HomeMy WebLinkAboutAgenda Packet - EVWD Board of Directors - 05/28/2014 (special)Water Reclamation Plant Feasibility Study Update May 28, 2014 Initial Project Considerations Project Feasibility? Environmental Impacts/ Benefits Technical Feasibility Permits/ Institutional AgreementsPlant Location Community Concerns & Input Permits/ Institutional AgreementsPlant Location Technical Feasibility Evaluated Three Potential Plant Locations 210 Near District Headquarters Near Golden Triangle Sterling Road Preliminary Evaluation of Potential Plant Locations Near  Headquarters Near Golden  Triangle Area Sterling Between  3rd and 5th Available Flow Land Uses Impacts to  Community Energy Impacts Site Availability Proximity to  Reuse Sites Proximity to  Recharge Sites Potential Plant Flow Varies by Area of Wastewater Contribution 210 Near Headquarters  ADWF Projection: 2017: 0 MGD 2022: 1.3 MGD 2035: 1.35 MGD Potential Plant Flow Varies by Area of Wastewater Contribution 210 ADWF Projection: 2017: 0 MGD 2022: 1.3 MGD 2035: 1.35 MGD ADWF Projection: 2017: 1.30 MGD 2022: 3.53 MGD 2035: 3.85 MGD ADWF Projection: 2017: 2.65 MGD 2022: 5.13 MGD 2035: 6.09 MGD 210 Near Golden Triangle ADWF Projection: 2017: 1.30 MGD 2022: 3.53 MGD 2035: 3.85 MGD Potential Plant Flow Varies by Area of Wastewater Contribution 210 Sterling Road ADWF Projection: 2017: 2.65 MGD 2022: 5.13 MGD 2035: 6.09 MGD Energy Required for Pumping 210 Near District Headquarters Near Golden TriangleSterling Road 1000 1100 1200 1300 1400 1500 1600 1700 1800 01234567 El e v a t i o n ( f e e t ) Distance (Miles) Sterling Site Elevation Difference 580 feet Near Golden Triangle Elevation Difference 460 feet District Headquarters 7                    6                   5                  4                   3                   2                   1    0 Land Use and Impacts to Surrounding Community 210 ResidentialResidential and Retail Industrial Site Availability 210 District Property Adjacent to Headquarters Limited Availability District Property at Sterling Preliminary Evaluation of Potential Plant Locations Near  Headquarters Near Golden  Triangle Area Sterling Between  3rd and 5th Available Flow Land Uses Impacts to  Community Energy Impacts Site Availability Proximity to  Reuse Sites Proximity to  Recharge Sites Relative Lower Ranking Relative Higher Ranking Preliminary Evaluation of Potential Plant Locations Near  Headquarters Near Golden  Triangle Area Sterling Between  3rd and 5th Available Flow Land Uses Impacts to  Community Energy Impacts Site Availability Proximity to  Reuse Sites Proximity to  Recharge Sites Relative Lower Ranking Relative Higher Ranking Most Suitable Site - District’s Property at Sterling between 3rd and 5th Questions Next Steps •Required Infrastructure •Potential Recycled Water  Uses •Treatment Requirements •Potential Partnerships •Complimentary/Secondary Use Facilities •Identification of Cost and Financing Options Required Infrastructure •Minimize Pumping/  Energy Costs •Coordinate with Other  System Improvement  Needs •Reducing other System  Capacity/Infrastructure  Investments Potential Recycled Water Uses •Landscape Irrigation •Groundwater Recharge •Industrial Use Potential Recycled Water Uses 210 Landscape and  Urban Irrigation  Areas SH2 Potential Recycled Water Uses 210 Commercial and  Industrial use  Areas Potential Recycled Water Uses 210 Groundwater  Recharge Areas Treatment Requirements •Minimum of Title 22  Tertiary  Treatment •Evaluate  need for  added  levels of treatment Treatment Requirements Sequencing Batch Reactor •Proven Technology •Larger Footprint •Potentially less costly in  smaller sizes ‐<2 mgd Treatment Requirements Membrane Biological  Reactor •Proven Technology •Smaller Footprint •Modular – allows for   ease of expansion •Excellent preliminary  step for  advanced  treatment processes MBR Plant being designed for City of Malibu adjacent to award winning Legacy Park. Potential Partnerships Project Permitting/Approvals •State Level Permits –Regional  Water  Quality Board –State Water  Resources Control Board (was CDPH) •Local Permits/Approvals –CEQA Compliance ‐EVWD –County Flood Control –if any facilities in flood plain Project Decision Timeline Feasibility  Study Kick‐off •April 16, 2014 Outreach Technical  Evaluation Board Action • October 2014 Site Selection Required Infrastructure Potential Uses Treatment Requirements Potential Partnerships Complimentary/Secondary Uses Costs and Financing Draft Report/Summary Final Report Continuous Outreach May June July August September October Project Decision Timeline Project Implementation Timeline - Recycling Plant or System Enlargements Outreach Technical  Evaluation CEQA Review Permitting Engineer’s Report  Design  Development Construction Start‐up 2014 2015 2016 2017 Questions