HomeMy WebLinkAboutAgenda Packet - EVWD Board of Directors - 07/11/2018REG ULA R BO A RD MEET IN G
C losed Session Begins at 4:30 P M
J uly 11, 2018 - 5:30 P M
31111 Greenspot Road, Highland, C A 92346
AGE N D A
"In order to comply with legal requirements for posting of agenda, only those items filed
with the District Clerk by 12:00 p.m. on Wednesday prior to the following Wednesday
meeting not requiring departmental investigation, will be considered by the Board of
Directors".
C A LL TO O RD ER
RO LL C A LL O F BO A RD MEMBERS
P U B L I C C OMME N T S
Any person wishing to speak to the Board of Directors is asked to complete a Speaker
Card and submit it to the D istrict C lerk prior to the start of the meeting. Each speaker is
limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State
of C alifornia Brown Act, the Board of Directors is prohibited from discussing or taking
action on any item not listed on the posted agenda. T he matter will automatically be
referred to staff for an appropriate response or action and may appear on the agenda at a
future meeting.
AGE N D A - T his agenda contains a brief general description of each item to be
considered. Except as otherwise provided by law, no action shall be taken on any item not
appearing on the following agenda unless the Board of Directors makes a determination
that an emergency exists or that a need to take immediate action on the item came to the
attention of the District subsequent to the posting of the agenda.
1.Approval of Agenda
REC ESS IN TO C LO SED SESSIO N
C L OSE D SE SSI O N
2.T HREAT TO PUBLIC SERVIC ES O R FA C ILIT IES
[Government C ode Section 54957(a)]
C onsultation with: Robert Peng, Internet Technology Manager, East Valley Water
District
5:30 P M RE C O N VE N E ME E T I N G
PLED G E O F A LLEG IA N C E
RO LL C A LL O F BO A RD MEMBERS
A N N O UN C EMEN T O F C LO SED SESSIO N A C T IO N S IT EMS
P U B L I C C O MME N T S
3.AP P RO VAL O F C ON SE N T C AL E N D AR
All matters listed under the C onsent C alendar are considered by the Board of
Directors to be routine and will be enacted in one motion. T here will be no
discussion of these items prior to the time the board considers the motion unless
members of the board, the administrative staff, or the public request specific items to
be discussed and/or removed from the Consent Calendar.
a.Directors' fees and expenses for J une 2018
I N F ORMAT I O N AL I T E MS
4.Leadership Academy Presentation
D I SC U SSI ON AN D P O SSI B L E AC T I O N I T E MS
5.C onsider Adoption of Resolution 2018.12 - Amending the Schedule of Fees and
C harges for Wastewater Service
6.C onsider Assignment and Assumption of EIR Obligations and Implementation,
Monitoring, and Reporting Responsibilities Under the Sterling Natural Resource
C enter
RE P O RT S
7.Board of Directors' Reports
8.General Manager/C EO Report
9.Legal Counsel Report
10.Board of Directors' Comments
AD J O U RN
P LEAS E NO T E:
Materials related to an item on this agenda s ubmitted to the Board after dis tribution of the agenda packet
are availab le fo r pub lic ins p ectio n in the District's o ffic e lo cated at 31111 G reens p o t R d., Highland , during
normal bus ines s ho urs. Also, s uc h d o cuments are available on the District's website at www.eastvalley.org
subject to staff's ability to pos t the doc uments before the meeting.
P urs uant to G overnment C o d e S ec tio n 54954.2(a), any reques t for a d is ab ility-related modific ation or
ac commodation, inc luding auxiliary aid s o r s ervic es , that is s o ught in order to p artic ip ate in the above-
agendized p ublic meeting s ho uld be d irected to the District C lerk at (909) 885-4900 at leas t 72 ho urs prior
to said meeting.
R ecommended b y:
Jo hn Mura
G eneral Manager/C EO
R espec tfully sub mitted:
Jus tine Hendric ksen
District C lerk
B O AR D AGE N D A S TAF F R E P ORT
Agenda Item #3.a.
Meeting Date: July 11, 2018
C ons ent Item
To: G o verning Board Memb ers
F rom: G eneral Manager/C EO
Subject: Direc tors ' fees and exp enses fo r June 2018
R E C O MME N D AT IO N:
Approve the G o verning Board Memb ers ’ fees and exp ens es for June 2018.
B AC KGR O UN D / AN ALYS IS :
T he Bo ard has ins tructed staff to lis t all directo r fees and exp ens es as a separate agend a item to s how full fis cal
trans p arency. O nly after Board review and approval will the c o mp ens ation and expens es be paid.
AG E N C Y G O ALS AN D OB J E C T IVE S :
G o al and O bjec tives I I - Maintain a C ommitment to S us tainab ility, Transparenc y, and Ac c o untability
a) P rac tice Trans parent and Ac countab le F is cal Management
R E VIE W B Y O T HE R S :
T his agenda items has been reviewed by the Ad minis tratio n d ep artment.
F IS C AL IMPAC T
T he fis c al impac t as soc iated with this agenda item is $6,195.14 whic h is includ ed in the c urrent fis c al b udget.
ATTACH M E N TS:
Description Type
Directors' Expense Reports J une 2018 Backup Material
B O AR D AGE N D A S TAF F R E P ORT
Agenda Item #4.
Meeting Date: July 11, 2018
Dis c ussion Item
To: G o verning Board Memb ers
F rom: G eneral Manager/C EO
Subject: Leaders hip Ac ad emy P resentation
R E C O MME N D AT IO N:
T his rep ort is p ro vided to the Bo ard of Direc tors fo r its informatio n only.
B AC KGR O UN D / AN ALYS IS :
In O cto b er of 2015, the Dis tric t kic ked o ff its first Leadership Academy. T he Dis tric t p artnered with Dennis
Boylin, C ertified P ro fes s io nal Behavio ral Analys t and P res id ent of Boylin Management Ins titute, to c o nduc t a
s ix-month p rogram p ro viding emerging District lead ers with finely d eveloped leaders hip skills thro ugh gro up
d is cus s io n and skill practicing techniques .
In ad d ition, participants worked in teams to create a p ro jec t that wo uld enhanc e pro d uc tivity and effic iency or
s ave the Dis tric t money. During the Ac ad emy graduation c eremo nies , grad uates presented their id eas and
recommendatio ns to the management team to s ho w the level o f hard work and dedic atio n that was p ut into their
p ro jects .
O n Marc h 15, 2018, the Dis tric t’s 4th Leadership Academy grad uated and gave their p rojec t pres entations . T he
management s taff c ontinues to be amazed b y the inno vative ideas these group s are c o ming up with and
imp res s ed b y the time and dedicatio n they have given to their p ro jects and teammates to c o me up with
s uc ces s ful p res entations. Ten o ut of the fifteen projects presented over the cours e o f the fo ur ac ad emies have
either been s uc ces s fully implemented , o r plan to b e implemented in the up coming fisc al year.
T his 4th Ac ad emy will be the las t fo r a while as mos t emp lo yees identified as future leaders, or who s howed a
s trong interes t in p artic ip ating, have c o mp leted the academy. Mr. Boylin and the program will be b ro ught b ac k in
the future when a new gro up o f emp lo yees is read y to go through the ac ad emy.
Due to the impres s ive nature o f the p ro jects and pres entations , o ne team fro m the 4th academy will be
highlighted tonight to provid e the Bo ard of Direc tors with ins ight into the effec tivenes s of this p ro gram.
AG E N C Y G O ALS AN D OB J E C T IVE S :
G oal and O b jectives I - Implement Effec tive S o lutio ns T hrough Visionary Leadership
R ecommended b y:
Jo hn Mura
G eneral Manager/C EO
R espec tfully sub mitted:
Kerrie Bryan
HR /R is k S afety Manager
d) Enc o urage P erfo rmance Bas ed R esults T hrough S taff Emp o werment
G o al and O bjec tives I I I - Deliver P ublic S ervic e with P urpose W hile Emb rac ing C ontinuo us G rowth
d ) Embrace an Environment of Active Learning and Knowled ge S haring
R E VIE W B Y O T HE R S :
T his agenda item has been reviewed by the Ad minis tratio n d ep artment.
F IS C AL IMPAC T
S ufficient funds have b een b udgeted in the adopted F Y 2017-18 Bud get.
ATTACH M E N TS:
Description Type
Test the Waters P resentation Backup Material
July 11, 2018
TEST THE WATERS
Micah Kennedy Jeremy Subriar Roxana Morales
PROGRAM GOALS
•Educate Customers on Water Treatment
and System Maintenance
•Expose Customers to Tasks Completed by
Field Staff
•Raise Awareness of the Value of Water
TEST THE WATERS DIFFERENCE
•Program Exposes Customers to the Daily Tasks for
Operation
•Tour Does Not Focus on System History
•More Hands-On Approach
•Participants Ride Along with Field Staff in Field Vehicles
ACTION STEPS
•Determine Project Structure
•Frequency
•Twice a Year
•Tour Size
•Groups of 3-4 People
•Program Scheduling
•Coordinate with Field Managers and Leads
•Determine Tour Stops
•Evaluate Cost
•Promotional Items and Lunch
•Compose Program Waiver
•Train Tour Guide Staff
•Implement Employee Pilot Program
•Evaluate Feedback
•Program Launch
POTENTIAL TOUR SITES
Welcome /
Safety Orientation
Job Site
•Current Project
Sewer Maintenance
•Sewer Jetting and Cleaning
•Mainline Inspection with Camera and
Video Valve Exercising
Visit Water Treatment
Plant (Plant 134)
•Capable of Treating 8 MGD
•Treatment Processes
•Water Sampling
•Lunch (1 Hour)
•Q&A Session
Visit Well Site
(Plant 28)
•Groundwater GAC Filtration Process
•Groundwater Distribution
Visit SNRC
Construction Site End of Tour
*Stops dependent on weather conditions and site security
COMMUNITY OUTREACH
GETTING THE COMMUNITY INVOLVED
•Print Marketing
•Digital Marketing
•Social Media
•District Kiosk
•Direct Invitation
•Customer Interaction
•Tour Wait List
•Post-Tour Marketing
•Participant interview videos
•Tour Pictures
PARTICIPANT SELECTION
PROGRAM PARTICIPANTS
•Current Tour Wait Listers
•EVWD Customers
•Local Media
•Other Agency Representatives
•Board of Supervisors, City Officials, Assembly, Special Agency Representatives, Etc.,
•To be held on a special day
•Participants Must be 18 Years or Older Unless Accompanied by a Legal
Guardian
•Hold Tour Later This Year
BENEFITS OF ATTENDING
•Customers Get to Know District Staff
•Learn About Water Treatment and System
Maintenance
•Encourage Water Conservation
•Appreciation for Water Services
B O AR D AGE N D A S TAF F R E P ORT
Agenda Item #5.
Meeting Date: July 11, 2018
Dis c ussion Item
To: G o verning Board Memb ers
F rom: G eneral Manager/C EO
Subject: C ons id er Adoptio n of R es o lution 2018.12 - Amending the S ched ule of F ees and C harges fo r
Was tewater S ervic e
R E C O MME N D AT IO N:
Approve R es olutio n 2018.12 updating the Dis tric t’s S ched ule o f Water and Wastewater R ates and C harges to
reflec t 1) the eliminatio n o f Joint P o wer Agreement s tipulated s urcharges fo r was tewater c usto mers eas t of C ity
C reek, and 2) reflec t East Valley Water Distric t’s Wastewater Treatment C apac ity fee adopted by the Bo ard in
Dec emb er 2014.
B AC KGR O UN D / AN ALYS IS :
In Ap ril o f 1984, S ec tion 10, - ‘Ac cess C harge fo r P ump S tations , Trunk Lines, Interc ep tors and C ollecto rs ’ –
was ad d ed to the Joint P owers Agreement of 1957 between the C ity of S an Bernardino and EVW D. S ectio n
10 req uired the Dis tric t to collec t a monthly c harge of $2.00 fro m cus tomers eas t of C ity C reek. A $.09 per
HC F of water cons ump tion was later ad d ed fo r c o mmerc ial c us to mers.
With the L AF C O app ro val of the District’s authority to treat and reclaim was tewater, the Bo ard now has the
ab ility to d is continue c o llec tion of this s urc harge that affec ts just a portio n o f Dis tric t ratep ayers, and to make
rates uniform fo r all was tewater c usto mers
In ad ditio n, the S c hed ule of R ates and C harges includ es Was tewater Treatment C apac ity F ees (p age 13). T he
Dis tric t ado p ted this , alo ng with o ther c ap acity fees , in December of 2014 as the res ult o f a C apac ity F ee s tud y
cond uc ted by Willdan F inancial S ervices . However, as the Dis tric t d id not have was tewater treatment authority
until June 20th o f this year, the Dis tric t’s s c hedule of rates and c harges inc luded the C ity o f S an Bernard ino
s ewer treatment capacity fee of $3,500, which was c o llec ted fro m developers and remitted to the C ity.
As a res ult of the June 20, 2018 ac tion by LAF C O activating the District’s was tewater treatment autho rity, the
Dis tric t’s $2,806 was tewater treatment c ap acity fee has b een add ed to the S ched ule and will be held by Eas t
Valley Water Dis tric t for future exp ansion of the S terling Natural R esource C enter.
S taff rec o mmend s that the Bo ard ad o pt res o lutio n 2018.12 autho rizing an up d ate to the Dis trict’s S ched ule of
R ates , F ees & C harges to reflec t uniform was tewater c o llectio n rates , and a transitio n from collectio n o f C ity of
S an Bernardino Was tewater Treatment C apac ity fees to c o llectio ns of Dis tric t S ewer Treatment C apac ity F ees .
T he effec tive d ate o f thes e c hanges will be August 12, 2018.
R ecommended b y:
Jo hn Mura
G eneral Manager/C EO
R espec tfully sub mitted:
Brian Tomp kins
C hief F inancial O ffic er
T he effec tive d ate o f thes e c hanges will be August 12, 2018.
AG E N C Y G O ALS AN D OB J E C T IVE S :
G o al and O bjec tives I I - Maintain a C ommitment to S us tainab ility, Transparenc y, and Ac c o untability
a) P rac tice Trans parent and Ac countab le F is cal Management
R E VIE W B Y O T HE R S :
T his agenda item has been reviewed by Legal C o uns el.
F IS C AL IMPAC T
T here is no fis cal impac t as s o c iated with this agend a item.
ATTACH M E N TS:
Description Type
Resolution 2018.12 Resolutio n Letter
Exhibit "A" - Effective 7-1-17 Exhibit
Exhibit "B" - Effective 8-12-18 Exhibit
East Valley Water District
Resolution 2018.12
Page 1 of 4
RESOLUTION 2018.12
A RESOLUTION OF THE BOARD OF DIRECTORS OF
THE EAST VALLEY WATER DISTRICT
AMENDING THE SCHEDULE OF FEES AND CHARGES FOR WASTEWATER
SERVICE AND UPDATING EXHIBIT “A” TO RESOLUTION 2017.01
WHEREAS, East Valley Water District (“District”) is a county water district organized
and operating pursuant to California Water Code Section 30000 et seq.; and
WHEREAS, pursuant to applicable law, including but not limited to Water Code Sections
31024, 31101 and 31027, the District’s Board of Directors adopted Ordinance No. 389 on
September 28, 2016, establishing the rules and regulations for wastewater service by the District;
and
WHEREAS, pursuant to applicable law, including but not limited to Water Code Sections
31007 and 31101, the District’s Board of Directors is authorized to adopt by resolution such rates
for the provision of wastewater service by the District to implement the rules and regulations set
forth in Ordinance No. 389 and to yield an amount sufficient to pay the operating expenses of the
District, provide for repairs and depreciation of works owned or operated by the District, pay the
interest on any bonded debt, and, so far as possible, provide a fund for the payment of the principal
of the bonded debt as it becomes due; and
WHEREAS, Ordinance No. 389 provides that rates and charges may be changed from
time to time or new rates and charges may be established by resolution of the Board of Directors;
and
WHEREAS, Section 21080(b)(8) of the Public Resources Code provides that the
establishment, modification, structuring, restructuring or approval of rates, tolls, fares or other
charges by public agencies are exempt from the requirements of the California Environmental
Quality Act (CEQA) provided that certain findings are made specifying the basis for the claim of
exemption; and
WHEREAS, the actions taken herein are necessary for setting rates, fees, and charges for
the provision of water service within the boundaries of the District and are therefore exempt from
the requirements of the California Environmental Quality Act as provided by Public Resources
Code Section 21080(b)(8); and
WHEREAS, since 1957, wastewater treatment services have been provided to District
ratepayers pursuant to the terms of the Joint Powers Agreement of 1957 Between the City of San
Bernardino and the East San Bernardino County Water District, as amended from time to time
(JPA); and
WHEREAS, in 1984, the second amendment to the JPA was enacted and through its terms
established a two dollar per month service charge for pump stations, trunk lines, interceptors and
East Valley Water District
Resolution 2018.12
Page 2 of 4
collectors for the service area located east of Boulder Avenue in the city of Highland which in
effect created two classes of ratepayers within the District; and
WHEREAS, on January 22, 2014 the District initiated a study to determine the feasibility
of providing its own wastewater treatment and recycled water conservation services through the
planning, development and construction of a recycled water plant. The findings of the study
demonstrated that the District and the surrounding region would realize significant benefits from
the construction and operation of a recycled water plant; and
WHEREAS, on or about March 23, 2016 the Board of Directors of the District authorized
the design and construction of a recycled water plant known as the Sterling Natural Resource
Center (SNRC) and on March 15, 2016 a final environmental impact report for the SNRC was
certified by the San Bernardino Valley Municipal Water District Board of Directors; and
WHEREAS, on June 20, 2018, the San Bernardino County Local Agency Formation
Commission activated the District’s latent wastewater treatment authority enabling the District to
construct and operate the SNRC. As a result, and through prior settlement agreement with the city
of San Bernardino dated November 21, 2017, the terms and conditions of the JPA are no longer
completely binding on the District and the District now has authority to establish wastewater
treatment rates which authority was previously exercised by the city of San Bernardino Municipal
Water Department; and
WHEREAS, as part of the settlement agreement with the city of San Bernardino, the
District will acquire ownership of the East Trunk sewer line including the responsibilities of
inspection, maintenance and repair thereof, which the District can accomplish more economically;
and
WHEREAS, based upon the foregoing factors, the Board of Directors of the District has
determined that a reduction in the wastewater system charge for the collection of wastewater for
both residential and commercial customers located east of Boulder Ave, can be achieved; and
WHEREAS, the District adopted Resolution 2017.01, and Exhibit “A” thereto,
establishing a schedule of rates and charges for the provision of water and wastewater service on
January 25, 2017 after conducting a duly noticed public hearing on the matter. Said schedule of
rates and charges for water and wastewater service remains unchanged. The current schedule of
rates and charges for water and wastewater service is attached hereto as Exhibit “A” to this
Resolution; and
WHEREAS, the District’s updated schedule of fees and charges for water and wastewater
service is attached hereto as Exhibit “B” to this Resolution and reflects a decrease in rates and
charges than those provided under previously approved schedule of fees and charges; and
WHEREAS, the amount of the rates and charges hereby adopted do not exceed the
reasonable anticipated costs for the corresponding services provided by the District, and therefore
the fees imposed hereby do not qualify as a “tax” under Article XIIIC, Section 1(e), of the
California Constitution or Section 50076 of the California Government Code, and the actions taken
East Valley Water District
Resolution 2018.12
Page 3 of 4
herein are exempt from the additional notice and public meeting requirements of the Brown Act
pursuant to Government Code Section 54954.6(a)(1)(A) and (B); and
WHEREAS, the District has satisfied all of the substantive and procedural prerequisites
of Article XIIID of the California Constitution in establishing the rates and charges set forth herein,
including but not limited to, the identification of the parcels upon which the rates and charges will
be imposed; the calculation of the rates and charges; the mailing of written notice to the record
owners of each parcel upon which the rates and charges will be imposed describing the amount
thereof, the basis upon which the rates and charges were calculated, the reason for the rates and
charges, and the date, time, and location of the public hearing to be held thereon; and the
conducting of a public hearing on the rates and charges not less than 45 days after mailing the
notice during which all protests against the fee were considered. The reduction of fees by this
Resolution requires no additional procedural prerequisites as no new or increased fees are being
established.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the East Valley
Water District as follows:
Section 1. It is hereby found and determined that the schedule of rates and charges for
wastewater treatment shall be reduced as reflected in the updates to Exhibit “A” to Resolution
2017.01.
Section 2. It is hereby found and determined that the proposed changes to the Schedule of
Rates and Charges are within the purposes set forth in Section 21080(b) of the Public Resources
Code including but not by way of limitation, the purposes of (1) meeting operating expenses, (2)
purchasing or leasing supplies, equipment or materials, (3) meeting financial reserve needs and
requirements, and (4) obtaining funds for capital projects necessary to maintain service within
existing areas, and therefore, that such changes are exempt from CEQA.
Section 3. The revisions to the previously approved rate(s), fee(s) and/or charge(s) as set
forth in Exhibit “B” attached to this resolution and by this reference incorporated herein are hereby
adopted in conformity with the authority set forth in Section 13.01 of Ordinance 389, and the
corresponding rate(s), fee(s) or charges(s), if any, as set forth in Ordinance 389 currently in effect,
are hereby superseded. Staff is directed to incorporate the hereby adopted new and/or revised
rate(s), fee(s) and/or charge(s) into Exhibit “A” attached hereto.
Section 6. That the provisions of this Resolution shall be effective August 12, 2018.
Section 7. That the Secretary is hereby ordered and directed to post a certified copy of this
Resolution in a public place within the District.
East Valley Water District
Resolution 2018.12
Page 4 of 4
Section 8. Exhibit “A” to Resolution 2017.01 is hereby updated:
This Resolution shall take effect as of the 12th day of August 2018.
ADOPTED this 11th day of July 2018.
ROLL CALL:
Ayes:
Noes:
Absent:
Abstain:
Chris Carrillo
Board President
July 11, 2018
I HEREBY CERTIFY that the foregoing is a full, true and correct copy of Resolution 2018.12
adopted by the Board of Directors of East Valley Water District at its Regular Meeting held July
11, 2018.
ATTEST:
_____________________________
John Mura
Board Secretary
EXHIBIT “A”
EAST VALLEY WATER DISTRICT
SCHEDUL E O F
WATER AND WASTEWATER
RATE S AND CHARGES
UPDATED JANUARY 25, 2017
i
Table of Contents
Section 1: Water Service Charges............................................................ 2
Monthly Water System Charge ............................................................. 2
Commodity Charges: Potable Water ...................................................... 2
MWD Surcharge ................................................................................ 3
Private Fire Protection Service ............................................................ 4
1. Commercial Standby Charge ........................................................... 4
2. Fire Flow Testing ........................................................................ 4
Temporary Water Service Connection .................................................... 5
Monthly Service Charge ..................................................................... 5
1. Commodity Charge ...................................................................... 5
2. Meter Deposit ............................................................................ 5
3. Unauthorized use of Water Charge ................................................... 5
New Account Fees for Water Services .................................................... 6
1. Service Initiation Charge ............................................................... 6
2. Security Deposit.......................................................................... 6
Miscellaneous Water Service Charges and Fees ......................................... 6
1. Delinquency Charge ..................................................................... 6
2. Returned Payment Charge.............................................................. 6
3. Disconnection Notice Charge .......................................................... 6
4. Service Reconnect Charge (Business Hours) ......................................... 6
5. Service Reconnect Charge (After Hours) ............................................. 6
6. Meter Test Charge ....................................................................... 7
7. Annual Backflow Compliance Test (per device) ..................................... 7
8. Backflow Device Installation Fee ...................................................... 7
9. Backflow Device Annual Administration Fee (per device) ......................... 7
Section 2: Wastewater Service Charges .................................................... 8
Monthly Wastewater System Charge ...................................................... 8
Collection Charges ........................................................................... 8
ii
Treatment Charges .......................................................................... 9
Section 3: Developer Services ............................................................... 12
Water Connection Fees ..................................................................... 12
Wastewater Connection Fees.............................................................. 13
Fire Service Connection Charges ......................................................... 13
Developer Services Charges and Fees ................................................... 14
1. Front Footage Charge ................................................................. 14
2. Water Main Extension Charge ........................................................ 14
3. Fire Hydrant Installation Charge .................................................... 14
4. Special Facility Charge ................................................................ 14
5. Construction Inspection Charge ..................................................... 14
6. Water System Design Charge ......................................................... 15
7. Engineering Service Charges ......................................................... 15
8. Sewer Manhole and Valve Can Deposit ............................................. 15
9. Research Fee (flat rate, 4 hour minimum) ......................................... 15
10. Development Meeting Fee (after first meeting) .................................. 16
11. Annual Backflow Compliance Test (per device) ................................... 16
12. Backflow Inspection Fee (per inspection) .......................................... 16
13. Water Quality Sampling Fee (per sample) ......................................... 16
14. New Construction Chlorination and Flushing Fee ($225 minimum to actual
cost) .......................................................................................... 16
History of Revisions ............................................................................ 18
1
[THIS PAGE IS INTENTIONALLY BLANK]
2
Section 1 : Water S ervice Charges
Monthly Water S ystem Charge
The water system charge is the monthly availability charge applicable to all metered
water services, and shall apply whether or not premises served by the meter are
occupied. The charges, which vary by meter size, are established at the amounts listed
in the table below.
6/1/2015 7/1/2016 7/1/2017
5/8"20.96$ 23.06$ 24.67$
3/4"26.61$ 29.27$ 31.32$
1"37.92$ 41.71$ 44.63$
1 1/2"66.19$ 72.81$ 77.91$
2"100.12$ 110.13$ 117.84$
3"207.54$ 228.30$ 244.28$
4"365.85$ 402.44$ 430.61$
6"744.67$ 819.14$ 876.48$
8"1,366.62$ 1,503.28$ 1,608.51$
Meter Size
Rates Effective on:
Commodity Charges: Potable Water
Commodity Charges are billed on a per unit basis for water consumption registered by
the water service meter. One unit is 100 cubic feet (hcf) of water, which is equal to
748 gallons.
6/1/2015 7/1/2016 7/1/2017
Tier 1 - Indoor Use 1.45$ 1.63$ 1.83$
Tier 2 - Outdoor Use 2.07$ 2.32$ 2.61$
Tier 3 - Inefficient Use 2.89$ 3.24$ 3.64$
Tiers
Rates Effective on:
3
MWD Surcharge
The MWD surcharge rate (per hundred cubic feet) for all customer types is as follows
Effective 6/1/2015
Rate per HCF $0.00
The MWD Surcharge Rate represents increased costs associated with water imported
from the State Water Project. The charge to the District for State Water Project
imported water is established by the San Bernardino Valley Municipal Water District.
Since the District has no control over the adoption or imposition of MWD water charges,
imposed through San Bernardino Valley Municipal Water District for the delivery of
imported water to the District, EVWD may pass-through, for a five year period beginning
June 1, 2015 any increases in the cost of MWD imported water imposed by the San
Bernardino Valley Municipal Water District.
4
Private Fire Protection Service
1. Commercial Standby Charge
The fire service standby charge is the monthly charge assessed per inch diameter of
the District fire service meter. Water use through this service is limited to
emergency fire requirements only.
6/1/2015 7/1/2016 7/1/2017
1"7.97$ 8.78$ 9.40$
1 1/2"11.98$ 13.18$ 14.10$
2"15.97$ 17.57$ 18.80$
3"23.96$ 26.35$ 28.20$
4"31.94$ 35.14$ 37.59$
6"47.91$ 52.70$ 56.39$
8"63.88$ 70.27$ 75.19$
10"79.85$ 87.84$ 93.99$
Meter Size
Rates Effective on:
2. Fire Flow Testing
The fire flow test charge is a flat rate established to cover the District’s time and
effort for testing parts of the water system to obtain fire flow test data and
calculate results as requested. The District will charge a one-time fee of $100.00 to
administer fire flow tests.
5
Temporary Water Service Connection
A temporary service is available through the use of a fire hydrant. A customer deposit
for the temporary service will be required, and all other applicable service charges
shall apply.
Monthly Service Charge
Refer to the schedule of Monthly Water System Charges for three inch (3”) meters.
1. Commodity Charge
Commodity charges for temporary services shall be bill ed at the Tier 3 rates based
on the Potable Water Commodity Rates. When available, and feasible, recycled
water shall be used for temporary construction uses.
The Commodity Charge shall be as follows:
Area Rate/100 Cubic Feet
Potable Tier 3 Rate
Recycled TBD
2. Meter Deposit
A deposit equal to the replacement cost of the construction meter shall be collected
at the time of service application. Currently, the replacement cost is estimated to
be $1,800.00. The deposit will be applied to the closing bill and any remaining
amount refunded to the customer. Lost meters will result in forfeiture of the
deposit.
3. Unauthorized use of Water Charge
The unauthorized use of water charge shall be charged to any person, organization
or agency for each unauthorized use of District water or for tampering in any manner
with any meter belonging to the District where this tampering shall affect the
accuracy of such meter. The unauthorized use of water charge is hereby established
at the rate of $500.00 for a first occurrence and $1,000.00 for each subsequent
occurrence.
6
New Account Fees for Water Services
The following fees are applicable to all requests for new service, or transfer of an
existing account to a new location:
1. Service Initiation Charge
The service initiation charge is a non-refundable charge of $30.00 per account,
which covers the reasonable District costs for initiating water service.
2. Security Deposit
A deposit of $150.00 will be required until a one year payment history, with fewer
than two delinquencies, has been established . The deposit insures payment of
minimum District charges.
Miscellaneous Water Ser vice Charges and Fees
1. Delinquency Charge
Rates and charges which are not paid on or before the due dates shall be subject to
interest charges. Interest will be calculated at a rate of one and one -half percent
(1 ½%) on all amounts that remain unpaid at the end of each billing cycle.
2. Returned Payment Charge
A returned check charge is a charge which covers the reasonable administrative cost
and banking charges for processing a returned check.
3. Disconnection Notice Charge
The disconnect notice charge is the charge which covers reasonable District costs to
notify customers that their water service is subject to impending termination.
4. Service Reconnect Charge (Business Hours)
The service reconnect charge is the charge which covers the reasonable District
costs for disconnection and reconnection during regular business hours, of service
connections which are in violation of the provisions contained herein.
5. Service Reconnect Charge (After Hours)
The service reconnect charge is the charge which covers the reasonable D istrict
costs for disconnection and reconnection during non -business hours, of service
connections which are in violation of the provisions contained herein.
7
6. Meter Test Charge
The meter test charge is the charge which covers the District costs for removi ng,
bench testing, and reinstalling the water meter to be tested.
7. Annual Backflow Compliance Test (per device)
A fee of $5.00 per month will be charged to the customer when the annual backflow
compliance test is performed by District staff. The customer will only be billed as a
lump sum when District standards regarding the inspection, testing, and
maintenance of customer-owned backflow assemblies are not followed.
8. Backflow Device Installation Fee
Installation of new backflow prevention assemblies completed by the District will
be done at actual cost.
9. Backflow Device Annual Administration Fee (per device)
The District shall appoint at least one person trained in cross -connection control to
administer and ensure all District standards are met. This backflow device annual
administration fee will be assessed annually.
Charge or Fee Name Charge/Fee
Delinquency Charge 1.5%
Returned Payment Charge $20.00
Disconnect Notice Charge $23.00
Service Reconnect Charge (Business Hours)$70.00
Service Reconnect Charge (After Hours)$150.00
Meter Test Charge $75.00
Annual Backflow Compliance Test $ 60.00 ($5.00 per month)
Backflow Device Installations Actual Cost
Backflow Annual Administration Fee $20.00 (per device)
8
Section 2: Wastewater Service Char ges
Monthly Wastewater System Charge
Collection Charges
Collection charges were established to maintain the District's wastewater collection
lines.
A. Residential Customers (1 – 3 units)
The collection charge for residential customers is a monthly fixed cha rge.
Customer Class Charge
West of Boulder Avenue 15.36$
East of Boulder Avenue 17.36$
B. Commercial Customers
The collection charges for commercial customers include a small fixed charge plus
a volumetric charge (water usage). Commercial accounts east of Boulder have an
additional $0.09/hcf (hundred cubic feet) charge.
Customer Class Charge
Fixed Charge 3.90$
9
Volumetric Charge (per HCF):
West of East of
Customer Class Boulder Avenue Boulder Avenue
Multi-Family (4 or more units, Mobile Home Park)0.55$ 0.64$
Commercial/Retail (Non-Office, Bakery, Market)0.55$ 0.64$
Restaurant/Lounge 0.55$ 0.64$
Laundromat 0.55$ 0.64$
Dry Cleaner 0.55$ 0.64$
School/Church (Daycare, Nursery School)0.55$ 0.64$
Office Building/Motel (without a restroom,
Municipality)
0.55$ 0.64$
Convalescent Home 0.55$ 0.64$
Treatment Charges
The District pays treatment charges established by the City of San Bernardino for the
operation and maintenance of their wastewater treatment facilities. Any future
increases made by the City over the next five years following the previous public
hearing, held on January 25, 2017, may be automatically passed through and
incorporated herein by this reference, by action of the District’s Board of Directors to
the extent authorized by Government Code Section 53756 and any other applic able
provision of law.
A. Residential Customers
Treatment charges for residential customers are a monthly fixed charge.
7/1/2016 7/1/2017
Residential 20.85$ 21.55$
Multi-Family (2 Units)41.72$ 43.10$
Multi-Family (3 Units)62.58$ 64.64$
Customer Class
Rates Effective on:
10
B. Commercial Customers
Treatment charges for commercial customers include a small fixed plus a volumetric
charge (water usage) which varies depending on the nature of the commercial
entity.
Fixed Charges:
7/1/2016 7/1/2017
Multi-Family (4+ Units), Mobile Home Parks 1.90$ 1.97$
Non-Residential Customer Classes 3.42$ 3.52$
Customer Class
Rates Effective on:
Volumetric Charges (per HCF):
7/1/2016 7/1/2017
Multi-Family (4+ Units), Mobile Home Parks 1.48$ 1.53$
Commercial / Retail 2.47$ 2.55$
Restaurants / Lounges 3.18$ 3.28$
Laundromats 1.77$ 1.83$
Dry Cleaners 2.47$ 2.55$
Schools / Churches 1.29$ 1.33$
Governments / Municipal 1.77$ 1.83$
Convalescent Homes 1.58$ 1.63$
Hotels (with Restaurants)3.18$ 3.28$
Offices Buildings / Motels 1.77$ 1.83$
Auto Repair / Service Station 1.53$ 1.58$
Car Wash 1.53$ 1.58$
Rates Effective on:
Customer Class
11
Users other than Residential: Rates for users other than “residential” shall be
computed on the basis of actual consumption as reflected by water meter
readings for the billing period. Such water consumption may be reduced for the
purpose of establishing sewer service charges subject to “seasonal” or
“consumptive” use as recognized and approved by the Board of Directors.
Unmetered Commercial Dischargers: Unmetered co mmercial dischargers shall
be billed as follows:
Residential units in apartments, condominiums, and mobile home parks shall be
billed for each dwelling unit at the rate established for single -family dwelling
units. Other commercial dischargers shall be bil led at a rate determined by the
General Manager, based on experience from similar metered dischargers.
12
Section 3: Developer Services
Water Connection Fees
The water service connection charge is the charge for the type and size of water service
connection desired. Such regular charge shall be pai d in advance by the applicant.
Where there is no regular charge, the District reserves the right to require the applicant
to deposit an amount equal to the estimated cost of suc h service connection.
Harmony Non-Harmony
3/4"5,200.00$ 4,607.00$
1"8,684.00$ 7,694.00$
1 1/2"17,316.00$ 15,343.00$
2"27,714.00$ 24,556.00$
3"51,997.00$ 46,072.00$
4"86,741.00$ 76,858.00$
6"173,165.00$ 153,434.00$
8"311,983.00$ 276,434.00$
10"519,971.00$ 460,723.00$
Meter Size
Capacity Charge
Installation charges will be estimated by the District based on availab ility of District
staff to complete the work and site specific construction conditions and requirements.
If the applicant elects not to have District staff complete the installation then an
administrative fee of 5% of the estimate will be charged.
13
Wastewater Connection Fees
The sewer service connection charge is the charge for the type and size of service
connection desired. Such regular charge shall be paid in advance by the applicant.
Where there is no such regular charge, the District reserves the right to require the
applicant to deposit an amount equal to the estimated cost of such service connection.
The following charges are hereby established and shall be collected at the time of
application for sewer connection:
Charge or Fee Name
Permit Charge 25.00$ per connection
Inspection Charge 100.00$ per connection
District Conveyance Capacity Charge 3,099.00$ per EDU or portion thereof
Trunk Sewer Charge 158.00$ per EDU or portion thereof
Charge/Fee
The City of San Bernardino Water Reclamation Plant currently treats all wastewater
flows generated by residential and commercial dischargers within the East Valley Water
District service area. Accordingly, the City is responsible for establishing the
Wastewater Treatment Capacity fee collected by the District for new development.
The current fee established by the City is $3,500 per equivalent dwelling unit (EDU).
Fire Service Connection Charges
The fire service charge is the charge for the type and size of fire service connection
desired. Such regular charge shall be paid in advance by the applicant. Where there is
no regular charge, the District reserves the right to require the applicant to deposit an
amount equal to the estimated cost of such service connection.
Installation charges will be estimated by the District based on availability of District
staff to complete the work and site specific construction conditions and requirements.
If the applicant elects not to have District staff complete the installation then an
administrative fee of 5% of the estimate will be charged.
14
Developer Services Charges and Fees
1. Front Footage Charge
The front footage charge is a one-time reimbursement to the District for previously
constructed water mains adjacent to all sides of an unimproved property to be
serviced. This charge is hereby established at a rate of $30.00 per lineal foot.
2. Water Main Extension Charge
The water main extension charge is for the construction of a water main extending
to the far side of the property to be served. This charge shall be based on the
prevailing rates of time and material per District approved plans. The customer shall
be responsible to provide the plans and for all applicable Engineering Services
charges described below.
3. Fire Hydrant Installation Charge
Installation charges will be estimated by the District based on availability of District
staff to complete the work and site specific construction conditions and
requirements. If the applicant elects not to have District staff complete the
installation then an administrative fee of 5% of the estimate will be charged.
4. Special Facility Charge
A special facility charge shall be required for development of limited service
whenever special facilities, including pressure regulators are required. The charge
to be made to a developer or owner of land that is considered by the District to be
within a limited service area shall be based upon the developer’s or landowner’s
proportionate share of the cost for the installation of such Special Facility. Such
proportionate share to be borne by the developer or landowner shall be based on
the percentage of such development to the entire limited service area to be served
by the Special Facilities; and the same number of acres or area under normal
conditions and the cost of facilities to serve the acreage of area under special
conditions at a higher cost.
5. Construction Inspection Charge
Where a customer service connection or facility requires inspection by District
personnel, the customer shall be charged for such inspection at the rate of $900.00
per day. When District personnel are not available, inspection will be performed by
third party inspectors retained by the District. The hourly rate for third party
inspectors will be established at the beginning of each third party inspection
assignment.
15
6. Water System Design Charge
A water system design charge shall be required for all main ex tensions, service
connections and/or special facilities requiring the preparation of engineering plans
and drawings. The water system design charge is hereby established as that fee
charged by an engineering firm of the District’s choosing, plus an additio nal 10%
thereof for the District’s administrative costs. In the event the costs exceed the fees
charged, the additional cost will be billed to the customer.
7. Engineering Service Charges
The Engineering Services charge is a fee for the District’s time and ef fort spent on
assisting customers who have a requirement to construct water or sewer main
extensions, or other water and/or sewer facilities, which must meet District needs
and conform to District standards. This fee includes time and effort the District
spends on plan checking, plan and easement development, and all other related
work.
Prior to submission of any documents requiring work by the District, a non -
refundable minimum charge in the amount of 10% of the engineer’s estimated cost
for the project shall be submitted to the District. The work will be accomplished on
a time and effort basis. Should the District require more funds than the original
charge, the additional costs will be billed and must be paid prior to allowing water
and/or sewer service to the project.
8. Sewer Manhole and Valve Can Deposit
A refundable deposit of $1,500.00 per manhole will be charged for each sewer
manhole structure shown on the sewer construction plans. A refundable deposit of
$500 per valve can will be charged for each val ve can as shown on the water
construction plans. These deposits will be returned when all manholes and valve
cans are constructed to final grade by the developer’s contractor and verified by
the District.
As an alternative to the manhole and valve can depo sit, a guarantee bond may be
provided in the same amount as the deposit. The guarantee bond shall contain
covenants that are satisfactory to the District. Such bond shall remain in force until
all manholes and valve cans are constructed to final grade by t he developer’s
contractor and verified by the District.
9. Research Fee (flat rate, 4 hour minimum)
This $200.00 fee will provide funding for engineering staff to conduct research and
provide copies of materials to developer engineers ’ such as plans, easements, and
other development related materials. This would only apply to obtaining information
16
for developers that is unique to their development area and not general information
such as fee schedules or District design standards.
10. Development Meeting Fee (after first meeting)
This $250.00 per hour fee will provide funding for engineering staff to prepare for
and attend, meetings with developers regarding their projects beyond the initial
project consultation meeting and set-up. This fee will impact primarily larger more
complex developments which may require multiple coordination meetings with
staff.
11. Annual Backflow Compliance Test (per device)
A fee of $60.00 will be charged to the developer after newly installed and inspected
devices (performed by District staff) are complete.
12. Backflow Inspection Fee (per inspection)
A fee of $80.00 will be charged for each backflow inspection of newly installed
backflow prevention devices, in accordance with District standards.
13. Water Quality Sampling Fee (per sample)
A fee of $110.00 will be charged for each water quality sample taken for new
construction.
14. New Construction Chlorination and Flushing Fee ($225 minimum to actual cost)
A minimum fee of $225.00 will be charged for new construction disinfection plan
review, inspection, and flushing prior to sampling.
17
Charge or Fee Name Charge/Fee
Front Footage Charge $30.00 (per lineal foot)
Water Main Extension Charge
Fire Hydrant Installation Charge Actual cost or 5% of estimate
Special Facility Charge
Construction Inspection Charge $900.00 (per day) or actual cost
Water System Design Charge Actual cost + 10%
Engineering Service Charges 10% (of Engineer's estimated project cost)
Sewer Manhole and Valve Can Deposit $1,500.00 (per manhole); $500.00 (per valve can)
Research Fee $200.00 (flat rate, 4 hour minimum)
Development Meeting Fee $250.00 (per hour, after first meeting)
Annual Backflow Compliance Test $60.00 (per device)
Backflow Inspection Fee $80.00 (per inspection)
Water Quality Sampling Fee $110.00 (per sample)
New Construction Chlorination and Flushing Fee $225.00 (minimum to actual cost)
18
History of Revisions
DATE
ADOPTED RESOLUTION RESCIND REVISION
DATE
EFFECTIVE
01/25/17 2017.01 2016.05 Update Wastewater Treatment Fees and
Renew 5-Year Pass Through Provision
07/01/17
02/24/16 2016.05 2015.04 Update Wastewater and Miscellaneous Fees 04/01/16
03/25/15 2015.04 2014.32 Implement Water Budget Based Rates 06/01/15
03/25/15 2015.04 Ord 391 Update Wastewater Fees 06/01/15
EXHIBIT “B”
EAST VALLEY WATER DISTRICT
SCHEDULE OF
WATER AND WASTEWATER
RATES AND CHARGES
UPDATED JULY 11, 2018
i
Table of Contents
Section 1: Water Service Charges ............................................................. 2
Monthly Water System Charge ............................................................... 2
Commodity Charges: Potable Water ....................................................... 2
MWD Surcharge ................................................................................. 3
Private Fire Protection Service ............................................................. 4
1. Commercial Standby Charge ........................................................... 4
2. Fire Flow Testing ......................................................................... 4
Temporary Water Service Connection ..................................................... 5
Monthly Service Charge ..................................................................... 5
1. Commodity Charge ....................................................................... 5
2. Meter Deposit ............................................................................. 5
3. Unauthorized Use of Water Charge ................................................... 5
New Account Fees for Water Services ..................................................... 6
1. Service Initiation Charge ................................................................ 6
2. Security Deposit .......................................................................... 6
Miscellaneous Water Service Charges and Fees ......................................... 6
1. Delinquency Charge ..................................................................... 6
2. Returned Payment Charge .............................................................. 6
3. Disconnection Notice Charge ........................................................... 6
4. Service Reconnect Charge (Business Hours) ......................................... 6
5. Service Reconnect Charge (After Hours) ............................................. 6
6. Meter Test Charge ....................................................................... 7
7. Annual Backflow Compliance Test (per device) ..................................... 7
8. Backflow Device Installation Fee ...................................................... 7
9. Backflow Device Annual Administration Fee (per device) ......................... 7
Section 2: Wastewater Service Charges ..................................................... 8
Monthly Wastewater System Charge ....................................................... 8
Collection Charges ........................................................................... 8
ii
Treatment Charges ........................................................................... 9
Section 3: Developer Services ............................................................... 12
Water Connection Fees ..................................................................... 12
Wastewater Connection Fees .............................................................. 13
Fire Service Connection Charges ......................................................... 13
Developer Services’ Charges and Fees .................................................. 14
1. Front Footage Charge .................................................................. 14
2. Water Main Extension Charge ......................................................... 14
3. Fire Hydrant Installation Charge ..................................................... 14
4. Special Facility Charge ................................................................. 14
5. Construction Inspection Charge ...................................................... 14
6. Water System Design Charge .......................................................... 15
7. Engineering Service Charges .......................................................... 15
8. Sewer Manhole and Valve Can Deposit .............................................. 15
9. Research Fee (flat rate, 4 hour minimum) .......................................... 15
10. Development Meeting Fee (after first meeting) ................................... 16
11. Annual Backflow Compliance Test (per device) .................................... 16
12. Backflow Inspection Fee (per inspection) ........................................... 16
13. Water Quality Sampling Fee (per sample) .......................................... 16
14. New Construction Chlorination and Flushing Fee ($225 minimum to actual
cost) ............................................................................................ 16
History of Revisions ............................................................................. 18
1
[THIS PAGE IS INTENTIONALLY BLANK]
2
Section 1: Water Service Charges
Monthly Water System Charge
The water system charge is the monthly availability charge applicable to all metered
water services, and shall apply whether or not premises served by the meter are
occupied. The charges, which vary by meter size, are established at the amounts listed
in the table below.
Rates Effective on:
7/1/2016
5/8" 23.06$
3/4" 29.27$
1" 41.71$
1 1/2" 72.81$
2" 110.13$
3" 228.30$
4" 402.44$
6" 819.14$
8" 1,503.28$
Meter Size
Commodity Charges: Potable Water
Commodity Charges are billed on a per unit basis for water consumption registered by
the water service meter. One unit is 100 cubic feet (HCF) of water, which is equal to
748 gallons.
Rates Effective on:
7/1/2017
Tier 1 - Indoor Use 1.73$
Tier 2 - Outdoor Use 2.46$
Tier 3 - Inefficient Use 3.44$
Tiers
3
MWD Surcharge
The MWD surcharge rate (per hundred cubic feet) for all customer types is as follows
Effective 6/1/2015
Rate per HCF $0.00
The MWD Surcharge Rate represents increased costs associated with water imported
from the State Water Project. The charge to the District for State Water Project
imported water is established by the San Bernardino Valley Municipal Water District.
Since the District has no control over the adoption or imposition of MWD water charges,
imposed through San Bernardino Valley Municipal Water District for the delivery of
imported water to the District, EVWD may pass-through, for a five year period beginning
June 1, 2015 any increases in the cost of MWD imported water imposed by the San
Bernardino Valley Municipal Water District.
4
Private Fire Protection Service
1. Commercial Standby Charge
The fire service standby charge is the monthly charge assessed per inch diameter of
the District fire service meter. Water use through this service is limited to
emergency fire requirements only.
Rates Effective on:
7/1/2016
1" 8.78$
1 1/2" 13.18$
2" 17.57$
3" 26.35$
4" 35.14$
6" 52.70$
8" 70.27$
10" 87.84$
Meter Size
2. Fire Flow Testing
The fire flow test charge is a flat rate established to cover the District’s time and
effort for testing parts of the water system to obtain fire flow test data and
calculate results as requested. The District will charge a one-time fee of $100.00 to
administer fire flow tests.
5
Temporary Water Service Connection
A temporary service is available through the use of a fire hydrant. A customer deposit
for the temporary service will be required, and all other applicable service charges
shall apply.
Monthly Service Charge
Refer to the schedule of Monthly Water System Charges for three inch (3”) meters.
1. Commodity Charge
Commodity charges for temporary services shall be billed at the Tier 3 rates based
on the Potable Water Commodity Rates. When available, and feasible, recycled
water shall be used for temporary construction uses.
The Commodity Charge shall be as follows:
Area Rate/100 Cubic Feet
Potable Tier 3 Rate
Recycled TBD
2. Meter Deposit
A deposit equal to the replacement cost of the construction meter shall be collected
at the time of service application. Currently, the replacement cost is estimated to
be $1,800.00. The deposit will be applied to the closing bill and any remaining
amount refunded to the customer. Lost meters will result in forfeiture of the
deposit.
3. Unauthorized Use of Water Charge
The unauthorized use of water charge shall be charged to any person, organization
or agency for each unauthorized use of District water or for tampering in any manner
with any meter belonging to the District where this tampering shall affect the
accuracy of such meter. The unauthorized use of water charge is hereby established
at the rate of $500.00 for a first occurrence and $1,000.00 for each subsequent
occurrence.
6
New Account Fees for Water Services
The following fees are applicable to all requests for new service, or transfer of an
existing account to a new location:
1. Service Initiation Charge
The service initiation charge is a non-refundable charge of $30.00 per account,
which covers the reasonable District costs for initiating water service.
2. Security Deposit
A deposit of $150.00 will be required until a one year payment history, with fewer
than two delinquencies, has been established. The deposit insures payment of
minimum District charges.
Miscellaneous Water Service Charges and Fees
1. Delinquency Charge
Rates and charges which are not paid on or before the due dates shall be subject to
interest charges. Interest will be calculated at a rate of one and one-half percent
(1 ½%) on all amounts that remain unpaid at the end of each billing cycle.
2. Returned Payment Charge
A returned check charge is a charge which covers the reasonable administrative cost
and banking charges for processing a returned check.
3. Disconnection Notice Charge
The disconnect notice charge is the charge which covers reasonable District costs to
notify customers that their water service is subject to impending termination.
4. Service Reconnect Charge (Business Hours)
The service reconnect charge is the charge which covers the reasonable District
costs for disconnection and reconnection during regular business hours, of service
connections which are in violation of the provisions contained herein.
5. Service Reconnect Charge (After Hours)
The service reconnect charge is the charge which covers the reasonable District
costs for disconnection and reconnection during non-business hours, of service
connections which are in violation of the provisions contained herein.
7
6. Meter Test Charge
The meter test charge is the charge which covers the District costs for removing,
bench testing, and reinstalling the water meter to be tested.
7. Annual Backflow Compliance Test (per device)
A fee of $5.00 per month will be charged to the customer when the annual backflow
compliance test is performed by District staff. The customer will only be billed as a
lump sum when District standards regarding the inspection, testing, and
maintenance of customer-owned backflow assemblies are not followed.
8. Backflow Device Installation Fee
Installation of new backflow prevention assemblies completed by the District will
be done at actual cost.
9. Backflow Device Annual Administration Fee (per device)
The District shall appoint at least one person trained in cross-connection control to
administer and ensure all District standards are met. This backflow device annual
administration fee will be assessed annually.
Summary of charges/fees for Miscellaneous Water Service:
Charge or Fee Name Charge/Fee
Delinquency Charge 1.5%
Returned Payment Charge $20.00
Disconnect Notice Charge $23.00
Service Reconnect Charge (Business Hours) $70.00
Service Reconnect Charge (After Hours) $150.00
Meter Test Charge $75.00
Annual Backflow Compliance Test $60.00 ($5.00 per month)
Backflow Device Installations Actual Cost
Backflow Annual Administration Fee $20.00 (per device)
8
Section 2: Wastewater Service Charges
Monthly Wastewater System Charge
Collection Charges
Collection charges were established to maintain the District's wastewater collection
lines.
A. Residential Customers (1 – 3 units)
The collection charge for residential customers is a monthly fixed charge.
Customer Class Monthly Charge
Residential 15.36$
East of Boulder Avenue 17.36$
B. Commercial Customers
The collection charges for commercial customers include a small fixed charge plus
a volumetric charge (water usage).
Customer Class Monthly Fixed Charge
Commercial / Multi-Family 3.90$
Volumetric Charge per hundred cubic feet (HCF) of water used:
Commercial Customer Type Charge Per HCF
Multi-Family (4 or more units, Mobile Home Park) 0.55$
Commercial/Retail (Non-Office, Bakery, Market) 0.55$
Restaurant/Lounge 0.55$
Laundromat 0.55$
Dry Cleaner 0.55$
School/Church (Daycare, Nursery School) 0.55$
Office Building/Motel (without a restroom,
Municipality)
0.55$
Convalescent Home 0.55$
9
Treatment Charges
The District pays treatment charges established by the City of San Bernardino for the
operation and maintenance of their wastewater treatment facilities. Any future
increases made by the City over the next five years following the previous public
hearing, held on January 25, 2017, may be automatically passed through and
incorporated herein by this reference, by action of the District’s Board of Directors to
the extent authorized by Government Code Section 53756 and any other applicable
provision of law.
A. Residential Customers
Treatment charges for residential customers are a monthly fixed charge.
Rates Effective on:
7/1/2017
Residential 21.55$
Multi-Family (2 Units) 43.10$
Multi-Family (3 Units) 64.64$
Customer Class
10
B. Commercial Customers
Treatment charges for commercial customers include a small fixed plus a volumetric
charge (water usage) which varies depending on the nature of the commercial
entity.
Fixed Charges:
7/1/2017
Multi-Family (4+ Units), Mobile Home Parks 1.97$
Non-Residential Customer Classes 3.52$
Customer Class
Rates Effective on:
Volumetric Charges (per HCF):
7/1/2017
Multi-Family (4+ Units), Mobile Home Parks 1.53$
Commercial / Retail 2.55$
Restaurants / Lounges 3.28$
Laundromats 1.83$
Dry Cleaners 2.55$
Schools / Churches 1.33$
Governments / Municipal 1.83$
Convalescent Homes 1.63$
Hotels (with Restaurants) 3.28$
Offices Buildings / Motels 1.83$
Auto Repair / Service Station 1.58$
Car Wash 1.58$
Rates Effective on:
Customer Class
11
Users other than Residential: Rates for users other than “residential” shall be
computed on the basis of actual consumption as reflected by water meter
readings for the billing period. Such water consumption may be reduced for the
purpose of establishing sewer service charges subject to “seasonal” or
“consumptive” use as recognized and approved by the Board of Directors.
Unmetered Commercial Dischargers: Unmetered commercial dischargers shall
be billed as follows:
Residential units in apartments, condominiums, and mobile home parks shall be
billed for each dwelling unit at the rate established for single-family dwelling
units. Other commercial dischargers shall be billed at a rate determined by the
General Manager, based on experience from similar metered dischargers.
12
Section 3: Developer Services
Water Connection Fees
The water service connection charge is the charge for the type and size of water service
connection desired. Such regular charge shall be paid in advance by the applicant.
Where there is no regular charge, the District reserves the right to require the applicant
to deposit an amount equal to the estimated cost of such service connection.
Harmony Non-Harmony
3/4" 5,200.00$ 4,607.00$
1" 8,684.00$ 7,694.00$
1 1/2" 17,316.00$ 15,343.00$
2" 27,714.00$ 24,556.00$
3" 51,997.00$ 46,072.00$
4" 86,741.00$ 76,858.00$
6" 173,165.00$ 153,434.00$
8" 311,983.00$ 276,434.00$
10" 519,971.00$ 460,723.00$
Meter Size
Capacity Charge
Installation charges will be estimated by the District based on availability of District
staff to complete the work and site specific construction conditions and requirements.
If the applicant elects not to have District staff complete the installation then an
administrative fee of 5% of the estimate will be charged.
13
Wastewater Connection Fees
The sewer service connection charge is the charge for the type and size of service
connection desired. Such regular charge shall be paid in advance by the applicant.
Where there is no such regular charge, the District reserves the right to require the
applicant to deposit an amount equal to the estimated cost of such service connection.
The following charges are hereby established and shall be collected at the time of
application for sewer connection:
Charge or Fee Name
Permit Charge 25.00$ per connection
Inspection Charge 100.00$ per connection
Conveyance Capacity Charge 3,099.00$ per EDU or portion thereof *
Trunk Sewer Charge 158.00$ per EDU or portion thereof *
Treatment Capacity Charge 2,806.00$ per EDU or portion thereof *
Charge/Fee
*Adopted December 2014
The City of San Bernardino Water Reclamation Plant currently treats all wastewater
flows generated by residential and commercial dischargers within the East Valley Water
District service area. Accordingly, the City is responsible for establishing the
Wastewater Treatment Capacity fee collected by the District for new development.
The current fee established by the City is $3,500 per equivalent dwelling unit (EDU).
Accordingly, the District has been collecting monthly treatment fees and treatment
capacity fees on behalf of the City Water Department. However, on June 20, 2018 the
Local Agency Formation Commission for San Bernardino County (LAFCO) activated East
Valley Water District’s latent authority to treat and reclaim wastewater. As a result,
EVWD now assesses a Treatment Capacity Charge of $2,806 to be used for construction
of a wastewater reclamation plant, rather than collecting a $3,500 per EDU capacity
fee established by the City of San Bernardino Municipal Water Department.
Fire Service Connection Charges
The fire service charge is the charge for the type and size of fire service connection
desired. Such regular charge shall be paid in advance by the applicant. Where there is
no regular charge, the District reserves the right to require the applicant to deposit an
amount equal to the estimated cost of such service connection.
Installation charges will be estimated by the District based on availability of District
staff to complete the work and site specific construction conditions and requirements.
If the applicant elects not to have District staff complete the installation then an
administrative fee of 5% of the estimate will be charged.
14
Developer Services’ Charges and Fees
1. Front Footage Charge
The front footage charge is a one-time reimbursement to the District for previously
constructed water mains adjacent to all sides of an unimproved property to be
serviced. This charge is hereby established at a rate of $30.00 per lineal foot.
2. Water Main Extension Charge
The water main extension charge is for the construction of a water main extending
to the far side of the property to be served. This charge shall be based on the
prevailing rates of time and material per District approved plans. The customer shall
be responsible to provide the plans and for all applicable Engineering Services
charges described below.
3. Fire Hydrant Installation Charge
Installation charges will be estimated by the District based on availability of District
staff to complete the work and site specific construction conditions and
requirements. If the applicant elects not to have District staff complete the
installation then an administrative fee of 5% of the estimate will be charged.
4. Special Facility Charge
A special facility charge shall be required for development of limited service
whenever special facilities, including pressure regulators are required. The charge
to be made to a developer or owner of land that is considered by the District to be
within a limited service area shall be based upon the developer’s or landowner’s
proportionate share of the cost for the installation of such Special Facility. Such
proportionate share to be borne by the developer or landowner shall be based on
the percentage of such development to the entire limited service area to be served
by the Special Facilities; and the same number of acres or area under normal
conditions and the cost of facilities to serve the acreage of area under special
conditions at a higher cost.
5. Construction Inspection Charge
Where a customer service connection or facility requires inspection by District
personnel, the customer shall be charged for such inspection at the rate of $900.00
per day. When District personnel are not available, inspection will be performed by
third party inspectors retained by the District. The hourly rate for third party
inspectors will be established at the beginning of each third party inspection
assignment.
15
6. Water System Design Charge
A water system design charge shall be required for all main extensions, service
connections and/or special facilities requiring the preparation of engineering plans
and drawings. The water system design charge is hereby established as that fee
charged by an engineering firm of the District’s choosing, plus an additional 10%
thereof for the District’s administrative costs. In the event the costs exceed the fees
charged, the additional cost will be billed to the customer.
7. Engineering Service Charges
The Engineering Services charge is a fee for the District’s time and effort spent on
assisting customers who have a requirement to construct water or sewer main
extensions, or other water and/or sewer facilities, which must meet District needs
and conform to District standards. This fee includes time and effort the District
spends on plan checking, plan and easement development, and all other related
work.
Prior to submission of any documents requiring work by the District, a non-
refundable minimum charge in the amount of 10% of the engineer’s estimated cost
for the project shall be submitted to the District. The work will be accomplished on
a time and effort basis. Should the District require more funds than the original
charge, the additional costs will be billed and must be paid prior to allowing water
and/or sewer service to the project.
8. Sewer Manhole and Valve Can Deposit
A refundable deposit of $1,500.00 per manhole will be charged for each sewer
manhole structure shown on the sewer construction plans. A refundable deposit of
$500 per valve can will be charged for each valve can as shown on the water
construction plans. These deposits will be returned when all manholes and valve
cans are constructed to final grade by the developer’s contractor and verified by
the District.
As an alternative to the manhole and valve can deposit, a guarantee bond may be
provided in the same amount as the deposit. The guarantee bond shall contain
covenants that are satisfactory to the District. Such bond shall remain in force until
all manholes and valve cans are constructed to final grade by the developer’s
contractor and verified by the District.
9. Research Fee (flat rate, 4 hour minimum)
This $200.00 fee will provide funding for engineering staff to conduct research and
provide copies of materials to developer engineers such as plans, easements, and
other development related materials. This would only apply to obtaining information
16
for developers that is unique to their development area and not general information
such as fee schedules or District design standards.
10. Development Meeting Fee (after first meeting)
This $250.00 per hour fee will provide funding for engineering staff to prepare for
and attend, meetings with developers regarding their projects beyond the initial
project consultation meeting and set-up. This fee will impact primarily larger more
complex developments which may require multiple coordination meetings with
staff.
11. Annual Backflow Compliance Test (per device)
A fee of $60.00 will be charged to the developer after newly installed and inspected
devices (performed by District staff) are complete.
12. Backflow Inspection Fee (per inspection)
A fee of $80.00 will be charged for each backflow inspection of newly installed
backflow prevention devices, in accordance with District standards.
13. Water Quality Sampling Fee (per sample)
A fee of $110.00 will be charged for each water quality sample taken for new
construction.
14. New Construction Chlorination and Flushing Fee ($225 minimum to actual cost)
A minimum fee of $225.00 will be charged for new construction disinfection plan
review, inspection, and flushing prior to sampling.
17
Summary of charges/fees for Developer Services:
Charge or Fee Name Charge/Fee
Front Footage Charge $30.00 (per lineal foot)
Water Main Extension Charge
Fire Hydrant Installation Charge Actual cost or 5% of estimate
Special Facility Charge
Construction Inspection Charge $900.00 (per day) or actual cost
Water System Design Charge Actual cost + 10%
Engineering Service Charges 10% (of Engineer's estimated project cost)
Sewer Manhole and Valve Can Deposit $1,500.00 (per manhole); $500.00 (per valve can)
Research Fee $200.00 (flat rate, 4 hour minimum)
Development Meeting Fee $250.00 (per hour, after first meeting)
Annual Backflow Compliance Test $60.00 (per device)
Backflow Inspection Fee $80.00 (per inspection)
Water Quality Sampling Fee $110.00 (per sample)
New Construction Chlorination and Flushing Fee $225.00 (minimum to actual cost)
18
History of Revisions
DATE
ADOPTED RESOLUTION
UPDATED OR
RESCINDED REVISION
DATE
EFFECTIVE
07/11/18 2018.12 2017.01 Update Wastewater Fees 08/12/18
05/24/17 2017.07 2017.01 Update Water Fees 07/01/17
01/25/17 2017.01 2016.05 Update Wastewater Treatment Fees and
Renew 5-Year Pass Through Provision
07/01/17
02/24/16 2016.05 2015.04 Update Wastewater and Miscellaneous Fees 04/01/16
03/25/15 2015.04 2014.32 Implement Water Budget Based Rates 06/01/15
03/25/15 2015.04 Ord 391 Update Wastewater Fees 06/01/15
B O AR D AGE N D A S TAF F R E P ORT
Agenda Item #6.
Meeting Date: July 11, 2018
Dis c ussion Item
To: G o verning Board Memb ers
F rom: G eneral Manager/C EO
Subject: C ons id er Assignment and As s ump tion of EI R O b ligations and Implementatio n, Monitoring, and
R eporting R es p o ns ib ilities Under the S terling Natural R esource C enter
R E C O MME N D AT IO N:
S taff rec o mmend s that the Board autho rize the G eneral Manager/ C EO to exec ute an agreement with S an
Bernardino Valley Munic ipal Water Dis tric t to as s ume the EIR obligatio ns and implementatio n, mo nito ring and
reporting respons ibilities under the S terling Natural R esourc e C enter mitigation mo nitoring and reporting
program.
B AC KGR O UN D / AN ALYS IS :
In O c tober 2015 Eas t Valley Water District (Dis trict) and S an Bernard ino Valley Munic ipal Water Dis tric t
(Valley Dis tric t) entered into a framework agreement for the cons truc tion and o p eratio n of groundwater
rep lenis hment facilities, whic h wo uld inc lude the S terling Natural R es ource C enter (S NR C ). T hrough this
cooperative effo rt, Valley Dis tric t prepared an Environmental Impact R ep o rt (EI R ) and c o nduc ted extens ive
community o utreac h. In Marc h 2016, Valley Dis tric t certified the E I R and ad o p ted the C alifornia Enviro nmental
Q uality Act (C EQ A) find ings, S tatement of O verrriding C o nsiderations , Mitigatio n Monitoring and R ep o rting
P lan (MMR P ), and ap p ro ved the S terling Natural R es o urc e C enter P ro ject. T hes e doc uments have no t only
withsto o d legal challenges, but also have been commended b y the wildlife agenc ies for the q uality ap p roac h.
In Marc h 2018, the Dis tric t and Valley Dis tric t approved an amend ment to the F ramewo rk Agreement whic h
p ro vided that the agreement would terminate s ho uld Loc al Agency F ormatio n C o mmis s io n (L AF C O ) authorize
the activatio n of the Dis trict's wastewater treatment authority. Within this amendment, it was agreed that the
Dis tric t would take on any and all res p ons ib ilities o f the EIR or s upporting doc uments . O n June 20, 2018,
L AF C O held a pub lic hearing and ap p roved the activation o f the Dis trict's wastewater autho rity, and inc luded a
cond ition requiring the trans fer o f all obligations from the S NR C EI R and MMR P to the Distric t within 90
d ays.
As s ignment will confirm that the Dis trict takes full res p o nsibility fo r complianc e with all items relating to the
S NR C EI R and MMR P. S ome examples of this res p o ns ib ility inc ludes enviro nmental mitigatio n outlined to
p ro tec t the various protec ted spec ies within the p ro jec t area, ens uring that the project complies with all air q uality
regulations, the expectation of traffic control measures to b e in plac e d uring c onstruc tion.
T he Dis tric t is fully p rep ared to uphold the commitments made within the E I R s o that the S NR C can s erve as a
community asset.
R ecommended b y:
Jo hn Mura
G eneral Manager/C EO
R espec tfully sub mitted:
Kelly Malloy
Direc tor o f S trategic S ervic es
community asset.
AG E N C Y G O ALS AN D OB J E C T IVE S :
G oal and O b jectives I - Implement Effec tive S o lutio ns T hrough Visionary Leadership
a) Identify O pportunities to O p timize Natural R esourc es
R E VIE W B Y O T HE R S :
T his agenda item has been reviewed by Legal C o uns el.
F IS C AL IMPAC T
T here is no fis cal impac t as s o c iated with this agend a item.