REGULAR BOARD MEETING
March 11, 2015 – 5:30 P.M.
31111 GREENSPOT ROAD, HIGHLAND, CA
AGENDA
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
“In order to comply with legal requirements for posting of agenda, only those items filed
with the District Secretary by 12:00 p.m. on Wednesday prior to the following Wednesday
meeting not requiring departmental investigation, will be considered by the Board of
Directors”.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL OF BOARD MEMBERS
SUPPLEMENTAL INFORMATION FROM THE GENERAL MANAGER REGARDING AGENDA ITEMS
PRESENTATIONS & CEREMONIAL ITEMS
• Check presentation from Amy Olson (Southern California Edison) for Energy
Efficiency Pumping Savings
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
PUBLIC COMMENTS
Any person wishing to speak to the Board of Directors is asked to complete a Speaker Card
and submit it to the District Clerk prior to the start of the meeting. Each speaker is
limited to three (3) minutes, unless waived by the Chairman of the Board. Under the
State of California Brown Act, the Board of Directors is prohibited from discussing or
taking action on any item not listed on the posted agenda. The matter will automatically
be referred to staff for an appropriate response or action and may appear on the agenda
at a future meeting.
AGENDA - This agenda contains a brief general description of each item to be considered.
Except as otherwise provided by law, no action shall be taken on any item not appearing
on the following agenda unless the Board of Directors makes a determination that an
emergency exists or that a need to take immediate action on the item came to the
attention of the District subsequent to the posting of the agenda.
1. Approval of Agenda
2. APPROVAL OF CONSENT CALENDAR
All matters listed under the Consent Calendar are considered by the Board of
Directors to be routine and will be enacted in one motion. There will be no
discussion of these items prior to the time the Board considers the motion unless
members of the Board, the General Manager, or the public request specific items to
be discussed.
a) Resolution 2015.02 – A resolution accepting notice of completion for the
Walmart Expansion Project
b) Disbursements Accounts Payable Disbursements: Accounts Payable Checks
#243205 through #243927 which were distributed during the period of
January 1, 2015 through February 28, 2015, bank drafts and ACH Payments in
the amount of $6,259,551 and $840,170 for payroll and benefit
contributions. Total Disbursements for the period $7,099,721.
c) Directors’ fees and expenses for January & February 2015
OLD BUSINESS
3. Accept findings included in the updated Recycled Water Feasibility Study.
Recommendation: Approve
NEW BUSINESS
4. Receive and file the Economic Impact of the East Valley Recycled Water Project
report
Recommendation: Receive and File
5. Receive and file the results from the 2015 Community Survey conducted by
Probolsky Research
Recommendation: Receive and File
REPORTS
6. Board of Directors Reports
7. General Manager/CEO
8. Legal Counsel Report
9. Board of Directors Comments
CLOSED SESSION
10. CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION
[Government Code Section 54956.9(d)(1)]
Name of Case: East Valley Water District v. San Bernardino International Airport
Authority, et al., United States District Court Central District of California Case No.
EDCV14-00138-GAF(SPx)
11. PUBLIC EMPLOYEE PERFORMANCE EVALUATION
[Government Code Section 54957]
Unrepresented Employee: General Manager/CEO
ANNOUNCEMENT OF CLOSED SESSION ACTIONS
ADJOURN
PLEASE NOTE:
Materials related to an item on this agenda submitted to the Board after distribution of the agenda packet
are available for public inspection in the District’s office located at 31111 Greenspot Road, Highland, during
normal business hours. Also, such documents are available on the District’s website at www.eastvalley.org
subject to staff’s ability to post the documents before the meeting.
Pursuant to Government Code Section 54954.2(a), any request for a disability-related modification or
accommodation, including auxiliary aids or services, that is sought in order to participate in the above-
agendized public meeting should be directed to the District’s District Clerk at (909) 885-4900 at least 72
hours prior to said meeting.
Update of Water Reclamation
Plant Feasibility Study
March 11, 2015
Updates
October 2014 Feasibility Study Finalized
Key Updates
New Site Identified at Del Rosa
Habitat Conservation Plan is Progressing
Why Update the Feasibility Study?
Identification that the recycled water from the
proposed facility could be used for habitat
conservation and groundwater recharge
Potential new treatment plant site (Del Rosa)
could provide greater community benefits
Integration with Upper Santa Ana River Habitat
Conservation Plan Creates Unique Opportunities
Restoration of habitat
in City Creek for Santa
Ana Sucker habitat
Integrates habitat
restoration with
groundwater recharge
and water supply
reliability
City Creek Could be Managed to be
Continuously Wet to the Santa Ana River
City
Creek
Santa Ana
River
City Creek Could be Managed to be
Continuously Wet to the Santa Ana River
City
Creek
Santa Ana
River
Introduce Water
Near Plant 134
for Habitat
And Recharge
Introduce Recycled
Water Near 210
for Habitat
And Recharge
Evaluated a Fourth Potential Plant Site at Del Rosa
210
Near District
Headquarters
Near Golden
Triangle Sterling Avenue
Del Rosa Avenue
Del Rosa Site Provides Greater
Opportunities
Learning center
adjacent to schools
Captures more flow
by gravity, reducing
energy requirements
Maintains Sterling
property for uses
such as airport
corridor for San
Bernardino thus
providing tax revenue
Treatment
Facilities
Potential
Recharge
Basins
Identifying Ideal Recharge Basins
Project will
use both new
and existing
recharge
basins
•Redlands
•City Creek
Sterling and Del Rosa Site Comparison
3. Treatment at
Sterling for
Entire District
4. Treatment at
Del Rosa for
Entire District
20-yr Cost to EVWD for
Treatment at San Bernardino - -
20-yr Cost for Treatment by
East Valley $93 Million $93 Million
20-yr Cost of New Treatment
Facility $103 Million $103 Million
20-yr Cost of Infrastructure to
EVWD $21 Million $21 Million
20-yr Value of Water to East
Valley ($148 Million) ($148 Million)
Costs represent total costs over 20 – years of operation
Continued Commitment to Multi-Use
Development to Enhance the Community
Findings
Del Rosa site provides multiple benefits and
integrates well within the community
Del Rosa site is more energy efficient since it
captures more flow by gravity
Similar savings are achieved at Del Rosa site
as the previous recommendation of Sterling
site
Recycled water will provide enhanced
benefits for habitat conservation
Recommendations
Accept Findings and Incorporate in a
Revised Feasibility Study
Direct General Manger to Proceed toward
Implementation of the Project at Del Rosa
Site
Direct General Manager to Continue to Seek
Multiple Benefits thru HCP Process
Questions?
Contact Us
wwstudy@eastvalley.org | www.eastvalley.org/wwstudy
(909) 885-4900
EVWD - Community Survey
- Report on Results -
February 6, 2015
Probolsky Research
3990 Westerly Place Suite 185
Newport Beach, CA 92660 USA
(949) 855-6400 Newport Beach
(916) 256-4040 Sacramento
(202) 559-0270 Washington DC
www.probolskyresearch.com
EVWD - Community Survey
Methodology
From Thursday, January 29 through Sunday, February 1, 2015, Probolsky Research conducted a telephone survey within
the service area of East Valley Water District.
A total of 400 surveys were collected. A survey of this size yields a margin of error of +/-4.9% with a 95% degree of
confidence. Interviews were conducted with voters on both landline and cell phones and were offered in English and
Spanish languages.
Probolsky Research specializes in opinion research on behalf of government, business, special interest and media clients.
2 (949) 855 6400
www.probolskyresearch.com
EVWD - Community Survey
Highlights: general water issues and themes
•Water is an issue of concern to more than 75 percent of respondents, who worry about the availability of future water
supplies.
•More than 90 percent of respondents support major investments that will modernize and upgrade our infrastructure.
•An approval rating of 78.8 percent indicates that customers feel confident that EVWD is doing a good job in supplying its
water and wastewater services, saying “I always have water,” and “They do a good job.”
3 (949) 855 6400
www.probolskyresearch.com
EVWD - Community Survey
Highlights: Recycled water and the Recycled Water Center
•Three-quarters of respondents are familiar with the concept of recycled water. More than half think recycling water is a
good idea. Respondents commented on the value of conservation and helping with the drought situation.
•Similarly, 75.8 percent of respondents support the concept of a District Recycled Water Center that would treat up to 10
million gallons a day of wastewater instead of discharging it into the Santa Ana River.
•Support remains strong among all audience segments: genders, political parties, age groups, owners and renter and
differing ethnic groups.
•Support for the Recycled Water Center grew when respondents knew that:
o It will provide a local, high quality, drought-proof supply.
o It will replenish groundwater levels.
o The state-of-the-art purification process will be closely monitored.
o It will create jobs.
o It will produce $148 million of water over two decades.
o Similar projects are at work around the world.
•Support also became more likely when respondents were told that the Center’s location near a school would allow for
extensive educational partnership opportunities.
4 (949) 855 6400
www.probolskyresearch.com
(949) 855 6400
www.probolskyresearch.com
General
Community Themes
and
District Awareness
5
What is top of mind in the District?
Highlights from the cloud
6 (949) 855 6400
www.probolskyresearch.com
Public safety and jobs/the economy
Are the most important issues
Question: What is the most important issue facing your community today?
7 (949) 855 6400
www.probolskyresearch.com
35.3%
22.0%
8.8%
7.8%
5.8%
5.5%
5.5%
1.8%
1.8%
1.0%
0.8%
3.8%
1.3%
16.5%
Public safety
Jobs and the economy
Poverty
Environmental issues
Government
Transportation
Education/schools/higher education
Overpopulation/controlling growth/development
Healthcare
Affordable housing
Moral issues
None/nothing
Other
Don't know/refused
51.3% correctly identify East Valley Water District
As their water provider
Question: Can you tell me who provides the water service for your home?
8 (949) 855 6400
www.probolskyresearch.com
51.3%
4.3%
4.0%
3.0%
2.3%
1.5%
1.5%
1.3%
1.0%
1.8%
7.3%
22.0%
East Valley Water District/EVWD
Water department/water district in our area
San Bernardino Municipal Water Department/SBMWD
Apartment complex
Highland Water District
West Valley Water District
The landlord/landowner
City
Edison
Nothing/don't have water service
Other
Don't know/not sure
(949) 855 6400
www.probolskyresearch.com
News Sources for
Water and Water-Related
Issues
9
Local TV is the top source for news/information about water,
Followed by newspapers and the local water agency
Question: What are your top two sources for news and information about water and water-related issues? Pick two.
10 (949) 855 6400
www.probolskyresearch.com
49.3%
32.5%
29.5%
22.3%
15.5%
13.3%
2.3%
4.0%
7.5%
6.5%
Local television
Newspaper
Your local water agency
Social media platforms such as Facebook and Twitter
A website or blog
Local radio
Magazines
Nothing
Something else
Unsure/refuse
(949) 855 6400
www.probolskyresearch.com
Focusing on
Water Availability
11
75.3% are concerned
About the availability of water in their community in the years to come
Question: How concerned are you about the availability of water in your community in the years to come? Would you
say that you are extremely concerned, somewhat concerned, not too concerned or not at all concerned?
12 (949) 855 6400
www.probolskyresearch.com
75.3%
22.5%
2.2%
Concerned Not concerned Unsure/refused
13 (949) 855 6400
www.probolskyresearch.com
30.5%
5.8%
44.8%
16.8%
Concerned Not concerned
Extremely
Not at all
Somewhat
Not too
30.5% say they are very concerned
About the availability of water in the years to come
Question: How concerned are you about the availability of water in your community in the years to come? Would you
say that you are extremely concerned, somewhat concerned, not too concerned or not at all concerned?
91.0% agree that we need to make
Major investments to modernize and upgrade our water infrastructure
Question: Now, please tell me if you agree or disagree with the following statement:
“Water supply is always an issue in drought-prone California, and while water conservation is important, it is only part of
the solution. We need to make major investments to modernize and upgrade our water infrastructure to ensure local, safe,
reliable, high quality water now and in future years.”
14 (949) 855 6400
www.probolskyresearch.com
91.0%
6.8%
2.2%
Agree Disagree Unsure/refused
15 (949) 855 6400
www.probolskyresearch.com
60.3%
3.0%
29.8%
3.3%
1.0%
0.5%
Agree Disagree
Strongly
Strongly
Somewhat
Somewhat
The intensity of agreement is high:
60.3% strongly agree
Question: [IF AGREE OR DISAGREE>>>] And would you say that you strongly or somewhat (agree/disagree)?] [IF
UNSURE>>>] And would you say that you would lean one way or the other?
Lean
Lean
(949) 855 6400
www.probolskyresearch.com
District Performance
And
Satisfaction
16
78.8% approve of the job
The East Valley Water District is doing
Question: East Valley Water District provides water and wastewater services to nearly 100,000 people in San Bernardino
and Highland. In general, do you approve or disapprove of the job that East Valley Water District is doing?
17 (949) 855 6400
www.probolskyresearch.com
78.8%
7.8%
13.4%
Approve Disapprove Unsure/refused
18 (949) 855 6400
www.probolskyresearch.com
38.8%
3.8%
40.0%
4.0%
Approve Disapprove
Strongly
Strongly
Somewhat
Somewhat
38.8% strongly approve
Of the District’s job performance
Question: [IF APPROVE OR DISAPPROVE>>>] And would you say that you strongly or somewhat
(approve/disapprove)?
Top reasons why 78.8%
Of respondents approve of the District’s job performance*
Question: Thinking specifically, why do you approve of the job East Valley Water District is doing?
19 (949) 855 6400
www.probolskyresearch.com
31.4%
27.6%
23.2%
13.7%
7.3%
6.0%
5.1%
4.4%
1.6%
1.3%
1.9%
2.9%
3.8%
I always have water/we have water supply
They do a good job/good service
I'm good with it/no problem
Quality/reliability of the water
Keep consumers well informed
Educating community on water conservation
Low cost/not overpriced
Not enough information about them
They have new/updated their facility
Community involvement
None/no reason/don't approve
Other
Don't know/not sure
*Asked only of those who said they approve of the District’s job performance
62.5% are satisfied
With the quality of drinking water that comes out of their taps at home
Question: Thinking about the quality of drinking water that comes out of the tap at your home, would you say that you
are very satisfied, somewhat satisfied, somewhat dissatisfied or very dissatisfied?
20 (949) 855 6400
www.probolskyresearch.com
62.5%
28.8%
8.7%
Satisfied Dissatisfied Unsure/refused
(949) 855 6400
www.probolskyresearch.com
District Communications
21
Where do respondents currently get
Information from East Valley Water District?
Question: Where do you currently get information from East Valley Water District? Choose as many as you like, or none at
all.
22 (949) 855 6400
www.probolskyresearch.com
42.5%
40.8%
23.5%
12.0%
10.0%
7.5%
7.5%
7.0%
2.5%
0.8%
0.8%
0.5%
0.5%
0.5%
0.8%
13.3%
1.3%
Newsletter mailed to your home
Inserts included in your monthly bills
Notices and articles printed in newspapers
Social media, such as Twitter or Facebook posts
Postings on the District's website, www.eastvalley.org
Community events
A message from the District's online bill pay system
E-mail alerts
On television
Word of mouth/from other people
Straight from the Water District
On radio
Internet (unspecified)
Phone call
Some other way
None of the above
Unsure/refused
How would residents prefer to be kept informed
By the District about water and water-related issues?
Question: How would you prefer that East Valley Water District keep you informed about water and water -related issues?
Choose as many as you like, or none at all.
23 (949) 855 6400
www.probolskyresearch.com
52.8%
48.0%
23.0%
22.0%
18.0%
17.0%
15.0%
13.5%
0.8%
0.3%
0.3%
1.3%
3.5%
0.8%
Newsletter mailed to your home
Inserts included in your monthly bills
Notices and articles printed in newspapers
E-mail alerts
Postings on the District's website, www.eastvalley.org
Social media, such as Twitter or Facebook posts
Community events
A message from the District's online bill pay system
On television
On radio
Phone call
Some other way
None of the above
Unsure/refused
Bill payment is the primary driver
Of traffic to www.eastvalley.org
Question: If you have ever visited the website of East Valley Water District, www.eastvalley.org, please tell me why you
visited the District’s website. Choose as many as you like, or nothing at all. If you’ve never visited www.eastvalley.org, just say
so:
24 (949) 855 6400
www.probolskyresearch.com
17.5%
9.0%
5.8%
3.0%
1.3%
0.8%
0.8%
1.0%
72.3%
0.5%
To pay my bill
To find out more information about water-related topics
To find out more information about East Valley Water
District events and programs
To find out more information about sewage-related topics
Find out their location/address
For employment reasons
Curiosity
Something else
I've never visited www.eastvalley.org
Unsure/refused
(949) 855 6400
www.probolskyresearch.com
Attitudes Towards
Water Recycling
and Ensuring a Local,
Reliable Supply of Water
25
74.0% have heard
Of water recycling
Question: Have you heard of water recycling, a process that removes impurities from wastewater and sewer water
resulting in clean enough water for irrigation and groundwater replenishment?
26 (949) 855 6400
www.probolskyresearch.com
74.0%
25.3%
0.7%
Yes No Unsure/refused
What do people think
About water recycling?
Question: What do you think of water recycling?
27 (949) 855 6400
www.probolskyresearch.com
51.3%
10.5%
10.3%
9.3%
9.0%
7.8%
7.5%
7.0%
6.5%
4.5%
4.3%
2.3%
1.3%
1.0%
1.0%
1.0%
0.8%
0.8%
3.3%
4.3%
Good thing/great idea/I'm all for it/it should be done
Not informed/don't know much about it
Good for watering outside
Not good for home consumption/drinking/cooking
Makes the water clean/safe/purified/good for drinking/consumption
Cover up drought/shortage of water
It's necessary/needed/important
Water conservation/water shouldn't be put into waste
Don't trust that the water is purified/filtered from harmful materials/unsafe/gross
It will be useful/helpful
Good for irrigation/agricultural purposes
Don't like it/don't approve it
Depends on what water they are recycling
Affordable/cost-effective/save us money
It is mandatory/should be done by everyone
Smart thing to do
Depends on what it was for/how they are going to use the water
Interesting idea
Other
Don't know/not sure
What is the best way for local water agencies
To ensure reliable local water supply?
Question: What, in your opinion, is the best way for local water agencies to ensure reliable local water supply? Choose as
many as you like, or none at all.
28 (949) 855 6400
www.probolskyresearch.com
49.3%
46.0%
43.5%
41.8%
36.3%
25.5%
25.0%
22.0%
17.0%
0.8%
0.5%
0.5%
0.5%
0.5%
1.0%
1.3%
7.0%
Capturing and recycling storm water run-off
Recycling treated sewer water for non-drinking water purposes
Desalination, a process of turning ocean water into drinking water
Conservation
More surface storage or dams
Mandatory water use restrictions
Recycling treated sewer water for drinking water purposes
More imported water
Limit population growth
Watering of crops/plants
Having filters/filtering system
More resources
Recycling
Education/awareness
Something else
None
Unsure/refused
(949) 855 6400
www.probolskyresearch.com
Introducing the
Recycled Water Center
29
75.8% support
The District’s Recycled Water Center
Question: Now, I am going to read you some more information about water in your area. East Valley Water District produces 80% of our water supply from
local groundwater. 15% comes from the Santa Ana River, which goes through several treatment and disinfection processes prior to delivery. The remaining less than
5% is purchased from imported water sources, such as the Sacramento Bay Delta. To expand its water resources and increase local reliability, East Valley Water
District has prioritized recycled water and other local water supply projects. One way the District can increase local water supply and reliability is by recycling sewage
water, also known as wastewater, that would otherwise be sent to the San Bernardino Municipal Water Department wastewater tre atment plant and then released
into the Santa Ana River. The District plans to construct a recycled water plant, to be called the Recycled Water Center, and treat up to 10 million gallons a day of
wastewater. The wastewater would be disinfected to nearly distilled quality using the same technologies that purify baby food, fruit juices, medicines and bottled
water. The recycled water is then put into the ground where it filters through the earth, traveling through layers of gravel and sand before finally settling into
underground lakes where it would blend with existing groundwater. After at least six months, and in some cases years later, this blended water could be pumped out
and disinfected with chlorine prior to being used for drinking water. Based on what you now know, do you support or oppose the District’s Recycled Water Center?
30 (949) 855 6400
www.probolskyresearch.com
75.8%
17.0%
7.2%
Support Oppose Unsure/refused
Thank you
Probolsky Research
3990 Westerly Place Suite 185
Newport Beach, CA 92660 USA
(949) 855-6400 Newport Beach
(916) 256-4040 Sacramento
(202) 559-0270 Washington DC
www.probolskyresearch.com
Update of Water Reclamation
Plant Feasibility Study
March 11, 2015
Updates
October 2014 Feasibility Study Finalized
Key Updates
New Site Identified at Del Rosa
Habitat Conservation Plan is Progressing
Why Update the Feasibility Study?
Identification that the recycled water from the
proposed facility could be used for habitat
conservation and groundwater recharge
Potential new treatment plant site (Del Rosa)
could provide greater community benefits
Integration with Upper Santa Ana River Habitat
Conservation Plan Creates Unique Opportunities
Restoration of habitat
in City Creek for Santa
Ana Sucker habitat
Integrates habitat
restoration with
groundwater recharge
and water supply
reliability
City Creek Could be Managed to be
Continuously Wet to the Santa Ana River
City
Creek
Santa Ana
River
City Creek Could be Managed to be
Continuously Wet to the Santa Ana River
City
Creek
Santa Ana
River
Introduce Water
Near Plant 134
for Habitat
And Recharge
Introduce Recycled
Water Near 210
for Habitat
And Recharge
Evaluated a Fourth Potential
Plant Site at Del Rosa
210
Near District
Headquarters
Near Golden
TriangleSterling Avenue
Del Rosa Avenue
Del Rosa Site Provides Greater
Opportunities
Learning center
adjacent to schools
Captures more flow
by gravity, reducing
energy requirements
Maintains Sterling
property for uses
such as airport
corridor for San
Bernardino thus
providing tax revenue
Treatment
Facilities
Potential
Recharge
Basins
Identifying Ideal Recharge Basins
Project will
use both new
and existing
recharge
basins
• Redlands
• City Creek
Sterling and Del Rosa Site Comparison
3. Treatment at
Sterling for
Entire District
4. Treatment at
Del Rosa for
Entire District
20-yr Cost to EVWD for
Treatment at San Bernardino --
20-yr Cost for Treatment by
East Valley $93 Million $93 Million
20-yr Cost of New Treatment
Facility $103 Million $103 Million
20-yr Cost of Infrastructure to
EVWD $21 Million $21 Million
20-yr Value of Water to East
Valley ($148 Million) ($148 Million)
Costs represent total costs over 20 – years of operation
Continued Commitment to Multi-Use
Development to Enhance the Community
Findings
Del Rosa site provides multiple benefits and
integrates well within the community
Del Rosa site is more energy efficient since it
captures more flow by gravity
Similar savings are achieved at Del Rosa site
as the previous recommendation of Sterling
site
Recycled water will provide enhanced
benefits for habitat conservation
Recommendations
Accept Findings and Incorporate in a
Revised Feasibility Study
Direct General Manger to Proceed toward
Implementation of the Project at Del Rosa
Site
Direct General Manager to Continue to Seek
Multiple Benefits thru HCP Process
Questions?
Contact Us
wwstudy@eastvalley.org | www.eastvalley.org/wwstudy
(909) 885-4900
EVWD - Community Survey
- Report on Results -
February 6, 2015
Probolsky Research
3990 Westerly Place Suite 185
Newport Beach, CA 92660 USA
(949) 855-6400 Newport Beach
(916) 256-4040 Sacramento
(202) 559-0270 Washington DC
www.probolskyresearch.com
EVWD - Community Survey
Methodology
From Thursday, January 29 through Sunday, February 1, 2015, Probolsky Research conducted a telephone survey within
the service area of East Valley Water District.
A total of 400 surveys were collected. A survey of this size yields a margin of error of +/-4.9% with a 95% degree of
confidence. Interviews were conducted with voters on both landline and cell phones and were offered in English and
Spanish languages.
Probolsky Research specializes in opinion research on behalf of government, business, special interest and media clients.
2 (949) 855 6400
www.probolskyresearch.com
EVWD - Community Survey
Highlights: general water issues and themes
•Water is an issue of concern to more than 75 percent of respondents, who worry about the availability of future water
supplies.
•More than 90 percent of respondents support major investments that will modernize and upgrade our infrastructure.
•An approval rating of 78.8 percent indicates that customers feel confident that EVWD is doing a good job in supplying its
water and wastewater services, saying “I always have water,” and “They do a good job.”
3 (949) 855 6400
www.probolskyresearch.com
EVWD - Community Survey
Highlights: Recycled water and the Recycled Water Center
•Three-quarters of respondents are familiar with the concept of recycled water. More than half think recycling water is a
good idea. Respondents commented on the value of conservation and helping with the drought situation.
•Similarly, 75.8 percent of respondents support the concept of a District Recycled Water Center that would treat up to 10
million gallons a day of wastewater instead of discharging it into the Santa Ana River.
•Support remains strong among all audience segments: genders, political parties, age groups, owners and renter and
differing ethnic groups.
•Support for the Recycled Water Center grew when respondents knew that:
o It will provide a local, high quality, drought-proof supply.
o It will replenish groundwater levels.
o The state-of-the-art purification process will be closely monitored.
o It will create jobs.
o It will produce $148 million of water over two decades.
o Similar projects are at work around the world.
•Support also became more likely when respondents were told that the Center’s location near a school would allow for
extensive educational partnership opportunities.
4 (949) 855 6400
www.probolskyresearch.com
(949) 855 6400
www.probolskyresearch.com
General
Community Themes
and
District Awareness
5
What is top of mind in the District?
Highlights from the cloud
6 (949) 855 6400
www.probolskyresearch.com
Public safety and jobs/the economy
Are the most important issues
Question: What is the most important issue facing your community today?
7 (949) 855 6400
www.probolskyresearch.com
35.3%
22.0%
8.8%
7.8%
5.8%
5.5%
5.5%
1.8%
1.8%
1.0%
0.8%
3.8%
1.3%
16.5%
Public safety
Jobs and the economy
Poverty
Environmental issues
Government
Transportation
Education/schools/higher education
Overpopulation/controlling growth/development
Healthcare
Affordable housing
Moral issues
None/nothing
Other
Don't know/refused
51.3% correctly identify East Valley Water District
As their water provider
Question: Can you tell me who provides the water service for your home?
8 (949) 855 6400
www.probolskyresearch.com
51.3%
4.3%
4.0%
3.0%
2.3%
1.5%
1.5%
1.3%
1.0%
1.8%
7.3%
22.0%
East Valley Water District/EVWD
Water department/water district in our area
San Bernardino Municipal Water Department/SBMWD
Apartment complex
Highland Water District
West Valley Water District
The landlord/landowner
City
Edison
Nothing/don't have water service
Other
Don't know/not sure
(949) 855 6400
www.probolskyresearch.com
News Sources for
Water and Water-Related
Issues
9
Local TV is the top source for news/information about water,
Followed by newspapers and the local water agency
Question: What are your top two sources for news and information about water and water-related issues? Pick two.
10 (949) 855 6400
www.probolskyresearch.com
49.3%
32.5%
29.5%
22.3%
15.5%
13.3%
2.3%
4.0%
7.5%
6.5%
Local television
Newspaper
Your local water agency
Social media platforms such as Facebook and Twitter
A website or blog
Local radio
Magazines
Nothing
Something else
Unsure/refuse
(949) 855 6400
www.probolskyresearch.com
Focusing on
Water Availability
11
75.3% are concerned
About the availability of water in their community in the years to come
Question: How concerned are you about the availability of water in your community in the years to come? Would you
say that you are extremely concerned, somewhat concerned, not too concerned or not at all concerned?
12 (949) 855 6400
www.probolskyresearch.com
75.3%
22.5%
2.2%
Concerned Not concerned Unsure/refused
13 (949) 855 6400
www.probolskyresearch.com
30.5%
5.8%
44.8%
16.8%
Concerned Not concerned
Extremely
Not at all
Somewhat
Not too
30.5% say they are very concerned
About the availability of water in the years to come
Question: How concerned are you about the availability of water in your community in the years to come? Would you
say that you are extremely concerned, somewhat concerned, not too concerned or not at all concerned?
91.0% agree that we need to make
Major investments to modernize and upgrade our water infrastructure
Question: Now, please tell me if you agree or disagree with the following statement:
“Water supply is always an issue in drought-prone California, and while water conservation is important, it is only part of
the solution. We need to make major investments to modernize and upgrade our water infrastructure to ensure local, safe,
reliable, high quality water now and in future years.”
14 (949) 855 6400
www.probolskyresearch.com
91.0%
6.8%
2.2%
Agree Disagree Unsure/refused
15 (949) 855 6400
www.probolskyresearch.com
60.3%
3.0%
29.8%
3.3%
1.0%
0.5%
Agree Disagree
Strongly
Strongly
Somewhat
Somewhat
The intensity of agreement is high:
60.3% strongly agree
Question: [IF AGREE OR DISAGREE>>>] And would you say that you strongly or somewhat (agree/disagree)?] [IF
UNSURE>>>] And would you say that you would lean one way or the other?
Lean
Lean
(949) 855 6400
www.probolskyresearch.com
District Performance
And
Satisfaction
16
78.8% approve of the job
The East Valley Water District is doing
Question: East Valley Water District provides water and wastewater services to nearly 100,000 people in San Bernardino
and Highland. In general, do you approve or disapprove of the job that East Valley Water District is doing?
17 (949) 855 6400
www.probolskyresearch.com
78.8%
7.8%
13.4%
Approve Disapprove Unsure/refused
18 (949) 855 6400
www.probolskyresearch.com
38.8%
3.8%
40.0%
4.0%
Approve Disapprove
Strongly
Strongly
Somewhat
Somewhat
38.8% strongly approve
Of the District’s job performance
Question: [IF APPROVE OR DISAPPROVE>>>] And would you say that you strongly or somewhat
(approve/disapprove)?
Top reasons why 78.8%
Of respondents approve of the District’s job performance*
Question: Thinking specifically, why do you approve of the job East Valley Water District is doing?
19 (949) 855 6400
www.probolskyresearch.com
31.4%
27.6%
23.2%
13.7%
7.3%
6.0%
5.1%
4.4%
1.6%
1.3%
1.9%
2.9%
3.8%
I always have water/we have water supply
They do a good job/good service
I'm good with it/no problem
Quality/reliability of the water
Keep consumers well informed
Educating community on water conservation
Low cost/not overpriced
Not enough information about them
They have new/updated their facility
Community involvement
None/no reason/don't approve
Other
Don't know/not sure
*Asked only of those who said they approve of the District’s job performance
62.5% are satisfied
With the quality of drinking water that comes out of their taps at home
Question: Thinking about the quality of drinking water that comes out of the tap at your home, would you say that you
are very satisfied, somewhat satisfied, somewhat dissatisfied or very dissatisfied?
20 (949) 855 6400
www.probolskyresearch.com
62.5%
28.8%
8.7%
Satisfied Dissatisfied Unsure/refused
(949) 855 6400
www.probolskyresearch.com
District Communications
21
Where do respondents currently get
Information from East Valley Water District?
Question: Where do you currently get information from East Valley Water District? Choose as many as you like, or none at
all.
22 (949) 855 6400
www.probolskyresearch.com
42.5%
40.8%
23.5%
12.0%
10.0%
7.5%
7.5%
7.0%
2.5%
0.8%
0.8%
0.5%
0.5%
0.5%
0.8%
13.3%
1.3%
Newsletter mailed to your home
Inserts included in your monthly bills
Notices and articles printed in newspapers
Social media, such as Twitter or Facebook posts
Postings on the District's website, www.eastvalley.org
Community events
A message from the District's online bill pay system
E-mail alerts
On television
Word of mouth/from other people
Straight from the Water District
On radio
Internet (unspecified)
Phone call
Some other way
None of the above
Unsure/refused
How would residents prefer to be kept informed
By the District about water and water-related issues?
Question: How would you prefer that East Valley Water District keep you informed about water and water -related issues?
Choose as many as you like, or none at all.
23 (949) 855 6400
www.probolskyresearch.com
52.8%
48.0%
23.0%
22.0%
18.0%
17.0%
15.0%
13.5%
0.8%
0.3%
0.3%
1.3%
3.5%
0.8%
Newsletter mailed to your home
Inserts included in your monthly bills
Notices and articles printed in newspapers
E-mail alerts
Postings on the District's website, www.eastvalley.org
Social media, such as Twitter or Facebook posts
Community events
A message from the District's online bill pay system
On television
On radio
Phone call
Some other way
None of the above
Unsure/refused
Bill payment is the primary driver
Of traffic to www.eastvalley.org
Question: If you have ever visited the website of East Valley Water District, www.eastvalley.org, please tell me why you
visited the District’s website. Choose as many as you like, or nothing at all. If you’ve never visited www.eastvalley.org, just say
so:
24 (949) 855 6400
www.probolskyresearch.com
17.5%
9.0%
5.8%
3.0%
1.3%
0.8%
0.8%
1.0%
72.3%
0.5%
To pay my bill
To find out more information about water-related topics
To find out more information about East Valley Water
District events and programs
To find out more information about sewage-related topics
Find out their location/address
For employment reasons
Curiosity
Something else
I've never visited www.eastvalley.org
Unsure/refused
(949) 855 6400
www.probolskyresearch.com
Attitudes Towards
Water Recycling
and Ensuring a Local,
Reliable Supply of Water
25
74.0% have heard
Of water recycling
Question: Have you heard of water recycling, a process that removes impurities from wastewater and sewer water
resulting in clean enough water for irrigation and groundwater replenishment?
26 (949) 855 6400
www.probolskyresearch.com
74.0%
25.3%
0.7%
Yes No Unsure/refused
What do people think
About water recycling?
Question: What do you think of water recycling?
27 (949) 855 6400
www.probolskyresearch.com
51.3%
10.5%
10.3%
9.3%
9.0%
7.8%
7.5%
7.0%
6.5%
4.5%
4.3%
2.3%
1.3%
1.0%
1.0%
1.0%
0.8%
0.8%
3.3%
4.3%
Good thing/great idea/I'm all for it/it should be done
Not informed/don't know much about it
Good for watering outside
Not good for home consumption/drinking/cooking
Makes the water clean/safe/purified/good for drinking/consumption
Cover up drought/shortage of water
It's necessary/needed/important
Water conservation/water shouldn't be put into waste
Don't trust that the water is purified/filtered from harmful materials/unsafe/gross
It will be useful/helpful
Good for irrigation/agricultural purposes
Don't like it/don't approve it
Depends on what water they are recycling
Affordable/cost-effective/save us money
It is mandatory/should be done by everyone
Smart thing to do
Depends on what it was for/how they are going to use the water
Interesting idea
Other
Don't know/not sure
What is the best way for local water agencies
To ensure reliable local water supply?
Question: What, in your opinion, is the best way for local water agencies to ensure reliable local water supply? Choose as
many as you like, or none at all.
28 (949) 855 6400
www.probolskyresearch.com
49.3%
46.0%
43.5%
41.8%
36.3%
25.5%
25.0%
22.0%
17.0%
0.8%
0.5%
0.5%
0.5%
0.5%
1.0%
1.3%
7.0%
Capturing and recycling storm water run-off
Recycling treated sewer water for non-drinking water purposes
Desalination, a process of turning ocean water into drinking water
Conservation
More surface storage or dams
Mandatory water use restrictions
Recycling treated sewer water for drinking water purposes
More imported water
Limit population growth
Watering of crops/plants
Having filters/filtering system
More resources
Recycling
Education/awareness
Something else
None
Unsure/refused
(949) 855 6400
www.probolskyresearch.com
Introducing the
Recycled Water Center
29
75.8% support
The District’s Recycled Water Center
Question: Now, I am going to read you some more information about water in your area. East Valley Water District produces 80% of our water supply from
local groundwater. 15% comes from the Santa Ana River, which goes through several treatment and disinfection processes prior to delivery. The remaining less than
5% is purchased from imported water sources, such as the Sacramento Bay Delta. To expand its water resources and increase local reliability, East Valley Water
District has prioritized recycled water and other local water supply projects. One way the District can increase local water supply and reliability is by recycling sewage
water, also known as wastewater, that would otherwise be sent to the San Bernardino Municipal Water Department wastewater tre atment plant and then released
into the Santa Ana River. The District plans to construct a recycled water plant, to be called the Recycled Water Center, and treat up to 10 million gallons a day of
wastewater. The wastewater would be disinfected to nearly distilled quality using the same technologies that purify baby food, fruit juices, medicines and bottled
water. The recycled water is then put into the ground where it filters through the earth, traveling through layers of gravel and sand before finally settling into
underground lakes where it would blend with existing groundwater. After at least six months, and in some cases years later, this blended water could be pumped out
and disinfected with chlorine prior to being used for drinking water. Based on what you now know, do you support or oppose the District’s Recycled Water Center?
30 (949) 855 6400
www.probolskyresearch.com
75.8%
17.0%
7.2%
Support Oppose Unsure/refused
Thank you
Probolsky Research
3990 Westerly Place Suite 185
Newport Beach, CA 92660 USA
(949) 855-6400 Newport Beach
(916) 256-4040 Sacramento
(202) 559-0270 Washington DC
www.probolskyresearch.com
Economic Impact of the
East Valley Recycled Water Project
John E. Husing, Ph.D.
Economics & Politics, Inc.
Economic Impacts
1. Customer Benefits
2. Project Construction Impact
3. Economic Threat From Environmental Lawsuits Based
Upon Lack of 20-Years of Verifiable Water
4. Groundwater Sustainability
Customer Benefits
Key SB Assumptions
•East Valley Water District customers pay $18.50 a month to the SB Municipal
Water Department for wastewater treatment plus the $0.54 proportionate share
of the $2.00 fee for customers east of Boulder Avenue ($19.04 in 2015).
•It is assumed this rate SB Municipal Water Dept. will rise to $24.70 by 2018 in
accordance with that department’s presentation.
•It is further assumed that after 2018 the rate will annually increase by 3% over
inflation given the electrical and other costs of water treatment. The same
factor is used for O&M for the East Valley Recycled Water Project
•SB Water Department sends its treated reclaimed water to the Santa Ana River
and downstream to the ocean.
Customer Benefits
EV Recycled Water Project Assumptions
•Existing wastewater collection system must be upgraded. The $29.2 million
cost will be financed a 1.5%; 30 years ($1,215,864/yr) using a CA Clean Water
State Revolving Fund loan. That is their current rate.
•Phase 1 of the EV Recycled Water Project will be built from 2015-2018 & become
operational at a cost of $82.2 million for a 6.0 million gallon per day (MGD) plant.
•Financing will be at 1%; 30 years ($3,185,095/yr)under a special CA Clean Water
State Revolving Fund loan, with payments starting when plant is operational.
•Operations & Maintenance of the plant will start at $3.01 million/yr. in 2018. That
cost will rise 3% per year beyond inflation from then on. Also, there will be a
$550,000 per change in MGD until Phase 1 capacity is reached with that cost
also increased 3% per year. Costs based on other agencies with similar plants.
•Phase 2 expansion to 10.0 MGD capacity will cost $41.9 million.
•Financing for Phase 2 will be from DIF fees as builders add to housing and other
uses in the Highland, SB and unincorporated areas of the EVWD’s service area.
•Operations & Maintenance will rise at $350,000 plus the 3% factor per change in
MGD once Phase 2 is operational. Again, based on agencies with similar plants.
Customer Benefits
Key Demand Assumptions
•Forecast from 2015-2037, allowing 3 years to build plant and 20 years operation.
•Population in the EVWD service area has 101,733 people in 2015 according to
the 2010 U.S. Census and CA Finance Dept. plus data about 2010-2014 growth.
•Wastewater connections in 2015 in the EVWD : 19,527.
•Build-out of the Highland, SB and Unincorporated zones will be at 144,987
people. This is mostly from the new Highland Hills project (SB), Greenspot
Village and Harmony (Highland) and 17 other Highland projects as of 2012.
•Wastewater connections in 2037 at build-out: 31,280. This implies the ratio of
various types of connections to population will remain constant from 2015-2037.
•Connections growth rate assumed at a constant 2.17% per year.
Rising Electrical Rates For State Water Project
Water, Are Causing Water Costs to Increase
Customer Benefits
Recycled Water Value Assumptions
•Bunk Hill Basin is replenished with State Project Water to recharge the basin.
•Cost of State Project Water delivered to the East Branch Turnout near Highland
in 2014-2015: $125 an acre/foot.
•Pressures are limiting CA’s water supply & increasing demand while electrical
costs are also rising. This will force water prices to increase beyond inflation.
•San Bernardino Valley Municipal Water District indicates electrical costs will
force the cost up to $200 an acre/foot in 2017 with it increasing an estimated 4%
beyond inflation thereafter.
•With the East Valley Recycled Water Project in operation, EVWD won’t have to
pass the cost of recharging the Bunker Hill Basin on to it customers.
Cost Comparison/Benefits to Customers
Reclaimed
Water (Acre/Ft)
Total Cost
including Bond &
Expansion
Payments
Replenishment
Water Cost Acre/ft
4.00% Growth
Total
Replenishment
Avoided Water
Cost
Net Cost to
Wastewater &
Water Customers
Net Cost With
Replenishment
Offset Per Month &
Customer
San Bernardino Costs
Per Month Per
Customer
Net Savings Compared
to San Bernardino
2015 $125.00 $19.04 $19.04 $0.00
2016 $125.00 $21.08 $21.08 $0.00
2017 $200.00 $23.33 $23.33 $0.00
2018 6,270 $7,479,608 $208.00 $1,304,160 $6,175,448 $24.72 $24.70 $0.02
2019 6,464 $7,575,074 $216.32 $1,398,385 $6,271,913 $24.58 $25.44 ($0.87)
2020 6,665 $7,673,502 $224.97 $1,499,418 $6,272,101 $24.06 $26.21 ($2.15)
2021 6,872 $7,738,079 $233.97 $1,607,751 $6,227,897 $23.38 $26.99 ($3.61)
2022 7,085 $7,804,660 $243.33 $1,723,910 $6,217,032 $22.85 $27.80 ($4.96)
2023 7,304 $7,873,304 $253.06 $1,848,462 $6,201,073 $22.31 $28.64 ($6.33)
2024 7,531 $7,944,078 $263.19 $1,982,013 $6,179,521 $21.76 $29.50 ($7.74)
2025 7,764 $8,017,046 $273.71 $2,125,213 $6,151,837 $21.20 $30.38 ($9.18)
2026 8,005 $8,092,277 $284.66 $2,278,759 $6,117,440 $20.64 $31.29 ($10.66)
2027 8,253 $8,169,841 $296.05 $2,443,398 $6,075,702 $20.06 $32.23 ($12.17)
2028 8,509 $8,249,809 $307.89 $2,619,933 $6,025,944 $19.47 $33.20 ($13.72)
2029 8,773 $8,332,258 $320.21 $2,809,222 $5,967,434 $18.88 $34.19 ($15.32)
2030 9,045 $8,417,264 $333.01 $3,012,188 $5,899,385 $18.27 $35.22 ($16.95)
2031 9,326 $8,504,905 $346.34 $3,229,818 $5,820,945 $17.64 $36.28 ($18.64)
2032 9,615 $8,595,264 $360.19 $3,463,171 $5,731,196 $17.00 $37.37 ($20.36)
2033 9,913 $8,688,425 $374.60 $3,713,384 $5,629,151 $16.34 $38.49 ($22.14)
2034 10,220 $8,784,475 $389.58 $3,981,675 $5,513,743 $15.67 $39.64 ($23.97)
2035 10,537 $8,883,503 $405.16 $4,269,350 $5,383,825 $14.98 $40.83 ($25.85)
2036 10,864 $8,985,602 $421.37 $4,577,809 $5,238,160 $14.26 $42.06 ($27.79)
2037 11,201 $9,090,867 $438.22 $4,908,554 $5,075,417 $13.53 $43.32 ($29.79)
From second year of operation, the cost of
wastewater treatment per EVWD connection
would be less than using the SB Municipal
Water Department
Over time, the East Valley Recycled Water Project
would dramatically reduce costs by offsetting
replenishment water
Primary Tier
Secondary Tier
How Regional Economies Work
Construction Activity
East Valley Recycled Water Project
•System upgrades $29,200,000
•Phase 1 Expandable Plant (construction only) $76,600,000
•Phase 2 Expansions $41,900,000
•Total Construction $147,700,000
•Local Share 90%
•Direct Impact $131,130,000
Primary Tier
Secondary Tier
Potential Loss - Economic Impact: SB Co.
$131.1 Million
$82.7 Million
Total
$213.8 Million
809 Full Time Jobs
582 Full Time Jobs
Total
1,390 Full Time Jobs
Highest Unemployment Rates
Major U.S. Metro Areas
Adults, High School or Less
Poverty Rates, 2013
Economic Threat:
Use of Environmental Laws To Sue To Stop Projects
Santa Ana Sucker
Delta Smelt
SB 901/221 Certification of 20-
Year Supply of Water Required
for Major Projects
Major Potential Projects: EV Water District
Greenspot Village
Highland
Harmony
Highland
Highland Hills
San Bernardino
4 Warehouse/E-Commerce
(Unincorporated)
769,600 Retail
800 Apartment Units
AV Potential = $334.1 Million
3,632 Residential Units
AV Potential = $1,234 Million
695 Residential Units
AV Potential = $243.3 Million
2,800,000 Sq. Ft.
AV Potential = $165.9 Million
Potential Loss of Economic Value Creation
From Environmental Lawsuits
$1,977 Million ($1.98 billion) in Assessed Valuation Creation
$1.14609 average property tax rate per $100
$ 226 Million in Annual Lost Property Taxes To Local Governments
$188.3 Million in lost Retail Sales within Highland
1% to the City of Highland
$ 1.9 Million in annual lost retail sales Taxes to City of Highland
Total
15,119 Full Time Jobs
7,110 Full Time Jobs
Primary Tier
Secondary Tier
Potential Loss - Construction Activity
$0.974 Billion
8,007 Jobs
Total
$2.528 Billion
$1.554 Billion
Ground Water Sustainability
•Bunker Hill Basin is the underground source of much of the water used in the
Eastern San Bernardino Valley, including the EVWD service area
•More water is leaving the Bunker Hill Basin that flowing into it.
•EVWD has budgeted $750,000 to buy State Water Project water in FY 2015 to
recharge the basin.
•In 2014, CA Legislation mandated creation of groundwater management to
monitor extraction & create sustainability plans that must be in place in 20 years.
•Currently, wastewater is sent to the SB Municipal Water Department which
reclaims it but sends it into the Santa Ana River and downstream to the ocean.
•By capturing and reclaiming local wastewater and using it to recharge the
Bunker Hill Basin, the East Valley Recycled Water Project will allow the district to
meet its obligations under this act.
•The project would help the wider East SB Valley region meets its obligations.
Economic Impacts
Customer Benefits: Lower wastewater & water costs after first year of
operation
Project Construction Impact: 1,390 Jobs; $213.8 million in lost business
Economic Threat From Environmental Lawsuits Based Upon Lack of
20-Years of Verifiable Water: 15,119 Jobs; $2.53 billion in lost business.
Groundwater Sustainability: Achieved
www.johnhusing.com
Economic Impact of the
East Valley Recycled Water Project
Final Report
March 11, 2015
John E. Husing, Ph.D.
Economics & Politics, Inc.
961 Creek View Lane
Redlands, CA 92373
(909) 307-9444 Phone
john@johnhusing.com
www.johnhusing.com
Economic Impact: East Valley Recycled Water Project Page i
Economic Impact of the
East Valley Recycled Water Project
Executive Summary
In 2014, the East Valley Water District (EVWD) proposed the construction of the East Valley
Recycled Water Project. This facility would recycle all wastewater flows captured by the
district. This would be accomplished by treating these flows by a Membrane BioReactor Facility
and using them for groundwater recharge into the Bunker Hill Basin. This report examines the
potential impact on the local economy of this proposal. It indicates that the East Valley Recycled
Water Project would allow the EVWD to accomplish several important economic objectives:
• Customer Benefits in reduced overall costs and efficiencies of a new plant. The
modeling shows that after the project’s first year, the cost per EVWD’s connection for
reclaimed water treatment plus the development of replenishment water needed to
recharge the Bunker Hill Basin will be less than continuing to use the San Bernardino
Municipal Water Department for wastewater treatment. To calculate the savings over
time:
o The financial payments that must be made to build the East Valley Recycled
Water Project were calculated along with the cost of system upgrades as well as
operations and maintenance.
o Deducted from these costs was the offset from the reclaimed water that the East
Valley Recycled Water Project will produce. This is an important consideration
since this water will be used to recharge the Bunker Hill Basin. Without the
project, the EVWD would need to purchase increasingly expensive State Water
Project water for that purpose and pass that cost on to its customers. With the
project, this cost will be avoided for both the district and its customers.
o The project will thus both save the reclaimed water that the San Bernardino
system currently sends to the Santa Ana River and downstream to the sea and turn
it into a local asset benefiting its customers.
In 2018 when the East Valley Recycled Water Project begins operation, the net cost to
customers based on these calculations would be $24.72 per month per connection, barely
above the $24.70 estimated cost for the San Bernardino Municipal Water Department.
Starting in 2019, the cost per month per connection ($24.58) would be less than for the
San Bernardino system ($25.44) yielding a cost reduction of $0.87 per connection. This
reduction would dramatically increase from there, reaching $29.80 per connection by
2037. This occurs because the increasing production of replenishment water offsets the
ever-more expensive water that would otherwise have to be purchased or traded to
recharge the Bunker Hill Basin. These savings would allow the EVWD to control
wastewater treatment and water costs for its customers as well as allow it to maintain,
improve and modify both systems by deploying the funds that become available due to
reduced costs.
Economic Impact: East Valley Recycled Water Project Page ii
Comparison rates for the San Bernardino Municipal Water Department were based upon
that agency’s stated need for its rates to rise over the next three years (by 2018) to $24.16
plus the $0.54 added for the proportional rate charged to EVWD customers east of
Boulder Avenue.1 From 2019 on, that rate is estimated to increase 3% a year based upon
the increased costs of electrical and other needs for running a wastewater treatment
facility. The same 3% factor was used for the annual increase of operations and
maintenance cost for the East Valley Recycled Water Project.
• Ground Water Sustainability. Meanwhile in 2014, California passed new rules
governing underground aquifers that require that water agencies put in place policies to
make them sustainable over the long run. By producing reclaimed water and using it to
recharge the Bunker Hill Basin, the EVWD would not only help its customers but also
help meet its obligations and those of other Bunker Hill Basin producers under this
legislation. It would thus provide a regional benefit.
Project Construction Impact. There would be a substantial construction impact to
building the facilities needed by the EVWD to capture and recycle water into the Bunker
Hill Basin. This would occur as $147.7 million is spent upgrading the wastewater
collection system, plus building and expanding the East Valley Recycled Water Project.
Assuming that 90% of these funds are spent inside of San Bernardino County, with a
concentration in and around the EVWD, the project would represent $131,130,000 in
new funds coming from the national money markets to local contractors and workers.
That “direct” expansion of the economy will set off “indirect and induced” impacts as
these firms and workers re-spend the same dollars with outlets throughout the local area.
NOTE: The full economic impact of a project is analogous to a gold mining town in
the Old West where gold is sent away and money flows into the area to the miners
(direct impact). They in turn spend the same dollars buying food and tools at the
general store and entertainment at the saloon (secondary impacts). The outside dollars
thus have a two stage impact on the local economy as they flow through it.
Using the standard IMPLAN economic impact model for San Bernardino County, the full
direct and secondary impact of the construction effort for the East Valley Recycled Water
Project is calculated to include:
o Job Creation: 1,390. These are jobs created to directly produce the project and
jobs secondarily created as money works its way through other local firms.
o Payroll: $82.4 million. These are funds paid directly to workers to produce the
project and secondarily paid to workers as funds work their way through other
local companies.
1 Presentation to the East Valley Water District, Board of Directors Meeting-Sewer Treatment Rate Study, San
Bernardino Municipal Water Department, January 15, 2014
Economic Impact: East Valley Recycled Water Project Page iii
o Value Added: $109.3 million. This is the increase in the size of the county’s
economy because the project is built. It only counts new value created by each
operation supporting a project. Thus if cement is mined in the area, that is the
cement company’s contribution to the economy. When that company sells
cement to a concrete firm and it turns it into concrete and sells that to the project,
the value added is not the sales price of the concrete. Rather, it is the difference
between the price of the concrete and the price paid for the cement. Otherwise,
the value of the cement would be counted twice in estimating the actual value
added into the economy.
o Sales: $213.8 million. To local companies, an important consideration is how
much money they will directly receive for building the project. For those
secondarily involved, they want to know how much they will be able to sell to
those contractors or to their workers as money moves through the economy. In
neither case are they worried about their net contribution to value added. The
sales levels are thus not net of the items each firm buys from other local firms.
Importantly, the bulk of this economic impact will occur in the near term when the Inland
Empire still has the third highest unemployment for U.S. areas of over one million
people. Also, it will help a construction sector that has barely begun to recover from the
Great Recession. Construction jobs are a type needed in the EVWD area given that
51.3% of Highland’s adults have a high school or less education and poverty levels are
affecting 20.8% of the city’s population and 30.4% of its children. In San Bernardino,
60.1% are marginally educated with poverty at 34.4% of all people and 46.2% children.
Economic Threat. Important considerations for any construction project in the Santa
Ana River Watershed are the implications of the Delta Smelt and Santa Ana Sucker
judicial decisions plus the terms of SB 901/221 that require water agencies like the
EVWD to certify their ability to provide 20-years of water before granting will-serve
notices to major projects. Given the environmental litigation that often surrounds major
projects, this could potentially impact the two phases of the Greenspot Village Project
(Highland), the Harmony project (Highland), the Highland Hills Development (San
Bernardino) and the potential for four logistics facilities near the former Norton Air
Force Base (Unincorporated). The development of the East Valley Recycled Water
Project would provide the water supplies to minimize the risk of stopping these efforts.
The economic losses that would be avoided by doing so were estimated in a similar
fashion to the construction activity for the project. The results were:
o Construction efforts creating $1.7 billion in property value would be able to go
forward. This would annually generate $18.4 million in property tax revenue to
local governments. Also, the City of Highland would not see $1.88 million per
year in sales taxes from retail projects that could be built.
Economic Impact: East Valley Recycled Water Project Page iv
o With the construction phases of these projects allowed to occur, the modeling of
the full direct and secondary economic impact on San Bernardino County, largely
focused in and around the EVWD, showed the impact would be:
Job Creation: 15,119
Payroll: $897 million
Value Added: $1,315 million ($1.32 billion)
Sales: $2,528 million ($2.53 billion)
Taken together, these combined impacts indicate that the East Valley Recycled Water Project
would thus have several important economic impacts. It would:
• Lower the combined cost of water reclamation and water supply to the EVWD’s
customers.
• Serve as an economic stimulus to the key construction sector at a time when the Inland
Empire’s economy is emerging from the Great Recession.
• Meet the requirements for groundwater sustainability recently laid down by the State of
California.
• Ensure that projects involving thousands of jobs and millions of dollars in economic
impact can withstand legal challenges based upon the needed water to serve them.
Economic Impact: East Valley Recycled Water Project Page 1
Economic Impact of the
East Valley Recycled Water Project
John E. Husing, Ph.D.
In 2014, the East Valley Water District (EVWD) proposed the construction of the East Valley
Recycled Water Project. This facility would recycle all wastewater flows captured by the
district. This would be accomplished by treating these flows by a Membrane BioReactor Facility
and using them for groundwater recharge into the Bunker Hill Basin. This report’s intent is to
examine the potential impacts on the local economy of this proposal.
To accomplish this task, three economic issues appear to arise:
• Customer Benefits. Currently, there is an economic loss to residents of the EVWD
service area from funds currently paid by the district to the San Bernardino Municipal
Water Department to treat the wastewater collected by EVWD. That water is then sent
down the Santa Ana River to the sea rather than being used to recharge the Bunker Hill
Basin. The impact of the loss of this water is underscored in that it is the EVWD
budgeted $750,000 in a fiscal year for replenishment water for the Bunker Hill Basin.2
Over time, that annual cost will certainly rise as demands and limitations on water
supplies increase.
• Construction Economic Impact. When loanable funds or developer fees are used to
build the East Valley Recycled Water Project, there will be a local multi-million dollar
economic impact of this project on the local economy and employment during its
construction phase.
• Economic Threat. There is a need for water reclamation and recharge due to the threats
to economic activity in the areas served by the Bunker Hill aquifer. These result from
two important court decisions and two pieces of legislation:
o The protections given to the Delta Smelt has reduced the flow of water to all of
Southern California including the area served by EVWD.
o The added protections given by the federal court to the Santa Ana Sucker require
the release of water being stored behind Seven Oaks Dam to aid the fish, instead
of this local source being available to recharge the aquifer.
o State legislation requiring closer regulation of overdrafts in ground water aquifers.
o State legislation requiring any major residential, industrial, commercial or retail
construction project to demonstrate the availability of a 20 year supply of water
by local water agencies.
Together, these actions threaten the long term ability of the area including the East Valley
Water District to see its economy expand. One of the few strategies available to offset
their potential economic impact is using reclaimed water that can help recharge the basin.
2 Comprehensive Water Rate Cost of Service & Rate Study, East Valley Water District, January 28, 2015, page 22
Economic Impact: East Valley Recycled Water Project Page 2
Customer Benefits
An important consideration for the East Valley Recycled Water Project is the extent that it will
annually reduce costs for the district’s wastewater treatment from the year it starts operation.
That is the conclusion from analyzing the costs and benefits of the project and comparing the net
annual benefit to the $18.50 per connection plus the $2 charge to for connections east of Boulder
Avenue, currently paid by the customers of the EVWD to the San Bernardino Municipal Water
Department for treatment costs.
Below are the steps in the model to look at the costs and benefits are explained. To examine this
issue, the process operates under somewhat different assumptions than those in the East Valley
Water District’s Recycled Water Feasibility Study. It shows the following
Note: Each step conforms to a column in Exhibit 2 below:
1. Fiscal Years. The period used is from 2015-2037. This allows three years for the
reclaimed water project to be built and 20 years of operation.
2. Population. EVWD’s population is shown going from 101,733 in 2015 to 144,987 in
FY 2037, a compound annual growth rate of 1.62%. These data were created as follows:
o A careful analysis of 2010 Census data for the tracts and blocks in the EVWD put the
population at 100,671 that year. From 2010-2014, the area grew by 1.75% in
Highland and 1.33% in San Bernardino areas. This took the EVWD population to an
estimated 101,733 by January 2014, the mid-point of Fiscal Year 2015.
o EVWD has forecasted that the district’s population growth will grow in a range from
30.0% to 46.0% by 2035. This would put build-out at between 132,253 to 148,530
people in 2035. This represented compound annual growth rates of 1.32% and 1.96%
respectively for this period.
o In 2012, Highland had 19 projects on the books that would create 5,118 dwelling
units. Using the city’s 3.47 average density per unit in the city for single family
projects, and 2.62 for apartment projects, yields 17,079 people in these projects.
They would take the district’s population to 118,812. This would leave from 13,441
or 29,718 to come from other projects and/or background growth including the
recently approved Highland Hills project in San Bernardino.
o If all of that growth is assumed to come from the 2015 base of 101,733 (without the
new projects), it would require compound annual growth rates of 0.62% or 1.29%
from those other sources. This allows the population to reach the 2035 range of
132,253 to 148,530 for EVWD’s two growth scenarios (Exhibit 1).
o To allow a 20 year operating period from 2018-2037, the forecast was extended to
2037. The growth rate assumed was 1.62%, the average of EVWD’s annual growth
rates of 1.32% the 1.91%. This took the population to 144,987 in 2037 (Exhibit 3,
col. 2). That is towards to the upper end of the EVWD build-out range.
Economic Impact: East Valley Recycled Water Project Page 3
Exhibit 1.-Population Forecasts, East Valley Water District, 2015-2035
Project Units Density6 Population 30% Population 46%
Existing Population1 101,733 101,733
Forecasted gain2 30.0%46.0%
Build-Out Population 132,253 148,530
Compound Growth Rate 1.32%1.91%
Known Projects in Highland
Hamony3 3,632 3.47 12,603
Greenspot4 800 2.62 2,096
17 Other Highland Projects5 686 3.47 2,380
Project Totals 5,118 17,079 17,079
Population With Projects 118,812 118,812
Population Growth Not Including Current Projects 13,440 29,718
Forecasted Population Base Not Including Projects 115,173 131,451
Non-Project Population Base Compound Annual Growth Rates 0.62%1.29%
Sources: 1. 2010 U.S. Census plus 2010-2014 growth from E-5 Reports, CA Department of Finance
2. Recycled Water Feasibility Study, East Valley Water District, page 1
3. Harmony Draft Specific Plan, page 4-3
4. Greenspot Final Specific Plan, page 6
5. Highland Planning Department, Housing Activity Report, 2012
6. Highland density from 2014 E-5 Reports CA Department of Finance
3. Sewer Connections. The number of sewer connections was estimated based upon the
ratio of 19.19% of the population level that existed in FY 2015 (19,527 ÷ 101,733). This
takes connections from the 19,519 in FY 2015 to 31,280 in FY 2037, up 11,761. This
implicitly assumes that residential, commercial and industrial connections will continue
to grow in the same pattern that currently exists.
4. Acre-Feet of Reclaimed Water Production. The acre-feet of reclaimed water
production assumes operations start at 6,270 acre-feet in 2018. That would be 93.3% of
the 6,721 acre-feet per year capacity of the Phase 1 plant (6 million gallons per day
[MGD]).3 It then is assumed to grow at 3.10% compounded to reach the full 11,201
acre-foot capacity of the expanded facility in 2037 after 20-years of operation (10 MGD).
It is recognized that the construction sequence will not strictly follow the same
incremental addition to the facility.
5. Million Gallons Per Day (MGD). Million of gallons per day (MGD) of reclaimed water
is the acre-feet times the 892.75 gallons per day for one acre-foot a year. (#4 x 892.75). It
reaches 10 million in FY 2037.
6. Change in Millions of Gallons Per Day. The change in reclaimed water production,
measured in MGD, starts when the plant is in operation in FY 2018 at 5.60 MGD. From
then on , it is the change in MGD production from one fiscal year to the next.
3 East Valley Water District, An Update of the Recycled Water Feasibility Study, page 12-4, Table 12-6 middle
column
Economic Impact: East Valley Recycled Water Project Page 4
Costs
7. Plant Operations & maintenance. O&M is estimated at $550,000 per change in MGD
(#6) starting in 2018,4 up to a flow of 6 MGD. This is based upon the $3.3 million O&M
cost for a 6.0 MGD plant. From 6 MGD to a volume of 10 MGD, it is estimated at
$350,000 per change in MGD. That is based upon a $4.7 million O&M cost for a 10.0
MGD plant. The base cost of $3.08 million in 2018 at 5.6 MGD is annually increased
3% compounded for the increase in electrical and other costs. So also are the $550,000
and $350,000 extra cost figures as MGD increases.
8. System Upgrades. System upgrades totaling $29,200,0005 are assumed to be made
progressively as the plant comes on line. CA Clean Water State Revolving Fund (SRF)
policies currently allow a repayment period of 30 years6. The $29,200,000 is therefore
borrowed from the SRF at their current rate (1.5%7) with repayment spread over 30 years.
The payments are thus constant at $1,215,864 annually (Exhibit 3 col. 8).8
9. Bond Payments. Bond payments are required for the Phase 1 expandable plant financed
at $82,200,000,9 using a 1.0% interest rate for 30 years, with payments starting when
plant is operational in 2018. The payments are thus constant on an annual payment of
$3,185,095 (Exhibit 3 col. 9). This financing takes advantage of the program by which
the SRF is making available funding for water reclamation projects on these very
favorable terms if they can start operation within three years.10 The EVWD will be
applying for the funds available under this SRF program.
10. Plant Expansion Cost. The cost of the reclaimed water plant expansion to 10 MGD is
estimated by the EVWD at $41,900,000.11 It will occur in three equal phases in 2018,
2023 and 2028. However, the cost will be paid by Developer Impact Fees (DIF) and will
not fall on the district’s customers. It is thus shown at zero.
11. Total Cost of O&M, System Upgrades, Plant Construction & Expansion is the sum
of these expenditures for each year (#7 through #10).
4ibid, Table 12-5: Estimated Annual O& M Costs for the Proposed Recycled Water Project
5ibid, page 12-5, footnote 1 to Table 12-7
6State Water Board Offers Extended Term Financing for All Clean Water State Revolving Fund Loans, CA Water
Boards Media Release, January 2014
7Current Rate 1.5% from CA State Water Resources Control Board
8 EVWD intends to apply for these funds but has not yet done so.
9ibid, page 12-3, Table 12-4 middle column
10“State Water Board Approves $800 Million in Financial Incentives for Recycled Water Projects to Provide
Drought Relief,” CA Water Boards Media Release, March 2014
11East Valley Water District, An Update of the Recycled Water Feasibility Study, page 12-3, Table 12-4 last column
Economic Impact: East Valley Recycled Water Project Page 5
Exhibit 2.-Modeled Forecast of Net Cost Per Connection of Reclaimed water 2015-2037
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Fiscal
Year Population Connections Acre Feet MGD Change
in MGD
O&M Growth
$550,000 X Chg.
MGD to 6 MGD
$350,000 X Chg.
MGD After 6
MGD & 3%
Annual Increase
System
Upgrade
$29.2m,
1.5%, 30 yrs.
Phase 1:
Plant Bond
Payments
$82.2m, 1.0%,
30 yrs.
Plant
Expansion
Paid By
DIF
Total Cost
Replenishment
Water Cost
Acre/ft
4.00%
Annual Increase
Total
Replenishment
Avoided Water
Cost
Net Cost With
Replenishment
Water Offset
Net Cost
With Offset
Per Month
Per
Connection
SB Cost
3%
Annual
Increase
Net Cost
comparison
with San
Bernardino
Treatment
Costs
2015 101,733 19,519 $125.00 $19.04 $0.00
2016 103,385 19,942 $125.00 $21.08 $0.00
2017 105,063 20,374 $200.00** $23.33 $0.00
2018 106,769 20,815 6,270 5.60 5.60 $3,078,648 $1,215,864 $3,185,095 $0 $7,479,608 $208.00 $1,304,160 $6,175,448 $24.72 $24.70 $0.02
2019 108,502 21,266 6,464 5.77 0.17 $3,269,339 $1,215,864 $3,185,095 $0 $7,670,298 $216.32 $1,398,385 $6,271,913 $24.58 $25.44 ($0.87)
2020 110,264 21,727 6,665 5.95 0.18 $3,370,559 $1,215,864 $3,185,095 $0 $7,771,519 $224.97 $1,499,418 $6,272,101 $24.06 $26.21 ($2.15)
2021 112,054 22,198 6,872 6.13 0.18 $3,434,688 $1,215,864 $3,185,095 $0 $7,835,647 $233.97 $1,607,751 $6,227,897 $23.38 $26.99 ($3.61)
2022 113,873 22,679 7,085 6.32 0.19 $3,539,983 $1,215,864 $3,185,095 $0 $7,940,942 $243.33 $1,723,910 $6,217,032 $22.84 $27.80 ($4.96)
2023 115,721 23,170 7,304 6.52 0.20 $3,648,575 $1,215,864 $3,185,095 $0 $8,049,535 $253.06 $1,848,462 $6,201,073 $22.30 $28.64 ($6.34)
2024 117,600 23,672 7,531 6.72 0.20 $3,760,574 $1,215,864 $3,185,095 $0 $8,161,534 $263.19 $1,982,013 $6,179,521 $21.75 $29.50 ($7.74)
2025 119,509 24,185 7,764 6.93 0.21 $3,876,091 $1,215,864 $3,185,095 $0 $8,277,050 $273.71 $2,125,213 $6,151,837 $21.20 $30.38 ($9.18)
2026 121,449 24,709 8,005 7.15 0.21 $3,995,240 $1,215,864 $3,185,095 $0 $8,396,199 $284.66 $2,278,759 $6,117,440 $20.63 $31.29 ($10.66)
2027 123,421 25,245 8,253 7.37 0.22 $4,118,141 $1,215,864 $3,185,095 $0 $8,519,100 $296.05 $2,443,398 $6,075,702 $20.06 $32.23 ($12.18)
2028 125,425 25,792 8,509 7.60 0.23 $4,244,917 $1,215,864 $3,185,095 $0 $8,645,877 $307.89 $2,619,933 $6,025,944 $19.47 $33.20 ($13.73)
2029 127,461 26,351 8,773 7.83 0.24 $4,375,698 $1,215,864 $3,185,095 $0 $8,776,657 $320.21 $2,809,222 $5,967,434 $18.87 $34.19 ($15.32)
2030 129,530 26,922 9,045 8.08 0.24 $4,510,614 $1,215,864 $3,185,095 $0 $8,911,573 $333.01 $3,012,188 $5,899,385 $18.26 $35.22 ($16.96)
2031 131,633 27,505 9,326 8.33 0.25 $4,649,803 $1,215,864 $3,185,095 $0 $9,050,762 $346.34 $3,229,818 $5,820,945 $17.64 $36.28 ($18.64)
2032 133,770 28,101 9,615 8.58 0.26 $4,793,408 $1,215,864 $3,185,095 $0 $9,194,367 $360.19 $3,463,171 $5,731,196 $17.00 $37.37 ($20.37)
2033 135,942 28,710 9,913 8.85 0.27 $4,941,576 $1,215,864 $3,185,095 $0 $9,342,535 $374.60 $3,713,384 $5,629,151 $16.34 $38.49 ($22.15)
2034 138,149 29,332 10,220 9.12 0.27 $5,094,459 $1,215,864 $3,185,095 $0 $9,495,418 $389.58 $3,981,675 $5,513,743 $15.66 $39.64 ($23.98)
2035 140,392 29,967 10,537 9.41 0.28 $5,252,215 $1,215,864 $3,185,095 $0 $9,653,175 $405.16 $4,269,350 $5,383,825 $14.97 $40.83 ($25.86)
2036 142,671 30,617 10,864 9.70 0.29 $5,415,010 $1,215,864 $3,185,095 $0 $9,815,969 $421.37 $4,577,809 $5,238,160 $14.26 $42.06 ($27.80)
2037 144,987 31,280 11,201 10.00 0.30 $5,583,012 $1,215,864 $3,185,095 $0 $9,983,971 $438.22 $4,908,554 $5,075,417 $13.52 $43.32 ($29.80)
141.96 $84,952,549 $24,317,286 $63,701,898 $0 $88,019,184 $54,796,571 $118,175,162
**San Bernardino Valley Municipal Water District Charges for the energy cost of pumping water. This increase is expected and imminent.
Economic Impact: East Valley Recycled Water Project Page 6
Benefits
12. Reclaimed Water Value Per Acre-Foot. The inflation adjusted value of an acre-foot of
reclaimed water is conservatively estimated to grow from $150 in 2015 to $438 in 2037.
This forecast is made given the statutory, policy and demand pressures on Southern
California’s water supplies. It underlines how wasteful it is to have the EVWD’s
reclaimed water simply lost as it flows from San Bernardino’s treatment facility
downstream to the sea. The calculation of this increasing value is made as follows:
o The EVWD is currently charging $125 an acre-foot for water delivered to it by the
San Bernardino Valley Municipal Water District (Muni). This is the electrical cost
involved in moving water to and within their district. With electrical rates soaring in
California, Muni indicates this cost will rise to $200 in 2017.
o Muni also anticipates the rate will annually increase 4% more than inflation from
2017 forward. This is the case since it takes a significant amount of electrical energy
to move California’s water and the state’s renewable policies have pushed electrical
costs to the point that the state’s November 2014 rates were 49.5% higher than North
Dakota, the second highest state west of the Mississippi River. With Governor
Brown now wanting to raise the renewable share of electrical generation from 30% to
50% over time, that rate will continue to soar and water pricing along with it.
o To estimate the future value of reclaimed water to the EVWD, the starting price is the
$200 per acre-foot in FY 2017. This is increased 4.00% per year beyond inflation to
yield the inflation adjusted value from that point forward.
13. Total Replenishment Water Avoided Cost. Total replenishment water avoided cost is
the acre-feet reclaimed each year times the estimated cost of water that year (#4 x #12).
This is relevant as the EVWD estimates it must find 9,600 acre-feet of potable water to
meet the growing needs of the district as seen in the $750,000 estimate to recharge the
Bunker Hill Basin in just one fiscal year. To the extent that the operation of the East
Valley Recycled Water Project generates reclaimed water each year, it will eliminate the
future need to purchase water to meet this need. EVWD customers will save money as
they will not have to fund the replenishment water. This will be a particularly important
savings to them as replacement water costs increase over time due to higher water
demand in California and/or supplies under increasingly stress as well as soaring
electrical prices.
Net Customer Annual Savings
14. Net Treatment Cost Including Replenishment Water Offset . Net treatment cost is
the total annual cost of the wastewater system upgrades as well as the financing to build
and expand the East Valley Recycled Water Project and operate it (#11) less the offset for
replenishment water produced each year that will not have to be purchased (#13).
Economic Impact: East Valley Recycled Water Project Page 7
15. Net Cost of Treatment Per Month With Replenishment Offset. Net treatment cost per
month is the cost of building and operating the East Valley Recycled Water Project less
the replenishment water offset (#14) divided by the number of connections (#3) each
year. In 2018, the project starts operation at a monthly cost per connection of $24.72. It
declines from there as the offset from reclaimed water production grows faster than the
costs of operating and financing the project. The net connection cost reaches $13.52 by
2037.
16. Costs Per Connection with Treatment at San Bernardino Plant. The net costs from
the project need to be compared to the costs that would be incurred if the EVWD’s
customers continued having their wastewater treated by the San Bernardino Municipal
Water Department. Its monthly charge in 2015 was $18.50 plus the $0.54 proportion
share of the $2.00 fee charged customers east of Boulder Avenue or $19.04 per customer
on a uniform basis. This increases to $24.70 by 2018 based upon the rate study
undertaken by that department.12 From there forward, it is assumed that rates from San
Bernardino’s department would rise by 3.0% a year above inflation given the rising price
of electrical and other costs to operate a wastewater facility. It is the same factor applied
to the operations and maintenance costs of the East Valley Recycled Water Project.
17. Net Cost Comparison with Treatment at San Bernardino. Compared to the $24.70 per
connection charge anticipated from the San Bernardino Municipal Water Department in
2018, the EVWD’s customers would pay $24.72 or $0.02 more that year. From there
forward, the monthly cost per connection would be $0.87 less during 2019 and $29.80
less by 2037. The reduction in costs in this analysis is shown on the sewer costs. Since
this reduction is possible by not having the EVWD have to budget to acquire ever-more
expensive replenishment water, the district could choose to use some of these funds to
pay for operations and maintenance, improvement and modifications of its sewer
collection and water systems or rate stabilization for the sewer and water fund.
Reclaimed Water Facilities Construction Impact
There would be an economic gain to San Bernardino County’s economy, largely centered around
the EVWD, that would occur beyond insulating the district’s customers from increased
wastewater treatment and offsetting replenishment water costs. That is the impact of spending
on building the East Valley Recycled Water Project. This occurs because the construction will
be financed by funds flowing into the area from the national money system through either
developer loans, DIF fees or the SRF. It thus represents new money entering the local economy
from the outside world. The money moves from the district to its construction companies (direct
impact) and through them to their local suppliers (indirect impact). All of these firms and their
12 Presentation to the East Valley Water District, Board of Directors Meeting-Sewer Treatment Rate Study, San
Bernardino Municipal Water Department, January 15, 2014
Economic Impact: East Valley Recycled Water Project Page 8
employees spend at least some of this money in local retail stores and other outlets (induced
impact).
NOTE: The full economic impact is analogous to a gold mining town in the Old West
where gold is sent away and money flows into the area to the miners (direct
impact). They in turn spend the same dollars buying food and tools at the
general store and entertainment at the saloon (indirect and induced impacts).
The outside dollars thus have a two stage impact on the economy as they flow
through the local economy.
To measure these impacts, the starting place is the amount of money being raised for the
construction activity. It is then necessary to assume how much of it is spent with local firms and
workers. That yields the direct impact by sector. Given that information, the indirect and
induced impacts (secondary impacts) are then estimated using the IMPLAN model based upon
U.S. Bureau of Economic Analysis data for the relevant market.13 In the case of the East Valley
Recycled Water Project, the impact would come from the spending of funds to build the various
facilities discussed in conjunction with Exhibit 2. That would include:
• System upgrades $29,200,000
• Phase 1 Expandable Plant (construction only) $76,600,000
• Phase 2 Expansions $41,900,000
• Total Construction $147,700,000
• Local Share 90%
• Direct Impact $131,130,000
Through build-out of the East Valley Recycled Water Project, the expenditure of $147.7 million
to build the project would inject $131.1 million into the local economy from the outside world.
The 90% factor is used because nearly all of the firms and workers doing the work would come
from operations located inside the county’s economy. The direct and secondary impact of this
injection of funds into the county’s economy, a large part in the EVWD, would be (Exhibit 3):14
Exhibit 3.-Economic Impact, Reclaimed water Facility Construction
Impact Jobs Payroll Value Added Sales
Direct 809 $53,337,047 $60,677,215 $131,130,000
Indirect & Induced 582 $29,018,064 $48,611,164 $82,677,161
Total Impact 1,390 $82,355,111 $109,288,379 $213,807,161
• Job Creation: 1,390. These are jobs created to directly produce the project and jobs
secondarily created as money works its way through other companies in the economy.
13 IMPLAN Professional Model 3.1.1001.12 copyrighted 2013
14 Modeling is specially related to San Bernardino County and thus yielded somewhat lower economic impacts than
shown in the East Valley Water District, An Update to the Recycled Water Feasibility Study, February 2015, page
12-4
Economic Impact: East Valley Recycled Water Project Page 9
• Payroll: $ 82.4 million. These are funds paid directly to workers to produce the
project and secondarily paid to workers as the same monies work their way through other
local companies in the economy.
• Value Added: $109.3 million. This is the increase in the size of the county’s economy
because the project is built. It only counts new value created by each operation
supporting a project. Thus, if cement is mined in the area, that is the cement company’s
contribution to the economy. When that company sells cement to a concrete firm and it
turns it into concrete and sells it to the project, the value added is not the sales price of the
concrete. Rather, it is the difference between the price of the concrete and the price paid
for the cement. Otherwise the value of the cement would be counted twice in estimating
the actual value added into the economy.
• Sales: $213.8 million. To firms in an economy, an important consideration is
how much they receive for directly building the project. For those secondarily involved,
they want to know how much they will be able to sell to those contractors or to their
workers. In neither case are they worried about the issue of their net contribution to
value added. The sales levels are thus not net of the items each firm buys from other
local firms.
Importantly, the bulk of this economic impact would be occurring between 2015 and 2018 when
the Inland Empire is still suffering economically. While its 7.2% unemployment rate is down, it
is still the third highest of any U.S. area of one million or more people (Exhibit 4). The
construction of the East Valley Recycled Water Project would help with this issue.
More specifically, the project would help the Inland Empire’s construction sector which is just
starting to move out of the doldrums (Exhibit 5). From 2007 to 2011, it went from 127,483 jobs
to 59,080, a decrease of -68,433 positions or -23.7%. It has come back a little in 2012-2014,
adding back 13,013 jobs. However, the sector’s employment is still off net of -55,420. This is
work that needs to be created in the region and the EVWD since construction is a major
Economic Impact: East Valley Recycled Water Project Page 10
employer of marginally educated workers. For instance in Highland, 51.3% of residents 25 and
over had a high school or less education in 2013. It was 60.1% in the city of San Bernardino.
By creating construction and other jobs, projects like the East Valley Recycled Water Project can
also help with the levels of poverty being experienced in the EVWD. Specially, the 2013
American Community Survey by the Census Bureau found that:
• Highland: 20.8% of all people and 30.4% of all children were living in poverty in 2013
• San Bernardino: 34.4% of all people and 46.2% of all children were living in poverty
The project would thus represent a part of an economic recovery strategy for San Bernardino
County and the EVWD’s service area.
Economic Threat
Meanwhile, residents and businesses in Southern California and the EVWD’s service area face
difficulties from two major environmental court decisions and two important pieces of
environmental legislation.
Delta Smelt. The first is from the protections given to the Delta Smelt in the San Joaquin Valley
that were upheld last month by the U.S. Supreme Court. According to the Natural Resources
Defense Counsel:
“WASHINGTON (January 12, 2015) – The Supreme Court today let stand a federal plan
to protect California’s vital Delta ecosystem. The Court refused to hear an appeal brought
by agribusinesses trying to undermine protections for the Delta Smelt under the
Endangered Species Act.
Economic Impact: East Valley Recycled Water Project Page 11
Specifically, the businesses were trying to overturn a federal appeals court decision that
had upheld the protections– which limit pumping during certain times of the year to
protect this imperiled native fish. The protections are crucial to help maintain the health
of California’s Bay-Delta estuary and the thousands of fishing and farming jobs that
depend on its health.”15
One result of these protections has been to reduce the water allocations to the regional water
agencies in wet and dry years since 2000 in all but one year (2004). Since 2003, the available
water has varied from a low of 5% (2014) to a high of 80% (2009, 2011). Increasingly, this
appears to be a permanent condition (Exhibit 6). For Southern California, this means continued
difficulties in supplying water to companies, industry and dwellings.
Santa Ana Sucker. More recently, the Inland Empire has found that even its locally generated
water is under threat from an endangered species, in this case the Santa Ana Sucker. To lessen
the region’s dependence on the State Water Project, local leaders supported investment in the
Seven Oaks Dam which can capture up to 200,000 acre feet of water flowing out of the local San
Bernardino and San Gabriel mountains and use it for groundwater recharge and water banking.
However, a recent court ruling on expanding the habitat for the fish includes the dry land
northeast of the I-10 and I-215 interchange up to and including the Seven Oaks Dam. It would
require water releases to maintain flows through this area and downstream to support it.16 Thus:
“Water managers in the Inland Empire have said the habitat designation could cause the
loss of up to 125,800 acre-feet of local water supplies each year, an amount that
15 http://www.nrdc.org/media/2015/150112.asp
16 Oct. 23 decision of U.S. District Court Judge James V. Selna
Economic Impact: East Valley Recycled Water Project Page 12
represents about one-third of the water currently used by 1 million residents of Riverside
and San Bernardino counties.”17
“… the critical habitat designation threatens our rights to water behind the dam and could
spell the end of our Seven Oaks Dam Stormwater Management Project.”18
CA Water Legislation. With a significant share of State Water Project flows restricted by the
Delta Smelt ruling and the pending impact on local water flows of the Santa Ana Sucker
decision, the Inland Empire now faces water supply difficulties with enormous potential
consequences for the economy. This is the case because of the potential impact on development
of two pieces of California legislation:
• SB 901 (Costa, 1995) requires urban water suppliers (3,000+ customers) to prepare an
Urban Water Management Plan which includes a description of conservation
investments. This applies to project for which an application has been submitted to a city
or county:19
(a) A proposed residential development of more than 500 dwelling units.
(b) A proposed shopping center or business establishment employing more than 1,000
persons or having more than 500,000 square feet of floor space.
(c) A proposed commercial office building employing more than 1,000 persons or
having more than 250,000 square feet of floor space.
(d) A proposed hotel or motel, or both, having more than 500 rooms.
(e) A proposed industrial, manufacturing, or processing plant, or industrial park
planned to house more than 1,000 persons, occupying more than 40 acres or land, or
having more than 650,000 square feet of floor area.
(f) A mixed-use project that would demand an amount of water equivalent to, or
greater than, the amount of water required by a 500-dwelling-unit project.
• SB 610 (Costa, 2001) & SB 221 (Keuhl, 2001) tightened the requirements of SB 901 by
indicating that local water agency must determine that there is a 20-year supply of
sufficient water to support the developments detailed in the Costa bill. It specifically
states that:20
17 “Santa Ana Sucker Fish Habitat Expansion Upheld by Federal Court,” Submitted by Matt Williams on Tuesday,
10/23/2012. Association of California Water Agencies, http://www.acwa.com/news/endangered-and-invasive-
species/santa-ana-sucker-fish%E2%80%99s-expanded-habitat-upheld-federal-court
18 John Rossi, General Manager Western Municipal Water District Testimony on “Questionable Fish Science and
Environmental Lawsuits: Job and Water Supplies at Risk in The Inland Empire,” House Natural Resources
Subcommittee on Water and Power, October 18, 2011
19 CA Legislative Counsel's Digest, SB 901, Costa. Water Supply Planning, February 23, 1995
20 CA Legislative Counsel's Digest, SB 221, Kuehl. Land use: water supplies, February 14, 2001
Economic Impact: East Valley Recycled Water Project Page 13
(2) "Sufficient water supply" means the total water supplies available during normal,
single-dry, and multiple-dry years within a 20-year projection that will meet the
projected demand associated with the proposed subdivision, in addition to existing
and planned future uses, including, but not limited to, agricultural and industrial
uses. [italics added for emphasis]
While this requirement has not been implemented to a large degree as yet, it has served to stop a
major Newhall Ranch development in Ventura County.21 Locally, it led to the 2007 temporary
suspension of large projects in the Perris area of Riverside County. In that case the legislation
was cited when for “some projects within the Eastern Municipal Water District Service Area, …
will-serve letters were not issued pending an improvement in the water supply outlook in light of
the drought and Delta pumping restrictions.”22 [underlining added]
Given this background, a major rationale for the EVWD proposing the East Valley Recycled
Water Project is to help protect the economy of the area dependent upon the Santa Ana River
Watershed including that within the district. Looking specifically at the district in 2015, there
are 5,795.5 acres of developable land that fall in categories potentially subjected to 20-year water
supply requirements (Exhibit 7). Three types of projects in particular standout:
Exhibit 7.-Vacant Developable Space, East Valley Water District, 2015
Proposed Land Use Vacant May Be Converted Future Total Existing Total
Industrial 121.1 48.3 169.4 58.7 228.1
Multi-Family Residential 335.2 276.9 612.1 265.7 877.8
Office 146.0 149.7 295.7 3.6 299.3
Retail 239.6 133.0 372.6 159.0 531.6
Single Family 4,953.6 387.2 5,340.8 4,122.0 9,462.8
Total Developable Acres 5,795.5 995.1 6,790.6 4,609.0 11,399.6
Square Feet Per Acre 43,560 43,560 43,560 43,560 43,560
Total Potential Square Feet 252,451,980 43,346,556 295,798,536 200,768,040 496,566,576
Source: Doug Mende, Geographic Information Systems
• Greenspot Village. This project will occupy 104-acres of the Golden Triangle
Community Policy Area of the City of Highland. It would include:
o 595,600 square feet of commercial/retail space in the Highland Marketplace
o 174,000 square feet of commercial retail space in the Village Center
o 769,600 square feet total.
21 “Judge Blocks Plan to Build 22,000 Homes in L.A. County,” by Todd S. Purdum, New York Times, June 3, 2000
22 “Perris-Based Water District First To Postpone Delivery Deals to Major New Developments,” Jennifer Bowles &
Dan Lee, Riverside Press Enterprise, Dec. 11, 2007.
Economic Impact: East Valley Recycled Water Project Page 14
o In addition, some 800 dwelling units are planned in the project area23.
Under SB 901/221 rules, it appears that both the retail and residential portions of this
project will require will-serve letters certifying that 20 years of water would be available
to it.
• Harmony. This proposed project sits on 1,673 acres that constitute the eastern side of
the City of Highland. The project would contain 658 acres of residential development
ranging from very low to high density units. Also, there would be associated
neighborhood commercial sites.
Altogether, the proposed Harmony Specific Plan calls for 3,467 to 3,632 residential
units to be built.24 Under SB 901/221 rules, it would also require will-serve letters
certifying that 20 years of water will be available to it.
23 Specific Plan, Greenspot Village Marketplace, June 2013, page 23
Economic Impact: East Valley Recycled Water Project Page 15
• Highland Hills. In February 2015, the San Bernardino Planning Commission approved
the 695 home Highland Hills development that lies within the EVWD’s service area.25
Under SB 901/221 rules, will-serve letters certifying 20 years of water will be required.
• Industrial. While there is not a lot of vacant industrial land within the EVWD, most of it
lies just north of Third Street and the former Norton Air Force Base in unincorporated
San Bernardino County. There appears to be contiguous land in that area sufficient for
four major industrial buildings in the 700,000 square foot range common for this use in
that area. They would consume 5,600,000 square feet or property, including 50%
setbacks or 104.6 acres. As they would be above the 650,000 square foot threshold for
SB 901/221, it would again appear that any development of such facilities would require
will-serve letters certifying that 20 years of water will be available to it.
Potential Economic Impact. With the Delta Smelt and Santa Ana Sucker court decisions
reducing availability of CA State Water Project water as well as that being captured by Seven
Oaks Dam, the ability of local water agencies like EVWD to certify the availability of 20 years
of water to new projects in the Santa Ana Watershed is threatened. That combined with the
provisions of SB 901/221 mean that without other strategies, the groups seeking to use
environmental policies to stop growth in places like the Inland Empire will have succeeded.
To put these results into context, it is possible to estimate the economic impact of the loss of
Greenspot Village, Harmony, Highland Hills and the four potential industrial facilities:
• Greenspot Village. Using a $250 estimated value for completed regional center
construction based upon estimates by major local construction firms, the value of 595,600
square feet of space would be $148.9 million. A 174,000 square foot central commercial
center would be worth another $43.5 million. Together, this 769,600 square feet in
facilities would be valued at $192.4 million in 2014 dollars.
Based upon projects under construction elsewhere in the East Valley region, high quality
apartment projects are currently valued at $245 a square foot. Using that figure, 800
units in a variety of standard sizes averaging 723 square feet would represent 578,476
square feet of livable space and have a value of $141.7 million in 2014 dollars.
If Greenspot Village could not be built, the lost value of structures created in the
EVWD’s service area economy would be $334.1 million.
In addition, there would be 595,600 square feet of retail space in the Highland
Marketplace. That would include a 150,000 square foot Target store. If that retailer
matches its expected store average in 2015, it will generate $306 in sales per square foot
24 Harmony Draft Specific Plan, August 2014, page 4-2
25San Bernardino County Planning Commission action Tentative Tract Map 15731 on 695 homes, February 18,
2015
Economic Impact: East Valley Recycled Water Project Page 16
or $45.9 million a year.26 Meanwhile, U.S. non-tenant in-line retailers averaged $355 per
square foot in 2012 (Exhibit 8).27 Using that figure and assuming 10% vacancy or
401,040 square feet of occupied space, the center would see another $142.4 million a
year in retail sales for a total of $188.3 million a year.
If a project like Greenspot Village could not be built because of the combination of court
imposed water reductions to the region as well as state law, the cost to the local economy
would be $334.1 million in lost property value creation plus $188.3 million a year in
2014 prices of lost retail activity. This does not include any retail sales off of the 174,000
square feet of commercial space in the Village Center.
Exhibit 9.-Current Status, East Highland Residential Market, Jun-Dec 2014
Metric East Highlands Highland California
Average Home Price $339,222 $216,385 $346,694
Average Home Price/sq. ft. $133 $136 $193
% New Listings 17% 17% 13%
% Reduced Listings 40% 34% 29%
% Foreclosed Listings N/A N/A 2%
% of All Homes For Sale 1% 1% 1%
% of All Homes Sold (last 6 months) 2% 2% 2%
Average Sale Price $348,530 $265,065 $550,476
Average Sale Price/sq. ft. $153 $147 $299
Source: Realtor.Com
• Harmony. The Draft Specific Plan calls for 3,417 non-apartment dwellings including
single family residential units, townhomes, clustered enclave homes and a few duplexes.
In the East Highland area, homes sold for an average of $348,530 in the last six months
of 2014 (Exhibit 9). As these are almost all existing homes, they do not necessarily have
the wide variety of amenities planned for Harmony based upon similar Lewis Operating
Company projects in Chino, Fontana and Rancho Cucamonga. It would thus appear to be
26 “What’s Driving Target’s U.S. Revenue Per Square Foot?” Trefis for Professional Investors, January 3, 2014
27 Retail Sales Set Rent Levels by Raymond T. Cirz, CRE, Retail Issues, Vol. 37, November 1, 2012
Exhibit 8.-Tenant Mix Analysis, In-Line Non-Anchor Occupied Space, 2012
Economic Impact: East Valley Recycled Water Project Page 17
a modest price assumption to use $350,000. The value would thus be $1,195,950,000 at
built-out, in 2014 pricing terms.
There would also be 215 apartment units assuming that neighborhood retail is not built.
If this follows the pattern of recent high end apartment units built in the Inland Empire,
they would average 723 square feet for a total of 155,445 square feet. At $245 per square
foot, they would be worth $38,084,025 in 2014 dollars when completed.
If a 3,632 dwelling project like Harmony could not be built because of the combination of
court imposed water reductions to the region as well as state law, the cost to the local
economy would be a total of $1.234 billion in lost property value creation.
• Highland Hills. The EVWD services the portion of the city of San Bernardino where the
recently approved Highland Hills project is planned. Given the hillside location of the
project, the $350,000 new home price appears appropriate. The value of 695 homes
would thus total $243,250,000. That valuation would be lost if 20 years of water could
not be certified by the district for the development.
• 4 Industrial Facilities. As indicated, if four 700,000 square foot logistics facilities to
handle warehousing operations or ecommerce were built just north of the former Norton
Air Force Base where this type of activity is concentrated, they would consume
5,600,000 square feet of land area or 104.6 acres. Based upon facilities of this type
located in the Redlands donut hole, the assessed valuation per square foot of such
facilities averages $59.23 per square foot of 2,800,000 developed square feet. If projects
like these four warehouses could not be built because of the combination of court
imposed water reductions to the region as well as state law, the cost to the local economy
would be $165.9 million in lost property value creation.
• Total Property Value Loss. Adding these estimates, the potential threat in constant
2014 dollars of the lack of water resources available to the EVWD, due to legal and
Economic Impact: East Valley Recycled Water Project Page 18
legislative actions, could cost the economy of the district’s service area +$1.977 billion
in lost property value (Exhibit 10). At the $1.14609 average property tax rate per $100 of
assessed valuation in San Bernardino County, local governments and transportation
agencies would ultimately lose $22.6 million in annual property tax revenue. In
addition, the $188.3 million a year in lost retail sales activity in Highland would mean
that 1.0% of that amount would be the lost retail sales taxes to the city or $1.88 million a
year.
Exhibit 10.-Summary of Potential Economic Impacts
Environmental Decisions & SB 901/221
Impact Type Estimate
Greenspot Village Commercial Centers (Highland) $192,400,000
Greenspot Apartments (Highland) $141,708,000
Harmony (Highland) $1,234,034,025
Highland Hills (San Bernardino) $243,250,000
Warehouses (Unincorporated) $165,853,263
Total $1,977,245,288
• Construction Activity Loses. If the properties outlined above and summarized in
Exhibit 11 are not built, there would also be a loss of construction activity to create them.
This also represents an economic loss to San Bernardino County with the loss
concentrated in and around the EVWD. This is because the construction will be financed
by funds flowing into the EVWD from the national banking system. It thus represents
new money entering the local economy from the outside world. It moves from
construction companies (direct impact) and through them to their suppliers (indirect
impact). All of these firms and their employees may spend at local retail stores and other
outlets (induced impact).
To measure these impacts, the starting place is the amount of money being raised for the
construction activity. It is then necessary to assume how much of it is spent with various
sectors and what percent of each of those is likely to be spent with local firms and
workers. That yields the direct impact by sector. Given that information, the indirect and
induced impacts (secondary impacts) is estimated using the IMPLAN model based upon
U.S. Bureau of Economic Analysis data for the county.28 Looking at each phase of
construction:
o Greenspot Village. This represents 595,600 square feet for a regional commercial
center at $125.35 per square foot or $74.7 million plus 174,000 square feet for a
community commercial center at $138.50 per square foot or $24.1 million. The total
spent would be $98.8 million. It is assumed however that only 90% of this money
would go to local suppliers and workers in the county. This reduces the direct impact
28 IMPLAN Professional Model 3.1.1001.12 copyrighted 2013
Economic Impact: East Valley Recycled Water Project Page 19
to $88.9 million. The direct and secondary economic impact results would be
(Exhibit 11):
Job Creation: 960. These are jobs created to directly produce the project
and jobs secondarily created as money works its way through other local
firms.
Payroll: $57.0 million. These are funds paid directly paid to workers to
produce the project and secondarily paid to workers as funds work their way
through other local companies.
Value Added: $75.1 million. This is the increase in the size of the economy
because the project is built. As explained earlier, it only counts new value
created by each operation supporting a project.
Sales: $143.6 million. To firms in an economy, this is the level of business
each would obtain.
Exhibit 11.-Economic Impact, Greenspot Village Construction
Impact Jobs Payroll Value Added Sales
Direct 579 $38,117,025 $42,997,550 $88,881,574
Indirect & Induced 381 $18,899,967 $32,064,517 $54,711,745
Total Impact 960 $57,016,992 $75,062,068 $143,593,319
o Greenspot Apartments. Based upon this analyst’s experience with higher-end
apartment projects, it is assumed that the 800 apartments will average 723 square feet
a piece for 578,400 total square footage. The soft costs for engineering, architecture,
legal and other such work is estimated at $10.2 million with 92.8% or $9.5 million
going to local professionals. Construction costs are estimated at $36.2 million with
100% going to local workers and subcontractors. Financing costs are estimated at
$2.6 million with 15% or $0.4 going to local financing firms. The total direct
injection of funds would thus be $46.0 million. The direct and secondary economic
impact results would be (Exhibit 12):
Job Creation: 482
Payroll: $27.3 million
Value Added: $39.1 million
Sales: $75.0 million
Exhibit 12.-Economic Impact, Greenspot Apartment Construction
Impact Jobs Payroll Value Added Sales
Direct 261 $16,850,259 $21,409,700 $46,033,954
Indirect & Induced 221 $10,469,811 $17,610,074 $28,967,857
Total Impact 482 $27,320,070 $39,019,773 $75,001,811
Economic Impact: East Valley Recycled Water Project Page 20
o Harmony. Based upon this analyst’s experience with higher-end master planned
projects, a 3,632 residential unit master planned community is roughly estimated to
have the following costs and injection of funds into San Bernardino County’s
economy:
Residential construction costs of $509.8 million with 90% to local workers
and contractors or $458.8 million.
As it starts with raw land, backbone infrastructure costs are estimated at
$102.3 million with 90% or $92.1 million to local firms.
In-tract infrastructure is estimated at $48.8 million with 90% or $43.9 million
from local operations.
An elementary school is estimated at $8.4 million with 90% or $7.6 million
from local contractors and workers.
At 6% of $1.23 billion in real estate sales, broker commissions are calculated
at $74.0 million with 100% going to local agents.
Contractor and sub-contractor profits are the difference between the $1.234
billion in sales and $743.4 in total costs (assuming conservatively that the
developer pays the real estate commissions) or $490.6 million. Of this 75%
or $368.0 million is estimated to go to local firms.
This puts the direct local injection of funds into the EVWD’s service area economy at
$1,044 million ($1.04 billion). The direct and secondary economic impact results
would be (Exhibit 13):
Job Creation: 9,967
Payroll: $590 million
Value Added: $887 million
Sales: $1,698 million ($1.70 billion)
Exhibit 13.-Economic Impact, Harmony Construction & Sale
Impact Jobs Payroll Value Added Sales
Direct 5,172 $361,405,158 $491,832,753 $1,044,443,535
Indirect & Induced 4,795 $228,754,776 $391,958,046 $653,731,071
Total Impact 9,967 $590,159,934 $883,790,799 $1,698,174,606
Harmony will be built over a much longer period than the Greenspot complex.
These impacts will thus be dependent on the levels of production and sales in any
given time frame.
o Highland Hills. Based upon discussions with residential developers, 695 homes at
an average size of 2,250 square feet would represent 1,563,750 square feet of
building:
Economic Impact: East Valley Recycled Water Project Page 21
At the conservative rate of $75 per square foot including soft costs,
backbone infrastructure and lot preparation, that would represent $117.3
million in construction. If 90% goes to local firms in San Bernardino
County, that would amount to $105.6 million.
Profit on the construction activity would be the difference between the
sales price and the costs or $137.7 million. If 75% went to local
contractors and sub-contractors, that would put $103.3 million into the
economy.
At 6% commissions on sales of $243,250,000, the local real estate
community would earn $14.6 million.
This puts the direct local injection of funds into the East Valley’s economy from
Highland Hills at $223.4 million. The direct and secondary economic impact results
would be (Exhibit 14):
Job Creation: 2,107
Payroll: $127 million
Value Added: $191 million
Sales: $365 million
Exhibit 14.-Economic Impact, Highland Hills Construction & Sale
Impact Jobs Payroll Value Added Sales
Direct 1,064 $77,759,057 $106,236,703 $223,420,781
Indirect & Induced 1,042 $49,375,360 $85,042,327 $141,560,981
Total Impact 2,107 $127,134,417 $191,279,030 $364,981,762
Highland Hills will also be built over a moderately long period. These impacts
will thus be dependent on the levels of production and sales in any given time
frame.
o 4-Logistics Facilities. Based upon this analyst’s experience with large logistics
facilities, a 700,000 warehouse is roughly estimated to cost $60 per square foot. Four
such facilities would cost $168 million to design and build. Assuming 90% or $151.2
million of this represented funds injected into the East Valley economy, the direct and
secondary economic impact results would be (Exhibit 15):
Job Creation: 1,603
Payroll: $95 million
Value Added: $126 million
Sales: $247 million
Economic Impact: East Valley Recycled Water Project Page 22
Exhibit 15.-Economic Impact, Logistics Facilities
Impact Jobs Payroll Value Added Sales
Direct 932 $61,500,508 $69,964,119 $151,200,000
Indirect & Induced 671 $33,459,401 $56,051,308 $95,331,249
Total Impact 1,603 $94,959,909 $126,015,427 $246,531,249
• Potential Role: East Valley Recycled Water Project. In Fiscal Year 2014-2015, the
EVWD estimates that it will deliver 21,730 acre feet of water to its customers. At its
inception the East Valley Recycled Water Project would capture and recharge 6,270 acre
feet of water into the Bunker Hill Basin or 28.9% of the current need. At build-out, the
facility would capture and recharge 11,201 acre feet or 51.5% of the current need. In
either case, the facility would allow the EVWD to certify its ability to supply 20-years of
water to major projects within the district. It would thus be a key strategy in ensuring
that the economic impacts of major projects within the district are not lost to
environmental lawsuits and legislation. Through build-out for the projects discussed
above, this includes (Exhibit 16):
Job Creation: 15,119
Payroll: $897 million
Value Added: $1,315 million ($1.32 billion)
Sales: $2,528 million ($2.53 billion)
Exhibit 16.-Economic Impact, All Facilities
Impact Jobs Payroll Value Added Sales
Direct 8,007 $555,632,006 $732,440,824 $1,553,979,844
Indirect & Induced 7,110 $340,959,316 $582,726,272 $974,302,904
Total Impact 15,119 $896,591,322 $1,315,167,096 $2,528,282,748
These are likely conservative estimates that do not include several other possible impacts:
o The local retail spending of the new population that would move into the EVWD
to inhabit the Harmony and Greenspot Village projects.
o The huge potential retail sales that could occur if one of the four warehouses were
to become a fulfillment center, a use becoming increasingly common in the inland
region.29
o The retail sales in the commercial space at the Greenspot project’s Village Center
or any retail component of Harmony.
29A study by this analyst of a 1,000,000 square foot e-commerce facility, using average sales per square foot for
such operations, was estimated to generate to $3.3 million in local retail sales taxes.
Economic Impact: East Valley Recycled Water Project Page 23
Sustainable Supply
In light of the recent drought, “Governor Edmund G. Brown Jr. on September 16, 2014 signed
historic legislation to ensure a sustainable supply of California groundwater [SB 1168 (Pavley)
SB 1319 (Pavley), AB 1739 (Dickinson) that together makeup the Sustainable Groundwater
Management Act] ... The new law mandates the creation of local groundwater management
agencies that will monitor extraction and create sustainability plans that must be in place in 20
years. DWR [Department of Water Resources] is given expanded responsibilities under the law,
including requirements to revise groundwater basin boundaries and create guidelines for local
agencies to write their Sustainable Groundwater Management Plans:”30 The time table for local
agencies to comply is as follows:
• By 2017, local groundwater management agencies must be identified.
• By 2020, over draft groundwater basins must have sustainability plans.
• By 2022, other high and medium priority basins not currently in overdraft must have
sustainability plans.
• By 2040, all high and medium priority groundwater basins must achieve sustainability.
As discussed earlier, the EVWD currently sends wastewater from the district’s customers to the
San Bernardino Municipal Water Department for treatment at its facility. The resulting water is
then sent down the Santa Ana River to the sea rather than being used to recharge the Bunker Hill
Basin. The creation of the East Valley Recycled Water Project would allow the EVWD to treat
its own wastewater and use it to recharge the underground basin. As it would allow the district
to meet 28.9% to 51.5% of its current water delivery needs by capturing and recharging the
Bunker Hill Basin, the project would be an important element in allowing the district to comply
with responsibilities under this act.
Grand Total Impact
Altogether, the East Valley Recycled Water Project would allow the EVWD to accomplish
several important economic objectives:
• The modeling shows that after the first year of operation, the EVWD’s net cost of
wastewater treatment per connection will be less than if the San Bernardino Municipal
Water Department continued to supply this service. This includes the offset for
replacement water to recharge the Bunker Hill Basin. It also includes the financial
payments made to build the new facilities. The reduction in cost will increase
dramatically as production of reclaimed water increases with population growth. It will
give the EVWD the opportunity to utilize the funds that become available with reduced
costs to keep customer wastewater and water costs down as well as fund needed
maintenance, improvements and modifications of both the sewer and water systems
30 Governor Brown Signs Historic Groundwater Legislation, http://gov.ca.gov/news.php?id=18701
Economic Impact: East Valley Recycled Water Project Page 24
• The cleaned reclaimed water lost to the sea would instead be used to recharge into the
Bunker Hill Basin with an asset whose value will increase as California’s supply is
restrained, its demand increases and the electrical costs of moving it grow.
• There would be a substantial construction impact to building the facilities needed by the
EVWD to capture and recycle water into the Bunker Hill Basin. These include nearly
1,400 jobs, over $82 million in payroll, almost a $110 million impact on economic
activity and just under $214 million in new business for San Bernardino County’s firms.
Importantly, most of this impact would occur at a time when the local economy is still
struggling with high employment and poverty levels.
• Given the pressure that court decisions and state policies are having on California’s water
supplies, there exists the threat that districts like the EVWD will no longer be able to
certify the availability of 20 year water supplies to projects under SB 901 and SB 221.
Were that to occur, the potential losses from major projects like the Greenspot Village
project, Harmony and the four logistics facilities would be nearly 14,500 lost jobs, over
$850 million in lost payroll, the loss of $1.25 billion in economic activity and $2.42
billion in business sales.
• In addition, if these projects could not be built, $1.7 billion in property valuation would
not be created nor would there be the annual generation of $18.4 million in property tax
revenue to local governments. Also, the City of Highland would not see $1.88 million
per year in sales taxes from retail projects that could not be built.
• The reclaimed water facility will assist in making the Bunker Hill Basin sustainable over
time, providing regional benefits and satisfying a long term requirement of California’s
newest water management legislation.