62 - Materials and Supplies 279,000.00 78,491.79 - 279,000.00
r Pr 63 - Contract Services 341,000.00 61,742.83 - 341,000.00
r Pr 64 - Utilities 1,614,000.00 806,242.53 (1,150.00) 1,612,850.00
r Pr 65 - Professional Development 9,000.00 5,171.84 - 9,000.00
r Pr 67 - Other - - - -
r Pr Total 4,404,000.00 1,922,571.03 (264,150.00) 4,139,850.00 -6.00%
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
WATER FUND
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 5100 - Water Treatment
r Tre51 - Labor 217,000.00 114,511.70 - 217,000.00
r Tre52 - Temporary Labor - - - -
r Tre53 - Overtime 10,000.00 6,840.16 - 10,000.00
r Tre54 - Standby - - - -
r Tre56 - Benefits 69,000.00 48,314.14 - 69,000.00
r Tre61 - Water Supply - - - -
r Tre62 - Materials and Supplies 165,000.00 109,253.44 - 165,000.00
r Tre63 - Contract Services 166,000.00 50,981.42 - 166,000.00
r Tre64 - Utilities 200,000.00 57,532.05 - 200,000.00
r Tre65 - Professional Development - - - -
r Tre67 - Other - - - -
r Tre Total 827,000.00 387,432.91 - 827,000.00 0.00%
Program: 5200 - Water Quality
r Qu51 - Labor 162,000.00 85,276.97 - 162,000.00
r Qu52 - Temporary Labor - - - -
r Qu53 - Overtime 4,000.00 3,630.51 - 4,000.00
r Qu54 - Standby - - - -
r Qu56 - Benefits 60,000.00 33,381.66 - 60,000.00
r Qu61 - Water Supply - - - -
r Qu62 - Materials and Supplies 18,000.00 2,329.32 - 18,000.00
r Qu63 - Contract Services 161,000.00 60,123.07 - 161,000.00
r Qu64 - Utilities 2,000.00 295.73 - 2,000.00
r Qu65 - Professional Development - - - -
r Qu67 - Other - - - -
r Qu Total 407,000.00 185,037.26 - 407,000.00 0.00%
Program: 6000 - Field Maintenance Administration
Mai 51 - Labor 94,500.00 47,542.42 - 94,500.00
Mai 52 - Temporary Labor - - - -
Mai 53 - Overtime - - - -
Mai 54 - Standby 18,000.00 10,128.56 - 18,000.00
Mai 56 - Benefits 37,800.00 15,066.74 - 37,800.00
Mai 61 - Water Supply - - - -
Mai 62 - Materials and Supplies 2,700.00 828.57 - 2,700.00
Mai 63 - Contract Services - - - -
Mai 64 - Utilities 18,900.00 7,000.15 - 18,900.00
Mai 65 - Professional Development 22,500.00 7,025.66 - 22,500.00
Mai 67 - Other - - - -
Mai Total 194,400.00 87,592.10 - 194,400.00 0.00%
Program: 6100 - Water Maintenance
r Ma51 - Labor 727,000.00 363,630.89 - 727,000.00
r Ma52 - Temporary Labor - - - -
r Ma53 - Overtime 150,000.00 97,126.91 - 150,000.00
r Ma54 - Standby - - - -
r Ma56 - Benefits 316,000.00 201,467.41 - 316,000.00
r Ma61 - Water Supply - - - -
r Ma62 - Materials and Supplies 232,000.00 169,769.69 - 232,000.00
r Ma63 - Contract Services 334,000.00 133,578.14 - 334,000.00
r Ma64 - Utilities - 48,665.88 - -
r Ma65 - Professional Development - - - -
r Ma67 - Other - - - -
r Ma Total 1,759,000.00 1,014,238.92 - 1,759,000.00 0.00%
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
WATER FUND
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 6200 - Wastewater Maintenance
ewa 51 - Labor - - - -
ewa 52 - Temporary Labor - - - -
ewa 53 - Overtime - - - -
ewa 54 - Standby - - - -
ewa 56 - Benefits - - - -
ewa 61 - Water Supply - - - -
ewa 62 - Materials and Supplies - - - -
ewa 63 - Contract Services - - - -
ewa 64 - Utilities - - - -
ewa 65 - Professional Development - - - -
ewa 67 - Other - - - -
ewa Total - - - - #DIV/0!
Program: 7000 - Facilities Maintenance
ties 51 - Labor 62,300.00 42,432.78 - 62,300.00
ties 52 - Temporary Labor - - - -
ties 53 - Overtime 17,500.00 11,813.21 - 17,500.00
ties 54 - Standby - - - -
ties 56 - Benefits 25,900.00 20,568.43 - 25,900.00
ties 61 - Water Supply - - - -
ties 62 - Materials and Supplies 33,900.00 15,979.04 - 33,900.00
ties 63 - Contract Services 306,600.00 172,664.32 (1,150.00) 305,450.00
ties 64 - Utilities 159,200.00 61,498.00 - 159,200.00
ties 65 - Professional Development - - - -
ties 67 - Other - - - -
ties Total 605,400.00 324,955.78 (1,150.00) 604,250.00 -0.19%
Program: 7100 - Fleet Maintenance
Mai 51 - Labor 135,900.00 73,994.48 - 135,900.00
Mai 52 - Temporary Labor - - - -
Mai 53 - Overtime 2,700.00 518.63 - 2,700.00
Mai 54 - Standby - - - -
Mai 56 - Benefits 59,400.00 24,508.85 - 59,400.00
Mai 61 - Water Supply - - - -
Mai 62 - Materials and Supplies 62,100.00 40,917.65 - 62,100.00
Mai 63 - Contract Services 112,500.00 34,151.95 - 112,500.00
Mai 64 - Utilities 113,400.00 41,125.66 - 113,400.00
Mai 65 - Professional Development 4,500.00 1,555.20 - 4,500.00
Mai 67 - Other - - - -
Mai Total 490,500.00 216,772.42 - 490,500.00 0.00%
Total Operating Expenses 15,647,900.00 7,278,508.12 (271,250.00) 15,376,650.00
Other Expenses
al 71 - Debt Service 4,007,000.00 2,581,249.87 - 4,007,000.00
al 81 - Capital Improvement 2,780,000.00 1,056,347.20 401,000.00 3,181,000.00
al 82 - Capital Outlay 515,000.00 310,165.00 214,250.00 729,250.00
al 88 - Transfer to Reserves 435,100.00 - 86,000.00 521,100.00
al Total 7,737,100.00 3,947,762.07 701,250.00 8,438,350.00 9.06%
Net - 2,515,757.03 - -
`
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
Revenue
4100 - Water Sales -
4200 - Meter Charges -
4301 - Penalties 50,000.00 21,601.42 120,000.00 170,000.00
4400 - Wastewater Collection 4,460,000.00 2,423,519.41 4,460,000.00
4500 - Wastewater Treatment 7,610,000.00 4,121,853.80 7,610,000.00
4600 - Other Operating Charges 190,000.00 53,888.96 (120,000.00) 70,000.00
4700 - Investment Income 22,000.00 9,791.33 22,000.00
4703 - Energy Incentive Rebates - -
4704 - Miscellaneous Revenue - -
12,332,000.00 6,630,654.92 12,332,000.00 0.00%
Program: 1000 - Board of Directors
d of 51 - Labor 31,500.00 15,171.73 - 31,500.00
d of 52 - Temporary Labor - - - -
d of 53 - Overtime - - - -
d of 54 - Standby - - - -
d of 56 - Benefits 12,300.00 834.63 - 12,300.00
d of 61 - Water Supply - - - -
d of 62 - Materials and Supplies 300.00 - - 300.00
d of 63 - Contract Services 3,300.00 453.00 - 3,300.00
d of 64 - Utilities - - - -
d of 65 - Professional Development 16,500.00 2,747.89 - 16,500.00
d of 67 - Other - - - -
d of Total 63,900.00 19,207.25 - 63,900.00 0.00%
Program: 2000 - General Administration
ral A51 - Labor 195,300.00 77,384.11 (30,000.00) 165,300.00
ral A52 - Temporary Labor - - - -
ral A53 - Overtime - 356.01 - -
ral A54 - Standby - - - -
ral A56 - Benefits 79,800.00 29,234.24 (10,000.00) 69,800.00
ral A61 - Water Supply - - - -
ral A62 - Materials and Supplies 3,000.00 651.23 - 3,000.00
ral A63 - Contract Services 90,000.00 54,271.93 - 90,000.00
ral A64 - Utilities 1,500.00 434.52 - 1,500.00
ral A65 - Professional Development 35,100.00 23,250.42 - 35,100.00
ral A67 - Other - - - -
ral A Total 404,700.00 185,582.46 (40,000.00) 364,700.00 -9.88%
Program: 2100 - Human Resources
an R51 - Labor 60,300.00 31,642.70 - 60,300.00
an R52 - Temporary Labor 3,600.00 2,016.19 - 3,600.00
an R53 - Overtime 900.00 401.12 - 900.00
an R54 - Standby - - - -
an R56 - Benefits 25,200.00 14,638.48 4,000.00 29,200.00
an R61 - Water Supply - - - -
an R62 - Materials and Supplies 2,100.00 109.54 - 2,100.00
an R63 - Contract Services 28,800.00 12,693.62 - 28,800.00
an R64 - Utilities 300.00 73.22 - 300.00
an R65 - Professional Development 10,200.00 5,567.71 - 10,200.00
an R67 - Other 89,100.00 73,426.20 - 89,100.00
an R Total 220,500.00 140,568.78 4,000.00 224,500.00 1.81%
WASTEWATER FUND
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
`
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
WASTEWATER FUND
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 2200 - Public Affairs
c Aff51 - Labor 148,000.00 63,464.19 (18,000.00) 130,000.00
c Aff52 - Temporary Labor - 205.20 - -
c Aff53 - Overtime 3,500.00 1,485.94 - 3,500.00
c Aff54 - Standby - - - -
c Aff56 - Benefits 53,000.00 17,918.70 (10,000.00) 43,000.00
c Aff61 - Water Supply - - - -
c Aff62 - Materials and Supplies 82,500.00 38,964.43 - 82,500.00
c Aff63 - Contract Services 200,400.00 32,474.37 (151,000.00) 49,400.00
c Aff64 - Utilities 11,500.00 8,914.74 - 11,500.00
c Aff65 - Professional Development 10,000.00 2,188.46 - 10,000.00
c Aff67 - Other - - - -
c Aff Total 508,900.00 165,616.03 (179,000.00) 329,900.00 -35.17%
Program: 2300 - Conservation
erva51 - Labor - - - -
erva52 - Temporary Labor - - - -
erva53 - Overtime - - - -
erva54 - Standby - - - -
erva56 - Benefits - - - -
erva61 - Water Supply - - - -
erva62 - Materials and Supplies - - - -
erva63 - Contract Services - - - -
erva64 - Utilities - - - -
erva65 - Professional Development - - - -
erva67 - Other - - - -
erva Total - - - - #DIV/0!
Program: 3000 - Finance
ce 51 - Labor 192,000.00 94,482.90 - 192,000.00
ce 52 - Temporary Labor 4,200.00 5,973.85 - 4,200.00
ce 53 - Overtime 900.00 1,090.27 - 900.00
ce 54 - Standby - - - -
ce 56 - Benefits 76,500.00 42,273.59 - 76,500.00
ce 61 - Water Supply - - - -
ce 62 - Materials and Supplies 1,800.00 1,224.30 - 1,800.00
ce 63 - Contract Services 42,300.00 92,628.23 62,450.00 104,750.00
ce 64 - Utilities 1,200.00 424.59 - 1,200.00
ce 65 - Professional Development 7,200.00 1,776.37 - 7,200.00
ce 67 - Other - - - -
ce Total 326,100.00 239,874.10 62,450.00 388,550.00 19.15%
Program: 3200 - Information Technology
matio51 - Labor 87,000.00 48,573.28 - 87,000.00
matio52 - Temporary Labor - - - -
matio53 - Overtime - - - -
matio54 - Standby - - - -
matio56 - Benefits 31,200.00 16,289.29 - 31,200.00
matio61 - Water Supply - - - -
matio62 - Materials and Supplies 9,000.00 6,537.01 - 9,000.00
matio63 - Contract Services 96,600.00 32,638.41 - 96,600.00
matio64 - Utilities 1,500.00 666.71 - 1,500.00
matio65 - Professional Development 6,900.00 2,377.48 - 6,900.00
matio67 - Other - - - -
matio Total 232,200.00 107,082.18 - 232,200.00 0.00%
`
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
WASTEWATER FUND
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 3300 - Customer Service
me 51 - Labor 144,900.00 69,887.43 - 144,900.00
me 52 - Temporary Labor 900.00 2,870.28 - 900.00
me 53 - Overtime 1,500.00 484.88 - 1,500.00
me 54 - Standby - - - -
me 56 - Benefits 70,200.00 40,236.92 - 70,200.00
me 61 - Water Supply - - - -
me 62 - Materials and Supplies 1,800.00 737.88 - 1,800.00
me 63 - Contract Services 135,000.00 68,721.56 (3,500.00) 131,500.00
me 64 - Utilities 45,900.00 13,625.53 - 45,900.00
me 65 - Professional Development 5,100.00 31.41 - 5,100.00
me 67 - Other - (10.00) - -
me Total 405,300.00 196,585.89 (3,500.00) 401,800.00 -0.86%
Program: 3400 - Meter Service
Se 51 - Labor - - - -
Se 52 - Temporary Labor - - - -
Se 53 - Overtime - - - -
Se 54 - Standby - - - -
Se 56 - Benefits - 6,680.47 - -
Se 61 - Water Supply - - - -
Se 62 - Materials and Supplies - - - -
Se 63 - Contract Services - - - -
Se 64 - Utilities - - - -
Se 65 - Professional Development - - - -
eer 67 - Other - - - -
eer Total - 6,680.47 - - #DIV/0!
Program: 4000 - Engineering
eer 51 - Labor 171,800.00 101,643.30 - 171,800.00
eer 52 - Temporary Labor - 181.50 - -
eer 53 - Overtime 600.00 606.78 - 600.00
eer 54 - Standby - - - -
eer 56 - Benefits 81,600.00 40,656.04 - 81,600.00
eer 61 - Water Supply - - - -
eer 62 - Materials and Supplies 6,900.00 133.74 - 6,900.00
eer 63 - Contract Services 66,900.00 19,675.50 (1,550.00) 65,350.00
eer 64 - Utilities 36,900.00 12,356.60 - 36,900.00
eer 65 - Professional Development 8,100.00 230.06 - 8,100.00
eer 67 - Other - - - -
eer Total 372,800.00 175,483.52 (1,550.00) 371,250.00 -0.42%
Program: 5000 - Water Production
r Pr 51 - Labor - - - -
r Pr 52 - Temporary Labor - - - -
r Pr 53 - Overtime - - - -
r Pr 54 - Standby - - - -
r Pr 56 - Benefits - - - -
r Pr 61 - Water Supply - - - -
r Pr 62 - Materials and Supplies - - - -
r Pr 63 - Contract Services - - - -
r Pr 64 - Utilities - - - -
r Pr 65 - Professional Development - - - -
r Pr 67 - Other - - - -
r Pr Total - - - - #DIV/0!
`
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
WASTEWATER FUND
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 5100 - Water Treatment
r Tre51 - Labor - - - -
r Tre52 - Temporary Labor - - - -
r Tre53 - Overtime - - - -
r Tre54 - Standby - - - -
r Tre56 - Benefits - - - -
r Tre61 - Water Supply - - - -
r Tre62 - Materials and Supplies - - - -
r Tre63 - Contract Services - - - -
r Tre64 - Utilities - - - -
r Tre65 - Professional Development - - - -
r Tre67 - Other - - - -
r Tre Total - - - - #DIV/0!
Program: 5200 - Water Quality
r Qu51 - Labor - - - -
r Qu52 - Temporary Labor - - - -
r Qu53 - Overtime - - - -
r Qu54 - Standby - - - -
r Qu56 - Benefits - - - -
r Qu61 - Water Supply - - - -
r Qu62 - Materials and Supplies - - - -
r Qu63 - Contract Services - - - -
r Qu64 - Utilities - - - -
r Qu65 - Professional Development - - - -
r Qu67 - Other - - - -
r Qu Total - - - - #DIV/0!
Program: 6000 - Field Maintenance Administration
Mai 51 - Labor 10,500.00 9,769.32 - 10,500.00
Mai 52 - Temporary Labor - - - -
Mai 53 - Overtime - - - -
Mai 54 - Standby 2,000.00 1,556.00 - 2,000.00
Mai 56 - Benefits 4,200.00 6,428.54 - 4,200.00
Mai 61 - Water Supply - - - -
Mai 62 - Materials and Supplies 300.00 9.81 - 300.00
Mai 63 - Contract Services - - - -
Mai 64 - Utilities 2,100.00 777.79 - 2,100.00
Mai 65 - Professional Development 2,500.00 711.69 - 2,500.00
Mai 67 - Other - - - -
Mai Total 21,600.00 19,253.15 - 21,600.00 0.00%
Program: 6100 - Water Maintenance
r Ma51 - Labor - (156.00) - -
r Ma52 - Temporary Labor - - - -
r Ma53 - Overtime - - - -
r Ma54 - Standby - - - -
r Ma56 - Benefits - - - -
r Ma61 - Water Supply - - - -
r Ma62 - Materials and Supplies - - - -
r Ma63 - Contract Services - - - -
r Ma64 - Utilities - 135.00 - -
r Ma65 - Professional Development - - - -
r Ma67 - Other - - - -
r Ma Total - (21.00) - - #DIV/0!
`
FY 2016-17 Budget FY 2016-17 Percent
Budget YTD Activity Adjustment Projected Change
WASTEWATER FUND
FY 2016-17 MID-YEAR BUDGET REVIEW
JULY 1, 2016 - DECEMBER 31, 2016
Program: 6200 - Wastewater Maintenance
ewa 51 - Labor 242,000.00 170,743.48 60,000.00 302,000.00
ewa 52 - Temporary Labor - - - -
ewa 53 - Overtime 3,000.00 1,592.72 - 3,000.00
ewa 54 - Standby - - - -
ewa 56 - Benefits 115,000.00 16,946.16 (60,000.00) 55,000.00
ewa 61 - Water Supply - - - -
ewa 62 - Materials and Supplies 32,000.00 14,091.85 - 32,000.00
ewa 63 - Contract Services 7,841,000.00 4,132,908.27 (1,150.00) 7,839,850.00
ewa 64 - Utilities - - - -
ewa 65 - Professional Development - - - -
ewa 67 - Other - - - -
ewa Total 8,233,000.00 4,336,282.48 (1,150.00) 8,231,850.00 -0.01%
Program: 7000 - Facilities Maintenance
ties 51 - Labor 26,700.00 6,467.91 - 26,700.00
ties 52 - Temporary Labor - - - -
ties 53 - Overtime 7,500.00 2,232.59 - 7,500.00
ties 54 - Standby - - - -
ties 56 - Benefits 11,100.00 6,568.74 - 11,100.00
ties 61 - Water Supply - - - -
ties 62 - Materials and Supplies 8,100.00 5,033.18 - 8,100.00
ties 63 - Contract Services 83,400.00 25,757.03 - 83,400.00
ties 64 - Utilities 61,800.00 25,901.04 - 61,800.00
ties 65 - Professional Development - - - -
ties 67 - Other - - - -
ties Total 198,600.00 71,960.49 - 198,600.00 0.00%
Program: 7100 - Fleet Maintenance
Mai 51 - Labor 15,100.00 10,644.91 - 15,100.00
Mai 52 - Temporary Labor - - - -
Mai 53 - Overtime 300.00 138.82 - 300.00
Mai 54 - Standby - - - -
Mai 56 - Benefits 6,600.00 4,965.78 - 6,600.00
Mai 61 - Water Supply - - - -
Mai 62 - Materials and Supplies 6,900.00 6,375.03 - 6,900.00
Mai 63 - Contract Services 12,500.00 4,680.67 - 12,500.00
Mai 64 - Utilities 12,600.00 4,569.50 - 12,600.00
Mai 65 - Professional Development 500.00 172.80 - 500.00
Mai 67 - Other - - - -
Mai Total 54,500.00 31,547.51 - 54,500.00 0.00%
Total Operating Expenses 11,042,100.00 5,695,703.31 (158,750.00) 10,883,350.00
Other Expenses
al 71 - Debt Service 317,000.00 206,762.50 - 317,000.00
al 81 - Capital Improvement 645,000.00 1,256,406.77 2,456,000.00 3,101,000.00
al 82 - Capital Outlay 228,000.00 227,591.00 87,750.00 315,750.00
al 88 - Transfer to Reserves 99,900.00 - (2,385,000.00) (2,285,100.00)
al Total 1,289,900.00 1,690,760.27 158,750.00 1,448,650.00 12.31%
Net - (755,808.66) - -
OPERATING BUDGET REVIEW
FISCAL YEAR 2016-17
3EAST VALLEY WATER DISTRICT
WATER FUND SUMMARY
Revenue Budget YTD Actual Projected
Water Sales 13,500,000$ 8,476,799$ 13,800,000$
Meter Charges 8,960,000 4,430,661 8,910,000
Other Charges / Revenue 925,000 834,567 1,105,000
Total Revenue 23,385,000$ 13,742,027$ 23,815,000$
Expenses
Labor & Benefits 6,607,100$ 3,523,660$ 6,752,100$
Other Operating Expenses 9,040,800 3,754,848 8,624,550
Capital Expenditures 3,295,000 1,366,512 3,910,250
Debt Service 4,007,000 2,581,250 4,007,000
Transfer To Reserves 435,100 - 521,100
Total Expenses 23,385,000$ 11,226,270$ 23,815,000$
Net -$ 2,515,757$ -$
4EAST VALLEY WATER DISTRICT
WATER SALES ANALYSIS
By Tier Budget YTD Actual Projected
Tier 1 Sales 5,915,000$ 3,015,800$ 5,715,000$
Tier 2 Sales 4,878,000 3,616,563 5,278,000
Tier 3 Sales 2,707,000 1,844,435 2,807,000
By Customer Class Budget YTD Actual Projected
Residential SFR 7,784,000$ 4,776,071$ 7,804,000$
Multi Family 2,812,000 1,666,987 2,862,000
Commercial 1,146,000 694,195 1,226,000
Irrigation 1,758,000 1,339,546 1,908,000
5EAST VALLEY WATER DISTRICT
WASTEWATER FUND SUMMARY
Revenue Budget YTD Actual Projected
Collection System Charges 4,460,000$ 2,423,519$ 4,460,000$
Treatment Charges 7,610,000 4,121,854 7,610,000
Other Charges / Revenue 262,000 85,280 262,000
Total Revenue 12,332,000$ 6,630,653$ 12,332,000$
Expenses
Labor & Benefits 1,876,900$ 948,576$ 1,812,900$
Other Operating Expenses 9,165,200 4,747,125 9,070,450
Capital Expenditures 873,000 1,483,998 3,416,750
Debt Service 317,000 206,762 317,000
Transfer from Reserves 99,900 - (2,285,100)
Total Expenses 12,332,000$ 7,386,461$ 12,332,000$
Net -$ (755,808)$ -$
GOALS & OBJECTIVES
FISCAL YEAR 2016-17
GOVERNING BOARD
GOAL % COMPLETE
Conduct Board Evaluations 94
Increase Community Involvement 100
Address SNRC Agenda Items 33
Continue Efforts to Enhance District
Identity as a Regional Leader 83
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$213,000 $66,609 $213,000 0.00%
80%Average
Percent
Completion
7
GENERAL ADMINISTRATION
GOAL % COMPLETE
Preserve and Maintain NFWC Records 70
Dissolve City Creek Water Company 60
Maintain SNRC Financing/
Construction Documents 35
Promote Public Transparency
and Accountability 80
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$1,349,000 $639,091 $1,295,600 -3.96%
8
60%Average
Percent
Completion
HUMAN RESOURCES
GOAL % COMPLETE
Support Workforce Needs of the SNRC 40
Initiate Programs in Support of Districts
Succession Planning, Recruitment, and
Retention Efforts
100
Promote a Positive Organizational Culture 66
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$735,000 $473,350 $753,300 2.49%
9
70%Average
Percent
Completion
PUBLIC AFFAIRS
GOAL % COMPLETE
Conduct Extensive Outreach
to Support SNRC Project 80
Enhance Communications
Methods to Promote District Identity 45
Elevate District Emergency
Preparedness Program 70
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$1,018,000 $333,013 $685,470 -32.67%
10
65%Average
Percent
Completion
CONSERVATION
GOAL % COMPLETE
Maintain Compliance with SWRCB
Conservation Standards 92
Evaluate and Revise District
Rebate Program 44
Continue Outreach Encouraging
Water Efficiency 67
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$1,021,000 $280,145 $1,124,150 10.10%
11
70%Average
Percent
Completion
FINANCE
GOAL % COMPLETE
Support SNRC Project 50
Enhance Understanding
of Financial Reports 67
Improve Credit Rating 25
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
1,088,000 $673,068 $1,176,550 8.14%
12
50%Average
Percent
Completion
INFORMATION TECHNOLOGY
GOAL % COMPLETE
Secure Reliable Technology Infrastructure 53
Increase Use of Existing Technologies 30
Enhance Business Analytics 70
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$774,000 $348,324 $772,300 -0.22%
13
50%Average
Percent
Completion
CUSTOMER SERVICE
GOAL % COMPLETE
Strive for World Class Public Service 83
Promote Fiscally Prudent Processes 33
Improve Efficiencies and Customer
Awareness of Department Processes 50
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$1,730,000 $801,905 $1,699,180 -1.78%
14
55%Average
Percent
Completion
METER SERVICES
GOAL % COMPLETE
Ensure Accurate and Efficient Reads
of Customer Meters 73
Utilize Opportunities Present While
Meter Reading for Public Outreach 100
Provide Professional, Timely Response
to Customer Service Requests
100
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$348,000 $178,375 $348,000 0.00%
15
90%Average
Percent
Completion
ENGINEERING
GOAL % COMPLETE
Provide Leadership in the
Development and Implementation
of the District’s CIP and Maintain
Compliance with the SWRCB
54
Partner with Surrounding Agencies and
Other Stakeholders to Provide Benefits
to the District and the Region
65
Implement Modernization Programs
and/or Software to Track Customer
Service Efficiency
19
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$1,219,000 $631,374 $1,263,900 3.68%
16
45%
Average
Percent
Completion
WATER PRODUCTION
GOAL % COMPLETE
Increase Production and Distribution
Efficiency Through System Improvements 100
Utilize Electronic Asset Management for
Production Records and Reports 75
Ensure System Reliability Through
Routine Inspections and Testing 92
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$4,404,000 $1,922,571 $4,139,850 -6.00%
17
90%Average
Percent
Completion
WATER TREATMENT
GOAL % COMPLETE
Evaluate Maintenance of Well-Head
Treatment to Optimize Efficiencies 100
Increase Plant 134
Operational Efficiencies 75
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$827,000 $387,433 $827,000 0.00%
18
90%Average
Percent
Completion
WATER QUALITY
GOAL % COMPLETE
Provide Safe and Reliable Water
to Customers 100
Convert Flush-Outs to Control
Water Discharge 75
Improve Cross-Connection
Control Compliance 90
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$407,000 $185,037 $407,000 0.00%
19
90%Average
Percent
Completion
WATER MAINTENANCE
GOAL % COMPLETE
Reduce Staff Exposure to Risk through
Enhanced Safety Training 100
Foster Continuing Education
and Technology Training 80
Incorporate Field Staff in Efforts to
Achieve World Class Customer Service
100
Implement Valve Shut Down Program 25
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$1,759,000 $965,552 $1,759,000 0.00%
20
80%Average
Percent
Completion
WASTEWATER MAINTENANCE
GOAL % COMPLETE
Evaluate FOG Compliance
Requirements to Support SNRC 100
Meet and Exceed Wastewater Collection
System Maintenance Standards 60
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$8,233,000 $4,336,282 $8,231,850 -0.01%
21
80%Average
Percent
Completion
FACILITIES MAINTENANCE
GOAL % COMPLETE
Ensure Functional Upkeep of
District Structures 50
Ensure HQ Facility is Clean, Sanitary
and Safe 100
Develop Facilities Maintenance Program 50
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$804,000 $396,916 $802,850 -0.14%
22
70%Average
Percent
Completion
FLEET MAINTENANCE
GOAL % COMPLETE
Prepare Equipment and Staff for
Emergency Responses 100
Implement Fleet Maintenance
Management Program
50
Comply with DOT Regulations 100
EAST VALLEY WATER DISTRICT
BUDGET
FY2016-17 YTD PROJECTED
FY2016-17 % CHANGE
$545,000 $248,320 $545,000 0.00%
23
80%Average
Percent
Completion
CAPITAL BUDGET REVIEW
FISCAL YEAR 2016-17
25
CAPITAL OUTLAY
Project Funding Source
Adopted
Budget
Proposed Mid-
Year
Adjustment
Projected
Budget
Water Operating Revenue $ 35,000 $ 75,000 $ 110,000
Wastewater Operating Revenue 15,000 - 15,000
Water Operating Revenue 57,500 34,250 91,750
Wastewater Operating Revenue 22,000 10,750 32,750
Water Operating Revenue 35,000 75,000 110,000
Wastewater Operating Revenue 15,000 25,000 40,000
Fleet Vehicle-Fuel Efficient Water Operating Revenue - 30,000 30,000
Vactor (Unit 116) Rehabilitation Wastewater Operating Revenue - 52,000 52,000
Total Proposed Adjustments $ 302,000
HQ Site / Security Improvements
Software Upgrades
Business Intelligence Reporting
26EAST VALLEY WATER DISTRICT
CAPITAL OUTLAY
Project Funding Source
Adopted
Budget
Proposed Mid-
Year
Adjustment
Projected
Budget
Wash Plan Endowment Water Operating Revenue $ 52,000 $ - $ 52,000
Surface Pro Laptops Water Operating Revenue 18,000 - 18,000
Water Operating Revenue 42,000 - 42,000
Water Replacement Reserve 18,000 - 15,000
Water Replacement Reserve 15,500 - 15,500
Wastewater Replacement Reserve 8,000 - 8,000
Plant 134 Equipment Water Replacement Reserve 95,000 - 95,000
Wastewater Bypass Hose Wastewater Replacement Reserve 135,000 - 135,000
CCTV Truck Generator Wastewater Replacement Reserve 15,000 - 15,000
Fleet Pickup Trucks (4) Water Replacement Reserve 140,000 - 140,000
Equipment Trailer Water Replacement Reserve 25,000 - 25,000
Total $ 743,000 $ 302,000 $ 1,045,000
Office Equipment
Network Firewalls
27EAST VALLEY WATER DISTRICT
CAPITAL IMPROVEMENT PROJECTS
Project Funding Source
Adopted
Budget
Proposed Mid-
Year
Adjustment
Projected
Budget
Pumalo Street Main Water Replacement Reserve $ 710,000 $ (85,000) $ 625,000
Dwight/Glasgow Main Water Replacement Reserve 875,000 (15,000) 860,000
Plant 101 Tank & Boosters Water Operating Revenue 100,000 50,000 150,000
SNRC Water Operating Revenue - 401,000 401,000
SNRC Wastewater Operating Revenue - 181,000 181,000
SNRC Reserve Borrowing - 2,385,000 2,385,000
SNRC DWR State Revolving Fund Loan 63,850,000 - 63,850,000
Wastewater Flow Monitoring Wastewater Operating Revenue 30,000 (30,000) -
Wastewater Rate Study Wastewater Operating Revenue 80,000 (80,000) -
Total Proposed Adjustments $ 2,807,000
28EAST VALLEY WATER DISTRICT
CAPITAL IMPROVEMENT PROJECTS
Project Funding Source
Adopted
Budget
Proposed Mid-
Year
Adjustment
Projected
Budget
Habitat Conservation Plan Water Operating Revenue $ 310,000 $ - $ 310,000
AMI Phase 1 DWR Grant 2,011,000 - 2,011,000
Canal Zone Reservoir Water Operating Revenue 410,000 - 410,000
Upper Zone Booster Station Developer Fees 250,000 - 250,000
North Fork Pipeline Water Replacement Reserve 125,000 - 125,000
Misc. Facility Relocations/Rehabilitation Water Operating Revenue 250,000 - 250,000
Paloma Road Main Wastewater Replacement Reserve 160,000 - 160,000
Orange Street Main Wastewater Replacement Reserve 75,000 - 75,000
4th Street Main Wastewater Replacement Reserve 200,000 - 200,000
City Creek Manhole Relocation Wastewater Operating Revenue 100,000 - 100,000
Greenspot East Main Developer Fees 700,000 - 700,000
Total $70,236,000 $ 2,807,000 $73,043,000
Under
Construction
Facility Type: Water
FY 16/17 Budget: $2,011,000 (Grant-Funded)
Future Budget: $6,000,000
Completion Date: August 2017 (Phase I)
First year of a multi-year capital project to
install Advanced Metering Infrastructure (AMI)
hardware, software and meters for more
efficient and accurate meter reads.
29EAST VALLEY WATER DISTRICT
AMI METER RETROFIT
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
Project Timeline Design Completion Percent Project Complete Construction Completion Grant Closeout
SCHEDULE
DESIGN
CONSTRUCTION
20172016
20%
Preliminary
Design
Facility Type: Water
FY 16/17 Budget: $410,000
Future Budget: $2,665,000
Completion Date: December 2018
This project includes design, property
acquisition and construction of a 2.5 million
gallon reservoir within the Canal 3 pressure
zone. Current funding is for design and
property acquisition only.
30EAST VALLEY WATER DISTRICT
CANAL ZONE STORAGE RESERVOIR
2018
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
Project Timeline Siting Study Complete Design Completion
20172016
CONSTRUCTION
SCHEDULE
DESIGN
Preliminary
Design
Facility Type: Water
FY 16/17 Budget: $250,000
Future Budget: $1,245,000
Completion Date: June 2019
This project will provide additional pumping
capabilities to be used in conjunction with the
proposed Canal Zone Storage Reservoir project.
31EAST VALLEY WATER DISTRICT
UPPER ZONE BOOSTER STATION
AU
G
OC
T
DE
C
FE
B
AP
R
JU
N
AU
G
OC
T
DE
C
FE
B
AP
R
JU
N
AU
G
OC
T
DE
C
JA
N
FE
B
MA
R
Project Timeline Siting Study Complete Design Completion
CONSTRUCTION
2019201820172016
SCHEDULE
DESIGN
Construction
Complete
Facility Type: Water
FY 16/17 Budget: $805,000
Project Cost: $716,695
Completion Date: September 2016
Replacement of aging water line with
approximately 2,000 lineal feet of 8-inch
ductile iron water main between Del Rosa
Avenue and Golden Avenue.
32EAST VALLEY WATER DISTRICT
PUMALO STREET WATER MAIN REPLACEMENT
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
Project Timeline Design Completion Construction Completion
SCHEDULE
DESIGN
CONSTRUCTION
20172016
Design in
Progress
Facility Type: Water
FY 16/17 Budget: $875,000
Future Budget: $450,000
Completion Date: October 2017
This project will upgrade approximately 8,000 lineal
feet of existing 4-inch and 6-inch water mains with
an 8-inch water main, which will provide increased
reliability and fire flow protection. Add’l funding
needed in FY 17/18 to complete project.
33EAST VALLEY WATER DISTRICT
DWIGHT/GLASGOW WATER MAIN REPLACEMENT
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
Project Timeline Design Completion Percent Project Complete Construction Completion
2017 2018
SCHEDULE
DESIGN
CONSTRUCTION
2016
Project
out to Bid
Facility Type: Water
FY 16/17 Budget: $315,000
Completion Date: May 2017
This project will replace a section of the
30-inch Northfork Water Company pipeline
at the Santa Ana River Crossing that has
been subject to numerous leaks.
34EAST VALLEY WATER DISTRICT
NORTHFORK PIPELINE REPLACEMENT
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
Project Timeline Design Completion Percent Project Complete Construction Completion
20172016
SCHEDULE
DESIGN
CONSTRUCTION
5%
In Design
Facility Type: Water
FY 16/17 Budget: $100,000
Future Budget: $50,000
Completion Date: November 2017
This project will replace the existing 3,500 gallon
hydro-pneumatic tank. The existing tank is deteriorated
and out of compliance with current state regulations.
Add’l funding needed in FY 17/18 to complete project.
35EAST VALLEY WATER DISTRICT
PLANT 101 HYDRO TANK REPLACEMENT
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
Project Timeline Design Completion Percent Project Complete Construction Completion
DESIGN
CONSTRUCTION
2016 2017
SCHEDULE
Design in
Progress
Facility Type: Wastewater
FY 16/17 Budget: $160,000
Completion Date: August 2017
Repair of existing 8-inch vitrified clay pipe (VCP)
with cured in place lining. The existing 8-inch
pipe has numerous cracks and fractures, but no
structural damage.
36EAST VALLEY WATER DISTRICT
PALOMA ROAD WASTEWATER MAIN REPLACEMENT
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
Project Timeline Design Completion Percent Project Complete Construction Completion
DESIGN
CONSTRUCTION
SCHEDULE
2017 2018
Construction
Complete
Facility Type: Wastewater
FY 16/17 Budget: $82,500
Project Cost: $72,500
Completion Date: October 2016
Repair of 10 existing concrete wastewater
manholes showing sever deterioration.
37EAST VALLEY WATER DISTRICT
VALARIA MANHOLE REHABILITATION
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
Project Timeline Design Completion Construction Completion
2016 2017
DESIGN
CONSTRUCTION
SCHEDULE
Design in
Progress
Facility Type: Wastewater
FY 16/17 Budget: $200,000
Future Budget: Unknown
Completion Date: Not yet Determined
Replace approximately 810 lineal feet of 6-inch
VCP wastewater pipeline with new 8-inch pipe.
Current funding is for design only. Future funding
needs and construction schedule will be
determined upon final design completion.
38EAST VALLEY WATER DISTRICT
4TH STREET WASTEWATER MAIN REPLACEMENT
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
Project Timeline Design Completion
CONSTRUCTION
2017 2018
SCHEDULE
DESIGN
Design in
Progress
Facility Type: Wastewater
FY 16/17 Budget: $75,000
Completion Date: December 2017
Replacement of 200 lineal feet of 8-inch VCP
wastewater main due to cracking and structural
defects. The existing main is located between
two single family homes between Orange Street
and Holly Circle Drive. Due to location special
construction procedures will be required.
39EAST VALLEY WATER DISTRICT
ORANGE STREET WASTEWATER MAIN REPLACEMENT
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
Project Timeline Design Completion Percent Project Complete Construction Completion
DESIGN
CONSTRUCTION
SCHEDULE
2017 2018
In Permit
Process
Facility Type: Wastewater
FY 16/17 Budget: $100,000
Future Budget: $910,000
Completion Date: October 2017
An existing wastewater manhole within the
streambed of City Creek is subject to erosion.
This project will provide structural protection
during wet and dry periods.
40EAST VALLEY WATER DISTRICT
CITY CREEK MANHOLE RELOCATION
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
JA
N
FE
B
Project Timeline Design Completion Percent Project Complete Construction Completion
DESIGN
CONSTRUCTION
201820172016
SCHEDULE
ON-GOING PROJECTS
•Fleet Management Program
•Customer Portal
•SRF Grant Application for SNRC
•Secure Electronic Document Program
•Integration of Facility Rentals with
Financial Program
•Community Advisory Commission
41EAST VALLEY WATER DISTRICT
ACCOMPLISHMENTS
FISCAL YEAR 2016-17
ACCOMPLISHMENTS
•Succession Planning
•Demonstration Garden Upgrade
•PayNearMe Implementation
•CIMIS Weather Station Installation
•1099s for Conservation Rebates Issued
•Tyler Content Management Installation
•Miscellaneous Fee Update
•Backflow Testing Program
•Pressure Regulator Maintenance
Program
43EAST VALLEY WATER DISTRICT
ACCOMPLISHMENTS
•Safety Training Program
•Injury Prevention Program
44EAST VALLEY WATER DISTRICT
•CSDA Succession
Planning Award
•Press Enterprise Top
Workplace
•PRSA-IE Polaris Drought
Campaign Award
•GFOA Distinguished Budget
Award & CAFR
•CAPIO Award of Distinction
Budget Based Rates
45EAST VALLEY WATER DISTRICT
AWARDS
WATER SEWER WATER SEWER
OPERATING OPERATING GRANTS/LOANS REPLACEMENT DEVELOPER PROJECT OPERATING OPERATING GRANTS/LOANS DEVELOPER ADJ PROJECT
PROJECT REVENUE REVENUE OTHER FUND RESERVES FEES TOTAL REVENUE REVENUE OTHER FUND RESERVES FEES TOTAL
CAPITAL OUTLAY
HQ Site/Security Upgrades 35,000 15,000 - - - 50,000 50,000 - - - - 100,000
Tyler Inventory / Content Mgt Systems 8,000 - - - - 8,000 27,250 7,750 - - - 43,000
Sharepoint Development (BI)35,000 15,000 - - - 50,000 75,000 25,000 - - - 150,000
Mobile Ruggedized Surface Pros (10)18,000 - - - - 18,000 - - - - - 18,000
Laserfiche Upgrade 14,000 6,000 - - - 20,000 - - - - - 20,000
Active Directory / Shared Folder Monitoring S/W 5,500 2,500 - - - 8,000 - - - - - 8,000
Civic Engagement Portal 14,000 6,000 - - - 20,000 - - - - - 20,000
Contact Center Business Intelligence 9,500 4,500 - - - 14,000 - - - - - 14,000
Network Monitoring Expansion 6,500 3,000 - - - 9,500 - - - - - 9,500
Next Generation Firewalls (2)42,000 18,000 - - - 60,000 - - - - - 60,000
Wash Plan Endowment Contribution 52,000 - - - - 52,000 - - - - - 52,000
Copier / Printer 6,500 6,500 - - - - - 6,500
NeoPost Mail Processing Equipment 17,000 17,000 - - - - - 17,000
Fiber Glass Chlorine Tank 25,000 25,000 - - - - - 25,000
Polymer Chemical Feed Pumps-Plant 134 (2), 2
touch screens 70,000 70,000 - - - - - 70,000
Sewer By-Pass Pump and Hose 135,000 135,000 - - - - - 135,000
Generator - CCTV Truck 15,000 15,000 - - - - - 15,000
Trucks (4)140,000 140,000 - - - - - 140,000
Retrofit Hydro Excavator to Sewer Only - - - 52,000 - - - 52,000
Tandem Axle Equipment Trailer 25,000 25,000 - - - - - 25,000
Pool Vehicle - 30,000 - - - - 30,000
HVAC Control Upgrade - 25,000 25,000
Cityworks - - - - 7,000 3,000 - - - 10,000
TOTAL CAPITAL OUTLAY 239,500 70,000 - 433,500 - 743,000 214,250 87,750 - - - 1,045,000
CAPITAL IMPROVEMENT PROGRAM
GENERAL CIP
Habitat Conservation Plan 310,000$ -$ -$ -$ -$ 310,000$ -$ -$ -$ -$ -$ 310,000$
AMI Meter Retrofit Program - - 2,011,000 - - 2,011,000 - - - - - 2,011,000
General Subtotal 310,000 - 2,011,000 - - 2,321,000 - - - - - 2,321,000
WATER CIP
Canal Zone 3 MG Reservoir 410,000 - - - - 410,000 - - - - - 410,000
Upper Zone Booster Station - - - - 250,000.00 250,000 - - - - - 250,000
Water Main Replacement - Pumalo Street - - - 710,000 - 710,000 - - - (85,000) - 625,000
Water Main Replacement - Dwight/Glasgow - - - 875,000 - 875,000 - - - (15,000) - 860,000
North Fork Pipeline Replacement - - - 125,000 - 125,000 - - - - - 125,000
Facilities Relocations 100,000 - - - - 100,000 - - - - - 100,000
Plant 101 Hydro Tank Rehabilitation 100,000 - - - 100,000 - - - 50,000 - 150,000
Facility Rehabilitations 150,000 - - - - 150,000 - - - - - 150,000
Water Subtotal 760,000 - - 1,710,000 250,000 2,720,000 - - - (50,000) - 2,670,000
WASTEWATER CIP
Sewer Main Replacement - Paloma Road - - - 160,000.00 - 160,000 - - - - - 160,000
Sewer Main Replacement - Orange Street - - 75,000.00 - 75,000 - - - - - 75,000
Sewer Main Replacement - 4th Street - - 200,000.00 - 200,000 - - - - - 200,000
City Creek Manhole Relocation 100,000.00 - - - 100,000 - - - - - 100,000
Sterling Natural Resource Center (SNRC) - 61,000,000.00 - - 61,000,000 401,000 181,000 - 2,385,000 - 63,967,000
5th Street Trunk Sewer Line (SNRC) - 350,000.00 - - 350,000 - - - - - 350,000
Del Rosa Avenue Trunk Sewer (SNRC) - 400,000.00 - - 400,000 - - - - - 400,000
6th Street Lift Station and Force Main (SNRC) - 1,800,000.00 - - 1,800,000 - - - - - 1,800,000
3rd Street Lift Station and Force Main (SNRC) - 300,000.00 - - 300,000 - - - - - 300,000
Greenspot East Sewer Main - - - - 700,000.00 700,000 - - - - - 700,000
Wastewater Flow Monitoring - 30,000.00 - - - 30,000 - (30,000) - - - -
Wastewater Multi-Year Rate Study - 80,000.00 - - - 80,000 - (80,000) - - - -
- - - - - - - - - - - -
Wastewater Subtotal - 210,000 63,850,000 435,000 700,000 65,195,000 401,000 71,000 - 2,385,000 - 68,052,000
TOTAL CAPITAL IMPROVEMENT PROGRAM 1,070,000$ 210,000$ 65,861,000$ 2,145,000$ 950,000$ 70,236,000$ 401,000$ 71,000$ -$ 2,335,000$ -$ 73,043,000$
MID-YEAR ADJUSTMENT
EAST VALLEY WATER DISTRICT
CAPITAL EXPENSES
FY 2016-17