Loading...
HomeMy WebLinkAboutAgenda Packet - EVWD Board of Directors - 04/16/2014    SPECIAL BOARD MEETING April 16, 2014 – 5:30 pm 31111 Greenspot Road HIGHLAND, CA 92346 AGENDA CALL TO ORDER PLEDGE OF ALLEGIANCE PUBLIC COMMENTS - At this time, members of the public may address the Board of Directors regarding any items within the subject matter jurisdiction of the East Valley Water District. The Board of Directors may BRIEFLY respond to statements made or questions posed. Comments are limited to three minutes per speaker. 1. Wastewater Reclamation Plant Feasibility Study Update 2. General Manager Report 3. Legal Counsel Report 4. Board of Directors Comments ADJOURN Pursuant to Government Code Section 54954.2(a), any request for a disability-related modification or accommodation, including auxiliary aids or services, that is sought in order to participate in the above agendized public meeting should be directed to the District’s Administrative Manager at (909) 885-4900. Wastewater Reclamation Plant Feasibility Study Complex Challenges Innovative Solutions April 16, 2014 Draft Leverage regulatory and technological opportunities to maximize project economicsHow Will We Evaluate a Recycled Water Plant For the East Valley Water District Community? Project Feasibility? Environmental Impacts/ Benefits Technical Feasibility Permits/ Institutional AgreementsPlant Siting Community Concerns & Input Draft Technical Feasibility Will Focus on Cost •Appropriate level of treatment •Proximity to potential recharge  basins •Required levels of pumping •Minimizing investment in new  trunk sewers Draft Facility Siting Must Address Engineering and Community Concerns •Engineering considerations will include: ƒHydraulics – minimize pumping ƒEnergy recovery/solids management ƒAccessibility ƒModular approach to address future needs •Community concerns will include: ƒAesthetics ƒConsistency with community values ƒCost Draft Plant Siting Must Address Land Use and Future Community Development Potential Non-Potable Reuse Areas Potential Area for Plant Siting 210 215 10 Draft Facilities Can be Constructed Consistent with the Surrounding Community Cauley Creek, Georgia 4 mgd Powell River, British Columbia 1.5 mgd Draft Permitting/Institutional Process is the Critical Path to Project Implementation California Department Of Health State Water Resources Control Board San Bernardino Water Department San Bernardino Valley MWD Regional Water Quality Control Board Bunker Hill Basin Watermaster Draft A Preliminary Analysis of Environmental Impacts will Identify Areas of Potential Concern Identify Environmental  Issues Scope Environmental  Process Prepare Environmental  Documents Soliciting Public Review and Input Draft Community Input will be Sought Thru a Series of Discussions •East  Valley Board Meetings •City of Highland Council  Meetings •San Bernardino Water   Board •City of San Bernardino  Council Meetings •San Bernardino Valley  MWD •City of Redlands  •Neighborhood Groups •Developers •Environmental Groups Needs EVWD Input Draft Leverage regulatory and technological opportunities to maximize project economicsHow Will We Evaluate a Recycled Water Plant For the East Valley Water District Community? Project Feasibility? Environmental Impacts/ Benefits Technical Feasibility Permits/ Institutional AgreementsPlant Siting Community Concerns & Input Draft