Loading...
HomeMy WebLinkAboutAgenda Packet - EVWD Board of Directors - 08/27/2014    REGULAR BOARD MEETING August 27, 2014 – 5:30 P.M. 31111 GREENSPOT ROAD, HIGHLAND, CA AGENDA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - “In order to comply with legal requirements for posting of agenda, only those items filed with the District Secretary by 12:00 p.m. on Wednesday prior to the following Wednesday meeting not requiring departmental investigation, will be considered by the Board of Directors”. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL OF BOARD MEMBERS SUPPLEMENTAL INFORMATION FROM THE GENERAL MANAGER REGARDING AGENDA ITEMS PRESENTATIONS & CEREMONIAL ITEMS • Recognition of Hernan Ramirez’s participation in the 2014 Special Olympics USA Games • Introduction of East Valley Water District’s newly hired employees - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - PUBLIC COMMENTS Any person wishing to speak to the Board of Directors is asked to complete a Speaker Card and submit it to the Administrative Manager prior to the start of the meeting. Each speaker is limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State of California Brown Act, the Board of Directors is prohibited from discussing or taking action on any item not listed on the posted agenda. The matter will automatically be referred to staff for an appropriate response or action and may appear on the agenda at a future meeting. AGENDA - This agenda contains a brief general description of each item to be considered. Except as otherwise provided by law, no action shall be taken on any item not appearing on the following agenda unless the Board of Directors makes a determination that an emergency exists or that a need to take immediate action on the item came to the attention of the District subsequent to the posting of the agenda. 1. Approval of Agenda     2. APPROVAL OF CONSENT CALENDAR All matters listed under the Consent Calendar are considered by the Board of Directors to be routine and will be enacted in one motion. There will be no discussion of these items prior to the time the Board considers the motion unless members of the Board, the General Manager, or the public request specific items to be discussed. a) Approve the August 13, 2014 Board meeting minutes b) Resolution 2014.25 – Accepting Notice of Completion (Weka, Inc.) c) Receive and file update to the Sewer System Management Plan (SSMP) d) Receive and file update to the Development Guidelines and Procedures NEW BUSINESS 3. Association of California Water Agencies (ACWA) update by Vice President Kathy Tiegs 4. Alternative Power Program Development Recommendation: Direct and authorize the General Manager/CEO to negotiate an agreement with Chevron Energy Solutions 5. Participation in the development of the proposed Santa Ana River Habitat Conservation Plan Recommendation: Authorization to participate in the Santa Ana Habitat Conservation Plan and the expenditure of $162,470 REPORTS 6. General Manager/CEO 7. Legal Counsel Report 8. Board of Directors ADJOURN PLEASE NOTE: Materials related to an item on this agenda submitted to the Board after distribution of the agenda packet are available for public inspection in the District’s office located at 31111 Greenspot Road, Highland, during normal business hours. Also, such documents are available on the District’s website at www.eastvalley.org subject to staff’s ability to post the documents before the meeting. Pursuant to Government Code Section 54954.2(a), any request for a disability-related modification or accommodation, including auxiliary aids or services, that is sought in order to participate in the above- agendized public meeting should be directed to the District’s Administrative Manager at (909) 885-4900 at least 72 hours prior to said meeting. Sewer System Management Plan (SSMP) 2014 Prepared By: East Valley Water District 31111 Greenspot Road Highland, CA 92346 TOC-1 Table of Contents Section 1 Goals 1-1 Section 2 Organization 2-1 2.1 Authorized Representatives 2-1 2.2 Organization Chart 2-1 2.3 Chain of Communications for reporting Overflows 2-3 Section 3 Legal Authority 3-1 EVWD Ordinance No. 359 3-1 Section 4 Operations and Maintenance Program 4.1 Sewer System Mapping 4-1 4.1.1 Electronic Maps 4-2 4.1.2 Sewer Manhole & Pipe Numbering System 4-3 4.2 Preventative Operation and Maintenance 4-6 4.2.1 Scheduled cleaning of sewers 4-6 4.2.2 CCTV Inspection Program 4-7 4.2.3 Process for Investigation and Resolution of Customer Complaints 4-8 4.2.4 Maintenance Activity Records 4-8 4.3 Rehabilitation and Replacement Plan 4-8 4.3.1 Multi Year CIP 4-9 4.4 Training Program 4-9 4.5 Equipment and Replacement Parts 4-10 Section 5 Design and Performance Provisions 5-1 5.1 Existing EVWD Standards 5-1 5.2 Development of Additional Standards 5-1 Section 6 Overflow Emergency Response Plan 6-1 6.1 Existing EVWD Emergency Response Plan 6-1 6.2 Need for Specific OERP 6-2 Section 7 7-1 7.1 Existing FOG Control Program 7-1 7.2 Implementation of the FOG Control Program 7-2 Section 8 8-1 8.1 Capacity Evaluation 8-1 8.1.1 Flow Monitoring 8-1 8.1.2 Hydraulic Modeling 8-1 8.1.3 Sewer Master Planning 8-2 8.1.4 Identification of Capacity Needs 8-2 8.1.5 Identification of Rehabilitation Needs 8-2 8.2 Design Criteria 8-3 8.3 Capital Improvement Program 8-3 TOC-2 Table of Contents (continued) 8.3.1 Short Term CIPs 8-4 8.3.2 Long Term CIPs 8-4 8.4 CIP Schedule 8-4 Section 9 Monitoring, Measuring, and Program Modifications 9-1 9.1 Benchmarking Data 9-1 9.1.1 American Water Works Association (AWWA) Report 9-2 9.1.2 American Society of Civil Engineers (ASCE) Report 9-2 9.2 System Specific Performance Indicators 9-3 9.3 Demographic Indicators 9-4 9.3.1 Service Area Population 9-4 9.3.2 Number of Customer Accounts 9-4 9.3.3 New Connections per Year 9-4 9.3.4 Length of Sewers 9-5 9.3.5 Average Age of System 9-5 9.4 Budget Performance Indicators 9-5 9.4.1 Annual Collection System Budget per Account 9-5 9.4.2 Percentage of Budget for Collection System Rehabilitation 9-7 9.5 Staff and Equipment Performance Indicators 9-7 9.5.1 Population per Collection System Employee 9-7 9.5.2 Length of Sewer per Collection System Employee 9-8 9.6 System Performance Indicators 9-8 9.6.1 Sanitary Sewer Overflows per Year per Length of Sewer 9-8 9.6.2 Mainline Blockages per Year per Length of Sewer 9-10 9.6.3 Pipe Failures per Year per Length of Sewer 9-11 9.6.4 Flow Monitoring Events per Year 9-13 9.6.5 Percentage of Sewers Inspected by Video per Year 9-13 9.6.6 Percentage of Sewers Cleaned per Year 9-14 9.6.7 Percentage of Sewers Lined per Year 9-15 9.6.8 Planned Maintenance Ratio 9-15 9.7 Summary of Current Status 9-16 9.8 Benchmarking Conclusions 9-16 Section 10 SSMP Program Audits 10-1 Section 11 Communication Program 11-1 Section 12 Sewer Collection System 12-1 Overflow Emergency Response Plan (OERP) ***See contents under Section 12*** 1-1 Section 1 Goals This section contains East Valley Water District (EVWD) goal of Sewer System Management Plan (SSMP). The standards for the operation and maintenance of a sewer collection system are to properly operate and maintain all portions of the collection system, to report overflows within the required time frame, and to respond effectively to any overflows that may occur. EVWD’s goal statement is as follows: “To control, mitigate and maintain the public sewer system within available resources to limit sewer overflows, and to protect the public and the environment.” EVWD’s goals for this Sewer System Management Plan within the next two years, through June 2016, are: 1. Minimize the number and impact of sanitary sewer overflows (SSOs). This will be tracked by recording the following: SSOs per Year per Length of Sewer Mainline Blockages per Year per Length of Sewer Pipe Failures per Year per Length of Sewer 2. Continue to improve customer service Track the date and time that calls come in and the time used to respond to the problems 3. Maintain and/or improve the condition of the collection system infrastructure in order to provide reliable service and capacity now and into the future. This goal will be implemented and tracked as follows: Develop and implement a flow monitoring strategy that can be used later to update the sewer collection system master plan Percentage of Sewers Inspected by Video per Year – inspect a minimum of 20% of the system every year Percentage of Sewers Cleaned per Year – clean a minimum of 20% of the system every year Implement the Capital Improvement Program identified in the 2013 Sewer Master Plan. Also, the CCTV inspection program results Section 1 Goals 1-2 should be used in developing a Capital Improvement Program for sewer rehabilitation/repairs 4. Work towards achieving full compliance with California’s State Water Resources Control Board (SWRCB) adopted Order No. 2006-0003, Statewide General Waste Discharge Requirements (WDRs) for Sanitary Sewer Systems by: Continue working with City of San Bernardino Sewer Department to comply with items (a), preventing illicit discharges, and (d), limiting the discharge of fats, oils, and grease, of the WDR Maintain the new hydraulic model of the system that was created in District’s 2013 Sewer Master Plan As part of the update of the Sewer Master Plan, maintain a prioritized list of system deficiencies and Capital Improvement Program to correct the identified deficiencies 5. Work towards improving the District’s internal systems by: Using the recently purchased Computerized Maintenance Management System (CMMS) Granite 2-1 Section 2 Organization This section contains EVWD’s Organizational Chart, information about the responsibility of staff implementing specific measures of this SSMP, and the chain of communication for reporting SSOs. The offices of EVWD are located at: East Valley Water District 31111 Greenspot Rd. Highland, California 92346 Telephone: (909) 889-9501 Fax: (909) 383-1481 2.1 Authorized Representatives EVWD has appointed and authorized several representatives for implementing the requirements of California’s State Water Resources Control Board (SWRCB) adopted Order No. 2006-0003, Statewide General Waste Discharge Requirements (WDRs) for Sanitary Sewer Systems, herein called the WDR. The authorized representatives are shown in Table 2-1. Table 2-1 EVWD Authorized Representatives Name Title Work Telephone Cellular Telephone Home Telephone John Mura General Manager 909 806-4290 Mike Maestas Assistant General Manager Legally Responsible Official (LRO)909 806-4089 909 266-6744 Tom Holliman Engineering Manager Legally Responsible Official (LRO)909 806-4096 909 573-6802 909-393-0300 Kerry Bryan Regulatory Affairs Director 909 806-4087 Justine Hendricksen Administrative Manager 909-806-4080 909-806-0390 909-425-5545 Martha Duran Executive Assistant 909-806-4083 909-208-9430 909-600-7343 Gerald Sievers Water System Superintendent Legally Responsible Official (LRO)909-885-4900 909-772-5169 909-425-1940 2.2 Organization EVWD is managed by a General Manager (GM), John Mura, under a Board of Directors and Districts Legal Counsel. Under the GM there are two branches, the Assistant General Manager (AGM) and the Chief Financial Officer (CFO). Under these two branches fall all the supervisors and managers and then the remainder of employees. Se c t i o n 2 Or g a n i z a t i o n 2- 2 Fi g u r e 2 - 1 – E V W D O r g a n i z a t i o n C h a r t Section 2 Organization 2-3 2.3 Chain of Communications for reporting Overflows EVWD has developed specific procedures for responding to SSOs, whether the report comes from their own field staff, or from a customer. It is important to note that EVWD only owns, operates and maintains the sewer collection system main lines; they do not own or maintain the service laterals or the JPA trunk sewers. Figure 2-2 contains EVWD’s Overflow Emergency Response Plan Communication Protocol. SSO Response Plan and Procedure will be part of the Emergency Response Plan section of this SSMP. In summary, all incoming calls received are logged in and routed to the Customer Service Supervisor (CSS), who ensures that the order has been called out and that the crews have been dispatched. Figure 2-2 – OERP Communications Protocol Section 2 Organization 2-4 Figure 2-3 – SSO Response Procedures 3-1 Section 3 Legal Authority This section of the SSMP demonstrates that EVWD possesses the legal authority, through sanitary sewer system ordinances, pre-treatment ordinances, service agreements, and other legally binding procedures, to: (a) Prevent illicit discharges into its sanitary sewer system (examples may include I/I, storm water, chemical dumping, unauthorized debris and cut roots, etc.); (b) Require that sewers and connections be properly designed and constructed; (c) Ensure access for maintenance, inspection, or repairs for portions of the lateral owned or maintained by the Public Agency; (d) Limit the discharge of fats, oils, and grease and other debris that may cause blockages; and (e) Enforce any violation of its sewer ordinances. 3.1 EVWD Ordinance No. 359 EVWD’s legal authority is provided by EVWD Ordinance No. 359. The following excerpt from this ordinance shows an enforcement action that can be taken by an established “Sewer Department”: An Ordinance of the East Valley Water District, Rescinding Ordinance 356 entitled “An Ordinance Regulating the Use of Public Sewers, the Installation and Connection of Building and Lateral Sewers, Public Sewer Main Extensions, Establishing a Sewer Department, Providing Permits for the Installation and Connection of Sanitary Sewers, Providing Sewers for Annexed Areas and Subdivisions, Regulating the Discharge of Waters and Wastes into the Public Sewer System, Providing Relief for the Violation of Provisions Thereof and Providing Procedures for Enforcement.” The ordinance has provisions for sewer permits, inspection, facility requirements, and enforcement. The ordinance also has provisions on sewer laterals that are connected to the EVWD sewer main line up to the private property line and beyond are owned and maintained by the individual property owner(s) and not by EVWD. When blockages occur in sewer laterals, EVWD crew members assist property owners by checking if the blockages have occurred in the sewer main line, and have inspected the existing sewer lateral connections via the CCTV camera, when they are repaired, and when new sewer lateral connections are installed. EVWD currently works closely with the City of San Bernardino Sewer Department to comply with the WDR items (a), preventing illicit discharges, Section 3 Legal Authority 3-2 and (d), limiting the discharge of fats, oils, and grease, of WDR SSMP Section (iii). The City of San Bernardino currently handles the FOG program for the area since they own and operate the treatment plant. The San Manuel Indian Reservation and Patton State Hospital are connected to EVWD sewer system. The gap analysis recommended that user agreements shall be required with these agencies and EVWD. The user agreements must reference the requirements of being in compliance with WDR. EVWD is currently in the process of establishing a emergency and maintenance contract with Patton State Hospital. The contract will allow EVWD to enter hospital grounds and CCTV, repair and clean as needed to prevent any SSO’s from happening downstream in EVWD’s portion of the collection system. EVWD will also work with San Manuel to possibly establish an agreement similar to Patton. San Manuel has maintenance personnel that can respond to incidents as needed. EVWD would provide support. EVWD has emergency contact information from both agencies. San Manuel is a member of the Emergency Network of the Inland Empire (ERNIE). 4-1 Section 4 Operations and Maintenance Program A preventive and proactive Operations and Maintenance (O&M) Program is the basis of a well-run sewer collection system. It describes what work is done on a regular basis to the collection system mains, manholes, siphons, appurtenances and associated equipment in order to prevent them from failing and causing SSOs. The WDR requires that the elements listed below are included in the O&M program of SSMP: Maintain up-to-date sewer collection system maps Develop a routine preventive O&M program and activities for staff and contractors maintaining the sewer collection system and a system to document scheduled activities in a form of a work order Develop a rehabilitation and replacement plan identifying and prioritizing system deficiencies and implement short- and long-term actions to address the deficiencies Develop and provide training program on a regular basis for the O&M staff Develop and provide equipment and replacement part inventories, including critical replacement parts This section describes EVWD’s existing Sewer System Mapping, O&M Program, Rehabilitation and Replacement Plan or the Capital Improvement Plan (CIP) and On and Off Site Training. 4.1 Sewer System Mapping The Sewer System Maps are in Geographic Information System (GIS) data. These maps are viewed through the GIS desktop (ArcGIS) program. A complete digital file of all maps is available in pdf format, viewed on screen from a shared server or in print. In addition, a work order program, Cityworks, is built upon the GIS data and is available to all District Management Staff. (See Figure 4.1) The GIS database is updated after new pipeline installations, sewer main repairs and abandonments have been completed refer to Table 4-1. The field staff also use connected applications to make additions and corrections to the drawings. This information is verified and edited in the GIS master drawings. The entire sewer system has been Closed Circuit Televised (CCTV’d) and this information is available as an overlay on the GIS system maps. The CCTV program Section 4 Operations and Maintenance Program 4-2 notes the sewer main size and type, location of laterals, manholes and defects. It also records the direction of flow, invert to rim depth, and stationing to the centerline of the pipe. The current CCTV program and video library reside on the computer located on the CCTV truck and on a separate office based computer. Section 4 Operations and Maintenance Program 4-3 Figure 4.1 Section 4 Operations and Maintenance Program 4-4 Figure 4.1 - Sample Sewer Atlas Sheet Table 4-1 Existing Sewer System Data GIS Data Facility GIS Information Manhole Facility ID number GPS coordinates Station Date built Rim elevation Invert elevation Size of manhole Material type Inspection dates Pipes Facility ID number Location with reference to streets and property lines Size (diameter) Shape Direction of flow Length Slope Material type Date built Pipe invert elevations (upstream and downstream) Plan or as-built number Inspection dates Repair Reline Date of replacement Breaks/Damage Priority locations CCTV Hyperlink to pipes Areas of increased maintenance Laterals Location with station reference to sewer line Size (diameter) Length Material type APN Roots or Grease Code Defective Taps Streets Name Right-of-Way Lots Property Addresses Section 4 Operations and Maintenance Program 4-5 4.2 Preventive Operation and Maintenance (O&M) Preventive maintenance is defined as routine and scheduled activities performed before equipment or buried assets fail for the purpose of extending their life, reducing maintenance and replacement costs, and increasing reliability. Planned and proactive preventive maintenance is more efficient and cost effective than reactive and curative operations. Preventive maintenance anticipates and prevents problems from occurring and maintains the long-term integrity of all assets rather than fixing the short-term problems. Preventive maintenance will also include the most immediate and pressing problems within the sewer collection system. 4.2.1 Scheduled Cleaning of Sewers The District cleans the entire sewer distribution system on a regular basis. Using a high pressure jet and various spray nozzles, every pipe is flushed out. Different nozzles, root eradicators and cleaning agents are used based on the presence of debris, sand, roots, and fats, oils and grease. Areas of increased maintenance are cleaned monthly, bimonthly, or quarterly, according to historical results. This is also done for areas identified in the Sewer Master Plan rated “high” in the O&M frequency category. In addition, any sewers that are scheduled to be CCTV’d are cleaned before the inspection. As part of the O&M of the sewer collection system, EVWD maintains a list of locations that are “priority increased maintenance” locations. This group of pipes includes historic problem areas, and pipes identified during the CCTV operations. In addition to the list of priority locations, there are seven (7) siphons in the sewer collection system the District staff inspects on a regular basis and cleans as needed. The list of increased maintenance locations are part of the GIS data. 4.2.2 Resolution of Customer Complaints The District’s procedure for customer complaints regarding odor, are to forward the call to the Sewer Maintenance department for investigation. Staff will investigate and, if appropriate, jet the line to remove any standing water. If the problem is emanating from a known commercial area, or from an area of increased maintenance, efforts to clear any fats, oils or grease may include adding a degreaser to the jet’s water. 4.2.3 Maintenance Activity Records The District schedules and performs regular O&M of the sewer pipelines and maintains a daily log of the jetting and cleaning. The log includes equipment used, location, description of the work performed and any remarks. If sand, rocks, roots, grease are found they are cleared and noted on the report. The reports are kept for 7 years and can be found at the District offices. Section 4 Operations and Maintenance Program 4-6 4.3 Rehabilitation and Replacement Plan The WDR requires that a Rehabilitation and Replacement plan be developed to identify and prioritize system deficiencies and implement short-term and long-term rehabilitation actions to address each deficiency. The program should include regular visual and TV inspections of manholes and sewer pipes, and it should list the condition of sewer pipes for priority scheduling of replacement or rehabilitation with ranking applied to each significant defect. 4.3.1 Routine Visual Inspections Routine above ground inspections occur every time a manhole is opened. District crews look for any structural anomalies in the lid, rim, rings, ladders, shelf and inverts. Staff also looks for damage due to excessive hydrogen sulfide gas (H2S) corrosion. If any defects are noted, a work order is initiated to make the necessary repairs. As the sewer crew jets and cleans the sewer mains, every manhole is inspected during the process to see if debris from possible pipe breaks and collapses is present. If any is discovered, follow up CCTV inspections are scheduled. 4.3.2 CCTV Inspection Program EVWD adopted the National Association of Sewer Service Companies (NASSCO)’s Pipeline Assessment & Certification Program (PACP) to provide standardization and consistency in the way sewer pipe conditions are evaluated and ranked. The CCTV inspection program and is run by staff with certificates in NASSCO PACP codes. A total of five (5) EVWD field staff and two office staff have been trained and certified using PACP standards. EVWD maintenance staff conducted a District-wide CCTV inspection of all mains in the system. Each main was identified by the upper and lower manholes connecting the pipe run. Information was entered identifying the size of the main, material, level of water in the pipe, length, and observations about any materials on the surface, and the existence of cracks, fractures, holes, offsets, and collapses. As the camera moved down the interior, notes were taken as to the depth of the water, the presence of debris, sand, roots, FOG and location of and condition of lateral connections to the main. 4.3.3 Manhole Inspection Program As part of the cleaning and CCTV inspection program, EVWD staff also inspects the manholes in the system. Inspections are done every time a manhole is opened. Every manhole is inspected; when jetting is performed and when preventative maintenance Section 4 Operations and Maintenance Program 4-7 operations such as odor control and insect eradication take place. Manholes are inspected for: Accessibility Proper drainage from the cover Infiltration Joint security Grease accumulation Debris accumulation Corrosion Design or construction flaws in the invert that cause turbulence Grout bed or frame Warped or misfit lid – no rattle or rock Ring clean and seated properly Signs of potential problems with the lining (if interior is lined) Cracks or breaks in the cover, adjustment rings, walls, or bottom 4.4 Training Program EVWD currently provides the following formal training to each member of its O&M staff as shown on Table 4-4: Table 4-4 EVWD Training Program Description of Training Frequency Confined space entry Annually Trench shoring Annually First aid and CPR Certification every two years Spill Response Annually In-House Sewer response Team Training Annually PACP Certification every two years Safety Meetings Monthly EVWD uses on-the-job training for basic system cleaning and surveillance activities. Senior staff is paired with junior staff in order to carry out system O&M activities. District staff performs in-house sewer response team training and conducts monthly safety meetings. 4.5 Equipment and Replacement Parts Per the SSMP requirements, equipment and replacement part inventories should be available that include identification of critical replacement parts. Since there are no Section 4 Operations and Maintenance Program 4-8 pump stations within the EVWD collection system, the replacement part inventory is limited to pipelines and their appurtenances. Maintenance trucks are equipped for minor repairs on smaller diameter pipelines. Materials currently stored at EVWD facility includes: Small sections of VCP pipe Small sections of PVC pipe Repair clamps Manholes and riser rings Hand tools Pressure cleaning nozzles EVWD keeps an inventory of parts including a sewer emergency response trailer, CCTV truck, blowers, tripods, pumps, inflatable sewer plugs, air monitoring equipment, masks, decontamination pools, SCBAs, spare sewer pipe, couplings, cleanouts, two vacuum trucks, tools and other spare parts. The inventory can be viewed at the District’s service yard. 5-1 Section 5 Design and Performance Provisions This section of the SSMP will describe the existing EVWD’s standards and their future plans for the development of the standards for the design, construction, inspection, testing, and acceptance of new, rehabilitated, or repaired sewer collection system and their appurtenances. 5.1 Existing EVWD Standards EVWD has a well-established set of standards and criteria for the design and construction of sewer lines. These include: Standard Requirements for the Design and Processing of Sanitary Sewer Improvement Plans, revised Standard Specifications for the Furnishing of Materials and the Construction of Sanitary Sewers, revised Standard Drawings for Sewer Systems, revised Approved General Notes & Certificates, revised EVWD staff reviews projects for conformance with these design standards and procedures. Copies of the existing standards for the sewer collection system can be viewed at the District’s office. 5.2 Development of Additional Standards EVWD has contracted with an outside consultant to perform a review and update of their existing standard specifications and drawings (details) for sewer collection system. Senior EVWD staff, both in engineering and O&M, will be involved in reviewing the deliverables of the Consultant. It is expected that the review and update of the standard details will be completed by the September, 2014. Design standards and construction specifications will provide the enforcement measures to ensure quality and consistency in the sewer collection system and prevent future SSOs. These standards shall be routinely reviewed and updated at every five to ten years. The EVWD design standards and standard specifications will be updated to require Contractors to perform CCTV inspection of newly installed sewer lines after they have been constructed. Detail testing requirements such as CCTV, air testing, vacuum testing, hydro testing, mandrel testing, and others for gravity sewer, sewer manholes, force mains, and pump stations shall be added to the standard specifications. Standard specifications will also be developed for the rehabilitation and repair of the existing sewer lines. Standards for sewer collection system are available on the District’s website. 6-1 Section 6 Overflow Emergency Response Plan This section of SSMP will describe what the WDR requires from an agency when it develops and implements an Overflow Emergency Response Plan (OERP) including measures to protect public health and the environment. At a minimum, the plan must include the following: (a) Proper notification procedures so that the primary responders and regulatory agencies are informed of all SSOs in a timely manner; (b) A program to ensure an appropriate response to all overflows; (c) Procedures to ensure prompt notification to appropriate regulatory agencies and other potentially affected entities (e.g. health agencies, Regional Water Boards, water suppliers, etc.) of all SSOs that potentially affect public health or reach the waters of the State in accordance with the OERP. All SSOs shall be reported in accordance with this OERP, the California Water Code, other State Law, and other applicable Regional Water Board WDRs or NPDES permit requirements. The SSMP should identify the officials who will receive immediate notification; (d) Procedures to ensure that appropriate staff and contractor personnel are aware of, and follow, the Emergency Response Plan, and are appropriately trained; (e) Procedures to address emergency operations, such as traffic and crowd control and other necessary response activities; and (f) A program to ensure that all reasonable steps are taken to contain and prevent the discharge of untreated and partially treated wastewater to waters of the United States. And to minimize or correct any adverse impact on the environment resulting from the SSOs, including such accelerated or additional monitoring as may be necessary to determine the nature and impact of the discharge. 6.1 Existing EVWD Emergency Response Plan EVWD developed an Emergency Response Plan (ERP) in 2010. A copy of the ERP is located at EVWD’s main office. The ERP was intended to provide EVWD staff with emergency response procedures should a disaster cause a failure in their facilities. Failures may result from, but are not limited to, damage to the pipeline due to seismic activity, flooding, surge, debris accumulation, increased loading conditions, vandalism, pipeline deterioration, or construction of adjacent or crossing facilities, as much of the sewer system is within the right-of-way of public streets. Section 6 Overflow Emergency Response Plan 6-2 6.2 OERP EVWD developed a specific sewer system Overflow Emergency Response Plan (OERP) in March 2010. The OERP complies with the current requirements of the WDR and include updated response and notification procedures for SSOs. The OERP takes into consideration the National Incident Management System (NIMS) and the Standardized Emergency Management System (SEMS) format, reporting, and training that EVWD has had in the past. Standard reporting forms have also been developed. The OERP will be updated in 2014 and will be available to view at the District’s office. 7-1 Section 7 FOG Program The WDR requires that EVWD evaluate the agency’s service area to determine whether a FOG (fats, oil and grease) control program is needed. If it is determined that a FOG program is not needed, justification must be provided for why it is not needed. If FOG is found to be a problem, then the agency must prepare and implement a FOG source control program to reduce the amount of these substances discharged to the sanitary sewer system. This program must include the following, as appropriate: (a) An implementation plan and schedule for a public education outreach program that promotes proper disposal of FOG; (b) A plan and schedule for the disposal of FOG generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of FOG generated within a sanitary sewer system service area; (c) The legal authority to prohibit discharges to the system and identify measures to prevent SSOs and blockages caused by FOG; (d) Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, BMP requirements, record keeping and reporting requirements; (e) Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the FOG ordinance; (f) An identification of sanitary sewer system sections subject to FOG blockages and establishment of a cleaning maintenance schedule for each section; and (g) Development and implementation of source control measures for all sources of FOG discharged to the sanitary sewer system for each section identified in (f) above. 7.1 Existing FOG Control Program The City of San Bernardino Municipal Water Department, operators of the regional sewage treatment plant, handle FOG control program for the region through a Joint Powers Authority (JPA) agreement. EVWD falls under the umbrella of the City of San Bernardino Ordinance MC-1010, which requires Section 7 FOG Control Program 7-2 compliance with Federal and State wastewater standards and provides the City and EVWD with the authority to inspect and enforce for FOG violations. A copy of San Bernardino’s Ordinance MC-1010 can be obtained at the City of San Bernardino or at the District’s office. In addition, EVWD and the City of San Bernardino have signed a Pretreatment Program Administrative Agreement, which gives EVWD further authority to implement and enforce the City’s pretreatment program. A copy of this agreement is kept at the District’s office and is available for review. 7.2 Implementation of the FOG Control Program EVWD will continue to work with the City of San Bernardino to implement and enforce the FOG program. As part of their preventive operations and maintenance (O&M) of the sewer collection system, EVWD has developed and maintains a list of “Areas of Increased Maintenance” and schedules cleanings weekly, monthly and every 3 months. This type of preventive maintenance insures that no SSO occur in these specific areas. In addition to regularly scheduled cleanings the District also sends out informational pamphlets to tributary areas that explain how to properly dispose of grease or fats and the consequences of inappropriate disposal. Also on the schedule for regularly scheduled maintenance are the seven siphons that are located in the collection system. District staff inspects these on a regular basis and cleans as needed. In addition, EVWD has implemented a program to perform cleaning and regular visual and CCTV inspections of sewer pipes and manholes of the entire system, which is composed of approximately 215 miles of pipe. In order to avoid major budget impacts, cleaning and inspection of sewers has been prioritized by the District and implementation of this program began in April of 2008. The Districts goal is to CCTV 20% of the collection system each year so that the entire system is inspected in a five year period. Section 4, Operations and Maintenance Program, of this SSMP provides more detailed information on the cleaning and CCTV inspection program. In 2012 the District completed the first go around for CCTV inspection of the entire collection system which was one year ahead of schedule. The second go around for CCTV inspection began in early 2014. This round of inspection should be complete by 2019. 8-1 Section 8 System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a System Evaluation and Capacity Assurance Plan (SECAP). This component involves preparing and implementing a Capital Improvement Program (CIP) that will provide hydraulic capacity of key sewer system elements for dry weather peak flow conditions, as well as the appropriate design storm or wet weather event. At a minimum, the SECAP must include: Steps to evaluate those portions of the sanitary sewer system, which are experiencing or contributing to an SSO discharge caused by hydraulic deficiency. The evaluation must provide estimates of peak flows (including flows from SSOs that escape from the system) associated with conditions similar to those causing overflow events, estimates of the capacity of key system components, hydraulic deficiencies (including components of the system with limiting capacity) and the major sources that contribute to the peak flows associated with overflow events; Establishing a short- and long-term CIP to address identified hydraulic deficiencies including prioritization, alternatives analysis, and schedules. The CIP may include increases in pipe size, I&I reduction programs, increases and redundancy in pumping capacity, and storage facilities. 8.1 Capacity Evaluation The capacity of a sewer collection system should be regularly evaluated to ensure that all areas of the system have sufficient capacity for existing and future flow conditions. It is especially critical to evaluate capacity when adding new connections or developments to the existing system. Several tools exist to aid in the assessment of sewer system capacity, including flow monitoring, Inflow & Infiltration (I&I) study and hydraulic modeling. 8.1.1 Flow Monitoring System capacity is also evaluated using real-time flow monitoring data. EVWD occasionally contracts with flow monitoring contractors to measure actual flows in mainline trunks. The flow monitoring data is used to verify possible areas of the system that are experiencing capacity problems. For fiscal year Section 8 System Evaluation and Capacity Assurance Plan 8-2 2014-15, the District budgeted money to purchase flow monitors in order to monitor flows on a yearly basis. In the past, flow monitoring data was limited to 4-6 weeks a year. By purchasing flow monitors the District has the flexibility to monitor different types of scenarios. The data will also help with calibrating the Districts existing model. 8.1.2 Hydraulic Modeling Measured flow monitoring data and evaluation of current City and County land use plan information was used in developing a dry weather and wet weather hydraulic models for the 2013 Wastewater Collection System Master Plan. Wet weather storm events were monitored to as best as could be to further develop and evaluate the capacity within the existing trunk sewer lines and to help calibrate the model. 8.1.3 Sewer Master Planning EVWD completed a comprehensive Wastewater Collection System Master Plan in 2013. This Master Plan includes a capacity analysis and provided a capital improvement program that identifies capacity related improvement projects. The Districts goal is to revise the plan every 5 years to maintain an accurate capital improvement program and to maintain an updated model which can be used to analyze developments as needed. 8.1.4 Identification of Capacity Needs The capacity assessment of the entire sewer collection system has been evaluated through the development of EVWD’s Wastewater Collection System Master Plan. The capacity analysis used the calibrated dry weather and wet weather wastewater collection system model to evaluate existing and projected 2035 conditions. The District’s sewer collection system lines range from 6- inches to 24-inches in diameter. There are 4,500 manholes and 215 miles of gravity sewer pipes that were included in the hydraulic model which was used to develop the2013 master plan. The hydraulic model includes all pipes 10 inches in diameter and larger, as well as 6 inch and 8 inch lines that were considered hydraulically necessary or important to evaluate the wastewater collection system. The model also includes the entire East Trunk Sewer. Section 8 System Evaluation and Capacity Assurance Plan 8-3 The ratio of flow depth to pipe diameter (d/D ratio) was used to identify pipe capacity issues. The District’s criteria is d/D = 0.50 (peak dry weather) for pipes equal to or less than 12 inches in diameter and d/D = 0.75 (peak dry weather) for pipes greater than 12 inches in diameter and d/D=1.0 (peak wet weather) for all gravity sewer pipelines. 8.1.5 Identification of Rehabilitation Needs EVWD has developed and implemented a Closed Circuit Television (CCTV) inspection program of the sewer system as part of their Operation and Management (O&M) Program. Inspection of sewer lines follows National Associating of Sewer Services Companies’ (NASSCO) Pipeline Assessment and Certification Program (PACP) standards. This program has allowed EVWD to identify and verify some of the hydraulic deficiencies as identified in the model and also deficiencies that exist in the system due to structural, operations, construction, or other miscellaneous issues. This program has provided a standardized comprehensive reservoir of data that is used for the prioritization, planning and renovation of wastewater collection improvement projects. The CIP schedule will be determined according to the prioritization as determined by the PACP grading system. Deficient pipes will be ranked and prioritized and incorporated into the short-term or long-term CIPs. 8.2 Design Criteria EVWD has a well established set of standards and criteria for the design and construction of sewer lines within their system. These include: Standard Specifications for the Furnishing of Materials and the Construction of Sanitary Sewers, revised Standard Drawings for Sewer Systems, Approved General Notes & Certificates, Table 8-1 shows the design criteria used by EVWD for sewer lines. It is important to note that EVWD does not own or operate any lift stations or force mains; thus they have not developed specific design criteria for these facilities. Section 8 System Evaluation and Capacity Assurance Plan 8-4 Table 8-1 Hydraulic Criteria for the Design of EVWD Sewer Collection System Lines Element Value Manning’s ‘n’ Factor 0.013 for all materials Minimum Pipe Size (for gravity sewers) 8 inches Maximum Allowable Flow Depth Under peak design dry weather flow conditions: d/D = 0.50 for pipes 12-inches in diameter and smaller d/D = 0.75 for pipes larger than 12-inches in diameter The remaining capacity is assumed to be available for wet weather flows. Minimum Velocity/Slope Gravity lines: 2 ft/sec at peak dry weather flow at build-out (2.5 ft/sec is preferred). Maximum Velocity Gravity lines: 10 ft/sec 8.3 Capital Improvement Program The 2013 Master Plan presented recommendations to the District to address existing and future hydraulic and capacity deficiencies found in the compilation of data and analysis of the primary wastewater system using a hydraulic model. This section presents the recommendations to meet the primary objectives of this report. The 2013 Wastewater Collection System Master Plan contains a more detailed discussion of the capacity evaluation recommendations. A copy of the plan is located on the Districts website at www.eastvalley.org. Recommended Master Plan Programs Two wastewater collection system programs designed to meet various operational needs are recommended for implementation: 1. Short-Term Capital Improvements for immediate consideration. 2. Long-Term Capital Improvements for development and implementation These recommendations will be updated as EVWD’s CCTV program is being implemented. Section 8 System Evaluation and Capacity Assurance Plan 8-5 8.3.1 Short-Term CIPs As part of the update of the wastewater collection system master plan, EVWD will develop a Short-Term CIP to correct hydraulic deficient primary sewers in the existing system or to identify potential deficiencies that may occur at these locations. The short-term CIP will identify the deficient locations, costs associated with the improvement needs, and a time line for implementation of the projects. The deficient pipe(s) will be sized to accommodate system flows at build out as well as to correct existing deficiencies. 8.3.2 Long-Term CIPs As part of the update of the wastewater collection system master plan, EVWD will develop a Long-Term CIP to correct hydraulic deficient sewers using a phasing system that allows the District to evaluate the improvements to accommodate system flows for build-out conditions. The long-term CIP will identify the deficient locations, costs associated with the improvement needs, and a time line for implementation of the projects. 8.4 CIP Schedule As stated above, the short-term and long-term CIPs will include a time line for implementation of the projects. It is important to note that the CIPs will be living documents that will be adjusted as the District gathers additional information of their system as the CCTV program continues to be implemented and as their master plan is updated. 9-1 Section 9 Monitoring, Measurement, and Program Modifications One of the critical components of a comprehensive SSMP program is the development and tracking of performance indicators. Performance indicators describe the performance of the collection system and related maintenance activities on the basis of measurable objectives. These indicators provide information that can be used to: Evaluate the effectiveness of operations and maintenance activities (i.e., cleaning, jetting, CCTV inspections, flow of service calls, and reports), programs, and budgets Identify performance trends Demonstrate compliance with the SSMP Modify planning and operational practices to maximize system performance during audits This section contains recommendations for performance indicators specific to EVWD that will help monitor the progress and effectiveness of its SSMP program. EVWD's initial status or rating with respect to the recommended performance indicators is presented based on system and performance data provided by EVWD. 9.1 Benchmarking Data Although it is important to tailor performance indicators to the unique characteristics of a specific system, it is also useful to develop indicators that can be used to compare performance with other collection systems. This comparison can be accomplished through benchmarking. The usefulness of a benchmarking analysis can be maximized by gathering data from systems with similar characteristics. Although it is difficult to identify and collect the necessary information from agencies owning and operating similar sewer collection systems. This is due to the fact that many utilities either have not kept track of the information, or are reluctant or unwilling to release sensitive information related to the performance of their wastewater collection systems. For these reasons, the benchmarking analysis in this SSMP utilizes two recent national reports that address benchmarking values for wastewater collection Section 9 Monitoring, Measurement, and Program Modifications 9-2 systems. Although these reports consider wastewater collection systems with wide ranging characteristics, the comparisons still provide useful insight as to how EVWD's wastewater collection system performs compared to that of other municipalities. This report uses the following two reports: “Benchmarking Performance Indicators for Water and Wastewater Utilities: Survey Data and Analyses Report. American Water Works Association, 2005.” “Optimization of Collection System Maintenance Frequencies and System Performance. American Society of Civil Engineers, 1999.” The following sections contain a brief description of the indicators investigated in each report. 9.1.1 American Water Works Association (AWWA ) Report The AWWA Report, developed performance indicators for both water and wastewater utilities. The survey sample size for the wastewater performance indicators ranged in size from 78 to 121 and included utilities of varying size from across the country. The results were reported by region (West, South, Midwest, and Northeast) as well as by service population (>500,000; 100,001- 500,000; 50,001-100,000; 10,000-50,000; <10,000). The following performance indicators related to wastewater collection systems were benchmarked in the study: Sewer Overflow Rate - number of sanitary sewer overflows per year per mile of sewer Collection System Integrity - number of pipe failures per year per mile of sewer O&M Cost per Account Planned Maintenance Ratio - ratio of planned maintenance to unplanned maintenance 9.1.2 American Society of Civil Engineers (ASCE) Report The ASCE Report focused specifically on wastewater collection systems. In addition to benchmarking performance indicators, the report also investigated maintenance practices and frequencies and attempted to correlate maintenance activities with system performance. A total of 42 agencies from throughout the country provided data that was used in the report. Table 9-1 summarizes the characteristics of the collection Section 9 Monitoring, Measurement, and Program Modifications 9-3 systems analyzed in the study. The characteristics of EVWD's wastewater collection system are also presented for comparison. Table 9-1 ASCE Report and EVWD Collection System Characteristics Description Average from ASCE Report EVWD Population Served 619,771 95,000 Miles of Sewer 1,660 215 Average Annual Daily Flow (MGD) 82.0 6.5 Number of Lift Stations 47 0 Industrial-Commercial Percentage 20.2% 5.9% Some of the performance indicators and maintenance practices benchmarked in the ASCE Report include: Miles of Sewer Cleaned per Year Mainline Stoppages Cleared per Year Percent of System Inspected by Video per Year Sanitary Sewer Overflows per Year per Mile of Sewer Pipe Failures per Year per Mile of Sewer Customer Complaints per Year 9.2 System Specific Performance Indicators Although the studies mentioned above provide useful guidance, the availability of information on wastewater collection systems and sanitary sewer overflows (SSOs) is system specific and performance indicators are difficult to develop purely from a national perspective. Therefore, performance indicators were developed that recognize the size, complexity, and unique characteristics of EVWD's wastewater collection system. Several indicators can be used to measure both the performance of the wastewater collection system and the efficiency, productivity, and adequacy of SSMP programs. The selection of indicators for a specific system depends on a variety of factors including regulatory requirements, EVWD's operational and performance goals, and availability of data and resources. In general, indicators that describe a wastewater collection system can be grouped into the following categories: Section 9 Monitoring, Measurement, and Program Modifications 9-4 Demographic Indicators Budget Performance Indicators System Performance Indicators Staff and Equipment Performance Indicators The following sections describe the recommended performance indicators for EVWD's wastewater collection system. EVWD's baseline status for the indicators is also described when sufficient data is available. Benchmarking results from the AWWA Report and ASCE Report studies are presented for applicable indicators for comparison. A summary of the recommended indicators and EVWD’s current or baseline status has also been provided in Section 9.8. 9.3 Demographic Indicators Demographic indicators are used to describe the size, complexity, and growth of the collection system. This type of information is especially critical for EVWD because of continued growth and development in and around the service area. Detailed system information data will allow EVWD to optimize planning activities and maximize service. 9.3.1 Service Area Population This indicator tracks the total number of people receiving wastewater collection services from EVWD and can be used to track and forecast the demand for wastewater collection services. EVWD's current service population is estimated to be 95,000 with a projected increase to 150,700 by the year 2035. 9.3.2 Number of Customer Accounts Similar to service area population, the number of customer accounts will provide important information about the size of the wastewater collection system. As of August 2014, EVWD had 21,326 residential accounts and 1,330 commercial/ industrial accounts, for a total of 22,656 customer accounts. 9.3.3 New Connections per Year This indicator provides a direct measure of system growth by measuring how many new customers are being added to the system. For the 2012/2013 fiscal year, EVWD reported 136 new connections. New developments are planned in the service area that could result in a significant increase in wastewater collection system connections. Section 9 Monitoring, Measurement, and Program Modifications 9-5 9.3.4 Length of Sewers This indicator provides information on the size of the collection system. Over the past 20 years EVWD has installed approximately 100 miles of sanitary sewer. As of July 2014, EVWD has maintenance responsibility for 215 miles of sanitary sewer. It is estimated that at complete build-out the system will have approximately 280 miles of sanitary sewer. 9.3.5 Average Age of System The age of the EVWD's wastewater collection system varies widely. Some sections are over 50-years old, while other areas have sewers that have been installed in past fifteen years. Table 9-2 below presents the length of sewer constructed in EVWD's service area in 5-year increments during the last 50 years. Using this data, the average age of the wastewater collection system is approximately 38 years. Table 9-2 EVWD Wastewater Collection System Age Years Miles of Sewer Installed Percentage of System Average Age 1957-1959 67 miles 31 +/- 55 years 1960-1980 69 miles 32 +/- 44 years 1981-2013 79 miles 37 +/- 16 years Total 215 miles 100 38 9.4 Budget Performance Indicators Budget indicators are used to monitor and track the level of funding allocated and expended on operation and maintenance of the wastewater collection system. The Capacity, Management, Operations and Maintenance (CMOM) program and SSMP program require that collection system owners or operators demonstrate that the allocation of budget resources is adequate to deliver an acceptable level of service to customers. Budget indicators can be used to help demonstrate compliance with this requirement. 9.4.1 Annual Collection System Budget per Account This indicator is defined as the total annual budget allocated to the wastewater collection system divided by the number of customer accounts. EVWD budgeted $200,000 to its Sewer Operation and Maintenance Fund for fiscal Section 9 Monitoring, Measurement, and Program Modifications 9-6 year 2014/15. EVWD also budgets money for sewer capital projects, but these dollars are excluded from this calculation. Given 22,656 customer accounts (see Section 9.3.2), EVWD currently budgets approximately $8.83 per customer account for wastewater collection system operations and maintenance. The AWWA Report contains the performance indicator “O&M Cost per Account” defined as the total O&M cost per customer account. Customer accounts included all customer classes that were billed for some or all of the reporting period. The O&M cost per account performance indicator is defined as follows: O&M cost per account = total O&M costs (less depreciation)/total number of active customer accounts The AWWA Report definition matches the definition stated in Section 9.4.1, so the benchmark analysis provides a useful comparison. Table 9-3 below summarizes the comparison between the AWWA Report results and EVWD’s results. Table 9-3 AWWA Report Benchmark Results for O&M per Account 25th Percentile Median 75th Percentile Sample Size EVWD (2014) Region West $168 $239 $489 40 $8.83 South $168 $267 $350 53 n/a Midwest $159 $266 $425 18 n/a Northeast $165 $282 $303 6 n/a Size >500,000 $176 $275 $350 22 n/a 100,001-500,000 $157 $232 $347 41 n/a 50,001-100,000 $186 $283 $464 20 $8.83 10,000-50,000 $181 $274 $464 29 n/a <10,000 $206 $298 $445 8 n/a All Participants $168 $272 $378 121 $8.83 Source: Benchmarking Performance Indicators for Water and Wastewater Utilities: Survey Data and Analysis Report. American Water Works Association 2005. Section 9 Monitoring, Measurement, and Program Modifications 9-7 Table 9-3 indicates that EVWD is currently budgeting approximately 89.1% less than average on collection system operations and maintenance than the utilities surveyed for the AWWA Report. Among agencies or municipalities of similar size, EVWD is spending approximately 89.4% less than average on collection system O&M. 9.4.2 Percentage of Budget for Collection System Rehabilitation This indicator will be used to track EVWD's commitment to sewer system rehabilitation. It should be calculated as the total budget for collection system rehabilitation and replacement divided by the total collection system budget. Budgetary data provided by EVWD indicates that approximately $200,000 was budgeted for the Sewer Replacement Fund for fiscal year 2013-2014. Assuming a total budget of $31,000,000 (see Section 9.4.1), EVWD currently budgets approximately 0.65% of its total budget to collection system replacement and rehabilitation. It should be noted that EVWD has developed a Capital Improvement Plan (CIP) based on video inspection activities as well as the Sewer Master Plan evaluation. Capital improvement projects are not factored into the replacement and rehabilitation budget. 9.5 Staff and Equipment Performance Indicators Staff and Equipment indicators describe the staffing and equipment resources available to properly operate and maintain the wastewater collection system. Although the level of staffing and required equipment is unique to individual collection systems, it is still helpful to develop and track these indicators for analysis and comparison. 9.5.1 Population per Collection System Employee This indicator provides information on the level of staffing to complete necessary O&M activities. In order to complete this calculation, it is necessary to define who will be considered a collection system employee. There are currently 65 full time equivalent (FTE) employees in EVWD dedicated to management, operations, and maintenance of the wastewater collection system. Therefore, with 65 FTE employees and a service population of approximately 95,000 people, EVWD currently has approximately 1,462 people per collection system employee. Section 9 Monitoring, Measurement, and Program Modifications 9-8 9.5.2 Length of Sewer per Collection System Employee This indicator provides similar information to the previous indicator except that it is based on the length of sewer. EVWD is currently responsible for 215 miles of sewer. Assuming 65 collection system employees, EVWD has approximately 3.3 miles of sewer per employee. 9.6 System Performance Indicators Performance indicators are used to determine how well EVWD's sewer maintenance program meets goals related to level of service, asset management, and environmental protection. 9.6.1 Sanitary Sewer Overflows per Year per Length of Sewer The occurrence of SSOs is probably the most critical performance indicator for EVWD's SSMP program. An SSO represents a failure of a wastewater collection system's main function and is the event that both CMOM and SSMP programs are primarily aimed at reducing. EVWD is already required to track and report SSOs of sufficient volume to the Regional Water Quality Control Board. However, all SSOs of any volume should be recorded to develop a complete data set for this performance indicator. EVWD reported four (4) SSOs during the past five years, which is equal to an average of 0.004 SSOs per year per mile of sewer. To accurately track SSOs, it is important to adopt a specific definition of what will be considered an SSO event. For this SSMP and SSO be defined as an overflow, spill, release, or diversion of wastewater from a sanitary sewer system including overflows or releases of wastewater that reach waters of the United States; overflows or releases of wastewater that do not reach waters of the United States; and wastewater backups into buildings that are caused by blockages or flow conditions in a sanitary sewer other than a building lateral. Wastewater backups into buildings caused by a blockage or other malfunction of a building lateral that is privately owned are not counted as an SSO by EVWD. Both AWWA Report and ASCE Report studies provide benchmarking data on sanitary sewer overflows. In the AWWA Report an SSO was defined as the total number of sewer overflows during the reporting period per mile of pipe in the collection system. A sewer overflow was defined as a discharge from a sewer through an access whole, clean-out, pumping facility, customer floor Section 9 Monitoring, Measurement, and Program Modifications 9-9 drain, or the drain in a fixture, if that discharge was related to limitations or problems with collection or treatment system components under the control of the utility. Overflows caused by limitations or problems within customer- controlled piping and facilities were specifically excluded from the definition. The AWWA Report sewer overflow rate is defined as follows: Sewer overflow rate =100 x total number of sewer overflows during the reporting period/total miles of pipe in the sewage collection system Given four (4) SSOs during the last five years, EVWD has a score of 2.0 for sewer overflow rate. Table 9-4 summarizes the AWWA Report Benchmark results. Table 9-4 AWWA Report Benchmark Results for Sewer Overflow Rate 25th Percentile Median 75th Percentile Sample Size EVWD Region West 1.44 2.74 6.46 39 2.0 South 2.45 5.66 10.52 48 n/a Midwest 1 2.76 9.41 16 n/a Northeast 4.43 7.61 17.48 5 n/a Size >500,000 1.71 5.47 9.67 23 n/a 100,001-500,000 1.36 3.5 7.35 41 n/a 50,001-100,000 1.68 2.26 8.96 19 2.0 10,000-50,000 2.47 7.29 15.04 23 n/a <10,000 n/a n/a n/a n/a n/a All Participants 1.8 4.3 9.5 110 2.0 Source: Benchmarking Performance Indicators for Water and Wastewater Utilities: Survey Data and Analyses Report. American Water Works Association. 2005 The ASCE Report study defined a sanitary sewer overflow as a discharge of wastewater from the collection system with the potential to enter surface water courses occurring either in the collection system or in the headworks of the wastewater treatment plant. Table 9-5 below compares the results of the ASCE Report study with EVWD’s performance. Section 9 Monitoring, Measurement, and Program Modifications 9-10 Table 9-5 ASCE Report Benchmark Results for Sanitary Sewer Overflows ASCE Report Sample Size 25 ASCE Report Standard Deviation 0.048 ASCE Report Range 0.002-0.17 ASCE Report Mean 0.045 EVWD Mean (2013) 0.004 Source: Optimization of Collection System Maintenance Frequencies and System Performance. American Society of Civil Engineers 1999. The results presented in both Table 9-4 and Table 9-5 indicate that EVWD has experienced a lower than average occurrence of SSOs. 9.6.2 Mainline Blockages per Year per Length of Sewer A mainline blockage is defined as a significant flow restriction in a mainline sewer under EVWD's control. Blockages can have many sources including: Pipe Collapse Root Intrusion Vandalism Fats, Oils, and Grease Construction Debris Although blockages frequently lead to SSOs, a release of wastewater does not have to occur for an event to be considered a blockage. EVWD recorded four (4) mainline blockages since January 2009. This indicates an average of 0.8 mainline blockages per five (5) year period and 0.004 mainline blockages per five (5) year period per mile of sewer. This value is significantly lower than national and regional averages and it is recommended that an additional year of data be collected to validate the data sample used for this performance measure. Mainline Blockages per Year per Length of Sewer Benchmark Table 9-7 summarizes the ASCE Report results of average mainline blockages cleared per year per length of sewer by region and collection system size. EVWD's average of 0.004 blockages cleared per year per length of sewer is significantly lower than the national and regional averages. Section 9 Monitoring, Measurement, and Program Modifications 9-11 Table 9-7 ASCE Results of Average Mainline Stoppages Cleared Sample Size Mainline Stoppages Cleared/mile/year EVWD (2009/2014) Region Central 18 0.29 n/a Northeast 3 0.20 n/a Northwest 4 0.11 n/a Southeast 4 0.36 n/a Southwest 9 0.13 0.004 Size Large 13 0.20 n/a Medium 19 0.29 0.004 Small 6 0.13 n/a Overall 38 0.23 0.004 Source: Optimization of Collection System Maintenance Frequencies and System Performance. American Society of Civil Engineers. 1999. 9.6.3 Pipe Failures per Year per Length of Sewer This performance indicator is used to measure and track the structural integrity of the wastewater collection system. For simplicity, it is recommended that pipe failure be defined as total or partial pipe collapse (loss of 50% of pipe area or 25% of pipe wall around any circumference). Pipe failures per length of sewer can be determined by dividing the total number of pipe failures per year, based on the definition stated above, by the total miles of sewer pipe in the system. EVWD is only aware of two pipe collapse during the last year identified during EVWD's video inspection program, which results in 0.009 pipe failures per mile of sewer. As EVWD continues its proactive approach to assess the condition of the wastewater collection system, this number could increase. Failures per Year per Length of Sewer Benchmark Benchmarks of collection system integrity are included in both the AWWA Report and ASCE Report. The ASCE Report defined pipe failure per year per mile of pipe using the same definition presented above. Table 9-8 summarizes the results from the ASCE Report. Section 9 Monitoring, Measurement, and Program Modifications 9-12 Table 9-8 ASCE Report Results for Pipe Failures ASCE Report Sample Size 29 ASCE Report Standard Deviation 0.059 ASCE Report Range 0.025 ASCE Report Mean 0.041 EVWD Mean (2013) 0.009 Source: Optimization of Collection System Maintenance Frequencies and System Performance. American Society of Civil Engineers 1999. The AWWA Report study defined collection system integrity as the total number of collection system failures during the year per mile of collection system piping. A failure was defined as a loss of capacity that resulted from a flow restriction in gravity or pressurized sewer systems. Flow restrictions could be caused by deposition of foreign materials; structural failure of pipes, appurtenances, or access holes; deterioration of collection system materials; and root intrusion. The definition excluded any failure directly caused by the action of a person authorized by the utility, such as failure caused by incidental damage during construction/repair or an incorrectly marked location. The AWWA Report collection system integrity failure rate is defined as follows: Collection system integrity failure rate = 100 x total number of collection system failures during the year/total miles of collection system piping Table 9-9 presents the results of the AWWA Report collection system integrity failure rate results along with EVWD's results for comparison. Table 9-9 AWWA Report Benchmark Results for Collection System Integrity Failure 25th Percentile Median 75th Percentile Sample Size EVWD (2014) Region West 1.7 5.6 1.2 36 0.9 South 7.3 20 54.3 49 n/a Midwest 4 8.2 33 18 n/a Northeast 4.43 7.61 17.48 5 n/a Size >500,000 4.6 15.8 26.3 22 n/a Section 9 Monitoring, Measurement, and Program Modifications 9-13 100,001-500,000 5 9.3 24.5 40 n/a 50,001-100,000 2.1 8 17.6 19 0.9 10,000-50,000 3.9 7.2 36.8 23 n/a <10,000 4.4 10.5 17.6 5 n/a All Participants 3.6 9.4 26.1 109 0.9 Source: Benchmarking Performance Indicators for Water and Wastewater Utilities: Survey Data and Analyses Report. American Water Works Association, 2005. 9.6.4 Flow Monitoring Events per Year Flow monitoring can be used to measure the quantity of wastewater flowing through the collection system. The frequency and extent of flow monitoring can be a useful indication of how proactive EVWD is in anticipating and preventing capacity issues. Currently, EVWD conducts flow monitoring events on main trunk lines servicing the area and on lines that may be identified as priority locations. The District will purchase flow monitoring equipment or contract for flow monitoring data acquisition and management services in 2014-2015 in order to gather additional flow monitoring information. Data collected from the flow monitoring program will be used to develop, calibrate, and validate a hydraulic model for the collection system. 9.6.5 Percentage of Sewers Inspected by Video per Year EVWD has recognized the importance of proactive condition assessment to ensure the continued functioning of its wastewater collection system. This performance indicator can be defined as the length of sewers inspected by video per year divided by the total length of sewers. In fiscal year 2014, EVWD inspected 10,000 linear-feet of pipe (1% of the system). 2014 is the first year of the second round of videoing the entire system. The Districts goal is to CCTV inspect 20% of the system every year and be complete with the entire system in 2019. Percentage of Sewers Inspected by Video per Year Benchmark The ASCE Report study provides benchmark data for the video inspection of sewer pipes. Table 9-10 summarizes these results along with EVWD’s performance. Section 9 Monitoring, Measurement, and Program Modifications 9-14 Table 9-10 ASCE Report of Video Inspection Frequency Sample Size ASCE Video Inspection (% of system per year) EVWD Video Inspection (% of system per year) Region Central 19 6% n/a Northeast 3 8% n/a Northwest 4 7% n/a Southeast 4 9% 20% Southwest 9 10% 1% Size Large 13 7% n/a Medium 19 6% 20% Small 6 11% n/a Overall 38 7% 20% Source: Optimization of Collection System Maintenance Frequencies and System Performance. American Society of Civil Engineers, 1999. The comparison presented in Table 9-10 demonstrates EVWD's aggressive and proactive commitment to monitor the condition of its wastewater collection system. 9.6.6 Percentage of Sewers Cleaned per Year This indicator provides information on EVWD's preventive maintenance program, which prioritizes cleaning areas of the system with fats, oils, grease, and root problems. EVWD reports that the current rate of mainline cleaning is up to 2,200 linear-feet per day. Assuming two-days per week of cleaning at this rate, approximately 20% of the system should be cleaned each year. The ASCE Report study provides benchmark information related to sewer system cleaning. Table 9-11 presents the average percentage of the collection system cleaned by region and system size. EVWD's average of 20% of sewers cleaned per year is slightly lower than the national and regional averages. Section 9 Monitoring, Measurement, and Program Modifications 9-15 Table 9-11 ASCE Report of Average Sewer Cleaning Sample Size Sewer Cleaning (% of system per year) EVWD Sewer Cleaning (% of system per year) Region Central 20 22% n/a Northeast 2 9% n/a Northwest 4 61% n/a Southeast 4 29% n/a Southwest 11 38% 20% Size Large 16 27% n/a Medium 20 30% 20% Small 5 40% n/a Overall 41 30% 20% Source: Optimization of Collection System Maintenance Frequencies and System Performance. American Society of Civil Engineers, 1999. 9.6.7 Percentage of Sewers Lined per Year As mentioned previously, EVWD has in the past used cured-in-place plastic lining to rehabilitate areas of the system that were found to be deteriorating. This indicator tracks the percentage of the system that has been lined during this program. As EVWD's CCTV inspection program progresses, they will identify lines in need of rehabilitation and a formal program will be developed. 9.6.8 Planned Maintenance Ratio This performance indicator measures the relative time or money spent on planned maintenance (preventive and predictive) versus unplanned maintenance (corrective and emergency). As mentioned previously, planned maintenance is generally more cost-effective, provides a higher level of service for customers, and results in better regulatory compliance. The planned maintenance ratio can be defined by dividing the hours or cost spent on planned maintenance by the total cost or hours on all maintenance. EVWD currently does not categorize maintenance activities as planned or unplanned, but it does have IMS (Information Management Systems) infrastructure to begin to track this performance indicator in the future. Section 9 Monitoring, Measurement, and Program Modifications 9-16 Planned Maintenance Ratio Benchmark The AWWA Report study contains benchmark data for the planned maintenance ratio by both cost and time. The planned maintenance ratio by cost is defined as follows: Planned maintenance ratio (cost) = 100 x cost of planned maintenance I (cost of planned maintenance + cost of corrective maintenance) Table 9-12 presents the results of the AWWA Report benchmarking survey for planned maintenance ratio by hours. Table 9-12 AWWA Report Benchmark Results for Planned Maintenance Ratio (cost) 25th Percentile Median 75th Percentile Sample Size Region West 47.2 66.6 77.7 33 South 36 55.9 81.2 36 Midwest 32.9 55.7 77.5 16 Northeast n/a n/a n/a 4 Size >500,000 30.7 47.2 60 17 100,001-500,000 45.5 58 81.2 32 50,001-100,000 25 56.4 76.5 17 10,000-50,000 50 74.9 88.5 20 <10,000 34.5 74.4 75 5 All Participants 36 58 80.4 98 Source: Benchmarking Performance Indicators for Water and Wastewater Utilities: Survey Data and Analyses Report. American Water Works Association, 2005. 9.7 Summary of Current Status Table 9-13 summarizes initial values for the indicators described in the previous sections based on data provided by EVWD. The development and tracking of performance indicators is an ongoing process that requires frequent data updating and analysis. As EVWD continues to improve its program, additional data should become available to provide more in-depth analysis of performance and trends. Section 9 Monitoring, Measurement, and Program Modifications 9-17 9.8 Benchmarking Conclusions This section proposed a set of performance indicators specific to the wastewater collection system in EVWD's service area that can be used to monitor the system's performance and effectiveness. The baseline values of the performance indicators were established based on available data provided from EVWD. The performance of EVWD's wastewater collection system was also compared to other collection systems throughout the region and country using two recent national wastewater collection system performance reports. Table 9-13 EVWD Wastewater Collection System Initial Values for Performance Indicators Indicator Description Value Service Area Population 95,000 people Number of Customer Accounts 22,656 New Connections per Year Length of Sewer Mains 215 miles Average Age of System 38 years Number of Lift Stations No lift stations Annual Collection System Budget per Account $8.83 Percentage of Budget for Collection System Rehabilitation 0.65% Population per Collection System Employee 1,462 people/employee Miles of Sewer Main per Collection System Employee 3.3 miles/employee AWWA REPORT Sewer Overflow Rate 2.0 ASCE Sanitary Sewer Overflows 0.004 Mainline Blockages per Year per Length of Sewer 0.004 Pipe Failures per Year per Length of Sewer 0.009 Flow Monitoring Events per Year 1 Percentage of Sewers Inspected by Video per Year 20% Percentage of Sewers Cleaned per Year 20% The results from benchmarking against these reports generally indicate that EVWD's wastewater collection system is performing well above average. Using the proposed performance indicators, EVWD will be able to track the performance of the collection system as time goes on. Using this information, EVWD will be able to enhance its planning and operational practices in order Section 9 Monitoring, Measurement, and Program Modifications 9-18 to maximize the performance of the system and continue to meet current and future regulatory requirements. Recommendations for EVWD's SSMP program enhancements, as they relate to the Monitoring, Measurement, and Program Modifications, include the following: Conduct audits of EVWD's SSMP program using data collected during the preparation of the annual updates to the Performance Indicator and Benchmarking Analysis. At a minimum these audits should occur every two years and a report should be prepared and kept on file. This audit should focus on evaluating the effectiveness of the SSMP Program and its compliance with the proposed regulatory requirements. The report should also include a discussion of potential deficiencies and steps to correct them. During the internal audits required every two years, prepare an internal technical memorandum that updates the Monitoring, Measurement, and Program Modifications provided within this report. Monitor the implementation and, where appropriate, measure the effectiveness of each performance measure of the SSMP program. Periodically update program elements and performance measures, as appropriate, based on monitoring or performance evaluations. Continue to improve long term data collection efforts to enhance the quality and integrity of the data sample used for the annual Monitoring, Measurement, and Program Modifications. Develop a database for tracking long term performance measure data and benchmarking data. 9-19 Goals Yes/No Responsible Person Date Completed Supporting Documentation Minimize the number and impact of sanitary sewer overflows (SSOs)Yes Gerald Sievers Continue to improve customer service. Has response time improved?Yes Carol Cales Maintain and/or improve the condition of the collection system infrastructure in order to provide reliable service and capacity now and into the future Yes Gerald Sievers Work towards achieving full compliance with the Waste Discharge Regulations (WDRs) Yes Andrew Theisen Work towards improving the District’s internal systems Yes Tom Holliman Organization Yes/No Responsible Person Date Completed Supporting Documentation Review and Update Names of Authorized Representatives as needed Yes Eliseo Ochoa Review and Update Organization Chart as needed Yes Eliseo Ochoa Review and Update Chain of Communications Yes Eliseo Ochoa Legal Authority Yes/No Responsible Person Date Completed Supporting Documentation Did the State/Regional Board Update Legal Requirements? Yes Eliseo Ochoa If so, was Ordinance 359 reviewed and/or updated? No NA Has an agreement with San Manuel Indian Reservation been signed?No NA Has an agreement with Patton State Hospital been signed? NO NA Section 9 Monitoring, Measurement, and Program Modifications 9-20 O&M Yes/No # of Feet % of System Responsible Person Date Completed Supporting Documentation Vandalism Other Damage Training Section 9 Monitoring, Measurement, and Program Modifications 9-21 Design and Performance Yes/No Count Responsible Person Date Completed Supporting Documentation Does the Design and Performance Provisions section of the SSMP need updating? OERP Yes/No Count Responsible Person Date Completed Supporting Documentation Review and update self-contact information Review and update contacts for Regulatory Agencies and potential affect agencies Review and update Contractors and Suppliers List Were problems encountered with OERP during SSOs? How many SSO responses were not able to follow the OERP procedures? Was yearly OERP training exercise completed and documented? Section 9 Monitoring, Measurement, and Program Modifications 9-22 FOG Control: SECAP Yes/No Responsible Person Date Completed Supporting Documentation Was flow monitoring conducted? Yes Tom Holliman Was a sewer model developed? Yes Tom Holliman Were existing flows in the sewer model updates to reflect latest data?Yes Tom Holliman Were future flow projections updated in the hydraulic model? Yes Tom Holliman Was a CIP developed or updates to address hydraulic deficiencies?Yes Tom Holliman Was a CIP developed or updated to address rehabilitation of replacement identified by the CCTV inspections?Yes Tom Holliman Does the SECAP section of the SSMP need updating? Yes Eliseo Ochoa Section 9 Monitoring, Measurement, and Program Modifications 9-23 Monitor Measure and Program Modifications Yes/No Count Gallons Responsible Person Date Completed Supporting Documentation Number of Dry Weather SSOs Number of Wet Weather SSOs Volumes of SSOs < 100 gallons 100 to 999 gallons 1,000 to 9,999 gallons > 10,000 gallons Volume of SSOs contained Volume of SSOs discharged to drainage system or surface waters Causes of SSOs Roots Grease Debris Pipe Failure Capacity Contractor Error Other SSOs per Year per Length of Sewer Mainline Blockages per Year per Length of Sewer Pipe Failures per Year per Length of Sewer Section 9 Monitoring, Measurement, and Program Modifications 9-24 Program Audits Yes/No Count Gallons Responsible Person Date Completed Supporting Documentation Was there an audit completed on the SSMP? Were there any program modifications recommended after the audit? Were the program modifications completed? Section 10 SSMP Program Audits 10-1 Section 10 SSMP Program Audits Attachment 1 EAST VALLEY WATER DISTRICT Sewer System Management Plan (SSMP) 2014 Annual Audit Report The purpose of the Annual SSMP Audit is to evaluate the effectiveness of the EVWD’s SSMP and to identify deficiencies, if any, and steps to correct them. Directions: Please check YES or NO for each question. If NO is answered for any question, describe the updates/changes needed and the timeline to complete those changes in the “Description of Scheduled Updates/Changes to the SSMP” section on Page 5 of this form. YES NO ELEMENT 1 – GOALS A. Are the goals stated in the SSMP still appropriate and accurate? ELEMENT 2 -- ORGANIZATION A. Is the EVWD Key Staff Telephone List current? B. Is the Sanitary Sewer Overflow Responder Telephone List current? C. Is Figure 1 of the SSMP, entitled “EVWD Organization Chart,” current? D. Are the job descriptions an accurate portrayal of staff responsibilities? E.Is Table 2 of the SSMP, titled “Chain of Communication for Reporting and Responding to SSOs,” accurate and up-to-date? ELEMENT 3 – LEGAL AUTHORITY Does the SSMP contain excerpts from the current Code(s) documenting the District’s legal authority to: A. Prevent illicit discharges? B. Require proper design and construction of sewers and connections? C.Ensure access for maintenance, inspection, or repairs for portions of the lateral owned or maintained by the City? D. Limit discharges of fats, oil and grease? Section 10 SSMP Program Audits 10-2 YES NO E. Enforce any violation of its sewer ordinances? ELEMENT 4 – OPERATIONS AND MAINTENANCE Collection System Maps A.Does the SSMP reference the current process and procedures for maintaining EVWD’s wastewater collection system maps? B.Are the EVWD’s wastewater collection system maps complete, current, and sufficiently detailed? Resources and Budget C. Does EVWD allocate sufficient funds for the effective operation, maintenance and repair of the wastewater collection system and is the current budget structure documented in the SSMP? Prioritized Preventive Maintenance D.Does the SSMP describe current preventive maintenance activities and the system for prioritizing the cleaning of sewer lines? E. Based upon information in the Annual SSO Report, are EVWD’s preventive maintenance activities sufficient and effective in minimizing SSOs and blockages? Scheduled Inspections and Condition Assessments F. Is there an ongoing condition assessment program sufficient to develop a capital improvement plan addressing the proper management and protection of infrastructure assets? Are the current components of this program documented in the SSMP? Contingency Equipment and Replacement Inventory G. Does the SSMP list the major equipment currently used in the operation and maintenance of the collection system and document the procedures of inventory management? H.Are contingency equipment and replacement parts sufficient to respond to emergencies and properly conduct regular maintenance? Training I. Is the training calendar current? J.Does the SSMP document current training expectations and programs within EVWD’s sewer division? Outreach to Plumbers and Building Contractors K.Does the SSMP document current outreach efforts to plumbers and building contractors? ELEMENT 5 – DESIGN AND PERFORMANCE STANDARDS Section 10 SSMP Program Audits 10-3 YES NO A. Does the SSMP contain current design and construction standards for the installation of new sanitary sewer systems, manholes and other appurtenances and for the rehabilitation and repair of existing sanitary sewer systems? B. Does the SSMP document current procedures and standards for inspecting and testing the installation of new sewers, manholes, and other appurtenances and the rehabilitation and repair of existing sewer lines? ELEMENT 6 – OVERFLOW AND EMERGENCY RESPONSE PLAN A. Does EVWD’s Sanitary Sewer Overflow and Backup Response Plan establish procedures for the emergency response, notification, and reporting of sanitary sewer overflows (SSOs)? B. Are Wastewater Division staff and contractor personnel appropriately trained on the procedures of the Sanitary Sewer Overflow and Backup Response Plan? C. Considering performance indicator data, is the Sanitary Sewer Overflow and Backup Response Plan effective in handling SSOs in order to safeguard public health and the environment? ELEMENT 7 – FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM A.Do the Fats, Oils, and Grease (FOG) Control Program include efforts to educate the public on the proper handling and disposal of FOG? B. Does EVWD’s FOG Control Program identify sections of the collection system subject to FOG blockages, establish a cleaning schedule and address source control measures to minimize these blockages? C. Are requirements for grease removal devices, best management practices (BMP), record keeping and reporting established in EVWD’s FOG Control Program? D.Does EVWD have sufficient legal authority to implement and enforce the FOG Control Program? E.Is the current FOG program effective in minimizing blockages of sewer lines resulting from discharges of FOG to the system? ELEMENT 8 – SYSTEM EVALUATION AND CAPACITY ASSURANCE PLAN A. Does EVWD’s Sanitary Sewer Master Plan evaluate hydraulic deficiencies in the system, establish sufficient design criteria and recommend both short and long term capacity enhancement and improvement projects? B. Does EVWD’s Capital Improvement Plan (CIP) establish a schedule of approximate completion dates for both short and long-term improvements and is the schedule reviewed and updated to reflect current budgetary capabilities and activity accomplishment? Section 10 SSMP Program Audits 10-4 YES NO ELEMENT 9 – MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS A.Does the SSMP accurately portray the methods of tracking and reporting selected performance indicators? B.Is EVWD able to sufficiently evaluate the effectiveness of SSMP elements based on relevant information? ELEMENT 10 – SSMP AUDITS A. Will the SSMP Audit be submitted with the SSO Annual Report to the Regional Water Board by March 15th of the year following the end of the calendar year being audited? ELEMENT 11 – COMMUNICATION PROGRAM A. Does EVWD effectively communicate with the public and other agencies about the development and implementation of the SSMP and continue to address any feedback? Section 10 SSMP Program Audits 10-5 Description of Scheduled Updates/Changes to the SSMP Directions: For each NO answer, please describe the planned revision and indicate the date the revision will be completed. Reference the SSMP element and question number with each explanation. Audit results: Due to a systemic reorganization of the District, the years passed since the SSMP’s original creation (2009), and lack of any updates, all elements of this document must be readdressed. The entire SSMP must be recreated, and completion of the new document is expected July 1st. Element 1A Since the document was created in 2009 and has not been audited or updated since, it is assumed that all compliance factors must be readdressed. Element 3 A, B, C, D, E The current plan states a revision of the current ordinance is required in order to be in compliance. A copy of the revised ordinance No. 359 is required to determine EVWD’s legal authority. Element 4 A The current SSMP does not provide the process EVWD follows for wastewater collection system map updates. Element 4 E-Prioritized Preventative Maintenance To determine compliance with this element, the Annual SSO Report is required. Element 4 F-Scheduled Inspections and Condition Assessments The current condition assessment program is not documented in the SSMP. Element 4 G-Contingency Equipment and Replacement Inventory The plan lists related inventory and equipment. The actual equipment has since been updated. There is no equipment inventory management procedure listed. Section 10 SSMP Program Audits 10-6 Element 4 I, J Training calendar is not current and does not outline training expectations and programs. Training is listed as “on the job,” and an annual CWEA meeting. Element 4 K SSMP does not document current outreach efforts to plumbers and building contractors. Element 5 A, B The District’s design standards are currently being recreated by a consultant. The SSMP does not document current procedures and standards for inspecting and testing the installation of new sewers, manholes and other appurtenances . Element 6 A, B, C There is a Response Plan; it needs to be updated with appropriate personnel. To determine training compliance, a data request from HR is required. Effectiveness of SSO and Backup Response Plan need evaluation for current compliance standards. Element 7 A, C, D, E-Fats, Oils and Grease (FOG) Control Program The District identifies SBMWD as being responsible for the FOG program through the Joint Powers Agreement. The SSMP states what would be required to implement if required to do so. The District has legal authority under an SBMWD ordinance. Element 8 A, B-System Evaluation and Capacity Assurance Plan New Master Plan was completed in 2013. The SSMP states what EVWD plans to accomplish for capacity, short and long term projects, it does not go into detail, it is based upon the 2002 report. Element 9 Monitoring, Measurement and Program Modifications The SSMP is based upon old,outdated data and figures developed prior to the implementation of the GIS, the creation of the new SMP, and the reorganization of East Valley Water District. 11-1 Section 11 Communication Program The WDR requires that EVWD communicate on a regular basis with the public on the development, implementation, and performance of its SSMP. The communication program must provide the public the opportunity to provide input to EVWD as the program is developed and implemented. The communication program must also include a plan of communication with systems that are tributary and/or satellite sewer systems. EVWD has communicated on a regular basis with the public and agencies tributary to its system, such as Patton State Hospital and the San Manuel Indian Reservation. The District has a well organized website that allows its customers and the public in general to find out about the District, its Board of Directors, projects in planning and design, access customer service information, communicate news and updates, access the specifications for construction and plan processing, and access their accounts. The District’s website address is www.eastvalley.org. As required by the WDR, the SSMP will undergo review and revisions through internal audits every two years. The results of these audits will be available to the public for review on the District’s website. Section 11 Communication Program 11-2 The District is the lead agency and founder of the Emergency Response Network of the Inland Empire (ERNIE). This is a group of water/wastewater agencies throughout San Bernardino and Riverside Counties, which focus on Emergency Management and local jurisdictional mutual aid. The District is a member of the California Water/Wastewater Agency Response Network (CalWARN), which is a mutual aid network within California. The District is a paid member of the California Utilities Emergency Association (CUEA). CUEA is an emergency coordination group, which will coordinate communications between the District, with other utilities such as electrical power, telephone, natural gas and cellular communication The EVWD Board of Directors meetings are scheduled on the second and forth Wednesdays of each month at 5:30 in the evening at the Districts headquarters located at 31111 Greenspot Road Highland, CA 92346. Board meetings are open to the public. Section 9 Monitoring, Measurement and Program Modifications 9-1 Goals Yes/No Responsible Person Date Completed Supporting Documentation Minimize the number and impact of sanitary sewer overflows (SSOs) Yes Gerald Sievers Continue to improve customer service. Has response time improved? Yes Carol Cales Maintain and/or improve the condition of the collection system infrastructure in order to provide reliable service and capacity now and into the future Yes Tom Holliman Work towards achieving full compliance with the Waste Discharge Regulations (WDRs) Yes Andrew Theisen Work towards improving the District’s internal systems Yes Tom Holliman Organization Yes/No Responsible Person Date Completed Supporting Documentation Review and Update Names of Authorized Representatives as needed Yes Eliseo Ochoa Review and Update Organization Chart as needed Yes Eliseo Ochoa Review and Update Chain of Communications Yes Eliseo Ochoa Legal Authority Yes/No Responsible Person Date Completed Supporting Documentation Did the State/Regional Board Update Legal Requirements? No NA If so, was Ordinance 359 reviewed and/or updated? Tom Holliman Has an agreement with San Manuel Indian Reservation been signed? No Tom Holliman Has an agreement with Patton State Hospital been signed? No Tom Holliman Section 9 Monitoring, Measurement and Program Modifications 9-2 O&M Yes/No # of Feet %of System Responsible Person Date Completed Supporting Documentation Cleaning and CCTV Inspections Small diameter (6” to 12”) sewers inspected w/CCTV Gerald Sievers Large diameter (>12”) sewers inspected w/CCTV Gerald Sievers Small diameter (6” to 12”) sewers cleaned Gerald Sievers Large diameter (>12”) sewers cleaned Gerald Sievers Manholes Inspected Gerald Sievers Repair, Rehabilitation and Replacement Pipe Repairs Gerald Sievers Pipe Replacements Gerald Sievers Pipes rehabilitated Gerald Sievers Manhole covers replaced Gerald Sievers Vandalism Gerald Sievers Other damage Gerald Sievers Training Staff Training Gerald Sievers Confined space entry Gerald Sievers Trench shoring Gerald Sievers First aid and CPR Gerald Sievers Spill Response Gerald Sievers PACP Gerald Sievers In-House Sewer response Team Training Gerald Sievers Safety Meetings Gerald Sievers Review and Update Review and update O&M Program Gerald Sievers Review and update Inventory Gerald Sievers Update sewer maps and/or GIS Section 9 Monitoring, Measurement and Program Modifications 9-3 Design and Performance Yes/No Count Responsible Person Date Completed Supporting Documentation How many capital projects were completed this year? How many capital projects were completed according to the standard drawings and specifications? How many standard drawings were added to the EVWD library? How many standard specifications were added to the EVWD library? Does the Design and Performance Provisions section of the SSMP need updating? OERP Yes/No Count Responsible Person Date Completed Supporting Documentation Was a system-specific OERP developed? Have Spill Notification Requirements changed in the last year? Is Impact Mitigation and Containment still current? Are emergency operations still current? Review and update staff contact information Review and update contacts for Regulatory Agencies and potential affected agencies Review and update Contractors and Suppliers List Were problems encountered with OERP during SSOs? How many SSO responses were not able to follow the OERP procedures? Was yearly OERP training exercise completed and documented? Section 9 Monitoring, Measurement and Program Modifications 9-4 FOG Control SECAP Yes/No Responsible Person Date Completed Supporting Documentation Was flow monitoring conducted? Yes Eliseo Ochoa Report provided by ADS Was a sewer model developed? Yes Eliseo Ochoa Sewer Master Plan Were existing flows in the sewer model updated to reflect latest data? Yes Eliseo Ochoa Sewer Master Plan Were future flow projections updated in the hydraulic model? Yes Eliseo Ochoa Sewer Master Plan Was the Sewer Master Plan updated? Yes Eliseo Ochoa Sewer Master Plan Were all infrastructure changes reflected in the hydraulic model? Yes Eliseo Ochoa Sewer Master Plan Was a CIP developed or updated to address hydraulic deficiencies? Yes Eliseo Ochoa District Budget Was a CIP developed or updated to address rehabilitation or replacement identified by the CCTV inspections? Yes Eliseo Ochoa District Budget Does the SECAP section of the SSMP need updating? No Eliseo Ochoa NA Section 9 Monitoring, Measurement and Program Modifications 9-1 Goals Yes/No Responsible Person Date Completed Supporting Documentation Minimize the number and impact of sanitary sewer overflows (SSOs) Yes Gerald Sievers Continue to improve customer service. Has response time improved? Yes Carol Cales Maintain and/or improve the condition of the collection system infrastructure in order to provide reliable service and capacity now and into the future Yes Tom Holliman Work towards achieving full compliance with the Waste Discharge Regulations (WDRs) Yes Andrew Theisen Work towards improving the District’s internal systems Yes Tom Holliman Organization Yes/No Responsible Person Date Completed Supporting Documentation Review and Update Names of Authorized Representatives as needed Yes Eliseo Ochoa Review and Update Organization Chart as needed Yes Eliseo Ochoa Review and Update Chain of Communications Yes Eliseo Ochoa Legal Authority Yes/No Responsible Person Date Completed Supporting Documentation Did the State/Regional Board Update Legal Requirements? No NA If so, was Ordinance 359 reviewed and/or updated? Tom Holliman Has an agreement with San Manuel Indian Reservation been signed? No Tom Holliman Has an agreement with Patton State Hospital been signed? No Tom Holliman Section 9 Monitoring, Measurement and Program Modifications 9-2 O&M Yes/No # of Feet %of System Responsible Person Date Completed Supporting Documentation Cleaning and CCTV Inspections Small diameter (6” to 12”) sewers inspected w/CCTV Gerald Sievers Large diameter (>12”) sewers inspected w/CCTV Gerald Sievers Small diameter (6” to 12”) sewers cleaned Gerald Sievers Large diameter (>12”) sewers cleaned Gerald Sievers Manholes Inspected Gerald Sievers Repair, Rehabilitation and Replacement Pipe Repairs Gerald Sievers Pipe Replacements Gerald Sievers Pipes rehabilitated Gerald Sievers Manhole covers replaced Gerald Sievers Vandalism Gerald Sievers Other damage Gerald Sievers Training Staff Training Gerald Sievers Confined space entry Gerald Sievers Trench shoring Gerald Sievers First aid and CPR Gerald Sievers Spill Response Gerald Sievers PACP Gerald Sievers In-House Sewer response Team Training Gerald Sievers Safety Meetings Gerald Sievers Review and Update Review and update O&M Program Gerald Sievers Review and update Inventory Gerald Sievers Update sewer maps and/or GIS Section 9 Monitoring, Measurement and Program Modifications 9-3 Design and Performance Yes/No Count Responsible Person Date Completed Supporting Documentation How many capital projects were completed this year? How many capital projects were completed according to the standard drawings and specifications? How many standard drawings were added to the EVWD library? How many standard specifications were added to the EVWD library? Does the Design and Performance Provisions section of the SSMP need updating? OERP Yes/No Count Responsible Person Date Completed Supporting Documentation Was a system-specific OERP developed? Have Spill Notification Requirements changed in the last year? Is Impact Mitigation and Containment still current? Are emergency operations still current? Review and update staff contact information Review and update contacts for Regulatory Agencies and potential affected agencies Review and update Contractors and Suppliers List Were problems encountered with OERP during SSOs? How many SSO responses were not able to follow the OERP procedures? Was yearly OERP training exercise completed and documented? Section 9 Monitoring, Measurement and Program Modifications 9-4 FOG Control SECAP Yes/No Responsible Person Date Completed Supporting Documentation Was flow monitoring conducted? Yes Eliseo Ochoa Report provided by ADS Was a sewer model developed? Yes Eliseo Ochoa Sewer Master Plan Were existing flows in the sewer model updated to reflect latest data? Yes Eliseo Ochoa Sewer Master Plan Were future flow projections updated in the hydraulic model? Yes Eliseo Ochoa Sewer Master Plan Was the Sewer Master Plan updated? Yes Eliseo Ochoa Sewer Master Plan Were all infrastructure changes reflected in the hydraulic model? Yes Eliseo Ochoa Sewer Master Plan Was a CIP developed or updated to address hydraulic deficiencies? Yes Eliseo Ochoa District Budget Was a CIP developed or updated to address rehabilitation or replacement identified by the CCTV inspections? Yes Eliseo Ochoa District Budget Does the SECAP section of the SSMP need updating? No Eliseo Ochoa NA Section 9 Monitoring, Measurement and Program Modifications 9-5 Monitor Measure and Program Modifications Yes/No Count Gallons Responsible Person Date Completed Supporting Documentation Number of Dry Weather SSOs Number of Wet Weather SSOs No Volumes of SSOs < 100 gallons 100 to 999 gallons 1,000 to 9,999 gallons > 10,000 gallons Volume of SSOs contained Volume of SSOs discharged to drainage system or surface waters Causes of SSOs Roots Grease Debris Pipe Failure Capacity Contractor error Other SSOs per Year per Length of Sewer Mainline Blockages per Year per Length of Sewer Pipe Failures per Year per Length of Sewer Section 9 Monitoring, Measurement and Program Modifications 9-5 Monitor Measure and Program Modifications Yes/No Count Gallons Responsible Person Date Completed Supporting Documentation Number of Dry Weather SSOs Number of Wet Weather SSOs No Volumes of SSOs < 100 gallons 100 to 999 gallons 1,000 to 9,999 gallons > 10,000 gallons Volume of SSOs contained Volume of SSOs discharged to drainage system or surface waters Causes of SSOs Roots Grease Debris Pipe Failure Capacity Contractor error Other SSOs per Year per Length of Sewer Mainline Blockages per Year per Length of Sewer Pipe Failures per Year per Length of Sewer Section 9 Monitoring, Measurement and Program Modifications 9-6 Program Audits Yes/No Responsible Person Date Completed Supporting Documentation Was an audit completed on the SSMP? Yes Eliseo Ochoa Were there any program modifications recommended after the audit? No NA Were the program modifications implemented? No NA i Sewer Collection System Overflow Emergency Response Plan (OERP) June 2014 Prepared By: East Valley Water District 31111 Greenspot Road Highland, Ca. 92346 ii Contents Section 1 Introduction .................................................................................................. 1-1 1.1 Background and Purpose ........................................................................................ 1-1 1.2 Project Scope .............................................................................................................. 1-2 1.3 Plan Objective ............................................................................................................ 1-2 1.4 Overflow Emergency Response Plan Organization ............................................ 1-2 Section 2 System Description and Regulatory Environment................................ 2-1 2.1 Project Area and System Description .................................................................... 2-1 2.2 System Hydraulics .................................................................................................... 2-3 2.3 Potential Sanitary Sewer Overflow Mechanisms ................................................. 2-3 2.3.1 Seismic Considerations ............................................................................. 2-4 2.4 Sanitary Sewer Management Plan Required Elements ....................................... 2-4 Section 3 Emergency Response Plan .......................................................................... 3-1 3.1 Overview of Overflow Emergency Response Plan ............................................. 3-1 3.2 East Valley Water District Overflow Emergency Response Plan Organization ............................................................................................................ 3-1 3.3 Notification and Response Procedures.................................................................. 3-1 3.4 Impact Mitigation and Containment Procedures ................................................ 3-4 3.4.1 Response Crew Responsibilities .............................................................. 3-6 3.4.2 Cleanup ....................................................................................................... 3-6 3.4.3 Public Notification..................................................................................... 3-7 3.4.4 Traffic and Crowd Control ....................................................................... 3-7 3.4.5 Monitoring .................................................................................................. 3-8 3.5 Emergency Operations ............................................................................................ 3-9 3.5.1 Bypass Pumping ........................................................................................ 3-9 3.5.2 Pump and Haul Initial Response .......................................................... 3-10 3.5.3 Additional Emergency Measures for Flow Reduction ....................... 3-10 3.6 Vendors, Suppliers, and Response Contractors ................................................. 3-10 Section 4 Sanitary Sewer Overflow Reporting ........................................................ 4-1 4.1 Overview of Online Reporting Procedures ......................................................... 4-1 4.2 Sanitary Sewer Overflow Categories ..................................................................... 4-1 4.3 Sanitary Sewer Overflow Reporting Timeframes ................................................ 4-2 4.4 Mandatory Information to be Included in Sanitary Sewer Overflow Reporting ................................................................................................................... 4-3 4.4.1 SSO Volume ............................................................................................. 4-10 Section 5 Record Keeping and Certification ............................................................ 5-1 5.1 Record Keeping ......................................................................................................... 5-1 iii 5.2 Certification ............................................................................................................... 5-2 Section 6 Training and Follow-up Plans ................................................................... 6-1 6.1 Training ...................................................................................................................... 6-1 6.2 Follow-up Plans ........................................................................................................ 6-1 References ..........................................................................................................................R-1 Glossary of Terms/Acronyms ................................................................................................G-1 List of Figures Figure 2-1 EVWD Service Area ..................................................................................... 2-2 Figure 3-1 EVWD Overflow Emergency Response Plan Command & Management Organization Chart .............................................................. 3-2 Figure 3-2 EVWD OERP Communications Protocol .................................................. 3-3 Figure 3-3 SSO Response Procedure ............................................................................. 3-5 List of Tables Table 2-1 EVWD Siphons.............................................................................................. 2-3 Table 3-1 NIMS Resource: EVWD SSO Response/Repair Team .......................... 3-11 Table 4-1 SSO Categories .............................................................................................. 4-1 Table 4-2 Reporting Timeframes for SSO Categories ............................................... 4-2 Appendices Appendix A Police, Fire Department, and City Contacts for EVWD Appendix B Contractors and Suppliers Appendix C Sample Templates for SSO Volume Estimation Appendix D Sample Collection Guidelines (BACWA/CVCWA) 1-1 Section 1 Introduction 1.1 Background and Purpose In May 2006, the SWRCB adopted Order No. 2006-0003, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems (WDR). All federal and state agencies, municipalities, counties, districts, and other public entities that own or operate sanitary sewer systems greater than one mile in length and that collect and/or convey untreated or partially treated wastewater to a publicly owned treatment facility in the State of California are required to comply with the terms of this Order. The principal requirement of the WDR is for each system owner to develop and implement a system-specific Sewer System Management Plan (SSMP). One element of the SSMP requirements is an Overflow Emergency Response Plan (OERP). This OERP is intended to provide East Valley Water District (EVWD) with emergency response procedures should an overflow occur in the Sewer Collection System owned by EVWD. This is a living document, intended to be updated annually or more frequently if there is a need based on regulatory changes or modifications within the sewer line system. This document focuses specifically on the sewer collection system. While this OERP is intended to be a standalone document focused on emergency response protocol for sewer overflow events, it also serves to supplement the EVWD ERP by providing additional key emergency response procedures pertaining directly to the Sewer Collection System. The OERP is also intended to meet the requirements of the National Incident Management System (NIMS) and the State Emergency Management System (SEMS). The NIMS provides a nationwide approach to incident management, integrating best management practices. The OREP also follows the State’s standardized emergency management system. EVWD is a member of the following groups: Emergency Response Network of the Inland Empire (ERNIE). This is a mutual aid group encompassed of 22 water agencies in San Bernardino and Riverside Counties. ERNIE also coordinates with San Bernardino and Riverside counties Office of Emergency Services CalWarn. Water and Wastewater agency response network. This is a mutual aid agreement for agencies in California NatWarn. Water and Wastewater agency response network in 44 states. Section 1 Introduction 1-2 1.2 OERP Scope The scope of this project included the following major tasks: Collect sources of information currently available from EVWD. Conduct workshops and meetings with EVWD staff to develop OERP. Prepare an OERP that meets SSMP and SEMS/NIMS requirements. 1.3 OERP Objective The following sections will provide the emergency responder with specific information and tools that may be used to: Meet the requirements of the WDR, including emergency response, notification, and staff training; Understand key sanitary sewer overflow (SSO) mechanisms; Understand the consequences associated with a sewer line SSO; Identify, assess, and mitigate a sewer line SSO emergency; Meet overflow reporting and record keeping requirements; and Consider requirements of SEMS/NIMS. 1.4 Overflow Emergency Response Plan Organization This report consists of six sections and appendices. Each section is briefly described below: Section 1 – Provides the background and purpose of the project, project scope, plan objective, and the organization of the report. Section 2 – Provides a description of the project area and sanitary sewer system, describes system hydraulics, identifies potential SSO mechanisms, and identifies regulatory elements required by the WDR. Section 3 – Provides information on overflow emergency response procedures, including communication procedures, impact mitigation and containment procedures, emergency operations, and resources. Section 4 – Provides SSO reporting procedures. Section 5 – Provides requirements for record keeping and certification. Section 6 – Provides information on training and follow-up plans. 2-1 Section 2 System Description and Regulatory Environment 2.1 Project Area and System Description The District’ s existing wastewater collection system includes approximately 215 miles of gravity sewer pipelines, 4500 sewer manholes, 7 siphons and 5 flow diversion structures. The pipeline sizes range from 6 inches to 24 inches and the majority of the pipelines are composed of vitrified clay pipe but there is some HDPE, PVC and TRUSS pipe in the system. The District conveys wastewater flow to the East Trunk Sewer which is owned and operated by the City of San Bernardino. The East Trunk Sewer ranges in size from 8 inches to 54 inches and conveys all wastewater flow from the City of San Bernardino and EVWD to the City of San Bernardino’s Wastewater Reclamation Plant. The City of San Bernardino and EVWD have a joint powers agreement which allow the District to collect and maintain the collection system and transfer all wastewater to the City of San Bernardino for treatment. The service area is approximately 35 square miles and is bounded on the north by the San Bernardino National Forest; on the east by unincorporated San Bernardino County and the San Bernardino National Forest; on the south by the City of Redlands; and on the west by the San Bernardino Municipal Water District. Figure 2-1 shows EVWD’s service area and sphere of influence. The existing sewer collection system serves all of the City of Highland, portions of the City of San Bernardino and unincorporated areas of the County of San Bernardino. The majority of the service area is residential but there are also a number of active commercial/retail, public facilities and industrial areas that contribute to the effluent. Key agency contacts of EVWD are City of San Bernardino, County of San Bernardino and the City of Highland. Because the Sewer Collection System is owned and operated by EVWD, the emergency protocol established in this OERP should be used. Section 2 System Description and Regulatory Environment 2-2 Figure 2-1 (EVWD Service Area) Section 2 System Description and Regulatory Environment 2-3 2.2 System Hydraulics As part of the 2013 Master Plan update, EVWD’s consultant modeled the sewer collection system using Innovyze’s InfoSewer software and the Districts GIS information. Measured flow monitoring data and current land use plan information were used in developing the hydraulic model. Wet weather storm events were monitored and the data was used to help calibrate the model and further develop and evaluate the capacity within the existing system. Table 2-1 EVWD Siphons Siphon Name - Location Description (barrels - diameter) Material *Pumalo - East of Del Rosa 1-10" VCP *3rd Street - West of Palm Lane 1-6" & 1-8" VCP *Holly Vista - North of Citrus, East of Del Rosa Ave. 1-12" VCP Warm Creek - (Trailer Park), East of Victoria Ave. 2-4" CIP *Plunge Creek - Greenspot Road 3-6" DIP *Pacific - Sand Creek Channel Crossing, east of Osbun 3-8" CIP *Baseline - At San Francisco Ave. 3-8" VCP *Denotes Siphons Modeled 2.3 Potential Sanitary Sewer Overflow Mechanisms An SSO is the release of wastewater from a sanitary sewer system. SSOs include discharges of wastewater, either to public or private property outside of the sanitary sewer system. SSOs are caused by blockages, vandalism, contractor error or unusual flow conditions in the sanitary sewer system, whether or not the release reaches the waters of the United States. Backups of privately owned laterals are not considered SSOs unless sewage flows onto public property, such as streets or storm drains. SSOs are also violations of the Federal Clean Water Act (CWA) if they contact waters of the United States, and therefore may be subject to federal enforcement actions. SSOs can impair the beneficial uses of surface waters, including aquatic life, drinking water supply, body contact and non-contact recreation, and aesthetics. Groundwater beneficial uses, such as drinking water and agricultural supply, can also be affected. SSOs are considered a nuisance if they meet the following requirements: Injurious to health, indecent or offensive to the senses, or obstructing the free use of property so as to interfere with the comfortable enjoyment of life or property; Affect an entire community, neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal; Section 2 System Description and Regulatory Environment 2-4 Occur during, or as a result of, the treatment or disposal of sewage wastes. The primary sewer system SSO mechanism may be damage caused by contractors and equipment. Other mechanisms that cause SSOs include: root, grease and debris blockages; sewer line flood damage; seismic damage; manhole structure failure; vandalism; pump station failure or wastewater treatment plant mechanical failure; a power outage; excessive storm water or groundwater inflow and infiltration; insufficient capacity; increased loading conditions; and, operator error. Age of the system, construction materials, adequate and appropriate facilities, operations and maintenance, source control measures, geology, design, and population growth are all factors that can affect the likelihood of an SSO occurrence. 2.3.1 Seismic Considerations Many known and unknown, potentially active faults are located within the general area of the EVWD Sewer Collection System. These faults have the capability to produce significant ground accelerations which may result in a break and/or failure, and may cause an SSO to occur within the Sewer Collection System. 2.4 Sanitary Sewer Management Plan Required Elements The WDR states that “an SSMP must contain a spill response plan that establishes standard procedures for immediate response to an SSO in a manner designed to minimize water quality impacts and potential nuisance conditions.” This OERP is intended to identify the required measures to protect public health and the environment. This OERP meets the intent of the WDR by including the following items: Proper notification procedures so that the primary responders and regulatory agencies are informed of all SSOs in a timely manner; A program that ensures an appropriate response to all overflows; Procedures to ensure prompt notification to appropriate regulatory agencies and other potentially affected entities (e.g. County health agencies, Regional Water Boards, water suppliers, etc.) of all SSOs that potentially affect public health or reach the waters of the U.S. in accordance with the State Water Resources Control Board’s (SWRCB) WDR Monitoring and Reporting Program (MRP). All SSOs shall be reported in accordance with this MRP, the California Water Code, other laws, and other applicable Regional Water Board WDRs or National Pollutant Discharge Elimination System (NPDES) permit requirements. The SSMP should identify the officials who will receive immediate notification; Procedures to ensure that appropriate staff and contractor personnel are aware of and follow the Emergency Response Plan and are appropriately trained; Section 2 System Description and Regulatory Environment 2-5 Procedures to address emergency operations, such as traffic and crowd control and other necessary response activities; and A program to ensure that all reasonable steps are taken to contain and prevent the discharge of untreated and partially treated wastewater to waters of the U.S. and to minimize or correct any adverse impact on the environment resulting from the SSOs, including such accelerated or additional monitoring as may be necessary to determine the nature and impact of the discharge. 3-1 Section 3 Emergency Response Plan 3.1 Overview of Overflow Emergency Response Plan The Sewer Collection System OERP is intended to identify what constitutes an SSO and to define emergency procedures for responding to an overflow event. The OERP must include an organization chart with specific contact information, notification and communication plans, impact mitigation and containment procedures, emergency operations, and vendor, supplier, and response contractor lists, as described in the following sections. 3.2 East Valley Water District Overflow Emergency Response Plan Organization Figure 3-1 provides key EVWD OERP responsibilities within the District. Key contact names and telephone numbers are provided in Section 4. The SEMS/NIMS Incident Command System organizes response in terms of a command element and subsequent section elements such as operations and finance. Within each section element is a designated section chief responsible for organizing and assuring the execution of the appropriate response within each section element’s area of expertise. 3.3 Notification and Response Procedures EVWD has developed specific procedures for responding to SSOs, whether the report comes from their own field staff, or from a customer. It is important to note that EVWD only owns, operates and maintains the sewer collection system main lines; they do not own or maintain the service laterals. All customer calls come into Customer Operations or Engineering, or are handled by an after-hours service. Figure 3-2 contains EVWD’s Overflow Emergency Response Plan Communication Protocol. In summary, incoming SSO calls are logged in and all paperwork is routed to the Customer Service Supervisor (CSS), who ensure that the order has been called out and that the field crew has been dispatched. The CSS then forwards all forms to the Engineering Executive Assistant, and/or the Project Manager. The Engineering Department will track all progress and make necessary phone calls to any City, County or State Agency as needed. Once Engineering receives the field crew’s written report on what was observed and how they responded, Engineering logs all information into EVWD’s internal SSO tracking database. The event is reported to the General Manager and the Risk and Safety Manger. If required, The Engineering Executive Assistant or the Project Manager will report the SSO to the California Integrated Water Quality System (CIWQS) database system within three working days of receiving the confirmation of a sewer overflow. The Field Superintendent will ensure that the SSO is certified and completed within the allowable timeframe. He will create the monthly reports and upload to the CIWQS website. In his absence, the Chief Financial Officer will complete the certification. Section 3 Emergency Response Plan 3-2 Name In c i d e n t C o m m a n d e r Pu b l i c I n f o r m a t i o n O f f i c e r Li a i s o n O f f i c e r Sa f e t y O f f i c e r Op p e r a t i o n s S e c t i o n Pl a n n i n g S e c t i o n Lo g i s t i c s S e c t i o n Fi n a n c e S e c t i o n John Mura Mike Maestas Brian Tompkins Justine Hendrickson Kerrie Bryan Kelley Malloy Marie Ricci Carol Cales Tom Holliman Eliseo Ochoa Gerald Sievers Rick Becerra Mike Henderson Allen Williams Andrew Theisen Robert Peng Figure 3-1 – OERP Command & Management Organization Chart Incident Commander Liaison Officer Safety Officer Public Information Officer Operations Section Finance Section Planning Section Logistics Section Section 3 Emergency Response Plan 3-3 Figure 3-2 – OERP Communications Protocol Figure 3-3 provides the SSO Response Procedure and defines the necessary actions and procedures once a spill occurs. When spills are reported, a response crew must be dispatched to verify and contain the spill. Once the spill has been contained, responsible parties are notified of the occurrence and an incident report or online field report must be prepared. Documentation of the SSO and the contaminated area should include photographs, measurements, and sampling if appropriate. Mitigation may include bypass pumping, repairs, clean up and disinfection, and post-event monitoring. Section 3 Emergency Response Plan 3-4 3.4 Impact Mitigation and Containment Procedures When an SSO occurs, all feasible steps must be taken to prevent impacts including controlling or limiting the volume of untreated or partially treated wastewater discharged, terminating the discharge, and recovering and properly disposing of as much of the SSO volume as is possible, including any wash down water that is used. In the event of a failure in a segment of the Sewer Collection System, EVWD operations staff will be required to stop flow while the pipeline is being repaired or implement a temporary bypass. Bypass pumping would be required for the remaining flow from domestic areas that cannot be shut off. Should an SSO occur in which untreated or partially treated wastewater enters the storm drain system, all feasible steps must be taken to prevent wastewater from discharging to flood control channels and waters of the State, by blocking the storm drainage system and removing the wastewater from the storm drains. Mitigation and containment activities may include: Interception and rerouting of untreated or partially treated wastewater flows around the failure that produced the SSO; Vacuum truck recovery of SSO and wash down water; Cleanup of debris at the overflow site; System modifications to prevent future SSOs in the same location; Sufficient sampling to determine the nature and impact of the discharge; and Public notification to minimize public exposure to the SSO. Section 3 Emergency Response Plan 3-5 Figure 3-3 – SSO Response Procedures Section 3 Emergency Response Plan 3-6 3.4.1 Response Crew Responsibilities In case of a sewer overflow report, an EVWD response crew is dispatched to assess the spill and determine appropriate response, which may include conducting mitigation and containment activities. The first personnel who arrive have the responsibility of protecting public health and safety to the maximum extent possible. If it is determined that the overflow is not EVWD’s responsibility, however there is imminent danger to public health, public or private property, or the quality of waters of the State, then emergency action should be taken by EVWD’s crew until the responsible party assumes the responsibility. The response crew should take the following actions upon arrival at an overflow location: Determine the cause of the overflow; Take immediate action to stop the overflow. If an overflow on private property threatens public health, measures will be taken to protect public health; Identify and request any needed assistance or resources to determine the overflow cause and prevent further discharge; Estimate volume of the SSO to the nearest 1,000 gallons; Determine if private property or waters of the State are affected; and Request additional personnel, materials, supplies, or equipment that will expedite and minimize the impact of the overflow. 3.4.2 Cleanup Sewer overflow sites must be thoroughly cleaned after an overflow event such that no identifiable residue remains, such as sewage solids, rags, and other debris. Solids and debris must be collected for proper disposal. In order to properly clean up an SSO and mitigate potential effects, several actions may be taken, including but not limited to: Application of absorbent material; Excavation and disposal of affected soil and used absorbent; Flushing of the overflow site with clean (generally potable) water; Application, containment and recovery of any chlorinated wash-down water; and Return of all wash-down water to the sewer. Section 3 Emergency Response Plan 3-7 Disinfection may be required in instances where a ponded area of sewage cannot be pumped dry or sewage has mixed with additional standing water. Disinfectants may include bleach or high-test hypochlorite (HTH). A dosing of 10 to 12 ounces of HTH per 100 square feet of pond surface is generally appropriate for relatively shallow ponds. Deeper ponds may require higher dosages, which must be determined by EVWD staff, the local health department, or the local water quality authority. Chlorine products are not acceptable for use in a body of water containing fish or other aquatic life, unless the local wildlife management authority has specifically instructed otherwise. In cases where complete recovery of sewage is not practical and severe oxygen depletion is expected in existing surface waters, the use of portable aerators may be required. 3.4.3 Public Notification In the event of a sewer overflow, EVWD’s responsible parties will assess the situation and will determine the need to post notices of polluted surface water bodies or ground surfaces in order to protect public health. Notices may only warn of potential public health risks due to sewage contamination, but do not necessarily prohibit the use of the affected land or water for recreation, unless otherwise stated. The postings must be displayed for five days. Public notification may include signs, hangers on the front doors of potentially affected residences and businesses, or pre-scripted news releases to the printed or electronic news media for immediate publication or airing on local radio and/or television stations as appropriate. 3.4.4 Traffic and Crowd Control Traffic and crowd control measures vary based on the size and potential impact of the overflow event as stated in the SSMP regulations. When appropriate, local police, fire department, and City contacts should be notified to aide in addressing traffic and crowd control issues. These contacts are available for the Sewer Collection System in Appendix B. The spill amounts, as defined in the SSMP regulations (see also section 4.4.1 and Appendix C, and traffic controls to be employed by EVWD are: Small Spill (Less than 1,000 gallons) - Setup traffic cones to direct traffic from spill area - Use staff personnel to control traffic and pedestrians Medium Spill (Greater than or equal to 1,000 gallons and less than 10,000 gallons) - Perform lane closures as needed. - Close any affected entrances or exits from all public and private facilities. Section 3 Emergency Response Plan 3-8 - Place proper signage for any lane closures including contaminated area signs. - Inform local law enforcement and/or fire department of lane/road closures and traffic control. - Use caution tape and barricades to protect pedestrians from contaminated areas. Large Spill (Greater than or equal to 10,000 gallons) - Inform local police and sheriff’s department of any law enforcement needed for road closures and traffic control. - Inform local fire department of lane and road closures. - Use signage to inform public of potential hazards to public health and safety. - Block public access to hazards using barricades, cones and caution tape. 3.4.5 Monitoring In the event of a sewer overflow reaching receiving waters, Standard Operating Procedures (SOPs) should be used for the testing of receiving waters to assess the qualitative and quantitative extent (pollutant load) of the discharge, determine the effectiveness of the containment and cleanup, and assess when the discharge of pollutants no longer poses a health or water quality concern. Water quality testing will be performed by EVWD contracting a State approved laboratory, who will conduct the sampling and analysis and will develop a report. Water quality analyses should be performed by approved methods at the lowest detection limit that may be achieved based on the water sample and potential matrix interferences. This may require some samples near the point of release to be analyzed by wastewater methods that have higher detection limits and are capable of processing “dirty” matrices. Samples should be representative of the affected area and should be collected at or near the point of discharge from the sewer line and locations downstream. The frequency of monitoring should ensure capture of appropriate flow and water quality conditions, and should continue until ambient (pre-spill) conditions are restored in the river and downstream recharge basins, if they were impacted by the SSO event. A general description of the monitoring procedures for SSO impacted receiving waters includes the following activities: Sample receiving waters upstream of the SSO discharge point using drinking water analysis methods to provide a snapshot of ambient (pre-spill) conditions; Sample receiving waters immediately downstream of the SSO discharge point using wastewater analysis methods; Section 3 Emergency Response Plan 3-9 Continue sampling downstream of the SSO discharge point at periodic locations using wastewater and/or drinking water analysis methods to verify the extent of the SSO plume within the receiving waters (frequency and distance between sampling locations will vary with the size of the SSO); and Continue sampling receiving waters using wastewater analysis methods at periodic time intervals until ambient (pre-spill) conditions have been restored (intervals for sampling locations will vary with the size of the SSO and the extent of the cleanup efforts). Appendix D shows a list of parameters to be analyzed and a sampling location diagram. The information is from “Best Management Practices for Sanitary Sewer Overflow (SSO) Reduction Strategies” developed by the Central Valley Clean Water Association (CVCWA) and the Bay Area Clean Water Agencies (BACWA) in late 2009. 3.5 Emergency Operations 3.5.1 Bypass Pumping Manhole-to-manhole bypass pumping is the anticipated method of emergency response for routing Sewer Collection flows around failed segments of the sewer line. If the manholes within the subject sewer lines are accessible in the event of a failure, these bypass pumping systems would be capable of routing effluent through an alternate conduit from manhole(s) upstream of the failure to manhole(s) downstream of the failure, thereby isolating the problematic section of the sewer line. Several items must be considered when planning for bypass pumping operations including: Peak and average flow rates that will require pumping after flow minimization efforts have occurred; Pump site access at both the suction and discharge points; Pipeline alignment, including traffic control and crossings of either roadways or driveways; Availability of equipment; Time required to install equipment; and Coordination with local jurisdictions. To the maximum extent possible, pre-event coordination with local jurisdictions should occur through the use of the District’s Mutual Aid Agreements, such as CalWarn and ERNIE, and coordination with Caltrans and potentially affected Cities. Section 3 Emergency Response Plan 3-10 3.5.2 Pump and Haul Initial Response As described in Section 2.1, the nature of the Sewer Collection flows requires strategic SSO emergency response procedures for EVWD. Liquid and debris recovered by vacuum truck from a Sewer Collection System SSO may be discharged for disposal into any of the surrounding domestic sanitary sewer systems. Typical pump and haul initial response activities for a Sewer Collections System SSO would include: Response crews and vacuum truck equipment arrive at the SSO site; Vacuum truck recovery of SSO and wash down water; Haul recovered SSO liquid, debris and wash down water into the collection system; Address traffic control and access to discharge point along the sewer lines; Connect vacuum truck to designated manholes; and Discharge recovered SSO liquid, debris and wash down water into the collection system. 3.5.3 Additional Emergency Measures for Flow Reduction Under scenarios of multiple, complex, or difficult-to-access SSO causing failures, significant time may pass before permanent repairs may be fully executed. During this time, additional temporary bypass pumping systems would need to be implemented by EVWD, as would other contingency plans to minimize sewer pipeline flows and further damage and SSOs. These additional plans may include limitations on upstream discharges, a limitation on new discharge permits or increased discharge flows for an existing permit, and/or a temporary halt to the construction of new connection laterals to the Sewer Collection System. 3.6 Vendors, Suppliers, and Response Contractors Whenever possible, EVWD resources will be utilized to respond to an overflow emergency. However there may be times when resources are insufficient and the District will seek external help from their mutual aid agreements such as CalWarn and Ernie, or vendors, suppliers, and response contractors may be used. To the extent possible, EVWD should consider vendors, suppliers, and response contractors that have been fully trained in SSO response procedures and protocol. During smaller or less critical SSO causing emergencies, EVWD may choose to function as the general emergency response contractor and provide the required on- site labor and equipment. During larger or more complex emergency situations and/or in the event of reduced pump and pipe inventories at contractor yards, multiple bypass pumping (and other) contractors may need to coordinate their efforts Section 3 Emergency Response Plan 3-11 and share equipment and supplies. Appendix B provides a list of local vendors, suppliers, and response contractors that may be called upon during an SSO emergency in the Sewer Collection System. It is anticipated that a bypass pumping contractor will be able to mobilize to the site with the necessary pumps and associated piping as soon as possible following a confirmed failure that is causing an SSO. In this scenario, the contractor would function as the general emergency response contractor with oversight from EVWD. The vendors and suppliers identified in Appendix B have been organized to fit the SEMS/NIMS resource typing system, which uses definitions of category, kind, components, metrics, and type to organize resources that may be called upon in the event of an emergency. Table 3-1 provides the breakdown of EVWD vendors, suppliers, and response contractors in the SEMS/NIMS format. Table 3-1 NIMS Resource: EVWD SSO Response/Repair Team Category: Operations and Engineering: Emergency repair of water and wastewater treatment facilities Kind:Team - SSO Response Component Metrics Type External Support Team Bypass Pump Contractors External Support Team Pipe Subcontractors External Support Team Miscellaneous Subcontractors Waste Disposal; Chlorination and Disinfection; Cleaning and Chemical Cleaning; Blasting; Railroad Construction; Pest & Termite Control; Environmental Mitigation / Abatement Contractors Rental Equipment Temporary Facility Rental Pipeline; Hot Taps and Stopples; Piping / Mechanical; Fire Protection Systems; Plumbing; Pipe and Equipment Cleaning; Fiberglass Installation; Pipe Lining Systems Rental Equipment Construction Equipment Rental Materials Piping Material Suppliers Section 4 Sanitary Sewer Overflow Reporting 4-1 Section 4 Sanitary Sewer Overflow Reporting 4.1 Overview of Online Reporting Procedures The online spill reporting system is hosted, controlled and maintained by the State Water Board at http://ciwqs.waterboards.ca.gov. This online database is part of a secure site that is accessed by unique usernames and passwords which are obtained by registering for an SSO Database account through the California Integrated Water Quality System (CIWQS). In addition to enrolling for an account, a “Collection System Questionnaire” must be completed and updated at least once every 12 months. Online SSO database users under the Santa Ana Regional Water Quality Control Board (Region 8) received CIWQS User Identification (ID) numbers and passwords by December 1, 2006. The WDR requires Region 8 users to begin reporting all SSOs on January 2, 2007 (State Water Resources Control Board, September 2006). 4.2 Sanitary Sewer Overflow Categories The Monitoring and Reporting Program (MRP) breaks down SSOs into four categories, described in Table 4-1. For any Category 1 SSO greater than or equal to 1,000 gallons that results in a discharge to a surface water, or spilled in a location where it probably will be discharged to surface water, must be reported to the California Office of Emergency Services (Cal OES) as soon as possible but no later than 2 hours after (A) knowledge of the discharge, (B) notification is possible, and (C) notification can be provided without substantially impeding cleanup or other emergency measures. Table 4-1 SSO Categories Category Description 1 Any volume of untreated or partially treated wastewater discharge and Reaches surface water and/or drainage channel tributary to a surface water; or Reaches a Municipal Separate Storm Sewer System and are not fully captured and returned to the sanitary sewer system or not otherwise captured and disposed of properly. 2 Discharges of untreated or partially treated wastewater of 1,000 gallons or more resulting from a sanitary sewer system failure or flow condition that does not reach surface water or drainage channel or unless the entire SSO discharged to the storm drain system is fully recovered and disposed of properly. 3 All other discharges of untreated or partially treated wastewater resulting from a sanitary sewer system failure or flow condition. Private Lateral Sewage discharges that are caused by blockages or other problems within a privately owned lateral. Section 4 Sanitary Sewer Overflow Reporting 4-2 4.3 Sanitary Sewer Overflow Reporting Timeframes Reporting timeframes for each category or occurrence of SSO are summarized in Table 4-2. Table 4-2 Reporting Timeframes for SSO Categories SSO Category Reporting Requirements Category 1 and Category 2 Draft Report shall be submitted to the CIWQS Online SSO Database within 3 business days of becoming aware of SSO. Final Certified Report Shall be certified through the CIWQS Online SSO Database within 15 calendar days of the end date of the SSO. Category 3 Shall be reported to the CIWQS Online SSO Database and certified within 30 Calendar days after the end of the calendar month in which the SSO occurs. Private Lateral SSO occurrence reported at utility’s discretion, unless overflow reaches the public right-of-way. None 30 calendar days after the end of each calendar month, or quarterly within 30 calendar days after the end of each quarter. If there are no SSO’s during calendar month but a PLSD was reported a “No Spill” certification statement should still be filed. Category 1 SSOs must be reported as soon as: EVWD has knowledge of the discharge; Reporting is possible; and Reporting can be provided without substantially impeding cleanup or other emergency measures. Initial reporting of a Category 1 SSO must be conducted through the Online SSO System as soon as possible but no later than three business days after EVWD has become aware of the SSO. A final certified report must be completed through the Online SSO System within 15 calendar days of the conclusion of SSO response and remediation. Additional information may be added to the certified report, in the form of an attachment, at any time. These reporting requirements do not preclude other emergency notification requirements and timeframes mandated by other regulatory agencies (local County Health Officers, local Director of Environmental Health, Regional Water Boards, or the State’s Emergency Management Agency or State law. Section 4 Sanitary Sewer Overflow Reporting 4-3 Category 2 SSOs must be reported within 30 days after the end of the calendar month in which the SSO occurs (e.g. all SSOs occurring in the month of January must be entered in the database by March 1st). Private Lateral Sewage Discharges may be reported to the Online SSO Database based upon EVWD’s discretion. If a Private Lateral Sewage Discharge is entered into the database, EVWD must identify the sewage discharge as occurring and caused by a private lateral, and a responsible party (other than EVWD), if known, should be identified. If no SSOs occur during the calendar month, EVWD must provide, within 30 days after the end of each calendar month, a statement through the Online SSO Database certifying that there were no SSOs for the designated month. If the SSO Online Database becomes unavailable, all required information must be faxed to the Regional Water Board office in accordance with the mandated time schedules. All required information must be entered into the Online SSO Database as soon as practical once it becomes available. 4.4 Mandatory Information to be Included in Sanitary Sewer Overflow Reporting The WDR requires that specific information be reported through the online database. All information required to be provided, for all categories of SSOs that are reported, is included in EVWD’s standard Sewer Stoppage/Overflow Report and Sewer response Procedures. These documents are presented in the following pages. Section 4 Sanitary Sewer Overflow Reporting 4-4 DATE: AM / PM RECEIVED BY: CALLER'S NAME: CALLER'S PHONE NO: CALLER'S ADDRESS: LOCATION OF OVERFLOW / STOPPAGE: CROSS ST: NAMES OF CREW MEMBERS DISPATCHED: TIME: DESCRIPTION OF COMPLAINT: ACCOUNT NUMBER: ACCOUNT LOGGED: Y / N BY: DATE: TIME ARRIVED: TIME DEPARTED: CREW: MAINTENANCE WORK PERFORMED: CAUSE OF STOPPAGE: OWNER'S PROBLEM: Y / N CONDITIONS FOUND: OWNER CONTACTED: Y / N SIZE OF LINE: LENGTH OF LINE: GPS LATITUDE: DATE: SSO EVENT #: OES CONFIRMATION #: CALL OES ON ANY SPILL REACHING A STORM DRAIN OR WATER WAY REQUIRED INFORMATION BY ALL USERS CALL RECEIVED: First & Last Name Needed First & Last Name needed FOR OFFICE USE AM / PM First & Last Name needed SUPERVISOR'S SIGNATURE: STOPPAGE FIELD REPORT (FOR RESPONSE CREW) UPSTREAM MH#: DOWNSTREAM MH#: GPS LONGITUDE: SIGNATURE: SEWER STOPPAGE / OVERFLOW REPORT EVWD Section 4 Sanitary Sewer Overflow Reporting 4-5 (COMPLETE REMAINDER OF FORM IF AN OVERFLOW HAS OCCURRED) TIME ARRIVED: TIME DEPARTED: CREW: TIME OVERFLOW STARTED: TIME OVERFLOW STOPPED: OVERFLOW DURATION: MINUTES OVERFLOW FLOW: GAL/MIN SIZE OF LINE: LENGTH OF LINE: GPS LATITUDE: DATE: DESCRIBE CAUSE OF OVERFLOW: DESCRIBE CLEANUP METHOD: DESCRIBE HOW OVERFLOW QUANTITY WAS CALCULATED: RECEIVING WATERS: YES NO PICTURES TAKEN: YES NO BY: SAMPLES TAKEN: YES NO BY: LOCATION OF SAMPLES: PROPERTY DAMAGE AND AFFECTED AREA: YES NO DESCRIBE: YES NO BYPASS PUMPING: YES NO YES NO LINE CLEANED: YES NO YES NO SSO EVENT #: OVERFLOW FIELD REPORT (FOR RESPONSE CREW) UPSTREAM MH#: DOWNSTREAM MH#: GPS LONGITUDE: SIGNATURE: LOCATION: SIGNS POSTED: BARRICADED: NOTIFY NEIGHBORS: Section 4 Sanitary Sewer Overflow Reporting 4-6 REGULATORY AGENCIES NOTIFIED: YES NO SPILL #: YES NO SPILL #: YES NO SPILL #: OTHER: YES NO SPILL #: CONTACTS / DETAILS: FOLLOWUP MEASURES: WORK ORDER #: FREQUENCY OF EXISTING P/M PROGRAM: LAST DATE P/M PERFORMED: RECOMMENDATIONS ON HOW TO ELIMINATE FUTURE PROBLEMS: REPORT COMPLETED BY: DATE: SSO SUBMITTED BY: DATE: SSO CERTIFIED BY: DATE: DATE: DATE / TIME: RWQCB: DATE / TIME: SSO EVENT #: OES: DATE / TIME: SKETCH OF AREA: (INCLUDE MANHOLES, INTERSECTIONS, LOCATION OF STOPPAGE, ETC.) CERTIFICATE #: COUNTY HEALTH: DATE / TIME: Section 4 Sanitary Sewer Overflow Reporting 4-7 PHONE #: (800) 852-7550 FAX #: WEBSITE:http://www.oes.ca.gov PHONE #: (916) 341 - 5250 FAX #: (916) 341 - 5252 WEBSITE:http://www.swrcb.ca.gov PHONE #: (909) 384-5383 CELL #: (909) 379-2593 FAX #: (909) 384-5258 WEBSITE:http://www.sbcitywater.org/ PHONE #: (800) 782-4264 FAX #: WEBSITE:http://www.co.san-bernardino.ca.us/pubhlth/ PHONE #: (909) 387-7986 FAX #: WEBSITE:http://www.co.san-bernardino.ca.us/fl ood/ Michael Placentia Environmental Control Section, Grease Only (FOG) COUNTY OF SAN BERNARDINO DEPARTMENT OF HEALTH STATE WATER RESOURCES CONTROL BOARD CITY OF SAN BERNARDINO MUNICIPAL WATER DEPARTMENT COUNTY OF SAN BERNARDINO FLOOD CONTROL DISTRICT STATE GOVERNOR'S OFFICE OF EMERGENCY SERVICES Section 4 Sanitary Sewer Overflow Reporting 4-8 Sewer Response Procedures When a sewer call is received by Customer Service, the sewer call is logged into the customer’s account and the customer service representative fills out the “for office use” section of the Districts Sewer Response Form. The sewer crew is then notified to respond to the incident, and the form is sent to the Customer Service Supervisor for review to ensure the form has been completely filled out with the customer’s information and that the field crew has been notified. The Customer Service Supervisor then initials the form and forwards it to Martha Duran or Brenda Van Meter. If away from their desk the Customer Service Supervisor is required to notify Martha Duran or Brenda Van Meter immediately by contacting them on their cellular phone. (See numbers below) 1. Field personnel responding to the call will indicate what type of work was done on the form. If the call is a stoppage, only the “stoppage” section of the form is filled out. If the call is a sewer overflow, only the “overflow” section of the form is filled out. When the work is completed the form is forwarded to Martha Duran or Brenda Van Meter for processing. If the field personnel find a “sewer overflow”, sewage flowing out of a manhole and into the street or sewage flowing onto the ground from a pipe or any other structure, then field personnel will contact Martha Duran or Brenda Van Meter immediately, either at their extension or by contacting them on their cellular phone. Contact with Martha Duran or Brenda Van Meter must be made on all “overflows” 24hrs a day, including weekends and holidays. Martha Duran or Brenda VanMeter will notify Kerrie Bryan, Risk and Safety Manger, who will intern notify the Districts management immediately. Gerald Sievers, Tom Holliman or Mike Maestas will insure that the certification of the overflow report is completed within the allowed timeframe and that the monthly reports are completed. Employee Cell Number Home Number Gerald Sievers (909) 772-5169 Mike Maestas (909) 266-6744 Tom Holliman (909) 573-6802 (909) 393-0300 Brenda Van Meter (909) 772-5163 Martha Duran (909) 208-9430 (909) 350-8535 Section 4 Sanitary Sewer Overflow Reporting 4-9 Sewer Response Procedures for Upper Management 2. Martha Duran or Brenda Van Meter will report the “sewage overflow” to the State Water Resources Control Board by logging into the California Integrated Water Quality System (CIWQS), web-based reporting program, within three (3) working days of receiving the confirmation of a “sewer overflow” report or within twelve (12) hours of the sewage reaching a water way. 3. Gerald Sievers, Tom Holliman or Mike Maestas must log into the CIQWS reporting site within fifteen (15) working days to certify the report to the State. Sewer overflows that reach a State waterway, such as a creek bed, or concrete channel, (such as a flood control channel) must be reported to the California Water Resources Board, State OES, San Bernardino County Flood Control, and San Bernardino County Public Health Officer, by telephone within two (2) hours of the District’s knowledge of sewage reaching a waterway. An overflow report must be reported to the CIWQS within twelve (12) hours. Gerald Sievers, Tom Holliman or Mike Maestas must certify the report within twenty-four (24) hours of the District’s knowledge of the overflow. 4. All sewer stoppage/overflow form/reports will be given to Martha Duran or Brenda Van Meter for scanning into the sewer file in Laserfiche. All hard copies will be filed in Engineering. Employee Cell Number Home Number Gerald Sievers (909) 772-5169 Mike Maestas (909) 266-6744 Tom Holliman (909) 573-6802 (909) 393-0300 Brenda Van Meter (909) 772-5163 Martha Duran (909) 208-9430 (909) 350-8535 Section 4 Sanitary Sewer Overflow Reporting 4-10 4.4.1 SSO Volume In order to complete the online reporting forms, it is necessary to calculate the volume of sewage that has been discharged outside of the sanitary sewer system. There are several methods for calculating the number of gallons discharged during a sanitary sewer overflow event and the appropriate method is dependent upon the circumstances surrounding the specific SSO; some are mentioned below. If the sewage has discharged to a rectangular ponded area, the volume of the discharge may be calculated as: 348.7*)(*)(*)( ft gallonsftDepthftWidthftLengthVolume If the ponded area is circular, a factor of 0.7 is multiplied by the above result to account for the proportional difference between a rectangle and circle having the same side and diameter length. If an overflow has discharged to the storm drain system, the volume must be calculated by using an estimate of the sewage that was flowing in the sanitary sewer system, based on the number of service connections multiplied by the duration of the overflow. In a traditional sanitary sewer system, a rough estimate of 200 gallons is contributed per household lateral every 24 hours. If the SSO is still occurring when the response crew arrives it may be possible to estimate the volume of sewage that has been released, based on the flow multiplied by the duration of the overflow, using the orifice equation to determine flow: ghCaQ2 Where, Q = flow of fluid from a hole, ft3/s C = coefficient of discharge a = area of the hole, ft g = gravity (32.2 ft/s) h = height of the fluid above the cover, ft C = C v * C c , typically between 0.608 and 0.639 C v = coefficient of velocity, ranging from 0.954 for ¾” orifice to 0.991 for 2½” orifice C c = coefficient of velocity, ranging from 0.67 for ¾” orifice to 0.614 for 2½” orifice See also Appendix C for additional volume estimation templates and information. 5-1 Section 5 Record Keeping and Certification 5.1 Record Keeping Existing EVWD procedures for records filing and retention shall be followed unless otherwise mandated by the WDR. The WDR mandates that individual SSO records shall be maintained by EVWD for a minimum of five years from the date of the SSO. This period may be extended when requested by a Regional Water Board Executive Officer. All records must be made available for review upon State or Regional Water Board staff’s request. The records of SSOs that must be retained include, but are not limited to: Record of Certified report, as submitted to the online SSO database; Service call records and complaint logs of calls received by EVWD SSO calls; SSO records; Steps that have been and will be taken to prevent the SSO from recurring and a schedule to implement those steps; Work orders, work completed, and any other maintenance records from the previous 5 years which are associated with responses and investigations of system problems related to SSOs; A list and description of complaints from customers or others from the previous 5 years; and Documentation of performance and implementation measures for the previous 5 years. If water quality samples are required by an environmental or health regulatory agency or State law, or if voluntary monitoring is conducted by EVWD or its agent(s), as a result of any SSO, records of monitoring information shall include: The date, exact place, and time of sampling or measurements; The individual(s) who performed the sampling or measurements; The date(s) analyses were performed; The individual(s) who performed the analyses; The analytical technique or method used; and Section 5 Record Keeping and Cerification 5-2 The results of such analyses. All monitoring instruments and devices that are used to fulfill the prescribed monitoring and reporting program must be properly maintained and calibrated by the appropriate laboratory as necessary to ensure their continued accuracy. 5.2 Certification All final reports must be certified by an authorized person as required by Provision J of the WDR. Authorized persons for EVWD are the General Manager, Administrative Manager, and the Safety and regulatory Affairs Director. For the purposes of electronic reporting, an electronic signature and accompanying certification, which is in compliance with the Online SSO database procedures, meet this certification requirement. 6-1 Section 6 Training and Follow-up Plans 6.1 Training EVWD staff and contractors should be aware of and properly trained to implement the provisions and procedures of the OERP. Staff must fully understand the response protocol for SSO events and should be notified of any changes to the OERP, particularly annual updates that may be made to the report. If major response protocols are revised, staff should be retrained to assure full understanding of SSO emergency response protocol. Lack of training can lead to a slower and less effective response during an emergency event. The State Water Board has signed a memorandum of agreement (MOA) with the California Water Environment Association (CWEA) to develop a training course in response to the requirements of the WDR. The course is intended to educate participants about the terms of the WDR and use of the online SSO database, as well as development of an SSMP. Training is conducted using a team format where participants will work through case studies and enter data into a database simulation via laptops. Current EVWD response staff completed the training in November 2006. Additional follow-up training and refresher sessions on the various procedures were held in January and February of 2007, April 2008, and April 2009. Refresher sessions will continue to be held yearly. The Safety and Regulatory Affairs Director is responsible for ensuring all training is conducted. In addition, field training should occur to prepare response crews for conditions that will be encountered during an overflow emergency event. Field training activities should include a mock clean up and other exercises of procedures that the response crews may need to perform. 6.2 Follow-up Plans Specific field conditions and emergency response personnel and/or procedures may change over time. As such, this OERP must be treated as a living document and be updated on an annual basis. At a minimum, phone numbers and forms must be updated, and a review of the procedures must be conducted. Plan performance should also be checked on an annual basis. Pre-event planning involves reviewing and updating the contractors and suppliers list, equipment requirements, and the notification and communications protocol described in this document. R-1 References American Public Works Association. “Preparing Sewer Overflow Response Plans: A Guidebook for Local Governments.” January 1999. California Water Environment Association (CWEA). “Sanitary Sewer Overflows – Waste Discharge Requirements Training.” Accessed: September 27, 2006. Available at: http://www.cwea.org/et_ssowdr.shtml CDM. “East Valley Water District (EVWD) Emergency Response Plan.” October, 2006. Federal Emergency Management Agency. “NIMS Basic: Resource Typing System.” March 24, 2006. Federal Emergency Management Agency. “NIMS Basic: Incident Command System.” March 27, 2006. Inland Empire Utilities Agency. “Sanitary Sewer Overflow Unified Response Guidance Plan.” July 2003. Psomas. “East Valley Water District Wastewater Collection System Master Plan.” 2002. State Water Resources Control Board. “Monitoring and Reporting Program No. 2006- 0003-DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.” May 2, 2006. State Water Resources Control Board. “Order No. 2006-0003-DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.” May 2, 2006. State Water Resources Control Board. “Sanitary Sewer Overflow Program.” Accessed: September 2006. Available at: http://www.swrcb.ca.gov/sso/index.html Western Municipal Water District. “Emergency Response and Recovery Plan.” January 2005. G-1 Glossary of Terms/Acronyms CIWQS - California Integrated Water Quality System CMLC - Cement Mortar Lined and Coated CRC - California Rehabilitation Center CWA – Federal Clean Water Act CWEA - California Water Environment Association DHS – Department of Health Services DWP – Department of Water and Power ERP - Emergency Response Plan GPS – Global Positioning System HDPE - High Density Polyethylene Pipe HTH - High-Test Hypochlorite ID - CIWQS User Identification MOA - Memorandum of Agreement MRP - Monitoring and Reporting Program NIMS - National Incident Management System NPDES – National Pollutant Discharge Elimination System OERP - Overflow Emergency Response Plan OES - Office of Emergency Services POTW – Publicly-Owned Treatment Works PVC - Polyvinyl Chloride RCP - Reinforced Concrete Pipe RCPP - Reinforced Concrete Pressure Pipe RWQCB – Regional Water Quality Control Board SOP – Standard Operating Procedure Glossary of Terms/Acronyms G-2 SSMP - Sewer System Management Plan SSO - Sanitary Sewer Overflow SWRCB – State Water Resources Control Board TDS - Total Dissolved Solids USACE - U.S. Army Corps of Engineers USEPA - United States Environmental Protection Agency VCP - Vitrified Clay Pipe WDR - Statewide General Waste Discharge Requirements for Sanitary Sewer Systems WWTP - Wastewater Treatment Plant Appendix A Police, Fire Department, and City Contacts for EVWD Police, Fire Department, and City Contacts Agency/Entity Phone No. City of Highland 909-864-6861 Police Department 909-425-9793 Fire Department CDF Station 1 909-862-3031 Fire Department CDF Station 2 909-862-1760 Fire Department CDF Station 3 909-884-4100 City Engineer 909-864-6861 Ext 240 City of San Bernardino 909-384-5211 Police Department 909-384-5692 Fire Department 909-384-5286 Municipal Water Department (24hr) 909-384-5141 Development Services 909- 384-5057 City of Redlands 909-798-7655 San Bernardino County 888-818-8988 Sheriff Department 909-387-3545 Sheriff Department (24 Hrs) 909-387-8313 Highway Patrol 909-383-4247 S. B. County Fire Department 909-387-5974 Flood Control 909-387-7995 Environmental Health Services Protection Program (24 Hrs) 800-472-2376 Office of Emergency Services (24-Hr)909-356-3931 Local 909-356-3998 Regional 562-795-2900 California Utilities Emergency Association 916-845-8510 Bear Valley Mutual Water Co. 909-793-4901 San Bernardino Valley Municipal Water District 909-387-9200 City of San Bernardino Fire Stations Station Address Telephone Station #221 200 East 3rd Street 909-384-5207 Station #222 1201 West 9th Street 909-384-5200 Station #223 2121 Medical Center Drive 909-384-5400 Station #224 2641 North "E" Street 909-384-5402 Station #225 1640 Kendall Drive 909-384-5403 Station #226 1920 Del Rosa Avenue 909-384-5406 Station #227 282 West Fortieth Street 909-384-5407 Station #228 3398 East Highland Avenue 909-384-5408 Station #229 202 Meridian Avenue 909-384-5409 Station #230 502 South Arrowhead Avenue 909-384-5410 Station #231 450 Vanderbilt Way 909-384-5299 Station #232 6065 Palm Ave 909-384-5286 Station #233 165 South Leland Norton Way 909-382-7287 Appendix B Contractors and Suppliers Emergency Contact List - Contractors Merlin Johnson Construction Inc. PO Box 777 Mentone, CA 92359 Daytime Number: 909-794-7702 Emergency Contact: Merlin Johnson Emergency Number: 909-322-6061 Legend Pump & Well Service Inc. 1324 Rialto Avenue San Bernardino, CA 92410 Daytime Number: 909-384-1000 Emergency Contact: Keith Collier Cellular Number: 951-830-1355 (24hr.) Law Plumbing Company 32312 Dunlap Avenue Yucaipa, CA 92399 Emergency Contact: Ken Walton Cellular Number: 909-446-8809 Home Number: 909-790-0082 Courtney’s Electrical. 27202 3rd Street Highland, CA 92346 Daytime Phone: 909-862-5335 Emergency Contact: Val Home Number: 909-792-7515 E.S Babcock Laboratories 6100 Quail Valley Court Riverside, CA 92507-0704 Daytime Number: 951-653-3351 Clinical Lab of San Bernardino 21881 Barton Road Grand Terrace, CA 92313 Daytime Number: 909-825-7693 Emergency Contact: Bob Glaubig Swains Electric Motor Service 400 E. Devonshire Hemet, CA 92543 Daytime Number: 951-929-3411 Advanced Telemetry Systems (ATSI) PO Box 461659 Escondido, CA 924046 Daytime Number: 760-738-6804 Emergency Contract: Paul Johnson Tri County Pump Company 241 S. Arrowhead San Bernardino, CA 92408 Emergency Contact: Andy Bradbury Daytime Number: 909 888-7706 Cellular Number: 909 499-7124 Brithinee Electric 620 South Rancho Ave Colton, CA Daytime Number: 909-825-7971 Chem Tech Fullerton, CA Daytime Number: 714-524-8222 Emergency Contact: Rocky Zoeter Phone Number: 714-350-5981 Evans Hydro Rancho Dominguez, CA Phone Number: 310-608-5801 (24 Hrs) Emergency Contact: Kim Big Sky Electric Inc. 601 S. Milliken Ave., Suite R Ontario, CA 91761 Emergency Contact: John Phillips Daytime Number: 909 390-7215 Cellular Number: 909 952-6945 Malcom Enterprises PO Box 2510 Running Springs, CA 92382 Daytime Number: 909-867-7058 Emergency Contact: Jeff Malcom Cellular Number: 909-844-2155 Emergency Contact List – Suppliers Inland Water Works PO Box 2246 San Bernardino, CA 92406 Daytime No. 909-883-8941 Emergency Contact: Greg Spears Cellular Number: 909-322-0208 Home Number: 909-335-7062 Emergency Contact: Jeff Spears Cellular Number: 909-322-0210 Home Number: 909-864-0288 Northwest Pipe 12351 Rancho Road Adelanto, CA 92301 Daytime Number: 760-246-3191 Emergency Contact (Corona): Joe Musil Cellular Number: 951-736-4681 Fax: 760-246-2292 Rain for Rent 6400 Fishcher Riverside, CA 92507 Daytime No. 951-653-2171 Emergency Number: 951-653-2171 White House Sanitation PO Box 891012 Temecula, CA 92580-1012 Day Time No. 909-943-1550 Emergency Number: 909-943-1550 HD Supply Waterworks 3155 N. Indian Avenue Perris, CA 92571 Daytime Number: 951-657-6580 Fax Number: 951-657-7938 Emergency Contact: Mr. Paul Martinez Cellular Number: 909-376-8917 Trench Shoring 636 East Rosecrans Avenue Los Angeles, CA 90059 - 3507 Daytime No. 310-327-5554 Emergency Number: 1-800-423-4411 GE Power & Water 760 Shadowridge Drive Vista, CA 92083 Daytime No. 760-685-8562 Emergency Contract: Daniel Kelly Emergency Number: 760-305-0173 Hoffman Southwest Propipe 23311 Madero Street Mission Viejo, CA 92691 Daytime No. 1-909-598-9743 Emergency Contact: Steve Powers Emergency Number: 1-800-386-1497 Appendix C Sample Templates for SSO Volume Estimation Collection System Collaborative Benchmarking Group Best Practices for Sanitary Sewer Overflow (SSO) Prevention and Response Plan Attachment D - Sample Templates for SSO Volume Estimation Disclaimer: This sanitary sewer overflow table was developed by Ed Euyen, Civil Engineer, P.E. No. 33955, California, for County Sanitation District 1. This table is provided as an example. Other Agencies may want to develop their own estimating tables. TABLE 'A' ESTIMATED SSO FLOW OUT OF M/H WITH COVER IN PLACE 24" COVER 36" COVER Height of Min. Sewer Height of Min. Sewer spout above S S O FLOW size in which spout above S S O FLOW size in which M/H rim Q these flows M/H rim Q these flows H in inches in gpm in MGD are possible H in inches in gpm in MGD are possible 1/4 1 0.001 1/4 1 0.002 1/2 3 0.004 1/2 4 0.006 3/4 6 0.008 3/4 8 0.012 1 9 0.013 1 13 0.019 1 1/4 12 0.018 1 1/4 18 0.026 1 1/2 16 0.024 1 1/2 24 0.035 1 3/4 21 0.030 1 3/4 31 0.044 2 25 0.037 2 37 0.054 2 1/4 31 0.045 2 1/4 45 0.065 2 1/2 38 0.054 2 1/2 55 0.079 2 3/4 45 0.065 2 3/4 66 0.095 3 54 0.077 3 78 0.113 3 1/4 64 0.092 3 1/4 93 0.134 3 1/2 75 0.107 3 1/2 109 0.157 3 3/4 87 0.125 3 3/4 127 0.183 4 100 0.145 4 147 0.211 4 1/4 115 0.166 4 1/4 169 0.243 4 1/2 131 0.189 4 1/2 192 0.276 4 3/4 148 0.214 4 3/4 217 0.312 6" 5 166 0.240 5 243 0.350 5 1/4 185 0.266 5 1/4 270 0.389 5 1/2 204 0.294 5 1/2 299 0.430 5 3/4 224 0.322 6" 5 3/4 327 0.471 6 244 0.352 6 357 0.514 6 1/4 265 0.382 6 1/4 387 0.558 8" 6 1/2 286 0.412 6 1/2 419 0.603 6 3/4 308 0.444 6 3/4 451 0.649 7 331 0.476 7 483 0.696 7 1/4 354 0.509 7 1/4 517 0.744 7 1/2 377 0.543 7 1/2 551 0.794 7 3/4 401 0.578 8" 7 3/4 587 0.845 10" 8 426 0.613 8 622 0.896 8 1/4 451 0.649 8 1/4 659 0.949 8 1/2 476 0.686 8 1/2 697 1.003 8 3/4 502 0.723 8 3/4 734 1.057 9 529 0.761 9 773 1.113 Collection System Collaborative Benchmarking Group Best Practices for Sanitary Sewer Overflow (SSO) Prevention and Response Plan The formula used to develop Table A measures the maximum height of the water coming out of the maintenance hole above the rim. The formula was taken from hydraulics and its application by A.H. Gibson (Constable & Co. Limited). Example Overflow Estimation: The maintenance hole cover is unseated and slightly elevated on a 24” casting. The maximum height of the discharge above the rim is 5 ¼ inches. According to Table A, these conditions would yield an SSO of 185 gallons per minute. This sanitary sewer overflow drawing was developed by Debbie Myers, Principal Engineering Technician, for Ed Euyen, Civil Engineer, P.E. No. 33955, California, of County Sanitation District 1. FLOW OUT OF M/H WITH COVER IN PLACE Height to be measured Collection System Collaborative Benchmarking Group Best Practices for Sanitary Sewer Overflow (SSO) Prevention and Response Plan Disclaimer: This sanitary sewer overflow table was developed by Ed Euyen, Civil Engineer, P.E. No. 33955, California, for County Sanitation District 1. This table is provided as an example. Other Agencies may want to develop their own estimating tables. TABLE 'B' ESTIMATED SSO FLOW OUT OF M/H WITH COVER REMOVED 24" FRAME 36" FRAME Water Min. Sewer Water Min. Sewer Height above S S O FLOW size in which Height above S S O FLOW size in which M/H frame Q these flows M/H frame Q these flows H in inches in gpm in MGD are possible H in inches in gpm in MGD are possible 1/8 28 0.04 1/8 49 0.07 1/4 62 0.09 1/4 111 0.16 3/8 111 0.16 3/8 187 0.27 6" 1/2 160 0.23 1/2 271 0.39 5/8 215 0.31 6" 5/8 361 0.52 8" 3/4 354 0.51 8" 3/4 458 0.66 7/8 569 0.82 10" 7/8 556 0.8 10" 1 799 1.15 12" 1 660 0.95 12" 1 1/8 1,035 1.49 1 1/8 1,035 1.49 1 1/4 1,340 1.93 15" 1 1/4 1,486 2.14 15" 1 3/8 1,660 2.39 1 3/8 1,951 2.81 1 1/2 1,986 2.86 1 1/2 2,424 3.49 18" 1 5/8 2,396 3.45 18" 1 5/8 2,903 4.18 1 3/4 2,799 4.03 1 3/4 3,382 4.87 1 7/8 3,132 4.51 1 7/8 3,917 5.64 21" 2 3,444 4.96 21" 2 4,458 6.42 2 1/8 3,750 5.4 2 1/8 5,000 7.2 24" 2 1/4 3,986 5.74 2 1/4 5,556 8 2 3/8 4,215 6.07 2 3/8 6,118 8.81 2 1/2 4,437 6.39 2 1/2 6,764 9.74 2 5/8 4,569 6.58 24" 2 5/8 7,403 10.66 2 3/4 4,687 6.75 2 3/4 7,972 11.48 30" 2 7/8 4,799 6.91 2 7/8 8,521 12.27 3 4,910 7.07 3 9,062 13.05 3 1/8 9,604 13.83 3 1/4 10,139 14.6 3 3/8 10,625 15.3 36" 3 1/2 11,097 15.98 3 5/8 11,569 16.66 3 3/4 12,035 17.33 3 7/8 12,486 17.98 4 12,861 18.52 4 1/8 13,076 18.83 4 1/4 13,285 19.13 4 3/8 13,486 19.42 Collection System Collaborative Benchmarking Group Best Practices for Sanitary Sewer Overflow (SSO) Prevention and Response Plan The formula used to develop Table B for estimating SSO’s out of maintenance holes without covers is based on discharge over curved weir -- bell mouth spillways for 2” to 12” diameter pipes. The formula was taken from hydraulics and its application by A.H. Gibson (Constable & Co. Limited). Example Overflow Estimation: The maintenance hole cover is off and the flow coming out of a 36” frame maintenance hole at one inch (1”) height will be approximately 660 gallons per minute. This sanitary sewer overflow drawing was developed by Debbie Myers, Principal Engineering Technician, for Ed Euyen, Civil Engineer, P.E. No. 33955, California, of County Sanitation District 1. FLOW OUT OF M/H WITH COVER REMOVED (TABLE "B") Height to be measured Collection System Collaborative Benchmarking Group Best Practices for Sanitary Sewer Overflow (SSO) Prevention and Response Plan Note: This chart is based on a 7/8 inch diameter pick hole Disclaimer: This sanitary sewer overflow table was developed by Ed Euyen, Civil Engineer, P.E. No. 33955, California, for County Sanitation District 1. This table is provided as an example. Other Agencies may want to develop their own estimating tables. TABLE 'C' ESTIMATED SSO FLOW OUT OF M/H PICK HOLE Height of SSO Height of SSO spout above FLOW spout above FLOW M/H cover Q M/H cover Q H in inches in gpm H in inches in gpm 1/8 1.0 5 1/8 6.2 1/4 1.4 5 1/4 6.3 3/8 1.7 5 3/8 6.3 1/2 1.9 5 1/2 6.4 5/8 2.2 5 5/8 6.5 3/4 2.4 5 3/4 6.6 7/8 2.6 5 7/8 6.6 1 2.7 6 6.7 1 1/8 2.9 6 1/8 6.8 1 1/4 3.1 6 1/4 6.8 1 3/8 3.2 6 3/8 6.9 Unrestrained 1 1/2 3.4 6 1/2 7.0 M/H cover will 1 5/8 3.5 6 5/8 7.0 start to lift 1 3/4 3.6 6 3/4 7.1 1 7/8 3.7 6 7/8 7.2 2 3.9 7 7.2 2 1/8 4.0 7 1/8 7.3 2 1/4 4.1 7 1/4 7.4 2 3/8 4.2 7 3/8 7.4 2 1/2 4.3 7 1/2 7.5 2 5/8 4.4 7 5/8 7.6 2 3/4 4.5 7 3/4 7.6 2 7/8 4.6 7 7/8 7.7 3 4.7 8 7.7 3 1/8 4.8 8 1/8 7.8 3 1/4 4.9 8 1/4 7.9 3 3/8 5.0 8 3/8 7.9 3 1/2 5.1 8 1/2 8.0 3 5/8 5.2 8 5/8 8.0 3 3/4 5.3 8 3/4 8.1 3 7/8 5.4 8 7/8 8.1 4 5.5 9 8.2 4 1/8 5.6 9 1/8 8.3 4 1/4 5.6 9 1/4 8.3 4 3/8 5.7 9 3/8 8.4 4 1/2 5.8 9 1/2 8.4 4 5/8 5.9 9 5/8 8.5 4 3/4 6.0 9 3/4 8.5 4 7/8 6.0 9 7/8 8.6 5 6.1 10 8.7 Collection System Collaborative Benchmarking Group Best Practices for Sanitary Sewer Overflow (SSO) Prevention and Response Plan The formula used to develop Table C is Q=CcVA, where Q is equal to the quantity of the flow in gallons per minute, Cc is equal to the coefficient of contraction (.63), V is equal to the velocity of the overflow, and A is equal to the area of the pick hole.2 If all units are in feet, the quantity will be calculated in cubic feet per second, which when multiplied by 448.8 will give the answer in gallons per minute. (One cubic foot per second is equal to 448.8 gallons per minute, hence this conversion method). Example Overflow Estimation: The maintenance hole cover is in place and the height of water coming out of the pick hole seven-eighths of an inch in diameter (7/8") is 3 inches (3”). This will produce an SSO flow of approximately 4.7 gallons per minute. This sanitary sewer overflow drawing was developed by Debbie Myers, Principal Engineering Technician, for Ed Euyen, Civil Engineer, P.E. No. 33955, California, of County Sanitation District 1. 2 Velocity for the purposes of this formula is calculated by using the formula h = v squared / 2G, where h is equal to the height of the overflow, v is equal to velocity, and G is equal to the acceleration of gravity. FLOW OUT OF VENT OR PICK HOLE (TABLE "C") Height to be measured Collection System Collaborative Benchmarking Group Best Practices for Sanitary Sewer Overflow (SSO) Prevention and Response Plan Flow Estimation Pictures Appendix D Sample Collection Guidelines (BACWA/CVCWA) Development Guidelines and Procedures July 2014 Development Guidelines and Procedures – July 2014 i East Valley Water District Development Guidelines and Procedures TABLE OF CONTENTS 1 ABOUT THE EAST VALLEY WATER DISTRICT ............................................................ 1 2 DEVELOPMENT PROGRAM .................................................................................. 2 3 ABOUT THE DEVELOPER’S GUIDELINE AND PROCEDURES .......................................... 3 4 DISTRICT FEES AND ADVANCE PAYMENT AGAINST ACTUAL COST (DEPOSIT) ................. 8 4.1 WATER CAPACITY CHARGES ..................................................................................................... 8 4.2 SEWER CAPACITY CHARGES ..................................................................................................... 8 4.3 ADVANCE PAYMENT AGAINST ACTUAL COST ............................................................................... 9 5 PRE-DESIGN PHASE ......................................................................................... 11 5.1 ABOUT THE DISTRICT’S STANDARDS MANUAL ........................................................................... 11 5.2 GENERAL NOTES & REQUIREMENTS ........................................................................................ 11 5.2.1 General ...................................................................................................................... 11 5.2.2 Definitions ................................................................................................................. 12 5.2.3 General Procedure .................................................................................................... 14 5.2.4 Requirements of Other Public Agencies ............................................................................... 16 5.2.5 Revising Approved Water and/or Sewer Improvement Plans .............................................. 17 5.3 WATER AND SEWER AVAILABILITY LETTER REQUESTS .................................................................. 17 5.4 WATER SUPPLY ASSESSMENTS ............................................................................................... 18 5.5 PRE-DESIGN MEETINGS ........................................................................................................ 18 6 DESIGN PHASE ................................................................................................ 19 6.1 PLAN-CHECK PROCESS .......................................................................................................... 19 6.2 ABOUT THE DISTRICT’S CONSTRUCTION AGREEMENT .................................................................. 20 7 CONSTRUCTION PHASE .................................................................................... 21 7.1 PRE-CONSTRUCTION MEETINGS FOR DEVELOPER-FUNDED PROJECTS ............................................. 22 7.2 REQUIREMENTS FOR PRE-CONSTRUCTION MEETING ................................................................... 23 7.3 VIDEO INSPECTION OF SEWER PIPE LINES ................................................................................. 24 7.3.1 Procedures for Video Inspection of Sewer Pipeline ............................................................. 24 7.4 USE OF SEWER PLUGS .......................................................................................................... 25 Development Guidelines and Procedures – July 2014 ii TABLE OF CONTENTS (CONTINUED) 7.5 MANHOLE RING TOLERANCE VERIFICATION PROCEDURE ............................................................. 25 8 CLOSE-OUT PHASE .......................................................................................... 27 8.1 FINAL INSPECTION ............................................................................................................... 28 LIST OF APPENDICES Appendix A Current Charges and Deposits Appendix B Availability Letter Request Sample Letter Template Appendix C Requirements and Procedures for Requests of Availability Letters Appendix D Fire Flow and Hydraulic Analysis Requests Appendix E Data Required for First Plan Check of Water and/or Sewer Plans Appendix F East Valley Water District Plan Check Procedures Appendix G Grant of Easement Appendix H Determination of Inspection Deposits Appendix I Development Agreement for Water and Sewer Appendix J Acknowledgement of Policy for Improvements around District’s Facilities Appendix K Items Required Prior To Scheduling Pre-Construction Meeting Appendix L Certification of Streets to Final Grade Appendix M Contractor’s Data Sheet Appendix N Pre-Construction Meeting Agenda Appendix O Manhole Ring Tolerance Verification Form Appendix P Project Close-Out Checklist Appendix Q Digital Disk Requirements and Formatting Appendix R Tract/IP Final Inspection Sheet Appendix S Atlas Map Updating Procedures for New Development Development Guidelines and Procedures – July 2014 1 1 About the East Valley Water District Founded in 1954, the East Valley Water District (District) is a Special District, governed by a 5- member, elected, Board of Directors (Board). The District is responsible for providing water and sewer for over 95,000 people and for maintaining 293 miles of water distribution mains, over 20,000 water service connections, and 215 miles of sewer collection mains within a service area of just under 30 square-miles that encompasses all of the City of Highland, portions of the City of San Bernardino and unincorporated areas of San Bernardino County. Development Guidelines and Procedures – July 2014 2 2 Development Program The Development Program is administered within the District’s Engineering Department (Department). The program mission is to meet the water and sewer needs of development occurring within the District’s service area through a comprehensive approach to planning, design, and construction of required facilities. The Department is responsible for reviewing and approving plans for construction, and construction inspection of water and sewer facilities for Developer-funded projects (Project). In addition, the Department is responsible for creating and maintaining project records and tracking to facilitate and enhance efficiency and customer service. The Department maintains a plan-check tracking system, available to Developers and their Engineers, to observe the status of their current plan-check submittals. Additionally, the Department tracks all Developer- funded project milestones throughout all phases of the Project to maintain quality control. The Department maintains a Standards Manual which contains the District’s design Standards and specifications for both the water and sewer systems. The Standards Manual was developed to ensure that a consistent level of service is maintained in the process of planning, designing, and constructing water and sewer facilities. Developed separately, but for use in conjunction with the Standards Manual, the Development Guidelines and Procedures (Guidelines) presents a description of the procedures and policies to be followed during any Developer-funded project within the District. Procedures for development of the water and/or sewer system are similar for Tract Map developments, Parcel Map developments, and Plot Plan developments. Most of the procedures and policy requirements within these Guidelines have been prepared for Tract Map developments, but certain portions apply to all water and sewer system development work within the District’s service area. Development Guidelines and Procedures – July 2014 3 3 About the Development Guidelines and Procedures The Guidelines were developed as a guide for persons and entities associated with the establishment of new developments within the District. The Guidelines are applicable to developers, design engineers, construction contractors, and other parties conducting development activities within the District. The Guidelines will commonly refer to this group of stakeholders as “Developer”. The Guidelines contain descriptive preambles that describe the major phases of a project. These introductory sections refer to procedures, forms, and ancillary information in the appendices that the Developer will need to successfully complete a project. Additionally, a flow chart is provided at the end of this section that highlights, in chronological order, the phases, procedures, and milestones associated with a typical development project. The Development Guidelines should not be used as a substitute for the District’s Standards Manual, but used in conjunction with the most current version of the Standards Manual. The most current version of the Standards Manual is available on the District’s website (www.eastvalley.org). The Guidelines are organized into the following individual sections that mirror key phasing in the development process: 1. Pre-Design 2. Design 3. Construction 4. Close-out This phased approach provides Developers with a sequential and logical organization of information and requirements that pertain to each phase. Through a common understanding of these requirements, the Developer and the District can work together in identifying and implementing the appropriate water and sewer facilities needed to support the proposed development. Development Guidelines and Procedures – July 2014 4 Another objective of the Guidelines is to clearly identify the responsibilities and financial obligations of the Developer. The District will require that the Developer acknowledge that they have read and understand the contents of both the Guidelines and the District’s Standards Manual and that they will act in accordance with the policies and procedures contained in them. To initiate the development application process, the Developer must include the Request for Sewer/Water Availability as part of the first submittal. Development Guidelines and Procedures – July 2014 Page 5 Development Guidelines and Procedures – July 2014 Page 6 Development Guidelines and Procedures – July 2014 Page 7 Development Guidelines and Procedures – July 2014 Page 8 4 District Fees and Advance Payment Against Actual Cost The District collects fees to offset the public-service cost of a new development. An initial deposit of funds is applied to various phases of a project. These are essentially User Fees levied in anticipation of use, for expanding the capacity of the existing water and/or sewer system to accommodate additional demand and users. The “Advance Payment Against Actual Cost” funds various functions such as plan-checking, inspection, and other services required to implement the Project. The following sections provide a description of water and sewer facility charges and advance payment against actual cost. 4.1 Water Capacity Charges The water capacity charges as shown in “Current Charges and Deposits” (Appendix A) are used by the District to pay for infrastructure needed to provide water service to the proposed development. The “Water Capacity Charge” is based upon the size of the water meter and its corresponding capacity to deliver water flow to the customer. These charges are used to fund that portion of the District’s water supply, treatment, transmission, pumping, and storage capacities to serve the development. The “Meter Installation” fee is the cost to provide the water meter. For a single-family dwelling project only, the “Installation Charge” is the cost of having the water meter only installed by the District. The Developer’s Contractor needs to install the service line, angle meter valve and the meter box. 4.2 Sewer Capacity Charges The sewer facility charges as shown in “Current Charges and Deposits” (Appendix A) are used by the District to pay for related infrastructure to provide sewer collection service to the proposed development. These charges are based on the development’s number of “Equivalent Dwelling Units (EDU’s).” An EDU is a standard of measurement based on Development Guidelines and Procedures – July 2014 9 the standard single family residence. The Sewer Collection Charge is based on the total number of EDU’s calculated for the development. The City of San Bernardino Municipal Water Department is responsible for calculating the EDU’s for sewer capacity, and the Developer must contact its Engineering Department at (909) 384-5140 to start the EDU calculation process. The Engineering Department will need to see the site and plumbing plans for the project in order to calculate the total number of EDU’s that the project will accumulate and need to be treated. Once the City of San Bernardino Municipal Water Department has calculated the total EDU’s, the District will then need to be supplied with a copy of the worksheet done by an engineer for City of San Bernardino Municipal Water District. The District will then use the worksheet to calculate the District’s sewer fees. These charges are used to fund that portion of the District’s sewer collection system to provide sewer collection service for the project. In addition to the District’s Sewer Facility Charges , the Developer will be required to purchase treatment capacity from the City of San Bernardino Municipal Water District, which treats the sewer flows collected by the District. The offices of the City of San Bernardino Municipal Water District are located at 300 North “D” Street, San Bernardino, CA 92418. After paying for treatment capacity, the City of San Bernardino Municipal Water District will provide the Developer with a “Certification of Payment of Sewer Capacity Fees”. This certificate must be submitted to the District prior to finalizing the development package and approving the Developer’s sewer plans. 4.3 Advance Payment Against Actual Cost The “Advance Payment Against Actual Cost” is a deposit against the cost to process the development package through the District’s approval process, and is estimated based on project requirements. It is important to note that the deposit may or may not be adequate to complete all project processing tasks. For example, a project might require more plan-check review because the initial plans and subsequent drafts lack details or Development Guidelines and Procedures – July 2014 10 did not address prior comments. Some examples of project tasks requiring a deposit include:  Water and/or Sewer Availability Determination  Hydraulic Analysis  Fire Flow Test  Plan-check  Inspection Items submitted to the District for review must be complete and of required quality to allow cost-efficiency and reduce the need to collect additional funds beyond the initial deposit (as needed to complete tasks). Unused portions of the deposit will be refunded back to the Developer. Should it be determined that the initial deposit is not adequate to complete the task, additional funds will be requested and the subject task will be suspended until additional funds are received. Development Guidelines and Procedures – July 2014 11 5 Pre-Design Phase The Pre-design Phase of a Developer-funded project starts when the Developer approaches the District with a request for, and pays for a Water and/or Sewer Availability Letter, and ends prior to submitting the first plan-check for District review. 5.1 About the District’s Standards Manual Products, manufacturing techniques, construction methodologies, and District operational and design parameters are constantly evolving and improving. As such, the Standards Manual will be updated and revised periodically. It will be the responsibility of the user of this manual to comply with the latest edition of the Standards Manual which can be found on the District’s website (www.eastvalley.org). 5.2 General Notes & Requirements 5.2.1 General If water and/or sewer service is desired within the District it can normally be provided when the following conditions are met: 1. Developer designs, pays for the construction of, and has constructed and dedicated the water and/or sewer facilities to the District, unless other arrangements have been made, in accordance with the requirements of the District. Water and/or sewer improvements must be provided in: (1) all interior development streets; (2) all streets on the boundary of the development (in order to provide for full frontage improvements); (3) any off-site improvements required to provide water and/or sewer service to the site. 2. Developer obtains and dedicates water and/or sewer right-of-way to the District. Facilities must be in either dedicated public right-of-way or in Development Guidelines and Procedures – July 2014 12 specially deeded easements to the District with a minimum width of 20 feet for single pipelines, or 30 feet for water and sewer pipelines within the same easement. Private roads must meet public street width requirements for easement dedication purposes. No structures, buildings, fences, or other obstructions can be constructed on these easements. The District's standard “Grant of Easement” form (Appendix G) must be used and must be formally accepted by the District pursuant to the “Certification of Acceptance of Grant of Easement”. 3. Water facilities include water pipelines and related fittings and appurtenances, and may also include additional offsite facilities such as pumping stations, water storage tanks, pressure regulating stations, and water transmission and distribution mains as are necessary to deliver water to the development and to provide adequate pressure and capacity to such development. Sewer facilities include sewer pipelines, fittings and appurtenances, laterals and manholes as are necessary to provide sewer service to the development. 4. The Developer makes the necessary financial arrangements with the District to satisfy the above stated conditions. 5.2.2 Definitions The following definitions are used throughout these Guidelines with the meanings stated below: 1. The term “Board” means the Board of Directors of the East Valley Water District. 2. The term "District" means the East Valley Water District. The term "Agent", when used with reference to the District, includes the District's officers, agents, consultants and employees. 3. The term "General Manager" means the General Manager of the East Valley Water District as designated by the Board to have charge, supervision, and Development Guidelines and Procedures – July 2014 13 administration of the East Valley Water District. The General Manager may, at his option, designate a person or persons to represent him for inspecting, and reporting on the work as it progresses. 4. The term "Contractor" means the construction company that enters into a contract with the District, or the Developer, to furnish material, equipment, and/or services, and the legal representatives of the construction company, or their authorized agent. The Contractor must hold a valid Contractor's license in accordance with the provisions of Division 3, Chapter 9 of the Business and Professions Code of the State of California, including all amendments. 5. The term "Engineer" means a California Registered Professional Engineer designated by the District to provide general engineering supervision of the work. 6. The term "Developer's Engineer" means the Registered Professional Engineer designated by the Developer to design the proposed water and/or sewer system facilities in accordance with the District’s rules, regulations and standards. 7. The term "Owner Property" means any work site upon which the Contractor is required to work under the contract including private property, property owned in-fee by the District or upon which it holds an appropriate lease, right-of-way, license, or encroachment permit. 8. The term "Developer" means the person, persons, or firm having legal authority to enter into agreements with the District as related to work performed within public rights of way and Public Utility Easements and having legal responsibility of the Engineer and Contractor retained or contracted with by Developer to perform the work. 9. The term "Owner" means the administrator of the Contract, which may be the District or Developer of the overlying project or land development. Development Guidelines and Procedures – July 2014 14 10. The term "County" means San Bernardino County, California. 11. The term "Contract" means the written agreement covering the performance of the work including, but not limited to, the formal Contract, bonds and insurance, notice inviting bids, bidder's plan for construction and specifications, statement of experience, financial condition and references, bidding sheet, certified data sheet, special requirements, and District Standards (latest edition). 12. The term "Work" means the facilities that will be constructed or performed under the Contract or permit, including furnishing of all labor and materials. 5.2.3 General Procedure Procedures for the development of water and/or sewer systems are shown below. The following are minimum procedures: 1. Developer submits two (2) copies of a project site map showing the boundaries of the area requiring water and/or sewer service and requests a water and/or sewer "Availability Letter" from the District. The appropriate “Availability Letter” fee is paid to the District. 2. District staff reviews and approves or denies said service. 3. District issues water and/or sewer "Availability Letter(s)". 4. Developer enters into a Development Agreement with the District. 5. Developer has water and/or sewer plans prepared , meeting all District specifications, by a California licensed civil engineer. 6. For a water system design, a fire flow application must be submitted and appropriate fees paid. (Appendix D) 7. Developer's Engineer submits engineered drawings to the District as outlined in Appendix F of the Guidelines, along with the appropriate deposit for the first (1st) plan-check. Drawings must be submitted within two (2) years of the issuance of the “Availability Letter”; otherwise, an updated “Availability Development Guidelines and Procedures – July 2014 15 Letter” will be required and drawings will not be plan-checked until an updated “Availability Letter” is issued. 8. Plan-checking process: District reviews and approves plans. The District's approval of the Developer’s plans denotes that the Plans were prepared in conformance with District Standards. The Developer’s Engineer will be responsible for any errors, coordination with other facilities, and interpretation of plans. All revisions and changes in the Plans must be approved by the Engineer. 9. Developer pays deposits and necessary fees to the District. 10. Developer's Engineer submits original Mylar’s with all approval signatures to the District. 11. Drawings must be re-submitted for first (1st) plan-check if over one (1) year has elapsed from the previous plan-check submittal, and anytime if the tract is split into separate tracts. Drawings approved by the District will be void 24- months from the date of District’s signature. After 24-months the drawings must be re-submitted for plan-checking (see above No. 7). 12. Developer contracts with an appropriately licensed Contractor. 13. Developer/contractor provides all bonds and insurance certificates to the District, prior to the pre-construction meeting. 14. Developer/contractor coordinates a pre-construction conference with the District. 15. District issues a "Notice-to-Proceed". 16. District inspects the construction of the facilities. 17. Developer's Engineer submits a complete set of "as-built" Mylar drawings within thirty days after construction. Additionally, the District is provided a submittal containing all project maps and land base information on a disk along with the "as-built" Mylar drawings and AutoCAD drawings. Development Guidelines and Procedures – July 2014 16 18. Developer provides the District with the final cost to construct all District facilities (for District capitalization purposes). 19. District accepts improvement facilities and issues a "Notice of Final Acceptance." 20. Developer dedicates the facilities to the District 12 months after the “Notice of Final Acceptance”. In the event that the District makes revisions to any of its rules, regulations or standards, those revisions must be incorporated into the Plans, be in effect as if they were in force from the beginning of the procedure, and be adhered to and/or constructed accordingly, unless otherwise approved by the District. 5.2.4 Requirements of Other Public Agencies The requirements for the design of water and/or sewer plans and systems specified in these Guidelines do not waive, nor are they intended to contradict, any requirements required by any other public agencies with authority over the Project. Engineers designing plans and systems for acceptance by the District must be knowledgeable of, and must comply with, all regulations of the following entities, depending on the location of the project :  City of Highland  City of San Bernardino  County of San Bernardino  Caltrans  State of California and Regional Water Quality Control Board 5.2.5 Revising Approved Water and/or Sewer Improvement Plans If a revision has to be made to an approved set of plans which have already been signed by the District, the proposed revisions must first be made on a new set of drawings and Development Guidelines and Procedures – July 2014 17 all changes must be encircled within a cloud and delta revision labeled. The revised plans need to be submitted to the District for review and approval. Once the revisions are approved, the Developer’s Engineer and or contractor need to update the original set of plans and keep records for “As-Built” changes. It should be noted that if plan revisions are required prior to , or concurrent to, the construction of the project, and these changes require an increase in the bond amount, the revised plans will be held until a new estimate has been prepared by the District and a new bond has been provided to the District. 5.3 Water and Sewer Availability Letter Requests Requests for a Water and Sewer Availability Letters must be made using the “Availability Letter Request Sample Letter Template” (Appendix B) and be submitted to the District with the items identified in the “Requirements and Procedures for Requests of Availability Letters” (Appendix C) along with the appropriate Advance Payment of Deposit. The District’s Engineer will prepare the Water and Sewer Availability Letter. 5.4 Water Supply Assessments During the initial CEQA screening by the appropriate Planning Agency, the Developer’s project may be required to provide a Water Supply Assessment (WSA). The WSA is a more detailed report which contains specific information required by CEQA regarding the long term water supply for the project. Preparation of a WSA, if required, will be the responsibility of the Developer. 5.5 Pre-Design Meetings The Developer will conduct a pre-design meeting with the District after the District provides the Developer with a Water and/or Sewer Availability Letter. The meeting will provide the Developer with important design parameters such as system connection points and conditions of approval placed on the project by the District. The meeting Development Guidelines and Procedures – July 2014 18 must be attended by the Developer, the Developer’s Engineer, the District’s Representative and other key District personnel. The purpose of the pre-design meeting is to acquaint the Developer and the Developer’s Engineer with the District’s policies, standard specifications and procedures, as outlined in the “General Notes & Requirements” (Section 5.2 of the Guidelines). Development Guidelines and Procedures – July 2014 19 6 Design Phase The Design Phase begins when the Developer’s Engineer submits the first plan-check with the appropriate deposit as determined by the District and ends when the Developer schedules the Pre-Construction meeting for the project. During this phase the Developer’s Engineer will submit design plans for the water and sewer facilities for the District’s review and approval. 6.1 Plan-Check Process After the appropriate Plan-check Deposit is paid, and the Developer’s Engineer submits the proposed drawings for the first plan-check along with all of the items detailed on the “Data Required for First Plan-check of Water and/or Sewer Plans” check sheet (Appendix E), the District will follow the procedures outlined in the “East Valley Water District Plan-check Procedures” guide (Appendix F). The Developer will be able to view and download the most current District Standards and Specifications on the District’s website. Approximate time for plan check turn-around is as follows:  1st Plan Check (1-100 EDU’s) – 3 week turn-around  1st Plan Check (100-500 EDU’s) – 4 week turn-around  1st Plan Check (over 500 EDU’s) – 5 week turn-around  2nd Plan Check – 2 week turn-around  3rd Plan Check – 1 week turn-around  4th Plan Check – 1 week turn-around For those plans, which due to incompleteness or errors, requires more than a 4 th Plan Check a meeting will be required with the District to continue the plan checking process. Development Guidelines and Procedures – July 2014 20 In the event the plan check deposit has been exhausted during the plan checking process, plan checking will be suspended until an additional deposit has been made equal to the original deposit. When the District Representative is satisfied with the plan-check submittal, the Developer’s Engineer will be authorized to produce and submit Mylar drawings to the District for final review and signature by the District’s Engineering Manager. Prior to Mylar’s being approved and signed, the District will require that :  All appropriate fees and deposits are paid.  All appropriate easements have been executed using the “Grant of Easement” template (Appendix G). Among the deposits and fees that must be paid by the Developer prior to the District signing the Mylar’s, is the deposit for the District’s inspection services, as required in the Construction Phase. The inspection deposit is calculated as a minimum deposit based on the linear footage of the water and sewer pipe to be installed , as outlined in the “Determination of Inspection Deposits” (Appendix H). 6.2 About the District’s Development Agreement Some Developer-funded projects may require that the Developer enter into a development agreement with the District (Appendix I). As outlined in the sample agreement, the Developer will be required to provide the appropriate bonds securing the agreement. Development Guidelines and Procedures – July 2014 21 7 Construction Phase The Construction Phase begins with the scheduling and completion of the Pre- Construction meeting and ends when : 1) all facilities have been installed per the approved plans, 2) all dwellings have been occupied, unless prior arrangements have been made with the District and 3) the final street cap paving is complete (for Tract Projects). For Individual and Parcel Map Projects, the end of the Construction Phase occurs when all facilities have been installed per the approved plan and final cap paving has been completed. During this phase, the Developer and key individuals such as the Project Superintendent and the Developer’s Contractor along with key District personnel will attend a pre-construction meeting to be conducted by the Developer (see Pre-Construction Meeting Procedures contained in this section). After the pre- construction meeting is complete, the District will issue a notice-to-proceed. The Developer’s Contractor will then install the water and sewer facilities per the approved plans. Note that, during construction, the District will not allow jumpers to be installed in place of actual meters at any time. Also, during the construction of the Project, the District will inspect all utilities where they cross District facilities during dry-utility installation and prior to back-fill of the excavations (for subject work) to ensure that the District’s facilities are undisturbed, meet specifications, and no damage has occurred. As part of the construction procedures for all sewer and mains when VCP pipe is used, a video inspection of the interior of the pipeline is used to verify that the material meets the District’s Standards and that the installation of the sewer main meets the District’s specifications (see procedures for Video Inspections contained in this section). For Tract projects, the Developer may elect to occupy certain phases prior to completion and final acceptance of the entire project. The District will install meters after receiving a certificate of occupancy issued by the City. Because the District’s policy Development Guidelines and Procedures – July 2014 22 is to assume operational control of the water and sewer facilities once a customer moves into the home, the inspection is performed to ensure that all of water and sewer facilities (that serve the home) have been completed to District’s specifications. After successfully passing the Pre-Occupancy Inspection, the District’s Development Representative will send the appropriate notification to the City or County approving the move-in of the specific lots and/or addresses only. As part of the District’s effort to comply with Fire Ordinances, it is the District’s policy to prohibit hardscape improvements (such as decorative walks, driveways and walls) within three feet of District’s facilities without written consent. The Developer will be responsible for adhering to this po licy until the project is accepted by the Board. See the District’s “Acknowledgement of Policy for Improvements around District’s Facilities” (Appendix J). 7.1 Pre-construction Meetings for Developer-funded Projects Pre-construction meetings are conducted for all Tracts, Parcel Map and Plot Plan projects after the District has received , signed, and approved plans, and prior to any work on District facilities. The District’s Representative (using the District’s Pre- Construction Meeting Agenda) conducts the pre-construction meeting. The District’s Representative, the District’s Inspector, the Developer’s Contractor, and the Developer’s Project Superintendent must be present at the pre-construction meeting. If any of these persons cannot attend, the meeting will be rescheduled. It is desirable to have a representative or inspector from the agency having jurisdiction present at the pre- construction meeting. 7.2 Requirements for Pre-construction Meeting The following requirements must be met prior to scheduling a pre-construction meeting: Development Guidelines and Procedures – July 2014 23 1. The District’s Representative has verified that all fees have been paid, all agreements have been executed, all easements have been recorded (and accepted by the District), and the items on the pre-job checklist (Appendix K) have been completed. 2. All necessary material submittals for the project have been reviewed and approved by the District’s Representative and the District’s Inspector a minimum of five working days prior to scheduling the pre-construction meeting. 3. A District Inspector has been assigned to the project. 4. The Developer has presented to the District: a. “Certification of the Streets to Final Grade” form (Appendix L) b. Complete cut-sheets for the first three hundred (300) feet for each crew’s start location. c. Completed “Contractor’s Data Sheet” (Appendix M) d. A copy of the Contractor’s safety program. e. A list of the Certified Competent Persons who will be on the project. f. A copy, from the Contractor, of the certifications for each person and a Certified Competent Person for confined space entry on the job. 5. The District’s Representative who has reviewed the information supplied by the Developer and contractor determines that the pre-construction meeting can proceed. 6. The Developer’s contractor coordinates with the attendees to set a time and date for the pre-construction meeting to be conducted. The pre-construction meeting is conducted using the District’s “Pre-construction Meeting Agenda” (Appendix N), which lists pertinent discussion items. At the meeting, a copy of the pre-construction meeting agenda, along with copies of the pre-occupancy and final inspection check-list are provided to those in attendance. Development Guidelines and Procedures – July 2014 24 After the pre-construction meeting is complete, the District, along with the District’s Inspector, sets a start-work date within two (2) working days; and the Engineering Manager will sign and issue a notice-to-proceed to the Developer. 7.3 Video Inspection of Sewer Pipe Lines Video inspections of sewer lines on tract projects are done to ensure that the newly installed sewer lines meet the District’s Standards and specifications for material and installation. The video inspection is performed after the sewer lines and laterals have been installed, the streets are at final grade, and prior to the final air-test and base- paving. The District’s Operations Representative or the Inspector, using the District’s video inspection standards (Appendix N), conducts the video inspection. A minimum of five business days is required from the time of notification to set the video inspection date and time. A subsequent video inspection will be required if debris has been introduced into the sewer line or after required repairs have been completed. Videos are to be submitted to the District on one CD in DVD form at with the completed and approved sewer system improvements for the project. The Developer is responsible for contracting directly with the video inspection company. 7.3.1 Procedures for Video Inspection of Sewer Pipeline 1. The District Inspector will verify that: a. All sewer lines, laterals and manholes have been installed per the approved plans. b. All lines have been cleaned. c. All manholes are accessible to the video truck and are at the elevation and grade for base paving. 2. After the Inspector has verified all the above items have been completed, the District Inspector will observe the video inspection by Developer’s video company using the video inspection check sheet. If there are no items listed for correction, the Inspector will sign the video inspection check sheet Development Guidelines and Procedures – July 2014 25 verifying the designated sections have passed video inspection. The completed and signed check sheets are given to the District’s Engineering Representative for the project file and a copy is given to the Inspector. If there are any items listed for correction during the video inspection the District Inspector will make sure the items have been corrected. 3. After the Inspector verifies that all the items noted for correction on the video inspection check sheet have been corrected , a follow up video inspection is requested, using the steps outlined above. 7.4 Use of Sewer Plugs During the construction and phasing of a project it may be necessary to use one or more sewer plugs to protect the District’s existing sewer system from a section currently under construction. The placement and location of these plugs will be at the direction of the District or its Inspector. Under no circumstances are these plugs to be removed without permission from the District. 7.5 Manhole Ring Tolerance Verification Procedure In order to ensure the manhole ring tolerance dimensions as shown on District Standard Drawing No. S-7 are adhered to, the following procedure must be performed. Prior to installation of the manhole rings, a measurement must be taken from the manhole inlet flow-line to the top of the manhole cone. Adding this dimension to the inlet flow-line elevation will provide a top of manhole cone elevation. This elevation must then be subtracted from the manhole rim elevation provided on a grade stake or as shown on the Plans. The resulting dimension must be within the 12” – 20” tolerance shown on the reference standards drawing. If not within tolerance, additional work on the manhole shaft must be performed until the tolerance is met. This procedure must be documented by the use of the form in Appendix O. Development Guidelines and Procedures – July 2014 26 8 Close-Out Phase The Close-out Phase of a Developer-funded project starts when: 1) all prior phases are complete, 2) construction is complete on the project, 3) final street cap paving is complete, and 4) the District has received a written request from the Developer to conduct a final inspection for a Notice of Acceptance. During this phase the Developer’s Superintendent and Contractor will be working with the District’s Inspector to correct any items related to the installation of the sewer and wa ter facilities and prepare the project for final inspection by the District’s Representative. Also, during this phase the District’s Representative will be working with the Developer’s Superintendent and Contractor to insure that all of the items identified on the “Project Close-Out Checklist” (Appendix P) are completed and that all outstanding financial obligations have been met. In addition to the Mylar plans, the District requires submission of three digital copies of the as-built drawings in the form of digital disks for Tracts, Plot Plans, and Parcel Maps, etc. The requirements for the digital disks can be found in “Digital Disk Requirements and Formatting” (Appendix Q). After completion of the final inspection using the “Tract/IP Final Inspection Sheet” (Appendix R), correction of any items identified during the inspection and the completion of all of the items on the Project Close-Out Checklist, the District’s Representative will schedule the Project to be presented to the Board for consideration of final acceptance. After Board approval , the District’s Representative will write a letter to the appropriate Planning Agency no tifying them that the District has accepted the project . All activity and costs up to final acceptance will be calculated and a final invoice will be sent to the Developer for payment. In cases where a credit is due, the invoice will be accompanied with a check for the remainder of those funds that were deposit ed towards the Project. Development Guidelines and Procedures – July 2014 27 8.1 Final Inspection The Final Inspection is a more thorough inspection of the water and sewer facilities compared to the pre-occupancy inspection. The Final Inspection is normally conducted after construction has been completed on the project and final street cap paving is complete. On individual project and plot plan projects, this inspection is conducted after all the water and sewer facilities have been installed and after final street cap paving is complete. The District’s Representative, the District’s Inspector, and a representative of the Developer must be present to conduct the final inspection. The procedure for this inspection is as follows: 1. The Developer requests final close-out and acceptance of the project by sending a letter request to the District. 2. The District’s Representative will verify that all items on the project close-out sheet pertaining to the tract project (payment of fees, easement documents, as-built drawings and CDs, etc.) have been completed and have been presented to the District. 3. The District’s Inspector ensures that the project is ready for final inspection. After all items are complete to the District’s specifications (and the approved plan) the Inspector contacts the District’s Representative and notifies them that the project is ready for a final inspection. 4. The District’s Representative schedules a time for the final inspection. 5. Once the required persons have accepted the time and date of the final inspection, the District’s Representative will notify the Developer and the Inspector of the time and date of the inspection. The Tract Superintendent, the District’s Inspector, and the District’s Representative (or his designee) must be present to conduct the inspection. If any of these persons cannot attend, the inspection must be rescheduled. A copy of the as-built drawings and the completed and signed copy of the Inspector ’s punch-list must be presented at the final inspection. Development Guidelines and Procedures – July 2014 28 6. The District’s Representative conducts the final inspection and identifies any items for correction. The District’s Inspector will ensure that any items identified during the final inspection are corrected. 7. The District’s Inspector will verify that the as-built plan on the submitted CD is accurate and includes any changes identified on the final walk through inspection. The District’s Representative will request that the Developer resubmit the CD if any inaccuracies are identified. The District’s GIS Department will update atlas maps and GIS to indicate facilities that exist once the required actions on the “Atlas Map Updating Procedures for New Development” (Appendix S) are completed. 8. The District’s Representative prepares and schedules the notice of completion for approval by the Board. The District’s Representative will send the appropriate letter to the Developer notifying them of the District’s acceptance of the facilities. Appendix A Current Charges and Deposits Effective as of April 23, 2014 Water Meter and Monthly Charges ($) Meter GPM Installation Capacity Total Monthly Meter Size Charge Charge Rates * * plus $1.77 /HCF 5/8” 13.71 Initiation of service charge: $25.00 per service address 3/4" 24-30 2,128.00 4,623.00 6,751.00 13.71 1" 40-50 2,160.00 7,721.00 9,881.00 20.87 Fire standby charge: $5.60 per inch diameter per month 1 ½" 80-100 4,714.00 15,397.00 20,111.00 38.60 2" 128-160 4,924.00 24,642.00 29,566.00 88.48 3" 240-300 10,739.00 46,234.00 56,973.00 163.25 Temporary serviced charge: $1,800.00 deposit plus $1.77 per HCF of metered water 4" 16,551.00 77,127.00 93,678.00 270.06 6" 27,117.00 153,970.00 181,087.00 537.09 8" 29,983.00 277,401.00 307,384.00 857.52 10" ** 462,335.00 ** Monthly Sewer Rates ($) w/o Boulder e/o Boulder ** To be determined at time of application based on the flow capacity of the proposed meter in relation to the flow capacity of a 3/4" meter Residential (1 to 3 EDUs) 33.86 / EDU 35.86 / EDU Commercial: (per HCF, plus flat charge of $6.30 /month) Multi-Family 1.80 1.89 Fire Services ($) Commercial / Retail 2.65 2.74 Size Installation Restaurant / Lounges 3.25 3.34 1” 2,160.00 Laundromats 2.05 2.14 1 ½” 4,717.00 Dry Cleaners 2.65 2.74 2” 4,924.00 Schools / Churches 1.65 1.74 3” 10,739.00 Governments / Municipal 2.05 2.14 4” D.D.C. 13,873.00 Convalescent Homes 1.90 1.99 6” D.D.C. 19,186.00 Hotels 3.25 3.34 8” D.D.C. 20,211.00 Office Buildings / Motels 2.05 2.14 Auto Repair / Service Station 1.85 1.94 Car Wash 1.85 1.94 Sewer Service Fees Fire Flow Test: $100.00 each Sewer Trunk Fee $ 158.00 / EDU Temp. Fire Hydrant Meter: $1,800.00 deposit Permit Fee $ 25.00 Front Footage Charge: $30.00 per lineal foot Inspection Fee $ 75.00 Fire Hydrant Assembly Short: $3,807.00 Sewer Capacity Fee $5,361.00 / EDU Long: $6,359.00 Total $5,619.00 / EDU Service Abandonment Charge: $421.00 per service Development Agreement Projects Down payment for Engineering Services (nonrefundable): 7.5% of the Engineer’s estimated cost of the project Inspection Fee: $600.00 per day Structure Deposits Gate Valve: $100.00 per gate can Manhole: $250.00 per manhole Tentative Water Design (nonrefundable): $1,000.00 deposit Main Extension Fees: Prevailing rates of time and materials System Design Charge: Fees charged by an engineering firm of the District’s choosing plus 10% (as deposit for the District’s administrative efforts) Appendix B Availability Letter Request Sample Letter Template Date East Valley Water District 31111 Greenspot Road Highland, CA 92346 Attention: Thomas R. Holliman, PE, Engineering Manager RE: SEWER/WATER AVAILABILITY As evidenced by this letter, I hereby request a Sewer/Water Availability letter for *___________________________ (include assessor’s parcel no.) This project is part of Specific Plan ____________________, City of Highland/San Bernardino, California, located **____________________________________________. The proposed development consists of ***___________________________________. on approximately ______ acres. Proposed sewer and water connections are to be made to existing lines located in ****_____________________________ (refer to attached map). Should you have any questions or require any further information, please do not hesitate to call. Sincerely, * Tentative Tract, Parcel Map or Plot Plan No. ** Location of Development *** Number of dwellings if known. **** Point of connection to District line if known. (Note: Please attach a set of prints or a plot map with this letter). Appendix C Requirements and Procedures for Request of Availability Letter Items Needed for Availability Letters 1. Letter requesting availability with information regarding type of project. 2. Advance payment of Deposit determined by the District for processing request. 3. Tentative Tract, Parcel Map or Plot Plan or Assessor’s Parcel Number and two (2) copies of a map showing area and boundaries of property requiring water and/or sewer service. 4. Proof of Property Ownership/Grant Deed or Title Report. Procedures for Availability Letter Request 1. Developer submits a request for an Availability Letter using the Request of Availability Letter Template along with all of the items specified above to East Valley Water District (District). 2. The District’s Engineering Representative will then schedule the request for the Engineering Manager to review and consider the approval of the request. 3. The District’s Engineering Representative will write the appropriate cover letter, as well as have the District’s Engineering Manager sign the approved letter that will be transmitted to the Developer. Water Supply Assessments 1. Developments that fall under the criteria of a “project” as defined under Senate Bill (SB) 610 will be required to provide a Water Supply Assessment (WSA) prior to the issuance of an availability letter. SB 610 provides the legal requirements for confirmation of water supply sufficiency as a condition of approval for development projects. Appendix D Fire Flow and Hydraulic Analysis Requests It is the policy of East Valley Water District to require a hydraulic analysis for Tract, Commercial, Industrial, School and Park Projects. There is a necessity for accurate and thorough information to be provided on these various projects concerning calculations for design of private fire systems, water system design and in some cases to provide information to government agencies with oversight on specific projects such as schools. Please include with your written request, an advance payment of deposit determined by the District, along with a copy of your “Conditions of Approval” from the City of Highland or the City of San Bernardino's Fire Department Engineering Division. FLOW TEST REQUEST Date Address: 31111 Greenspot Road, Highland, CA 92346 Phone: (909) 888-8986, Fax: (909) 383-1481 APPLICANT Address City/State Zip Code Phone No. Fax No. Email FLOW TEST REQUIRED FOR: (PLEASE COMPLETE ONE OR MORE) Address Assessor’s Parcel No. Tract / Lot Location SUBMIT TEST RESULT: MAIL FAX E-MAIL PICK-UP ******************************************************************************************************************** FEE SCHEDULE A non-refundable charge in the amount of $ 100.00 will be charged for each flow test performed. ******************************************************************************************************************** DISTRICT USE ONLY TEST DATE TIME GENERAL LOCATION MAIN SIZE/TYPE PRESSURE ZONE MAP PRESSURE HYDRANT NO. HYDRANT TYPE HYDRANT SIZE PRESSURE: NOZZLE: INITIAL psi SIZE in RESIDUAL psi FLOW gpm PITOT psi @ 20 psi gpm (Account No. 20-0000-00-4603) FOR OFFICE USE ONLY APPLICATION taken by Date Appendix E Data Required for First Plan Check of Water and/or Sewer Plans Residential Developers 1. Water and / or Sewer Plans 2 copies 2. Conditions of Approval of Tentative Map 1 copy 3. Easement Document and Plats 2 copies a. Title Reports, Deeds, Etc. 1 copy b. Easement Boundary Closure (to 3 decimal point min.) 1 copy c. Coordinate List 1 copy d. Any Appropriate Survey Notes 1 copy e. Any Reference PM/RS/Etc. 1 copy 4. Fees payable to East Valley Water District in the amount established by the District 5. Project Identification Forms with each plan check (Attachment 1) 1 copy Commercial / Industrial Development 1. Items Listed in above requirements 2. Site Plan / Plot Plan 1 copy 3. Landscape Irrigation Plan 1 copy 4. Total Fixture Unit Calculations (Water & Sewer) 1 copy 5. Fire Protection Plans and Fire Flow Calculations 1 copy NOTE: INCOMPLETE SUBMITTALS WILL NOT BE ACCEPTED. PROJECT IDENTIFICATION: __________________________________ For First Check Only: “All information required pursuant to Section II.B.3 of the District’s Standards Manual is attached.” ________________________________ ______________________________ Engineer’s Signature District Check (Submittal is complete and ready for first plan check) For Subsequent Plan Checks: The attached plan set(s) is/are being submitted to the East Valley Water District for _______ Plan Check. I certify that the following statements are correct: 1. All “redlined” corrections from the previous plan check have been made or the reason they have not been made has been explained directly on the previous plan check sheets. 2. Changes made by the Design Engineer to the water and sewer plans, other than those corrections indicated by the District, have been highlighted. 3. Revisions to the reference plans (i.e. street plans, storm drain plans, grading plans, etc.) have/have not been made. If changes have been made, the revised plans are attached. Dated: _________________ ________________________________ Signature ________________________________ Print Name The District plan check process and approvals on improvement plans are not a guarantee or warranty that the design is complete and without error, but that an appropriate amount of time was spent on reviewing the plans for general engineering designs commensurate with the engineering standards of the District. Pursuant to state law, the civil engineer of record is the engineer of work and bears full responsibility for the design. This is signified by State law that requires the design engineer to apply his “seal” to the plans. Please refer to the Business and Professions Code (Engineers’ Act) Section 6703, Responsible Charge: Section 6735, Preparation of Plans and Other Documents, et. al. Appendix F East Valley Water District Plan Check Procedures September, 2010 Prior to Developer’s Engineer (Engineer) commencing development design engineering, it is required that the Developer’s Engineer and the Developer’s Representative meet with District’s Engineering personnel after an Availability Letter has been issued. 1. Engineer submits plan check package to District. 2. District conducts plan check and makes redline edits. Note: If, at 2nd plan check, the amount of redlines is excessive, the District’s Engineering Department will request a meeting with the Engineer to discuss any problems or deficiencies. The Developer will also be made aware of this meeting and is welcome to attend. 3. District reviews and makes comments (in red) changes and transmits redlines back to Engineer. 4. Engineer makes revisions and transmits back to the District along with the redline copy; Item 1 above is then repeated etc. Note: Redline set must accompany revised set, or plans will be returned to engineer. 5. Once all revisions are complete to the satisfaction of the District, a recommendation for Mylars will be submitted. This will be in the form of a written request from the District to the Engineer. At the time the District receives the plans from the Engineer, if the changes have not been made, the plans are returned to the Engineer with a request to complete redline changes. If the Engineer adheres to the District’s standards and specifications, as provided for within the East Valley Water District Standards Manual, and the above is followed, it is expected that the number of plan checks should not exceed four. For those plans, which due to incompleteness or errors, requires more than a 4th Plan Check a meeting will be required with the District to continue the plan checking process. Approximate time for plan check turn-around is as follows: • 1st Plan Check (1-100 EDU’s) – 3 week turn-around • 1st Plan Check (100-500 EDU’s) – 4 week turn-around • 1st Plan Check (over 500 EDU’s) – 5 week turn-around • 2nd Plan Check – 2 week turn-around (provided there are minimal changes and a meeting is not necessitary as explained above) • 3rd Plan Check – 1 week turn-around • 4th Plan Check – 1 week turn-around In the event the plan check deposit has been exhausted during the plan checking process, plan checking will be suspended until an additional deposit has been made equal to the original deposit. Note: Any changes to the original intent of the plans (such as adding phases to a tract) may be considered as a ‘new’ plan check. Appendix G Grant of Easement Recording requested by When recorded mail to: East Valley Water District 31111 Greenspot Road Highland, CA 92346 APN EXEMPT FROM RECORDING FEES PER GOVT. CODE §27383 NO DOCUMENTARY TRANSFER TAX PER R&T CODE §11922 GRANT OF PERMANENT EASEMENT For valuable consideration, (enter name here) (“Grantor”), hereby grants to EAST VALLEY WATER DISTRICT, a public agency (“Grantee”), its successors and assigns, a permanent easement and right of way in, over, upon, under and across the lands hereinafter described to construct, reconstruct, install replace, remove, repair, alter, operate, maintain, inspect and utilize _____________________________________ (enter name of project or facility, such as “a sewer lift station”), together with any easement roads and appurtenances within the right of way including, but not limited to, cable for communication purposes, and for the ingress and egress throughout the entire easement area and right of way (collectively, “Easement Area”) in connection with the exercise of any of the foregoing rights. The property subject to this easement is located in the County of San Bernardino, State of California, described as follows: See Exhibits “A” (Description) and “B” (Plat) attached hereto and made a part hereof. It is further understood and agreed that no other easement or easements shall be granted on, under, or over said Easement Area by the Grantor to any person, firm, corporation, or other entity without the previous written consent of said Grantee. Grantor, and his successors and assigns, shall not increase or decrease, or permit to be increased or decreased, the now existing ground elevations of said Easement Area and right of way without the prior written consent of Grantee. Grantor, and Grantor’s successors and assigns, further agree that no building, fences, walls or other structures of any kind, or trees, shall be installed, constructed, erected, placed planted or maintained in any portion of the Easement Area, and no shrubs or other plants or vegetation shall be placed, planted or maintained in the portion of Easement Area which is included within any travel way, and that no changes in the alignment of grading of any such road will be made without prior written consent of the Grantee. Grant of Permanent Easement The Permanent Easement, as applicable, shall include, without limitation, the right and privilege of Grantee and its employees, agents, representatives, contractors, subcontractors, and workmen to: (i) perform all activities as may be necessary to facilitate the purposes of the Permanent Easement; (ii) use, control and occupy the Easement Area (iii) have access to, ingress to, and egress from the Easement Area; (iv) construct and utilize an access road within said Easement Area, and to use gates in all fences which now cross said Easement Area; (v) use and temporarily place and operate tools, equipment, machinery, and materials on the Easement Area, and (vi) trim, cut, remove, or clear away any trees, brush, or other vegetation or flora, including the roots thereof, located within the Easement Area. No additional fences or gates or gates shall be constructed across said Easement Area unless approved in writing by the Grantee. Grantee shall also have the right to mark the location of this easement in a manner which will not interfere with Grantor’s reasonable and lawful use of said Easement Area. The covenants contained herein shall run with the land. Since the construction and installation of the facilities (the “Facilities”) provided for under the terms of this Grant of Easement will require incidental entry and construction activities upon a portion of the Grantor’s property adjacent to the Easement Area, the purpose of the following Grant of Temporary Easement is to provide for such incidental activities. Therefore, subject to the provisions described below, Grantor hereby grants to Grantee a temporary, non-exclusive easement over the Grantor’s adjacent property (the “Temporary Construction Easement”) described and depicted in Exhibits “C” and “D” for the purposes of enabling Grantee to construct and install the Facilities. This Temporary Construction Easement is intended to be temporary and will remain in effect until completion of the construction and installation of the Facilities, which will occur not later than ___________ (____) days after such construction and installation commences. Following completion of such construction and installation of the Facilities, Grantee will execute, acknowledge and provide to Grantor a quitclaim deed or other release to confirm the termination of the Temporary Construction Easement only. This Grant shall inure to the benefit of and be binding upon the Grantor and Grantee and their respective assigns, heirs and voluntary and involuntary successors in interest. IN WITNESS WHEREOF, Grantor has executed this instrument this ______ day of , 20_____. GRANTOR: (Enter name of entity/person here) By: (Enter name of authorized person) Its: (Enter title as stated in paragraph 1) Grant of Permanent Easement NOTARY ACKNOWLEDGMENT (California All-Purpose Acknowledgment) STATE OF CALIFORNIA ) ) ss. COUNTY OF ________________ ) On ______________, 20_____ before me, _________________________, notary public, personally appeared _______________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. __________________________________________ Signature of Notary Public Grant of Permanent Easement EXHIBIT “A” LEGAL DESCRIPTION OF EASEMENT AREA [INSERT LEGAL DESCRIPTION HERE] Grant of Permanent Easement EXHIBIT “B” PLAT [INSERT PLAT HERE] Grant of Permanent Easement EXHIBIT “C” TEMPORARY CONSTRUCTION EASEMENT DESCRIPTION [INSERT LEGAL DESCRIPTION HERE] Grant of Permanent Easement EXHIBIT “D” PLAT OF TEMPORARY CONSTRUCTION EASEMENT [INSERT PLAT HERE] Grant of Permanent Easement CERTIFICATE OF ACCEPTANCE This is to certify that the interest in real property conveyed by that certain Grant of Easement to which this Certificate is attached from ______________________________________________, to EAST VALLEY WATER DISTRICT, a public agency (“Grantee”), is hereby accepted by the undersigned officer or agent on behalf of the Grantee, pursuant to authority conferred by resolution of the Board of Directors adopted on ___________________, 20____, and the Grantee consents to recordation thereof. Dated: ________________, 20_______ EAST VALLEY WATER DISTRICT, a public agency By: _______________________________ _______________________ _ (Name) ________________________ (Title) ATTEST: _____________________________________ Grant of Permanent Easement Appendix H Determination of Inspection Deposits The following figures should be used for deposit towards inspection of Sewer and Water Construction: Waterline Diameter Estimated Inspection Cost 8” Waterline $2.48 Per L.F. 12“ Waterline $3.00 Per L.F. 16” Waterline $3.96 Per L.F. Sewer Diameter 6” Sewerline $2.16 Per L.F 8” Sewerline $2.16 Per L.F. 10” Sewerline $2.32 Per L.F. 12” Sewerline $2.52 Per L.F. Minimum Deposit Requirement The minimum required inspection deposit shall be $4,000 with the exception of the inspection of one single family residential unit that requires the construction of one domestic water service connecting to an existing waterline contiguous to the subject property and/or one sewer lateral connecting to an existing sewerline contiguous to the subject property. The required inspection deposit for this situation will be established on a case by case basis. Appendix I Development Agreement for Water and Sewer (Developer Initiated/Contractor Installed) THIS AGREEMENT is made this ____ day of ______________, _____, by and between EAST VALLEY WATER DISTRICT, a public agency (hereinafter "the DISTRICT"), and _________________________ (hereinafter "the DEVELOPER"). RECITALS A. The DISTRICT is a County Water District organized and operating pursuant to California Water Code Section 30000 et seq. B. The DEVELOPER proposes to subdivide and develop certain real property within the boundaries of the DISTRICT, which is located at _________________________________________________, in the City of ________, County of San Bernardino, State of California, and is generally identified as Tract No. _______________ (hereinafter "the PROPERTY). A copy of the Tentative Tract Map for the PROPERTY is attached hereto as Exhibit "A" and is incorporated herein by this reference. C. The development of the PROPERTY will consist of ______ dwelling units, and the DEVELOPER desires that the DISTRICT provide domestic water and sewer service to the PROPERTY. The DEVELOPER intends to design and construct the facilities necessary for water and sewer service to be furnished to the PROPERTY. D. The DISTRICT supplies domestic water and sewer service within the area to be served and is the public agency empowered by law to provide such services to the PROPERTY. E. The purpose of this AGREEMENT is to provide the terms and conditions under which the DEVELOPER will design and construct the facilities necessary for the DISTRICT to supply water and sewer service to the PROPERTY (hereinafter "the PROJECT"). COVENANTS NOW THEREFORE, in consideration of the preceding Recitals and the mutual Covenants contained herein, the parties hereto agree as follows: Section 1. DESIGN OF FACILITIES. The DEVELOPER agrees to design the water and sewer facilities for the PROPERTY in the following manner and according to the Rules and Regulations of the DISTRICT: a. The DISTRICT agrees to provide to the DEVELOPER tentative water and sewer plans which conform to the requirements of the DISTRICT. Development Agreement for Water and Sewer b. The DEVELOPER agrees to design the water and sewer facilities for the PROPERTY in accordance with the DISTRICT's Standards for Design and Processing of Water and Sewer Plans and the tentative plans provided by the DISTRICT. The designs shall be submitted to the DISTRICT in a complete form which shall provide sufficient information for review and approval by the DISTRICT in the exercise of its sole discretion. c. The DISTRICT may request certain changes in the plans to provide for oversizing of facilities, which DEVELOPER agrees to incorporate into the plans and specifications for the PROPERTY. d. The DEVELOPER shall furnish the DISTRICT with any and all easements necessary for the construction, operation, maintenance, and repair of any and all water and/or sewer facilities to be installed and/or used for the PROJECT. All easements shall be submitted to the DISTRICT for review and approval by the DISTRICT in the exercise of its sole discretion prior to the DISTRICT's acceptance of any dedication of the PROJECT facilities under Section 6 of this AGREEMENT. e. The DEVELOPER shall submit all plans, drawings, specifications, and contract documents, for all work to be performed pursuant to this AGREEMENT, to the DISTRICT for review and approval, if acceptable to the DISTRICT. The DISTRICT agrees to review all such documents in a timely manner and, upon inclusion of all changes thereto requested by the DISTRICT in a manner satisfactory to the DISTRICT, the DISTRICT will provide the DEVELOPER with authorization to proceed. The DEVELOPER shall not proceed with the construction of the PROJECT and any other water or sewer facilities for use on the PROPERTY until the DISTRICT so authorizes. Section 2. CONSTRUCTION OF FACILITIES. The DEVELOPER agrees to construct the PROJECT and all other water and sewer facilities necessary for the PROPERTY in the following manner subject to the DISTRICT's approval: a. The DEVELOPER shall obtain all necessary permits from the (County or City ________) and all other public or private agencies required for the construction thereof. The PROJECT and the facilities appurtenant thereto shall be constructed at a location determined by the DISTRICT, and shall be relocated by the DISTRICT at the DEVELOPER's sole expense if such relocation is deemed necessary by the DISTRICT in its sole discretion. The DEVELOPER hereby grants the DISTRICT full access to the PROPERTY and all other locations where the work contemplated herein is to be performed. b. All facilities constructed pursuant to this AGREEMENT shall be in accordance with accepted standards and practices in the industry and in compliance with all local, state, and federal laws, rules, and regulations. The DEVELOPER shall be responsible for providing all labor, materials, and equipment necessary to perform the work for the PROJECT, and such work shall be performed in a timely and workmanlike manner by a party or entity acceptable to the DISTRICT. All such facilities shall conform to the DISTRICT's Standard Specifications for the Furnishing of Materials and the Construction of Water and Sewer Pipelines. All costs and Development Agreement for Water and Sewer liabilities in connection with the design and construction of the PROJECT shall be borne solely by the DEVELOPER. c. The DISTRICT shall inspect and approve all work to be performed under this AGREEMENT. However, any approval by the DISTRICT of such work, or of the designs, specifications, reports, and/or materials furnished hereunder, is understood to be conceptual approval only and will not operate to relieve the DEVELOPER or its contractors, consultants, or subcontractors of responsibility for complying with all laws, codes, industry standards, and liability for damages caused by negligent acts, errors, omissions, noncompliance with industry standards, or their own willful misconduct. Further, neither the DISTRICT's review, approval, or acceptance of any of the work or services performed in connection with this AGREEMENT shall be construed as a waiver of any rights hereunder or of any defense or cause of action which the DISTRICT may have arising out of the performance of this AGREEMENT or any previous or subsequent agreements. The DEVELOPER shall cause the facilities constructed under this AGREEMENT to be inspected as required by any and all other public or private agencies. Section 3. DEVELOPER'S COSTS. In addition to all other obligations imposed upon the DEVELOPER under this AGREEMENT, the DEVELOPER shall be responsible for the payment of all of the following: a. The DEVELOPER shall pay to the DISTRICT all, or any portion, of the connection fees for the PROPERTY at the time of application for water and sewer service therefor. The DISTRICT will provide water and sewer service only to those specific subdivision lots within the PROPERTY for which payment in full has been made to the DISTRICT. b. The DEVELOPER shall be solely responsible for the payment of all costs, fees, and expenses associated with the construction, inspection, operation, maintenance, repair, and relocation of the PROJECT, including all costs, fees, and expenses incurred for the environmental analysis, engineering, and design of the PROJECT. c. The DEVELOPER shall comply with all rules, regulations, resolutions, and ordinances of the DISTRICT that are currently in place or may hereafter be adopted, and shall pay when due any and all fees, deposits, charges, rates, fines, penalties, taxes, and/or assessments that may be levied by the DISTRICT. d. The DEVELOPER hereby consents, and waives any objection, to the exercise of any and all collection remedies that are available to the DISTRICT under the law upon the PROPERTY and/or the person and/or property of DEVELOPER and its shareholders and partners. Section 4. SECURITY. a. The DEVELOPER shall provide performance, completion, and/or payment bonds for the PROJECT in the minimum amount of not less than 100 percent of the estimated construction costs containing covenants, which are acceptable to the DISTRICT and the (County or City _______________). Development Agreement for Water and Sewer b. The DEVELOPER shall provide a maintenance bond for the PROJECT in the amount of 100 percent of the construction cost, which shall contain covenants which are satisfactory to the DISTRICT. Such bond shall remain in force for at least twelve (12) months from the date of acceptance by the DISTRICT of the dedication of said facilities. c. The DEVELOPER shall also procure and maintain during the performance of this AGREEMENT such policies of insurance, bonds from an acceptable surety, cash deposits, escrow accounts, letters of credit, and other forms of security, in amounts and upon terms deemed sufficient by the DISTRICT in its sole discretion to protect the DISTRICT from any and all exposure to loss and/or liability. Section 5. COSTS FOR OVERSIZING. Pursuant to Section 1.c. of this AGREEMENT, the DISTRICT agrees to pay to the DEVELOPER the incremental cost of oversizing any PROJECT facilities greater than twelve inches (12") in diameter for water distribution pipelines and ten inches (10") in diameter for sewage collection pipes. The DISTRICT shall determine the amount of the incremental cost of oversizing and the method of payment in the exercise of its sole discretion prior to its acceptance of the PROJECT facilities. Section 6. DEDICATION OF FACILITIES. a. The DEVELOPER shall, upon completion of the construction of all facilities to be installed hereunder to the satisfaction of the DISTRICT, dedicate said facilities to the DISTRICT by a deed of dedication or such other instrument as the DISTRICT may prescribe, and the DISTRICT agrees to accept the dedication thereof by formal action of its Board of Directors. Thereafter, such dedicated facilities shall become and be operated and maintained by the DISTRICT as part of the DISTRICT's water and sewer system. The DISTRICT shall not accept dedication of said water or sewer facilities until all connection fees have been paid unless otherwise allowed under Section 3.a. herein. b. The DEVELOPER hereby grants the DISTRICT full access to the PROPERTY for the purpose of installing, operating, inspecting, maintaining, and repairing all meters, valves, and other appurtenances necessary for the DISTRICT to record, regulate, and control the amount of water pumped therefrom. Section 7. SERVICE RESTRICTIONS. Any obligation on the part of the DISTRICT to supply water to the PROPERTY pursuant to the terms of this AGREEMENT shall be excused in the event that the performance thereof is interrupted for any of the following reasons: riots, wars, sabotage, civil disturbances, insurrection, explosion, court order, natural disasters such as floods, earthquakes, landslides, and fires, and other labor disturbances and other catastrophic events which are beyond the reasonable control of the DISTRICT. Notwithstanding any other provision to the contrary, the DISTRICT may suspend or refuse water service to the PROPERTY if the DEVELOPER is in breach, default, or violation of this AGREEMENT or any rule, regulation, resolution, and/or ordinance of the DISTRICT that is currently in place or may hereafter be adopted, or if such service would adversely affect the health, safety, or welfare of the DISTRICT's customers, or for any other reason deemed paramount by the DISTRICT in its sole discretion. Development Agreement for Water and Sewer Section 8. NO REPRESENTATIONS, WARRANTIES, OR CLAIM OF WATER RIGHTS. The DISTRICT makes no express or implied representations or warranties concerning the quality, pressure, or temperature of any water delivered pursuant to the terms of this AGREEMENT, or the manner in which the water is provided, or its fitness for any particular purpose, and the DISTRICT shall not be held liable for any losses incurred or damages sustained as a direct or indirect result thereof, nor shall the DISTRICT be held liable for any losses incurred or damages sustained after the water furnished hereunder is transferred to the PROJECT facilities. Any water conveyed by the DISTRICT under this AGREEMENT shall not serve as the basis of, or otherwise support, any water rights claim that may be asserted by the DEVELOPER. Section 9. LIABILITY FOR DAMAGES. The DISTRICT shall not be held liable or responsible for any debts or claims that may arise from the operation of this AGREEMENT, or for any damage claims for injury to persons, including the DEVELOPER and/or its officers, directors, shareholders, guests, invitees, trespassers, agents, contractors, consultants, and employees, or for property damage, from any cause arising out of or in any way related to the PROPERTY, the PROJECT, and/or the DEVELOPER's obligations hereunder. Section 10. RELEASE. The DEVELOPER hereby expressly waives and releases the DISTRICT and its agents, officers, directors, and employees from any and all liability for the claims, actions, and/or losses set forth in Section 9 above and for any costs and expenses incurred in connection therewith. The DEVELOPER, notwithstanding the provisions of California Civil Code § 1542, which provides as follows: "A general release does not extend to claims which the creditor did not know or suspect to exist in his or her favor at the time of the executed release which if known by him or her must have materially affected his or her settlement with the debtor." expressly waives and relinquishes all rights and benefits afforded to the DEVELOPER thereunder and under any and all similar laws of any state or territory of the United States with respect to the claims, actions, and/or losses referenced above. This AGREEMENT shall act as a release of any claims that may arise from the aforementioned whether such claims are currently known or unknown. The DEVELOPER understands and acknowledges the significance and consequences such specific waiver of Civil Code § 1542 and hereby assumes full responsibility for any injuries, damages, losses, or liability that may result from the claims identified above. This AGREEMENT shall also act as a release of any claims, actions, and/or losses set forth in Section 9 above, that may arise in the future whether such claims are currently foreseen or unforeseen. Section 11. HOLD HARMLESS. Excepting the sole or active negligence or willful misconduct of the DISTRICT, the DEVELOPER shall indemnify and hold the DISTRICT and its officers, directors, agents, and employees harmless from and against all claims and liabilities of any kind arising out of, in connection with, or resulting from, any and all acts or omissions on the part of the DEVELOPER and/or its officers, directors, shareholders, partners, assignees, guests, invitees, trespassers, agents, contractors, consultants, and employees in connection with the PROPERTY, the PROJECT, and the performance of their obligations under this AGREEMENT, including design defects, even if occurring after the completion of the PROJECT, and defend the DISTRICT and its officers, directors, agents, and employees from any suits or actions at law or in equity for damages, and pay all court costs and counsel fees in connection Development Agreement for Water and Sewer therewith. In addition, the DEVELOPER agrees to defend, indemnify, and hold the DISTRICT harmless from and against all claims, losses, liabilities, damages, demands, actions, judgments, causes of action, assessments, penalties, costs, expenses (including, without limitation, the reasonable fees and disbursements of legal counsel, expert witnesses, and accountants), and all foreseeable and unforeseeable consequential damages which might arise or be asserted against the DISTRICT and/or the DEVELOPER with regard to the PROPERTY and/or the PROJECT which are alleged and/or determined to be tortious, and/or in violation of present and future federal, state, and local laws (whether under common law, statute, rule, regulation, or otherwise), including, but not limited to, the California Environmental Quality Act, Public Resources Code Section 21000 et seq., and the Guidelines adopted thereunder, California Code of Regulations Section 15000 et seq., all as the same may be amended from time to time. Section 12. NOTICES. Any notice, tender, or delivery to be given hereunder by either party to the other shall be effected by personal delivery in writing or by registered or certified mail, postage prepaid, return receipt requested, and shall be deemed communicated as of mailing or in the case of personal delivery, as of actual receipt. Mailed notices shall be addressed as set forth below, but each party may change its address by written notice in accordance with this section. If to the DISTRICT: East Valley Water District 31111 Greenspot Road Highland, CA 92346 Attn: General Manager If to the DEVELOPER: Section 13. DISPUTES. Any dispute or controversy arising out of, under, or in connection with, or in relation to this AGREEMENT, and any amendments thereto, or the breach thereof, which is not resolved informally by prior mutual agreement of the parties hereto, shall be submitted to arbitration in accordance with the California Arbitration Act, Sections 1280 through 1294.2 of the Code of Civil Procedure. The parties shall pay the cost of such arbitration equally; however, the prevailing party in the arbitration shall be entitled to reimbursement of its attorney’s fees and other costs incurred in connection therewith. Section 14. ATTORNEYS FEES. If a dispute arises which cannot be resolved by arbitration, regarding the breach or enforcement of the provisions of this AGREEMENT, the prevailing party therein shall be entitled to recover all attorneys fees and other costs actually incurred in connection with reaching a resolution of the dispute whether or not an action, claim, or lawsuit is filed. In any action brought, the entitlement to recover attorney’s fees and costs will be considered an element of costs and not of damages. Development Agreement for Water and Sewer Section 15. INUREMENT. This AGREEMENT and all provisions hereof shall be jointly and severally binding upon, and inure to the benefit of, the parties hereto, their respective heirs, successors, legal representatives, and assigns, and each of the shareholders and partners of the DEVELOPER in their individual, separate, and/or other capacities. Section 16. ASSIGNMENT. This AGREEMENT may not be assigned to any individual or entity without the written consent of the parties hereto. Section 17. INTEGRATION AND AMENDMENT. This AGREEMENT constitutes the entire understanding of the parties hereto with respect to the subject matter hereof and supersedes any and all prior agreements, whether oral or written, between the parties in connection therewith. This AGREEMENT may not be amended unless in writing and signed by the parties hereto. Section 18. CAPTIONS. The captions of sections and subsections of this AGREEMENT are for reference only and are not to be construed in any way as a part of this AGREEMENT. Section 19. INTERPRETATION AND ENFORCEMENT. This AGREEMENT shall not be construed against the party preparing it, but shall be construed as if both parties jointly prepared this AGREEMENT and any uncertainty or ambiguity contained herein shall not be interpreted against any one party. Failure by either party to enforce any provision of this AGREEMENT, or any waiver thereof by such party, shall not constitute a waiver of said party's right to enforce subsequent violations of the same or any other terms or conditions herein. This AGREEMENT shall be enforced and governed by and under the laws of the State of California, and venue for any action brought to interpret and/or enforce any provision of this AGREEMENT shall be in a state or federal court located in the State of California that would generally have in rem jurisdiction over the PROPERTY. Section 20. SEVERABILITY. If any portion of this AGREEMENT is declared by a court of competent jurisdiction to be illegal, invalid, or unenforceable, the remaining provisions of this AGREEMENT shall continue in full force and effect. Section 21. TIME OF THE ESSENCE. Time is of the essence in this AGREEMENT, and the parties hereto agree to proceed in good faith, with due diligence, to complete all covenants and conditions set forth herein and to perform such further acts as is reasonably necessary to effectuate the purpose of this AGREEMENT. Section 22. AUTHORITY. Each individual executing this AGREEMENT on behalf of a party hereto represents and warrants that he or she is fully and duly authorized and empowered to so execute on behalf of such party, and that this AGREEMENT is binding in the manner set forth in Section 15 hereof. Development Agreement for Water and Sewer IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be executed by their respective officers as of the date first above written DISTRICT: By: _______________________________________ East Valley Water District President, Board of Directors ATTEST: _________________________ Secretary DEVELOPER: By: _______________________________________ Name Title ATTEST: ______________________________ Notary Public Development Agreement for Water and Sewer EXHIBIT “A” [Tentative Tract Map for the PROPERTY] Development Agreement for Water and Sewer Appendix J Acknowledgement of Policy for Improvements around District’s Water Facilities Hardscape Improvements in Close Proximity to District’s Water Facilities and Meter Boxes The District’s meter boxes, fire hydrants and other related water facilities are placed within City or County rights of way. Hardscape improvements such as planters, walls, sidewalks, walkways, curbs, drainage ways and other concrete, asphalt, block, brick or paved surfaces or improvements may not be placed within three (3) feet of meter boxes, fire hydrants and other related water facilities and driveways may not be located closer than three (3) feet from meter boxes. Prior to the sale of any residences in a project, Developer will record a Declaration of Covenants, Conditions and Restrictions (“CC&Rs”) containing the following language verbatim (modified only by Developer’s use of different defined terms in its CC&R document): Owners may not construct hardscape improvements including (without limitation) planters, walls, sidewalks, walkways, curbs, drainage ways or other hardscape improvements (constructed with cement, concrete, asphalt, block, brick, stone or similar material) closer than three (3) feet from the outer edge of any fire hydrants and other related water facilities or; from any water meter box serving a residence. Driveways may not be located closer than three (3) feet from meter boxes. Declarant, so long as it owns a Lot within the Project and the Association [if there is a homeowners association for the Project] shall have the right and easement to enter upon a Lot and remove any hardscape improvements constructed in violation of the above requirements, without liability to the affected Owner. If East Valley Water District (“District”) or any successor water utility provider, in order to service a meter box, encounters hardscape improvements located in violation of the above requirements, District may demolish any portion of such hardscape improvements as necessary in order to service the meter box. In such event, District will have no responsibility to reconstruct or otherwise compensate the Owner for demolition of hardscape improvements. Owners will also be responsible for replacement of any landscaping affected by meter box service and repair. This section may not be amended or terminated without the prior written consent of the District as evidenced by its written consent to any recorded document effecting such amendment or termination. Prior to acceptance by the District of the water system for a project, the following requirements must be satisfied: (1) District must review and approve recorded CC&Rs containing the above language; (2) Developer shall include appropriate language containing the above disclosure in its purchase and sale agreements for the project, in bold type, and provide a copy of such contract to the District; (3) if any homeowner has constructed hardscape improvements that violate the above provisions, either Declarant or the Association must cause such hardscape improvements to be removed within the three (3) feet or two (2) foot perimeter areas described above. Appendix K Items Required Prior To Scheduling Pre-Construction Meeting Updated Availability Letter Approved and signed Mylars and two bonded copies of blue lines Board approved Deferment Agreement with letter of Credit Fees Paid Water/Sewer Construction Agreement Easements recorded (if applicable) Maps with Street Names and Addresses of lots Cut Sheets (minimum of 300’ for each start point) Inspector Assigned Items required from the Developer’s Contractor Contractor Data Sheet Complete Contractor’s Safety program Copy of Certifications for Confined Space and Competent Persons Material Submittals Approved Appendix L Certification of Streets to Final Grade TO: EAST VALLEY WATER DISTRICT 31111 Greenspot Road Highland, CA 92346 SUBJECT: CERTIFICATION OF STREETS TO FINAL GRADE TRACT NO. CONTRACT NO. 1. There has been executed a "WATER AND/OR SEWER SYSTEM CONSTRUCTION AGREEMENT" for the water and/or sewer mains described above; said Agreement being between the East Valley Water District, hereinafter designated as the "District"; hereinafter designated as the "Developer"; and, hereinafter designated as the Contractor.  Yes  No 2. The Developer certifies that all streets requiring water and/or sewer mains are to Final Grade and ready for installation of water and/or sewer mains; wherein the Final Grade shall be defined as the finished grade of the street base or sub-base required by the City of agency having jurisdiction. 3. Developer agrees that if there is a change required in the alignment or final grade of the street which occurs prior to acceptance by the District of the water and/or sewer mains, and which requires the relocation of any District facilities, the developer will make full payment for all costs necessary to relocate said facilities. Developer: Authorized Agent: (Sign) (Type) (Title) Date: Contractor: Authorized Agent: (Sign) (Type) (Title) Date: Appendix M Contractor’s Data Sheet Name of Contractor or Organization: Corporation Principal Office Address Partnership Phone Number ( ) Individual Names of Officers of Organization _____________ Name Title _______ Name Title License Number(s) Classification Engineering Class "A" C-34 Specialty 1. How many years has your organization been in business as a general contractor under your 1) present business name? and 2) present license(s)? 2. How many years experience in water and/or sewer pipeline construction work has your organization had (a) as a general contractor (b) as a sub-contractor 3. List below the applicable projects your organization has completed most recently. Project Completed Pipe Sizes Total Length Type of Pipe Contract Cost No. Year for 1 2 3 4 5 6 7 8 9 10 (Use additional sheet if necessary) 4. List names and addresses of persons to be contacted for information on projects listed in Item 3. No. Name of Owner Name, Address & Telephone Number of Person to be Contacted 1 2 3 4 5 6 7 8 9 10 5. Have you ever failed to complete any work awarded to you? ___ ____If so, where, when and why? 6. Have you ever filed bankruptcy? ______ If so, state details on separate sheet. 7. Have you ever been cited for violation of Cal-OSHA regulations? ____ If so, state on separate sheet where, when, why, and whether a minor or major violation. 8. Have you ever had a lien against you? ___ Have you ever had to obtain a lien against someone? ______ If so, where, when and why? 9. Can you provide letters of recommendation from previous contractual agreements? If so, please attach letters to this form. I hereby authorize EAST VALLEY WATER DISTRICT to obtain information concerning me or my organization from any source including former clients. I certify that the foregoing information obtained in this Experience Questionnaire is true and correct to the best of my knowledge. Date Signature Type or print name clearly Appendix N Pre-Construction Meeting Agenda Tract or Project #_________________________ Date _____________ On-Site Off-Site Developer _________________________ Start Date_____________ Superintendent _________________________ E-Mail _____________ Inspector _________________________ EVWD Representatives ___________________ Contractor _________________________ County of San Bernardino Transportation Department _____________________ City of Highland / City of San Bernardino Representative _____________________ Items to be presented to the District representative prior to the start of the pre-construction meeting. (Note: If any of these items are not available to the District’s representative or if the Tract Superintendent, Pipeline Contractor, District inspector or the EVWD Representative are not present, the meeting will be cancelled).  Submittals (check dates).  Cut sheets.  Copy of the Contractor’s safety program.  Copy of the certifications for: 1. Competent Person. 2. Confined Space Entry Supervisor, Attendant and Entrant.  Emergency phone number contact list.  Copy of the Contractor’s License Items discussed:  All requests, questions and guidance are to be through your inspector.  OSHA guidelines and District standards for safety will be strictly adhered to. 1. Confined space entry. 2. Trench shoring.  USA Guidelines 1. If you are calling for remarks, make sure you do not just resend work continuing. 2. Keep your USA current.  Protect fire hydrants 1. Painting (District will not accept painted units) 2. Stamping ID 3. Tack-weld 2 bolt  Water valves 1. Will be operated by District representatives only, when the water line affects district customers in occupied houses or businesses. 2. At the discretion / direction of the Inspector when not on an occupied street. 3. Will be accessible at all times and immediately after paving and final cap paving.  Waterline shutdowns 1. Schedule shutdowns through your Inspector. (no Mondays) 2. All water line shutdowns will be scheduled 5 business days in advance of work. 3. All shut downs will be at the District’s discretion/direction.  Meters. 1. Meters will be issued after approval from the Inspector and EVWD. (after curb & gutters) 2. Meters will be protected in place as per the Districts policy. 3. It is not EVWD’s policy to issue jumpers at any time. 4. Meters will be issued on Mon, Tues, Wed, and Thurs, 8:00 am. -12:00 pm. 5. Sewer must be accepted before meters will be issued. 6. Meters that are in drainage swales will not be accepted.  Disposal of chlorinated water will be per NPDES requirements. (de-chlorinate or dispose on-site) 1. If water leaves the site, the amount will be reported to the District.  All angle stops will be locked off until all bac-t tests have passed and the new facilities have been accepted and meters set.  Please insure your water and sewer plans show any points of connection for water service for your landscape frontages and parks irrigation needs.  Bac T’s and Heterotrophic plate sampling 1. Will be done by your Inspector. 2. It takes a minimum of 96 hours for results. 3. Tests will include all water services and laterals. 4. Tests will not be performed on any water systems currently being fed by a high line.  Tracer wires 1. Will run continuous thru the services and appurtenances. 2. Accessible at meters and appurtenance.  All manholes will be raised and accessible, within five days of paving and final cap paving.  Sewer air testing 1. Initial test after compaction. 2. After repairs (sags, cracks or damage). 3. Last test is after all other utilities have been installed and prior to paving. (base rock)  Video of sewer lines 1. The District requires all video in DVD format (authored). 2. The final DVD presented to the District will be representative of the sewer system, as the District will accept it with no issues pending. 3. Prior to scheduling the video inspection, base rock will be in place and the manhole frames will located at approximate grade for base paving. 4. Video of the sewer lines will be required after any repairs or every line cleaning. Protect in place to avoid possible re-cleaning & video (especially during paving operations) (asphalt, base rock, paint, plaster, solvents etc. are not to be dumped into sewers). 5. Sewer sags of 1/2-inch or greater are not acceptable. 6. Don’t accept bowed chipped or cracked pipe. 7. Plugs are to be removed only at the direction of the District representative.  Mapping of sewer laterals 1. On-site to be completed by contractor. (stress accuracy)  Prior to connecting to live sewer mains, the contractor will notify a District Supervisor thru the Inspector, 2 business days prior to the work.  Plug or cap all water and sewer pipes at the end of workday.  Install false bottoms on all manholes.  Maintaining separation of water and sewer laterals. Don’t wait until Pre-occupancy walks if there is a question. (staking)  Water and sewer line location etched into curb face where they cross the curb. (accuracy) 1. “S” for sewer and “W” for water.  Pre occupancy inspection 1. Will be performed prior to any approval of occupancy. 2. Ask your Inspector for details for coordinating. 3. Must be scheduled minimum 3 business days in advance. 4. Occupancy phasing should include whole streets, manhole-to-manhole. 5. Occupancy inspections will include the sewer lines to the point of discharge of the Tract.  Agriculture wells – If you have agriculture well on site, the District encourages the use of these wells to conserve potable water. Forms and applications must be filled out submitted to the District prior to their use.  Contractor’s responsibility to keep all letters, excavation and OSHA permits up to date. Appendix O Manhole Ring Tolerance Verification Form Project Identification (e.g. Tract No., CUP No., etc…) _____________ Manhole (MH) No. Inlet Flowline Elevation Distance From Inlet Flowline to Top of MH Cone Top of MH Cone Elevation MH Rim Elevation Elevation Difference1 Data provided hereon has been verified. Contractor Inspector 1 Must be 12” (1.0’) minimum to 20” (1.67’) maximum. Appendix P Project Close-Out Checklist The following items must be submitted to EVWD before Projects are accepted by the Board: √ As-Builts Drawings Approved by the Inspector Sewer Video of complete & accepted sewer system on DVD Sewer Mappings – 1 per lot Final Soils Report Agricultural Well Abandonment Certification Grant of Easements Continuity Certification Homeowner Improvement Disclosure Form Back Flow Certs. (Tested & Accepted within 8 months of Acceptance) Final Walkthru with District (See attached Final Inspection Sheet) Fees/Account Paid/Current Developers Engineer to Revise Mylars at EVWD Counter (Stamped Record Drawing) Appendix Q Digital Disk Requirements and Formatting INTRODUCTION In addition to mylar plans, EVWD requires submission of a digital copy of all plans of Tracts, Plot Plans, Parcel Maps, etc. The digital plans should be of the entire project. This data shall be provided once the plans are approved prior to the Construction Meeting. All data shall be submitted on a computer disk (CD), containing data as outlined below. The most important aspect of the submission is the “base” or “line work” that should show the new streets, lots, water, and sewer lines and appurtenances. Plan/profile drawings (PDF’s) of the fully approved (i.e. signed) water and sewer improvement Mylars are also provided. These data will be utilized to update water and wastewater atlas maps in the EVWD Geographic Information System. A fee payable to the District will be required for the work effort to update the District’s atlas maps. The amount of the fee will be the actual costs to perform the required work. Any submissions we receive that are not identified as “design” or “record” requires additional effort and therefore costs to determine the type of submission. DIGITAL DATA DISK REQUIREMENTS FOR “DESIGN” DOCUMENTS 1) All files transmitted will be in DWG (AutoCAD v2010 Drawing) format. 2) Data layering – Data layers must include specified data categories: A) Project boundary. B) Street centerlines. C) Lot lines. D) Water lines and associated water features. E) Wastewater lines and associated wastewater features. Drawing elements are to be placed in every layer for which they belong; i.e., if a line is both a lot line and a boundary line, the line must be placed on both the lot line layer and the boundary layer. 3) Data Integrity – Digital data checking criteria A) The drawing must include one or more known location points, such as a street intersection, section corner, etc., in order to tie the drawing to a real location. B) Base drawings are required to be consistent with State Plane NAD 1983 CA Zone VI Coordinates. Units will be in feet. These specifications regarding data integrity are format independent, although the layering must be consistent. Specific information regarding graphic elements, mapping index grids, etc. can be specified for each format. 4) Specific Layer Information A) All lines representing individual lots will be on the same layer. Every lot will be a closed polygon feature. B) Water and Wastewater utility lines will be represented by polylines. C) Water and Wastewater utility features, such as fire hydrants, manholes and valves, will be represented by points. 5) All reference files shall be imbedded into the drawing format. 6) Additional PDF’s of plan and profile sheets are required. DIGITAL DATA DISK REQUIREMENTS FOR “AS-BUILT” DOCUMENTS 1) Base data in DWG (v2010) format will be required if several design changes have occurred since the initial “design” submittal. This will save time in the GIS data updating process. 2) All CDs will be submitted with labels indicating the following data information: DATE: (Date submitted) MAP NAME: (TR, PM, PP, CUP #’s) DISTRICT IDENTIFICATION: (EVWD Project No.) COMPANY: (Engineering Firm) MEDIA CREATOR: (Person creating CD) FILE NAME: (.DWG or .PDF) PROJECT STATUS: (“Design” or “As-built”) Appendix R Tract/IP Final Inspection Sheet Date _______________ EVWD REP.________________________ Tract / IP# _______________ Developer ________________________ Items to be presented to the District prior to the final inspection: • DVD and CD of water and sewer system. • As-Built drawings. • Easement documents. • The EVWD Inspector’s completed punch list. Note: Final paving must be complete before the final inspection. Present at the inspection: Developer representative: __________________________________ Inspector: __________________________________ Items inspected:  Fire hydrants, blow offs and air vacs. 1. In per plan and specifications. 2. Painted. 3. Bumper posts installed. (If applicable) 4. Facing the right direction. 5. Concrete pads poured. 6. Tracer wire accessible. 7. Air vac screens installed. 8. Outlet caps installed with chains.  Water valves 1. Up in paving, clean and accessible. (Off-site and On-site) 2. Turned on.  Meters 1. Boxes set. - NOT IN SWALE. - 2 feet minimum from driveway. - 5 feet from sewer lateral. 2. Inside of box clean. Rock 3. Tracer wire accessible. 4. Final grade complete.  Sewer manholes and system 1. Manholes up in paving to District specification and accessible. (Off-site and On- site) 2. Sewer system videoed and tested to the discharge point of the tract. 3. Sewer system clean. 4. All sewer plugs removed. Final acceptance: Sign by ___________________ Date _________ NOTE: More than five items for correction will terminate the inspection. Items for correction: __________________________________________ __________________________________________ __________________________________________ Date items corrected: ______________________ Appendix S Atlas Map Updating Procedures for New Development 1. Original design drawings (Mylars) are signed by the District and other appropriate agencies. 2. Developer's Engineer submits original design drawings disk to District’s Development Representative in conformance with District's requirements. 3. District’s Development Representative GIS Department updates the atlas maps with line work indicating facilities are "as designed." 4. Project construction commences. 5. Project construction complete. 6. Developer submits “red-lined as-built drawings” to District’s Development Representative. 7. District’s Development Representative and Inspector confirm Contractor’s “red-lined as-built drawings” are accurate and inspector signs cover sheet indicating such. 8. “Final walk” of constructed improvements is performed and District recommends acceptance of the facilities. 9. District’s Development Representative has duplicate copy made of "red-lined as-built drawings" that they retain until entire process is complete. 10. District’s Development Representative verifies existence of electronic copies (i.e. “PDF’s”) of original fully signed Mylars. 11. Design engineer makes as-built revisions to the original Mylar’s at the District office, at which time all sheets including the face sheet will be stamped record drawing and signed by the “Engineer of Record” along with any noted delta changes within 15 working days. 12. District’s Development Representative has Inspector verify accurate transfer of revisions from red-line plans to Mylars. 13. District’s Development Representative submits a scanned copy of record drawing Mylars to District’s GIS Department. 14. District’s GIS Department updates atlas maps and GIS and changes line work to indicate facilities that exist. Contact Us: District Offices  31111 Greenspot Road  Highland, CA  92346  Phone  (909) 888‐8986  Website   www.eastvalley.org  Table of Contents Pioneering Progress With Chevron Energy Solutions August 27, 2014 Pioneering Progress EVWD will blaze the trail with these leading edge initiatives: Reliable Water   Supply Environmental  Champion Consumer Rate  Steward Community  Partner Workplace   Improvement  Energy  redundancy at key   facilities Produce  self‐generated  clean energy Promote efficiency  within EVWD Promote  conservation,  smarter  consumption, and  customer  engagement Support and  sustain a  desirable  place to work Pioneering Progress Solar Power  Generation Advanced Metering  Infrastructure (AMI) Fuel Cells & Clean  Natural Gas Engines Innovative Community  Engagement Reliable  Water  Supply Environmental  Champion Consumer  Rate Steward Community  Partner Workplace   Improvement Solar PV Let’s tour the shade structures at EVWD HQ Solar PV: 250 Kilowatts Headquarters Solar PV: 1 Megawatt at Plant 39 Advanced Metering Infrastructure (AMI) •Pilot Program, developed at  no risk to EVWD •Supports budget‐based rate   structure •Real time data on water  usage •Customized  recommendations for   conservation •Planning for, and tracking  efficiency activities •Incentivize EVWD customers Fuel Cell Continuous Power Fuel Cell on‐site power generation  provides more than just backup power  availability: •Continuous power generation  seamlessly islands the site in the  event of an electric grid outage •Near‐zero  emissions avoids  AQMD  and CARB permitting issues •Renewable generation raises   EVWD’s profile as a steward of the  environment Clean Natural Gas Engines Using clean natural gas engines to  directly run pumps at critical booster  stations: •Completely remove dependence  on grid power and backup  generators •Link energy costs to stable natural  gas  prices instead of rapidly‐ increasing electric prices •Qualifies for  continuous operation  under AQMD  rules Partnerships with Local School Districts Student education opportunities: – Indoor & outdoor water audits – Leak tests – Water data analysis – Report generation and delivery Closer involvement with the community Positive impact on the next generation of Highland’s community Positive PR celebrating the district's leadership and commitment to the community Solar Picnic Tables and Solar Trash Compactors Convenience Shade Security Efficient  Waste   Management Promoting Leadership Our Communications team is prepared to develop a customized outreach plan for East Valley Water District, that can include a ribbon- cutting event and press release to generate positive PR and community involvement. Proposed Development Plan Phase 1 (2014) Phase 2 (2015) Phase 3 (2016) Phase 4 (2017)Phase 1‐4 Solar PV X AMI X Fuel Cells X X WWTP (fuel cell/hydrogen) Natural Gas Engines X Solar Picnic Tables X Solar Trash Compactors X Community Outreach/Education X Water Smart (pilot) (pilot) (pilot) Pathway to Lasting Success Assess the Opportunity  Develop the Program Implement the Program Realize the Benefits Program   Development Agreement Board Approval‐September 24, 2014 Implementation  Contract Board Approval‐December 2014 Phase 1 Complete September 2015 First Meeting‐March 17, 2014   Program Concept Development:  May‐August 2014 Information Gathering, Data Collection and Collaboration: April 2014 August November Questions? •Presentation by Chevron Energy Solutions –Suzanne Gentilini, Regional Manager –Business Development –Crista Curtis, Business Development Manager  –Jon Eastmond, Project Manager –Conrad Newberry, Jr. P.E., Senior Project Manager