HomeMy WebLinkAboutAgenda Packet - EVWD Board of Directors - 12/13/2023BOARD OF DIRECTORS
DECEMBER 13, 2023
East Valley Water District was formed in 1954 and provides water and wastewater services to
104,000 residents within the cities of San Bernardino and Highland, and portions of San
Bernardino County.
EVWD operates under the direction of a 5member elected Board.
GOVERNING BOARD EXECUTIVE MANAGEMENT
Phillip R. Goodrich
Chairman of the Board
Michael Moore
General Manager/CEO
James Morales, Jr.
ViceChairman
Brian W. Tompkins
Chief Financial Officer
Chris Carrillo
Governing Board Member
Jeff Noelte
Director of Engineering & Operations
Ronald L. Coats
Governing Board Member
Kerrie Bryan
Director of Administrative Services
David E. Smith
Governing Board Member
Patrick Milroy
Operations Manager
Rocky Welborn
Water Reclamation Manager
Justine Hendricksen
District Clerk
Board of Directors Regular Meeting
December 13, 2023 5:30 PM
Closed Session begins at 4:30 p.m.
31111 Greenspot Road, Highland, CA 92346
www.eastvalley.org
PLEASE NOTE:
Materials related to an item on this agenda submitted to the Board after distribution of the
agenda packet are available for public inspection in the District’s office located at 31111
Greenspot Rd., Highland, during normal business hours. Also, such documents are available
on the District’s website at eastvalley.org and are subject to staff’s ability to post the
documents before the meeting.
Pursuant to Government Code Section 54954.2(a), any request for a disabilityrelated
modification or accommodation, including auxiliary aids or services, that is sought in order
to participate in the above agendized public meeting should be directed to the District Clerk
at (909) 8854900 at least 72 hours prior to said meeting.
In order to comply with legal requirements for posting of agenda, only those items filed
with the District Clerk by 12:00 p.m. on Wednesday prior to the following Wednesday
meeting not requiring departmental investigation, will be considered by the Board of
Directors.
CALL TO ORDER
ROLL CALL OF BOARD MEMBERS
PUBLIC COMMENTS
Any person wishing to speak to the Board of Directors is asked to complete a Speaker
Card and submit it to the District Clerk prior to the start of the meeting. Each speaker is
limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State
of California Brown Act, the Board of Directors is prohibited from discussing or taking
action on any item not listed on the posted agenda. The matter will automatically be
referred to staff for an appropriate response or action and may appear on the agenda at a
future meeting.
1.AGENDA
This agenda contains a brief general description of each item to be considered.
Except as otherwise provided by law, no action shall be taken on any item not
appearing on the following agenda unless the Board of Directors makes a
determination that an emergency exists or that a need to take immediate action on
the item came to the attention of the District subsequent to the posting of the
agenda.
a.Approval of Agenda
RECESS INTO CLOSED SESSION
2.CLOSED SESSION
a.CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION
[Government Code Section 54956.9(d)(1)]
Name of Case: Jodi Silsbee, an individual v. East Valley Water District, a
California Nonprofit Corporation, CASE NO. CIVSB 2326757
b.CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION
[Government Code Section 54956.9(d)(1)]
Name of Case: East Valley Water District v. Brucie Cagle, et al., CASE
NO. CIVSB 2112619 [CrossComplaint: Raley v. North Fork Water Company,
et al.]
5:30 PM RECONVENE MEETING
PLEDGE OF ALLEGIANCE
ROLL CALL OF BOARD MEMBERS
ANNOUNCEMENT OF CLOSED SESSION ACTIONS ITEMS
PRESENTATIONS AND CEREMONIAL ITEMS
Public Relations Society of America (PRSA) – 2023 Polaris Awards
PUBLIC COMMENTS
3.APPROVAL OF CONSENT CALENDAR
All matters listed under the Consent Calendar are considered by the Board of
Directors to be routine and will be enacted in one motion. There will be no
discussion of these items prior to the time the board considers the motion unless
members of the board, the administrative staff, or the public request specific items
to be discussed and/or removed from the Consent Calendar.
a.Approve the October 25, 2023 Regular Board Meeting Minutes
b.Approve the November 8, 2023 Regular Board Meeting Minutes
c.Approve Directors' Fees and Expenses for November 2023
d.Accept and File Financial Statements for September 2023
e.Accept and File Financial Statements for October 2023
f.Approve October 2023 Disbursements: Accounts payable disbursements for
the period include check numbers 262011 through 262150, bank drafts, and
ACH payments in the amount of $2,286,945.17 and $519,123.24 for payroll
g.Approve Investment Transaction Report for Month Ended November 30, 2023
h.Convey Sewer Easements for the Messina Housing Development, Tract 20142
i.Resolution 2023.16 and 2023.17 Accepting Dedication of Water and Sewer
System Improvements for Tract 18893, Mediterra Phases 1, 1B & 2
4.INFORMATIONAL ITEMS
a.Review the Draft Popular Annual Financial Report for Year Ended June 30,
2023
5.DISCUSSION AND POSSIBLE ACTION ITEMS
a.Consider Acceptance and File SB 165 Report for Community Facilities District
20211 Mediterra
b.Consider Authorization to Transfer Unclaimed Funds into the District's General
Fund
c.Consider Adoption of Resolution 2023.19 Water Main Seismic Retrofit Project
Notice of Intent to Adopt a Mitigated Negative Declaration and Mitigated
Monitoring and Reporting Program
d.Consider the purchase and installation of Granular Activated Carbon for the
District’s Surface Water Treatment Plant 134
e.Consider Approval of Agreement No. 2023.14 for Pretreatment/FOG
Inspection and Environmental Compliance Services with EEC Environmental
f.Consider Approval of Board Reorganization, appoinment of Executive
Management Team and set the time, day and place for holding meetings.
6.REPORTS
a.Board of Directors’ Reports
b.General Manager/CEO Report
• Water Supply Update
c.Legal Counsel Report
d.Board of Directors’ Comments
ADJOURN
BOARD OF DIRECTORSDECEMBER 13, 2023East Valley Water District was formed in 1954 and provides water and wastewater services to104,000 residents within the cities of San Bernardino and Highland, and portions of SanBernardino County.EVWD operates under the direction of a 5member elected Board.GOVERNING BOARD EXECUTIVE MANAGEMENTPhillip R. GoodrichChairman of the Board Michael MooreGeneral Manager/CEOJames Morales, Jr.ViceChairman Brian W. TompkinsChief Financial OfficerChris CarrilloGoverning Board Member Jeff NoelteDirector of Engineering & OperationsRonald L. CoatsGoverning Board Member Kerrie BryanDirector of Administrative ServicesDavid E. SmithGoverning Board Member Patrick Milroy Operations ManagerRocky Welborn Water Reclamation ManagerJustine Hendricksen
District Clerk
Board of Directors Regular Meeting
December 13, 2023 5:30 PM
Closed Session begins at 4:30 p.m.
31111 Greenspot Road, Highland, CA 92346
www.eastvalley.org
PLEASE NOTE:
Materials related to an item on this agenda submitted to the Board after distribution of the
agenda packet are available for public inspection in the District’s office located at 31111
Greenspot Rd., Highland, during normal business hours. Also, such documents are available
on the District’s website at eastvalley.org and are subject to staff’s ability to post the
documents before the meeting.
Pursuant to Government Code Section 54954.2(a), any request for a disabilityrelated
modification or accommodation, including auxiliary aids or services, that is sought in order
to participate in the above agendized public meeting should be directed to the District Clerk
at (909) 8854900 at least 72 hours prior to said meeting.
In order to comply with legal requirements for posting of agenda, only those items filed
with the District Clerk by 12:00 p.m. on Wednesday prior to the following Wednesday
meeting not requiring departmental investigation, will be considered by the Board of
Directors.
CALL TO ORDER
ROLL CALL OF BOARD MEMBERS
PUBLIC COMMENTS
Any person wishing to speak to the Board of Directors is asked to complete a Speaker
Card and submit it to the District Clerk prior to the start of the meeting. Each speaker is
limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State
of California Brown Act, the Board of Directors is prohibited from discussing or taking
action on any item not listed on the posted agenda. The matter will automatically be
referred to staff for an appropriate response or action and may appear on the agenda at a
future meeting.
1.AGENDA
This agenda contains a brief general description of each item to be considered.
Except as otherwise provided by law, no action shall be taken on any item not
appearing on the following agenda unless the Board of Directors makes a
determination that an emergency exists or that a need to take immediate action on
the item came to the attention of the District subsequent to the posting of the
agenda.
a.Approval of Agenda
RECESS INTO CLOSED SESSION
2.CLOSED SESSION
a.CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION
[Government Code Section 54956.9(d)(1)]
Name of Case: Jodi Silsbee, an individual v. East Valley Water District, a
California Nonprofit Corporation, CASE NO. CIVSB 2326757
b.CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION
[Government Code Section 54956.9(d)(1)]
Name of Case: East Valley Water District v. Brucie Cagle, et al., CASE
NO. CIVSB 2112619 [CrossComplaint: Raley v. North Fork Water Company,
et al.]
5:30 PM RECONVENE MEETING
PLEDGE OF ALLEGIANCE
ROLL CALL OF BOARD MEMBERS
ANNOUNCEMENT OF CLOSED SESSION ACTIONS ITEMS
PRESENTATIONS AND CEREMONIAL ITEMS
Public Relations Society of America (PRSA) – 2023 Polaris Awards
PUBLIC COMMENTS
3.APPROVAL OF CONSENT CALENDAR
All matters listed under the Consent Calendar are considered by the Board of
Directors to be routine and will be enacted in one motion. There will be no
discussion of these items prior to the time the board considers the motion unless
members of the board, the administrative staff, or the public request specific items
to be discussed and/or removed from the Consent Calendar.
a.Approve the October 25, 2023 Regular Board Meeting Minutes
b.Approve the November 8, 2023 Regular Board Meeting Minutes
c.Approve Directors' Fees and Expenses for November 2023
d.Accept and File Financial Statements for September 2023
e.Accept and File Financial Statements for October 2023
f.Approve October 2023 Disbursements: Accounts payable disbursements for
the period include check numbers 262011 through 262150, bank drafts, and
ACH payments in the amount of $2,286,945.17 and $519,123.24 for payroll
g.Approve Investment Transaction Report for Month Ended November 30, 2023
h.Convey Sewer Easements for the Messina Housing Development, Tract 20142
i.Resolution 2023.16 and 2023.17 Accepting Dedication of Water and Sewer
System Improvements for Tract 18893, Mediterra Phases 1, 1B & 2
4.INFORMATIONAL ITEMS
a.Review the Draft Popular Annual Financial Report for Year Ended June 30,
2023
5.DISCUSSION AND POSSIBLE ACTION ITEMS
a.Consider Acceptance and File SB 165 Report for Community Facilities District
20211 Mediterra
b.Consider Authorization to Transfer Unclaimed Funds into the District's General
Fund
c.Consider Adoption of Resolution 2023.19 Water Main Seismic Retrofit Project
Notice of Intent to Adopt a Mitigated Negative Declaration and Mitigated
Monitoring and Reporting Program
d.Consider the purchase and installation of Granular Activated Carbon for the
District’s Surface Water Treatment Plant 134
e.Consider Approval of Agreement No. 2023.14 for Pretreatment/FOG
Inspection and Environmental Compliance Services with EEC Environmental
f.Consider Approval of Board Reorganization, appoinment of Executive
Management Team and set the time, day and place for holding meetings.
6.REPORTS
a.Board of Directors’ Reports
b.General Manager/CEO Report
• Water Supply Update
c.Legal Counsel Report
d.Board of Directors’ Comments
ADJOURN
BOARD OF DIRECTORSDECEMBER 13, 2023East Valley Water District was formed in 1954 and provides water and wastewater services to104,000 residents within the cities of San Bernardino and Highland, and portions of SanBernardino County.EVWD operates under the direction of a 5member elected Board.GOVERNING BOARD EXECUTIVE MANAGEMENTPhillip R. GoodrichChairman of the Board Michael MooreGeneral Manager/CEOJames Morales, Jr.ViceChairman Brian W. TompkinsChief Financial OfficerChris CarrilloGoverning Board Member Jeff NoelteDirector of Engineering & OperationsRonald L. CoatsGoverning Board Member Kerrie BryanDirector of Administrative ServicesDavid E. SmithGoverning Board Member Patrick Milroy Operations ManagerRocky Welborn Water Reclamation ManagerJustine HendricksenDistrict ClerkBoard of Directors Regular Meeting December 13, 2023 5:30 PMClosed Session begins at 4:30 p.m.31111 Greenspot Road, Highland, CA 92346 www.eastvalley.orgPLEASE NOTE:Materials related to an item on this agenda submitted to the Board after distribution of theagenda packet are available for public inspection in the District’s office located at 31111Greenspot Rd., Highland, during normal business hours. Also, such documents are availableon the District’s website at eastvalley.org and are subject to staff’s ability to post thedocuments before the meeting.Pursuant to Government Code Section 54954.2(a), any request for a disabilityrelatedmodification or accommodation, including auxiliary aids or services, that is sought in orderto participate in the above agendized public meeting should be directed to the District Clerkat (909) 8854900 at least 72 hours prior to said meeting.
In order to comply with legal requirements for posting of agenda, only those items filed
with the District Clerk by 12:00 p.m. on Wednesday prior to the following Wednesday
meeting not requiring departmental investigation, will be considered by the Board of
Directors.
CALL TO ORDER
ROLL CALL OF BOARD MEMBERS
PUBLIC COMMENTS
Any person wishing to speak to the Board of Directors is asked to complete a Speaker
Card and submit it to the District Clerk prior to the start of the meeting. Each speaker is
limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State
of California Brown Act, the Board of Directors is prohibited from discussing or taking
action on any item not listed on the posted agenda. The matter will automatically be
referred to staff for an appropriate response or action and may appear on the agenda at a
future meeting.
1.AGENDA
This agenda contains a brief general description of each item to be considered.
Except as otherwise provided by law, no action shall be taken on any item not
appearing on the following agenda unless the Board of Directors makes a
determination that an emergency exists or that a need to take immediate action on
the item came to the attention of the District subsequent to the posting of the
agenda.
a.Approval of Agenda
RECESS INTO CLOSED SESSION
2.CLOSED SESSION
a.CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION
[Government Code Section 54956.9(d)(1)]
Name of Case: Jodi Silsbee, an individual v. East Valley Water District, a
California Nonprofit Corporation, CASE NO. CIVSB 2326757
b.CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION
[Government Code Section 54956.9(d)(1)]
Name of Case: East Valley Water District v. Brucie Cagle, et al., CASE
NO. CIVSB 2112619 [CrossComplaint: Raley v. North Fork Water Company,
et al.]
5:30 PM RECONVENE MEETING
PLEDGE OF ALLEGIANCE
ROLL CALL OF BOARD MEMBERS
ANNOUNCEMENT OF CLOSED SESSION ACTIONS ITEMS
PRESENTATIONS AND CEREMONIAL ITEMS
Public Relations Society of America (PRSA) – 2023 Polaris Awards
PUBLIC COMMENTS
3.APPROVAL OF CONSENT CALENDAR
All matters listed under the Consent Calendar are considered by the Board of
Directors to be routine and will be enacted in one motion. There will be no
discussion of these items prior to the time the board considers the motion unless
members of the board, the administrative staff, or the public request specific items
to be discussed and/or removed from the Consent Calendar.
a.Approve the October 25, 2023 Regular Board Meeting Minutes
b.Approve the November 8, 2023 Regular Board Meeting Minutes
c.Approve Directors' Fees and Expenses for November 2023
d.Accept and File Financial Statements for September 2023
e.Accept and File Financial Statements for October 2023
f.Approve October 2023 Disbursements: Accounts payable disbursements for
the period include check numbers 262011 through 262150, bank drafts, and
ACH payments in the amount of $2,286,945.17 and $519,123.24 for payroll
g.Approve Investment Transaction Report for Month Ended November 30, 2023
h.Convey Sewer Easements for the Messina Housing Development, Tract 20142
i.Resolution 2023.16 and 2023.17 Accepting Dedication of Water and Sewer
System Improvements for Tract 18893, Mediterra Phases 1, 1B & 2
4.INFORMATIONAL ITEMS
a.Review the Draft Popular Annual Financial Report for Year Ended June 30,
2023
5.DISCUSSION AND POSSIBLE ACTION ITEMS
a.Consider Acceptance and File SB 165 Report for Community Facilities District
20211 Mediterra
b.Consider Authorization to Transfer Unclaimed Funds into the District's General
Fund
c.Consider Adoption of Resolution 2023.19 Water Main Seismic Retrofit Project
Notice of Intent to Adopt a Mitigated Negative Declaration and Mitigated
Monitoring and Reporting Program
d.Consider the purchase and installation of Granular Activated Carbon for the
District’s Surface Water Treatment Plant 134
e.Consider Approval of Agreement No. 2023.14 for Pretreatment/FOG
Inspection and Environmental Compliance Services with EEC Environmental
f.Consider Approval of Board Reorganization, appoinment of Executive
Management Team and set the time, day and place for holding meetings.
6.REPORTS
a.Board of Directors’ Reports
b.General Manager/CEO Report
• Water Supply Update
c.Legal Counsel Report
d.Board of Directors’ Comments
ADJOURN
BOARD OF DIRECTORSDECEMBER 13, 2023East Valley Water District was formed in 1954 and provides water and wastewater services to104,000 residents within the cities of San Bernardino and Highland, and portions of SanBernardino County.EVWD operates under the direction of a 5member elected Board.GOVERNING BOARD EXECUTIVE MANAGEMENTPhillip R. GoodrichChairman of the Board Michael MooreGeneral Manager/CEOJames Morales, Jr.ViceChairman Brian W. TompkinsChief Financial OfficerChris CarrilloGoverning Board Member Jeff NoelteDirector of Engineering & OperationsRonald L. CoatsGoverning Board Member Kerrie BryanDirector of Administrative ServicesDavid E. SmithGoverning Board Member Patrick Milroy Operations ManagerRocky Welborn Water Reclamation ManagerJustine HendricksenDistrict ClerkBoard of Directors Regular Meeting December 13, 2023 5:30 PMClosed Session begins at 4:30 p.m.31111 Greenspot Road, Highland, CA 92346 www.eastvalley.orgPLEASE NOTE:Materials related to an item on this agenda submitted to the Board after distribution of theagenda packet are available for public inspection in the District’s office located at 31111Greenspot Rd., Highland, during normal business hours. Also, such documents are availableon the District’s website at eastvalley.org and are subject to staff’s ability to post thedocuments before the meeting.Pursuant to Government Code Section 54954.2(a), any request for a disabilityrelatedmodification or accommodation, including auxiliary aids or services, that is sought in orderto participate in the above agendized public meeting should be directed to the District Clerkat (909) 8854900 at least 72 hours prior to said meeting.In order to comply with legal requirements for posting of agenda, only those items filedwith the District Clerk by 12:00 p.m. on Wednesday prior to the following Wednesdaymeeting not requiring departmental investigation, will be considered by the Board ofDirectors.CALL TO ORDERROLL CALL OF BOARD MEMBERSPUBLIC COMMENTSAny person wishing to speak to the Board of Directors is asked to complete a SpeakerCard and submit it to the District Clerk prior to the start of the meeting. Each speaker islimited to three (3) minutes, unless waived by the Chairman of the Board. Under the Stateof California Brown Act, the Board of Directors is prohibited from discussing or takingaction on any item not listed on the posted agenda. The matter will automatically bereferred to staff for an appropriate response or action and may appear on the agenda at afuture meeting.1.AGENDAThis agenda contains a brief general description of each item to be considered.Except as otherwise provided by law, no action shall be taken on any item notappearing on the following agenda unless the Board of Directors makes adetermination that an emergency exists or that a need to take immediate action onthe item came to the attention of the District subsequent to the posting of theagenda.a.Approval of AgendaRECESS INTO CLOSED SESSION2.CLOSED SESSIONa.CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION[Government Code Section 54956.9(d)(1)]Name of Case: Jodi Silsbee, an individual v. East Valley Water District, aCalifornia Nonprofit Corporation, CASE NO. CIVSB 2326757 b.CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION[Government Code Section 54956.9(d)(1)]Name of Case: East Valley Water District v. Brucie Cagle, et al., CASENO. CIVSB 2112619 [CrossComplaint: Raley v. North Fork Water Company,et al.]5:30 PM RECONVENE MEETING
PLEDGE OF ALLEGIANCE
ROLL CALL OF BOARD MEMBERS
ANNOUNCEMENT OF CLOSED SESSION ACTIONS ITEMS
PRESENTATIONS AND CEREMONIAL ITEMS
Public Relations Society of America (PRSA) – 2023 Polaris Awards
PUBLIC COMMENTS
3.APPROVAL OF CONSENT CALENDAR
All matters listed under the Consent Calendar are considered by the Board of
Directors to be routine and will be enacted in one motion. There will be no
discussion of these items prior to the time the board considers the motion unless
members of the board, the administrative staff, or the public request specific items
to be discussed and/or removed from the Consent Calendar.
a.Approve the October 25, 2023 Regular Board Meeting Minutes
b.Approve the November 8, 2023 Regular Board Meeting Minutes
c.Approve Directors' Fees and Expenses for November 2023
d.Accept and File Financial Statements for September 2023
e.Accept and File Financial Statements for October 2023
f.Approve October 2023 Disbursements: Accounts payable disbursements for
the period include check numbers 262011 through 262150, bank drafts, and
ACH payments in the amount of $2,286,945.17 and $519,123.24 for payroll
g.Approve Investment Transaction Report for Month Ended November 30, 2023
h.Convey Sewer Easements for the Messina Housing Development, Tract 20142
i.Resolution 2023.16 and 2023.17 Accepting Dedication of Water and Sewer
System Improvements for Tract 18893, Mediterra Phases 1, 1B & 2
4.INFORMATIONAL ITEMS
a.Review the Draft Popular Annual Financial Report for Year Ended June 30,
2023
5.DISCUSSION AND POSSIBLE ACTION ITEMS
a.Consider Acceptance and File SB 165 Report for Community Facilities District
20211 Mediterra
b.Consider Authorization to Transfer Unclaimed Funds into the District's General
Fund
c.Consider Adoption of Resolution 2023.19 Water Main Seismic Retrofit Project
Notice of Intent to Adopt a Mitigated Negative Declaration and Mitigated
Monitoring and Reporting Program
d.Consider the purchase and installation of Granular Activated Carbon for the
District’s Surface Water Treatment Plant 134
e.Consider Approval of Agreement No. 2023.14 for Pretreatment/FOG
Inspection and Environmental Compliance Services with EEC Environmental
f.Consider Approval of Board Reorganization, appoinment of Executive
Management Team and set the time, day and place for holding meetings.
6.REPORTS
a.Board of Directors’ Reports
b.General Manager/CEO Report
• Water Supply Update
c.Legal Counsel Report
d.Board of Directors’ Comments
ADJOURN
BOARD OF DIRECTORSDECEMBER 13, 2023East Valley Water District was formed in 1954 and provides water and wastewater services to104,000 residents within the cities of San Bernardino and Highland, and portions of SanBernardino County.EVWD operates under the direction of a 5member elected Board.GOVERNING BOARD EXECUTIVE MANAGEMENTPhillip R. GoodrichChairman of the Board Michael MooreGeneral Manager/CEOJames Morales, Jr.ViceChairman Brian W. TompkinsChief Financial OfficerChris CarrilloGoverning Board Member Jeff NoelteDirector of Engineering & OperationsRonald L. CoatsGoverning Board Member Kerrie BryanDirector of Administrative ServicesDavid E. SmithGoverning Board Member Patrick Milroy Operations ManagerRocky Welborn Water Reclamation ManagerJustine HendricksenDistrict ClerkBoard of Directors Regular Meeting December 13, 2023 5:30 PMClosed Session begins at 4:30 p.m.31111 Greenspot Road, Highland, CA 92346 www.eastvalley.orgPLEASE NOTE:Materials related to an item on this agenda submitted to the Board after distribution of theagenda packet are available for public inspection in the District’s office located at 31111Greenspot Rd., Highland, during normal business hours. Also, such documents are availableon the District’s website at eastvalley.org and are subject to staff’s ability to post thedocuments before the meeting.Pursuant to Government Code Section 54954.2(a), any request for a disabilityrelatedmodification or accommodation, including auxiliary aids or services, that is sought in orderto participate in the above agendized public meeting should be directed to the District Clerkat (909) 8854900 at least 72 hours prior to said meeting.In order to comply with legal requirements for posting of agenda, only those items filedwith the District Clerk by 12:00 p.m. on Wednesday prior to the following Wednesdaymeeting not requiring departmental investigation, will be considered by the Board ofDirectors.CALL TO ORDERROLL CALL OF BOARD MEMBERSPUBLIC COMMENTSAny person wishing to speak to the Board of Directors is asked to complete a SpeakerCard and submit it to the District Clerk prior to the start of the meeting. Each speaker islimited to three (3) minutes, unless waived by the Chairman of the Board. Under the Stateof California Brown Act, the Board of Directors is prohibited from discussing or takingaction on any item not listed on the posted agenda. The matter will automatically bereferred to staff for an appropriate response or action and may appear on the agenda at afuture meeting.1.AGENDAThis agenda contains a brief general description of each item to be considered.Except as otherwise provided by law, no action shall be taken on any item notappearing on the following agenda unless the Board of Directors makes adetermination that an emergency exists or that a need to take immediate action onthe item came to the attention of the District subsequent to the posting of theagenda.a.Approval of AgendaRECESS INTO CLOSED SESSION2.CLOSED SESSIONa.CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION[Government Code Section 54956.9(d)(1)]Name of Case: Jodi Silsbee, an individual v. East Valley Water District, aCalifornia Nonprofit Corporation, CASE NO. CIVSB 2326757 b.CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION[Government Code Section 54956.9(d)(1)]Name of Case: East Valley Water District v. Brucie Cagle, et al., CASENO. CIVSB 2112619 [CrossComplaint: Raley v. North Fork Water Company,et al.]5:30 PM RECONVENE MEETINGPLEDGE OF ALLEGIANCEROLL CALL OF BOARD MEMBERSANNOUNCEMENT OF CLOSED SESSION ACTIONS ITEMSPRESENTATIONS AND CEREMONIAL ITEMSPublic Relations Society of America (PRSA) – 2023 Polaris AwardsPUBLIC COMMENTS3.APPROVAL OF CONSENT CALENDARAll matters listed under the Consent Calendar are considered by the Board ofDirectors to be routine and will be enacted in one motion. There will be nodiscussion of these items prior to the time the board considers the motion unlessmembers of the board, the administrative staff, or the public request specific itemsto be discussed and/or removed from the Consent Calendar.a.Approve the October 25, 2023 Regular Board Meeting Minutesb.Approve the November 8, 2023 Regular Board Meeting Minutesc.Approve Directors' Fees and Expenses for November 2023d.Accept and File Financial Statements for September 2023e.Accept and File Financial Statements for October 2023f.Approve October 2023 Disbursements: Accounts payable disbursements forthe period include check numbers 262011 through 262150, bank drafts, andACH payments in the amount of $2,286,945.17 and $519,123.24 for payrollg.Approve Investment Transaction Report for Month Ended November 30, 2023h.Convey Sewer Easements for the Messina Housing Development, Tract 20142i.Resolution 2023.16 and 2023.17 Accepting Dedication of Water and SewerSystem Improvements for Tract 18893, Mediterra Phases 1, 1B & 24.INFORMATIONAL ITEMSa.Review the Draft Popular Annual Financial Report for Year Ended June 30,20235.DISCUSSION AND POSSIBLE ACTION ITEMSa.Consider Acceptance and File SB 165 Report for Community Facilities District
20211 Mediterra
b.Consider Authorization to Transfer Unclaimed Funds into the District's General
Fund
c.Consider Adoption of Resolution 2023.19 Water Main Seismic Retrofit Project
Notice of Intent to Adopt a Mitigated Negative Declaration and Mitigated
Monitoring and Reporting Program
d.Consider the purchase and installation of Granular Activated Carbon for the
District’s Surface Water Treatment Plant 134
e.Consider Approval of Agreement No. 2023.14 for Pretreatment/FOG
Inspection and Environmental Compliance Services with EEC Environmental
f.Consider Approval of Board Reorganization, appoinment of Executive
Management Team and set the time, day and place for holding meetings.
6.REPORTS
a.Board of Directors’ Reports
b.General Manager/CEO Report
• Water Supply Update
c.Legal Counsel Report
d.Board of Directors’ Comments
ADJOURN
Agenda Item
#3a
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #3a
Consent Item
Regular Board Meeting with Closed Session
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Approve the October 25, 2023 Regular Board Meeting Minutes
RECOMMENDATION
That the Board of Directors approve the October 25, 2023 regular Board meeting
minutes as submitted.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
B. Utilize Effective Communication Methods
REVIEW BY OTHERS
This agenda item has been reviewed by Administration.
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Justine Hendricksen
District Clerk
ATTACHMENTS
Draft October 25, 2023 Regular Board Meeting Minutes
Regular Board Meeting
Meeting Date: October 25, 2023
CALL TO ORDER
The Chairman of the Board called the meeting to order at 5:30 p.m.
PLEDGE OF ALLEGIANCE
Director Coats led the flag salute.
ROLL CALL OF BOARD MEMBERS
PRESENT
Directors: Carrillo, Coats, Goodrich, Morales, Smith
ABSENT
None
STAFF
Jeff Noelte, Director of Engineering and Operations; Brian Tompkins, Chief Financial
Officer; Patrick Milroy, Operations Manager; Rocky Welborn, Water Reclamation
Manager; William Ringland, Public Affairs/Conservation Manager; Rudy Guerrero,
Finance Supervisor; Christi Koide, Business Services Coordinator; Shayla Antrim,
Administrative Specialist
LEGAL COUNSEL
None
GUESTS
Members of the public
PUBLIC COMMENTS
Chairman Goodrich declared the public participation section of the meeting open at 5:31
p.m.
There being no written or verbal comments, the public participation section was closed.
Draft pending approval
1
3
0
9
1.APPROVAL OF AGENDA
a.Approval of Agenda
A motion was made by Director Carrillo, seconded by Director Coats, that the Board
approve the October 25, 2023 agenda as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
2.APPROVAL OF CONSENT CALENDAR
a.Approve the October 11, 2023 Regular Board Meeting Minutes
b.Accept and File Investment Report for Quarter Ended September 30, 2023
c.Accept and File Financial Statements for July 2023
d.Accept and File Financial Statement for August 2023
e.Approve Board Meeting Cancellations
A motion was made by Director Coats, seconded by Director Smith, that the Board
approve the Consent Calendar items as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
3.DISCUSSION AND POSSIBLE ACTION ITEMS
a.Consider Approval of the Annual Comprehensive Financial Report for Year
Ended June 30, 2023
Mr. Scott Manno, Partner at Rogers, Anderson, Malody & Scott, LLP (RAMS), of the
District’s auditing firm, provided an overview of the audit report process and the letters
included in the report. He stated that the audit procedures are in compliance with
Government Auditing Standards. He stated that there were no significant changes in
financial reporting from the prior year. He reviewed highlights of the SAS 114 letter and
stated that there were no auditing adjustments.
The Finance Supervisor provided an in-depth presentation regarding the District’s
Annual Comprehensive Financial Report including but not limited to the District’s
financial condition, outstanding debt, unrestricted reserves, changes in net position,
expenditures, and debt service coverage.
The Finance Supervisor noted a correction to page 3 of the presentation: $147.3 Million
should read $147.8 Million.
Staff responded to several questions by the Board.
1
3
0
9
A motion was made by Vice Chairman Morales, seconded by Director Coats, that the
Board approve the Annual Comprehensive Financial Report for the year ended June 30,
2023.
The motion was carried by the following vote:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
b.Consider Approval of Conservation and Public Affairs Design Services
Contract with SG Creative and We The Creative
The Public Affairs/Conservation Manager reviewed professional services agreements
with SG Creative and We The Creative for on-call design services. He discussed an
overview of each firm, the tasks they will be performing, the request for proposal (RFP)
and selection process and terms of the agreements.
A motion was made by Vice Chairman Morales, seconded by Director Carrillo, that the
Board approve professional services agreements with SG Creative and We The Creative
for on-call creative design services as submitted.
The motion was carried by the following vote:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
c.Consider Approval of Amendments to the Memorandum of Understanding
and Cost Share Agreement for the Bunker Hill Basin Regional Recycled
Water Feasibility Study
The Director of Engineering and Operations provided information regarding
amendments to the Memorandum of Understanding (MOU) and Cost Share Agreement
for the Bunker Hill Basin Regional Recycled Water Feasibility Study. He provided
background information on the formation of the MOU and agreements and details of
the amendments.
A motion was made by Director Coats, seconded by Director Carrillo, that the Board
approve amendment No. 01 to the Memorandum of Understanding and amendment No.
01 to the Cost Share Agreement for the Bunker Hill Basin Regional Water Feasibility
Study and authorize de minimis changes to the amendments as submitted.
The motion was carried by the following vote:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
1
3
0
9
4.REPORTS
a.Board of Directors’ Reports
Director Carrillo reported on the following: October 17 he participated in the Inland
Action meeting via Zoom; October 18 he attended the City of San Bernardino City
Council meeting where he reported that Charles Montoya was appointed city manager;
and October 23 he met with the General Manager/CEO to discuss District business and
to review the agenda.
Director Coats reported on the following: October 16 he attended the Association of San
Bernardino County Special Districts Board meeting where they discussed Association
business; October 17 he attended the District’s Facilities Tour; October 18 he met with
the General Manager/CEO to discuss District business; October 18 he attended San
Bernardino Valley Municipal Water District’s policy workshop where they discussed
developing a master plan for the Sunrise Ranch Project; October 19 he attended the
East Valley Employee Events Association Jacket Drive luncheon; October 23 he attended
the Association of San Bernardino County Special Districts monthly meeting where the
topic was the Replenish Big Bear project; October 24 he attended the City of San
Bernardino Water Department Board meeting where they approved multiple service and
equipment contracts; and October 24 he attended the Highland Chamber of Commerce
monthly meeting where the guest speaker was Mark Cloud, Public Affairs Manager for
Southern California Edison.
Director Smith reported on the following: October 23 he attended the Association of
San Bernardino County Special Districts monthly meeting where the topic was the
Replenish Big Bear project; and October 24 he attended the Highland Chamber of
Commerce monthly meeting where the keynote speaker discussed Southern California
Edison’s grid.
Vice Chairman Morales reported on the following: October 18 he attended San
Bernardino Valley Municipal Water District’s policy workshop where they discussed the
Sunrise Ranch Master Plan; October 19 he met with the General Manager/CEO to
review the agenda and was provided District updates; and October 20 he attended the
Association of California Water Agencies Region 9 Board meeting where they discussed
their local member engagement plan and the upcoming annual conference.
Chairman Goodrich reported on the following: October 12 he attended the Legislative &
Public Outreach Committee meeting; October 19 he met with the General Manager/CEO
to review the agenda and to discuss District business; October 23 he attended the
Association of San Bernardino County Special Districts monthly meeting where the topic
was the Replenish Big Bear project; and October 24 he attended the Highland Chamber
of Commerce meeting where speaker Mark Cloud, from Southern California Edison,
discussed decarbonizing California.
1
3
0
9
For information only.
b.General Manager/CEO Report
The Director of Engineering and Operations reported the following:
•October 19 the District participated in the Great California ShakeOut earthquake
drill where staff dropped, covered, and held on at the announcement of the
“quake,” and evacuated to the outside staging area. District satellite phones and
handheld radios were also tested to practice the District’s emergency response
procedures.
•October 19 the Employee Events Association hosted a Jacket Drive and luncheon
for staff. Staff raised funds to donate jackets to Jefferson Hunt Elementary
School with the donations planned to be delivered next week.
•The District hosted the Community Facility Tour providing a behind-the-scenes
look at District operations and facilities. Another tour will be hosted in Spring
2024 and the community is invited to participate in one of these tours if they
haven’t done so already.
•October 21 a Conservation workshop was held at the Sterling Natural Resource
Center to provide information and tips on water-efficient yard maintenance. Over
80 members of the community participated in the workshop with multiple first-
time attendees.
•As part of the District’s commitment to educational partnerships and the Water
and Wastewater Pathway Program, field staff conducted an equipment
demonstration for the freshmen and sophomore students at Entrepreneur High
School.
For information only.
c.Legal Counsel Report
Legal Counsel not present. No report at this time.
d.Board of Directors’ Comments
Director Smith commended the Chief Financial Officer for achieving the 11th Certificate
of Achievement for Excellence in Financial Reporting from the Government Officers
Finance Association (GFOA) for the District.
1
3
0
9
Director Coats recognized the Chief Financial Officer and staff for how well they put all
the documents together for the auditors (reflecting on a comment made by the auditor
during the presentation).
Vice Chairman Morales commented on the Great ShakeOut earthquake drill and stated
that the text message that went out was a nice addition. He commended the Employee
Association for all that they do. He stated that he received positive feedback regarding
the District’s facilities tour.
Chairman Goodrich expressed appreciation for the public's engagement and attendance
at Board meetings.
For information only.
ADJOURN
Chairman Goodrich adjourned the meeting at 6:31 p.m.
Phillip R. Goodrich, Board President
Michael Moore, Board Secretary
Agenda Item
#3b
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #3b
Consent Item
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Approve the November 8, 2023 Regular Board Meeting Minutes
RECOMMENDATION
That the Board of Directors approve the November 8, 2023 regular Board meeting
minutes as submitted.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
B. Utilize Effective Communication Methods
REVIEW BY OTHERS
This agenda item has been reviewed by Administration.
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Justine Hendricksen
District Clerk
ATTACHMENTS
Draft November 8, 2023 Regular Board Meeting Minutes
Regular Board Meeting
Meeting Date: November 8, 2023
CALL TO ORDER
The Chairman of the Board called the meeting to order at 4:31 p.m.
ROLL CALL OF BOARD MEMBERS
PRESENT
Directors: Carrillo, Coats, Goodrich, Morales, Smith
ABSENT
None
STAFF
Michael Moore, General Manager/CEO; Brian Tompkins, Chief Financial Officer; Jeff
Noelte, Director of Engineering and Operations; Rocky Welborn, Water Reclamation
Manager; William Ringland, Public Affairs/Conservation Manager; Matt Armitage, Meter
Technician III; Rudy Guerrero, Finance Supervisor; Justine Hendricksen, District Clerk
LEGAL COUNSEL
Marty Cihigoyenetche
GUESTS
Members of the public
PUBLIC COMMENTS
Chairman Goodrich declared the public participation section of the meeting open at 4:31
p.m.
There being no written or verbal comments, the public participation section was closed.
1.APPROVAL OF AGENDA
Subject to approval
1
2
0
1
a.Approval of Agenda
A motion was made by Director Smith, seconded by Director Coats, that the Board
approve the November 8, 2023 agenda as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
2.RECESS INTO CLOSED SESSION
The Board entered into Closed Session at 4:32 p.m. as provided in the Ralph M. Brown
Act Government Code Section 54956.9(d)(1) to discuss the items listed on the agenda.
RECONVENE THE MEETING
The Board reconvened the meeting at 5:30 p.m.
PLEDGE OF ALLEGIANCE
Director Coats led the flag salute.
ROLL CALL OF BOARD MEMBERS
PRESENT
Directors: Carrillo, Coats, Goodrich, Morales, Smith
ABSENT
None
ANNOUNCEMENT OF CLOSED SESSION ACTIONS
With respect to Item #2.a. legal counsel stated that no reportable action was taken.
PRESENTATIONS AND CEREMONIAL ITEMS
•Presentation to Matthew Armitage for 25 Years of Dedicated Public Service
The General Manager/CEO presented Mr. Matthew Armitage with a framed resolution
for 25 years of dedicated service to the District.
Information only.
PUBLIC COMMENTS
Chairman Goodrich declared the public participation section of the meeting open at 5:40
p.m.
There being no written or verbal comments, the public participation section was closed.
1
2
0
1
3.APPROVAL OF CONSENT CALENDAR
a.Approve Directors’ Fees and Expenses for October 2023
b.Approve September 2023 Disbursements: Accounts payable
disbursements for the period include check numbers 261827 through
262010, bank drafts, and ACH payments in the amount of $4,831,747.78
and $679,870.84 for payroll
c.Approve Investment Transaction Report for Month Ended October 31, 2023
A motion was made by Director Coats, seconded by Director Carrillo, that the Board
approve the Consent Calendar items as submitted.
The motion carried by the following:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
4.INFORMATIONAL ITEMS
a. Update on District Performance Measurements
The General Manager/CEO provided and overview on the District’s performance
measurements and stated that the measurements provide guidance on how the District
is performing relative to industry guidelines and the Strategic Plan. He introduced Mr.
Rudy Guerrero to present this item.
Mr. Guerrero stated that the District is committed to delivering world class service to
our community, customers and stakeholders. As part of the District's continuous
improvement efforts, the District established performance measurements that offer
valuable insight into the District’s performance compared to other agencies. The
benchmarks will be used as tools to enhance operations, foster trust and transparency,
and the continuous efforts to invest in resources to enhance District operations.
Mr. Guerrero stated that the performance measurements will be presented to the Board
semi-annually. He reviewed seven performance measurements, discussing minimum
and maximum target levels including: operating fund, capital replacement reserve fund,
sewer pipeline maintenance, water main leaks, staffing levels, water affordability and
customer wait times.
Staff responded to several questions from the Board.
Information only, no action required.
b. Sterling Natural Resource Center Update
The General Manager/CEO provided an overview of the Sterling Natural Resource
Center (SNRC) project and stated that there are approximately 15 critical paths that
1
2
0
1
need to be addressed prior to the start-up of the plant. He stated that staff meets
daily/weekly to discuss these items, including the timeline of the project. He introduced
Mr. Jeff Noelte to present the project update.
Mr. Noelte stated that the Sterling Natural Resource Center is a progressive design-build
project that will treat 8 million gallons (MGD) of wastewater per day with an expansion
of up to 10 MGD. He stated that 100% of the recycled water will recharge the local
groundwater basin and that combined heat and power generation via biosolids co-
digestion will produce 3 megawatts of electricity.
Mr. Noelte provided information regarding the project, including but not limited to:
project execution, the permit process for 60 permits from 20 agencies, final
construction activity, pump station, membrane system, and the regional recycled water
pipeline from the SNRC to the Weaver Basins. He also provided a final timeline schedule
for the project.
Staff responded to several questions from the Board.
Information only, no action required.
5.DISCUSSION AND POSSIBLE ACTION ITEMS
a. Consider Adoption of Resolution 2023.18 – Participation in the Great
California ShakeOut
A motion was made by Director Coats, seconded by Director Smith, that the Board of
Directors adopt Resolution 2023.18 as submitted.
The motion was carried by the following vote:
Ayes: Carrillo, Coats, Goodrich, Morales, Smith
Noes: None
Absent: None
6.REPORTS
a.Board of Directors’ Reports
Director Carrillo reported on the following: October 31 he attended Inland Action where
Congressman Agular was the presenter; November 3 he met with the General
Manager/CEO to review the agenda and discuss District business; and November 7 he
attended Inland Action where the County’s new Chief Executive Officer, Luther Snoke,
gave an update on county services.
Director Coats reported on the following: November 1 he participated in a webinar titled
“Special District Socialites: How to Combat Rumors and Protect your District’s
1
2
0
1
Reputation”; November 7 he met with the General Manager/CEO to review the agenda
and discuss District business; and November 8 he participated in a webinar titled "Is
your Website ADA Compliant”.
Director Smith reported on the following: October 31 he met with the General
Manager/CEO to review the agenda and discuss District business; and November 8 he
attended the San Bernardino Valley Water Conservation’s board meeting via Zoom.
Vice Chairman Morales reported on the following: November 2 he attend San
Bernardino Valley Municipal Water District’s (Valley District) policy meeting where they
received investment portfolio updates and reviewed investment policies; November 2 he
met with the General Manager/CEO to discuss District business; and November 7 he
attended Valley District’s Board meeting where they were provided a status update on
their enhanced recharge project and reported that they are eight months ahead of
schedule.
Chairman Goodrich reported on the following: October 26 he attended the Highland
Senior Center volunteer awards banquet; and November 2 he met with the General
Manager/CEO to review the agenda and discuss District business.
For information only.
b. General Manager/CEO Report
The General Manager/CEO announced the following:
•November 9th the District and the Employee Events Association is hosting its
annual Thanksgiving luncheon for staff at the District’s headquarters.
•The District’s offices and customer service lines will be closed on Friday,
November 10, 2023 in observance of Veteran’s Day.
•On November 17 the Employee Events Association will be delivering over 100
jackets to students at Jefferson Hunt Elementary.
•The November 22 Board meeting has been canceled; the next regularly
scheduled Board meeting will be held on December 13th.
•The District’s offices and customer service lines will be closed on November 23-
24 for the Thanksgiving holiday. Customers may report water emergencies by
calling (909) 889-9501.
•The General Manager/CEO will be out of the office November 14-22.
•East Valley Water District was recognized with a first-place award by American
Concrete Institute in the Decorative Concrete category for the work completed at
the Sterling Natural Resource Center. Entries were received from major projects
across the region, and we are proud to receive this recognition for the work at
the administrative center.
1
2
0
1
•District staff participated in the Lankershim’s Fall Festival and passed out
information to around 250 students and parents. Staff provided students with
several water coloring activities, a prize plinko board and District information. We
will also be providing classroom water cycle demonstrations to Lankershim
students at the end of the month.
•Mr. Noelte presented the monthly Water Supply Update to the Board.
For information only.
c. Legal Counsel Report
No report at this time.
d. Board of Directors’ Comments
Director Carrillo had no comments.
Director Smith offered his appreciation to the Employee Events Association for providing
over 100 jackets to Jefferson Hunt Elementary.
Director Coats wished his fellow Veterans’ a Happy Veteran’s Day and wished everyone
a Happy Thanksgiving.
Vice Chairman Morales thanked members of the armed services, past and present for
their service to our Country.
Chairman Goodrich expressed his gratitude towards all members of the armed services
for their service and wished everyone a Happy Thanksgiving.
For information only.
ADJOURN
Chairman Goodrich adjourned the meeting at 6:53 p.m.
Phillip R. Goodrich, Board President
Michael Moore, Board Secretary
1
2
0
1
Agenda Item
#3c
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #3c
Consent Item
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Approve Directors' Fees and Expenses for November 2023
RECOMMENDATION
That the Board of Directors approve the Directors' Fees and Expenses for November
2023 as submitted.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by Administration.
FISCAL IMPACT
The fiscal impact associated with this agenda item is $12,558.08 which is included in
the current fiscal year budget.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Justine Hendricksen
District Clerk
ATTACHMENTS
November 2023 Director Expense Reports
Name: Month / Year:2023
Meeting
No.Stipend Written Oral
1 11 /01 236.25
2 11 /03 236.25
3 11 /07 236.25
4 11 /08 236.25
5 11 /15 236.25
6 11 /28 236.25
7 11 /29 236.25
8
9
10
11
12
13
14
15
16
17
18
19
20
Meetings
0.655/mi
No.
1 11 /29
2
3
4
5
6
7
8
9
10
Subtotal
TOTAL PAYMENT
Date of Approval
$260.22
Hotel Lodging for ACWA Conference
Mileage
65.00
65.00
Miscellaneous Reimbursement Description
Regular Board Meeting
City of San Bernardino Council Meeting
ACWA Event
ACWA Event
Expense Type
$1,653.75
$85.15
Reimbursement
260.22Lodging
Administration Signature
I certify that the above is correct and accurate to the best of my knowledge.
Chris Carrillo
Date Meeting / Event Description
Date
City of San Bernardino Council Meeting
Meeting with General Manager/CEO or Designee
Inland Action Meeting
$1,999.12
Chris Carrillo November /
130.00 X
7
Report Provided
Subtotal Meetings' Stipend
Mileage
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
1
Name: Month / Year:2023
1
2
3
4
5
Chris Carrillo November /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Meeting Date:
Event Description:
Attended the City of San Bernardino Council meeting via Zoom.
11 / 1 / 2023
City of San Bernardino Council Meeting
Brief Description of Meeting/Event Value to EVWD
Meeting Date:11 / 3 / 2023
Event Description:Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
Meeting Date:11 / 7 / 2023
Event Description:Inland Action Meeting
Meeting with General Manager/CEO to review agenda and discuss District business.
Brief Description of Meeting/Event Value to EVWD
Attended Inland Action meeting via Zoom.
Meeting Date:11 / 8 / 2023
Event Description:Regular Board Meeting
Brief Description of Meeting/Event Value to EVWD
Attended EVWD Board meeting, refer to public agenda.
Meeting Date:11 / 15 / 2023
Event Description:City of San Bernardino Council Meeting
Brief Description of Meeting/Event Value to EVWD
Attended the City of San Bernardino Council meeting via Zoom.
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
2
Name: Month / Year:2023
6
7
8
9
10
Meeting Date:11 / 28 / 2023
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Attended Association of California Water Agencies Annual Fall Conference.
Meeting Date:11 / 29 / 2023
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Attended Association of California Water Agencies Annual Fall Conference.
Meeting Date:
Event Description:
Brief Description of Meeting/Event Value to EVWD
Meeting Date:
Event Description:
Brief Description of Meeting/Event Value to EVWD
Meeting Date:
Event Description:
Brief Description of Meeting/Event Value to EVWD
Chris Carrillo November /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
3
Name: Month / Year:2023
Meeting
No.Stipend Written Oral
1 11 /01 236.25
2 11 /07 236.25
3 11 /08 0.00
4 11 /08 236.25
5 11 /09 0.00
6 11 /13 236.25
7 11 /14 0.00
8 11 /14 0.00
9 11 /14 236.25
10 11 /15 236.25
11 11 /28 236.25
12 11 /29 236.25
13 11 /30 236.25
14
15
16
17
18
19
20
Meetings
0.655/mi
No.
1 11 /30
2 11 /30
3
4
5
6
7
8
9
10
Subtotal
TOTAL PAYMENT
Date of Approval
Ronald L. Coats November /
140.00 X
9
70.00
70.00
Report Provided
Subtotal Meetings' Stipend
Mileage
Finance & Human Resources Committee Meeting
Administration Signature
I certify that the above is correct and accurate to the best of my knowledge.
Ronald L. Coats
Date Meeting / Event Description
Date
Webinar from Streamline
Meeting with General Manager/CEO or Designee
Webinar from Streamline
$2,833.92
$2,126.25
$91.70
Reimbursement
598.44
Meals 17.53
Lodging
Mileage
Miscellaneous Reimbursement Description
Webinar from Streamline
ACWA Event
ACWA Event
ACWA Event
Regular Board Meeting
EVWD Event
ASBCSD Board Meeting
San Bernardino Board of Water Commissioners
Highland Chamber of Commerce
Expense Type
$615.97
ACWA Lodging
Breakfast
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
1
Name: Month / Year:2023
1
2
3
4
5
Event Description:EVWD Event
Brief Description of Meeting/Event Value to EVWD
Attended our annual employee Thanksgiving lunch
Brief Description of Meeting/Event Value to EVWD
Attended a webinar titled: Is your website ADA compliant. They showed great examples of do's and don'ts
with regards to American's With Disabilities Act (ADA)
requirements with regards to our EVWD website.
Meeting Date:11 / 8 / 2023
Event Description:Regular Board Meeting
Brief Description of Meeting/Event Value to EVWD
See official board meeting minutes
Meeting Date:11 / 9 / 2023
Meeting Date:11 / 7 / 2023
Event Description:Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
Meeting Date:11 / 8 / 2023
Event Description:Webinar from Streamline
Discussed the agenda for tonight's meeting and other district business
Ronald L. Coats November /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Meeting Date:
Event Description:
Attended a webinar titled: Special district socialites: How to combat rumors and protect your district's
reputation. They highlighted the do's, don’ts and other aspects of all of the various social media available
to us all. The most used social media outlet, by the entire country, is YouTube.
11 / 1 / 2023
Webinar from Streamline
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
2
Name: Month / Year:2023
6
7
8
9
10
Ronald L. Coats November /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Reviewed the draft of the Popular Annual Financial Report; motioned to bring to the full board the transfer of
unclaimed funds into the district's general fund; received updates on Finance and Human Resources
activities
Meeting Date:11 / 15 / 2023
Event Description:Webinar from Streamline
Brief Description of Meeting/Event Value to EVWD
Attended a webinar titled: Artificial Intelligence (AI): Opportunities and Risks for districts.
This emerging technology may be very useful in the future, but it is also scary.
Event Description:Highland Chamber of Commerce
Brief Description of Meeting/Event Value to EVWD
Attended their meeting where we got legislative updates from Congressman Pete Aguilar (Matthew Tovar)
and County Supervisor Dawn Rowe (Scott Ward) offices
Meeting Date:11 / 14 / 2023
Event Description:Finance & Human Resources Committee Meeting
Brief Description of Meeting/Event Value to EVWD
Attended our monthly board meeting to discuss our upcoming general meeting and other association
business
Meeting Date:11 / 14 / 2023
Event Description:San Bernardino Board of Water Commissioners
Brief Description of Meeting/Event Value to EVWD
They approved the amendment to the Cost Share agreement related to mitigation of Salt Loading in the
Bunker Hill Basin, which we had already approved as well; They approved numerous other contracts
including several lines of insurance. They stated that all of their various lines of insurance have increased
10 to 16 % this year.
Meeting Date:11 / 14 / 2023
Meeting Date:11 / 13 / 2023
Event Description:ASBCSD Board Meeting
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
3
Name: Month / Year:2023
11
12
13
14
15
Ronald L. Coats November /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Event Description:
Brief Description of Meeting/Event Value to EVWD
Meeting Date:
Event Description:
Brief Description of Meeting/Event Value to EVWD
Attended the fall conference to learn all of the latest on water in California
Meeting Date:11 / 30 / 2023
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Attended the fall conference to learn all of the latest on water in California
Meeting Date:
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Attended the fall conference to learn all of the latest on water in California
Meeting Date:11 / 29 / 2023
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Meeting Date:11 / 28 / 2023
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
4
Name: Month / Year:2023
Meeting
No.Stipend Written Oral
1 11 /02 236.25
2 11 /08 236.25
3 11 /09 236.25
4 11 /14 236.25
5 11 /20 236.25
6 11 /27 236.25
7 11 /28 236.25
8 11 /29 236.25
9 11 /30 236.25
10
11
12
13
14
15
16
17
18
19
20
Meetings
0.655/mi
No.
1 11 /30
2 11 /30
3
4
5
6
7
8
9
10
Subtotal
TOTAL PAYMENT
Date of Approval
Phillip R. Goodrich November /
136.00 X
9
68.00
Report Provided
Subtotal Meetings' Stipend
Mileage
ACWA Event
Administration Signature
I certify that the above is correct and accurate to the best of my knowledge.
Phillip R. Goodrich
Date Meeting / Event Description
Date
Agenda Review
Regular Board Meeting
Meeting with General Manager/CEO or Designee
$2,813.77
$2,126.25
$89.08
Reimbursement
78.00
Lodging 520.44
Parking
Mileage
68.00
Miscellaneous Reimbursement Description
City of Highland Council Meeting
ASBCSD
Engineering & Operations Committee Meeting
ACWA Event
ACWA Event
Expense Type
$598.44
ACWA Conference Parking for 2 days
ACWA Conference lodging
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
1
Name: Month / Year:2023
1
2
3
4
5
Event Description:ASBCSD
Brief Description of Meeting/Event Value to EVWD
Attend Monthly Spl. Districts mtg Guest speaker scott Goldman briefed members on Doheney De salination
plant progress
Brief Description of Meeting/Event Value to EVWD
Meet with GM,staff and Vice Chair for development future protocol
Meeting Date:11 / 14 / 2023
Event Description:City of Highland Council Meeting
Brief Description of Meeting/Event Value to EVWD
Attend Monthly City council mtg see mins.
Meeting Date:11 / 20 / 2023
Meeting Date:11 / 8 / 2023
Event Description:Regular Board Meeting
Brief Description of Meeting/Event Value to EVWD
Meeting Date:11 / 9 / 2023
Event Description:Meeting with General Manager/CEO or Designee
Attend Reg, board mtg Ref. mins, this day
Phillip R. Goodrich November /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Meeting Date:
Event Description:
With CEO and Vice Chair for review of current agenda and discuss District business
11 / 2 / 2023
Agenda Review
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
2
Name: Month / Year:2023
6
7
8
9
10
Phillip R. Goodrich November /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Attend ACWA Winter conference continued board member education Day3
Meeting Date:
Event Description:
Brief Description of Meeting/Event Value to EVWD
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Attend ACWA Winter conference continued board member education Day2
Meeting Date:11 / 30 / 2023
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Attend committee meeting conservation district project updates and updates on dept. activities
Meeting Date:11 / 28 / 2023
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Attend ACWA Winter conference continued board member education Day1
Meeting Date:11 / 29 / 2023
Meeting Date:11 / 27 / 2023
Event Description:Engineering & Operations Committee Meeting
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
3
Name: Month / Year:2023
Meeting
No.Stipend Written Oral
1 11 /02 236.25
2 11 /02 0.00
3 11 /08 236.25
4 11 /09 236.25
5 11 /14 236.25
6 11 /22 236.25
7 11 /27 236.25
8 11 /28 236.25
9 11 /29 236.25
10 11 /30 236.25
11
12
13
14
15
16
17
18
19
20
Meetings
0.655/mi
No.
1 11 /29
2
3
4
5
6
7
8
9
10
Subtotal
TOTAL PAYMENT
Date of Approval
James Morales, Jr.November /
138.00 X
9
138.00
Report Provided
Subtotal Meetings' Stipend
Mileage
ACWA Event
Administration Signature
I certify that the above is correct and accurate to the best of my knowledge.
James Morales, Jr.
Date Meeting / Event Description
Date
San Bernardino Valley MWD
Meeting with General Manager/CEO or Designee
Regular Board Meeting
$2,737.08
$2,126.25
$90.39
Reimbursement
520.44Lodging
Mileage
Miscellaneous Reimbursement Description
ACWA Event
Meeting with General Manager/CEO or Designee
San Bernardino Valley MWD
Regular Board Meeting
Engineering & Operations Committee Meeting
ACWA Event
Expense Type
$520.44
ACWA Statewide Trade Conference
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
1
Name: Month / Year:2023
1
2
3
4
5
Event Description:San Bernardino Valley MWD
Brief Description of Meeting/Event Value to EVWD
Resources Engineering Workshop. Seven Oaks Dam control manual. Bunker Hill-B basin study and
agreement. Sant Ana Sucker monitoring. Board report assignment.
Brief Description of Meeting/Event Value to EVWD
Please refer to public agenda.
Meeting Date:11 / 9 / 2023
Event Description:Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
Recruitment policy review.
Meeting Date:11 / 14 / 2023
Meeting Date:11 / 2 / 2023
Event Description:Meeting with General Manager/CEO or Designee
Brief Description of Meeting/Event Value to EVWD
Meeting Date:11 / 8 / 2023
Event Description:Regular Board Meeting
District operational update. SNRC update.
James Morales, Jr.November /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Meeting Date:
Event Description:
Investment portfolio update. Board investment policy. Ad valorem tax terminology. Board report
assignment.
11 / 2 / 2023
San Bernardino Valley MWD
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
2
Name: Month / Year:2023
6
7
8
9
10
James Morales, Jr.November /
As part of the District's commitment to transparency, please provide a brief description of any meeting/event(s)
that you will not be providing a report during the Board meeting at which your Director's Expense Sheet is being
approved.
Statewide trade conference. Region 9 Board meeting.
Meeting Date:11 / 30 / 2023
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Statewide trade conference.
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Statewide trade conference. Committee meetings.
Meeting Date:11 / 29 / 2023
Event Description:ACWA Event
Brief Description of Meeting/Event Value to EVWD
Please refer to public agenda.
Meeting Date:11 / 27 / 2023
Event Description:Engineering & Operations Committee Meeting
Brief Description of Meeting/Event Value to EVWD
Please refer to public agenda.
Meeting Date:11 / 28 / 2023
Meeting Date:11 / 22 / 2023
Event Description:Regular Board Meeting
Brief Description of Meeting/Event Value to EVWD
DIRECTOR EXPENSE / REIMBURSEMENT
ACTIVITY SHEET
AB 1234 SUPPLEMENTAL REPORT FORM
3
Agenda Item
#3d
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #3d
Consent Item
9
3
4
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Accept and File Financial Statements for September 2023
RECOMMENDATION
That the Board of Directors accept and file the attached financial statements as of, and
for the period ended, September 30, 2023.
BACKGROUND / ANALYSIS
The East Valley Water District adopted an annual budget on June 28, 2023 for fiscal
year 2023-24. In accordance with District Administrative Policy 7.7, the Chief Financial
Officer provides regular budget updates to the Board of Directors (Board). Included
herewith for the Board’s review is a summary of the District’s financial results, as of
September 30, 2023.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by the Finance Department.
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Brian Tompkins
Chief Financial Officer
Agenda Item
#3d
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #3d
Consent Item
9
3
4
ATTACHMENTS
1. September 2023 Financial Statement Monthly Review
2. September 2023 Financial Statements
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING SEPTEMBER 30, 2023
page | 1
The following is a highlight summary of the District’s financial results as of September 30,
2023. Please note all values presented are in millions (unless otherwise noted).
Statement of Net Position
Total assets at September 30, 2023 are $407.96 million.
CLASSIFICATION WATER WASTEWATER RECLAMATION DISTRICT
TOTAL
Cash and Investments $ 15.51 $ 6.31 $ 2.75 $ 24.57
Utility Plant, Net 96.95 17.00 - 113.95
Other Assets 50.59 31.20 187.65 269.44
Current Liabilities 8.16 7.15 31.29 46.60
Long Term Liabilities 44.62 8.17 156.41 209.20
Beginning Net Position 105.34 38.68 3.01 147.03
Change in Equity 3.34 0.18 (0.30) 3.22
TOTAL NET $ 108.68 $ 38.86 $ 2.71 $ 150.25
Cash and Investments
Cash and Investments are $24.58 million for the month of September, an increase of
$1.43 million from the prior month. In September the District paid $1.83 million for
construction of the recycled water pipeline through June 2023. The District’s Due from
Other Governments includes a receivable for work performed on the Recycled Water
Pipeline from August through September and Grants Receivable from the State of
California bringing the ending balance as of September 30, 2023 to $21.04 million.
$0
$5
$10
$15
$20
$25
$30
Mi
l
l
i
o
n
s
CASH & INVESTMENTS
Restricted Unrestricted
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING SEPTEMBER 30, 2023
page | 2
Statement of Revenues & Expenses
Total Revenues & Expenses through September 30, 2023 are summarized below (in
millions):
Column1 WATER WASTEWATER RECLAMATION DISTRICT
TOTAL
Revenue $ 8.71 $ 1.68 $ 2.66 $ 13.05
Expense 5.37 1.50 2.95 9.82
Water Sales by Tier
Water Sales for the month ending September 30, 2023 were $2.12M; $62K over staff
projections for the month and $182K under projections year-to-date.
$0.0
$0.5
$1.0
$1.5
$2.0
$2.5
Mi
l
l
i
o
n
s
WATER SALES BY TIER
Tier 1 Tier 2 Tier 3 FY 2023-24 Projection
For a more detailed presentation, operating results are presented in three ways on pages
2 through 6 of the attached financial statements for the period ending September 30,
2023. First is a one-page summary with monthly and year-to-date totals for revenue and
expenses, presented by Expense Category. Second is a one-page summary with monthly
and year-to-date totals for Revenues and Expense by Program. Third is a Budget -to-
Actual presentation of program expense detail.
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING SEPTEMBER 30, 2023
page | 3
Water Sales by Customer Class
The table below shows the District’s water sales for the month of September 2023 by
customer class. The following icons are to compliment the graph below: positive
change, no change, negative change when comparing actuals versus projections.
CUSTOMER CLASS ACTUAL PROJECTION $
VARIANCE
%
VARIANCE
Residential 1,191,183$ 1,193,000$ (1,817)$ 0%
Multi-Family 384,973 398,000 (13,027) -3%
Commercial 197,309 163,000 34,309 21%
Irrigation 348,209 306,000 42,209 14%
TOTAL $ 2,121,674 $ 2,060,000 $ 61,674 3%
The following table displays customer class by tier for the month of September 2023:
CUSTOMER CLASS TIER ACTUAL PROJECTION $
VARIANCE
%
VARIANCE
Residential Tier 1 424,509$ 377,000$ 47,509$ 13%
Residential Tier 2 542,005 553,000 (10,995) -2%
Residential Tier 3 224,669 263,000 (38,331) -15%
Multi-Family Tier 1 178,983 157,000 21,983 14%
Multi-Family Tier 2 108,117 136,000 (27,883) -21%
Multi-Family Tier 3 97,873 105,000 (7,127) -7%
Commercial Tier 1 116,712 114,000 2,712 2%
Commercial Tier 2 12,298 11,000 1,298 12%
Commercial Tier 3 68,299 38,000 30,299 80%
Irrigation Tier 2 163,797 176,000 (12,203) -7%
Irrigation Tier 3 184,412 130,000 54,412 42%
TOTAL $ 2,121,674 $ 2,060,000 $ 61,674 3%
Legend
- Positive Change in Actuals
- Neutral Change in Actuals
- Negative Change in Actuals
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING SEPTEMBER 30, 2023
page | 4
The chart below is a comparative illustration of Water Revenue year -to-date compared
to last year’s Water Revenue year-to-date as of September. As noted in the graph, Water
Revenue experienced a minor decrease over last year. Water consumption decreased
88.02 million gallons (117.7K HCF) compared to September of 2022 and water sales were
down $157K for all three tiers combined.
$0
$1
$2
$3
$4
$5
$6
$7
$8
$9
9/30/2022 9/30/2023
Mi
l
l
i
o
n
s
COMPARATIVE MONTHLY WATER REVENUE
(WATER SALES & METER CHARGES)
Meter Tier 1 Tier 2 Tier 3
Total -$8,320,372 Total -$8,236,402
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING SEPTEMBER 30, 2023
page | 5
Water Fund Activities by Cost Center
The graph below provides a year-to-date comparison of the Water Fund operating cost
centers for FY 2022-23 and FY 2023-24.
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING SEPTEMBER 30, 2023
page | 6
Wastewater Fund Activities by Cost Center
The graph below provides a year-to-date comparison of the Wastewater Fund operating
cost centers for FY 2022-23 and FY 2023-24.
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING SEPTEMBER 30, 2023
page | 7
Water Reclamation Fund Activities by Cost Center
The graph below provides a year-to-date comparison of the Water Reclamation Fund
operating cost centers for FY 2022-23 and FY 2023-24.
Combining Schedule of Net Position
As of September 30, 2023
Unaudited
WATER WASTEWATER RECLAMATION DISTRICT TOTAL
Assets:
Current Assets:
Cash and Cash Equivalents
Investments
Accounts Receivable, Net
Interest Receivable
Other Receivables
Due from Sewer Fund
Due from Reclamation Fund
Due from Other Governments
Inventory
$4,148,245.40 $738,504.19
2,019,618.14
311,471.64
$2,750,000.00 $7,636,749.59
5,329,245.46
5,978,601.07
-
2,508,047.03
15,279,624.10
11,015,251.76
21,039,406.36
1,071,889.08
244,594.52
3,309,627.32
5,118,720.33
-
2,508,047.03
3,770,000.00
11,015,251.76
48,418.33
1,065,167.92
212,514.89
31,195,992.98
-
548,409.10
--
-
-
-
-
11,509,624.10
-
-20,990,988.03
6,721.16
32,079.63
14,618,018.86
-
-Prepaid Expenses
Total Current Assets:24,289,397.13 70,103,408.97
Non-Current Assets:
Restricted Cash and Cash Equivalents
Capital Assets not being Depreciated
Capital Assets, Net
8,056,028.53
21,311,748.23
96,948,239.29
126,316,016.05
157,512,009.03
3,555,502.92
17,522,756.38
16,997,047.78
38,075,307.08
52,693,325.94
-
166,114,947.56
-
166,114,947.56
190,404,344.69
11,611,531.45
204,949,452.17
113,945,287.07
330,506,270.69
400,609,679.66
Total Non-Current Assets:
Total Assets:
Deferred Outflow Of Resources
Deferred Charge on Refunding
Deferred Outflows - Pensions
581,826.53
4,954,821.80
163,048,657.36
272,820.05
1,546,575.07
54,512,721.06
-
-
854,646.58
6,501,396.87
407,965,723.11Total Assets and Deferred Outflows of Resources:190,404,344.69
Current Liabilities:
Accounts Payable and Accrued Expenses
Due to Water Fund
Due to Sewer Fund
Accrued Payroll and Benefits
Customer Service Deposits
Construction Advances and Retentions
Accrued Interest Payable
3,450,804.05
-
29,842.00
3,770,000.00
-
-3,480,646.05
14,785,251.76
11,509,624.10
-
1,390,877.44
12,193,266.73
263,777.47
652,177.00
2,315,008.61
46,590,629.16
11,015,251.76
11,509,624.10-
--
-
-
-1,390,877.44
485,491.64
239,066.72
449,527.20
2,140,008.61
8,155,775.66
3,010,696.98
24,710.75
137,616.80
175,000.00
7,147,866.53
8,697,078.11
-
65,033.00
-
Current Portion of Compensated Absences
Current Portion of Long-Term Debt
Total Current Liabilities:31,286,986.97
Non-Current Liabilities:
Compensated Absences, less current portion
Net Pension Liability
464,391.22
10,600,994.28
33,555,886.89
1,173.64
110,894.78
3,254,141.95
4,800,908.00
-
117,403.00 692,689.00
13,855,136.23
194,646,363.89
1,173.64
-
156,289,569.00
-
Long Term Debt, Less Current Portion
Other Liabilities
Total Non-Current Liabilities:
Total Liabilities:
44,622,446.03
52,778,221.69
8,165,944.73
15,313,811.26
156,406,972.00
187,693,958.97
209,195,362.76
255,785,991.92
Deferred Inflows Of Resources
Deferred Inflows - Pensions 1,589,671.06 336,902.07 -1,926,573.13
Total Liabilities and Deferred Inflows of Resources:54,367,892.75 15,650,713.33 187,693,958.97 257,712,565.05
Equity:
Equity 105,340,469.37
105,340,469.37
38,679,547.28
38,679,547.28
3,008,522.25
3,008,522.25
147,028,538.90
147,028,538.90Total Beginning Equity:
Total Revenue
Total Expense
8,707,472.54
5,367,177.30
3,340,295.24
1,684,715.50
1,502,255.05
182,460.45
2,656,025.99
2,954,162.52
(298,136.53)
13,048,214.03
9,823,594.87
3,224,619.16Revenues Over/Under Expenses
Total Equity and Current Surplus (Deficit):
Total Liabilities, Equity and Current Surplus (Deficit):
108,680,764.61
163,048,657.36
38,862,007.73
54,512,721.06
2,710,385.72 150,253,158.06
407,965,723.11$$$190,404,344.69 $
Page 1 of 6
Revenue and Expense Budget-to-Actual by Category
Month Ended September 30, 2023
Unaudited
WATER
YTD
WASTEWATER RECLAMATION
YTD
DISTRICT WIDE
AMENDED AMENDED
BUDGET
AMENDED
BUDGET
AMENDED REMAINING
BUDGETMTDBUDGETMTDYTDMTDTOTAL BUDGET
Revenue
Water Sales $2,122,222.16
832,614.26
44,430.09
$5,738,942.48
2,497,615.49
133,999.50
$18,345,000.00
9,996,000.00
450,000.00
$-
-
$-
-
$-
-
$-
-
-
-
$-
-
-
-
$692,000.00 $19,037,000.00
9,996,000.00
510,000.00
5,968,000.00
10,279,000.00
1,294,000.00
340,000.00
-
$13,298,057.52
Meter Charges
Penalties
-
-
-
7,498,384.51
360,285.66
4,488,037.09
7,622,974.01
772,293.25
335,753.93
-
5,065.32
499,906.45
15,714.84
1,479,962.91
60,000.00
5,968,000.00Wastewater System Charges
Wastewater Treatment Charges
Other Operating Revenue
Non Operating Revenue
Gain or Loss on Disposition
Benefits
-
-
-
-
-
----
-
913,093.52 2,656,025.99 10,279,000.00
1,252,000.00
100,000.00
209,730.42
267.83
332,669.00
4,246.07
42,000.00
220,000.00
178,910.75 189,037.75 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
20,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-Depreciation -
Revenue Total:3,209,264.76 8,707,472.54 29,053,000.00 683,882.52 1,684,715.50 6,048,000.00 913,093.52 2,656,025.99 12,323,000.00 47,424,000.00 34,375,785.97
Expense by Category
Labor 635,529.47
3,141.10
171,854.57
475,061.58
4,284.07
62,255.49
113,494.56
396,405.86
3,141.10
18,602.86
9,317.47
-
1,273,819.62
7,051.02
5,596,200.00
32,900.00
173,975.94
1,346.18
43,950.92
99,845.90
155.60
1,442.69
7,698.93
15,661.00
1,346.18
5,275.11
322.98
-
350,823.20
3,021.86
283,469.18
300,425.46
8,701.75
5,477.62
22,234.43
24,909.23
3,021.86
422,554.71
561.79
-
1,627,100.00
14,100.00
756,300.00
1,582,100.00
104,000.00
25,800.00
133,100.00
250,300.00
14,100.00
341,100.00
2,000.00
91,390.30 183,117.65 1,004,700.00 8,228,000.00
47,000.00
6,420,239.53
36,927.12Temporary Labor
Benefits
Contract Services
Professional Development
Overtime
Materials and Supplies
Utilities
Temporary Labor
Other
Standby
Water Supply
Debt Service
Capital Improvement
Capital Outlay
Accounting Income Add back
Transfer to Reserves
Transfer from Reserves
---
1,195,794.64
672,166.49
40,912.70
124,840.05
374,698.68
592,631.26
7,051.02
951,648.50
17,575.49
271.39
2,915,800.00
5,048,000.00
291,000.00
371,000.00
1,331,500.00
4,013,800.00
32,900.00
25,550.49
874,277.75
180,932.82
2,453,069.90
1,703.14
2,736.06
15,526.02
85,133.82
492,900.00
6,018,900.00
21,000.00
29,200.00
751,400.00
2,129,900.00
4,165,000.00
12,649,000.00
416,000.00
426,000.00
2,216,000.00
6,394,000.00
47,000.00
2,504,803.36
9,223,338.15
364,682.41
292,946.27
1,803,540.87
5,691,325.69
36,927.12
-
788.39
9,069.82
29,728.82
---
1,300,900.00
33,000.00
4,699.08 4,699.08 590,000.00
55,000.00
2,232,000.00
90,000.00
853,097.71
71,862.72-
-
-
-
-
-
-
-
-
-
-
-
768,000.00
3,103,000.00
3,425,000.00
695,000.00
-
--
-
-
768,000.00
3,376,000.00
3,725,000.00
1,165,000.00
-
767,728.61
3,370,685.64
3,654,433.78
957,299.93
70,566.22
-5,314.36 -
-
-
-
273,000.00
300,000.00
260,000.00
-
365,000.00
-
53,847.50
3,662.50
(53,847.50)
-
70,566.22
103,402.08
(70,566.22)
-
48,011.44
-
77,053.96 27,244.03 210,000.00
-
-
-
-
-
-
-
1,020,000.00
-
95,000.00 -
-
1,480,000.00
-
1,480,000.00
----
Expense Total:1,896,750.63 5,367,177.30 29,053,000.00 399,032.87 1,502,255.05 6,048,000.00 1,035,504.65 2,954,162.52 12,323,000.00 47,424,000.00 37,600,405.13
Total Surplus (Deficit):$1,312,514.13 $3,340,295.24 $-$284,849.65 $182,460.45 $-$(122,411.13)$(298,136.53)$-$-$(3,224,619.16)
Page 2 of 6
Revenue and Expense Budget-to-Actual by Program
Month Ended September 30, 2023
Unaudited
WATER
YTD
WASTEWATER RECLAMATION
YTD
DISTRICT WIDE
AMENDED AMENDED
BUDGET
AMENDED
BUDGET
AMENDED REMAINING
BUDGETMTDBUDGETMTDYTDMTDTOTAL BUDGET
Revenue
Water Sales $2,122,222.16
832,614.26
44,430.09
-
$5,738,942.48
2,497,615.49
133,999.50
-
$18,345,000.00
9,996,000.00
450,000.00
-
$-
-
$-
-
$-
-
$-
-
-
-
$-
-
-
-
$692,000.00 $19,037,000.00
9,996,000.00
510,000.00
5,968,000.00
10,279,000.00
1,294,000.00
340,000.00
$13,298,057.52
7,498,384.51
360,285.66
4,488,037.09
7,622,974.01
772,293.25
Meter Charges
Penalties
Wastewater System Charges
Wastewater Treatment Charges
Other Operating Revenue
Non Operating Revenue
-
-
-
5,065.32
499,906.45
-
178,910.75
-
15,714.84
1,479,962.91
-
189,037.75
-
60,000.00
5,968,000.00
----
-
913,093.52 2,656,025.99 10,279,000.00
1,252,000.00
100,000.00
12,323,000.00
209,730.42
267.83
3,209,264.76
332,669.00
4,246.07
8,707,472.54
42,000.00
220,000.00
29,053,000.00
-
-
-
-20,000.00
6,048,000.00
335,753.93
34,375,785.97Revenue Total:683,882.52 1,684,715.50 913,093.52 2,656,025.99 47,424,000.00
1000 - Governing Board
2000 - General Administration
2100 - Human Resources
2200 - Public Affairs
55,403.16
70,901.39
50,971.49
79,055.32
58,912.10
73,577.36
62,521.42
147,270.61
24,564.23
65,618.23
564,431.07
80,141.71
40,529.79
37,748.20
355,411.20
-
42,073.17
182,610.81
1,146,798.56
164,914.33
(272,211.97)
184,720.82
282,562.38
402,369.04
74,540.71
147,423.33
989,133.35
301,331.04
113,049.62
145,843.02
899,079.85
-
254,800.00
959,000.00
1,702,400.00
904,400.00
689,000.00
940,800.00
1,205,400.00
1,304,100.00
292,000.00
999,600.00
5,992,000.00
1,082,000.00
546,000.00
418,500.00
2,826,000.00
-
23,305.15
29,483.75
20,502.19
40,687.33
-
31,489.99
26,794.86
62,838.18
-
17,348.58
76,456.62
489,505.29
85,909.95
-
79,051.43
121,097.78
171,565.72
-
109,200.00
411,000.00
564,600.00
387,600.00
-
-
-
-
-
-
364,000.00
1,370,000.00
2,857,000.00
1,292,000.00
689,000.00
1,344,000.00
1,722,000.00
1,863,000.00
292,000.00
1,428,000.00
5,992,000.00
1,082,000.00
546,000.00
465,000.00
2,826,000.00
867,000.00
9,896,000.00
2,023,000.00
760,000.00
304,578.25
1,110,932.57
1,215,997.07
1,041,175.72
961,211.97
1,080,227.75
1,318,339.84
1,289,065.24
217,459.29
1,234,316.34
5,002,866.65
780,668.96
432,950.38
303,583.43
4,699.08 4,699.08 590,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2300 - Conservation -
3000 - Finance & Accounting
3200 - Information Technology
3300 - Customer Service
3400 - Meter Services
403,200.00
516,600.00
558,900.00
-
4000 - Engineering 24,608.02
-
46,260.33
-
428,400.00
5000 - Water Production
5100 - Water Treatment
5200 - Water Quality
6000 - Maintenance Administration
6100 - Water Maintenance
6200 - Wastewater Collection
6300 - Water Reclamation
7000 - Facilities Maintenance
7100 - Fleet Maintenance
8000 - Capital
-
--
-
-
--
46,500.00
-
867,000.00
-
405,000.00
152,000.00
1,198,000.00
-
3,930.89
-
53,911.03
-
21,684.22
11,785.82
48,011.44
284,849.65
15,573.55
-
145,382.03
-
153,574.32
23,475.49
77,053.96
182,460.45
1,926,920.15
721,617.97
7,240,942.40
1,299,594.11
584,971.47
--
9,896,000.00
607,000.00
-
1,230,000.00
-
---969,236.20
61,569.37
2,655,057.60
267,161.81
-
27,244.03
(298,136.53)
71,762.42
54,268.43
3,662.50
302,669.76
151,553.04
108,716.44
3,340,295.24
1,011,000.00
608,000.00
7,318,000.00
-
-
-9,746,000.00 9,532,985.57
(3,224,619.16)Total Surplus (Deficit):$1,312,514.13 $$$$$$(122,411.13)$$$-$
.
Page 3 of 6
Program Expense Detail Budget-to-Actual
Month Ended September 30, 2023
Unaudited
WATER
YTD
WASTEWATER
AMENDED
RECLAMATION
YTD
DISTRICT WIDE
AMENDED
BUDGET
AMENDED
BUDGET
AMENDED REMAINING
BUDGETMTDMTDYTDBUDGETMTDTOTAL BUDGET
Revenue
Water Sales $2,122,222.16
832,614.26
44,430.09
$5,738,942.48
2,497,615.49
133,999.50
$18,345,000.00
9,996,000.00
450,000.00
$-
-
$-
-
$-
-
$-
-
-
-
$-
-
-
-
$692,000.00 $19,037,000.00
9,996,000.00
510,000.00
5,968,000.00
10,279,000.00
1,294,000.00
340,000.00
-
$13,298,057.52
Meter Charges
Penalties
-
-
-
7,498,384.51
360,285.66
4,488,037.09
7,622,974.01
772,293.25
335,753.93
-
5,065.32
499,906.45
15,714.84
1,479,962.91
60,000.00
5,968,000.00Wastewater System Charges
Wastewater Treatment Charges
Other Operating Revenue
Non Operating Revenue
Gain or Loss on Disposition
Benefits
-
-
-
-
-
----
-
913,093.52 2,656,025.99 10,279,000.00
1,252,000.00
100,000.00
209,730.42
267.83
332,669.00
4,246.07
42,000.00
220,000.00
178,910.75 189,037.75 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
20,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-Depreciation -
Revenue Total:3,209,264.76 8,707,472.54 29,053,000.00 683,882.52 1,684,715.50 6,048,000.00 913,093.52 2,656,025.99 12,323,000.00 47,424,000.00 34,375,785.97--------Program: 1000 - Governing Board
Labor $7,111.13
4,171.42
-
43,096.19
1,024.42
55,403.16
$20,183.64
12,426.34
56.13
3,367.57
6,039.49
42,073.17
$98,000.00
63,000.00
2,100.00
$3,047.62
1,787.73
-
18,469.80
-
$8,650.11
5,325.45
24.05
1,443.25
1,905.72
17,348.58
$42,000.00
27,000.00
900.00
33,300.00
6,000.00
$-
-
-
-
-
$-
-
-
-
-
$-
-
-
-
-
$140,000.00
90,000.00
3,000.00
111,000.00
20,000.00
$111,166.25
72,248.21
2,919.82
106,189.18
12,054.79
304,578.25
Benefits
Materials and Supplies
Contract Services 77,700.00
14,000.00
254,800.00
Professional Development
Program: 1000 - Governing Board Total:23,305.15 109,200.00 ---364,000.00------Program: 2000 - General Administration
Labor
Temporary Labor
Overtime
Benefits
Materials and Supplies
Contract Services
Utilities
44,539.04
1,364.50
200.50
9,671.33
63.55
14,717.42
117.28
227.77
89,086.32
3,661.62
538.85
53,841.84
725.38
29,231.04
351.83
5,173.93
182,610.81
417,900.00
21,000.00
2,800.00
184,800.00
4,900.00
19,088.16
584.78
85.94
3,242.29
27.25
6,307.46
50.26
38,179.88
1,569.26
230.96
21,269.87
310.90
12,527.57
150.78
2,217.40
76,456.62
179,100.00
9,000.00
1,200.00
79,200.00
2,100.00
93,000.00
1,200.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
597,000.00
30,000.00
4,000.00
264,000.00
7,000.00
310,000.00
4,000.00
469,733.80
24,769.12
3,230.19
188,888.29
5,963.72
268,241.39
3,497.39
217,000.00
2,800.00
Professional Development
Program: 2000 - General Administration Total:
107,800.00
959,000.00
97.61 46,200.00
411,000.00
154,000.00
1,370,000.00
146,608.67
1,110,932.5770,901.39 29,483.75 ---------Program: 2100 - Human Resources
Labor
Temporary Labor
26,222.01
-
52,661.02
-
230,300.00
-
11,237.99
-
22,568.99
-
98,700.00
-
-
-
-
-
-
-
329,000.00
-
253,769.99
-
Overtime
Benefits
Materials and Supplies
Contract Services
Utilities
215.42
6,759.73
586.02
1,706.00
41.02
291.45
77,802.63
786.29
20,768.06
124.86
2,100.00
139,300.00
4,900.00
109,200.00
700.00
92.31 124.89
33,343.84
336.97
8,900.56
53.51
1,621.82
422,554.71
489,505.29
900.00 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3,000.00
199,000.00
7,000.00
156,000.00
1,000.00
2,583.66
87,853.53
5,876.74
2,896.92
251.15
731.13
17.58
59,700.00
2,100.00
46,800.00
300.00
126,331.38
821.63
49,107.59
689,652.55
1,215,997.07
Professional Development
Other
-5,270.59
989,093.66
1,146,798.56
39,200.00
1,176,700.00
1,702,400.00
-16,800.00
339,300.00
564,600.00
56,000.00
2,106,000.00
2,857,000.00
15,441.29
50,971.49
5,275.11
20,502.19
4,699.08
4,699.08
4,699.08
4,699.08
590,000.00
590,000.00Program: 2100 - Human Resources Total:------Program: 2200 - Public Affairs
Labor 38,500.61
-
77,001.22
-
580.31
36,233.83
2,727.64
46,979.77
583.99
300,300.00
-
16,500.23
-
33,000.44
-
248.68
15,528.42
1,169.00
35,367.02
250.27
128,700.00
-
5,100.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
429,000.00
-
318,998.34
-Temporary Labor
Overtime
Benefits
Materials and Supplies
Contract Services
Utilities
265.68
8,072.12
1,266.72
30,758.59
191.60
-
11,900.00
88,900.00
58,800.00
385,700.00
33,600.00
25,200.00
904,400.00
113.86
3,459.32
542.89
19,988.92
82.11
17,000.00
127,000.00
84,000.00
551,000.00
48,000.00
36,000.00
1,292,000.00
16,171.01
75,237.75
80,103.36
468,653.21
47,165.74
34,846.31
1,041,175.72
38,100.00
25,200.00
165,300.00
14,400.00
10,800.00
387,600.00
Professional Development
Program: 2200 - Public Affairs Total:
807.57
164,914.33
-346.12
85,909.9579,055.32 40,687.33 --------Program: 2300 - Conservation
Labor
Temporary Labor
Overtime
12,768.00
-
239.40
3,386.21
55.92
39,281.00
-
20.00
25,536.00
-
239.40
6,767.25
175.48
(271,071.31)
62.47
3,770.00
(37,691.26)
(272,211.97)
107,000.00
-
7,000.00
42,000.00
26,000.00
346,000.00
26,000.00
15,000.00
120,000.00
689,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
107,000.00
-
7,000.00
42,000.00
26,000.00
346,000.00
26,000.00
15,000.00
120,000.00
689,000.00
81,464.00
-
6,760.60
35,232.75
25,824.52
617,071.31
25,937.53
11,230.00
157,691.26
961,211.97
Benefits
Materials and Supplies
Contract Services
Utilities
Professional Development
Other 3,161.57
58,912.10Program: 2300 - Conservation Total:------
Program: 3000 - Finance & Accounting
Labor
Temporary Labor
Overtime
Benefits
Materials and Supplies
Contract Services
Utilities
Professional Development
Other
50,316.60
-
99,839.14
-
800.82
113,175.77
561.17
(31,242.23)
317.27
542,500.00
-
21,564.23
-
42,772.52
-
232,500.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
775,000.00
-
632,388.34
-
11,855.97
212,356.51
6,198.31
185,659.61
3,546.76
28,303.78
(81.53)
419.02
12,878.37
544.51
9,231.97
151.89
35.00
9,100.00
261,800.00
4,900.00
98,700.00
2,800.00
21,000.00
-
179.58
5,495.44
233.38
3,937.27
65.09
343.21
48,467.72
240.52
(13,417.38)
135.97
508.87
-
3,900.00
112,200.00
2,100.00
42,300.00
1,200.00
9,000.00
-
13,000.00
374,000.00
7,000.00
141,000.00
4,000.00
30,000.00
-
1,187.35
81.53
15.00
--
Program: 3000 - Finance & Accounting Total:73,577.36 184,720.82 940,800.00 31,489.99 79,051.43 403,200.00 ---1,344,000.00 1,080,227.75------
Page 4 of 6
Program Expense Detail Budget-to-Actual
Month Ended September 30, 2023
Unaudited
WATER
YTD
WASTEWATER
AMENDED
RECLAMATION
YTD
DISTRICT WIDE
AMENDED
BUDGET
AMENDED
BUDGET
AMENDED REMAINING
BUDGETMTD
32,118.27
1,776.60
-
9,084.04
6,393.76
12,004.03
1,144.72
-
MTD YTD BUDGET MTD TOTAL BUDGET
Program: 3200 - Information Technology ----
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
433,000.00
17,000.00
-
259,000.00
70,000.00
926,000.00
12,000.00
5,000.00
Labor
Temporary Labor
Overtime
Benefits
Materials and Supplies
Contract Services
Utilities
65,138.14
3,389.40
-
102,722.62
16,539.24
89,109.32
3,963.32
1,700.34
282,562.38
303,100.00
11,900.00
-
181,300.00
49,000.00
648,200.00
8,400.00
13,764.94
761.40
-
3,893.15
2,740.19
5,144.59
490.59
-
27,916.27
1,452.60
-
129,900.00
5,100.00
-
-
-
-
-
-
-
-
-
-
339,945.59
12,158.00
-
112,253.71
46,372.52
798,700.97
6,338.11
44,023.67
7,088.24
38,189.71
1,698.57
728.72
77,700.00
21,000.00
277,800.00
3,600.00
1,500.00
516,600.00
Professional Development
Program: 3200 - Information Technology Total:
3,500.00
1,205,400.00
2,570.94
62,521.42 26,794.86 121,097.78 --1,722,000.00 1,318,339.84------Program: 3300 - Customer Service
Labor
Temporary Labor
Overtime
Benefits
Materials and Supplies
Contract Services
Utilities
Professional Development
Other
47,812.96 96,661.83
-
1,781.85
86,383.59
36.13
195,272.31
22,031.81
36.95
433,300.00
-
4,900.00
217,000.00
4,900.00
515,200.00
112,700.00
11,900.00
4,200.00
20,491.25 41,426.39
-
763.66
37,020.98
15.49
83,688.12
8,635.25
15.83
185,700.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
619,000.00
-
7,000.00
310,000.00
7,000.00
736,000.00
161,000.00
17,000.00
6,000.00
480,911.78
-
4,454.49
186,595.43
6,948.38
457,039.57
130,332.94
16,947.22
5,835.43
--
419.06
5,871.90
-
28,537.19
7,518.78
-
977.80
13,701.73
-
66,586.76
18,191.36
-
2,100.00
93,000.00
2,100.00
220,800.00
48,300.00
5,100.00
1,800.00
558,900.00
-164.57
402,369.04
--
Program: 3300 - Customer Service Total:147,270.61 1,304,100.00 62,838.18 171,565.72 ---1,863,000.00 1,289,065.24------Program: 3400 - Meter Services
Labor
Overtime
Benefits
Materials and Supplies
Contract Services
Utilities
18,811.21 37,622.42 173,000.00
6,000.00
101,000.00
4,000.00
7,000.00
1,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
173,000.00
6,000.00
101,000.00
4,000.00
7,000.00
1,000.00
-
135,377.58
6,000.00
64,551.08
4,000.00
6,772.68
757.95
-
5,507.02
-
121.55
124.45
-
-
36,448.92
-
227.32
242.05
-Professional Development
Program: 3400 - Meter Services Total:
-
24,564.23 74,540.71 292,000.00 ----292,000.00 217,459.29------Program: 4000 - Engineering
Labor 46,336.63 92,848.27
-
438,900.00
-
2,100.00
19,858.57 39,792.13
-
188,100.00
-
900.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
627,000.00
-
3,000.00
494,359.60
-
3,000.00
127,303.36
18,833.58
401,101.90
174,792.95
14,924.95
1,234,316.34
Temporary Labor
Overtime
Benefits
Materials and Supplies
Contract Services
Utilities
-
-
-
---
8,972.32
116.50
9,669.10
523.68
-
17,987.81
116.50
23,927.10
12,491.11
52.54
107,100.00
13,300.00
296,100.00
131,600.00
10,500.00
999,600.00
3,845.09
49.92
780.00
74.44
7,708.83
49.92
(2,029.00)
715.94
22.51
45,900.00
5,700.00
126,900.00
56,400.00
4,500.00
428,400.00
153,000.00
19,000.00
423,000.00
188,000.00
15,000.00
1,428,000.00
Professional Development
Program: 4000 - Engineering Total:
-
65,618.23 147,423.33 24,608.02 46,260.33 --------Program: 5000 - Water Production
Labor
Overtime
Standby
Benefits
86,566.92
6,886.54
4,530.81
22,211.83
-
18,439.50
104,026.13
319,179.34
2,590.00
564,431.07
175,843.27
16,787.62
9,118.93
190,609.12
271.39
64,625.56
126,456.35
401,918.94
3,502.17
790,000.00
46,000.00
15,000.00
400,000.00
768,000.00
335,000.00
528,000.00
3,099,000.00
11,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
790,000.00
46,000.00
15,000.00
400,000.00
768,000.00
335,000.00
528,000.00
3,099,000.00
11,000.00
614,156.73
29,212.38
5,881.07
209,390.88
767,728.61
270,374.44
401,543.65
2,697,081.06
7,497.83
Water Supply
Materials and Supplies
Contract Services
Utilities
Professional Development
Program: 5000 - Water Production Total:989,133.35 5,992,000.00 ------5,992,000.00 5,002,866.65------Program: 5100 - Water Treatment
Labor
Overtime
Benefits
Materials and Supplies
Contract Services
31,531.20
3,443.45
8,598.16
15,334.71
2,574.36
18,659.83
80,141.71
63,062.40
8,205.80
95,159.11
63,936.04
4,282.08
273,000.00
39,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
273,000.00
39,000.00
209,937.60
30,794.20
68,840.89
136,063.96
219,717.92
115,314.39
780,668.96
164,000.00
200,000.00
224,000.00
182,000.00
1,082,000.00
164,000.00
200,000.00
224,000.00
182,000.00
1,082,000.00
Utilities 66,685.61
301,331.04
-
-
-
-Program: 5100 - Water Treatment Total:----------Program: 5200 - Water Quality
Labor 24,033.60
792.90
4,136.53
740.96
10,825.80
-
44,890.80
792.90
43,537.40
2,591.46
21,052.06
-
223,000.00
12,000.00
107,000.00
25,000.00
170,000.00
2,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
223,000.00
12,000.00
107,000.00
25,000.00
170,000.00
2,000.00
178,109.20
11,207.10
63,462.60
22,408.54
148,947.94
2,000.00
Overtime
Benefits
Materials and Supplies
Contract Services
Utilities
Professional Development
Program: 5200 - Water Quality Total:
-185.00
113,049.62
7,000.00 7,000.00 6,815.00
432,950.3840,529.79 546,000.00 ----546,000.00------
Page 5 of 6
Program Expense Detail Budget-to-Actual
Month Ended September 30, 2023
Unaudited
WATER
YTD
WASTEWATER
AMENDED
RECLAMATION
YTD
DISTRICT WIDE
AMENDED
BUDGET
AMENDED
BUDGET
AMENDED REMAINING
BUDGETMTD
22,112.81
MTD YTD BUDGET MTD TOTAL BUDGET
Program: 6000 - Maintenance Administration ----
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
217,000.00
-
Labor
Temporary Labor
Overtime
Standby
Benefits
Materials and Supplies
Contract Services
44,225.63 195,300.00
-
2,436.10
-
4,872.19 21,700.00
-
200.00
-
-
-
-
-
-
-
-
-
167,902.18
-
2,000.00
10,981.65
78,076.30
2,938.61
356.15
32,850.07
8,478.47
-
-
-
-
-
-1,800.00
18,000.00
142,200.00
2,700.00
900.00
36,900.00
20,700.00
418,500.00
-2,000.00
20,000.00
158,000.00
3,000.00
1,000.00
41,000.00
23,000.00
465,000.00
4,786.66
7,851.85
-
423.29
2,186.71
386.88
37,748.20
8,456.56
72,004.40
55.25
322.98
838.84
-
561.79
7,919.30
6.14
2,000.00
15,800.00
300.00
579.48 47.01
242.97
42.99
3,930.89
64.37 100.00
Utilities 7,334.93
13,186.77
145,843.02
815.00
1,334.76
15,573.55
4,100.00
2,300.00
46,500.00
Professional Development
Program: 6000 - Maintenance Administration Total:---303,583.43------Program: 6100 - Water Maintenance
Labor
Overtime
Benefits
Materials and Supplies
Contract Services
128,236.52
47,890.52
40,232.86
58,170.37
80,880.93
-
252,964.44
91,484.33
218,747.12
166,598.63
169,285.33
-
914,000.00
219,000.00
620,000.00
471,000.00
602,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
914,000.00
219,000.00
620,000.00
471,000.00
602,000.00
-
661,035.56
127,515.67
401,252.88
304,401.37
432,714.67
-Utilities --
Program: 6100 - Water Maintenance Total:355,411.20 899,079.85 2,826,000.00 ------2,826,000.00 1,926,920.15------Program: 6200 - Wastewater Collection
Labor
Overtime
Benefits
Materials and Supplies
Wastewater Treatment
Contract Services
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
41,374.44
374.18
10,765.34
976.36
82,748.88
2,912.80
51,672.86
2,527.55
-
371,000.00
9,000.00
174,000.00
36,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
371,000.00
9,000.00
174,000.00
36,000.00
288,251.12
6,087.20
122,327.14
33,472.45
7,610,000.00
(7,338,519.94)
721,617.97
-7,610,000.00
(7,333,000.00)
867,000.00
7,610,000.00
(7,333,000.00)
867,000.00
-
-
-
-
420.71 5,519.94
145,382.03
-
-Program: 6200 - Wastewater Collection Total:-53,911.03 --------Program: 6300 - Water Reclamation
Labor
Overtime
Standby
Benefits
Materials and Supplies
Contract Services
Utilities
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
84,011.54
490.50
168,360.19
1,541.48
939,000.00
25,000.00
55,000.00
456,000.00
734,000.00
5,646,000.00
2,021,000.00
20,000.00
939,000.00
25,000.00
55,000.00
456,000.00
734,000.00
5,646,000.00
2,021,000.00
20,000.00
770,639.81
23,458.52
55,000.00
290,739.61
728,375.73
3,394,556.43
1,959,875.44
18,296.86
--
23,367.51
7,048.72
829,804.88
24,513.05
-
165,260.39
5,624.27
2,251,443.57
61,124.56
1,703.14Professional Development
Program: 6300 - Water Reclamation Total:---969,236.20 2,655,057.60 9,896,000.00 9,896,000.00 7,240,942.40------Program: 7000 - Facilities Maintenance
Labor
Overtime
Benefits
Materials and Supplies
Contract Services
12,298.10
496.52
24,596.18
1,991.04
26,122.75
9,788.69
209,109.93
31,061.17
-
109,500.00
7,000.00
61,500.00
4,919.15
198.61
1,455.46
384.18
11,427.30
3,299.52
-
9,838.38
796.41
43,800.00
2,800.00
7,378.76
297.89
14,757.46
1,194.58
15,672.43
9,901.75
201,626.33
24,009.26
-
65,700.00
4,200.00
219,000.00
14,000.00
123,000.00
58,000.00
1,243,000.00
363,000.00
3,000.00
169,807.98
10,017.97
70,756.143,639.21
1,772.77
32,940.45
20,615.37
-
10,448.68
2,839.37
124,438.00
5,213.48
-
24,600.00
11,600.00
248,600.00
72,600.00
1,000.00
2,182.98
2,021.10
44,472.87
5,215.77
-
36,900.00
17,400.00
372,900.00
108,900.00
1,000.00
29,000.00 35,470.19
621,500.00
181,500.00
1,000.00
707,825.74
302,716.09
3,000.00
Utilities
Professional Development
Program: 7000 - Facilities Maintenance Total:71,762.42 302,669.76 1,011,000.00 21,684.22 153,574.32 405,000.00 61,569.37 267,161.81 607,000.00 2,023,000.00 1,299,594.11
Program: 7100 - Fleet Maintenance
Labor
Overtime
Benefits
Materials and Supplies
Contract Services
9,354.96
643.16
18,709.92
1,637.13
5,532.69
45,379.09
34,832.31
45,461.90
-
80,000.00
2,400.00
1,039.44
71.46
307.13
2,493.61
4,054.52
3,819.66
-
2,078.88
181.90
614.67
7,626.28
5,733.30
7,240.46
-
20,000.00
600.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
100,000.00
3,000.00
79,211.20
1,180.97
2,764.42
10,009.27
16,218.01
15,278.61
-
32,800.00
96,000.00
200,800.00
192,800.00
3,200.00
8,200.00
24,000.00
50,200.00
48,200.00
800.00
41,000.00
120,000.00
251,000.00
241,000.00
4,000.00
34,852.64
66,994.63
210,434.39
188,297.64
4,000.00
Utilities
Professional Development
Program: 7100 - Fleet Maintenance Total:54,268.43 151,553.04 608,000.00 11,785.82 23,475.49 152,000.00
-
760,000.00
-
584,971.47
Program: 8000 - Capital
Debt Service -
53,847.50
3,662.50
(53,847.50)
-
5,314.36
70,566.22
103,402.08
(70,566.22)
-
3,103,000.00
3,425,000.00
695,000.00
-
95,000.00
-
-
-
-
-
273,000.00
300,000.00
260,000.00
-
365,000.00
-
-
-
-
-
-
-
-
-
-
3,376,000.00
3,725,000.00
1,165,000.00
-
1,480,000.00
-
3,370,685.64
3,654,433.78
957,299.93
70,566.22
1,480,000.00
-
Capital Improvement
Capital Outlay
Accounting Income Add back
Transfer to Reserves
48,011.44 77,053.96 27,244.03 210,000.00
-
-
-
-
-
-
-
-
-
-
1,020,000.00
-Transfer from Reserves
Program: 8000 - Capital Total:
---
-3,662.50 108,716.44 7,318,000.00 48,011.44 77,053.96 1,198,000.00 27,244.03 1,230,000.00 9,746,000.00 9,532,985.57
Total Surplus (Deficit):$1,312,514.13 $3,340,295.24 $-$284,849.65 $182,460.45 $-$(122,411.13)$(298,136.53)$-$-$(3,224,619.16)
Page 6 of 6
Agenda Item
#3e
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #3e
Consent Item
9
3
6
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Accept and File Financial Statements for October 2023
RECOMMENDATION
That the Board of Directors accept and file the attached financial statements as of, and
for the period ended, October 31, 2023.
BACKGROUND / ANALYSIS
The East Valley Water District adopted an annual budget on June 28, 2023 for fiscal
year 2023-24. In accordance with District Administrative Policy 7.7, the Chief Financial
Officer provides regular budget updates to the Board of Directors (Board). Included
herewith for the Board’s review is a summary of the District’s financial results, as of
October 31, 2023.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by the Finance Department.
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Brian Tompkins
Chief Financial Officer
Agenda Item
#3e
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #3e
Consent Item
9
3
6
ATTACHMENTS
1. October 2023 Financial Statement Monthly Review
2. October 2023 Financial Statements
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING OCTOBER 31, 2023
page | 1
The following is a highlight summary of the District’s financial results as of October 31,
2023. Please note all values presented are in millions (unless otherwise noted).
Statement of Net Position
Total assets at October 31, 2023 are $411.24 million.
CLASSIFICATION WATER WASTEWATER RECLAMATION
DISTRICT
TOTAL
Cash and Investments $ 17.72 $ 6.31 $ 2.75 $ 26.78
Utility Plant, Net 96.95 17.00 - 113.95
Other Assets 50.49 31.43 188.59 270.51
Current Liabilities 9.40 7.15 32.30 48.85
Long Term Liabilities 44.58 8.15 156.40 209.13
Beginning Net Position 105.34 38.68 3.01 147.03
Change in Equity 4.24 0.42 (0.36) 4.30
TOTAL NET $ 109.58 $ 39.10 $ 2.65 $ 151.33
Cash and Investments
Cash and Investments are $26.78 million for the month of October, an increase of $2.20
million from the prior month. In October, the District incurred but did not pay for any
construction of the recycled water pipeline due to labor compliance holds restricting
payment to the vendor. The District’s Due from Other Governments includes a receivable
for work performed on the Recycled Water Pipeline from August through October and
Grants Receivable from the State of California bringing the ending balance as of October
31, 2023 to $21.88 million.
$0
$5
$10
$15
$20
$25
$30
Mi
l
l
i
o
n
s
CASH & INVESTMENTS
Restricted Unrestricted
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING OCTOBER 31, 2023
page | 2
Statement of Revenues & Expenses
Total Revenues & Expenses through October 31, 2023 are summarized below (in
millions):
Column1 WATER WASTEWATER RECLAMATION
DISTRICT
TOTAL
Revenue $ 11.25 $ 2.20 $ 3.52 $ 16.97
Ex pense 7.01 1.78 3.88 12.67
The Reclamation Fund expenses continue to exceed revenues as the SNRC facility has
yet to begin operations. The District is incurring Contract Service Expenses for Treatment
as well as plant expenses such as Salaries and Benefits, Utilities, Materials and Supplies
but has yet to begin collecting any offsetting revenues anticipated from operation such
as Tipping Fees, etc.
Water Sales by Tier
Water Sales for the month ending October 31, 2023 were $1.56M; $221K under staff
projections for the month and $403K under projections year-to-date.
$0.0
$0.5
$1.0
$1.5
$2.0
$2.5
Mi
l
l
i
o
n
s
WATER SALES BY TIER
Tier 1 Tier 2 Tier 3 FY 2023-24 Projection
For a more detailed presentation, operating results are presented in three ways on pages
2 through 6 of the attached financial statements for the period ending October 31, 2023.
First is a one-page summary with monthly and year-to-date totals for revenue and
expenses, presented by Expense Category. Second is a one-page summary with monthly
and year-to-date totals for Revenues and Expense by Program. Third is a Budget-to-
Actual presentation of program expense detail.
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING OCTOBER 31, 2023
page | 3
Water Sales by Customer Class
The table below shows the District’s water sales for the month of October 2023 by
customer class. The following icons are to compliment the graph below: positive
change, no change, negative change when comparing actuals versus projections.
CUSTOMER CLASS ACTUAL PROJECTION
$
VARIANCE
%
VARIANCE
Residential 905,912$ 1,036,000$ (130,088)$ -13%
Multi-Family 295,388 359,000 (63,612) -18%
Commercial 126,622 147,000 (20,378) -14%
Irrigation 236,449 243,000 (6,551) -3%
TOTAL $1,564,371 $ 1,785,000 $ (220,629) -12%
The following table displays customer class by tier for the month of October 2023:
CUSTOMER CLASS TIER ACTUAL PROJECTION
$
VARIANCE
%
VARIANCE
Residential Tier 1 342,391$ 369,000$ (26,609)$ -7%
Residential Tier 2 337,938 396,000 (58,062) -15%
Residential Tier 3 225,583 271,000 (45,417) -17%
Multi-Family Tier 1 141,121 157,000 (15,879) -10%
Multi-Family Tier 2 71,350 105,000 (33,650) -32%
Multi-Family Tier 3 82,917 97,000 (14,083) -15%
Commercial Tier 1 100,982 104,000 (3,018) -3%
Commercial Tier 2 4,467 10,000 (5,533) -55%
Commercial Tier 3 21,173 33,000 (11,827) -36%
Irrigation Tier 2 90,746 126,000 (35,254) -28%
Irrigation Tier 3 145,703 117,000 28,703 25%
TOTAL $ 1,564,371 $ 1,785,000 $ (220,629) -12%
Legend
- Positive Change in Actuals
- Neutral Change in Actuals
- Negative Change in Actuals
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING OCTOBER 31, 2023
page | 4
The chart below is a comparative illustration of Water Revenue year-to-date compared
to last year’s Water Revenue year-to-date as of October. As noted in the graph, Water
Revenue experienced a minor decrease over last year. Water consumption decreased
136.30 million gallons (182.2K HCF) compared to October of 2022 and water sales were
down $271K for all three tiers combined.
$0
$2
$4
$6
$8
$10
$12
10/31/2022 10/31/2023
M
i
l
l
i
o
n
s
COMPARATIVE MONTHLY WATER REVENUE
(WATER SALES & METER CHARGES)
Meter Tier 1 Tier 2 Tier 3
Total - $10,807,229 Total - $10,633,826
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING OCTOBER 31, 2023
page | 5
Water Fund Activities by Cost Center
The graph below provides a year-to-date comparison of the Water Fund operating cost
centers for FY 2022-23 and FY 2023-24.
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING OCTOBER 31, 2023
page | 6
Wastewater Fund Activities by Cost Center
The graph below provides a year-to-date comparison of the Wastewater Fund operating
cost centers for FY 2022-23 and FY 2023-24.
FINANCIAL STATEMENTS MONTHLY REVIEW
MONTH ENDING OCTOBER 31, 2023
page | 7
Water Reclamation Fund Activities by Cost Center
The graph below provides a year-to-date comparison of the Water Reclamation Fund
operating cost centers for FY 2022-23 and FY 2023-24.
WATER WASTEWATER RECLAMATION DISTRICT TOTAL
Assets:
Current Assets:
01 - Cash and Cash EquivalentsCash and Cash Equivalents 6,342,583.55$ 738,504.19$ 2,750,000.00$ 9,831,087.74$
02 - InvestmentsInvestments 3,309,627.32 2,019,618.14 - 5,329,245.46
03 - Accounts Receivable, NetAccounts Receivable, Net 4,415,066.60 311,471.64 548,409.10 5,274,947.34
04 - Interest ReceivableInterest Receivable - - - -
14*05 - Other ReceivablesOther Receivables 2,393,767.42 - - 2,393,767.42
07 - Due from Sewer FundDue from Sewer Fund 3,770,000.00 11,689,030.10 - 15,459,030.10
07.1 - Due from Reclamation FundDue from Reclamation Fund 11,759,313.01 - - 11,759,313.01
06 - Due from other GovernmentsDue from Other Governments 48,418.33 - 21,831,662.98 21,880,081.31
08 - InventoryInventory 1,117,783.59 6,721.16 - 1,124,504.75
09 - Prepaid ExpensesPrepaid Expenses 212,514.89 32,079.63 - 244,594.52
33,369,074.71 14,797,424.86 25,130,072.08 73,296,571.65
Non-Current Assets:
10 - Restricted Cash and Cash EquivalentsRestricted Cash and Cash Equivalents 8,063,265.32 3,555,502.92 - 11,618,768.24
11 - Capital Assets not being DepreciatedCapital Assets not being Depreciated 21,234,913.08 17,571,986.62 166,209,747.73 205,016,647.43
13 - Capital Assets, NetCapital Assets, Net 96,948,239.29 16,997,047.78 - 113,945,287.07
126,246,417.69 38,124,537.32 166,209,747.73 330,580,702.74
Total Assets:159,615,492.40 52,921,962.18 191,339,819.81 403,877,274.39
Deferred Outflow Of Resources
24*Deferred Charge on Refunding 581,826.53 272,820.05 - 854,646.58
25 - Deferred Outflow - PensionsDeferred Outflows - Pensions 4,954,821.80 1,546,575.07 - 6,501,396.87
165,152,140.73 54,741,357.30 191,339,819.81 411,233,317.84
Current Liabilities:
22 - PayablesAccounts Payable and Accrued Expenses 5,058,686.72 29,842.00 - 5,088,528.72
29 - Due to Water FundDue to Water Fund - 3,770,044.00 11,759,313.01 15,529,357.01
29.1 - Due to Sewer FundDue to Sewer Fund - - 11,689,030.10 11,689,030.10
23 - Payroll LiabilitiesAccrued Payroll and Benefits - - - -
15 - Customer Service DepositsCustomer Service Deposits 1,398,058.58 - - 1,398,058.58
16 - Construction Advances and RetentionsConstruction Advances and Retentions 119,421.22 3,010,696.98 8,784,665.92 11,914,784.12
17 - Interest PayableAccrued Interest Payable 239,066.72 24,710.75 - 263,777.47
18 - Current Portion of Compensated AbsencesCurrent Portion of Compensated Absences 449,527.20 137,616.80 65,033.00 652,177.00
19 - Current Portion of Long-Term DebtCurrent Portion of Long-Term Debt 2,140,008.61 175,000.00 - 2,315,008.61
9,404,769.05 7,147,910.53 32,298,042.03 48,850,721.61
Non-Current Liabilities:
20 - Compensated Absences, less current portionCompensated Absences, less current portion 418,053.70 98,495.22 106,450.50 622,999.42
28 - Net Pension LiabilityNet Pension Liability 10,600,994.28 3,254,141.95 - 13,855,136.23
21 - Long Term DebtLong Term Debt, Less Current Portion 33,555,886.89 4,800,908.00 156,289,569.00 194,646,363.89
27 - Other LiabilitiesOther Liabilities 1,173.64 - - 1,173.64
44,576,108.51 8,153,545.17 156,396,019.50 209,125,673.18
Total Liabilities:53,980,877.56 15,301,455.70 188,694,061.53 257,976,394.79
Deferred Inflows Of Resources
26 - Deferred Inflows - PensionsDeferred Inflows - Pensions 1,589,671.06 336,902.07 - 1,926,573.13
55,570,548.62 15,638,357.77 188,694,061.53 259,902,967.92
31 - EquityEquity 105,340,469.37 38,679,547.28 3,008,522.25 147,028,538.90
105,340,469.37 38,679,547.28 3,008,522.25 147,028,538.90
Total RevenueTotal Revenue 11,247,914.77 2,204,318.96 3,515,977.47 16,968,211.20
Total ExpenseTotal Expense 7,006,792.03 1,780,866.71 3,878,741.44 12,666,400.18
4,241,122.74 423,452.25 (362,763.97) 4,301,811.02
109,581,592.11 39,102,999.53 2,645,758.28 151,330,349.92
165,152,140.73$ 54,741,357.30$ 191,339,819.81$ 411,233,317.84$ Total Liabilities, Equity and Current Surplus (Deficit):
Total Beginning Equity:
Equity:
Revenues Over/Under Expenses
Total Current Liabilities:
Total Liabilities and Deferred Inflows of Resources:
Total Non-Current Liabilities:
Unaudited
As of October 31, 2023
Combining Schedule of Net Position
Total Equity and Current Surplus (Deficit):
Total Assets and Deferred Outflows of Resources:
Total Current Assets:
Total Non-Current Assets:
Page 1 of 6
AMENDED AMENDED AMENDED AMENDED REMAINING
MTD YTD BUDGET MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Revenue
41 - Water SalesWater Sales 1,564,372.75$ 7,303,315.23$ 18,345,000.00$ -$ -$ -$ -$ -$ 692,000.00$ 19,037,000.00$ 11,733,684.77$
42 - Meter ChargesMeter Charges 833,102.97 3,330,718.46 9,996,000.00 - - - - - - 9,996,000.00 6,665,281.54
43 - PenaltiesPenalties 56,012.53 190,012.03 450,000.00 5,797.15 21,511.99 60,000.00 - - - 510,000.00 298,475.98
44 - Wastewater System ChargesWastewater System Charges - - - 487,585.61 1,967,548.52 5,968,000.00 - - - 5,968,000.00 4,000,451.48
45 - Wastewater Treatment ChargesWastewater Treatment Charges - - - - - - 859,951.48 3,515,977.47 10,279,000.00 10,279,000.00 6,763,022.53
46 - Other Operating RevenueOther Operating Revenue 83,729.97 416,398.97 42,000.00 26,220.70 215,258.45 - - - 1,252,000.00 1,294,000.00 662,342.58
47 - Non Operating RevenueNon Operating Revenue 1,849.01 7,470.08 220,000.00 - - 20,000.00 - - 100,000.00 340,000.00 332,529.92
48 - Gain or Loss on DispositionGain or Loss on Disposition - - - - - - - - - - -
56 - BenefitsBenefits - - - - - - - - - - -
68 - DepreciationDepreciation - - - - - - - - - - -
Revenue Total:2,539,067.23 11,247,914.77 29,053,000.00 519,603.46 2,204,318.96 6,048,000.00 859,951.48 3,515,977.47 12,323,000.00 47,424,000.00 30,455,788.80
- - - - - - - -
Expense by Category
51 - LaborLabor 458,373.89 1,732,193.51 5,596,200.00 127,135.92 477,959.12 1,627,100.00 60,883.96 244,001.61 1,004,700.00 8,228,000.00 5,773,845.76
52 - Temporary LaborTemporary Labor 1,058.40 8,109.42 32,900.00 453.60 3,475.46 14,100.00 - - - 47,000.00 35,415.12
56 - BenefitsBenefits 171,667.98 1,367,462.62 2,915,800.00 47,156.21 330,625.39 756,300.00 21,055.41 201,988.23 492,900.00 4,165,000.00 2,264,923.76
63 - Contract ServicesContract Services 370,664.19 1,042,830.68 5,048,000.00 56,057.53 356,482.99 1,582,100.00 779,637.83 3,232,707.73 6,018,900.00 12,649,000.00 8,016,978.60
65 - Professional DevelopmentProfessional Development 38,877.04 79,789.74 291,000.00 15,165.67 23,867.42 104,000.00 19,053.41 20,756.55 21,000.00 416,000.00 291,586.29
53 - OvertimeOvertime 44,166.70 169,006.75 371,000.00 815.88 6,293.50 25,800.00 700.65 3,436.71 29,200.00 426,000.00 247,263.04
62 - Materials and SuppliesMaterials and Supplies 160,838.24 535,536.92 1,331,500.00 17,816.30 40,050.73 133,100.00 4,069.82 19,595.84 751,400.00 2,216,000.00 1,620,816.51
64 - UtilitiesUtilities 328,398.71 921,029.97 4,013,800.00 9,125.96 34,035.19 250,300.00 39,177.84 124,311.66 2,129,900.00 6,394,000.00 5,314,623.18
52 - Temporary LaborTemporary Labor 1,058.40 8,109.42 32,900.00 453.60 3,475.46 14,100.00 - - - 47,000.00 35,415.12
67 - OtherOther 8,377.21 960,025.71 1,300,900.00 3,478.41 426,033.12 341,100.00 - 4,699.08 590,000.00 2,232,000.00 841,242.09
54 - StandbyStandby 5,992.45 23,567.94 33,000.00 200.70 762.49 2,000.00 - - 55,000.00 90,000.00 65,669.57
61 - Water SupplyWater Supply - 271.39 768,000.00 - - - - - - 768,000.00 767,728.61
71 - Debt ServiceDebt Service - 5,314.36 3,103,000.00 - - 273,000.00 - - - 3,376,000.00 3,370,685.64
81 - Capital ImprovementCapital Improvement - 70,566.22 3,425,000.00 - - 300,000.00 - - - 3,725,000.00 3,654,433.78
82 - Capital OutlayCapital Outlay 50,141.52 153,543.60 695,000.00 751.88 77,805.84 260,000.00 - 27,244.03 210,000.00 1,165,000.00 906,406.53
83 - Accounting Income Add backAccounting Income Add back - (70,566.22) - - - - - - - - 70,566.22
88 - Transfer from ReservesTransfer to Reserves - - 95,000.00 - - 365,000.00 - - 1,020,000.00 1,480,000.00 1,480,000.00
99 - 99Transfer from Reserves - - - - - - - - - - -
Expense Total:1,639,614.73 7,006,792.03 29,053,000.00 278,611.66 1,780,866.71 6,048,000.00 924,578.92 3,878,741.44 12,323,000.00 47,424,000.00 34,757,599.82
Total Surplus (Deficit):899,452.50$ 4,241,122.74$ -$ 240,991.80$ 423,452.25$ -$ (64,627.44)$ (362,763.97)$ -$ -$ (4,301,811.02)$
Unaudited
Revenue and Expense Budget-to-Actual by Category
Month Ended October 31, 2023
WATER WASTEWATER DISTRICT WIDERECLAMATION
Page 2 of 6
AMENDED AMENDED AMENDED AMENDED REMAINING
MTD YTD BUDGET MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Revenue
41 - Water SalesWater Sales 1,564,372.75$ 7,303,315.23$ 18,345,000.00$ -$ -$ -$ -$ -$ 692,000.00$ 19,037,000.00$ 11,733,684.77$
42 - Meter ChargesMeter Charges 833,102.97 3,330,718.46 9,996,000.00 - - - - - - 9,996,000.00 6,665,281.54
43 - PenaltiesPenalties 56,012.53 190,012.03 450,000.00 5,797.15 21,511.99 60,000.00 - - - 510,000.00 298,475.98
44 - Wastewater System ChargesWastewater System Charges - - - 487,585.61 1,967,548.52 5,968,000.00 - - - 5,968,000.00 4,000,451.48
45 - Wastewater Treatment ChargesWastewater Treatment Charges - - - - - - 859,951.48 3,515,977.47 10,279,000.00 10,279,000.00 6,763,022.53
46 - Other Operating RevenueOther Operating Revenue 83,729.97 416,398.97 42,000.00 26,220.70 215,258.45 - - - 1,252,000.00 1,294,000.00 662,342.58
47 - Non Operating RevenueNon Operating Revenue 1,849.01 7,470.08 220,000.00 - - 20,000.00 - - 100,000.00 340,000.00 332,529.92
Revenue Total:2,539,067.23 11,247,914.77 29,053,000.00 519,603.46 2,204,318.96 6,048,000.00 859,951.48 3,515,977.47 12,323,000.00 47,424,000.00 30,455,788.80
Program: 1000 - Governing Board Total:1000 - Governing Board 15,393.47 57,466.64 254,800.00 6,383.14 23,731.72 109,200.00 - - - 364,000.00 282,801.64
Program: 2000 - General Administration Total:2000 - General Administration 134,686.30 317,297.11 959,000.00 56,820.16 133,276.78 411,000.00 - - - 1,370,000.00 919,426.11
Program: 2100 - Human Resources Total:2100 - Human Resources 38,738.74 1,185,537.30 1,702,400.00 16,602.21 506,107.50 564,600.00 - 4,699.08 590,000.00 2,857,000.00 1,160,656.12
Program: 2200 - Public Affairs Total:2200 - Public Affairs 44,326.69 209,241.02 904,400.00 19,149.32 105,059.27 387,600.00 - - - 1,292,000.00 977,699.71
Program: 2300 - Conservation Total:2300 - Conservation 29,785.90 (242,426.07) 689,000.00 - - - - - - 689,000.00 931,426.07
Program: 3000 - Finance Total:3000 - Finance & Accounting 48,466.76 233,187.58 940,800.00 20,771.36 99,822.79 403,200.00 - - - 1,344,000.00 1,010,989.63
Program: 3200 - Information Technology Total:3200 - Information Technology 58,629.69 341,192.07 1,205,400.00 25,127.01 146,224.79 516,600.00 - - - 1,722,000.00 1,234,583.14
Program: 3300 - Customer Service Total:3300 - Customer Service 95,481.47 497,850.51 1,304,100.00 40,457.48 212,023.20 558,900.00 - - - 1,863,000.00 1,153,126.29
Program: 3400 - Meter Services Total:3400 - Meter Services 17,517.63 92,058.34 292,000.00 - - - - - - 292,000.00 199,941.66
Program: 4000 - Engineering Surplus Total:4000 - Engineering 75,967.01 223,390.34 999,600.00 17,314.51 63,574.84 428,400.00 - - - 1,428,000.00 1,141,034.82
Program: 5000 - Water Production Total:5000 - Water Production 362,937.43 1,352,070.78 5,992,000.00 - - - - - - 5,992,000.00 4,639,929.22
Program: 5100 - Water Treatment Total:5100 - Water Treatment 215,999.07 517,330.11 1,082,000.00 - - - - - - 1,082,000.00 564,669.89
Program: 5200 - Water Quality Total:5200 - Water Quality 29,457.23 142,506.85 546,000.00 - - - - - - 546,000.00 403,493.15
Program: 6000 - Maintenance Administration Total:6000 - Maintenance Administration 28,812.82 174,655.84 418,500.00 2,985.82 18,559.37 46,500.00 - - - 465,000.00 271,784.79
Program: 6100 - Water Maintenance Total:6100 - Water Maintenance 251,521.46 1,150,601.31 2,826,000.00 - - - - - - 2,826,000.00 1,675,398.69
Program: 6200 - Wastewater Collection Total:6200 - Wastewater Collection - - - 37,997.13 183,379.16 867,000.00 - - - 867,000.00 683,620.84
Program: 6200 - Wastewater Collection Total:6300 - Water Reclamation - - - - - - 861,138.47 3,516,196.07 9,896,000.00 9,896,000.00 6,379,803.93
Program: 7000 - Facilities Maintenance Total:7000 - Facilities Maintenance 82,233.52 384,903.28 1,011,000.00 20,594.47 174,168.79 405,000.00 63,440.45 330,602.26 607,000.00 2,023,000.00 1,133,325.67
Program: 7100 - Fleet Maintenance Total:7100 - Fleet Maintenance 59,518.02 211,071.06 608,000.00 13,657.17 37,132.66 152,000.00 - - - 760,000.00 511,796.28
Program: 8000 - Capital Total:8000 - Capital 50,141.52 158,857.96 7,318,000.00 751.88 77,805.84 1,198,000.00 - 27,244.03 1,230,000.00 9,746,000.00 9,482,092.17
Total Surplus (Deficit):899,452.50$ 4,241,122.74$ -$ 240,991.80$ 423,452.25$ -$ (64,627.44)$ (362,763.97)$ -$ -$ (4,301,811.02)$
.
WATER WASTEWATER DISTRICT WIDE
Revenue and Expense Budget-to-Actual by Program
Month Ended October 31, 2023
Unaudited
RECLAMATION
Page 3 of 6
AMENDED AMENDED AMENDED AMENDED REMAINING
MTD YTD BUDGET MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Revenue
41 - Water SalesWater Sales 1,564,372.75$ 7,303,315.23$ 18,345,000.00$ -$ -$ -$ -$ -$ 692,000.00$ 19,037,000.00$ 11,733,684.77$
42 - Meter ChargesMeter Charges 833,102.97 3,330,718.46 9,996,000.00 - - - - - - 9,996,000.00 6,665,281.54
43 - PenaltiesPenalties 56,012.53 190,012.03 450,000.00 5,797.15 21,511.99 60,000.00 - - - 510,000.00 298,475.98
44 - Wastewater System ChargesWastewater System Charges - - - 487,585.61 1,967,548.52 5,968,000.00 - - - 5,968,000.00 4,000,451.48
45 - Wastewater Treatment ChargesWastewater Treatment Charges - - - - - - 859,951.48 3,515,977.47 10,279,000.00 10,279,000.00 6,763,022.53
46 - Other Operating RevenueOther Operating Revenue 83,729.97 416,398.97 42,000.00 26,220.70 215,258.45 - - - 1,252,000.00 1,294,000.00 662,342.58
47 - Non Operating RevenueNon Operating Revenue 1,849.01 7,470.08 220,000.00 - - 20,000.00 - - 100,000.00 340,000.00 332,529.92
48 - Gain or Loss on DispositionGain or Loss on Disposition - - - - - - - - - - -
56 - BenefitsBenefits - - - - - - - - - - -
68 - DepreciationDepreciation - - - - - - - - - - -
Revenue Total:2,539,067.23 11,247,914.77 29,053,000.00 519,603.46 2,204,318.96 6,048,000.00 859,951.48 3,515,977.47 12,323,000.00 47,424,000.00 30,455,788.80 - - - - - - - - Program: 1000 - Governing Board - - - - -
51 - LaborLabor 7,276.51$ 27,460.15$ 98,000.00$ 3,118.49$ 11,768.60$ 42,000.00$ -$ -$ -$ 140,000.00$ 100,771.25$
56 - BenefitsBenefits 4,184.06 16,610.40 63,000.00 1,793.16 7,118.61 27,000.00 - - - 90,000.00 66,270.99
62 - Materials and SuppliesMaterials and Supplies - 56.13 2,100.00 - 24.05 900.00 - - - 3,000.00 2,919.82
63 - Contract ServicesContract Services 1,398.25 4,765.82 77,700.00 599.25 2,042.50 33,300.00 - - - 111,000.00 104,191.68
65 - Professional DevelopmentProfessional Development 2,534.65 8,574.14 14,000.00 872.24 2,777.96 6,000.00 - - - 20,000.00 8,647.90
Program: 1000 - Governing Board Total:15,393.47 57,466.64 254,800.00 6,383.14 23,731.72 109,200.00 - - - 364,000.00 282,801.64 - - - - - - Program: 2000 - General Administration - - - - -
51 - LaborLabor 51,183.15 140,269.47 417,900.00 21,935.65 60,115.53 179,100.00 - - - 597,000.00 396,615.00
52 - Temporary LaborTemporary Labor - 3,661.62 21,000.00 - 1,569.26 9,000.00 - - - 30,000.00 24,769.12
53 - OvertimeOvertime 213.04 751.89 2,800.00 91.31 322.27 1,200.00 - - - 4,000.00 2,925.84
56 - BenefitsBenefits 36,737.05 90,578.89 184,800.00 14,841.89 36,111.76 79,200.00 - - - 264,000.00 137,309.35
62 - Materials and SuppliesMaterials and Supplies 169.34 894.72 4,900.00 72.58 383.48 2,100.00 - - - 7,000.00 5,721.80
63 - Contract ServicesContract Services 16,644.45 45,875.49 217,000.00 7,133.33 19,660.90 93,000.00 - - - 310,000.00 244,463.61
64 - UtilitiesUtilities 89.32 441.15 2,800.00 38.28 189.06 1,200.00 - - - 4,000.00 3,369.79
65 - Professional DevelopmentProfessional Development 29,649.95 34,823.88 107,800.00 12,707.12 14,924.52 46,200.00 - - - 154,000.00 104,251.60
Program: 2000 - General Administration Total:134,686.30 317,297.11 959,000.00 56,820.16 133,276.78 411,000.00 - - - 1,370,000.00 919,426.11 - - - - - - Program: 2100 - Human Resources - - - - - -
51 - LaborLabor 17,626.00 70,287.02 230,300.00 7,554.01 30,123.00 98,700.00 - - - 329,000.00 228,589.98
52 - Temporary LaborTemporary Labor - - - - - - - - - - -
53 - OvertimeOvertime 582.87 874.32 2,100.00 249.79 374.68 900.00 - - - 3,000.00 1,751.00
56 - BenefitsBenefits 5,181.51 82,984.14 139,300.00 2,220.56 35,564.40 59,700.00 - - - 199,000.00 80,451.46
62 - Materials and SuppliesMaterials and Supplies - 786.29 4,900.00 - 336.97 2,100.00 - - - 7,000.00 5,876.74
63 - Contract ServicesContract Services 6,444.32 27,212.38 109,200.00 2,761.83 11,662.39 46,800.00 - - - 156,000.00 117,125.23
64 - UtilitiesUtilities 42.12 166.98 700.00 18.05 71.56 300.00 - - - 1,000.00 761.46
65 - Professional DevelopmentProfessional Development 745.65 6,016.24 39,200.00 319.56 1,941.38 16,800.00 - - - 56,000.00 48,042.38
67 - OtherOther 8,116.27 997,209.93 1,176,700.00 3,478.41 426,033.12 339,300.00 - 4,699.08 590,000.00 2,106,000.00 678,057.87
Program: 2100 - Human Resources Total:38,738.74 1,185,537.30 1,702,400.00 16,602.21 506,107.50 564,600.00 - 4,699.08 590,000.00 2,857,000.00 1,160,656.12 - - - - - - Program: 2200 - Public Affairs - - - - - -
51 - LaborLabor 25,667.06 102,668.28 300,300.00 11,000.15 44,000.59 128,700.00 - - - 429,000.00 282,331.13
52 - Temporary LaborTemporary Labor - - - - - - - - - - -
53 - OvertimeOvertime 433.44 1,013.75 11,900.00 185.75 434.43 5,100.00 - - - 17,000.00 15,551.82
56 - BenefitsBenefits 6,416.18 42,650.01 88,900.00 2,749.70 18,278.12 38,100.00 - - - 127,000.00 66,071.87
62 - Materials and SuppliesMaterials and Supplies 1,135.20 3,862.84 58,800.00 486.52 1,655.52 25,200.00 - - - 84,000.00 78,481.64
63 - Contract ServicesContract Services 9,701.05 56,680.82 385,700.00 4,309.87 39,676.89 165,300.00 - - - 551,000.00 454,642.29
64 - UtilitiesUtilities 521.47 1,105.46 33,600.00 223.49 473.76 14,400.00 - - - 48,000.00 46,420.78
65 - Professional DevelopmentProfessional Development 452.29 1,259.86 25,200.00 193.84 539.96 10,800.00 - - - 36,000.00 34,200.18
Program: 2200 - Public Affairs Total:44,326.69 209,241.02 904,400.00 19,149.32 105,059.27 387,600.00 - - - 1,292,000.00 977,699.71 - - - - - - Program: 2300 - Conservation - - - - - -
51 - LaborLabor 8,512.00 34,048.00 107,000.00 - - - - - - 107,000.00 72,952.00
52 - Temporary LaborTemporary Labor - - - - - - - - - - -
53 - OvertimeOvertime 319.20 558.60 7,000.00 - - - - - - 7,000.00 6,441.40
56 - BenefitsBenefits 2,902.55 9,669.80 42,000.00 - - - - - - 42,000.00 32,330.20
62 - Materials and SuppliesMaterials and Supplies 1,378.40 1,553.88 26,000.00 - - - - - - 26,000.00 24,446.12
63 - Contract ServicesContract Services 15,911.92 (255,159.39) 346,000.00 - - - - - - 346,000.00 601,159.39
64 - UtilitiesUtilities 57.18 119.65 26,000.00 - - - - - - 26,000.00 25,880.35
65 - Professional DevelopmentProfessional Development 704.65 4,474.65 15,000.00 - - - - - - 15,000.00 10,525.35
67 - OtherOther - (37,691.26) 120,000.00 - - - - - - 120,000.00 157,691.26
Program: 2300 - Conservation Total:29,785.90 (242,426.07) 689,000.00 - - - - - - 689,000.00 931,426.07
Program: 3000 - Finance & Accounting - - - - - -
51 - LaborLabor 33,689.06 133,528.20 542,500.00 14,438.14 57,210.66 232,500.00 - - - 775,000.00 584,261.14
52 - Temporary LaborTemporary Labor - - - - - - - - - - -
53 - OvertimeOvertime 508.87 1,309.69 9,100.00 218.09 561.30 3,900.00 - - - 13,000.00 11,129.01
56 - BenefitsBenefits 10,365.57 123,541.34 261,800.00 4,442.33 52,910.05 112,200.00 - - - 374,000.00 197,548.61
62 - Materials and SuppliesMaterials and Supplies 272.51 833.68 4,900.00 116.79 357.31 2,100.00 - - - 7,000.00 5,809.01
63 - Contract ServicesContract Services 1,489.54 (29,752.69) 98,700.00 638.36 (12,779.02) 42,300.00 - - - 141,000.00 183,531.71
64 - UtilitiesUtilities 259.81 577.08 2,800.00 111.34 247.31 1,200.00 - - - 4,000.00 3,175.61
65 - Professional DevelopmentProfessional Development 1,881.40 3,068.75 21,000.00 806.31 1,315.18 9,000.00 - - - 30,000.00 25,616.07
67 - OtherOther - 81.53 - - - - - - - - (81.53)
Program: 3000 - Finance & Accounting Total:48,466.76 233,187.58 940,800.00 20,771.36 99,822.79 403,200.00 - - - 1,344,000.00 1,010,989.63 - - - - - -
Month Ended October 31, 2023
Unaudited
Program Expense Detail Budget-to-Actual
WATER WASTEWATER DISTRICT WIDERECLAMATION
Page 4 of 6
AMENDED AMENDED AMENDED AMENDED REMAINING
MTD YTD BUDGET MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Month Ended October 31, 2023
Unaudited
Program Expense Detail Budget-to-Actual
WATER WASTEWATER DISTRICT WIDERECLAMATION
Program: 3200 - Information Technology - - - - - -
51 - LaborLabor 21,412.17 86,550.31 303,100.00 9,176.63 37,092.90 129,900.00 - - - 433,000.00 309,356.79
52 - Temporary LaborTemporary Labor 1,058.40 4,447.80 11,900.00 453.60 1,906.20 5,100.00 - - - 17,000.00 10,646.00
53 - OvertimeOvertime - - - - - - - - - - -
56 - BenefitsBenefits 7,186.32 109,908.94 181,300.00 3,079.87 47,103.54 77,700.00 - - - 259,000.00 101,987.52
62 - Materials and SuppliesMaterials and Supplies 20,059.79 36,599.03 49,000.00 8,597.05 15,685.29 21,000.00 - - - 70,000.00 17,715.68
63 - Contract ServicesContract Services 8,025.40 97,134.72 648,200.00 3,439.46 41,629.17 277,800.00 - - - 926,000.00 787,236.11
64 - UtilitiesUtilities 887.61 4,850.93 8,400.00 380.40 2,078.97 3,600.00 - - - 12,000.00 5,070.10
65 - Professional DevelopmentProfessional Development - 1,700.34 3,500.00 - 728.72 1,500.00 - - - 5,000.00 2,570.94
Program: 3200 - Information Technology Total:58,629.69 341,192.07 1,205,400.00 25,127.01 146,224.79 516,600.00 - - - 1,722,000.00 1,234,583.14 - - - - - - Program: 3300 - Customer Service - - - - - -
51 - LaborLabor 32,428.56 129,090.39 433,300.00 13,897.94 55,324.33 185,700.00 - - - 619,000.00 434,585.28
52 - Temporary LaborTemporary Labor - - - - - - - - - - -
53 - OvertimeOvertime 710.45 2,492.30 4,900.00 304.49 1,068.15 2,100.00 - - - 7,000.00 3,439.55
56 - BenefitsBenefits 11,458.22 97,841.81 217,000.00 4,910.61 41,931.59 93,000.00 - - - 310,000.00 170,226.60
62 - Materials and SuppliesMaterials and Supplies - 36.13 4,900.00 - 15.49 2,100.00 - - - 7,000.00 6,948.38
63 - Contract ServicesContract Services 49,754.35 245,026.66 515,200.00 21,323.29 105,011.41 220,800.00 - - - 736,000.00 385,961.93
64 - UtilitiesUtilities 819.58 22,851.39 112,700.00 - 8,635.25 48,300.00 - - - 161,000.00 129,513.36
65 - Professional DevelopmentProfessional Development 49.37 86.32 11,900.00 21.15 36.98 5,100.00 - - - 17,000.00 16,876.70
67 - OtherOther 260.94 425.51 4,200.00 - - 1,800.00 - - - 6,000.00 5,574.49
Program: 3300 - Customer Service Total:95,481.47 497,850.51 1,304,100.00 40,457.48 212,023.20 558,900.00 - - - 1,863,000.00 1,153,126.29 - - - - - - Program: 3400 - Meter Services - - - - - -
51 - LaborLabor 12,540.80 50,163.22 173,000.00 - - - - - - 173,000.00 122,836.78
53 - OvertimeOvertime 205.75 205.75 6,000.00 - - - - - - 6,000.00 5,794.25
56 - BenefitsBenefits 4,492.78 40,941.70 101,000.00 - - - - - - 101,000.00 60,058.30
62 - Materials and SuppliesMaterials and Supplies - - 4,000.00 - - - - - - 4,000.00 4,000.00
63 - Contract ServicesContract Services 278.30 505.62 7,000.00 - - - - - - 7,000.00 6,494.38
64 - UtilitiesUtilities - 242.05 1,000.00 - - - - - - 1,000.00 757.95
65 - Professional DevelopmentProfessional Development - - - - - - - - - - -
Program: 3400 - Meter Services Total:17,517.63 92,058.34 292,000.00 - - - - - - 292,000.00 199,941.66 - - - - - - Program: 4000 - Engineering - - - - - -
51 - LaborLabor 31,007.76 123,856.03 438,900.00 13,289.04 53,081.17 188,100.00 - - - 627,000.00 450,062.80
52 - Temporary LaborTemporary Labor - - - - - - - - - - -
53 - OvertimeOvertime - - 2,100.00 - - 900.00 - - - 3,000.00 3,000.00
56 - BenefitsBenefits 6,816.70 24,804.51 107,100.00 2,921.37 10,630.20 45,900.00 - - - 153,000.00 117,565.29
62 - Materials and SuppliesMaterials and Supplies 233.62 350.12 13,300.00 100.11 150.03 5,700.00 - - - 19,000.00 18,499.85
63 - Contract ServicesContract Services 12,234.00 36,161.10 296,100.00 934.50 (1,094.50) 126,900.00 - - - 423,000.00 387,933.40
64 - UtilitiesUtilities 25,674.93 38,166.04 131,600.00 69.49 785.43 56,400.00 - - - 188,000.00 149,048.53
65 - Professional DevelopmentProfessional Development - 52.54 10,500.00 - 22.51 4,500.00 - - - 15,000.00 14,924.95
Program: 4000 - Engineering Total:75,967.01 223,390.34 999,600.00 17,314.51 63,574.84 428,400.00 - - - 1,428,000.00 1,141,034.82 - - - - - - Program: 5000 - Water Production - - - - - -
51 - LaborLabor 60,106.29 235,949.56 790,000.00 - - - - - - 790,000.00 554,050.44
53 - OvertimeOvertime 3,439.80 20,227.42 46,000.00 - - - - - - 46,000.00 25,772.58
54 - StandbyStandby 2,886.46 12,005.39 15,000.00 - - - - - - 15,000.00 2,994.61
56 - BenefitsBenefits 18,146.00 208,755.12 400,000.00 - - - - - - 400,000.00 191,244.88
61 - Water SupplyWater Supply - 271.39 768,000.00 - - - - - - 768,000.00 767,728.61
62 - Materials and SuppliesMaterials and Supplies 19,291.92 83,917.48 335,000.00 - - - - - - 335,000.00 251,082.52
63 - Contract ServicesContract Services 9,646.77 136,103.12 528,000.00 - - - - - - 528,000.00 391,896.88
64 - UtilitiesUtilities 248,945.19 650,864.13 3,099,000.00 - - - - - - 3,099,000.00 2,448,135.87
65 - Professional DevelopmentProfessional Development 475.00 3,977.17 11,000.00 - - - - - - 11,000.00 7,022.83
Program: 5000 - Water Production Total:362,937.43 1,352,070.78 5,992,000.00 - - - - - - 5,992,000.00 4,639,929.22 - - - - - - Program: 5100 - Water Treatment - - - - - -
51 - LaborLabor 21,020.80 84,083.20 273,000.00 - - - - - - 273,000.00 188,916.80
53 - OvertimeOvertime 1,105.89 9,311.69 39,000.00 - - - - - - 39,000.00 29,688.31
56 - BenefitsBenefits 6,279.80 101,438.91 164,000.00 - - - - - - 164,000.00 62,561.09
62 - Materials and SuppliesMaterials and Supplies 59,013.29 122,949.33 200,000.00 - - - - - - 200,000.00 77,050.67
63 - Contract ServicesContract Services 128,498.84 132,780.92 224,000.00 - - - - - - 224,000.00 91,219.08
64 - UtilitiesUtilities 80.45 66,766.06 182,000.00 - - - - - - 182,000.00 115,233.94
Program: 5100 - Water Treatment Total:215,999.07 517,330.11 1,082,000.00 - - - - - - 1,082,000.00 564,669.89 - - - - - - Program: 5200 - Water Quality - - - - - -
51 - LaborLabor 16,022.40 60,913.20 223,000.00 - - - - - - 223,000.00 162,086.80
53 - OvertimeOvertime - 792.90 12,000.00 - - - - - - 12,000.00 11,207.10
56 - BenefitsBenefits 2,843.41 46,380.81 107,000.00 - - - - - - 107,000.00 60,619.19
62 - Materials and SuppliesMaterials and Supplies 781.50 3,372.96 25,000.00 - - - - - - 25,000.00 21,627.04
63 - Contract ServicesContract Services 9,809.92 30,861.98 170,000.00 - - - - - - 170,000.00 139,138.02
64 - UtilitiesUtilities - - 2,000.00 - - - - - - 2,000.00 2,000.00
65 - Professional DevelopmentProfessional Development - 185.00 7,000.00 - - - - - - 7,000.00 6,815.00
Program: 5200 - Water Quality Total:29,457.23 142,506.85 546,000.00 - - - - - - 546,000.00 403,493.15 - - - - - -
Page 5 of 6
AMENDED AMENDED AMENDED AMENDED REMAINING
MTD YTD BUDGET MTD YTD BUDGET MTD YTD BUDGET TOTAL BUDGET BUDGET
Month Ended October 31, 2023
Unaudited
Program Expense Detail Budget-to-Actual
WATER WASTEWATER DISTRICT WIDERECLAMATION
Program: 6000 - Maintenance Administration - - - - - -
51 - LaborLabor 14,741.88 58,967.51 195,300.00 1,624.06 6,496.25 21,700.00 - - - 217,000.00 151,536.24
52 - Temporary LaborTemporary Labor - - - - - - - - - - -
53 - OvertimeOvertime - - 1,800.00 - - 200.00 - - - 2,000.00 2,000.00
54 - StandbyStandby 3,105.99 11,562.55 18,000.00 200.70 762.49 2,000.00 - - - 20,000.00 7,674.96
56 - BenefitsBenefits 6,517.66 78,522.06 142,200.00 686.49 8,605.79 15,800.00 - - - 158,000.00 70,872.15
62 - Materials and SuppliesMaterials and Supplies - 55.25 2,700.00 - 6.14 300.00 - - - 3,000.00 2,938.61
63 - Contract ServicesContract Services 38.68 618.16 900.00 4.28 68.65 100.00 - - - 1,000.00 313.19
64 - UtilitiesUtilities 2,024.53 9,359.46 36,900.00 224.84 1,039.84 4,100.00 - - - 41,000.00 30,600.70
65 - Professional DevelopmentProfessional Development 2,384.08 15,570.85 20,700.00 245.45 1,580.21 2,300.00 - - - 23,000.00 5,848.94
Program: 6000 - Maintenance Administration Total:28,812.82 174,655.84 418,500.00 2,985.82 18,559.37 46,500.00 - - - 465,000.00 271,784.79 - - - - - - Program: 6100 - Water Maintenance - - - - - -
51 - LaborLabor 91,762.48 344,726.92 914,000.00 - - - - - - 914,000.00 569,273.08
53 - OvertimeOvertime 37,084.09 128,568.42 219,000.00 - - - - - - 219,000.00 90,431.58
56 - BenefitsBenefits 36,153.20 254,900.32 620,000.00 - - - - - - 620,000.00 365,099.68
62 - Materials and SuppliesMaterials and Supplies 36,643.28 203,241.91 471,000.00 - - - - - - 471,000.00 267,758.09
63 - Contract ServicesContract Services 49,878.41 219,163.74 602,000.00 - - - - - - 602,000.00 382,836.26
64 - UtilitiesUtilities - - - - - - - - - - -
Program: 6100 - Water Maintenance Total:251,521.46 1,150,601.31 2,826,000.00 - - - - - - 2,826,000.00 1,675,398.69 - - - - - - Program: 6200 - Wastewater Collection - - - - - -
51 - LaborLabor - - - 27,582.96 110,331.84 371,000.00 - - - 371,000.00 260,668.16
53 - OvertimeOvertime - - - - 2,912.80 9,000.00 - - - 9,000.00 6,087.20
56 - BenefitsBenefits - - - 7,797.36 59,470.22 174,000.00 - - - 174,000.00 114,529.78
62 - Materials and SuppliesMaterials and Supplies - - - 2,616.81 5,144.36 36,000.00 - - - 36,000.00 30,855.64
Wastewater Treatment - - - - - 7,610,000.00 - - - 7,610,000.00 7,610,000.00
63 - Contract ServicesContract Services - - - - 5,519.94 (7,333,000.00) - - - (7,333,000.00) (7,338,519.94)
Program: 6200 - Wastewater Collection Total:- - - 37,997.13 183,379.16 867,000.00 - - - 867,000.00 683,620.84 - - - - - - Program: 6300 - Water Reclamation - - - - - -
51 - LaborLabor - - - - - - 55,964.83 224,325.02 939,000.00 939,000.00 714,674.98
53 - OvertimeOvertime - - - - - - 700.65 2,242.13 25,000.00 25,000.00 22,757.87
54 - StandbyStandby - - - - - - - - 55,000.00 55,000.00 55,000.00
56 - BenefitsBenefits - - - - - - 19,263.90 184,524.29 456,000.00 456,000.00 271,475.71
62 - Materials and SuppliesMaterials and Supplies - - - - - - 98.73 5,723.00 734,000.00 734,000.00 728,277.00
63 - Contract ServicesContract Services - - - - - - 739,261.37 2,990,704.94 5,646,000.00 5,646,000.00 2,655,295.06
64 - UtilitiesUtilities - - - - - - 26,795.58 87,920.14 2,021,000.00 2,021,000.00 1,933,079.86
65 - Professional DevelopmentProfessional Development - - - - - - 19,053.41 20,756.55 20,000.00 20,000.00 (756.55)
Program: 6300 - Water Reclamation Total:- - - - - - 861,138.47 3,516,196.07 9,896,000.00 9,896,000.00 6,379,803.93 - - - - - - Program: 7000 - Facilities Maintenance - - - - - -
51 - LaborLabor 8,198.73 32,794.91 109,500.00 3,279.49 13,117.87 43,800.00 4,919.13 19,676.59 65,700.00 219,000.00 153,410.63
53 - OvertimeOvertime - 1,991.04 7,000.00 - 796.41 2,800.00 - 1,194.58 4,200.00 14,000.00 10,017.97
56 - BenefitsBenefits 2,986.58 29,109.33 61,500.00 1,194.49 11,643.17 24,600.00 1,791.51 17,463.94 36,900.00 123,000.00 64,783.56
62 - Materials and SuppliesMaterials and Supplies 3,163.80 12,952.49 29,000.00 1,152.58 3,991.95 11,600.00 3,971.09 13,872.84 17,400.00 58,000.00 27,182.72
63 - Contract ServicesContract Services 37,350.86 246,460.79 621,500.00 11,523.58 135,961.58 248,600.00 40,376.46 242,002.79 372,900.00 1,243,000.00 618,574.84
64 - UtilitiesUtilities 30,533.55 61,594.72 181,500.00 3,444.33 8,657.81 72,600.00 12,382.26 36,391.52 108,900.00 363,000.00 256,355.95
65 - Professional DevelopmentProfessional Development - - 1,000.00 - - 1,000.00 - - 1,000.00 3,000.00 3,000.00
Program: 7000 - Facilities Maintenance Total:82,233.52 384,903.28 1,011,000.00 20,594.47 174,168.79 405,000.00 63,440.45 330,602.26 607,000.00 2,023,000.00 1,133,325.67
- - -
Program: 7100 - Fleet Maintenance - - - - - -
51 - LaborLabor 6,236.64 24,946.56 80,000.00 692.96 2,771.84 20,000.00 - - - 100,000.00 72,281.60
53 - OvertimeOvertime 146.17 1,783.30 2,400.00 16.24 198.14 600.00 - - - 3,000.00 1,018.56
56 - BenefitsBenefits 2,417.52 7,950.21 32,800.00 268.59 883.26 8,200.00 - - - 41,000.00 32,166.53
62 - Materials and SuppliesMaterials and Supplies 18,695.59 64,074.68 96,000.00 4,673.86 12,300.14 24,000.00 - - - 120,000.00 43,625.18
63 - Contract ServicesContract Services 13,559.13 48,391.44 200,800.00 3,389.78 9,123.08 50,200.00 - - - 251,000.00 193,485.48
64 - UtilitiesUtilities 18,462.97 63,924.87 192,800.00 4,615.74 11,856.20 48,200.00 - - - 241,000.00 165,218.93
65 - Professional DevelopmentProfessional Development - - 3,200.00 - - 800.00 - - - 4,000.00 4,000.00
Program: 7100 - Fleet Maintenance Total:59,518.02 211,071.06 608,000.00 13,657.17 37,132.66 152,000.00 - - - 760,000.00 511,796.28
- - -
Program: 8000 - Capital - - - - -
71 - Debt ServiceDebt Service - 5,314.36 3,103,000.00 - - 273,000.00 - - - 3,376,000.00 3,370,685.64
81 - Capital ImprovementCapital Improvement - 70,566.22 3,425,000.00 - - 300,000.00 - - - 3,725,000.00 3,654,433.78
82 - Capital OutlayCapital Outlay 50,141.52 153,543.60 695,000.00 751.88 77,805.84 260,000.00 - 27,244.03 210,000.00 1,165,000.00 906,406.53
83 - Accounting Income Add backAccounting Income Add back - (70,566.22) - - - - - - - - 70,566.22
88 - Transfer from ReservesTransfer to Reserves - - 95,000.00 - - 365,000.00 - - 1,020,000.00 1,480,000.00 1,480,000.00
99 - 99Transfer from Reserves - - - - - - - - - - -
Program: 8000 - Capital Total:50,141.52 158,857.96 7,318,000.00 751.88 77,805.84 1,198,000.00 - 27,244.03 1,230,000.00 9,746,000.00 9,482,092.17
Total Surplus (Deficit):899,452.50$ 4,241,122.74$ -$ 240,991.80$ 423,452.25$ -$ (64,627.44)$ (362,763.97)$ -$ -$ (4,301,811.02)$
Page 6 of 6
Agenda Item
#3f
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #3f
Consent Item
1
3
8
4
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Approve October 2023 Disbursements: Accounts payable disbursements for
the period include check numbers 262011 through 262150, bank drafts, and ACH
payments in the amount of $2,286,945.17 and $519,123.24 for payroll
RECOMMENDATION
That the Board of Directors approve the District's expense disbursements for the period
October 1, 2023 through October 31, 2023 in the amount of $2,806,068.41.
BACKGROUND / ANALYSIS
The payment register for supplies, materials, services, and payroll for October 2023 is
attached for review and approval. This process provides the Board of Directors and the
public with an opportunity to review the expenses of the District. Accounts Payable are
processed weekly, while payroll is processed bi-weekly. District Policy 7.1 provides the
requirements for purchases and contracts and all supporting documents are maintained
by the Purchasing Agent.
Accounts payable disbursements for the period include check numbers 262011 through
262150, bank drafts, and ACH Payments in the amount of $2,286,945.17 and
$519,123.24, for payroll. Significant expenses greater than or equal to $50,000 are
further explained below:
Agenda Item
#3f
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #3f
Consent Item
1
3
8
4
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by the Finance Department.
FISCAL IMPACT
This item is funded in the current fiscal year budget.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Brian Tompkins
Chief Financial Officer
ATTACHMENTS
October 2023 Payment Register
PAYMENT REGISTER
OCTOBER 1, 2023 - OCTOBER 31, 2023
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
10/5/2023 262011 D.R. HORTON 0.76
10/5/2023 262012
LOUISE M ZIEGLER REV TRUST 73.54
10/5/2023 262013 26158 LYNWOOD DR LLC 19.67
10/5/2023 262014
CLARK & SONS 1,910.31
10/5/2023 262015
AUTOZONE PARTS 799.86
10/5/2023 262016 CAL VALVE-JAQUELYN ROMERO 781.50
10/5/2023 262017 CHEM-TECH INTERNATIONAL INC 4,809.42
10/5/2023 262018
CITY OF HIGHLAND 350.00
10/5/2023 262019 CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262020
CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262021 CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262022
CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262023 CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262024
CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262025 CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262026
CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262027 CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262028
CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262029 CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262030
CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262031 CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262032
CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262033 CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262034
CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262035 CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262036
CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262037 CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262038
CITY OF SAN BERNARDINO, PUBLIC WORKS DEPT 391.39
10/5/2023 262039 DEPARTMENT OF JUSTICE 50.00
10/5/2023 262040
DONEGAN TREE SERVICE 5,000.00
10/5/2023 262041 EYE MED VISION CARE 1,549.52
10/5/2023 262042
FIRST CHOICE SERVICES 45.00
10/5/2023 262043 HYDROTECH ELECTRIC 2,500.18
10/5/2023 262044
IB CONSULTING, LLC 2,310.00
10/5/2023 262045 INLAND WATER WORKS SUPPLY CO 429.92
10/5/2023 262046
K & L HARDWARE 39.85
10/5/2023 262047 KOPPEL & GRUBER PUBLIC FINANCE 1,770.26
10/5/2023 262048
Marvin's Mobile Truck Wash 1,045.00
10/5/2023 262049 PACIFIC HYDROTECH CORPORATION 18,394.65
10/5/2023 262050
SAN BERNARDINO MUNICIPAL WATER DEPARTMENT 20,412.72
10/5/2023 262051 SO CAL GAS 60.15
10/5/2023 262052
Solitude Lake Management LLC 1,225.00
PAYMENT REGISTER
OCTOBER 1, 2023 - OCTOBER 31, 2023 Page 1 of 6
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
10/5/2023 262053 SOUTH BAY FOUNDRY, INC.696.00
10/5/2023 262054
SOUTHERN CALIFORNIA EMERGENCY
MEDICINE/COLTON/REDLANDS 415.00
10/5/2023 262055 STEMAR EQUIPMENT & SUPPLY CO., INC 6,076.31
10/5/2023 262056
Superior Tank Co., Inc 99,313.10
10/5/2023 262057 UNIFIRST CORPORATION 534.55
10/6/2023 262058
XAM T THACH 596.57
10/6/2023 262059 Donald or Nancy Wingfield 77.71
10/12/2023 262060 ACS SUPPORT 26.00
10/12/2023 262061
AMERICAN FIDELITY ASSURANCE COMPANY 2,944.07
10/12/2023 262062
AMERICAN FIDELITY ASSURANCE COMPANY (FSA)1,126.22
10/12/2023 262063 AUTOZONE PARTS 573.47
10/12/2023 262064 B4 Inspirations Inc.4,956.50
10/12/2023 262066 BURRTEC WASTE/ 5455 Industrial pkwy 711.82
10/12/2023 262067
BURRTEC WASTE/ E. 111 MILL ST 311.76
10/12/2023 262068 CitizensTrust 642.45
10/12/2023 262069
CITY OF HIGHLAND 18,696.00
10/12/2023 262070 CULLIGAN OF ONTARIO 163.43
10/12/2023 262071
EVERSOFT, INC 279.80
10/12/2023 262072 FedEx 169.92
10/12/2023 262073
FRANCHISE TAX BOARD 702.02
10/12/2023 262074 GEORGE LEPINS, BELOW ZERO 9,700.00
10/12/2023 262075
Goforth & Marti 2,613.24
10/12/2023 262076 Isabel Hernandez 1,100.00
10/12/2023 262077
K & L HARDWARE 31.43
10/12/2023 262078 KONICA MINOLTA BUSINESS SOLUTIONS 527.18
10/12/2023 262079
Marvin's Mobile Truck Wash 940.00
10/12/2023 262080 PACIFIC HYDROTECH CORPORATION 371,685.45
10/12/2023 262081
Schaeffer Manufacturing Company 2,435.53
10/12/2023 262082 SOUTHERN CALIFORNIA EDISON COMPANY 278,974.85
10/12/2023 262083
SPECTRUM 4,715.32
10/12/2023 262084 SWRCB-DWOCP 90.00
10/12/2023 262085
UNIFIRST CORPORATION 2,089.75
10/12/2023 262088 UNIVAR SOLUTIONS USA, INC 5,446.00
10/12/2023 262089
UPS, UNITED PARCEL SERVICE, INC.19.01
10/12/2023 262090
VECTOR RESOURCES, INC. VECTOR USA 244.20
10/12/2023 262091
WATER SYSTEMS CONSULTING, INC 13,828.75
10/12/2023 262092 WESTERN WATER WORKS SUPPLY CO., INC 12,475.62
10/12/2023 262114
JULIA PALACIOS 107.85
10/12/2023 262115 56 DEVELOPMENT 46.49
10/12/2023 262116
RODELIO AMANTE 84.27
10/12/2023 262117 RAFAEL REYES 60.37
10/12/2023 262118
HAROLD R HALLDORSON 27.23
10/12/2023 262119
AHD LIMITED PARTNERSHIP PS 150.05
10/12/2023 262120 MANUEL E J DURAZO 63.81
10/19/2023 262093
AT&T 535.02
10/19/2023 262094 BURRTEC WASTE/ E. 111 MILL ST 3,423.25
10/19/2023 262095 CHEM-TECH INTERNATIONAL INC 41,855.33
10/19/2023 262096
Commercial Gate Co., Inc.195.00
10/19/2023 262097 Consolidated Electrical Distributors, Inc.337.56
10/19/2023 262098
CONSUMERS PIPE & SUPPLY COMPANY 641.21
10/19/2023 262099 DAILY JOURNAL CORPORATION 211.60
PAYMENT REGISTER
OCTOBER 1, 2023 - OCTOBER 31, 2023 Page 2 of 6
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
10/19/2023 262100 DIRECTV 296.23
10/19/2023 262101 EUCLID MANAGERS, INSURANCE SERVICES INC.360.00
10/19/2023 262102
EXPERIAN 357.52
10/19/2023 262103 GEOSCIENCE SUPPORT SERVICES, INC 262.50
10/19/2023 262104
INLAND DESERT SECURITY & COMMUNICATIONS, INC 811.50
10/19/2023 262105 LOWE'S 1,107.64
10/19/2023 262106
Marvin's Mobile Truck Wash 880.00
10/19/2023 262107 O'REILLYS AUTO PARTS 167.63
10/19/2023 262108
SAN BERNARDINO MUNICIPAL WATER DEPARTMENT 18,398.33
10/19/2023 262109 Schaeffer Manufacturing Company 1,614.31
10/19/2023 262110
SOUTHERN CALIFORNIA EDISON COMPANY 25,812.87
10/19/2023 262111 Texas Life Insurance Company 592.46
10/19/2023 262112
TYLER BUSINESS FORMS 337.20
10/19/2023 262113
VALLEY OFFICE EQUIPMENT 2.03
10/26/2023 262121 ACS SUPPORT 26.00
10/26/2023 262122 ALTERNATIVE HOSE INC 810.87
10/26/2023 262123 AMERICAN FIDELITY ASSURANCE COMPANY (FSA)1,126.22
10/26/2023 262124
AT&T 47.28
10/26/2023 262125 AUTOZONE PARTS 1,951.90
10/26/2023 262126 Chase Truck Mobile Service 375.00
10/26/2023 262127
CHEM-TECH INTERNATIONAL INC 4,861.47
10/26/2023 262128 CHICAGO TITLE COMPANY 500.00
10/26/2023 262129
CITY OF HIGHLAND 17,685.00
10/26/2023 262130 COUNTY OF SAN BERNARDINO/TAX COLLECTOR 937.02
10/26/2023 262131
DENTAL HEALTH SERVICES 158.10
10/26/2023 262132 DIB'S SAFE & LOCK SERVICE 311.03
10/26/2023 262133
FIRST CHOICE SERVICES 1,048.18
10/26/2023 262134 HYDROTECH ELECTRIC 364.78
10/26/2023 262135
K & L HARDWARE 135.57
10/26/2023 262136 LA VERNE POWER EQUIPMENT, INC.160.91
10/26/2023 262137
Marvin's Mobile Truck Wash 975.00
10/26/2023 262138 METLIFE SMALL BUSINESS CENTER (Dental)11,304.24
10/26/2023 262139
METROPOLITAN LIFE INS CO 93.30
10/26/2023 262140 PETE'S ROAD SERVICE INC 159.54
10/26/2023 262141
PILAR ONATE 9,450.00
10/26/2023 262142 RYAN HERCO FLOW SOLUTIONS 2,123.38
10/26/2023 262143
SO CAL GAS 14.79
10/26/2023 262144 SPECTRUM 614.61
10/26/2023 262145
SWRCB-DWOCP 60.00
10/26/2023 262146
VERIZON 1,119.70
10/26/2023 262147 WEB ADVANCED CORPORATION 2,506.25
10/27/2023 262148 SKY LIVING INVESTMENTS LLC 529.04
10/27/2023 262149
ELIAZER SERRANO MARTINEZ 2.85
10/27/2023 262150 BJDM INVESTMENTS LLC 79.29
BANK DRAFTS
10/2/2023 DFT0005052 GLOBAL PAYMENTS 22,039.13
10/3/2023 DFT0005053 MERCHANT BANKCD 760.82
10/11/2023 DFT0005054
PayNearMe, Inc.204.97
10/11/2023 DFT0005066 FORTE, ACH DIRECT INC, ACH FEES 4,590.25
10/13/2023 DFT0005040
CA SDI Tax 2,808.90
10/13/2023 DFT0005041 CALPERS/ DEFERRED COMPENSATION 31,842.68
PAYMENT REGISTER
OCTOBER 1, 2023 - OCTOBER 31, 2023 Page 3 of 6
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
10/13/2023 DFT0005042 CALPERS/ RETIREMENT 57,079.68
10/13/2023 DFT0005043 Federal Payroll Tax 39,322.78
10/13/2023 DFT0005044
Medicare 11,222.33
10/13/2023 DFT0005045 Social Security 93.74
10/13/2023 DFT0005046
STATE DISBURSEMENT UNIT 908.77
10/13/2023 DFT0005047 State Payroll Tax 15,552.13
10/13/2023 DFT0005048
CA SDI Tax 27.00
10/13/2023 DFT0005049 Federal Payroll Tax 309.53
10/13/2023 DFT0005050
Medicare 87.00
10/13/2023 DFT0005051 State Payroll Tax 124.53
10/23/2023 DFT0005067
CBB 2,233.69
10/24/2023 DFT0005065 PayNearMe, Inc.284.57
10/27/2023 DFT0005055
CALPERS/ MEDICAL 111,062.85
10/27/2023 DFT0005056 CA SDI Tax 2,557.42
10/27/2023 DFT0005057
CALPERS/ DEFERRED COMPENSATION 22,908.76
10/27/2023 DFT0005059 Federal Payroll Tax 49,191.75
10/27/2023 DFT0005060
Medicare 11,817.21
10/27/2023 DFT0005061 Social Security 1,374.62
10/27/2023 DFT0005062
STATE DISBURSEMENT UNIT 908.77
10/27/2023 DFT0005063 State Payroll Tax 18,991.59
10/27/2023 DFT0005064
CALPERS/ RETIREMENT 55,724.48
10/31/2023 DFT0005068 PayNearMe, Inc.133.33
ACH PAYMENTS
10/5/2023 10013185 AMAZON CAPITAL SERVICES, INC 2,303.57
10/5/2023 10013187 BARRY'S SECURITY SERVICES, INC 6,800.96
10/5/2023 10013188
BURGESS MOVING & STORAGE 986.25
10/5/2023 10013189 CLARK PEST CONTROL 243.00
10/5/2023 10013191
CORE & MAIN LP 19,459.15
10/5/2023 10013192 CORELOGIC SOLUTIONS, LLC 392.04
10/5/2023 10013193
DANGELO CO INC 388.62
10/5/2023 10013194 EXCEL LANDSCAPE, INC 21,207.50
10/5/2023 10013195
GENESIS INDUSTRIAL SUPPLY, INC 873.45
10/5/2023 10013196 GRAINGER 192.57
10/5/2023 10013197
GROUP DELTA CONSULTANTS, INC 35,600.97
10/5/2023 10013198 HAAKER EQUIPMENT COMPANY & TOTAL CLEAN 577.71
10/5/2023 10013199
INFOSEND, INC 39,399.07
10/5/2023 10013200 JOSE MILLAN 160.00
10/5/2023 10013201
KRIEGER & STEWART, INCORPORATED 7,349.10
10/5/2023 10013202 MCMASTER-CARR 783.37
10/5/2023 10013203
MICHAEL BAFFA 225.00
10/5/2023 10013204 MissionSquare Retirement 40,000.00
10/5/2023 10013205
ROSEMOUNT , INC 2,294.56
10/5/2023 10013206 Safety Compliance Company 600.00
10/5/2023 10013207
SCN, SECURITY COMMUNICATION NETWORK, INC 105.00
10/5/2023 10013208 SDRMA, SPECIAL DISTRICT RISK MGMT 13,820.80
10/5/2023 10013209
STERICYCLE, INC DBA SHRED-IT 161.98
10/5/2023 10013210 UNDERGROUND SERVICE ALERT 1,116.00
10/5/2023 10013211
USA BLUE BOOK, HD SUPPLY FACILITIES MAINT, LTD 52.21
10/5/2023 10013212
VULCAN MATERIALS CO/ CALMAT CO 3,730.66
10/5/2023 10013213 WAXIE SANITARY SUPPLY 2,883.26
10/5/2023 10013214
Yahweh Pools 250.00
PAYMENT REGISTER
OCTOBER 1, 2023 - OCTOBER 31, 2023 Page 4 of 6
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
10/6/2023 10013215 CAROL CALES 555.99
10/6/2023 10013216 DANIEL DAVIS 663.92
10/6/2023 10013217
DAVID HERNANDEZ 505.94
10/6/2023 10013218 ED KING 850.00
10/6/2023 10013219
ELISEO OCHOA 562.73
10/6/2023 10013220 JOHN MURA 730.10
10/6/2023 10013221
MARTHA T DURAN 850.00
10/6/2023 10013222 MICHAEL HENDERSON 737.18
10/6/2023 10013223
REBECCA KASTEN 639.46
10/6/2023 10013224 RICHARD BECERRA 737.18
10/12/2023 10013225
ADCOMP SYSTEMS, INC 100.00
10/12/2023 10013226 ADVANCED TELEMETRY SYSTEMS INTERNATIONAL, INC.5,750.00
10/12/2023 10013227 ALLIED REFRIGERATION INC.237.14
10/12/2023 10013228
AMAZON CAPITAL SERVICES, INC 664.18
10/12/2023 10013229 APPLIED MAINTENANCE SUPPLIES & SOLUTIONS 692.24
10/12/2023 10013230 ARCADIS U.S., INC 2,122.50
10/12/2023 10013231 BARRY'S SECURITY SERVICES, INC 7,961.65
10/12/2023 10013232 BOOT BARN, INC 450.21
10/12/2023 10013233
CORE & MAIN LP 2,030.42
10/12/2023 10013234 COUNTY OF SAN BERNARDINO, RECORDER- CLERK 120.00
10/12/2023 10013235
EVWD EMPLOYEES EVENTS ASSOC 290.52
10/12/2023 10013236 FERGUSON ENTERPRISES, INC.4,493.26
10/12/2023 10013237
FRONTIER COMMUNICATIONS 46.57
10/12/2023 10013238 GENESIS INDUSTRIAL SUPPLY, INC 871.52
10/12/2023 10013239
HARRINGTON INDUSTRIAL PLASTIC 740.80
10/12/2023 10013240 JESUS FABIAN VALENZUELA 49.99
10/12/2023 10013241
KRIEGER & STEWART, INCORPORATED 12,382.95
10/12/2023 10013242 MANAGED MOBILE, INC.7,095.32
10/12/2023 10013243
MCCALL'S METER SALES & SERVICE 76.74
10/12/2023 10013244 MCMASTER-CARR 1,004.39
10/12/2023 10013245
MIKE J. ROQUET CONSTRUCTION INC 13,709.97
10/12/2023 10013246 MINUTEMAN PRESS OF RANCHO CUCAMONGA 1,114.90
10/12/2023 10013247
PSI WATER TECHNOLOGIES 3,155.73
10/12/2023 10013248 STAPLES BUSINESS ADVANTAGE 153.61
10/12/2023 10013249
TROY ALARM, INC.630.00
10/12/2023 10013250 USA BLUE BOOK, HD SUPPLY FACILITIES MAINT, LTD 799.68
10/12/2023 10013251
WHITE CAP LP 562.94
10/19/2023 10013252
ACWA, ASSOC OF CALIF WATER AGENCIES 29,795.00
10/19/2023 10013253 ADCOMP SYSTEMS, INC 319.29
10/19/2023 10013254
AMAZON CAPITAL SERVICES, INC 348.61
10/19/2023 10013255 ANTHESIS 10,005.00
10/19/2023 10013256
APPLIED MAINTENANCE SUPPLIES & SOLUTIONS 40.32
10/19/2023 10013257 ASBCSD 114.00
10/19/2023 10013258 BARRY'S SECURITY SERVICES, INC 6,971.88
10/19/2023 10013259
BOOT BARN, INC 771.90
10/19/2023 10013260 CARBON ACTIVATED CORP 122,491.50
10/19/2023 10013261
CINTAS CORPORATION (FIRST AID)1,462.12
10/19/2023 10013262 CLARK PEST CONTROL 223.00
10/19/2023 10013263
FRONTIER COMMUNICATIONS 83.45
10/19/2023 10013264 GRAINGER 332.81
10/19/2023 10013265
GROUP DELTA CONSULTANTS, INC 16,677.64
10/19/2023 10013266 INFOSEND, INC 335.25
PAYMENT REGISTER
OCTOBER 1, 2023 - OCTOBER 31, 2023 Page 5 of 6
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
10/19/2023 10013267 JC LAW FIRM 1,675.00
10/19/2023 10013268 MERLIN JOHNSON CONSTRUCTION 27,926.81
10/19/2023 10013269
PATTON'S SALES CORP 20.66
10/19/2023 10013270 QUADIENT, INC 673.51
10/19/2023 10013271
SAFETY KLEEN SYSTEMS, INC.359.54
10/19/2023 10013272 STAPLES BUSINESS ADVANTAGE 393.54
10/19/2023 10013273
STERICYCLE, INC DBA SHRED-IT 172.58
10/19/2023 10013274 TSR PERFORMANCE 2,481.67
10/19/2023 10013275
TYLER TECHNOLOGIES, INC 39,560.29
10/19/2023 10013276 USA BLUE BOOK, HD SUPPLY FACILITIES MAINT, LTD 339.99
10/19/2023 10013277
VALERO FLEET, WEX BANK 23,040.70
10/19/2023 10013278 VULCAN MATERIALS CO/ CALMAT CO 1,851.46
10/19/2023 10013279 WAXIE SANITARY SUPPLY 371.18
10/19/2023 10013280 ZENON ENVIRONMENTAL CORP.1,755.46
10/26/2023 10013281
ALBERT A. WEBB ASSOCIATES 64,157.89
10/26/2023 10013282 ALLISON MECHANICAL, INC 1,131.04
10/26/2023 10013283 AMAZON CAPITAL SERVICES, INC 2,493.39
10/26/2023 10013284
APPLIED MAINTENANCE SUPPLIES & SOLUTIONS 1,175.39
10/26/2023 10013285 BARRY'S SECURITY SERVICES, INC 6,676.47
10/26/2023 10013286 BOOT BARN, INC 371.50
10/26/2023 10013287
CALIFORNIA SPECIAL DISTRICTS 9,275.00
10/26/2023 10013288 CALIFORNIA TOOL & WELDING SUPPLY 208.81
10/26/2023 10013289
CINTAS CORPORATION (FIRST AID)238.83
10/26/2023 10013290 CLARK PEST CONTROL 109.00
10/26/2023 10013291
CLINICAL LAB OF S B 4,685.50
10/26/2023 10013292 EAGLE AERIAL PHOTOGRAPHY INC 39,281.00
10/26/2023 10013294
EVWD EMPLOYEES EVENTS ASSOC 390.49
10/26/2023 10013295 EXCEL LANDSCAPE, INC 3,710.00
10/26/2023 10013296
FERGUSON ENTERPRISES, INC.608.21
10/26/2023 10013297 FRONTIER COMMUNICATIONS 1,108.06
10/26/2023 10013298
GENESIS INDUSTRIAL SUPPLY, INC 302.68
10/26/2023 10013299 HARRINGTON INDUSTRIAL PLASTIC 427.32
10/26/2023 10013300
JOSE MILLAN 2,500.00
10/26/2023 10013301 JOSEPH TEJADA 65.00
10/26/2023 10013302
MANAGED MOBILE, INC.634.57
10/26/2023 10013303 MARLINK INC 468.75
10/26/2023 10013304
MIKE J. ROQUET CONSTRUCTION INC 18,429.40
10/26/2023 10013305 MINUTEMAN PRESS OF RANCHO CUCAMONGA 178.33
10/26/2023 10013306
PATTON'S SALES CORP 43.50
10/26/2023 10013307 PLUMBERS DEPOT INC.380.57
10/26/2023 10013308
RESOLUTE 4,200.00
10/26/2023 10013309 RK VENTURE LLC 8,893.75
10/26/2023 10013310
SG CREATIVE, LLC 3,850.00
10/26/2023 10013311 SHAYLA ANTRIM 101.53
10/26/2023 10013312
TSR PERFORMANCE 2,254.17
10/26/2023 10013313 USA BLUE BOOK, HD SUPPLY FACILITIES MAINT, LTD 98.46
10/26/2023 10013314
WAXIE SANITARY SUPPLY 727.42
10/26/2023 10013315 WILLDAN FINANCIAL SERVICES 1,310.45
TOTAL 2,286,945.17$
PAYMENT REGISTER
OCTOBER 1, 2023 - OCTOBER 31, 2023 Page 6 of 6
Agenda Item
#3g
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #3g
Consent Item
9
3
5
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Approve Investment Transaction Report for Month Ended November 30,
2023
RECOMMENDATION
That the Board of Directors approve the attached Investment Transaction Report for
the month ended November 30, 2023.
BACKGROUND / ANALYSIS
California Government Code §53607 requires the CFO/Treasurer of a public agency to
submit a monthly investment transaction report to the Board of Directors (Board) when
the Board has delegated to the CFO/Treasurer the authority to invest, reinvest, sell, or
exchange securities held in the Agency’s investment portfolio.
During November there were no deposits to, or draws from, the District’s LAIF account.
Accordingly, the account began and ended the month of November with a balance of
$11,910,138.
Investments held in the District’s US Bank Custodial Account totaled $6,051,272 at the
beginning of November. Earnings added $4,929 to the account, while fees reduced the
balance by $1,000. One Federal Home Loan Bank security with a value of $200,000
matured during November.
Amortization of premiums and accretion of discounts on several different securities
added $1,959 to the adjusted cost basis for the investments, resulting in an account
balance at the end of November of $6,057,160. This balance is split between a mutual
fund ($551,691) and federal securities shown on the attached schedule with a total
balance of $5,505,469.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by the Finance Department.
Agenda Item
#3g
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #3g
Consent Item
9
3
5
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Brian Tompkins
Chief Financial Officer
ATTACHMENTS
1. Investment Transaction Report for Month Ended November 30, 2023
2. LAIF Statement for November 2023
EAST VALLEY WATER DISTRICT
Investment Activity
Month Ended November 30, 2023
Activity (Book Value)
Adjusted
Purch Units /Maturity Prem Amortization/Adjusted Cost Matured /Cost Market
Date Issuer CUSIP Yield Face Value Date 11/1/2023 Disc Accretion 11/1/2023 Purchases Called 11/30/2023 Value
10/19/21 US Treasury Note 91282CAZ4 0.375%500,000 11/30/25 495,954.37 158.49 496,112.86 496,112.86 459,160.00
03/31/21 US Treasury Note 9128CBT7 0.750%500,000 03/31/26 497,696.46 64.00 497,760.46 497,760.46 458,360.00
01/21/20 Tenn Valley Authority 880591ER9 2.875%300,000 09/15/24 301,399.70 (134.35) 301,265.35 301,265.35 294,369.00
08/31/22 US Treasury N/B 91282CFG1 3.125%300,000 08/31/24 299,881.45 9.74 299,891.19 299,891.19 295,500.00
05/22/23 US Treasury Note 91282CGX3 3.875%300,000 04/30/25 298,404.19 76.96 298,481.15 298,481.15 295,524.00
06/15/23 US Treasury Bill 912797FU6 5.110%300,000 12/14/23 298,147.41 1,292.50 299,439.91 299,439.91 299,430.00
09/07/23 US Treasury Bill 912797GQ4 100,000 03/07/24 98,130.28 441.67 98,571.95 98,571.95 98,591.00
07/30/20 Federal Home Loan Bank 3130AJUN7 0.550%250,000 07/30/24 249,987.98 1.34 249,989.32 249,989.32 242,245.00
08/06/20 Freddie Mac 3134GWMY9 0.625%100,000 08/19/25 100,000.00 100,000.00 100,000.00 92,956.00
09/30/21 Federal Home Loan Bank 3030APAZ8 1.030%200,000 09/30/26 200,000.00 200,000.00 200,000.00 181,078.00
03/30/21 Federal Home Loan Bank 3130ALUF9 1.000%300,000 03/30/26 300,000.00 300,000.00 300,000.00 275,019.00
03/30/21 Federal Home Loan Bank 3130ALPB4 0.800%300,000 05/30/25 300,000.00 300,000.00 300,000.00 281,781.00
03/30/21 Federal Home Loan Bank 3130ALU93 0.750%200,000 06/30/25 200,000.00 200,000.00 200,000.00 187,200.00
09/20/21 Federal Home Loan Bank 3130AKL79 0.250%115,000 12/28/23 114,993.15 3.60 114,996.75 114,996.75 114,554.95
09/30/21 Federal Home Loan Bank 3130AP6M2 1.020%400,000 09/30/26 400,000.00 400,000.00 400,000.00 362,052.00
10/18/21 Federal Home Loan Bank 3130AKC95 0.550%200,000 10/29/25 198,922.52 44.51 198,967.03 198,967.03 183,596.00
10/26/21 Federal Home Loan Bank 3130APJ55 1.250%300,000 10/26/26 299,998.03 299,998.03 299,998.03 272,790.00
10/28/21 Federal Home Loan Bank 3130APLB9 0.850%100,000 10/28/24 100,000.00 100,000.00 100,000.00 96,062.00
11/24/21 Federal Home Loan Bank 3130APWP6 0.600%200,000 11/24/23 200,000.00 200,000.00 200,000.00 - -
11/30/21 Federal Home Loan Bank 3130APUY9 1.000%200,000 02/28/25 200,000.00 200,000.00 200,000.00 189,916.00
11/30/21 Federal Home Loan Bank 3130AQ2H5 1.050%100,000 11/25/24 99,994.41 0.54 99,994.95 99,994.95 95,888.00
08/30/22 Federal Home Loan Bank 3130AT2N6 3.700%250,000 02/28/24 250,000.00 250,000.00 250,000.00 248,930.00
11/23/21 Federal Farm Credit Bank 3133ENEM8 1.430%200,000 11/23/26 200,000.00 200,000.00 200,000.00 182,606.00
5,715,000.00 5,703,509.95 1,959.00 5,705,468.95 - 200,000.00 5,505,468.95 5,207,607.95
Attachment A
Agenda Item
#3h
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #3h
Consent Item
1
3
9
2
Regular Board Meeting with Closed Session
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Convey Sewer Easements for the Messina Housing Development, Tract
20142
RECOMMENDATION
That the Board of Directors approve the acceptance and recordation of two separate
sewer improvement easements for the Messina Housing Development, Tract 20142.
BACKGROUND / ANALYSIS
The Messina development consists of 54 homes in Tract 20142 north of Santa Ana
Canyon Road and west of Alta Vista in the City of Highland. Construction of the water
and sewer facilities are complete and meet all the requirements of the District
standards. Some of the water and sewer pipelines are located on private property and
the District requires an easement to maintain the facilities. The proposed easements are
on property owned by two private parties listed as Easements 1 & 2 below:
• Easement 1: KL BZR AIV LLC, A Delaware Limited Liability Company to EVWD, from
Santa Ana Canyon Road to Messina Heights Lane, through Lot 1, Tract Map 20142; and
from Sienna Springs Loop to Parcel “A” and Parcel “B”, through Lot 37, Tract Map
20142
• Easement 2: Caroline E. Kiel Ray, Charles R. Kiel and Nancy R Hulla, as Tenants in
Common to EVWD, a portion of Parcel “A” and a portion of Parcel “B”, COC 018-006.
Upon Board approval, staff will coordinate recordation of the prepared documents with
the County, archive the information internally, and send copies to the developer for
distribution.
AGENCY GOALS AND OBJECTIVES
IV - Promote Planning, Maintenance and Preservation of District Resources
C. Dedicate Efforts Toward System Maintenance and Modernization
REVIEW BY OTHERS
This agenda item has been reviewed by the Executive Management Team.
Agenda Item
#3h
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #3h
Consent Item
1
3
9
2
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Jeff Noelte
Director of Engineering and Operations
ATTACHMENTS
Easement Documents
Agenda Item
#3i
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #3i
Consent Item
1
3
9
1
Regular Board Meeting with Closed Session
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Resolution 2023.16 and 2023.17 - Accepting Dedication of Water and Sewer
System Improvements for Tract 18893, Mediterra Phases 1, 1B & 2
RECOMMENDATION
That the Board of Directors adopt Resolution 2023.16 and Resolution 2023.17 –
Accepting Dedication of Water & Sewer System Improvements for Tract 18893,
Mediterra Phases 1, 1B & 2.
BACKGROUND / ANALYSIS
The District entered into a development agreement on May 28, 2019 for the
construction of water and sewer facilities at the Mediterra Development. The
development consists of 149 homes in three construction phases located across from
District Headquarters. The development agreement describes the conditions for the
Developer (D.R. Horton) to construct water and sewer facilities to dedicate to the
District to serve the new residences.
DR Horton has completed the design and construction of all water and sewer mains in
the tract for phases 1, 1B and 2. The Offers of Dedication have been executed by the
developer and the Notices of Completion have been recorded with the County. DR
Horton has met all the conditions to dedicate and transfer the water and sewer facilities
as described in the District standards and development agreement.
Resolution 2023.16 will accept the dedication of water facilities for Phases 1, 1B and 2.
The water facilities include 6,600 linear feet of water main, 149 domestic connections, 3
irrigation meters, and 21 fire hydrants & blow-offs. Resolution 2023.17 will accept the
dedication of sewer facilities for Phases 1, 1B and 2. The sewer facilities include 6,000
linear feet of sewer main, 34 manholes, and just over 5,000 linear feet of new sewer
laterals. All facilities will be either within the public right-of-way or easements granted
to the District.
AGENCY GOALS AND OBJECTIVES
IV - Promote Planning, Maintenance and Preservation of District Resources
B. Enhance Planning Efforts that Respond to Future Demands
C. Dedicate Efforts Toward System Maintenance and Modernization
Agenda Item
#3i
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #3i
Consent Item
1
3
9
1
REVIEW BY OTHERS
This agenda item has been reviewed by the executive management team.
FISCAL IMPACT
There is no fiscal impact to the budget. The dedicated fixed assets will be designated as
District water and sewer assets accordingly.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Jeff Noelte
Director of Engineering & Operations
ATTACHMENTS
Resolution 2023.16 (Water)
Water Offer of Dedication
Water Notice of Completion
Resolution 2023.17 (Sewer)
Sewer Offer of Dedication
Sewer Notice of Completion
WS4193
RESOLUTION 2023.16
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE EAST VALLEY WATER DISTRICT
ACCEPTING DEDICATION OF WATER SYSTEM IMPROVEMENTS
TRACT 18893 (MEDITERRA) PH 1, 1B, & 2
D.R. HORTON LOS ANGELES HOLDING COMPANY, INC.
BE IT HEREBY RESOLVED by the Board of Directors of the East Valley Water District, as
follows:
WHEREAS the Water pipelines and appurtenant structures constructed in accordance with
specifications of the East Valley Water District for the development of a new subdivision, TRACT 18893,
MEDITERRA, PH 1, 1B, & 2, for public use in the City of Highland and the County of San Bernardino,
have been dedicated to East Valley Water District by the developer, D.R. Horton Los Angeles Holding
Company, Incorporated (DEVELOPER).
NOW THEREFORE, BE IT HEREBY RESOLVED, that the Dedication of Water System dated
October 19, 2023, executed by Vicki Gullion, Assistant Secretary, for the DEVLOPER, be accepted and all
rights, title and interest in and to said water system be vested in the East Valley Water District, and that the
Secretary of this District be, and is hereby authorized and directed to, record this Resolution with said
Irrevocable Offer of Dedication of Water System attached hereto, in the office of the County Recorder
of the County of San Bernardino, State of California.
* * * * * * * * * * * * * * * * * * * * * * *
The foregoing resolution was duly adopted at a meeting of the Board of Directors of the East Valley
Water District, upon motion duly made, seconded and carried on December 13, 2023.
AYES: Directors:
NOES:
ABSENT:
ABSTAIN:
EAST VALLEY WATER DISTRICT
_______________________________________
Phillip Goodrich,
Board President
East Valley Water District
Resolution 2023.16
Page 1 of 2
WS4193
DATE OF ACCEPTANCE
I HEREBY CERTIFY the foregoing is a full, true and correct copy of Resolution 2023.16 adopted by the
Board of Directors of East Valley Water District at its’ Regular Meeting held December 13, 2023.
ATTEST:
______________________________________________
Michael Moore, PE
Secretary, Board of Directors
East Valley Water District
Resolution 2023.16
Page 2 of 2
WS4193
RESOLUTION 2023.17
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE EAST VALLEY WATER DISTRICT
ACCEPTING DEDICATION OF SEWER SYSTEM IMPROVEMENTS
TRACT 18893 (MEDITERRA) PH 1, 1B, & 2
D.R. HORTON LOS ANGELES HOLDING COMPANY, INC.
BE IT HEREBY RESOLVED by the Board of Directors of the East Valley Water District, as
follows:
WHEREAS the Sewer pipelines and appurtenant structures constructed in accordance with
specifications of the East Valley Water District for the development of a new subdivision, TRACT 18893,
MEDITERRA, PH 1, 1B, & 2, for public use in the City of Highland and the County of San Bernardino,
have been dedicated to East Valley Water District by the developer, D.R. Horton Los Angeles Holding
Company, Incorporated (DEVELOPER).
NOW THEREFORE, BE IT HEREBY RESOLVED, that the Dedication of Sewer System dated
October 19, 2023, executed by Vicki Gullion, Assistant Secretary, for the DEVLOPER, be accepted and all
rights, title and interest in and to said water system be vested in the East Valley Water District, and that the
Secretary of this District be, and is hereby authorized and directed to, record this Resolution with said
Irrevocable Offer of Dedication of Sewer System attached hereto, in the office of the County Recorder
of the County of San Bernardino, State of California.
* * * * * * * * * * * * * * * * * * * * * * *
The foregoing resolution was duly adopted at a meeting of the Board of Directors of the East Valley
Water District, upon motion duly made, seconded and carried on December 13, 2023.
AYES: Directors:
NOES:
ABSENT:
ABSTAIN:
EAST VALLEY WATER DISTRICT
_______________________________________
Phillip Goodrich,
Board President
East Valley Water District
Resolution 2023.17
Page 1 of 2
WS4193
DATE OF ACCEPTANCE
I HEREBY CERTIFY the foregoing is a full, true and correct copy of Resolution 2023.17 adopted by the
Board of Directors of East Valley Water District at its’ Regular Meeting held December 13, 2023.
ATTEST:
______________________________________________
Michael Moore, PE
Secretary, Board of Directors
East Valley Water District
Resolution 2023.17
Page 2 of 2
Agenda Item
#4a
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #4a
Informational Item
9
2
2
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Review the Draft Popular Annual Financial Report for Year Ended June 30,
2023
RECOMMENDATION
This agenda item is for informational purposes only, no action required.
BACKGROUND / ANALYSIS
The Finance and Human Resources Committee reviewed the Popular Annual Financial
Report (PAFR) for fiscal year 2022-23, at their November 14, 2023 meeting.
The PAFR is designed to be a summarized, user-friendly version of the District’s Annual
Comprehensive Financial Report (Annual Report), which was audited and presented to
the Board in October. Most financial information in the PAFR is presented in graphic
form, and technical note disclosures are omitted.
In addition, as with the Budget and Annual Report, the Government Finance Officers
Association (GFOA) produces guidelines for producing an effective PAFR, and if an
agency’s PAFR substantially meets or exceeds those guidelines, the GFOA presents the
agency with an Award for Outstanding Achievement in Popular Annual Financial
Reporting. The District received the award for its June 2022 PAFR, for the sixth year in
a row. District staff will submit the current year PAFR for award consideration before
the end of December.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by the Finance and Public Affairs Departments and
the Finance and Human Resources Committee.
Agenda Item
#4a
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #4a
Informational Item
9
2
2
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Brian Tompkins
Chief Financial Officer
ATTACHMENTS
Draft PAFR 2023
Popular Annual
Financial Report
[FISCAL YEAR ENDED JUNE 30, 2023]
HIGHLAND, CALIFORNIA
FY 2022-23 PAFR | 2
Table of Contents
About the District 3
Organizational Structure 4
District-at-a-Glance 4
District Wide Goals & Objectives 5
Community Involvement 5
Capital Improvement Projects 6
TRANSMITTAL LETTER
Revenue and Expenses 7
Revenue by Sources 8
Breakdown of Expenses 9
Outstanding Long-Term Debt 10
Comparative Net Position 11
FINANCIAL PERFORMANCE
The Government Finance
Officers Association of the
United States and Canada
(GFOA) has given an Award
for Outstanding Achievement
in Popular Annual Financial
Reporting to East Valley Water
District, for its Popular Annual
Financial Report (PAFR) for the
fiscal year ended June 30, 2022.
In order to receive this award, a
government agency unit must
publish a Popular Annual Financial
Report, whose contents conform
to program standards of creativity,
presentation, understandability,
and reader appeal.
We believe our current PAFR
continues to conform to program
requirements, and we are
submitting it to GFOA to determine
its eligibility for another Award.
We also welcome and encourage
feedback from District ratepayers
to help make this publication more
useful and/or informative.
Government Finance Officers Association
Award for
Outstanding
Achievement in
Popular Annual
Financial Reporting
Presented to
East Valley Water District
California
For its Annual Financial ReportFor the Fiscal Year Ended
June 30, 2022
Executive Director/CEO
POPULAR ANNUAL
FINANCIAL
REPORTING AWARD
BOARD OF DIRECTORS
Phillip R. Goodrich
Chairman of the Board
James Morales, Jr.
Vice Chairman of the Board
Chris Carrillo
Governing Board Member
Ronald L. Coats
Governing Board Member
David E. Smith
Governing Board Member
3
7
DI
S
T
R
I
C
T
M
A
N
A
G
E
M
E
N
T
Kerrie Bryan
Director of
Administrative Services
Justine Hendricksen
District Clerk
Patrick Milroy
Operations Manager
Jeff Noelte, PhD, P.E.
Director of Engineering &
Operations
Brian Tompkins
Chief Financial Officer
Rocky Welborn
Water Reclamation Manager
Michael Moore, P.E.
General Manager/CEO
The District was formed through a local
election of mostly citrus grove farmers, to
have water service provided by a public
agency. East Valley Water District is located
in the foothills of the San Bernardino
Mountains, 65 miles east of Los Angeles in
the County of San Bernardino.
210
210
santa a
n
a
r
i
v
e
r
sant
a
a
n
a
r
i
v
e
r
plun
g
e
c
r
e
e
k
plunge creek
eld
e
r
c
r
e
e
k
cit
y
c
r
e
e
k
city c
r
e
e
k
sa
n
d
c
r
e
e
k
tw
i
n
c
r
e
e
k
tw
i
n
c
r
e
e
k
warm cr
e
e
k
cook creek
mil
l
c
r
e
e
k
San Bernardino
Highland
Seven Oaks Dam
N
DistrictHeadquarters
SNRC
ABOUT THE DISTRICT
EAST VALLEY WATER DISTRICT | 3
Transmittal Letter
We are pleased to present East Valley Water District’s (District) Popular Annual Financial Report (PAFR) for the
fiscal year ending June 30, 2023 (FY 2022-23). This report summarizes financial information appearing in the
2023 Annual Report and was created to provide valuable information related to District finances and the Five-
Year Capital Improvement Program, that support the quality and reliability of our community’s distribution system.
The PAFR is unaudited; however, the financial data presented in the PAFR is developed based on the audited
Annual Report, which is consistent with Generally Accepted Accounting Principles. This document can also be
reviewed on the District’s website at eastvalley.org/PAFR2023.
For more detailed information, the District’s 2023 Annual Report is available for interested individuals at the
District Headquarters, 31111 Greenspot Road, Highland, California 92346. It can also be viewed on the District’s
website, along with other key financial documents, at eastvalley.org/2023AnnualReport.
The organizational chart, District-at-a-Glance, and financial data represent the District during the
timeframe reflected in this document.
Questions, comments, and feedback regarding this report are encouraged. Please do not hesitate to contact
Brian Tompkins, Chief Financial Officer, at finance@eastvalley.org or (909) 381-6463.
On behalf of the District, thank you for the opportunity to serve you.
Respectfully submitted,
Michael Moore, P.E.
General Manager/CEO
TO OUR RATEPAYERS & COMMUNITY
490
Hydrants Repaired, Replaced, Inspected 5,100
Manholes
344
Hydrants Flushed
28,977,000
Gallons of Water Storage
6,000,000Average Gallons of Wastewater Collected
15
Active
Groundwater
Wells
191
Miles ofWastewaterMain Cleaned61Miles of Wastewater Video
300
Miles of Water Mains
16,500,000Average Gallons ofWater Produced Daily
3,500
Water
Samples
Collected
344 Water Leaks Repaired
1,185 Feet of WaterMain Replaced
230
Miles of
Wastewater
Mains
FY 2022-23 PAFR | 4
District-at-a-Glance
East Valley Water District provides water and
wastewater services to residents within a 30.1 square
mile area. This includes more than 104,000 people in
the cities of Highland and San Bernardino, portions
of the unincorporated County of San Bernardino,
the San Manuel Band of Mission Indians, and Patton
State Hospital.
Organizational Structure
Presented to the right is an overview of East Valley
Water District’s organizational structure. The District
employed 76 full-time positions during FY 2022-23.
As a performance-based
organization, the District takes
an active role maintaining
staffing levels to performance-
based objectives.
EAST VALLEY WATER DISTRICT | 5
District Wide Goals & Objectives
As part of the annual budget process, District wide goals are established by the Governing Board to identify priority
programs and projects.
I.Implement Effective Solutions Through Visionary Leadership
II.Maintain a Commitment to Sustainability, Transparency, and Accountability
III.Deliver Public Service with Purpose While Embracing Continuous Growth
IV.Promote Planning, Maintenance and Preservation of District Resources
Serving the Community
East Valley Water District strives to be a community partner by working with organizations and schools within its service
area to identify where there is a need. Through this effort, the District has helped provide meals and educational
resources to residents.
East Valley Water District partners with community
organizations. This year the District partnered with
with the San Bernardino City Mission, Highland
Senior Center, and San Bernardino Sheriff's
Department to supply canned and boxed food.
Through the combined efforts and generosity of
staff, the District supported residents in the local
mountain community by providing food during the
historic snow storm.
CANNED & BOXED FOOD DRIVE
The District has developed a comprehensive
educational program designed to engage, enlighten,
develop youth in the community and create future
water leaders. The program includes a range of
educational opportunities, including a pathway
internship program, facility field trip tours, vehicle
equipment demos, and classroom demonstrations.
Over the last year, multiple local students
participated in the District’s educational program.
EDUCATIONAL PROGRAMS
FY 2022-23 PAFR | 6
Capital Improvement Projects
ENHANCING AND INVESTING IN
THE WATER INFRASTRUCTURE
Plant 134 Process Improvements –
Granular Activated Carbon (GAC) Installation
The District completed the installation of GAC technology at the District's
Water Treatment Plant to remove organics and mitigate the possibility of
high Total Trihalomethane (TTHM) levels.
Date Completed: April 2023 Project Cost: $3,821,340
Benefits: The completion of this enhancement will allow the District to
continue meeting local, State, and Federal water quality requirements and
maintain the quality and safety of water provided to the community. Up to 4
million gallons of water per day will be treated by GAC Technology.
Water Main Rehabilitation Pleasant Hill Drive
Performed in-house by District Water Maintenance crews, 675 feet of water
main were replaced on Pleasant Hill Drive. The previous pipe did not meet
current minimum water main size standards. Installing new 6-inch ductile iron
pipe enhances fire flow capacity while contributing to more efficient system
circulation and service to residents.
Date Completed: October 2022 Project Cost: $102,030
Benefits: By replacing the undersized pipeline, the need for maintenance
and leak repairs is significantly reduced. Additional project enhancements
included the installation of fire hydrants to assist the fire department during an
emergency, as well as aid in the maintenance of the water system.
Reservoir Rehabilitation Project – Plant 108
The District contracted for the rehabilitation of a reservoir at Plant 108 to
extend the life of the tank. The 2 million gallon capacity tank serves customers
located in the District's Foothill pressure zone.
Date Completed: June 2023 Project Cost: $1,077,048
Benefits: Rehabilitation included removal of aged coating, internal
recoating, installation of anti-corrosion system, tank repairs, and access point
enhancements to meet current safety requirements.
EAST VALLEY WATER DISTRICT | 7
Revenues and Expenses
Providing safe drinking water to over 104,000 residents every day is the District’s top priority and also one of its most
significant expenses. The graphs below represent the District’s combined revenue and expenses for FY 2022-23. For
comparison purposes, FY 2020-21 and FY 2021-22 revenue and expenses have also been included.
Please refer to the District’s 2023 Annual Report for a comprehensive breakdown of expenses.
REVENUE EXPENSES
HOW IS REVENUE MANAGED?
East Valley Water District utilizes revenue to fund daily operations, scheduled capital improvements and replacements,
and principal and interest for debt financed construction projects. Remaining revenue is added to reserves or invested
back into capital improvement projects to help maintain and improve the system's reliability so that East Valley Water
District may continue taking steps to support the District's Vision of providing world-class public service.
Revenue also provides funding for conservation programming, which empowers customers to be efficient water
users and encourages water savings indoors and out.
GrantsNon-Operating Capacity Charges Non-OperatingOperating
FY 2020-21
$43.33Million
$47.15Million$46.16Million
FY 2021-22FY 2022-23
Operating
$39.12Million
FY 2020-21
$42.18Million
FY 2021-22
$43.48Million
FY 2022-23
GrantsNon-Operating Capacity Charges Non-OperatingOperating
FY 2020-21
$43.33Million
$47.15Million$46.16Million
FY 2021-22FY 2022-23
Operating
$39.12Million
FY 2020-21
$42.18Million
FY 2021-22
$43.48Million
FY 2022-23
Revenues by Sources
The District relies on user rates/fees to fund day-to-day operations.
East Valley Water District receives 99 percent of its revenue from user rates and fees; the District receives no funding
from property or sales taxes. Rates and fees are reviewed on 3 to 5 year cycles and are adjusted to meet the costs
of providing services to customers.
Meter charges are fixed monthly charges
assessed to customers based on the size
of the service connection to their property.
Wastewater collection revenue
consists of 1) fixed monthly charges
for residential customers and 2) a
combination of fixed and volumetric
charges for commercial customers.
Wastewater treatment revenue consists
of 1) fixed monthly charges for residential
customers and 2) a combination of fixed
and volumetric charges for commercial
customers. These revenues are used to
pay the City of San Bernardino Municipal
Water Department, which is currently
contracted to treat all wastewater
generated by District Customers.
Other charges are
assessed according to an
adopted fee schedule, but
are only charged to users
who request, or require,
use of District resources
beyond the scope of
delivering normal water
and wastewater services.
Water sales are based on
the volume of water used
by a customer during the
monthly billing period.
REVENUE HISTORY & FORECAST (IN MILLIONS)
fy 2022-23rate revenue
3%Other Charges
39%Water Sales
22% Meter Charges
23% Wastewater Treatment
13% Wastewater Collection
13.3 14.7 14.5
10.1 12.2
10
5
0
15
20
25
30
FY 21-22
Actual
FY 22-23
Actual
FY 23-24
Projected
FY 24-25
Projected
Water
Operating Revenue
Wastewater
Operating Revenue
Water Reclamation
Operating Revenue
28.9 28.4 27.9 28.3 29.2
FY 20-21
Actual
5.8 6.0 6.3
FY 2022-23 PAFR | 8
Breakdown of Expenses
Expenses are the cost of providing water to meet customer demand and collecting and treating wastewater
from customer residences or places of business. East Valley Water District strives to provide safe and
reliable water delivery services. The District has put forth significant effort to overcome the challenges of maintaining a
fiscally sustainable and operationally dependable organization.
Source of Supply
Pumping
Water Treatment
Transmission
Customer Accounts
Wastewater Treatment
Depreciation
Interest Expense
Wastewater Collection
Administrative and General
and Distribution
9 3 2 155
2 10 22 30 2
This graphic identifies
how every dollar spent
is allocated to cover
expenses (in cents).
EXPENSES
• Source of Supply - Expenses related to the
extraction of groundwater, and for procuring water
from the Santa Ana River or State Water Project
when supply is available.
• Pumping - Expenses related to moving water
throughout the District’s water distribution system.
• Water Treatment - Expenses related to the
treatment of water.
• Transmission and Distribution - Expenses for
transmitting water to treatment plants and storage
reservoirs for distribution to commercial and
residential customers.
• Customer Accounts - Expenses related to
the service of customer accounts including,
postage, telephone, printing and publishing, and
billing services.
• Wastewater Treatment - Expenses related to the
contracted service currently provided by the City of
San Bernardino Municipal Water Department.
• Wastewater Collection - Expenses for the operation
and maintenance of the District’s system of
wastewater collection pipelines.
• Administrative and General - Expenses related to
the administration of District operations. For example,
employee compensation, benefits, conservation
rebates, office supplies, banking services, materials
and supplies, utilities, fuel, permits, insurance claims,
legal services, and printing and publishing.
• Depreciation - Expenses related to the use of capital
assets over time.
• Interest Expense - Expenses incurred for
borrowing funds.
EXPLANATION OF EXPENSES
EAST VALLEY WATER DISTRICT | 9
Outstanding Long-Term Debt
Much like how a mortgage is financed to spread costs over 30 years, East Valley Water District has incurred debt
to fund large capital projects. The District has adopted a Debt Management Policy to clearly state that long-term
borrowing is only to be used for Capital Improvement Projects that cannot be funded from current revenues.
Similar to an individual’s credit score, public agencies have a bond rating used by investors to determine risk. The
District has a bond rating of AA- by both Fitch and Standard and Poor’s rating services. This is considered a high
quality investment grade.
US Bank Loan - Issued for the
purchase and installation of
energy conservation equipment
at several of the District’s water
production facilities.
Sterling Natural Resource
Center Loan - Funded the
design and construction of
the District’s water recycling
facility that will capture and treat
District wastewater flows. Recycled
water will be recharged to the
Weaver basin.
2020A Bonds - Issued to refund outstanding 2010 revenue
bonds and save $380,000 annually in interest. The 2010 bonds
were issued to finance pipeline and other infrastructure projects.
2020B Bonds - Issued to refund outstanding
2013 revenue bonds, which were issued
to finance the construction of a new
administration and operations headquarters.
State Department of Water Resources
Loans - Funded the improvement and
expansion of the District’s surface water
treatment plant.
SBVMWD Loans - Agreement with the
San Bernardino Valley Municipal Water
District (SBVMWD) for the construction,
financing, and maintenance of a
City Creek Turnout and Plant 134
Hydroelectric Station. The station
provides the District with direct access
to State Project Water, to be used for the
surface water treatment plant.
The District's long-term debt consists of bonds, loans and installment purchases.
explanation of
debt (in millions)
$155.7 million Sterling NaturalResource Center
$400,000US Bank Loan
$15.1 million 2020ABonds $13.1 million2020BBonds
$1.3 millionSBVMWD Loan
$5.4 millionState Dept. of Water Resources
FY 2022-23 PAFR | 10
Two-Year Comparative Net Position (In Millions)
As an infrastructure-based organization, the District directs significant resources in capital investments to maintain
and improve its water and wastewater system. Comparative net position offers perspective of the District’s assets,
liabilities, and equity. The information presented below applies to fiscal years ended June 30, 2023 and 2022.
EXPLANATION OF ASSETS
Current Assets - Cash and cash equivalents, customer
utility receivables, inventory, prepaid expenses, and
other liquid assets that can be readily converted to cash.
Restricted Assets - Cash equivalents, grants and bonds
restricted for a specific purpose and therefore not
readily available to use.
Other Assets - Special assessments receivable from
certain property owners for system improvements that
benefit only their properties.
Capital Assets - Any land, building, equipment, vehicles,
inventory, treatment plants, pipeline, and water
distribution systems owned by the District.
Deferred Outflow of Resources - Use of net assets
attributed to future reporting periods, such as prepaid
items and deferred charges.
EXPLANATION OF LIABILITIES
AND EQUITY (NET POSITION)
Current Liabilities - Present financial obligations including,
payments to vendors, payroll, and employee benefits.
Non-Current Liabilities - Long-term financial obligations
including payments for loans, bonds, and employee
retirement benefits.
Deferred Inflow of Resources - Receipt of net assets
attributed to future reporting periods, such as deferred
revenue and advance collections.
Equity (Net Position) - Represents the excess of assets
over liabilities.
$45.4
$36.4
$12.4
$0.3
$319.7
$309.2
$7.3
Current Assets
Restricted Assets
Other Assets
Capital Assets
Deferred Outflows
Current Liabilities
Non-Current Liabilities
Net Position
Deferred Inflows
$26.4
$21
$207.9
$186.9
$147.8
$145.1
$3.0
$7.6
$11
$3.7
$0.3
2022 Total Assets: $360.6 Million
2023 Total Assets: $385.1 Million
2023 Liabilities & Equity: $385.1 Million
2022 Liabilities & Equity: $360.6 Million
EAST VALLEY WATER DISTRICT | 11
31111 Greenspot Road
Highland, California 92346
District Headquarters
31111 Greenspot Road
Highland, California 92346
Sterling Natural Resource Center
25318 5th Street
Highland, California 92410
Customer Service & After-Hours
Emergency Service
(909) 889-9501
eastvalley.org @eastvalleywater
District Board Meetings
Second and Fourth Wednesday of
Each Month at 5:30pm
District Headquarters Board Room
31111 Greenspot Road
Highland, CA 92346
Office Hours
Monday – Thursday 8:00am – 5:00pm
2nd and 4th Tuesday 9:00am – 5:00pm
Friday 7:30am – 4:30pm
East Valley Water District was formed in 1954 and provides
water and wastewater services to over 104,000 residents
within the cities of Highland and San Bernardino, and portions
of San Bernardino County. The District operates under the
direction of a 5-member elected Board.
Agenda Item
#5a
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #5a
Discussion Item
9
2
3
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Consider Acceptance and File SB 165 Report for Community Facilities District
2021-1 Mediterra
RECOMMENDATION
That the Board of Directors accept and file the attached Special Tax and Bond
Accountability Report for Community Facilities District 2021-1 Mediterra.
BACKGROUND / ANALYSIS
The Local Agency Special Tax and Bond Accountability Act (Act) was adopted in August
2000 by Senate Bill 165 and is codified in California Government Code §53410 through
53412. Requirements under the Act took effect on January 1, 2001.
The Act requires that any local special tax or bond measure subject to voter approval
contain a statement about the purpose for the special tax, requires that proceeds from
the tax be used for that purpose, requires creation of an account into which proceeds
will be deposited, and requires an annual report containing specified information
concerning the use of the proceeds. The following bonds issued by the District are
subject to these requirements:
•$5,720,000 Community Facilities District (CFD) 2021-1 Series 2023 Special Tax
Bonds
The attached report for CFD 2021-1 addresses the reporting requirements under the
Act. The report has been prepared by Koppel and Gruber Public Finance, the District’s
CFD administrative services consultant, utilizing information provided by the District.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by the District’s legal counsel
Agenda Item
#5a
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #5a
Discussion Item
9
2
3
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Brian Tompkins
Chief Financial Officer
ATTACHMENTS
SB 165 Report for Mediterra
East Valley Water District
Community Facilities District No. 2021-1
(Mediterra)
Special Tax & Bond Accountability Report
Fiscal Year 2022/2023
Prepared for:
East Valley Water District
31111 Greenspot Road
Highland, CA 92346
T. 909.889.9501
District Administration
Brian Tompkins, Chief Financial Officer
Rudy Guerrero, Finance Supervisor
31111 Greenspot Road
Highland, CA 92346
T: 909.889.9501
Special Tax Administrator
Koppel & Gruber Public Finance
Scott Koppel / Nick Farrel
334 Via Vera Cruz, Suite 256
San Marcos, CA 92078
T. 760.510.0290
F. 760.510.0288
TABLE OF CONTENTS
BACKGROUND ......................................................................................................................... 1
SECTION I. SUMMARY ......................................................................................................... 2
SECTION II. BOND PROCEEDS ........................................................................................ 3
SECTION III. SPECIAL TAX COLLECTIONS AND EXPENDITURES ................. 4
SECTION IV. EXPENDITURES TO FUND AUTHORIZED FACILITIES ............ 5
East Valley Water District
Community Facilities District No. 2021-1 (Mediterra)
Accountability Report, Fiscal Year Ended June 30, 2023 1
BACKGROUND
The Local Agency Special Tax and Bond Accountability Act (“Accountability Act”) was enacted
by California State Legislature through Senate Bill 165 to provide accountability measures for any
local special tax and/or bond measure subject to voter approval on or after January 1, 2001.
According to the requirements of the Accountability Act (Sections 50075.1 and 53410 of the
Government Code of the State of California), an annual report must be filed by the local agency
levying a special tax and/or issuing a bond measure on or before each January 1, commencing
January 1, 2001 and shall contain a description of the following:
(1) The amount of funds collected and expended to fund authorized facilities.
(2) The status of any project required or authorized to be funded by the special tax and/or bond
measure.
The report is being prepared for Community Facilities District No. 2021-1 (Mediterra) (“CFD No.
2021-1” or “CFD”) of the East Valley Water District (“District”) for fiscal year ended June 30,
2023 pursuant to and in accordance with the requirements outlined in the Accountability Act.
East Valley Water District
Community Facilities District No. 2021-1 (Mediterra)
Accountability Report, Fiscal Year Ended June 30, 2023 2
SECTION I. SUMMARY
On October 13, 2021, the District’s Board of Directors (“the Board”) adopted a Resolution of
intention to form CFD No. 2021-1, to authorize the levy of special taxes and to incur bonded
indebtedness for the purpose of financing public improvements to meet the needs of new
development. After conducting a noticed public hearing on December 8, 2021, the Board adopted
resolutions approving the proposed rate and method of apportionment of special taxes and
establishing CFD No. 2021-1, which includes two Improvement Areas (“IA”), pursuant to the
provisions of the Mello-Roos Community Facilities Act of 1982, as amended (the “Act”).
On December 8, 2021, an election was held within CFD No. 2021-1 in which the landowner(s)
eligible to vote unanimously approved the levy of special taxes and the incurrence of bonded
indebtedness in an amount not to exceed $16,500,000 for the CFD, including $8,000,000 for IA
No. 1 and $8,500,000 for IA No. 2.
Bonds were issued on August 23, 2023 for IA No. 1 in the amount of $5,720,000 (the “2023
Bonds”). The annual debt service on the 2023 Bonds will be repaid by the Special Tax levied on
properties within IA No. 1.
East Valley Water District
Community Facilities District No. 2021-1 (Mediterra)
Accountability Report, Fiscal Year Ended June 30, 2023 3
SECTION II. BOND PROCEEDS
The 2023 Bonds were issued in the aggregate principal amount of $5,720,000. Proceeds of the
Bonds were issued to finance certain capital facilities fees of the District relating to public facility
improvements serving property within CFD No. 2021-1 IA No. 1, fund the administrative expense
account, fund the capitalized interest account, fund the reserve fund and pay cost of issuance of
the 2023 Bonds. The table below summarizes the application of the Bond proceeds and Special
Tax revenues on hand at the time of issuance:
2023 BOND PROCEEDS
FUND/ACCOUNT/SUBACCOUNT BOND PROCEEDS
Project Fund $4,639,607
Administrative Expenses Account 20,000
Capitalized Intertest Account 256,866
Reserve Fund 480,846
Costs of Issuance Fund 1 348,800
TOTAL 2 $5,746,119
1 Includes fees of the Trustee, the Special Tax Consultant, the Appraiser, legal fees, printing costs,
Underwriter’s discount, and other costs of issuance.
2 Total amount is comprised of the principal amount of the bonds issued in the amount of $5,720,000,
inclusive of $142,649 in previously paid Special Taxes on hand at the time of issuance and exclusive of
the Net Original Issue Discount in the amount of $116,530.
East Valley Water District
Community Facilities District No. 2021-1 (Mediterra)
Accountability Report, Fiscal Year Ended June 30, 2023 4
SECTION III. SPECIAL TAX COLLECTIONS AND EXPENDITURES
The table below provides a summary of the Special Taxes deposited, interest accrued, transfers
and other transactions within the fund established for collection and disbursement of the Special
Tax.
FACILITIES SPECIAL TAX
IMPROVEMENT AREA NO. 1
DESCRIPTION AMOUNT
BEGINNING BALANCE AS OF JULY 1, 2022 $0.00
Sources of Funds
Special Tax Receipts $142,649.04
Interest Accrued 0.00
Miscellaneous Transfers (in) 0.00
Subtotal: Sources $142,649.04
Uses of Funds
Administrative Expenses1 ($0.00)
Debt Service (0.00)
Miscellaneous Transfers (out) (0.00)
Subtotal: Uses ($0.00)
ENDING BALANCE AS OF JUNE 30, 2023 $142,649.04
1 The Administrative Expenses for Fiscal Year 2022/2023 will be reimbursed through the proceeds of
the bond issuance in August 2023.
East Valley Water District
Community Facilities District No. 2021-1 (Mediterra)
Accountability Report, Fiscal Year Ended June 30, 2023 5
SECTION IV. EXPENDITURES TO FUND AUTHORIZED FACILITIES
A Project Fund account was established in connection with the issuance of the 2023 Bonds, into
which a portion of the proceeds from the 2023 Bonds were deposited with the designated use
towards construction of facilities. However, the Bonds were issued and subsequently the funds
were deposited after the end of the 2022/2023 Fiscal Year and therefore there are no expenditures
reportable within the scope of the 2022/2023 report.
Agenda Item
#5c
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #5b
Discussion Item
9
3
3
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Consider Authorization to Transfer Unclaimed Funds into the District's
General Fund
RECOMMENDATION
That the Board of Directors authorize the Chief Financial Officer to perform procedures
prescribed in the Government Code and Code of Civil Procedure for the purpose of
unencumbering stale-dated checks and keeping the related funds from escheating to
the State.
BACKGROUND / ANALYSIS
The Finance and Human Resources Committee recommended, at their November 14,
2023 meeting, that the Board of Directors (Board) authorize the Chief Financial Officer
(CFO) to perform financial procedures related to unencumbering stale-dated checks.
The District’s checking account accumulates a long list of old, outstanding checks as a
result of customer refunds relating to the closing of water accounts and paid vendors
who failed to cash their check. All of the old checks make the reconciliation of the
checking account unnecessarily cumbersome.
Government Code sections 50050-50052 and Code of Civil Procedures section
1502(a)(2) describe procedures applied to unclaimed funds that are at least three years
old. The procedure involves publishing a notice about the unclaimed funds once a week
for two consecutive weeks in a paper of general circulation. Any claims that are
submitted as a result of the notice will be investigated and approved or rejected by the
CFO. Any funds remaining unclaimed 45 days after the first publication may be
transferred to the District’s General Fund.
Government Code section 50055 states that unclaimed funds of $15.00 or less that
have been held by the District for more than one year do not need to be publicly
noticed, but may be transferred into the District’s General Fund by simple action of the
Board.
Staff recommends that the Board authorize the CFO to write off all stale-dated checks
that are more than one year old and are less than $15.00 (attached Schedule A totaling
$54.88).
Agenda Item
#5c
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #5c
Discussion Item
9
3
3
Staff is also requesting that the Board authorize staff to publish a notice regarding all
stale-dated checks that are more than $15.00 and are more than three years old
(attached Schedule B totaling $3,511.39) in the San Bernardino Sun newspaper for the
purpose of satisfying the requirements of the Government Code.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by the Finance Department and Finance and
Human Resources Committee.
FISCAL IMPACT
The fiscal impact associated with this agenda item is $3,566.27 and could be converted
from liability to Unrestricted Net Assets by following Government Code procedures to
write off the checks listed on Attachments A and B.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Brian Tompkins
Chief Financial Officer
ATTACHMENTS
1. Schedule A
2. Schedule B
SCHEDULE A
UNCLAIMED CHECKS UNDER $15 & ONE YEAR OR OLDER
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
12/20/2021 258821 PATRICK & JULIE RAMIREZ $4.34
01/13/2022 258899 JAMIE CORBETT 13.59
06/08/2022 259580 BRAEMAR DEVELOPMENT 7.41
06/08/2022 259581 BRAEMAR DEVELOPMENT 14.77
06/08/2022 259582 BRAEMAR DEVELOPMENT 14.77
TOTAL $54.88
Page 1 of 1
SCHEDULE B
UNCLAIMED CHECKS $15 AND OVER & THREE YEARS OR OLDER
PAYMENT
DATE NUMBER VENDOR NAME AMOUNT
11/25/2019 255335 J D BILBAO $25.36
12/03/2019 255356 JANICE ANDRADE 75.96
01/10/2020 255552 BIANCA CAMPOS 53.09
01/22/2020 255584 PAUL HERRERA 96.45
02/04/2020 255671 CRYSTAL COMADURAN 93.43
02/04/2020 255673 JAIME C RODRIGUEZ 101.04
02/12/2020 255708 GLAK PROPERTIES, LLC 19.67
03/18/2020 255899 MATTHEW GRIFFIN 59.23
04/15/2020 256054 CAROLINE GUERRERO 37.25
05/13/2020 256172 COMMUNITY REDEVELOPER LP 485.99
05/20/2020 256199 FELICIA PARRA 46.17
05/27/2020 256231 MICHAEL BALLARD 174.59
07/01/2020 256397 OMAR REAL 75.62
07/10/2020 256458 IE GENERAL INC.1,703.53
08/19/2020 256636 DI QUN SU 263.85
10/28/2020 256886 ANGEL B. SANTOS 30.22
10/28/2020 256888 IVAN MAGNAYE 71.21
10/28/2020 256890 ANTHONY COE 25.85
10/28/2020 256891 MICHAEL CRAIG 72.88
TOTAL $3,511.39
Page 1 of 1
Agenda Item
#5c
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #5c
Discussion Item
1
3
8
9
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Resolution 2023.19 - Water Main Seismic Retrofit Project Notice of Intent to
Adopt a Mitigated Negative Declaration and Mitigated Monitoring and Reporting
Program
RECOMMENDATION
That the Board of Directors adopt Resolution 2023.19 approving the Mitigated Negative
Declaration and Mitigated Monitoring and Reporting Program for the Water Main
Seismic Retrofit Project.
BACKGROUND / ANALYSIS
The District is planning and designing the replacement of 34,000 feet of water pipeline
that is at-risk of damage during a seismic event. A majority of the planning, design and
construction is being funded by a grant from the Federal Emergency Management
Agency (FEMA). The grant requires the District comply with certain notifications and the
California Environmental Quality Act (CEQA).
In December of 2022, the District commissioned an Initial Study/Mitigated Negative
Declaration (IS/MND) to be prepared for the Water Main Seismic Retrofit Project by the
Districts consultant Krieger and Stewart. The purpose of the study is to comply with
CEQA to determine if this project will have a significant effect on the environment.
Before submitting the IS/MND to the State Clearing House for agency review, the
District sent notice to San Manuel Band of Mission Indians, Morongo Band of Mission
Indians, Gabrieleno Band of Mission Indians – Kizh Nation and Soboba Band of Luiseno
Indians as required per Assembly Bill 52 (AB52). AB 52 provides the Tribes an
opportunity to consult on the environmental process prior to beginning the review
process. The 30-day notice to the tribes concluded on August 18, 2023. Two responses
were received during this period. The District responded by providing the requested
design documents, and no other contact was received. A third response was received
after the 30-day period.
On October 30, the Draft IS/MND was filed with the State Clearing House for
distribution to local agencies for review. Notice was also filed with San Bernardino
County and posted on the District website. The 30-day public review period ended on
November 29, 2023. The District did not receive any comments during the public review
period. Consequently, the Draft IS/MND can be considered the Final IS/MND and
adopted by the Board through Resolution 2023.19.
Agenda Item
#5c
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #5c
Discussion Item
1
3
8
9
AGENCY GOALS AND OBJECTIVES
IV - Promote Planning, Maintenance and Preservation of District Resources
A. Develop Projects and Programs to Ensure Safe and Reliable Services
C. Dedicate Efforts Toward System Maintenance and Modernization
REVIEW BY OTHERS
This agenda item has been reviewed by the Executive Management Team
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Jeff Noelte
Director of Engineering and Operations
ATTACHMENTS
Draft IS/MND
Resolution 2023.19
EAST VALLEY WATER DISTRICT
31111 GREENSPOT ROAD
HIGHLAND, CA 92346
(909) 889-9501
EAST VALLEY WATER DISTRICT
INITIAL STUDY AND
DRAFT MITIGATED NEGATIVE DECLARATION
FOR
WATER MAIN SEISMIC RETROFIT PROJECT
W2233
SEPTEMBER 2023
Prepared by
(951) 684-6900
Office: 3602 University Ave, Riverside, CA 92501
Mail/Ship: 3890 Orange St #1509, Riverside, CA 92502
574-9.4
(REPORTS/CEQA/574-9P4)
VEM/DFS/blt
TABLE OF CONTENTS
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
TABLE OF CONTENTS
PAGE
PART 1 - PROJECT INFORMATION
A.
B.
C.
D.
E.
F.
INTRODUCTION............................................................................................................1
PROJECT DESCRIPTION ..............................................................................................1
ENVIRONMENTAL SETTING......................................................................................3
COMPLIANCE WITH CEQA.........................................................................................3
LEAD AGENCY..............................................................................................................3
PUBLIC INFORMATION DOCUMENT .....................................................4
PART 2 – ENVIRONMENTAL EFFECTS AND CHECKLIST
A.
B.
C.
D.
E.
PROJECT INFORMATION ............................................................................................5
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED...................................7
DETERMINATION.........................................................................................................8
EVALUATION OF ENVIRONMENTAL IMPACTS ....................................................9
ENVIRONMENTAL CHECKLIST ..............................................................................11
PART 3 - REFERENCES AND SOURCES .................................................................................49
FIGURES
FIGURE 1 PROJECT VICINITY
FIGURE 2 PROJECT AREA
FIGURE 3 PROJECT LOCATION
APPENDICES
A.
B.
DRAFT MITIGATED NEGATIVE DECLARATION AND MITIGATION MONITORING
AND REPORTING PROGRAM
AIR QUALITY CALCULATIONS
Table of Contents - i
PART 1
PROJECT INFORMATION
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
PART 1 - PROJECT INFORMATION
A.EAST VALLEY WATER DISTRICT
East Valley Water District (EVWD or the District) was formed in 1954 for providing water service
to residents of its service area. EVWD's service area encompasses an area of approximately 30
square miles along the foothills of the San Bernardino Mountains and includes the City of Highland,
some eastern parts of the City of San Bernardino, the San Manuel Band of Mission Indians, and
some unincorporated parts of San Bernardino County. EVWD currently provides water and
wastewater services to a total population of approximately 104,000 residents within its service area.
B.PROJECT DESCRIPTION
1.Background
There are two major earthquake faults in the San Bernardino Valley. The San Jacinto Fault
is located within 5 miles of the southwestern boundary of the District's service area, while
the San Andreas Fault runs directly through the District's service area. Ground shaking
from earthquakes can substantially damage water mains, which are a critical component of
the water distribution system. According to EVWD's 2019 Water System Master Plan,
about half of all water pipeline material is asbestos cement, which is a very brittle material
classified as having moderate to high vulnerability to seismic activities.
Due to the proximity of the two major fault lines mentioned above to the District's service
area, the District has studied system risks and vulnerabilities to earthquake hazards. The
District conducted a thorough review of vulnerable potable water mains, considering
locations of vulnerable pipe materials, population density, and the locations of critical
customers. Based on its review, the District selected the Project area, with the pipelines
located therein being nearly 69% asbestos cement, 23% steel double-dipped and wrapped,
and the remaining being either uncoated steel or cement mortar lined and coated steel.
2.Proposed Project
The District's Water Main Seismic Retrofit Project (the Project) consists of the replacement
of approximately 35,000 linear feet (LF) of existing potable water main pipelines that are
Page 1
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
considered susceptible to damage due to ground shaking from earthquakes. The water
main pipelines will be replaced with ductile iron pipe, incorporating special joints where
needed, to improve resilience of the pipelines in case of a seismic event.
Project construction is expected to include the following:
•
•
•
Removal of existing landscaping, asphalt, concrete, or soil, as necessary;
Trenching along the pipeline alignment;
Placement of pipe bedding, 8 to 16-inch diameter ductile iron pipeline, and
appurtenances (such as special joints and fittings);
•
•
Backfilling trenches and compacting soil;
Installing the portion of pipeline in Baseline Street that crosses under the Warm
Creek Channel using trenchless technology ;
•
•
Pressure testing and disinfection of the pipelines;
Returning the land surface to pre-construction conditions (e.g. asphalt replacement
or concrete replacement, soil and landscaping replacement);
Connection of the new pipelines to existing water system pipelines; and
Connection of existing customers to the new pipelines.
•
•
3.Purpose
The purpose of the Project is to improve the water system's resiliency to seismic events by
replacing existing water mains with ductile iron pipe, including the use of shorter pipe
lengths and flexible joints and fittings.
Nearly 69% of existing water mains at the Project Site are asbestos cement, 23% are steel
double-dipped and wrapped, and the remaining are either uncoated steel or cement mortar
lined and coated steel. The new pipe materials will result in greater resistance to ground
shaking and ground deformation during a seismic event.
Further, by basing minimum pipe size on current EVWD best practices, the Project will
reduce the risk of overtaxing the potable water system when using pressurized fire hydrants
Page 2
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
for fire suppression. Since fires commonly occur after earthquakes, the Project will also
reduce the risk of property damage due to fires after a seismic event.
C.ENVIRONMENTAL SETTING
1.Location
The Project is located within public street rights-of-way within the City of Highland, the City
of San Bernardino, and within an unincorporated portion of the County of San Bernardino,
in the following streets: Pacific Street, Dwight Way, E. Bessant Street, Independent Place,
Elmo Drive, Yates Street, Glasgow Avenue, Anson Street, Del Rosa Drive, Elmwood Road,
Del Rosa Avenue, Osbun Road, Byron Street, Fisher Street, E. Amanda Street, Jane Street,
Walker Street, Sterling Avenue, and Baseline Street. Refer also to Figures 1 through 3
herein. The pipeline alignments shown on Figure 3 are collectively referred to herein as the
Project Site.
2.Climate
Climate in the area is characterized by relatively hot, dry summers and cool winters with
intermittent precipitation. The area normally receives an average annual precipitation of
approximately 16 inches, most of which occurs during December through March.
3.Land Use
The Project is located within public street rights-of-way within a developed urban area.
Land uses in the Project area consist mostly of single-family properties, with some multi-
family properties, places of worship, commercial businesses, and an elementary school.
D.COMPLIANCE WITH CEQA
This document has been prepared in compliance with the provisions of the California
Environmental Quality Act, codified in California Public Resources Code, Division 13, Section
21000 et seq (CEQA) and the State CEQA Guidelines (California Code of Regulations, Title 14,
Page 3
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Section 15000 et seq). Pursuant to CEQA and the State CEQA Guidelines, this Initial Study has
been prepared to determine whether the Project may have a significant effect on the environment.
This Initial Study for EVWD's Water Main Seismic Retrofit Project has been prepared by Krieger
& Stewart, Incorporated under contract with EVWD to comply with the provisions of CEQA.
E.LEAD AGENCY
EVWD is lead agency for the Project, as it is the public agency with the primary responsibility for
preparing CEQA documents and for approving and carrying out the Project. Since EVWD is
responsible for the Project, it must comply with the requirements of CEQA and the CEQA
Guidelines issued by the State of California.
EVWD routinely constructs new facilities, maintains them, and replaces them as necessary to
maintain adequate, reliable, and safe domestic water service to its customers. The Project is a
continuation of the authority that the EVWD has exercised in the past.
F.PUBLIC INFORMATION DOCUMENT
This is a public information document prepared in accordance with CEQA and the State CEQA
Guidelines. The purposes of this Initial Study are to provide EVWD with information to use as a
basis for identifying the potential environmental impacts of the Project, for determining the
appropriate CEQA document to prepare for the Project, to facilitate environmental assessment of
the Project, and to provide documentation of the factual basis for the finding in the Project's CEQA
document. Additionally, this document identifies mitigation intended to avoid or reduce any
adverse environmental impacts of the Project to levels that are less than significant.
Page 4
PART 2
ENVIRONMENTAL EFFECTS AND CHECKLIST
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
PART 2 - ENVIRONMENTAL EFFECTS AND CHECKLIST
A.PROJECT INFORMATION
1.Project Title:
Water Main Seismic Retrofit Project
2.Lead Agency Name and Address:
East Valley Water District
31111 Greenspot Road
Highland, CA 92346
3.Contact Person and Phone Number:
Nathan J. Carlson, Project Engineer
East Valley Water District
(909) 806-4282
4.
5.
Project Location:
Refer to Part 1.C(1) on Page 3 herein. Refer also to Figures 1 through 3 following the
Environmental Checklist section.
Project Sponsor's Name and Address:
East Valley Water District
31111 Greenspot Road
Highland, CA 92346
6.General Plan Designation:
The Project is located within public street rights-of-way surrounded by development with
the following general plan land use designations, based on jurisdiction:
•City of Highland:Low Density Residential (2.1-6.0 du/acre), General
Commercial, and Planned Commercial
•
•
City of San Bernardino: Commercial – Heavy
County of San Bernardino: MDR (Medium Density Residential)
7.Zoning:
The Project is located within public street rights-of-way surrounded by development with
the following zoning designations, based on jurisdiction:
•City of Highland: R-1 – Single Family Residential, CG – General Commercial,
and PC – Planned Commercial
•
•
City of San Bernardino: Commercial Heavy
County of San Bernardino: RM (Multiple Residential)
Page 5
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
8.Description of Project:
Refer to Part 1.B, beginning on Page 1 herein.
9.Surrounding Land Uses and Setting:
Refer to Part 1.C(2) and Part 1.C(3) on Page 3 herein.
10.Other public agencies whose approval may be required (e.g., permits, financing
approval, or participation agreement):
•
•
•
State Water Resources Control Board, Division of Drinking Water
San Bernardino County Flood Control District
California Regional Water Quality Control Board, Santa Ana River Basin Region
11.Have California Native American tribes traditionally and culturally affiliated with
the project area requested consultation pursuant to Public Resources Code Section
21080.3.1? If so, is there a plan for consultation that includes, for example, the
determination of significance of impacts to tribal cultural resources, procedures
regarding confidentiality, etc.?
The District sent formal notification letters on July 20, 2023, informing the following three
Native American tribes of the Project:
•Yuhaaviatam of San Manuel Nation (formerly San Manuel Band of Mission
Indians)
•
•
Gabrieleño Band of Mission Indians – Kizh Nation
Morongo Band of Mission Indians
Yuhaaviatam of San Manuel Nation
In response to the District’s notification letter, Yuhaaviatam of San Manuel Nation replied
via email requesting copies of additional documentation pertaining to the Project. After
receiving the requested documents, the tribe then requested that certain mitigation be
included in the Project.
Gabrieleño Band of Mission Indians – Kizh Nation
In response to the District’s notification letter, Gabrieleño Band of Mission Indians – Kizh
Nation requested to consult on the Project; however, the tribe did not respond to further
communications from the District.
Morongo Band of Mission Indians
In response to the District’s notification letter, Morongo Band of Mission Indians submitted
a response letter; however, the letter was received on September 20, 2023, sixty days after
the formal notification was sent out.
Page 6
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
B.ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at
least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following
pages.
Aesthetics Agriculture/Forestry Resources
Biological Resources
Energy
Air Quality
Cultural Resources
Geology/Soils Greenhouse Gas Emissions
Hydrology/Water Quality
Mineral Resources
Population/Housing
Recreation
Hazards & Hazardous Materials
Land Use/Planning
Noise
Public Services
Tribal Cultural Resources
Wildfire
Transportation
Utilities/Service Systems
Mandatory Findings of Significance None
Page 7
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
C.DETERMINATION (To be completed by the Lead Agency):
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a significant effect on the environment,
and a NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the environment,
there will not be a significant effect in this case because revisions in the project have been made
by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will
be prepared.
I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have a "potentially significant" or "potentially significant
unless mitigated" impact on the environment, but at least one effect 1) has been adequately
analyzed in an earlier document pursuant to applicable legal standards, and 2) has been
addressed by mitigation measures based on the earlier analysis as described on attached sheets.
An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects
that remain to be addressed.
I find that although the proposed project could have a significant effect on the environment,
because all potentially significant effects (a) have been analyzed adequately in an earlier EIR
or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided
or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions
or mitigation measures that are imposed upon the proposed project, nothing further is required.
9/29/2023
David F. Scriven Date
KRIEGER & STEWART, INCORPORATED
District Consulting Engineer
EAST VALLEY WATER DISTRICT
Page 8
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
D.EVALUATION OF ENVIRONMENTAL IMPACTS
1.A brief explanation is required for all answers except "No Impact" answers that are
adequately supported by the information sources a lead agency cites in the parentheses
following each question. A "No Impact" answer is adequately supported if the referenced
information sources show that the impact simply does not apply to projects like the one
involved (e.g. the project falls outside a fault rupture zone). A "No Impact" answer should
be explained where it is based on project-specific factors as well as general standards (e.g.
the project will not expose sensitive receptors to pollutants, based on a project-specific
screening analysis).
2.
3.
All answers must take account of the whole action involved, including off-site as well as
on-site, cumulative as well as project-level, indirect as well as direct, and construction as
well as operational impacts.
Once the lead agency has determined that a particular physical impact may occur, then the
checklist answers must indicate whether the impact is potentially significant, less than
significant with mitigation, or less than significant. "Potentially Significant Impact" is
appropriate if there is substantial evidence that an effect is significant. If there are one or
more "Potentially Significant Impact" entries when the determination is made, an
Environmental Impact Report (EIR) is required.
4."Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where
the incorporation of mitigation measures has reduced an effect from "Potentially
Significant Impact" to a "Less than Significant Impact." The lead agency must describe
the mitigation measures, and briefly explain how they reduce the effect to a less than
significant level (mitigation measures from "Earlier Analyses," as described in (5) below,
may be cross-referenced).
5.Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA
process, an effect has been adequately analyzed in an earlier EIR or negative declaration.
Section 15063(c)(3)(D). In this case, a brief discussion should identify the following:
a.Earlier Analyses Used. Identify and state where they are available for review.
Page 9
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
b.
c.
Impacts Adequately Addressed. Identify which effects from the above checklist
were within the scope of and adequately analyzed in an earlier document pursuant
to applicable legal standards, and state whether such effects were addressed by
mitigation measures based on the earlier analysis.
Mitigation Measures. For effects that are "Less than Significant with Mitigation
Measures Incorporated," describe the mitigation measures which were
incorporated or refined from the earlier document and the extent to which they
address site-specific conditions for the project.
6.Lead agencies are encouraged to incorporate into the checklist references to information
sources for potential impacts (e.g. general plans, zoning ordinances). Reference to a
previously prepared or outside document should, where appropriate, include a reference to
the page or pages where the statement is substantiated.
7.
8.
Supporting Information Sources. A source list should be attached, and other sources used
or individuals contacted should be cited in the discussion.
This is only a suggested form, and lead agencies are free to use different formats; however,
lead agencies should normally address the questions from this checklist that are relevant to
a project's environmental effects in whatever format is selected.
9.The explanation of each issue should identify:
a.
b.
The significance criteria or threshold, if any, used to evaluate each question; and
The mitigation measure identified, if any, to reduce the impact to less than
significant.
Page 10
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
E.ENVIRONMENTAL CHECKLIST
Issue I. Aesthetics
Except as provided in Public Resources Code Section 21099, would the Project:
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
a) Have a substantial adverse effect on a scenic vista?
The Project will be located within public street rights-of-way. Because the Project consists of
belowground facilities (replacement water mains), the Project will not have a substantial adverse effect
on a scenic vista.
Issue I. Aesthetics (continued)
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impactb) Substantially damage scenic resources, including,
but not limited to, trees, rock outcroppings, and
historic buildings within a state scenic highway?
No Impact
There are no "Officially Designated State Scenic Highways" within close proximity to the Project Site.
State Route 210, which is located approximately 0.70 mile north of the Project Site, is listed as an
"Eligible State Scenic Highway". The nearest Officially Designated State Scenic Highway is State Route
38, which was designated in 1968 and is located approximately 30 miles northeasterly of the Project
Site. The Project consists of replacing existing water main pipelines, which are belowground facilities
and do not have the potential to substantially damage any scenic resources, including but not limited to
trees, rock outcroppings, and historic buildings within a state scenic highway. Refer also to Issue I(a)
above.
Page 11
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue I. Aesthetics (continued)
c) In non-urbanized areas, substantially degrade the
existing visual character or quality of public views
of the site and its surroundings? (Public views are
those that are experienced from a publicly
accessible vantage point.) If the project is in an
urbanized area, would the project conflict with
applicable zoning and other regulations governing
scenic quality?
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The Project is located in public street rights-of-way in an urbanized area, surrounded by residential
and commercial uses. The Project consists of construction and operation of belowground pipelines,
which will not substantially degrade the existing visual character or quality of public views of the area.
For these reasons, construction and operation of the Project facilities will not conflict with applicable
zoning or other regulations governing scenic quality.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impactd) Would the project create a new source of substantial
light or glare which would adversely affect day or
nighttime views in the area?
No Impact
The Project does not include any lighting features and will not create a new source of substantial light
or glare which would adversely affect daytime or nighttime views in the area.
Page 12
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue II. Agriculture and Forest Resources
In determining whether impacts to agricultural resources are significant environmental effects, lead
agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997)
prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on
agriculture and farmland. In determining whether impacts to forest resources, including timberland, are
significant environmental effects, lead agencies may refer to information compiled by the California
Department of Forestry and Fire Protection regarding the state's inventory of forest land, including the
Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon
measurement methodology provided in forest protocols adopted by the California Air Resources Board.
a) Would the project convert Prime Farmland, Unique
Farmland, or Farmland of Statewide Importance
(Farmland), as shown on the maps prepared
pursuant to the Farmland Mapping and Monitoring
Program of the California Resources Agency, to
non-agricultural use?
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
Based on maps available from the State of California Department of Conservation, Division of Land
Resources Protection, Farmland Mapping and Monitoring Program, online at
https://maps.conservation.ca.gov/DLRP/CIFF, the Project is located within an area of land categorized
as "Urban and Built-Up Land", which is defined below.
Urban and Built-Up Land is occupied by structures with a building density of at least 1 unit to 1.5
acres, or approximately 6 structures to a 10-acre parcel. Common examples include residential,
industrial, commercial, institutional facilities, cemeteries, airports, golf courses, sanitary landfills,
sewage treatment, and water control systems.
There is no land categorized as Prime Farmland, Unique Farmland, or Farmland of Statewide
Importance (collectively, Farmland) located on or adjacent to the Project Site. For these reasons,
construction and operation of the Project will not convert Farmland to non-agricultural use.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
b) Would the project conflict with existing zoning for
agricultural use, or a Williamson Act contract?
The Project Site is not zoned for agricultural use, and there are no Williamson Act contracts in effect
on any of the parcels included in the Project Site. For these reasons, the Project will not conflict with
existing zoning for agricultural use or with a Williamson Act Contract.
Page 13
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue II. Agriculture and Forest Resources (continued)
c) Would the project conflict with existing zoning for,
or cause rezoning of, forest land (as defined in
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact
Public Resources Code Section 12220(g)),
timberland (as defined by Public Resources Code
Section 4526), or timberland zoned Timberland
Production (as defined by Government Code
Section 51104(g))?
No Impact
The Project is located within public street rights-of-way that are adjacent to residential and commercial
land uses. There are no lands zoned for forest land or timberland located on or adjacent to the Project
Site. For these reasons, construction and operation of the Project will not conflict with existing zoning
for, or cause rezoning of, forest land, timberland, or timberland zoned Timberland Production.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
d) Would the project result in the loss of forest land or
conversion of forest land to non-forest use?
The Project Site does not contain nor adjoin any forest land. Therefore, construction and operation of
the Project will not result in the loss of forest land or conversion of forest land to non-forest use. Refer
also to Issue II(c) above.
Less Than
Significant
with
Mitigation
Incorporated
e) Would the project involve other changes in the
existing environment which, due to their location or
nature, could result in conversion of Farmland to
non-agricultural use or conversion of forest land to
non-forest use?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The Project does not involve changes in the existing environment that could result in conversion of
Farmland to non-agricultural use or conversion of forest land to non-forest use. Refer also to Issues
II(a) through II(d), above.
Page 14
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue III. Air Quality
Where available, the significance criteria established by the applicable air quality management district
or air pollution control district may be relied upon to make the following determinations.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Would the project conflict with or obstruct
implementation of the applicable air quality plan?
The Project is located within the South Coast Air Basin (SCAB), which encompasses portions of Los
Angeles County, Riverside County, San Bernardino County, and all of Orange County. The San
Bernardino County portion of the SCAB is under the jurisdiction of the South Coast Air Quality
Management District (SCAQMD).
A project is considered to conflict with or obstruct implementation of the applicable air quality plan if
it would result in population or employment growth that would exceed the estimates for such growth
that are set forth in the applicable air quality plan.
The Project includes replacement of existing water mains currently operated as part of EVWD's existing
water system, and the Project does not have the potential to result in an increase in population or
employment growth in the area. For these reasons, the Project would not conflict with or obstruct any
applicable air quality plan.
Potential impacts related to greenhouse gases are described in Issue VIII herein.
Less Than
Significant
with
Mitigation
Incorporated
b) Would the project result in a cumulatively
considerable net increase of any criteria pollutant for
which the project region is non-attainment under an
applicable federal or state ambient air quality
threshold?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
As described in Issue III(a) above, the Project is located within the South Coast Air Basin (SCAB). Air
quality conditions in the SCAB are under the jurisdiction of the South Coast Air Quality Management
District (SCAQMD).
State and federal designations based on the California Ambient Air Quality Standards (CAAQS) and
the National Ambient Air Quality Standards (NAAQS) for the project area are listed below.
"Attainment" is the category given to an area that has had no CAAQS or NAAQS violations in the past
Page 15
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
3 years. "Non-Attainment" is the category given to an area that has had one or more such violations in
the past 3 years. An area is considered "Unclassified" when there is insufficient data.
Under the CAAQS, the Project area is classified as Non-Attainment for ozone (O3), for particulate
matter measuring 2.5 microns or less in diameter (PM2.5), and for particulate matter measuring greater
than 2.5 microns and up to 10 microns in diameter (PM10). The Project area is classified as Attainment
for carbon monoxide (CO), nitrogen dioxide (NO ), sulfur dioxide (SO ), sulfates (SO ), and lead. The224
Project area is unclassified for hydrogen sulfide (H2S) and visibility reducing particles. Additional
information about each of these pollutants and the CAAQS is available at the California Air Resources
Board website at www.arb.ca.gov/resources/california-ambient-air-quality-standards.
Under the NAAQS, the Project area is classified as Non-Attainment for Ozone (O ) and PM , and as32.5
Unclassified/Attainment for PM , CO, NO , SO , and lead. Additional information about these1022
pollutants and the NAAQS is available on the United States Environmental Protection Agency's website
at www.epa.gov/criteria-air-pollutants.
Project construction air pollutant emissions were estimated using the California Emissions Estimator
Model (CalEEMod, Version 2022.1.1.7). A copy of the CalEEMod output report is included in
Appendix B herein. Peak day air pollutant emissions estimated to be generated during construction
are set forth in Table 1 below.
Table 1
Estimated Peak Day Construction Equipment Exhaust Emissions for Construction of
Water Main Seismic Retrofit Project
Pollutants (pounds/day)
VOC
1.42
NOX
8.13
CO SOx
0.03
PM10
0.32
PM2.5
0.29
Project Construction
Emissions (1)8.37
Significance
Thresholds (2)75
No
100
No
550
No
150
No
150
No
55
NoExceeds Threshold?
(1) Peak day, assuming all construction equipment operating simultaneously on the same day.
(2) South Coast Air Quality Management District, March 2023
Construction activities will result in a temporary increase in quantities of air pollutants in the Project
area, including airborne dust, resulting from operation of construction vehicles and equipment. Dust
will be mitigated to the extent possible using dust palliatives (such as water) and best management
practices (BMPs) specified in the construction contract documents for the Project. Air pollutant
emissions resulting from Project construction will be less than significant and short-term.
Page 16
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
For the reasons described above, air pollutant emissions generated by construction and operation of
the Project will be less than significant and will not result in an increase in O , or PM , for which the32.5
Project area is designated Non-Attainment under the CAAQS and NAAQS or PM10, for which the Project
area is designated Non-Attainment under the CAAQS.
Issue III. Air Quality (continued)
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
c) Would the project expose sensitive receptors to
substantial pollutant concentrations?
The sensitive receptors nearest the Project Site are residences, churches, and an elementary school
located on surrounding properties. Quantities of air pollutant emissions will temporarily increase
during Project construction; however, as described in Issue III(b) herein, said increases will be less
than significant and short-term. Ongoing operation of the Project will not result in air pollutant
emissions. For these reasons, construction and operation of the Project will not expose sensitive
receptors to substantial pollutant concentrations.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impactd) Would the project result in other emissions (such as
those leading to odors) adversely affecting a
substantial number of people?
No Impact
Project construction is expected to result in odors resulting from replacement of asphalt paving in the
streets after installation of the new pipelines. Said odors will be less than significant and short-term.
Operation of the Project will not generate other emissions, including those leading to odors. For these
reasons, the Project will not result in other emissions adversely affecting a substantial number of people.
Page 17
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue IV. Biological Resources
a) Would the project have a substantial adverse effect,
either directly or through habitat modifications, on
any species identified as a candidate, sensitive, or
special status species in local or regional plans,
policies, or regulations, or by the California
Department of Fish and Wildlife or U.S. Fish and
Wildlife Service?
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
Certain species of plants and animals have low populations, limited distributions, or both. Such species
are vulnerable to further declines in population and distribution and may be subject to extirpation as
the human population grows and the habitats these species occupy are converted to urban or other uses.
State and federal laws, particularly the Federal Endangered Species Act (FESA) and the California
Endangered Species Act (CESA) provide the California Department of Fish and Wildlife (CDFW) and
the United States Fish and Wildlife Service (USFWS) with mechanisms for conserving and protecting
native plant and animal species. Many plants and animals have been formally listed as "Threatened"
or "Endangered" under FESA, CESA, or both, while many others have been designated as candidates
for such listing. Additionally, others have been designated as "Species of Special Concern" by CDFW,
as "Species of Concern" by USFWS, or are on lists of rare, threatened or endangered plants developed
by the California Native Plant Society (CNPS). Collectively, all of these listed and designated species
are referred to as "special status species".
The Federal Migratory Bird Treaty Act (MBTA), codified in 50 CFR Section 10.13, makes it unlawful
to "take" (i.e. harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect) migratory birds
or their nests, eggs, feathers, or any part thereof. With few exceptions, all native bird species are
protected by the MBTA. Birds protected under the MBTA are also referred to as "special status species".
The Project is located within existing paved streets in an urban setting surrounded by residential and
commercial uses. Due to its location, the Project site does not contain any habitat for sensitive
biological resources. Therefore, the Project will not have substantial adverse effects, either directly or
through habitat modifications, on any species identified as a candidate, sensitive, or special status
species in local or regional plans, policies, or regulations, or by the California Department of Fish and
Wildlife or U.S. Fish and Wildlife Service.
Page 18
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue IV. Biological Resources (continued)
b) Would the project have a substantial adverse effect
on any riparian habitat or other sensitive natural
community identified in local or regional plans,
policies, regulations or by the California Department
of Fish and Wildlife or U.S. Fish and Wildlife
Service?
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
There are no riparian habitats or natural communities of concern located on the Project Site. While
the Project alignment within Baseline Road crosses Warm Creek, Project construction will not impact
the creek because pipeline installation will avoid contact with the creek by using trenchless technology
to install the pipeline beneath the creek. Therefore, the Project will not have a substantial adverse effect
on any riparian habitat or other sensitive natural community.
Less Than
Significant
with
Mitigation
Incorporated
c) Would the project have a substantial adverse effect
on state or federally protected wetlands (including,
but not limited to, marsh, vernal pool, coastal, etc.)
through direct removal, filling, hydrological
interruption, or other means?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
There are no wetlands located on or adjacent to the Project Site. Therefore, construction and operation
of the Project will not have a substantial adverse effect on state or federally protected wetlands.
Less Than
Significant
with
Mitigation
Incorporated
d) Would the project interfere substantially with the
movement of any native resident or migratory fish
or wildlife species or with established native
resident or migratory wildlife corridors, or impede
the use of native wildlife nursery sites?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
Because the Project is located within existing paved streets within an urban area, there are no native
resident or migratory fish or wildlife species or established native resident or migrator wildlife corridors
within the Project site. Therefore, the Project will not interfere with the movement of any native resident
or migratory fish or wildlife species, with any wildlife corridors, or with the use of native wildlife nursery
sites.
Page 19
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue IV. Biological Resources (continued)
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impacte) Would the project conflict with any local policies or
ordinances protecting biological resources, such as a
tree preservation policy or ordinance?
No Impact
The Project will not conflict with any local policies or ordinances protecting biological resources.
Further, no trees will be removed as part of the Project.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact
f) Would the project conflict with the provisions of an
adopted Habitat Conservation Plan, Natural No Impact
Community Conservation Plan, or other approved
local, regional, or state habitat conservation plan?
The Project Site is not located within an area covered by an adopted Habitat Conservation Plan, Natural
Community Conservation Plan or other approved habitat conservation plan; therefore, the Project
would not conflict with any such plan.
Issue V. Cultural Resources
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impacta) Would the project cause a substantial adverse
change in the significance of a historical resource
pursuant to §15064.5?
No Impact
CEQA Guidelines Section 15064.5(3) states, in part, that "Generally, a resource shall be considered by
the lead agency to be "historically significant" if the resource meets the criteria for listing on the
California Register of Historical Resources (Pub. Res. Code § 5024.1, Title 14 CCR, Section 4852),
including the following:
"(A) Is associated with events that have made a significant contribution to the broad patterns of
California's history and cultural heritage;
(B) Is associated with the lives of persons important in our past;
(C) Embodies the distinctive characteristics of a type, period, region, or method of construction, or
represents the work of an important creative individual, or possesses high artistic values; or
Page 20
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
(D) Has yielded, or may be likely to yield, information important in prehistory or history."
Further, California Public Resources Code Section 5020.1(j) states that a "'Historical resource'
includes, but is not limited to, any object, building, structure, site, area, place, record, or manuscript
which is historically or archaeologically significant, or is significant in the architectural, engineering,
scientific, economic, agricultural, educational, social, political, military, or cultural annals of
California."
The Project is located within existing public street rights-of-way that have been previously disturbed
during road construction and installation of various linear utilities (such as pipelines) beneath the
streets and are not expected to contain any historical or archaeological resources. No buildings located
along the pipeline alignment will be disturbed by the Project. In order to avoid or reduce potential
impacts upon historical or archaeological resources that may be uncovered during implementation of
the Project, Mitigation Measure CUL-1 is incorporated into the Project. Mitigation Measure CUL-1 is
summarized below and is set forth in the Mitigation Monitoring and Reporting Program for the Project,
which is included in Appendix A herein. With incorporation of Mitigation Measure CUL-1, the Project
will not cause a substantial adverse change in the significance of a historical resource pursuant to
§15064.5.
Mitigation Measure CUL-1: Cultural Resources
In the event that cultural resources are discovered during project activities, all work in the
immediate vicinity of the find (within a 60-foot buffer) shall cease and a qualified archaeologist
meeting Secretary of Interior standards shall be hired to assess the find. Work on the other
portions of the project outside of the buffered area may continue during this assessment period.
Additionally, the Yuhaaviatam of San Manuel Nation Cultural Resources Department (YSMN)
shall be contacted, as detailed within Mitigation Measure TCR-1, regarding any pre-contact
and/or historic-era finds and be provided information after the archaeologist makes an initial
assessment of the nature of the find, so as to provide tribal input with regards to significance
and treatment.
If significant pre-contact and/or historic-era cultural resources, as defined by CEQA, are
discovered and avoidance cannot be ensured, the archaeologist shall develop a Monitoring
and Treatment Plan, the drafts of which shall be provided to YSMN for review and comment,
as detailed within Mitigation Measure TCR-1. The archaeologist shall monitor the remainder
of project construction and implement the Monitoring and Treatment Plan accordingly.
Page 21
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
With incorporation of Mitigation Measure CUL-1, the Project would not cause a substantial adverse
change in the significance of a historical resource.
Issue V. Cultural Resources (Continued)
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impactb) Would the project cause a substantial adverse
change in the significance of an archaeological
resource pursuant to §15064.5?
No Impact
Refer to Issue V(a) above. With incorporation of Mitigation Measure CUL-1, as set forth in the
Mitigation Monitoring and Reporting Program for the Project, attached to the Mitigated Negative
Declaration in Appendix A herein, the Project would not cause a substantial adverse change in the
significance of an archaeological resource pursuant to CEQA Guidelines Section 15064.5.A
description of potential impacts upon tribal cultural resources is included in Issue XVIII herein.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impactc) Would the project disturb any human remains,
including those interred outside of dedicated
cemeteries?
No Impact
There are no known cemeteries or burial grounds located on or adjacent to the Project Site. To avoid
or reduce potential impacts upon any human remains that may be inadvertently encountered during
Project construction, Mitigation Measure CUL-2 is incorporated into the Project. Mitigation Measure
CUL-2 is summarized below and is set forth in the Mitigation Monitoring and Reporting Program for
the Project, which is included in Appendix A herein. Additionally, the Project will comply with the
provisions of Section 15064.5 of the State CEQA Guidelines.
Mitigation Measure CUL-2: Human Remains
In the event that any human remains or funerary objects are encountered during any activities
associated with Project construction, the construction contractor will halt or divert all work
within a 100-foot radius of the find and will immediately contact the San Bernardino County
Coroner's Office and East Valley Water District (EVWD). Construction activities will not resume
until a qualified archaeologist or historian evaluates the nature and significance of the find and
EVWD notifies the construction contractor to resume construction activities. California Health
and Safety Code Section 7050.5 will be enforced for the duration of the Project.
Page 22
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue VI. Energy
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact
a) Would the project result in potentially significant
environmental impact due to wasteful, inefficient, or
unnecessary consumption of energy resources,
during project construction or operation?
No Impact
The primary energy resource that will be consumed during construction of the Project is fuel needed by
the construction contractor for operating construction vehicles and equipment. Operation of the Project
will not require any increase in fuel or energy use, as the Project consists of the replacement of existing
water pipelines. For these reasons, the Project will not result in a potentially significant environmental
impact due to wasteful, inefficient, or unnecessary consumption of energy resources during Project
construction or operation.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impactb) Would the project conflict with or obstruct a state or
local plan for renewable energy or energy
efficiency?
No Impact
Construction and operation of the Project will not conflict with or obstruct a state or local plan for
renewable energy or energy efficiency. Refer also to Issue VI(a) above.
Page 23
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue VII. Geology and Soils
Less Than
Significant
with
Mitigation
Incorporated
a) Would the project directly or indirectly cause
potential substantial adverse effects, including the
risk of loss, injury, or death involving:
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the
State Geologist for the area or based on other
substantial evidence of a known fault? Refer to
Division of Mines and Geology Special
Publication 42.
ii) Strong seismic ground shaking?
iii) Seismic-related ground failure, including
liquefaction?
iv) Landslides?
i) Based on information available in the online mapping system, "Earthquake Zones of Required
Investigation", provided by the California Geological Survey on its website at
http://conservation.ca.gov/cgs/geohazards/eq-zapp, the Project Site is not located within an
earthquake fault zone. The nearest fault, Mill Creek Fault, is within the San Andreas Fault
Zone and is located approximately 3 miles northerly of the Project Site. Construction and
operation of the Project will not directly or indirectly cause potential substantial adverse effects,
including the risk of loss, injury, or death involving rupture of a known earthquake fault.
ii) Being located in seismically-active southern California, the Project Site is subject to strong
seismic ground shaking. The Project does not include any structures intended for human
occupancy, and Project facilities will be designed and constructed in accordance with the
recommendations provided in the geotechnical study report, Geotechnical Exploration East
Valley Water District Water Main Seismic Retrofit Project Southeast of Pacific Street and
Dwight Way City of San Bernardino, City of Highland, and Unincorporated San Bernardino
County, California, prepared by Leighton Consulting, Inc., dated April 24, 2023 (Leighton
Report). For these reasons, construction and operation of the Project is not expected to directly
or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or
death involving strong seismic ground shaking.
iii) Based on the Leighton Report cited in Issue VII(a)(ii) above, the majority of the Project is
mapped within a high liquefaction susceptibility zone based on San Bernardino County's
Page 24
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Hazard Overlay Maps. However, based on Leighton's review of historic groundwater data in
the area and the characteristics of the native alluvial soils encountered in soil borings,
becoming dense and very dense with depth, the potential for liquefaction at the Project Site is
considered low at the Project Site. Further, the Project does not include facilities intended for
human occupation. For these reasons, the Project will not expose people or structures to
potential substantial adverse effects, including seismic-related ground failure, such as
liquefaction.
iv) Based on information available in the online map titled "CGS Information Warehouse:
Landslides", provided by the California Geological Survey, there are no landslides mapped in
the vicinity of the Project Site. The nearest area shown on the map to include landslide hazards
is approximately 30 miles westerly of the Project Site. Further, the Project Site is located within
existing paved streets on relatively flat topography and is not subject to landslides. For these
reasons, the Project will not directly or indirectly cause potential substantial adverse effects,
including the risk of loss, injury, or death involving landslides.
Issue VII. Geology and Soils (Continued)
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
b) Would the project result in substantial soil erosion
or the loss of topsoil?
Disturbed ground surfaces will be returned to preconstruction conditions after Project construction,
and no erosion related to the Project is expected to occur after completion of construction and final site
stabilization. Further, best management practices will be implemented during Project construction to
avoid or reduce the potential soil erosion. For these reasons, and because the Project Site is relatively
flat and located within existing paved streets, the Project will not result in substantial soil erosion or
substantial impacts related to the loss of topsoil.
Page 25
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue VII. Geology and Soils (Continued)
Less Than
Significant
with
Mitigation
Incorporated
c) Would the project be located on a geologic unit or
soil that is unstable, or that would become unstable
as a result of the project, and potentially result in on-
or off-site landslide, lateral spreading, subsidence,
liquefaction or collapse?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
Based on the Leighton Report cited in Issue VII(a)(ii) above, the potential for liquefaction at the Project
Site is considered low. The Leighton Report further states that lateral spreading is unlikely to occur
due to the lack of liquefaction potential. The Project Site is located within existing paved streets on
relatively flat topography and would not result in landslides.
For the reasons described above, the Project is not located on a geological unit or soil that is unstable
or would become unstable as a result of the Project and potentially result in on- or off-site landslide,
lateral spreading, subsidence, liquefaction, or collapse. Refer also to Issue VII(a) above.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact
d) Would the project be located on expansive soil, as
defined in Table 18-1-B of the Uniform Building
Code (1994), creating substantial direct or indirect
risks to life or property?
No Impact
Based on the Leighton Report cited in Issue VII(a)(ii) above, soils at the Project Site have expansive
potential values indicating "very low" to "low" expansion potential. Therefore, the Project will not
create substantial direct or indirect risks to life or property related to expansive soil.
Less Than
Significant
with
Mitigation
Incorporated
e) Would the project have soils incapable of
adequately supporting the use of septic tanks or
alternative waste water disposal systems where
sewers are not available for the disposal of waste
water?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The Project does not include septic tanks or alternative wastewater disposal systems.
Page 26
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue VII. Geology and Soils (Continued)
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impactf) Would the project directly or indirectly destroy a
unique paleontological resource or site or unique
geologic feature?
No Impact
Federal, state, and local regulations and policies provide protection for paleontological resources.
These include, but are not limited to, the federal Paleontological Resources Preservation Act of 2009
(Public Law 111-011, Title VI, Subtitle D) and California Public Resources Code Section 30244.
Because soils at the Project Site have been previously disturbed, including during construction of the
existing paved streets and installation of existing belowground linear facilities (such as pipelines), the
area is not sensitive for paleontological resources, and no paleontological resources are known or
expected to be present on the Project site. Further, the Project site does not contain any unique geologic
features. For these reasons, no impacts to unique paleontological resources or unique geological
features are anticipated.
To prevent an adverse impact upon any previously undiscovered paleontological resources that may be
present in subsurface soil deposits, Mitigation Measure PALEO-1 is incorporated into the Project.
Mitigation Measure PALEO-1 is summarized below and is set forth in the Mitigation Monitoring and
Reporting Program for the Project, a copy of which is included in Appendix A herein. With
incorporation of PALEO-1, construction and operation of the Project would not directly or indirectly
destroy a unique paleontological resource or geological feature.
Mitigation Measure PALEO-1: Paleontological Resources
The following measures will be implemented to protect any paleontological resources
uncovered during ground disturbance during Project construction:
•If any potential paleontological resources are uncovered during Project construction, all
work within a 50-foot radius of the discovery shall be halted until a qualified paleontologist
can evaluate the nature and significance of the find.
•If the qualified paleontologist determines that a specimen uncovered during Project
construction is potentially significant, then all future ground-disturbing actions associated
with the Project will be monitored by a qualified paleontological monitor.
Page 27
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
•Specimens recovered from the Project site by the qualified paleontological monitor will
be, in accordance with standard paleontological practice, identified and curated at a
repository with permanent retrievable storage that will allow for additional research in
the future.
Issue VIII. Greenhouse Gas Emissions
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impacta) Would the project generate greenhouse gas
emissions, either directly or indirectly, that may
have a significant impact on the environment?
No Impact
Gases that trap heat in the Earth's atmosphere are referred to as greenhouse gases (GHGs). GHGs
that are emitted due to human activities, primarily from the combustion of fossil fuels (e.g. gasoline in
motor vehicles), are carbon dioxide (CO ), methane (CH ), and nitrous oxide (N O). The most common242
GHG that results from human activities is CO , followed by CH and N O, respectively.2 4 2
To quantify and combine these three GHGs into a single figure, each gas is converted to "carbon dioxide
equivalent" (CO e) units. CO e is defined by the United States Environmental Protection Agency22
(USEPA) as, "A metric measure used to compare the emissions from various greenhouse gases based
upon their global warming potential (GWP)…The carbon dioxide equivalent for a gas is derived by
multiplying the tons of the gas by the associated GWP." The GWPs for carbon dioxide, methane, and
nitrous oxide are 1, 21, and 310, respectively.
The Project is expected to generate GHGs during construction. GHGs emitted during construction
would result from operating construction vehicles and equipment and from workers' vehicles commuting
to and from the Project Site. Estimated quantities of GHGs that would be generated during Project
construction total approximately 51.6 metric tons of CO2e per year, as determined by reports generated
using the California Emissions Estimator Model (CalEEMod, Version 2022.1). A copy of the
CalEEMod output report is included in Appendix B herein.
Because the Project consists of replacement of water transmission pipelines, no GHGs will be emitted
during ongoing operation of the Project.
For the reasons described above, the Project will not generate GHG emissions that would, either
directly or indirectly, have a significant impact on the environment.
Page 28
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue VIII. Greenhouse Gas Emissions (Continued)
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impactb) Would the project conflict with an applicable plan,
policy, or regulation adopted for the purpose of
reducing the emission of greenhouse gases?
No Impact
As described in Issue VIII(a) above, construction of the Project would generate insignificant quantities
of GHGs, while operation of the Project would not generate GHG emissions. For these reasons,
construction and operation of the Project will not conflict with any plan, policy, or regulation adopted
for the purpose of reducing GHG emissions.
Issue IX. Hazards and Hazardous Materials
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impacta) Would the project create a significant hazard to the
public or the environment through the routine
No Impact
transport, use, or disposal of hazardous materials?
Small quantities of fuel, lubricants, adhesives, paint, and coatings will be used during construction of
the Project. Said use will be short-term and strictly controlled, and waste materials will be properly
disposed of. Such materials will not be allowed to enter any drainage. Further, operation of the Project
does not involve the generation, transport, use, storage, or disposal of any hazardous materials.
Therefore, construction and operation of the Project will not create a significant hazard to the public
or the environment through the routine transport, use, or disposal of hazardous materials.
Less Than
Significant
with
Mitigation
Incorporated
b) Would the project create a significant hazard to the
public or the environment through reasonably
foreseeable upset and accident conditions involving
the release of hazardous materials into the
environment?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The Project includes constructing and operating replacement water pipelines within a portion of
EVWD's service area. The Project does not have the potential to create a significant hazard to the
public or the environment through reasonably foreseeable upset and accident conditions involving the
release of hazardous materials into the environment. Refer also to Issue IX(a) above.
Page 29
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue IX. Hazards and Hazardous Materials (Continued)
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact
c) Would the project emit hazardous emissions or
handle hazardous or acutely hazardous materials,
substances, or waste within one-quarter mile of an
existing or proposed school?
No Impact
There are some schools located within one-quarter mile of the Project Site. Curtis Middle School is
located approximately 0.12 mile southwesterly of Baseline Street, Empire Academy is located
approximately 0.02 mile northeasterly of Sterling Avenue, and Fairfax Elementary School is located
approximately 0.05 mile northwesterly of Dwight Way. Project construction and operation will take
place within existing public street rights-of-way and will not emit hazardous emissions or handle
hazardous or acutely hazardous materials, substances, or waste.
Less Than
Significant
with
Mitigation
Incorporated
d) Would the project be located on a site which is
included on a list of hazardous materials sites
compiled pursuant to Government Code Section
65962.5 and, as a result, would it create a significant
hazard to the public or the environment?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The Project Site is not located on a site included on the list of hazardous materials sites compiled
pursuant to Government Code Section 65962.5. According to maps and data available to the public on
EnviroStor (the California Department of Toxic Substances Control (DTSC) database located online at
http://www.envirostor.dtsc.ca.gov/public), the nearest such site, the "Gerald Hobbs Property", located
at 7194 Conejo Drive in San Bernardino, is located approximately 900 feet westerly of the Dwight Way
portion of the Project. Said site is a residential property on which liquid waste from precious metal
extraction was poured onto the ground over a number of years. The site was since certified by DTSC
as remediated in 2009. Therefore, there would be no impact to the Project as a result of the remediated
site. For these reasons, the Project will not create a significant hazard to the public or the environment
related to a hazardous materials site.
Page 30
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue IX. Hazards and Hazardous Materials (Continued)
e) For a project located within an airport land use plan
or, where such a plan has not been adopted, within
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact
two miles of a public airport or public use airport,
would the project result in a safety hazard or
excessive noise for people residing or working in
the project area?
No Impact
The nearest airport is the San Bernardino International Airport, located approximately one mile south
of the Project Site. According to maps included in the San Bernardino County Airport Layout Plan
Narrative Report (adopted November 2010 by the San Bernardino International Airport Authority), the
Project does not lie within a compatibility zone, or within any of the existing or ultimate noise contours,
of the San Bernardino International Airport. While the Project will generate some noise during
construction, the Project would not result in a safety hazard or excessive noise related to proximity to
an airport.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impactf) Would the project impair implementation of or
physically interfere with an adopted emergency
response plan or emergency evacuation plan?
No Impact
Construction specifications will include provisions for the construction contractor to maintain
unobstructed access for emergency vehicles. Once construction is complete, the Project would not result
in any additional vehicle trips to the Project area in excess of existing conditions. Therefore,
construction and operation of the Project will not impair implementation of or physically interfere with
an adopted emergency response plan or emergency evacuation plan.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impactg) Would the project expose people or structures,
either directly or indirectly, to a significant risk of
loss, injury, or death involving wildland fires?
No Impact
Based on maps available on the Fire Hazard Severity Zone Viewer available on the California
Department of Forestry and Fire Protection's Fire Resource and Assessment Program website
(http://frap.fire.ca.gov), the Project Site is not located in, or adjacent to, an area designated as a
moderate, high, or very high fire hazard severity zone. There is a slight risk of fire occurring during
Project construction; however, the risk is less than significant and short-term. Additionally,
Page 31
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
construction contract documents for the Project will require construction contractors to comply with
safety standards specified in Title 8 of the California Code of Regulations and that any equipment or
machinery that poses a risk of emitting sparks or flame be equipped with an arrestor, thereby further
limiting potential impacts. For these reasons, construction and operation of the Project will not expose
people or structures, either directly or indirectly, to a significant risk of loss, injury, or death involving
wildland fires.
Issue X. Hydrology and Water Quality
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact
a) Would the project violate any water quality
standards or waste discharge requirements or
otherwise substantially degrade surface or
groundwater quality?
No Impact
The Project includes replacing existing water main pipelines with ductile iron pipe, incorporating
special joints where necessary, to improve resilience in the event of an earthquake. Due to the depth of
groundwater, trench dewatering is not anticipated to be necessary. Dechlorinated disinfection and
testing water will be discharged to local storm drainage facilities in accordance with the requirements
of the Santa Ana Regional Water Quality Control Board. The Project will comply with all applicable
water quality standards, waste discharge requirements, and all of the requirements of the Santa Ana
Regional Water Quality Control Board. For these reasons, the Project will not violate any water quality
standards or waste discharge requirements or otherwise substantially degrade surface or groundwater
quality.
Less Than
Significant
with
Mitigation
Incorporated
b) Would the project substantially decrease
groundwater supplies or interfere substantially with
groundwater recharge such that the project may
impede sustainable groundwater management of the
basin?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The Project does not have a water demand beyond that required during construction. Therefore, the
Project does not have the potential to substantially decrease groundwater supplies or interfere
substantially with groundwater recharge.
Page 32
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue X. Hydrology and Water Quality (Continued)
c) Would the project substantially alter the existing
drainage pattern of the site or area, including
through the alteration of the course of a stream or
river, or through the addition of impervious
surfaces, in a manner which would:
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
i) Result in substantial erosion or siltation on- or
off-site?
ii) Substantially increase the rate or amount of
surface runoff in a manner which would result in
flooding on- or offsite?
iii) Create or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide
substantial additional sources of polluted runoff?
iv) Impede or redirect flood flows?
i) The Project includes replacing water main pipelines within existing paved streets. Ground
surfaces on the Project Site will be returned to preconstruction conditions upon completion of
construction, and the Project will not substantially alter the existing drainage pattern of the site
or area, will not increase impervious surfaces in the area, and will not create or contribute
substantial sources of runoff or polluted runoff.
ii) Project construction will not increase impervious surfaces on the Project Site. Ground surfaces
in the Project area will be returned to preconstruction conditions after installation of the
replacement pipelines. For these reasons, the Project will not result in flooding on- or off-site.
Refer also to Issue X(c)(i) above.
iii) The Project would not create or contribute any runoff water or result in stormwater runoff that
would exceed the capacity of existing or planned drainage systems or provide substantial
additional sources of polluted runoff. Refer also to Issues X(c)(i) and X(c)(ii) above.
iv) Project facilities consists of belowground water main pipelines and do not have the potential to
impede or redirect flood flows. Refer also to Issues X(c)(i) through X(c)(iii) above.
Page 33
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue X. Hydrology and Water Quality (Continued)
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impactd) In flood hazard, tsunami, or seiche zones, would the
project risk release of pollutants due to project
inundation?
No Impact
The Project Site is located within the areas mapped on Federal Emergency Management Agency
(FEMA) Flood Insurance Rate Maps No. 06071C7944H and 06071C7963H, effective 08/28/2008, and
within FEMA Flood Insurance Rate Maps No. 06071C8701J and 06071C8682J, effective 09/02/2016,
available at the FEMA Map Service Center website, https://www.msc.fema.gov/portal/home. The
portion of the Project Site located within Baseline Street extending from Warm Creek east to Sterling
Avenue is in an area mapped as "Special Flood Hazard Areas Without Base Flood Elevations", while
the nearby portions of Warm Creek are mapped as "Regulatory Floodway". The rest of the Project Site
is within areas mapped as "Other Areas of Flood Hazard—Area with Reduced Flood Risk due to Levee".
Based on the California Official Tsunami Inundation Maps available on the California Department of
Conservation website at https://www.conservation.ca.gov/cgs/tsunami/maps, there are no tsunami
inundation areas mapped within San Bernardino County. There are no water bodies of sufficient size
located near the Project Site that would put the site at risk of a seiche. Since the Project consists of
replacement of belowground water pipelines, it does not have the potential to release pollutants as a
result of inundation in the area.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impacte) Would the project conflict with or obstruct
implementation of a water quality control plan or
sustainable groundwater management plan?
No Impact
The water quality control plan applicable to the Project Site is the Water Quality Control Plan for the
Santa Ana River Basin Region, amended through June 2019. The Project does not include features that
will conflict with or obstruct water quality policies or objectives, and will not conflict with or obstruct
implementation of the water quality control plan cited above.
There is no Sustainable Groundwater Management Act (SGMA) document applicable to the Project
area according to the Department of Water Resources SGMA website at
https://sgma.water.ca.gov/portal/gsp/status.
Page 34
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
For the reasons described above, the Project will not conflict with or obstruct implementation of a water
quality control plan or sustainable groundwater management plan.
Issue XI. Land Use and Planning
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
a) Would the project physically divide an established
community?
The Project includes replacement of belowground water main pipelines located within existing paved
streets and does not have the potential to physically divide an established community.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact
b) Would the project cause a significant environmental
impact due to a conflict with any land use plan,
policy, or regulation adopted for the purpose of
avoiding or mitigating an environmental effect?
No Impact
The Project Site is located within existing paved streets in an urban area, and construction and
operation of the Project will not conflict with any land use plan, policy, or regulation adopted for the
purpose of avoiding or mitigating an environmental effect.
Issue XII. Mineral Resources
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impacta) Would the project result in the loss of availability of
a known mineral resource that would be of value to
the region and the residents of the state?
No Impact
The Project is located within existing paved streets in an urban area, which are not known to contain
any mineral resources that would be of value to the region or to the residents of the state. The Project
would not impact the availability of any known mineral resources or mineral resource recovery sites.
For these reasons, the Project would not result in the loss of availability of a known mineral resource
that would be of value to the region and the residents of the state.
Page 35
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue XII. Mineral Resources (Continued)
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact
b) Result in the loss of availability of a locally-
important mineral resource recovery site delineated
on a local general plan, specific plan, or other land
use plan?
No Impact
The Project will not result in the loss of availability of a locally-important mineral resource recovery
site delineated on a local general plan, specific plan, or other land use plan. Refer also to Issue XII(a)
above.
Issue XIII. Noise
a) Would the project result in generation of a
substantial temporary or permanent increase in
ambient noise levels in excess of standards
established in the local general plan or noise
ordinance, or applicable standards of other
agencies?
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The Project will generate noise during construction and operation of Project facilities. Noise generated
during construction would be that resulting from construction equipment and from workers' vehicles
commuting to and from the Project Site.
Construction noise and hours that construction takes place will comply with the San Bernardino County
Development Code, "General Performance Standards Ch. 83.01, Section 83.01.080 Noise"; City of
Highland Municipal Code Chapter 8.50, Noise Control; and City of San Bernardino Municipal Code
Chapter 8.54, Noise Control, as well as any restrictions on hours during which construction can take
place in the various jurisdictions, as applicable. The Project will not generate noise during ongoing
operation.
For the reasons described above, the Project will not result in generation of a substantial temporary or
permanent increase in ambient noise levels in excess of standards established for the area.
Page 36
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue XIII. Noise (Continued)
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
b) Would the project result in generation of excessive
groundborne vibration or groundborne noise levels?
The Project is expected to result in groundborne vibration and groundborne noise at adjoining
properties during Project construction. Groundborne vibration or groundborne noise generated during
Project construction will take place during daytime hours and will be short-term. Ongoing Project
operation will not generate groundborne vibration or groundborne noise. For these reasons, the Project
will not result in the generation of excessive groundborne vibration or groundborne noise levels. Refer
also to Issue XIII(a) above.
c) For a project located within the vicinity of a private
airstrip or an airport land use plan or, where such a
plan has not been adopted, within two miles of a
public airport or public use airport, would the
project expose people residing or working in the
project area to excessive noise levels?
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The airport nearest the Project Site is the San Bernardino International Airport, located approximately
one mile southerly of the Project area. Based on maps included in the San Bernardino County Airport
Layout Plan Narrative Report (adopted November 2010 by the San Bernardino International Airport
Authority), the Project Site does not lie within a compatibility zone or a noise compatibility contour of
the San Bernardino International Airport. For these reasons, the Project will not expose people residing
or working in the Project area to excessive noise levels related to airports.
Issue XIV. Population and Housing
Less Than
Significant
with
Mitigation
Incorporated
a) Would the project induce substantial unplanned
population growth in an area, either directly (for
example, by proposing new homes and businesses)
or indirectly (for example, through extension of road
or other infrastructure)?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The Project is intended to improve resiliency of the water mains in the Project area during a seismic
event. The Project does not provide an additional water supply and would not induce substantial
unplanned growth in the area. Further, the Project would not result in a need for EVWD to hire
Page 37
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
additional employees. For these reasons, the Project does not have the potential to induce population
growth in the area, either directly or indirectly.
Issue XIV. Population and Housing (Continued)
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impactb) Would the project displace substantial numbers of
existing people or housing, necessitating the
No Impact
construction of replacement housing elsewhere?
The Project is located within existing paved streets, does not include the construction or destruction of
any housing, and does not have the potential to displace any existing people or housing.
Issue XV. Public Services
a) Would the project result in substantial adverse
physical impacts associated with the provision of
new or physically altered governmental facilities,
need for new or physically altered governmental
facilities, the construction of which could cause Less Than
Significant
with
Mitigation
Incorporated
significant environmental impacts, in order to
maintain acceptable service ratios, response times,
or other performance objectives for any of the
public services:
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
i) Fire protection?
ii) Police protection?
iii) Schools?
iv) Parks?
v) Other public facilities?
i) The Project does not include any features or facilities that would require additional or enhanced
fire protection resources.
ii) The Project does not include any features or facilities that would require enhanced levels of
police protection.
iii) The Project does not have the potential to increase or decrease the area's population and would
therefore not result in a greater or lesser demand for schools. The Project will not adversely
impact any school.
Page 38
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
iv) The Project does not have the potential to increase or decrease the area's population, and
therefore will not result in a greater or lesser demand for parks. The Project will not adversely
impact any park.
v) The Project will not adversely affect other public facilities.
Issue XVI. Recreation
Less Than
Significant
with
Mitigation
Incorporated
a) Would the project increase the use of existing
neighborhood and regional parks or other
recreational facilities such that substantial physical
deterioration of the facility would occur or be
accelerated?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
Construction and operation of the Project do not have the potential to increase or decrease the area's
population, and would therefore not result in increased or decreased use of parks or other recreational
facilities. Refer also to Issue XIV(a) herein.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact
b) Does the project include recreational facilities or
require the construction or expansion of recreational
facilities which might have an adverse physical
effect on the environment?
No Impact
The Project does not include recreational facilities and will not require the construction or expansion
of any recreational facilities.
Issue XVII. Transportation
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact
a) Would the project conflict with a program, plan,
ordinance, or policy addressing the circulation
system, including transit, roadway, bicycle, and
pedestrian facilities?
No Impact
Minor, temporary impacts to traffic, such as temporary lane closures, are expected to occur during
construction of the Project due to workers' vehicles and construction vehicles and equipment in the
Project area; however, said impacts will be less than significant and short-term. Vehicle access to enter
and exit properties adjacent to the pipeline construction will be maintained during construction, and
the construction contractor will be required to maintain unobstructed access to emergency vehicles.
Page 39
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Operation of the Project will not result in any impacts to transportation facilities. For these reasons,
construction and operation of the Project will not conflict with a program, plan, ordinance, or policy
addressing the circulation system.
Issue XVII. Transportation (Continued)
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
b) Would the project conflict or be inconsistent with
CEQA Guidelines section 15064.3, subdivision (b)?
Construction of the Project is expected to result in approximately ten workers' vehicles traveling to and
from the Project area per day. For the purposes of this analysis, we have assumed that workers will
commute a total of 40 miles per day each, round-trip, which results in a total of 400 vehicle miles
traveled (VMT) per day during construction. This amount of daily VMT will only occur during Project
construction and is not significant considering the existing traffic levels in the area and the short-term
nature of construction. Operation of the Project will not result in any daily vehicle trips; therefore, no
increase in VMT will result from operation of the Project. For these reasons, construction and operation
of the Project will not conflict or be inconsistent with CEQA Guidelines section 15064.3(b).
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impact
c) Would the project substantially increase hazards due
to a geometric design feature (e.g., sharp curves or
dangerous intersections) or incompatible uses (e.g.,
farm equipment)?
No Impact
Road surfaces will be returned to preconstruction conditions after installation of the new pipelines. No
road improvements are included in the Project. Therefore, construction and operation of the Project
will not substantially increase hazards due to a geometric design feature or incompatible uses.
Page 40
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue XVII. Transportation (Continued)
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
d) Would the project result in inadequate emergency
access?
Access for vehicles to enter and exit properties adjacent to the pipeline construction will be maintained
during construction, and the construction contractor will be required to maintain unobstructed access
to emergency vehicles. For these reasons, the Project will not result in inadequate emergency access.
Issue XVIII. Tribal Cultural Resources
a) Would the project cause a substantial adverse
change in the significance of a tribal cultural
resource, defined in Public Resources Code section
21074 as either a site, feature, place, cultural Less Than
Significant
with
Mitigation
Incorporated
landscape that is geographically defined in terms of
the size and scope of the landscape, sacred place, or
object with cultural value to a California Native
American tribe, and that is:
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
i) Listed or eligible for listing in the California
Register of Historical Resources, or in a local
register of historical resources as defined in
Public Resources Code section 5020.1(k), or
ii) A resource determined by the lead agency, in its
discretion and supported by substantial
evidence, to be significant pursuant to criteria
set forth in subdivision (c) of Public Resources
Code section 5024.1? In applying the criteria set
forth in subdivision (c) of Public Resources
Code section 5024.1, the lead agency shall
consider the significance of the resource to a
California Native American tribe.
i)The Project consists of replacing existing water main pipelines located within existing paved
streets. The streets and underlying sediments have been previously disturbed during
construction of the streets and existing utilities thereunder. There are no known tribal cultural
resources located along the pipeline alignments.
However, to avoid or reduce potential impacts upon tribal cultural resources that may be
present in subsurface sediments, Mitigation Measure TCR-1 is incorporated into the Project.
Page 41
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Mitigation Measure TCR-1 is summarized in Issue VIII(a)(2) below and is set forth in the
Mitigation Monitoring and Reporting Program for the Project, a copy of which is included in
Appendix A herein. With incorporation of Mitigation Measure TCR-1, the Project will not
cause a substantial adverse impact upon a tribal cultural resource with cultural value to a
California Native American tribe that is listed or eligible for listing in the California Register
of Historical Resources or in a local register of historical resources.
ii)On July 20, 2023, EVWD sent formal notification letters to Yuhaaviatam of San Manuel
(formerly San Manuel Band of Mission Indians), Gabrieleño Band of Mission Indians – Kizh
Nation, and Morongo Band of Mission Indians, informing the tribes of the Project and of the
opportunity to request consultation on the Project with EVWD within 30 days after receipt of
the notification letter.
Yuhaaviatam of San Manuel Nation
In response to the District’s notification letter, Yuhaaviatam of San Manuel Nation replied via
email requesting copies of additional documentation pertaining to the Project. After receiving
the requested documents, the tribe then requested that certain mitigation be included in the
Project.
Gabrieleño Band of Mission Indians – Kizh Nation
In response to the District’s notification letter, Gabrieleño Band of Mission Indians – Kizh
Nation requested to consult on the Project; however, the tribe did not respond to further
communications from the District.
Morongo Band of Mission Indians
In response to the District’s notification letter, Morongo Band of Mission Indians submitted a
response letter; however, the letter was received on September 20, 2023, sixty days after the
formal notification was sent out.
To avoid or reduce potential impacts upon tribal cultural resources that may be present in
subsurface sediments, Mitigation Measure TCR-1 is incorporated into the Project. Mitigation
Measure TCR-1 is summarized below and is set forth in the Mitigation Monitoring and
Reporting Program for the Project, a copy of which is included in Appendix A herein. With
incorporation of Mitigation Measure TCR-1, the Project will not cause a substantial adverse
Page 42
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
impact upon a significant tribal cultural resource with cultural value to a California Native
American tribe.
Mitigation Measure TCR-1: Tribal Cultural Resources
The Yuhaaviatam of San Manuel Nation Cultural Resources Department (YSMN) shall be
contacted, as detailed in Mitigation Measure CUL-1, of any pre-contact or historic-era cultural
resources discovered during project implementation, and be provided information regarding the
nature of the find, so as to provide Tribal input with regard to significance and treatment of the
find. Should the find be deemed significant, as defined by CEQA, a cultural resources Monitoring
and Treatment Plan shall be developed by the archaeologist, in coordination with YSMN, and all
subsequent finds shall be subject to said plan. The Monitoring and Treatment Plan shall allow for
a monitor to be present that represents YSMN for the remainder of the project, should YSMN elect
to place a monitor onsite. Any and all archaeological/cultural documents created as a part of the
project (isolate records, site records, survey reports, testing reports, etc.) shall be provided to East
Valley Water District for dissemination to YSMN. EVWD will consult in good faith with YSMN
throughout the project.
Issue XIX. Utilities and Service Systems
a) Would the project require or result in the relocation
or construction of new or expanded water,
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact
wastewater treatment, or storm water drainage,
electric power, natural gas, or telecommunications
facilities, the relocation or construction of which
could cause significant environmental effects?
No Impact
The Project consists of replacement of existing water main pipelines, as described in Part 1(B) herein.
The Project will not require or result in the relocation or construction of new or expanded water,
wastewater treatment, storm water drainage, electric power, natural gas, or telecommunications
facilities.
Page 43
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue XIX. Utilities and Service Systems (Continued)
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact
b) Would the project have sufficient water supplies
available to serve the project and reasonably
foreseeable future development during normal, dry,
and multiple dry years?
No Impact
Water needed during construction, such as for dust control, will be available from EVWD's existing
water supplies, and construction water demand will be less than significant and short-term. Operation
of the Project will not result in an increase in water demand in the Project area. For these reasons, the
Project has sufficient water supplies available to serve the Project and reasonably foreseeable future
development during normal, dry, and multiple dry years.
Less Than
Significant
with
Mitigation
Incorporated
c) Would the project result in a determination by the
wastewater treatment provider which serves or may
serve the project that it has adequate capacity to
serve the project's projected demand in addition to
the provider's existing commitments?
Potentially
Significant
Impact
Less Than
Significant
Impact
No
Impact
The Project will not generate sanitary wastewater.
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact
d) Would the project generate solid waste in excess of
state or local standards, or in excess of the capacity
of local infrastructure, or otherwise impair the
attainment of solid waste reduction goals?
No Impact
Project operation will not generate solid waste. Small quantities of solid waste may be generated during
Project construction; however, said quantities of solid waste would be minimal and would be recycled
or accommodated by a local landfill. For these reasons, the project will not generate solid waste in
excess of state or local standards or in excess of the capacity of local infrastructure. Further, the Project
will not impair the attainment of solid waste reduction goals.
Page 44
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue XIX. Utilities and Service Systems (Continued)
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impacte) Would the project comply with federal, state, and
local management and reduction statutes and
regulations related to solid waste?
No Impact
The Project will comply with all federal, state, and local statutes and regulations related to solid waste.
Refer also to Issue XIX(d) above.
Issue XX. Wildfire
If the Project is located in or near state responsibility areas or lands classified as very high fire hazard
severity zones:
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impacta) Would the project substantially impair an adopted
emergency response plan or emergency evacuation
plan?
No Impact
Based on maps available on the California Board of Forestry and Fire Protection State Responsibility
Area Viewer, the Project is not located within or near a state responsibility area (SRA) or a very high
fire hazard severity zone. The nearest very high fire hazard severity zone is located approximately two
miles northerly of the Project. The Project does not have the potential to substantially impair an adopted
emergency response plan or emergency evacuation plan.
Less Than
Significant
with
Mitigation
Incorporated
b) Due to slope, prevailing winds, or other factors,
would the project exacerbate wildfire risks and
thereby expose project occupants to pollutant
concentrations from a wildfire or the uncontrolled
spread of a wildfire?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The Project is located within existing paved streets within an urban area, is not located within or near
a very high fire hazard severity zone or a State Responsibility Area, and will not exacerbate wildfire
risks. Refer also to Issue XX(a) above.
Page 45
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue XX. Wildfire (Continued)
c) Would the project require the installation or
maintenance of associated infrastructure (such as
roads, fuel breaks, emergency water sources, power
lines, or other utilities) that may exacerbate fire risk
or that may result in temporary or ongoing impacts
to the environment?
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The Project is located within existing paved streets within an urban area and is not located within or
near a very high fire hazard severity zone or a State Responsibility Area. Further, the Project does not
require the installation or maintenance of associated infrastructure that will exacerbate fire risk or
result in temporary or ongoing impacts to the environment related to fire risk. Refer also to Issue XX(a)
above.
Less Than
Significant
with
Mitigation
Incorporated
d) Would the project expose people or structures to
significant risks, including downslope or
downstream flooding or landslide, as a result of
runoff, post-fire slope instability, or drainage
changes?
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
The Project Site is relatively flat and, after completion of construction, disturbed surfaces will be
returned to preconstruction conditions. Construction and operation of the Project will not expose
people or structures to significant risks, including downslope or downstream flooding or landslide as a
result of runoff, post-fire slope instability, or drainage changes.
Issue XXI. Mandatory Findings of Significance
a) Does the project have the potential to substantially
degrade the quality of the environment, substantially
reduce the habitat of a fish or wildlife species, cause
a fish or wildlife population to drop below self-
sustaining levels, threaten to eliminate a plant or
animal community, substantially reduce the number
or restrict the range of a rare or endangered plant or
animal, or eliminate important examples of the
major periods of California history or prehistory?
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact No Impact
Biological Resources
As described in Issue IV herein, the Project Site is located within existing paved streets in an urban
setting, surrounded by residential and commercial uses and does not contain any habitat suitable
for sensitive species. Although a portion of the pipeline to be replaced within Baseline Street crosses
Page 46
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Warm Creek, the pipeline will be installed beneath the creek using trenchless technology, avoiding
contact with the creek. After installation of the replacement pipelines, all ground surfaces will be
returned to preconstruction conditions. For these reasons, the Project will not adversely impact
any fish or wildlife species or habitats thereof.
Archaeological and Historical Resources
As described in Issue V herein, the Project site has been previously disturbed by installation of the
existing streets and underlying utilities, such as pipelines. There are no known historical or
archaeological resources located within the Project Site; however, to avoid or reduce potential
impacts upon any previously undiscovered historical or archaeological resources that may be
uncovered during Project construction, Mitigation Measure CUL-1 is incorporated into the Project.
Mitigation Measure CUL-1 is set forth in the Mitigation Monitoring and Reporting Program for the
Project, a copy of which is attached to the Mitigated Negative Declaration included in Appendix A
herein. With incorporation of Mitigation Measure CUL-1, the Project will not eliminate important
examples of the major periods of California history.
Paleontological Resources
As described in Issue VII(f) herein, there are no known paleontological resources present on the
Project Site. To avoid adverse impacts upon any previously undiscovered paleontological resources
that may be present in subsurface soils at the Project Site, Mitigation Measure PALEO-1 is
incorporated into the Project. Mitigation Measure PALEO-1 is set forth in the Mitigation
Monitoring and Reporting Program for the Project, a copy of which is included in Appendix A
herein. With incorporation of Mitigation Measure PALEO-1, the Project will not eliminate
important examples of the major periods of California prehistory.
Page 47
East Valley Water District
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
Issue XXI. Mandatory Findings of Significance (Continued)
b) Does the project have impacts that are individually
limited, but cumulatively considerable?
Less Than
Significant
with
Mitigation
Incorporated
Potentially
Significant
Impact
Less Than
Significant
Impact
("Cumulatively considerable" means that the
incremental effects of a project are considerable
when viewed in connection with the effects of past
projects, the effects of other current projects, and the
effects of probable future projects.)
No Impact
None of the impacts or potential impacts of the Project are cumulatively considerable.
Less Than
Significant
Potentially
Significant
Impact
with
Mitigation
Incorporated
Less Than
Significant
Impactc) Does the project have environmental effects which
will cause substantial adverse effects on human
beings, either directly or indirectly?
No Impact
As described herein, none of the environmental effects of the Project will cause substantial adverse
effects on human beings, either directly or indirectly.
Page 48
PART 3
REFERENCES AND SOURCES
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
PART 3 - REFERENCES AND SOURCES
•
•
•
•
•
•
•
California Air Resources Board Website for California Ambient Air Quality Standards,
www.arb.ca.gov/resources/california-ambient-air-quality-standards
California Board of Forestry and Fire Protection State Responsibility Area Viewer, bof.fire.ca.gov/
projects-and-programs/state-responsibility-area-viewer
California Department of Conservation, Division of Land Resources Protection, California Important
Farmland Finder, https://maps.conservation.ca.gov/DLRP/CIFF
California Code of Regulations, Title 14, Division 6, Chapter 3; Guidelines for Implementation of the
California Environmental Quality Act, Section 15000 et seq; as amended December 28, 2018
California Department of Conservation Tsunami Program Website,
conservation.ca.gov/cgs/tsunami/maps
California Department of Toxic Substances Control Website, EnviroStor Database,
www.envirostor.dtsc.ca.gov/public
California Department of Transportation California Scenic Highway Mapping System Website,
www.dot.ca.gov/programs/design/lap-landscape-architecture-and-community-livability/lap-liv-i-
scenic-highways
•
•
•
California Emissions Estimator Model® (CalEEMod) Software, Version 2022.1.1.7, online at
caleemod.com
City of Highland Municipal Code, codepublishing.com/CA/Highland, updated through January 10,
2023
City of San Bernardino Code of Ordinances,
codelibrary/amlegal.com/codes/sanbernardinoca/latest/sanbernardino_ca/0-0-0-1, updated through
March 15, 2023
•
•
Federal Emergency Management Agency (FEMA) Map Service Center Website, www.msc.fema.gov
Fire Hazard Severity Zone Viewer, Fire Resource and Assessment Program, California Department of
Forestry and Fire Protection, https://frap.fire.ca.gov
•
•
•
Google Earth Pro, Version 7.3.6.9345
Office of the State Fire Marshal Website, osfm.fire.ca.gov
San Bernardino County Code of Ordinances,
last updatedcodelibrary/amlegal.com/codes/sanbernardino/latest/sanberncty_ca/0-0-0-146479,
February 28, 2023
•San Bernardino County Countywide Plan, County Policy Plan, September 2022, at
countywideplan.com/resources
•
•
South Coast Air Quality Management District Website, www.aqmd.gov
State Water Resources Control Board Website, www.waterboards.ca.gov/waterboards_map.html
Page 49
Water Main Seismic Retrofit Project
Initial Study and Draft Mitigated Negative Declaration
•
•
•
Sustainable Groundwater Management Act (SGMA) Groundwater Management Website,
water.ca.gov/Programs/Groundwater-Management/SGMA-Groundwater-Management
United States Environmental Protection Agency Website for National Ambient Air Quality Standards,
www.epa.gov/criteria-air-pollutants
Upper Santa Ana River Watershed 2020 Integrated Regional Urban Water Management Plan, Water
Systems Consulting, Inc. and Woodard & Curran, June 2021
Page 50
FIGURES
HIGHLAND AVE.
PACIFIC ST.
BASELINE ST.
PACIFIC ST.
ANSON ST.
BYRON ST.
FISHER ST.
E. AMANDA ST.
E. BESSANT ST.
E. BESSANT ST.
JANE ST.
WARM CREEK
INDEPENDENT PL.
ELMO DR.
WALKER ST.
WARM CREEK
BASELINE ST.
APPENDIX A
DRAFT MITIGATED NEGATIVE DECLARATION
AND
MITIGATION MONITORING AND REPORTING PROGRAM
EAST VALLEY WATER DISTRICT
WATER MAIN SEISMIC RETROFIT PROJECT
DRAFT MITIGATED NEGATIVE DECLARATION
Project:EVWD's Water Main Seismic Retrofit Project (the Project) consists of the replacement of
approximately 35,000 linear feet (LF) of existing potable water main pipelines that are
considered susceptible to damage due to ground shaking from earthquakes. The water main
pipelines will be replaced with ductile iron pipe, incorporating special joints where needed,
to improve resilience of the pipelines in case of a seismic event. A more detailed description
of the Project is included in the Project Initial Study. A copy of the Project Initial Study is available
for review at East Valley Water District's office, located at the address referenced below.
Location:The Project is located within public street rights-of-way within the City of Highland, the City of San
Bernardino, and within an unincorporated portion of the County of San Bernardino, in the following
streets: Pacific Street, Dwight Way, E. Bessant Street, Independent Place, Elmo Drive, Yates Street,
Glasgow Avenue, Anson Street, Del Rosa Drive, Elmwood Road, Del Rosa Avenue, Osbun Road,
Byron Street, Fisher Street, E. Amanda Street, Jane Street, Walker Street, Sterling Avenue, and Baseline
Street. Refer also to Figures 1, 2, and 3 in the Project Initial Study, which is available for review at the
District's office located at 31111 Greenspot Road, Highland, CA 92346.
Entity:East Valley Water District
The District's Board of Directors, having conducted a careful and independent review of the Initial Study for
the Project, having reviewed the written comments received prior to the public meeting of the Board, and having heard
at a public meeting of the Board the comments of any and all concerned persons or entities, including the
recommendation of District staff, does hereby find and declare that the Project will not have a significant effect on the
environment. A brief statement of the reasons supporting the Board's findings is as follows:
Construction and operation of the Project as modified will not result in significant adverse impacts
upon any threatened or endangered species of plants or animals, nor will it result in damage to or
destruction of any significant examples of California history or prehistory or tribal cultural resources.
Potential impacts related to historical/archaeological/paleontological/tribal cultural resources will be
avoided or reduced by adhering to the terms of a Mitigation Monitoring and Reporting Program (see
Exhibit A, attached, which is incorporated herein by reference) throughout construction of the Project.
The Board of Directors hereby finds that the Mitigated Negative Declaration reflects its independent
judgment. The Initial Study was prepared by Krieger & Stewart, the District's Consulting Engineer for this project.
The Initial Study may be viewed at the office of the East Valley Water District located at 31111 Greenspot Road,
Highland, CA 92346.
Date:_____________________
Michael Moore
General Manager/CEO
EAST VALLEY WATER DISTRICT
East Valley Water District
Water Main Seismic Retrofit Project
Mitigated Negative Declaration Page 1 of 1
MITIGATION MONITORING AND REPORTING PROGRAM
EXHIBIT A TO THE MITIGATED NEGATIVE DECLARATION
Section I – Introduction
Section 21081.6 of the California Environmental Quality Act (CEQA) requires that a mitigation monitoring
program be prepared prior to the approval of any project which incorporates mitigation measures as a
condition of approval. Mitigation measures are generally adopted to reduce the potentially significant
adverse environmental impacts of a project to a level that is less than significant. The mitigation monitoring
program must ensure compliance with mitigation measures prior to and during project construction (and, if
applicable, during project operation).
Since the project considered by the Initial Study for the East Valley Water District's Water Main Seismic
Retrofit Project (Project) incorporates mitigation measures as a condition of approval, this mitigation
monitoring and reporting program has been prepared and incorporated into the Mitigated Negative
Declaration for the Project.
Section II – Historical and Archaeological Resources Mitigation Measures and Mitigation
Monitoring and Reporting Program
As discussed in Issue V of the Project Initial Study, the Project would not result in an adverse impact upon
any known historical or archaeological resources (cultural resources). This Mitigation Monitoring and
Reporting Program is intended to avoid or reduce the potential for impacts by the Project upon previously-
undiscovered cultural resources that may be present in subsurface soil deposits by specifying methods and
procedures for avoiding or reducing such impacts.
The following mitigation measures (CUL-1 and CUL-2) will be implemented in order to ensure that
construction of Project facilities does not result in significant adverse impacts upon any previously-
undiscovered cultural resources that may be uncovered during Project construction. Each measure is
attended by a notation of the party responsible for its implementation and of the period for which it will be
in effect.
East Valley Water District
Water Main Seismic Retrofit Project
Mitigation Monitoring and Reporting Program Page 1 of 4
CUL-1: Cultural Resources
In the event that cultural resources are discovered during Project activities, all work in the immediate
vicinity of the find (within a 60-foot buffer) shall cease and a qualified archaeologist meeting Secretary
of Interior standards shall be hired to assess the find. Work on the other portions of the Project outside
the buffered area may continue during this assessment period. Additionally, the Yuhaaviatam of San
Manuel Nation Cultural Resources Department (YSMN) shall be contacted, as detailed within
Mitigation TCR-1, regarding any pre-contact and/or historic-era finds and be provided information
after the archaeologist makes an initial assessment of the nature of the find, so as to provide Tribal
input with regard to significance and treatment of the find.
If significant pre-contact and/or historic-era cultural resources, as defined by CEQA, are discovered
and avoidance cannot be ensured, the archaeologist shall develop a Monitoring and Treatment Plan,
the drafts of which shall be provided to YSMN for review and comment, as detailed within Mitigation
Measure TCR-1. The archaeologist shall monitor the remainder of Project construction and implement
the Monitoring and Treatment Plan accordingly.
Responsible Party: EVWD Project Manager
Implementation Period: During Ground Disturbing Activities
CUL-2: Human Remains
In the event that any human remains or funerary objects are encountered during any activities
associated with Project construction, the construction contractor shall halt or divert all work within a
100-foot radius of the find and will immediately notify the San Bernardino County Coroner’s Office
and East Valley Water District (EVWD). Construction activities will not resume until EVWD notifies
the construction contractor to resume construction activities. California Health and Safety Code
Section 7050.5 will be enforced for the duration of the Project.
Responsible Party: EVWD Project Manager
Implementation Period: During Ground Disturbing Activities
Section III – Paleontological Resources Mitigation Measures and Mitigation Monitoring and
Reporting Program
As discussed in Issue VII of the Project Initial Study, there are no known paleontological resources present
on or adjacent to the Project site. This Mitigation Monitoring and Reporting Program is intended to avoid
or reduce the potential for impacts by the Project upon previously-undiscovered paleontological resources
East Valley Water District
Water Main Seismic Retrofit Project
Mitigation Monitoring and Reporting Program Page 2 of 4
that may be present in subsurface soil deposits by specifying methods and procedures for avoiding or
reducing such impacts.
The following mitigation measure (PALEO-1) will be implemented in order to ensure that construction of
Project facilities does not result in significant adverse impacts upon any previously-undiscovered
paleontological resources that may be uncovered during Project construction. The measure is attended by
a notation of the party responsible for its implementation and of the period for which it will be in effect.
PALEO-1:Paleontological Resources
The following measures will be implemented to protect any paleontological resources uncovered
during ground disturbance during Project construction:
If a potential paleontological resource is uncovered during Project construction, all work
within a 50-foot radius of the discovery shall be halted until a qualified paleontologist
evaluates the nature and significance of the find.
If the qualified paleontologist determines that a specimen uncovered during Project
construction is potentially significant, then all future ground-disturbing actions associated
with the Project will be monitored by a qualified paleontological monitor.
Specimens recovered from the Project site by the qualified paleontological monitor will be, in
accordance with standard paleontological practice, identified and curated at a repository with
permanent retrievable storage that will allow for additional research in the future.
Responsible Party: EVWD Project Manager
Implementation Period: During (and possibly after) Ground Disturbing Activities
Section IV – Tribal Cultural Resources Mitigation Measures and Mitigation Monitoring and
Reporting Program
As discussed in Issue XVIII of the Project Initial Study, there are no known tribal cultural resources or
other cultural resources on the Project site, and the Project would not result in an adverse impact upon any
known tribal cultural resources. This Mitigation Monitoring and Reporting Program is intended to avoid
or reduce the potential for impacts by the Project upon previously-undiscovered tribal cultural resources
that may be present in subsurface soil deposits by specifying methods and procedures for avoiding or
reducing such impacts.
East Valley Water District
Water Main Seismic Retrofit Project
Mitigation Monitoring and Reporting Program Page 3 of 4
The following mitigation measure (TCR-1) will be implemented in order to ensure that construction of
Project facilities does not result in significant adverse impacts upon any previously-undiscovered tribal
cultural resources that may be uncovered during Project construction. The measure is attended by a notation
of the party responsible for its implementation and of the period for which it will be in effect.
TCR-1: Tribal Cultural Resources
The Yuhaaviatam of San Manuel Nation Cultural Resources Department (YSMN) shall be contacted,
as detailed in Mitigation Measure CUL-1, of any pre-contact or historic-era cultural resources
discovered during Project implementation, and be provided information regarding the nature of the
find, so as to provide Tribal input with regard to significance and treatment of the find. Should the
find be deemed significant, as defined by CEQA, a cultural resources Monitoring and Treatment Plan
shall be developed by the archaeologist, in coordination with YSMN, and all subsequent finds shall
be subject to said plan. The Monitoring and Treatment Plan shall allow for a monitor to be present
that represents YSMN for the remainder of the Project, should YSMN elect to place a monitor onsite.
Any and all archaeological/cultural documents created as a part of the Project (isolate records, site
records, survey reports, testing reports, etc.) shall be provided to East Valley Water District for
dissemination to YSMN. EVWD will consult in good faith with YSMN throughout the Project.
Responsible Party: EVWD Project Manager
Implementation Period: During Project Construction
East Valley Water District
Water Main Seismic Retrofit Project
Mitigation Monitoring and Reporting Program Page 4 of 4
APPENDIX B
AIR QUALITY CALCULATIONS
Water Main Seismic Retrofit Project Summary Report, 4/11/2023
Water Main Seismic Retrofit Project Summary Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.4. Operations Emissions Compared Against Thresholds
6. Climate Risk Detailed Report
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
7. Health and Equity Details
7.3. Overall Health & Equity Scores
7.5. Evaluation Scorecard
1 / 6
Water Main Seismic Retrofit Project Summary Report, 4/11/2023
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name
Construction Start Date
Operational Year
Lead Agency
Land Use Scale
Analysis Level for Defaults
Windspeed (m/s)
Precipitation (days)
Location
Water Main Seismic Retrofit Project
8/1/2023
2023
East Valley Water District
Plan/community
County
2.50
11.2
34.12570921240665, -117.25116137354016
County San Bernardino-South Coast
HighlandCity
Air District South Coast AQMD
South CoastAir Basin
TA Z 5177
EDFZ 10
Electric Utility
Gas Utility
Southern California Edison
Southern California Gas
2022.1.1.7App Version
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq Special Landscape Population Description
ft)Area (sq ft)
2 / 6
Water Main Seismic Retrofit Project Summary Report, 4/11/2023
Apartments Mid Rise NaN Dwelling Unit 223 0.00 9,711,843 —53,000 —
1.3. User-Selected Emission Reduction Measures by Emissions Sector
No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Un/Mit.TOG
—
ROG
—
NOx
—
CO
—
SO2
—
PM10E
—
PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4
—
N2O
—
R CO2e
—Daily,—————————
Summer
(Max)
Unmit.1.42
—
1.19
—
8.13
—
8.37
—
0.03
—
0.32
—
0.00
—
0.32
—
0.29
—
0.00
—
0.29
—
—
—
2,994
—
2,994
—
0.12
—
0.02
—
—
—
3,004
—Daily,
Winter
(Max)
Unmit.1.42
—
1.19
—
8.13
—
8.37
—
0.03
—
0.32
—
0.00
—
0.32
—
0.29
—
0.00
—
0.29
—
—
—
2,994
—
2,994
—
0.12
—
0.02
—
—
—
3,004
—Average
Daily
(Max)
Unmit.0.15
—
0.12
—
0.85
—
0.87
—
< 0.005 0.03 0.00
—
0.03
—
0.03
—
0.00
—
0.03
—
—
—
312
—
312
—
0.01
—
< 0.005
—
—
—
313
—Annual
(Max)
——
Unmit.0.03 0.02 0.15 0.16 < 0.005 0.01 0.00 0.01 0.01 0.00 0.01 —51.6 51.6 < 0.005 < 0.005 —51.8
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
Un/Mit.TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
3 / 6
Water Main Seismic Retrofit Project Summary Report, 4/11/2023
Daily,——————————————————
Summer
(Max)
Unmit.—
—
—
—
—
—
—
—
—
—
—
—
0.00
—
—
—
—
—
0.00
—
—
—
6,381
—
—
—
—
—
—
—
—
—
0.00
—
—
—Daily,
Winter
(Max)
Unmit.0.00
—
0.00
—
0.00
—
0.00
—
0.00
—
0.00
—
0.00
—
0.00
—
0.00
—
0.00
—
0.00
—
6,381
—
0.00
—
6,381
—
638
—
0.00
—
0.00
—
22,326
—Average
Daily
(Max)
Unmit.—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
6,381
—
—
—
—
—
—
—
—
—
—
—
—
—Annual
(Max)
Unmit.———————————1,056 ——————
6. Climate Risk Detailed Report
6.2. Initial Climate Risk Scores
Climate Hazard
Temperature and Extreme Heat
Extreme Precipitation
Sea Level Rise
Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score
3 0 0 N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
N/A
0
N/A
0
Wildfire 1 0 0
Flooding N/A
N/A
N/A
0
N/A
N/A
N/A
0
N/A
N/A
N/A
0
Drought
Snowpack Reduction
Air Quality Degradation
4 / 6
Water Main Seismic Retrofit Project Summary Report, 4/11/2023
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest
exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the
greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard
Temperature and Extreme Heat
Extreme Precipitation
Sea Level Rise
Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score
3 1 1 3
N/A
1
N/A
1
N/A
1
N/A
2
Wildfire 1 1 1 2
Flooding N/A
N/A
N/A
1
N/A
N/A
N/A
1
N/A
N/A
N/A
1
N/A
N/A
N/A
2
Drought
Snowpack Reduction
Air Quality Degradation
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest
exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the
greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
7. Health and Equity Details
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a)83.0
6.00
Ye s
Ye s
No
Healthy Places Index Score for Project Location (b)
Project Located in a Designated Disadvantaged Community (Senate Bill 535)
Project Located in a Low-Income Community (Assembly Bill 1550)
Project Located in a Community Air Protection Program Community (Assembly Bill 617)
5 / 6
Water Main Seismic Retrofit Project Summary Report, 4/11/2023
a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
6 / 6
East Valley Water District
Resolution 2023.19
Page 1 of 3
RESOLUTION 2023.19
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
EAST VALLEY WATER DISTRICT ADOPTING A MITIGATED NEGATIVE
DECLARATION AND MITIGATED MONITORING AND REPORTING PROGRAM
FOR THE WATER MAIN SEISMIC RETROFIT PROJECT
WHEREAS, East Valley Water District (“District”) is a county water district organized
and operating pursuant to California Water Code Section 30000 et seq.; and
WHEREAS, the District is the lead agency, pursuant to the California Environmental
Quality Act (CEQA) (Public Resources Code §§ 21000 et seq.) and CEQA Guidelines (14
California Code of Regulations §§ 15000 et seq.), for the proposed Water Main Seismic Retrofit
(“WMSR”) Project; and
WHEREAS, the District's WMSR Project consists of the replacement of approximately
35,000 linear feet (“LF”) of existing potable water main pipelines that are considered susceptible
to damage due to ground shaking from earthquakes. The water main pipelines will be replaced
with ductile iron pipe, incorporating special joints where needed, to improve resilience of the
pipelines in case of a seismic event; and
WHEREAS, District staff determined that the WMSR Project is considered a “project”
subject to the requirements of CEQA and prepared an Initial Study; and
WHEREAS, based on the Initial Study, which concluded that the WMSR Project will not
have a significant impact on the environment after mitigation, District staff determined that a
Mitigated Negative Declaration (“MND”) should be prepared for the WMSR Project; and
WHEREAS, an MND (State Clearinghouse Number 2023100889) was prepared for the
WMSR Project pursuant to CEQA and the State CEQA Guidelines; and
WHEREAS, pursuant to CEQA, the District made the Draft Initial Study (“IS”)/MND
available to the public and all interested, responsible, and trustee agencies for review and comment
for at least 30 days by filing a Notice of Intent (“NOI”) to Adopt an MND with the State
Clearinghouse and filing an NOI with San Bernardino County Clerk, posting the NOI and the Draft
IS/MND on the District’s website at www.eastvalley.org, and making hard copies of the IS/MND
available at the District’s office; and
WHEREAS, the comment period began on October 30, 2023, and ended on November 29,
2023; and
WHEREAS, the District received no comments from the public, nor any responsible,
trustee, and interested agencies, on the Draft IS/MND; and
WHEREAS, the District’s Board of Directors (“Board”) has reviewed the Final IS/MND,
Mitigation Monitoring and Reporting Program (“MMRP”) and all of the relevant information
contained in the administrative record for the WMSR Project; and
East Valley Water District
Resolution 2023.19
Page 2 of 3
WHEREAS, all other legal prerequisites to the adoption of this Resolution have occurred.
NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of East Valley
Water District on the basis of substantial evidence and based upon the whole record, as follows:
1. The above recitals are incorporated herein by reference.
2. As the decision-making body for the District, which is the lead agency under
CEQA, the Board has reviewed and considered the information contained in the Final IS/MND,
the MMRP, and administrative record, together with all oral and written comments received during
the public review process. The Board finds that the Final IS/MND and MMRP prepared for the
WMSR Project contain a complete and accurate reporting of the environmental impacts associated
with the WMSR Project. The documents have been completed in compliance with CEQA and the
State CEQA Guidelines.
3. The Board hereby adopts the Final IS/MND for the WMSR Project pursuant to
Public Resources Code 21080, subdivision (c) (2).
4. Pursuant to Public Resources Code section 21081.6, the Board hereby approves
and adopts the MMRP prepared for the WMSR Project and attached to this Resolution as Exhibit
“A”.
5. The Board hereby approves the Water Main Seismic Retrofit Project as described
in the Final IS/MND.
6. A copy of the Final IS/MND, MMRP, and all other documents and materials that
constitute the record of proceedings on which these findings are based are located at: 31111
Greenspot Road, Highland, CA 92346. The Custodian of records is the District’s Engineering
Department.
7. The Board directs and authorizes staff to file a Notice of Determination with the
County of San Bernardino.
ADOPTED this 13th day of December, 2023.
AYES:
NOES:
ABSTAIN:
ABSENT:
_______________________________
Phillip R. Goodrich
Board President
East Valley Water District
Resolution 2023.19
Page 3 of 3
December13, 2023
I HEREBY CERTIFY that the foregoing is a full, true, and correct copy of Resolution 2023.19
adopted by the Board of Directors of East Valley Water District at its Regular Meeting held
December 13, 2023.
_______________________________
Michael Moore
Board Secretary
ATTEST: _______________________________
Michael Moore
Board Secretary
Agenda Item
#5b
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #5d
Discussion Item
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Consider the purchase and installation of Granular Activated Carbon for the
District’s Surface Water Treatment Plant 134
RECOMMENDATION
That the Board of Directors authorize the General Manager/CEO to approve the
purchase and installation of carbon from Carbon Activated Corp, USA in the amount of
$125,724.00.
BACKGROUND / ANALYSIS
East Valley Water District’s (District) Surface Water Treatment Plant 134 (Plant 134) is a
critical plant for production of potable water for District customers. Plant 134 was
recently upgraded with six Granular Activated Carbon (GAC) filters to improve the
removal of organic compounds in the treated water. Organic compounds have been
increasing due to variability in water quality from the Santa Ana River. The filters have
been successful in reducing an average of 35% of the organic compounds in the
treated water.
The six (6) GAC filters each hold approximately 20,000 lbs. of carbon that require
periodic replacement depending on the influent water quality. The District planned to
replace half of the GAC filters each year. Three (3) GAC filters were budgeted and
replaced August 2023. Due to running Plant 134 at high flows through the summer
months and the poor influent water quality, the carbon has been exhausted more
rapidly than anticipated. The remaining three (3) GAC filters are now in need of
replacement to ensure reliable operation of Plant 134.
Staff contacted three vendors for quotes to replace and install new carbon. Two
vendors responded with written quotes and one vendor declined to propose. Carbon
Activated Corp. USA is the lowest responsible bidder.
Carbon Activated Corp. USA $117,354
Calgon Carbon $124,800
Carbon Supply Inc No price provided
Quotes do not include Sales Tax
Agenda Item
#5b
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #5b
Discussion Item
Staff recommends selecting Carbon Activated Corp. USA for the GAC replacement and
installation.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
IV - Promote Planning, Maintenance and Preservation of District Resources
A. Develop Projects and Programs to Ensure Safe and Reliable Services
REVIEW BY OTHERS
This agenda item has been reviewed by the Executive Management Team.
FISCAL IMPACT
The fiscal impact associated with the purchase and installation of carbon including tax is
$125,724.00. The Operations budget will be amended at mid-year accordingly.
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Patrick Milroy
Operations Manager
ATTACHMENTS
Carbon Activated Corp, USA quote for GAC change out and installation
Quotation
Date
10/30/2023
Quotation No.
8720
Name / Address
EAST VALLEY WATER DISTRICT
31111 GREENSPOT ROAD
HIGHLAND, CA 92346
Ship To
EAST VALLEY WATER DISTRICT
4588 EAST HIGHLAND AVENUE
HIGHLAND, CA
Terms
NET 30
valid Until
11/29/2023
Rep
CAC
Ship Via
CAC
FOB
PRE-PAID
Attention To
MCHAEL HURST
THANK YOU FOR YOUR BUSINESS Total
CARBON ACTIVATED CORP. USA
2250 SOUTH CENTRAL AVE,
COMPTON,CA 90220
Item Description Ordered Rate Amount
321 REMOVE, REPLACE AND BACKWASH MEDIA WITH
60000
LBS OF EACH ACTIVATED CARBON COAL BASE
12X40 MESH
3 3,118.00 9,354.00
020 ACTIVATED CARBON COAL BASE 12X40 MESH 60,000 1.80 108,000.00T
Sales Tax 7.75% 8,370.00
8.2.1 F7 N/C
$125,724.00
Agenda Item
#5e
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #5e
Discussion Item
9
4
2
Regular Board Meeting with Closed Session
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Consider Approval of Agreement No. 2023.14 for Pretreatment/FOG
Inspection and Environmental Compliance Services with EEC Environmental
RECOMMENDATION
That the Board of Directors authorize the General Manager/CEO to negotiate and
execute Agreement No. 2023.14 for Pretreatment/FOG Inspection and Environmental
Compliance Services with EEC Environmental for an annual maximum cost of $75,000
for three years with the option to extend for an additional two years.
BACKGROUND / ANALYSIS
The District adopted Sewer Ordinance No. 404 at the March 22, 2023 Board meeting,
which updated the District’s Sewer Ordinance and established the District’s Source
Control/Pretreatment Program (Program) in preparation for the operations of Sterling
Natural Resource Center (SNRC). A Program is a requirement by the Regional Water
Quality Control Board for all wastewater treatment plants. The Program is intended to
protect treatment processes and the effluent water quality of SNRC by controlling
source level discharges that could have negative impacts to plant operations or pass
through to the effluent water, which will be recharged at the Weaver Basins, potentially
contaminating the groundwater basin.
A Program requirement requires inspection of dischargers into the District’s sewer
collection system. Inspection of industrial dischargers and fats, oils, and grease
dischargers has historically been performed by the City of San Bernardino. The District
currently does not have the in-house capabilities to perform the required inspections.
In October 2023, staff prepared and advertised a Request for Proposals (RFP) for
Pretreatment/FOG Inspections and Environmental Compliance Services in accordance
with District Purchasing Policy 7.1. The advertisement was posted on the District's
website and staff sent the RFP to five consultants who perform similar services in
Southern California.
On November 9, staff received one proposal in response to the RFP from EEC
Environmental. Staff performed a review of the proposal and determined the proposed
services met the requirements of the RFP and the costs were reasonable.
Agenda Item
#5e
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #5e
Discussion Item
9
4
2
The services proposed by EEC Environmental includes:
1. General coordination with the Districts Water and Wastewater Compliance
Supervisor,
2. Data management of the Permit and Inspection Database (SwiftComply),
3. Grease-Removal Equipment Inspections of approximately 110 Food Service
Establishments,
4. Staff training,
5. Plan/project reviews of potential new dischargers, and
6. Environmental Compliance Support.
The EEC Environmental proposal and draft agreement are attached to this staff report
for reference.
Staff attempted to reach out to the other contacted consultants who did not provide a
proposal in response to the RFP. One of the contacted firms described the District’s
proximity to their existing inspectors as a challenge and they did not feel they could
provide adequate inspection services with their existing staff.
AGENCY GOALS AND OBJECTIVES
I - Implement Effective Solutions Through Visionary Leadership
A. Identify Opportunities to Optimize Natural Resources
IV - Promote Planning, Maintenance and Preservation of District Resources
A. Develop Projects and Programs to Ensure Safe and Reliable Services
REVIEW BY OTHERS
This agenda item has been reviewed by the Executive Management Team.
FISCAL IMPACT
The first-year contract costs are included in the current fiscal year budget. Funding for
subsequent years will be subject to Board’s approval of future fiscal year budgets.
Agenda Item
#5e
December 13, 20233
Meeting Date: December 13, 2023
Agenda Item #5e
Discussion Item
9
4
2
Recommended by:
________________
Michael Moore
General Manager/CEO
Respectfully submitted:
________________
Rocky Welborn
Water Reclamation Manager
ATTACHMENTS
Draft Agreement No. 2023.14
EEC Environmental Proposal
EAST VALLEY WATER DISTRICT
AGREEMENT NO. 2023.14
FOR PROFESSIONAL SERVICES
WITH
EEC ENVIRONMENTAL
THIS AGREEMENT is made this 13 day of December 2023, by and between the EAST
VALLEY WATER DISTRICT, a County Water District organized and operating pursuant to California
Water Code Section 30000 et seq. (hereinafter referred to as the “DISTRICT”), and EEC
Environmental, a Corporation (hereinafter referred to as “CONTRACTOR”).
RECITALS
WHEREAS, the DISTRICT desires to contract with CONTRACTOR to provide services for
Pretreatment/FOG Inspection and Environmental Compliance Services also per Exhibit “A”
(hereinafter referred to as “Project”); and
WHEREAS, CONTRACTOR is willing to contract with the DISTRICT to provide such
services; and
WHEREAS, CONTRACTOR holds itself as duly licensed, qualified, and capable of
performing said services; and
WHEREAS, this Agreement establishes the terms and conditions for the DISTRICT to retain
CONTRACTOR to provide the services described herein for the Project.
COVENANTS
NOW, THEREFORE, in consideration of the faithful performance of the terms and
conditions set forth herein, the parties hereto agree as follows:
ARTICLE I
ENGAGEMENT OF CONTRACTOR
AND AUTHORIZATION TO PROCEED
1.1 ENGAGEMENT: The DISTRICT hereby engages CONTRACTOR, and CONTRACTOR hereby
accepts the engagement, to perform certain services described in Section 2.1 of this
Agreement for the term set forth in Section 6.7 of this Agreement.
1.2 AUTHORIZATION TO PROCEED: Authorization for CONTRACTOR to proceed with all or a
portion of the work described in Section 2.1 of this Agreement will be granted in writing by
the DISTRICT as soon as both parties sign the Agreement and all applicable insurance and
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
2
other security documents required pursuant to Section 6.3 of this Agreement are received and
approved by the DISTRICT. CONTRACTOR shall not proceed with said work until so
authorized by the DISTRICT, and shall commence work immediately upon receipt of the
Notice to Proceed.
1.3 NO EMPLOYEE RELATIONSHIP: CONTRACTOR shall perform the services provided for
herein as an independent CONTRACTOR, and not as an employee of the DISTRICT. The
DISTRICT shall have ultimate control over the work performed for the Project.
CONTRACTOR is not to be considered an agent or employee of the DISTRICT for any
purpose, and shall not be entitled to participate in any pension plans, insurance coverage,
bonus, stock, or similar benefits that the DISTRICT provides for its employees.
CONTRACTOR shall indemnify the DISTRICT for any tax, retirement contribution, social
security, overtime payment, or workers’ compensation payment, which the DISTRICT may
be required to make on behalf of CONTRACTOR or any employee of CONTRACTOR for work
performed under this Agreement.
ARTICLE II
SERVICES OF CONTRACTOR
2.1 SCOPE OF SERVICES: The scope of services to be performed by the CONTRACTOR under
this Agreement are described in the Scope of Work attached hereto as Exhibit “A” and
incorporated herein by this reference (“Scope of Work”), and shall, where not specifically
addressed, include all related services ordinarily provided by the CONTRACTOR under
same or similar circumstances and/or otherwise necessary to satisfy the requirements of
Section 3.3 of this Agreement. In case of conflict between the terms of this Agreement
and the provisions of the Scope of Work, this Agreement shall govern.
2.2 PREVAILING WAGES: In accordance with the provisions of the California Labor Code,
CONTRACTOR shall secure the payment of compensation to employees. To the
extent required by the California Labor Code, CONTRACTOR shall pay not less than
the prevailing rate of per diem wages as determined by the Director, Department of
Industrial Relations, and State of California. Copies of such prevailing rate of per
diem wages are on file at the DISTRICT’s office, which copies will be made available
to any interested party upon request. CONTRACTOR shall post a copy of such
determination at each job site. If applicable, CONTRACTOR shall forfeit to the
DISTRICT the amount of the penalty set forth in Labor Code Section 1777.7(b), or
any subsequent amendments thereto, for each calendar day, or portion thereof, for
each worker paid less than the specified prevailing rates for such work or craft in
which such worker is employed, whether paid by CONTRACTOR or by any
SUBCONTRACTOR.
2.3 HOURS AND WORKING CONDITIONS: The DISTRICT is a public entity in the State of
California and is subject to the provisions of the Government Code and the Labor
Code of the State. It is stipulated and agreed that all provisions of law applicable
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
3
to public contracts are a part of this Agreement to the same extent as though set
forth herein and will be complied with by CONTRACTOR. CONTRACTOR shall comply
with all applicable provisions of the California Labor Code relating to working hours
and the employment of apprentices on public works projects. CONTRACTOR shall,
as a penalty to the DISTRICT, forfeit $25.00 for each worker employed in the
execution of this Agreement by CONTRACTOR or by any SUBCONTRACTOR, for each
calendar day during which such worker is required or permitted to work more than
8 hours in any one calendar day and 40 hours in any one calendar week, unless
such worker received compensation for all hours worked in excess of 8 hours at not
less than 1½ times the basic rate of pay.
ARTICLE III
RESPONSIBILITIES OF THE DISTRICT AND OF CONTRACTOR
3.1 DUTIES OF THE DISTRICT: The DISTRICT, without cost to CONTRACTOR, will provide all
pertinent information necessary for CONTRACTOR’S performance of its obligations under
this Agreement that is reasonably available to the DISTRICT unless otherwise specified in
the Scope of Work, in which case the CONTRACTOR is to acquire such information. The
DISTRICT does not guarantee or ensure the accuracy of any reports, information, and/or
data so provided. To the extent that any reports, information, and/or other data so provided
was supplied to the DISTRICT by persons who are not employees of the DISTRICT, any
liability resulting from inaccuracies and/or omissions contained in said information shall be
limited to liability on behalf of the party who prepared the information for the DISTRICT.
3.2 REPRESENTATIVE OF DISTRICT: The DISTRICT will designate Mike Hurst as the person to
act as the DISTRICT's representative with respect to the work to be performed under this
Agreement. Such person will have complete authority to transmit instructions, receive
information, and interpret and define the DISTRICT's policies and decisions pertinent to the
work. In the event the DISTRICT wishes to make a change in the DISTRICT's
representative, the DISTRICT shall notify the CONTRACTOR of the change in writing.
3.3 DUTIES OF CONTRACTOR: CONTRACTOR shall perform the Project work in such a manner
as to fully comply with all applicable professional standards of care, including professional
quality, technical accuracy, timely completion, and other services furnished and/or work
undertaken by CONTRACTOR pursuant to this Agreement. The CONTRACTOR shall cause
all work and deliverables to conform to all applicable federal, state, and local laws and
regulations.
3.4 APPROVAL OF WORK: The DISTRICT's approval of work or materials furnished hereunder
shall not in any way relieve CONTRACTOR of responsibility for the technical adequacy of its
work. Neither the DISTRICT's review, approval or acceptance of, nor payment for any of
the services shall be construed to operate as a waiver of any rights under this Agreement
or of any cause of action arising out of the performance of this Agreement. Where approval
by the DISTRICT is indicated in this Agreement, it is understood to be conceptual approval
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
4
only and does not relieve the CONTRACTOR of responsibility for complying with all laws,
codes, industry standards, and liability for damages caused by negligent acts, errors,
omissions, noncompliance with industry standards, or the willful misconduct of the
CONTRACTOR or its SUBCONTRACTORs. CONTRACTOR’S obligation to defend, indemnify,
and hold harmless the DISTRICT, and its directors, officers, employees and agents as set
forth in Section 6.9 of this Agreement also applies to the actions or omissions of the
CONTRACTOR or its SUBCONTRACTORs as set forth above in this paragraph.
ARTICLE IV
PAYMENTS TO CONTRACTOR
4.1 PAYMENT: The DISTRICT will pay CONTRACTOR for work performed under this Agreement,
which work can be verified by the DISTRICT, on the basis of the following: CONTRACTOR
shall exercise its good faith best efforts to facilitate a full and clear definition of the scope
of all assigned work so that the amount set forth in Section 4.3 of this Agreement will cover
all tasks necessary to complete the work. The amount set forth in Section 4.3 of this
Agreement is the maximum compensation to which CONTRACTOR may be entitled for the
performance of services to complete the work for the Project, unless the Scope of Work or
time to complete the work is changed by the DISTRICT in writing in advance of the work to
be performed there under. Adjustments in the total payment amount shall only be allowed
pursuant to Section 6.4 of this Agreement. In no event shall CONTRACTOR be entitled to
compensation greater than the amount set forth in Section 4.3 of this Agreement where
changes in the Scope of Work or the time for performance are necessitated by the
negligence of CONTRACTOR or any SUBCONTRACTOR performing work on the Project.
4.2 PAYMENT TO CONTRACTOR: Payment will be made by the DISTRICT within thirty (30)
calendar days after receipt of an invoice from CONTRACTOR, provided that all invoices are
complete and product and services are determined to be of sufficient quality by the
DISTRICT. Invoicing shall be at the hourly rates described in the CONTRACTOR’s proposal
dated November 9, 2023 in the Proposal Fee Schedule. CONTRACTOR shall invoice
DISTRICT monthly for services performed under this Agreement. In the event that a
payment dispute arises between the parties, CONTRACTOR shall provide to the DISTRICT
full and complete access to CONTRACTOR'S labor cost records and other direct cost data,
and copies thereof if requested by the DISTRICT.
4.3 ESTIMATED CHARGES: The maximum annual charges for all work under this Agreement is
$75,000 and such amount is the cost ceiling as described herein. The total estimated
charges stated herein constitute the total amount agreed to.
4.4 COST FOR REWORK: CONTRACTOR shall, at no cost to the DISTRICT, prepare any
necessary rework occasioned by CONTRACTOR'S negligent act or omission or otherwise
due substantially to CONTRACTOR'S fault.
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
5
ARTICLE V
COMPLETION SCHEDULE
5.1 TASK SCHEDULE: The work is anticipated to be completed in accordance with the
schedule contained in the Scope of Work.
5.2 TIME OF ESSENCE: CONTRACTOR shall perform all services required by this Agreement in
a prompt, timely, and professional manner in accordance with the above schedule. Time
is of the essence in this Agreement.
5.3 TASK DURATION: This work is anticipated to be for a duration of three (3) years with the
optional for two extensions of one (1) year each upon written authorization of the District
ARTICLE VI
GENERAL PROVISIONS
6.1 COMPLIANCE WITH FEDERAL, STATE, AND LOCAL LAWS: CONTRACTOR shall at all times
observe all applicable provisions of Federal, State, and Local laws and regulations including,
but not limited to, those related to Equal Opportunity Employment.
6.2 SUBCONTRACTORS AND OUTSIDE CONTRACTORS: No subcontract shall be awarded by
CONTRACTOR if not identified as a SUBCONTRACTOR in its Proposal unless prior written
approval is obtained from the DISTRICT. CONTRACTOR shall be responsible for payment to
SUBCONTRACTORs used by them to perform the services under this Agreement. If
CONTRACTOR subcontracts any of the work to be performed, CONTRACTOR shall be as
fully responsible to the DISTRICT for the performance of the work, including errors and
omissions of CONTRACTOR’S SUBCONTRACTORs and of the persons employed by the
SUBCONTRACTOR, as CONTRACTOR is for the acts and omissions of persons directly
employed by the CONTRACTOR. Nothing contained in this Agreement shall create any
contractual relationship between any SUBCONTRACTOR of CONTRACTOR and the
DISTRICT. CONTRACTOR shall bind every SUBCONTRACTOR and every SUBCONTRACTOR
of a SUBCONTRACTOR to the terms of this Agreement that are applicable to CONTRACTOR’S
work unless specifically noted to the contrary in the subcontract in question and approved
in writing by the DISTRICT.
6.3 INSURANCE: CONTRACTOR shall secure and maintain in full force and effect, until the
satisfactory completion and acceptance of the Project by DISTRICT, such insurance as will
protect it and the DISTRICT in such a manner and in such amounts as set forth below. The
premiums for said insurance coverage shall be paid by the CONTRACTOR. The failure to
comply with these insurance requirements may constitute a material breach of this
Agreement, at the sole discretion of the DISTRICT.
(a) Certificates of Insurance: Prior to commencing services under this Agreement, and in
any event no later than ten (10) calendar days after execution of this Agreement,
CONTRACTOR shall furnish DISTRICT with Certificates of Insurance and endorsements
verifying the insurance coverage required by this Agreement is in full force and effect.
The DISTRICT reserves the right to require complete and accurate copies of all
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
6
insurance policies required under this Agreement.
(b) Required Provisions: The insurance policies required by this Agreement shall include
the following provisions or have them incorporated by endorsement(s):
(1) Primary Coverage: The insurance policies provided by CONTRACTOR shall be
primary insurance and any self-insured retention and/or insurance carried by or
available to the DISTRICT or its employees shall be excess and non-contributory
coverage so that any self-insured retention and/or insurance carried by or
available to the DISTRICT shall not contribute to any loss or expense under
CONTRACTOR’S insurance.
(2) Additional Insured: The policies of insurance provided by CONTRACTOR, except
Workers' Compensation and Professional Liability, shall include as additional
insureds: the DISTRICT, its directors, officers, employees, and agents when
acting in their capacity as such in conjunction with the performance of this
Agreement. Such policies shall contain a "severability of interests" provision,
also known as "Cross liability" or "separation of insured".
(3) Cancellation: Each certificate of insurance and insurance policy shall provide
that the policy may not be non-renewed, canceled (for reasons other than non-
payment of premium) or materially changed without first giving thirty (30) days
advance written notice to the DISTRICT, or ten (10) days advance written notice
in the event of cancellation due to non-payment of premium.
(4) Waiver of Subrogation: The insurance policies provided by CONTRACTOR shall
contain a waiver of subrogation against DISTRICT, its directors, officers,
employees and agents for any claims arising out of the services performed under
this Agreement by CONTRACTOR.
(5) Claim Reporting: CONTRACTOR shall not fail to comply with the claim reporting
provisions or cause any breach of a policy condition or warranty of the insurance
policies required by this Agreement that would affect the coverage afforded
under the policies to the DISTRICT.
(6) Deductible/Retention: If the insurance policies provided by CONTRACTOR
contain deductibles or self-insured retentions, any such deductible or self-insured
retention shall not be applicable with respect to the coverage provided to
DISTRICT under such policies. CONTRACTOR shall be solely responsible for any
such deductible or self-insured retention and the DISTRICT, in its sole discretion,
may require CONTRACTOR to secure the payment of any such deductible or self-
insured retention by a surety bond or an irrevocable and unconditional letter of
credit.
(7) CONTRACTOR’S SUBCONTRACTORs: CONTRACTOR shall include all
SUBCONTRACTORs as additional insureds under the insurance policies required
by this Agreement to the same extent as the DISTRICT or shall furnish separate
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
7
certificates of insurance and policy endorsements for each SUBCONTRACTOR
verifying that the insurance for each SUBCONTRACTOR complies with the same
insurance requirements applicable to CONTRACTOR under this Agreement.
(c) Insurance Company Requirements: CONTRACTOR shall provide insurance coverage
through insurers that have at least an "A" Financial Strength Rating and a "VII"
Financial Size Category in accordance with the current ratings by the A. M. Best
Company, Inc. as published in Best's Key Rating Guide or on said company’s web site.
In addition, any and all insurers must be admitted and authorized to conduct business
in the State of California and be a participant in the California Insurance Guaranty
Association, as evidenced by a listing in the appropriate publication of the California
Department of Insurance.
(d) Policy Requirements: The insurance required under this Agreement shall meet or
exceed the minimum requirements as set forth below:
(1) Workers' Compensation: CONTRACTOR shall maintain Workers' Compensation
insurance as required by law in the State of California to cover CONTRACTOR’S
obligations as imposed by federal and state law having jurisdiction over
CONTRACTOR’S employees and Employers' Liability insurance, including disease
coverage, of not less than $1,000,000.
(2) General Liability: CONTRACTOR shall maintain Comprehensive General Liability
insurance with a combined single limit of not less than $1,000,000 per
occurrence or claim and $1,000,000 aggregate. The policy shall include, but not
be limited to, coverage for bodily injury, property damage, personal injury,
products, completed operations and blanket contractual to cover, but not be
limited to, the liability assumed under the indemnification provisions of this
Agreement. In the event the Comprehensive General Liability insurance policy
is written on a "claims made" basis, coverage shall extend for two years after
the satisfactory completion and acceptance of the Project by DISTRICT.
(3) Automobile Liability: CONTRACTOR shall maintain Commercial Automobile
Liability insurance with a combined single limit for bodily injury and property
damage of not less than $1,000,000 each occurrence for any owned, hired, or
non-owned vehicles.
6.4 CHANGES IN SCOPE OR TIME: If the DISTRICT requests a change in the Scope of Work or
time of completion by either adding to or deleting from the original scope or time of
completion, an equitable adjustment shall be made and this Agreement shall be modified in
writing accordingly. CONTRACTOR must assert any claim for adjustment under this clause
in writing within thirty-(30) calendar days from the date of receipt from CONTRACTOR of
the notification of change unless the DISTRICT grants a further period of time before the
date of final payment under this Agreement.
6.5 NOTICES: All notices to either party by the other shall be made in writing and delivered
or mailed to such party at their respective addresses as follows, or to other such address
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
8
as either party may designate, and said notices shall be deemed to have been made when
delivered or, if mailed, five (5) days after mailing.
To DISTRICT: East Valley Water District
31111 Greenspot Road
Highland, CA 92346
Attn: Michael Moore, General Manager/CEO
To CONTRACTOR: EEC Environmental
1 City Blvd. W. STE 1800
Orange, CA 92868
Attn: John Shaffer, CEO
6.6 CONTRACTOR'S ASSIGNED PERSONNEL: CONTRACTOR designates Joseph Jenkins, Project
Manager to have immediate responsibility for the performance of the work and for all
matters relating to performance under this Agreement. Substitution of any assigned
personnel shall require the prior written approval of the DISTRICT. If the DISTRICT
determines that a proposed substitution is not acceptable, then, at the request of the
DISTRICT, CONTRACTOR shall substitute with a person acceptable to the DISTRICT.
6.7 TERMINATION:
(a) If the engagement of CONTRACTOR is not extended by the mutual written consent of
the DISTRICT and CONTRACTOR, then this Agreement shall expire on the latest date
set forth in the schedule contained in the Scope of Work for completion of tasks for
the Project.
(b) Notwithstanding the above, the DISTRICT may terminate this Agreement or abandon
any portion of the Project by giving ten (10) days written notice thereof to
CONTRACTOR. CONTRACTOR may terminate its obligation to provide further services
under this Agreement upon thirty (30) calendar days written notice only in the event
of substantial failure by the DISTRICT to perform in accordance with the terms of this
Agreement through no fault of the CONTRACTOR.
(c) In the event of termination of this Agreement or abandonment of any portion of the
Project, the DISTRICT shall be immediately given title and possession of all original
drawings and other documents developed for the Project, if any, and the sole right
and remedy of CONTRACTOR shall be to receive payment for all amounts due and not
previously paid to CONTRACTOR for services completed or in progress in accordance
with the Agreement prior to such date of termination. If termination occurs prior to
completion of any task for which payment has not been made, the fee for services
performed during such task shall be based on an amount mutually agreed to by the
DISTRICT and CONTRACTOR. Such payments available to the CONTRACTOR under
this paragraph shall not include costs related to lost profit associated with the expected
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
9
completion of the work or other such payments relating to the benefit of this
Agreement.
6.8 ATTORNEYS’ FEES: In the event that either the DISTRICT or CONTRACTOR brings an action
or proceeding for damages for an alleged breach of any provision of this Agreement, to
interpret this Agreement or determine the rights of and duties of either party in relation
thereto, the prevailing party shall be entitled to recover as part of such action or proceeding
all litigation, arbitration, mediation and collection expenses, including witness fees, court
costs, and reasonable attorneys' fees. Such fees shall be determined by the Court in such
litigation or in a separate action brought for that purpose. Mediation will be attempted if
both parties mutually agree before, during, or after any such action or proceeding has
begun.
INDEMNITY:
(a) CONTRACTOR shall defend, indemnify and hold DISTRICT, including its directors,
officers, employees and agents, harmless from and against any and all claims,
demands, causes of action, suits, debts, obligations, liabilities, losses, damages,
costs, expenses, attorney’s fees, awards, fines, settlements, judgments or losses of
whatever nature, character, and description, with respect to or arising out of the
work to be performed under this Agreement, including without limitation, any and all
such claims, demands, causes of action, suits, debts, obligations, liabilities, losses,
damages, costs, expenses, attorney’s fees, awards, fines, settlements, judgments or
losses of whatever nature, character, and description, arising by reason of death or
bodily injury to one or more persons, including the employees of CONTRACTOR;
injury to property of any kind, including loss of use; or economic damages of any
kind, caused by, or arising out of, any alleged or actual act or omission, regardless
of whether such act or omission is active or passive, by CONTRACTOR, any of
CONTRACTOR’S SUBCONTRACTORs or DISTRICT, including their respective
directors, officers, employees, agents and assigns, excepting only such matters
arising from the sole negligence or willful misconduct of the DISTRICT.
(b) CONTRACTOR shall defend, indemnify and hold DISTRICT, including its directors,
officers, employees and agents, harmless from and against any and all claims,
demands, causes of action, suits, debts, obligations, liabilities, losses, damages, costs,
expenses, attorney’s fees, awards, fines, settlements, judgments or losses of whatever
nature, character, and description, with respect to or arising out of any infringement
or alleged infringement of any patent, copyright or trademark and arising out of the
use of any equipment or materials furnished under this Agreement by the
CONTRACTOR or CONTRACTOR’S SUBCONTRACTORs, including their respective
directors, officers, employees, agents and assigns, or out of the processes or actions
employed by, or on behalf of, the CONTRACTOR or CONTRACTOR’S
SUBCONTRACTORs, including their respective directors, officers, employees, agents
and assigns, in connection with the performance of services under this Agreement.
CONTRACTOR shall have the right, in order to avoid such claims or actions, to
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
10
substitute at its expense non-infringing equipment, materials or processes, or to
modify at its expense such infringing equipment, materials, and processes so they
become non-infringing, provided that such substituted and modified equipment,
materials, and processes shall meet all the requirements and be subject to all the
provisions of this Agreement.
(c) CONTRACTOR shall defend, indemnify and hold DISTRICT, including its directors,
officers, employees and agents, harmless from and against any and all claims,
demands, causes of action, suits, debts, obligations, liabilities, losses, damages, costs,
expenses, attorney’s fees, awards, fines, settlements, judgments or losses of whatever
nature, character, and description, with respect to or arising out of any breach by
CONTRACTOR or CONTRACTOR’S SUBCONTRACTORs, including their respective
directors, officers, employees, agents and assigns, of the aforesaid obligations and
covenants, and any other provision or covenant of this Agreement.
(d) It is the intent of the parties to this Agreement that the defense, indemnity and hold
harmless obligation of CONTRACTOR under this Agreement shall be as broad and
inclusive as may be allowed under California Civil Code §§ 2778 through 2784.5, or
other similar state or federal law.
6.9 SAFETY: CONTRACTOR shall perform the work in full compliance with applicable State and
Federal safety requirements including, but not limited to, Occupational Safety and Health
Administration requirements.
(a) CONTRACTOR shall take all precautions necessary for the safety of, and prevention of
damage to, property on or adjacent to the Project site, and for the safety of, and
prevention of injury to, persons, including DISTRICT’s employees, CONTRACTOR’S
employees, and third persons. All work shall be performed entirely at CONTRACTOR'S
risk. CONTRACTOR shall comply with the insurance requirements set forth in Section
6.3 of this Agreement.
(b) CONTRACTOR shall also furnish the DISTRICT with a copy of any injury prevention
program established for the CONTRACTOR’S employees pursuant to Labor Code
Section 6401.7, including any necessary documentation regarding implementation of
the program. CONTRACTOR hereby certifies that its employees have been trained in
the program, and procedures are in place to train employees whenever new
substances, processes, procedures, or equipment are introduced. CONTRACTOR shall
demonstrate compliance with Labor Code Section 6401.7 by maintaining a copy of its
Injury and Illness Prevention Plan at the Project site and making it available to the
DISTRICT.
6.10 EXAMINATION OF RECORDS: All original drawings, specifications, reports, calculations, and
other documents or electronic data developed by CONTRACTOR for the Project shall be
furnished to and become the property of the DISTRICT. CONTRACTOR agrees that the
DISTRICT will have access to and the right to examine any directly pertinent books,
documents, papers, and records of any and all of the transactions relating to this
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
11
Agreement.
6.11 INTEGRATION AND AMENDMENT: This Agreement contains the entire understanding
between the DISTRICT and CONTRACTOR as to those matters contained herein. No other
representations, covenants, undertakings or other prior or contemporaneous agreements,
oral or written, respecting those matters, which are not specifically incorporated herein,
may be deemed in any way to exist or to bind any of the parties hereto. Each party
acknowledges that it has not executed this Agreement in reliance on any promise,
representation or warranty not set forth herein. This Agreement may not be amended
except by a writing signed by all parties hereto.
6.12 ASSIGNMENT: Neither party shall sign or transfer its interest in this Agreement without
written consent of the other party. All terms, conditions, and provisions of this Agreement
shall inure to and shall bind each of the parties hereto, and each of their respective heirs,
executors, administrators, successors, and assigns.
6.13 GOVERNING LAW: This Agreement shall be construed as if it was jointly prepared by both
parties hereto, and any uncertainty or ambiguity contained herein shall not be interpreted
against the party drafting same. This Agreement shall be enforced and governed by the
laws of the State of California. If any action is brought to interpret or enforce any term of
this Agreement, the action shall be brought in a state court situated in the County of San
Bernardino, State of California, or in a federal court within rem jurisdiction over the
Project.
6.14 HEADINGS: Article and Section headings in this Agreement are for convenience only and
are not intended to be used in interpreting or construing the terms, covenants, and
conditions of this Agreement.
6.15 PARTIAL INVALIDITY: If any term, covenant, condition, or provision of this Agreement is
found by a court of competent jurisdiction to be invalid, void, or unenforceable, the
remainder of the provisions hereof shall remain in full force and effect, and shall in no way
be affected, impaired, or invalidated thereby.
6.16 EFFECT OF DISTRICT’S WAIVER: Any failure by the DISTRICT to enforce any provision of
this Agreement, or any waiver thereof by the DISTRICT, shall not constitute a waiver of its
right to enforce subsequent violations of the same or any other terms or conditions
herein.
6.17 AUTHORITY: The individuals executing this Agreement represent and warrant that they
have the legal capacity and authority to sign this Agreement on behalf of and to so bind
their respective legal entities.
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
12
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date
first written above.
CONTRACTOR DISTRICT
By:_____________________________ By:_____________________________
John Shafer, CEO Michael Moore, General Manager/CEO
EEC Environmental East Valley Water District
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
13
EXHIBIT A
SCOPE OF WORK
Task 1 Kick‐off Meeting
EEC will attend a kickoff meeting to discuss the overall scope of the project with District Staff.
The kickoff meeting will include the prioritization of FSE inspections. EEC will prepare a meeting
agenda for the District’s review and comment at least 5 days prior to the kick‐off meeting.
EEC will also attend regular status meetings with the District. The status meeting will discuss
program progress, items in need of modification, active code compliance cases, active
violations, resolved violations, pending violations, and any other matters pertinent to the success
of the program.
Task 2 Pretreatment/FOG Program Management
EEC Manages FOG programs for six California Agencies, with varying levels of data
management demands. EEC has demonstrated the flexibility to adapt to these demands
and facilitate efficient inspection programs.
Task 2.1 Facility Data Management
EEC has worked with SwiftComply for multiple sewer agencies. Recently, EEC assisted the City
of Tulare with converting their FSE data to the SwiftComply database, helped to customize
inspection forms, and assisted with ongoing inspection frequencies and compliance. EEC will work
with the District to ensure the implementation of the SwiftComply database is as smooth as
possible. Any inspections that prove to be non‐ compliant will be reported to the Water and
Wastewater Compliance Supervisor within 48 hours with a detailed report of the violation(s).
Task 3 Food Service Establishment FOG Inspections
Task 3 consists of two subtasks to address grease‐removal device (GRD) inspections and
kitchen best management practice inspections. EEC will utilize the same inspections forms EEC
has developed for the previous FOG inspection projects. The inspection forms will adequately
evaluate the FSE’s compliance with the rules and regulations of the FOG Control Program.
Task 3.1 Grease‐Removal Equipment Inspections
EEC will conduct in‐depth inspections of GRDs at FSEs. EEC understands that there are
approximately 110 FSEs that will require an inspection annually.
To determine compliance with the established 25% rule, EEC will use a Dip‐stick Pro sample
collection tube to measure the level of FOG and solids in gravity grease interceptors. EEC
has developed inspection tools to accurately measure FOG and solids in smaller
hydromechanical grease interceptors (also known as grease traps) as well. During the inspections,
the EEC inspector will also request pumping records and will check appropriate GRD
connections. As necessary, EEC will collect representative discharge samples during the
inspections. It is anticipated that sampling will only be conducted when additional enforcement
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
14
information is needed.
For any FSE identified as being non‐compliant during an inspection, EEC will schedule and conduct
follow‐up inspections for the non‐compliance. EEC anticipates approximately 20 follow‐up
inspections being required.
Task 3.2 Best Management Practice Inspections
Having conducted over 20,000 kitchen best management practice (BMP) inspections, EEC
understands the importance of educating FSEs on proper BMPs. EEC will perform BMP inspections
for each FSE at the time of the GRD inspection, and will provide BMP only inspections for each
FSE that does not have a GRD.
The inspections will include providing BMP materials and necessary education. FOG program
education is a core component of efforts to reduce SSOs and FOG impacts to the sewer system.
EEC uses each FOG inspection as an opportunity to educate FSE staff about the importance of
following kitchen BMPs and proper GRD maintenance. EEC has developed public outreach efforts
for FOG programs that have included such items as door hangers, pot scrapers, FAQ sheets, and
postcard mailers.
EEC has also helped agencies develop websites that administer FOG program information for both
FSEs and the general public.
Task 4 Additional As‐Needed Services
Task 4.1 Staff Training
EEC previously developed and conducted California’s only Grease Interceptor Inspector
Training Workshop for the California Water Environment Association. To date, EEC has trained
over 300 FOG inspectors Statewide. EEC will conduct training for the District personnel. The
training will include classroom‐based training session, and as‐needed field training. The training
will include the procedures for identifying and inspecting multiple types of grease control devices
including gravity grease interceptors and automatic grease removal devices. The training will also
teach inspectors how to prioritize the inspections to be completed, identify non‐compliances, and
implement the proper enforcement actions.
Finally, the training will cover the use of the SwiftComply database and data entry.
Task 4.2 Plan/ProjectReview
EEC has expertise working with all types of GREs and currently performs plan review activities for
three clients. EEC served on the review committee during the development of the new sizing
criteria in the 2006 Uniform Plumbing Code and has conducted multiple studies on the
effectiveness of GREs and Automatic Removal Devices. EEC engineers also routinely design
industrial pretreatment systems for our industrial clients and EEC staff is very familiar with the
technical review of specifications for pretreatment processes.
Task 4.3 Environmental Compliance Support
EEC closely monitors regulatory developments to identify new or changing regulations for FOG
Agreement for Professional Services
December 13, 2023 – Pretreatment/FOG Inspection and Environmental Compliance Services
15
programs, the WDR, and SSMP requirements. EEC assists clients to proactively maintain
compliance with evolving regulations. EEC has assisted such agencies as the City of Anaheim,
Costa Mesa Sanitary District, City of El Segundo, City of Santa Ana, and City of Buena Park with
their SSMP and internal audits.
EEC currently manages Hazardous Materials Business Plans (HMBPs), Industrial General Permit
(IGP), and CUPA related compliance for multiple industrials facilities across California. EEC
routinely works with local CUPAs to ensure HMBPs are kept up to date and submitted on‐time.
Additionally, EEC currently has three Qualified Industrial Stormwater Practitioners (QISPs) on
staff who routinely develop and review Stormwater Pollution Prevention Plans (SWPPP)s, and
conduct Elevated Response Action (ERA) Level 1 and 2 Reports. EEC has the staff expertise and
experience to assist the District with any of these tasks as‐needed.
Project Schedule
Following is a general schedule of tasks and milestones based on the scope of work. During the
project kick‐off meeting, the schedule will be reviewed with the District’s staff and revised
as necessary.
Additionally, the schedule will be routinely updated as needed as tasks are completed and
milestones are reached.
Pretreatment/FOG
Inspection and
Environmental
Compliance Services
Prepared for
East Valley Water District
November 9, 2023
November 9, 2023
Mr. Mike Hurst
East Valley Water District
31111 Greenspot Road
Highland, California 92346
Subject: Pretreatment/FOG Inspection and Environmental Compliance Services
Dear Mr. Hurst:
EEC Environmental (EEC) is pleased to present this proposal to assist the East Valley Water District
(District) with implementation of its Pretreatment/Fats, Oils, and Grease (FOG) inspection program as it
pertains to the food service establishments (FSEs) community in the District’s service area. EEC
understands that the District is looking for a contractor with FOG program development experience, FSE
inspection experience and Industrial Pretreatment Program experience. EEC fully understands the scope
of work as presented in the RFP, and the terms and conditions of the RFP are understood and
acknowledged by the undersigned EEC representative. Additionally, EEC can meet all insurance
requirements as stated in the RFP.
As demonstrated in the enclosed proposal documents, EEC is uniquely qualified to provide these services
due to its successful development, implementation, and management of similar programs over the past
15+ years. Based on its recognized FOG expertise, EEC is afforded the opportunity to work with agencies
across the country, exposing the team to a variety of innovative ideas and concepts that can be shared
with the District. Joseph Jenkins (a CWEA Environmental Compliance Inspector Grade I) will serve as the
Project Manager for this project and can be contacted at any time at (714) 667-2300 or
jjenkins@eecenvironmental.com. Joseph Jenkins has served as the primary project manager for FSE
inspection projects for the past 10 years. If Mr. Jenkins is unavailable, Mr. Jim Kolk will serve as the
secondary project manager.
EEC’s expertise and reputation are perfectly suited to help the District continue this successful program.
EEC’s project team identified within the attached proposal is committed to perform the required tasks
throughout the duration of the contract. All persons working on this project are based out of our Orange,
California office. The signer of this proposal has the full authority to bind the principal proposer. The staff
involved with this project are included in the organization chart below.
Thank you for the opportunity to provide FOG/Pretreatment-related services to the District. We look
forward to the opportunity to discuss EEC’s proposal.
Respectfully,
EEC Environmental
John Shaffer
CEO
East Valley Water District FOG Inspection Services 1 November 9, 2023
Introduction
EEC Environmental (EEC) is pleased to submit this proposal to provide the East Valley Water District
(District) with inspection and enforcement services in support of the District’s pretreatment/fats, oils, and
grease (FOG) control program. Based on our firm’s extensive experience managing pretreatment/FOG
control programs and conducting pretreatment/FOG inspections, EEC is uniquely qualified and prepared
to assist the District with the tasks associated with food service establishment (FSE) inspection and
enforcement.
Company Details
Number of Employees: 45
Years in Business:28
Corporate headquarters: One City Boulevard West, Suite 1800
Orange, California 92868
Phone Number: (714)667‐2300
Fax Number: (714)667‐2310
Website:www.eecenvironmental.com
Firm Structure: Corporation
Certifications/Licenses: Class A General Engineering Contractor License
Hazardous Substances Removal Certification
Small Business Enterprise (California Department of General Services)
Small Business as prescribed by the Federal Acquisition Regulations
Tax Identification Number: 33‐0665828
Primary Project Contact: Mr. Joseph Jenkins
Project Manager / FOG Program Manager
Phone: (714) 667‐2300
Fax: (714) 667‐2310
E‐Mail: jjenkins@eecenvironmental.com
Secondary Project Contact: Mr. Jim Kolk
Sr. Project Engineer
Phone: (714) 667‐2300
Fax: (714) 667‐2310
E‐Mail: jkolk@eecenvironmental.com
Background
EEC is a full‐service environmental consulting firm that provides high‐quality, cost‐effective
environmental, engineering, technology, and consulting services to public and private entities throughout
the United States. EEC was founded in 1995 to fulfill a need for technical excellence and personal service
in environmental consulting. EEC comprises a team of experts in engineering, environmental compliance,
environmental science technology and data management systems, chemistry, toxicology, hydrogeology,
geology, and industrial hygiene.
East Valley Water District FOG Inspection Services 2 November 9, 2023
EEC comprises four main divisions: environmental,
engineering, technology, and construction. The
Engineering Division provides pretreatment/FOG
control services; wastewater treatment and reuse
design; NPDES/stormwater management; soil and
groundwater remediation design; chemical delivery
system design; and operation and maintenance of
wastewater treatment systems. The division also
designs and implements plans for remediation of soil
and groundwater, mitigation of lead and asbestos,
treatment and reuse of wastewater, and management
of stormwater.
The Environmental Division routinely performs Phase
I/II Environmental Site Assessments, soil and
groundwater investigations, air monitoring, and
asbestos and lead testing. The division also prepares
and implements site assessment work plans,
preliminary endangerment assessments, remedial
action plans, and closure reports for regulatory
acceptance and approval. Finally, the division
coordinates and negotiates with regulatory agencies on
behalf of clients.
EEC’s Technology Services Division facilitates efficient
collection, storage, and review of large data
inventories. This department uses computer‐aided
drafting and design (AutoCAD), GIS, and database
technologies to support and manage projects across
the firm. The department identifies the right
technologies for the client’s most critical needs and
ensures that the chosen technologies will stay relevant
and effective long after project completion.
The Construction Division supports projects
originating from the engineering and environmental
departments, but also undertakes projects
independently. This division removes underground
and aboveground storage tanks; installs, operates, and maintains remediation systems; designs and builds
electrical panels/control systems, and performs general construction services, including operation of
heavy equipment.
Finally, the administrative team supports the entire firm with project‐related activities, such as accounting
and invoicing.
KEY SERVICES
Engineering
FOG Program Management
FOG Program Inspections
NPDES Program Management
NPDES Program Inspections
SSMP Audits and Support Services
CIP Support
Wastewater Treatment & Water Reuse Design
Soil & Groundwater Remediation Design
Pumping System, Water/Wastewater Pipeline, Storage, and
Treatment Facility Design
Computer‐Aided Drafting and Design
Sewer System Elevated Maintenance Location
Investigations
SSO Response and Fog Inspection Training
Odor Investigations
Construction
Soil & Groundwater Remediation Systems
Wastewater / Stormwater Treatment Systems
Removal/Installation of Aboveground/Underground
Storage Tanks
General Construction
Mechanical/Electrical Installation
Information Management
Database Management
Geographic Information Systems
Computerized Maintenance Management Systems
Modeling
Asset Management
Cloud Services and Support
Environmental
Phase I & II ESAs
Brownfield Assessments
Groundwater Monitoring Well Installations
Groundwater Monitoring and Sampling
Vapor Intrusion Investigations
Indoor Air Sampling
Lead/Asbestos/Formaldehyde Assessment and Abatement
Waste Management
East Valley Water District FOG Inspection Services 3 November 9, 2023
Section 1.0 – Project Team
EEC has assembled a team of highly qualified and experienced key personnel to complete the scope of
work. As shown in Table 1‐1, Key Personnel Qualifications, all key personnel have the necessary
credentials, licenses, and relevant experience required to successfully complete the proposed scope of
work on schedule and within budget. Any changes in the key personnel will be communicated and agreed
upon by the District prior to finalizing. Résumés for key personnel are provided in Appendix A, Résumés.
Table 1‐1, Key Personnel Qualifications
Key Personnel Role Years Exp. Experience/Registration Licenses/Credentials
Joseph Jenkins Project Manager 15
B.A., Business Administration; Environmental
Management Certification; CWEA Environmental
Compliance Inspector Grade I; OSHA 40‐Hour
HAZPWOPER Certification, Inspection Management and
Training; EEC Inspector and QA/QC Inspection Procedures;
Qualified Industrial Stormwater Practitioner (QISP)
Performed/managed more than 5,000 FOG inspections
John Shaffer
Principal in
Charge,
Regulatory and
FOG Expert
31
General engineering contractor
FOG regulatory expert
Co‐author of the Orange County FOG Study
WEF/EPA FOG control workshop contributor & speaker
IAPMO FOG Task Group member
CWEA FOG inspector trainer
Jim Kolk FOG Regulations
Expert 26
FOG program development
FOG program management
City/agency ordinance and development
Hotspot and SSO abatement
Performed/managed more than 5,000 FOG inspections
Baltazar
Maldonado FOG Inspector 6
Conducted thousands of FOG inspections;
HAZPWOPER Certification, Inspection Management and
Training;
Bilingual (English and Spanish)
Jordan
Washburn FOG Inspector 3
California Water Distribution Level 1 Certification; OSHA
40‐Hour HAZPWOPER Certification; Compliance Inspector;
Conducted Hundreds of FSE Inspections; SSO Investigation
and Response.
Enrique Gamez FOG Inspector 1 40‐Hour HAZPWOPER Certification; Compliance Inspector;
Conducted Hundreds of FSE Inspections
Key:
CWEA = California Water Environment Association
EPA = Environmental Protection Agency
FOG = fats, oils, and grease
IAPMO = International Association of Plumbing and Mechanical Officials
SSO = sanitary sewer overflow
WEF = Water Environment Federation
East Valley Water District FOG Inspection Services 4 November 9, 2023
1.1 Project Management
Joseph Jenkins has served as the primary project manager for FSE inspection projects for the past 10 years
and will serve in this role (for a minimum of 1 year) for the District. Mr. Jenkins will provide overall
management and leadership that will include maintaining an effective team, ensuring availability of
technical staff, maintaining quality of work, and resolving project issues. While many tasks can and should
be handled directly by technical staff, all project communication will be routed through Mr. Jenkins to
ensure continuity of project tasks and control of project resources. If Mr. Jenkins is unavailable, Mr. Jim
Kolk will serve as the secondary project manager.
Joseph has conducted more than 4,000 FSE inspections for compliance with FOG control programs,
including those of Costa Mesa Sanitary District, City of Santa Ana, City of La Habra, City of Anaheim, and
IRWD. Joseph manages and schedules FSE inspections and provides training and quality control/quality
assurance for EEC’s FOG inspectors. Joseph is also the lead for sewer system management plan audits. To
date, Joseph has conducted internal SSMP audits for the Costa Mesa Sanitary District (CMSD), City of La
Habra, City of Buena Park, City of Santa Ana, and City of Anaheim. He has a B.S. in Business Administration
from York College, an Environmental Management Certificate from the University of California, Irvine, and
a certification as a Grade I Environmental Compliance Inspector from the California Water Environment
Association (CWEA).
A quality assurance / quality control (QA/QC) process will continue to be implemented throughout the
project and will include periodic reviews during the planning and execution phases. The project manager
will ensure that all the required elements are effectively incorporated into the project and the principal‐
in‐charge will ensure that the project manager is routinely performing this verification.
East Valley Water District FOG Inspection Services 5 November 9, 2023
Section 2.0 – Related Experience
EEC has extensive experience in providing FOG control inspection services throughout California. EEC has
provided FOG services to more than 30 cities and sewer districts including the following:
City of Los Altos City of Santa Ana Garden Grove Sanitary District
San Francisco PUC City of Stanton Irvine Ranch Water District
City of La Habra County of Orange Midway City Sanitary District
City of Anaheim Costa Mesa Sanitary District Orange County Sanitation District
Following is a selection of short project descriptions that represent EEC’s FOG inspection experience.
2.1 City of Santa Ana: FOG Program Management and Inspection Services
EEC developed, implemented, and managed the City of Santa Ana’s
FOG program and conducted on‐site facility inspections. EEC compiled
an exhaustive list of all food service establishments (FSEs) within the
City’s boundary and inspected each FSE to inventory cooking
equipment, fixtures, floor sinks and drains, and grease removal device
(GRD). EEC developed a FOG program database that processed the
equipment inventory and created inspection frequencies based, in
part, on an FSE’s potential to release FOG into the sewer system. EEC
used the geographic information system to determine an FSE’s
potential to impact sewer line hotspots. EEC has been inspecting FSEs
in Santa Ana for the past decade. Project highlights include:
FOG program development, implementation, and
management
FSE kitchen best management practices (BMP) inspections
GRD inspections
FSE noncompliance notifications
Compliance inspection and follow‐up efforts
Sanitary sewer overflow (SSO) response and support
FSE NPDES stormwater inspections
Mobile FOG inspection deployment
2.2 City of Tulare: FOG Program Development and Inspector Training
In 2023, EEC developed the FOG Control Program for the City of Tulare. The development includes
updating the City’s ordinance, developing program materials, and assisting the City with categorizing and
prioritizing FSEs. In addition to program development, EEC training the City inspectors on conducting
proper FOG inspections and the different types of grease interceptors the City inspectors may encounter.
The manage the FOG data, the City elected to implement SwiftComply software. EEC worked closely with
SwiftComply to customize inspection forms, develop workflows, evaluate existing FOG data, and to train
the City staff on the use of the SwiftComply software.
Inspector Using Mobile
Device to Gather FSE Data
East Valley Water District FOG Inspection Services 6 November 9, 2023
2.3 City of El Segundo: Industrial Pretreatment Program Development and
Implementation
EEC was contracted by the City to run its Industrial Pretreatment Program in 2015 after they were audited
by the EPA (PG Environmental). EEC essentially had to re‐build the City’s Industrial Pretreatment Program
from scratch as existing documents were inadequate. EEC created new permit templates for the various
types of permits, conducted an Industrial Waste Survey (IWS), permitted required industries, and updated
internal documents such as SOPs and the Enforcement Response Plan. EEC currently conducts the IWS,
manages the permits, performs inspections, reviews SMRs, assists in the submission of the Annual Report,
and updates program documents as needed. As part of the interjurisdictional agreement with the City of
L.A., EEC attends the Contract Cities Meetings with the City of L.A., and represents the City of El Segundo
for EPA Pretreatment Compliance Inspections and Pretreatment Compliance Audits as needed.
2.4 Costa Mesa Sanitary District: FOG Program Management and Inspection Services
EEC currently provides many of the same services the City is requesting—FOG program management and
inspections, plan review, interagency support, and education development—to the Costa Mesa Sanitary
District (CMSD). Some project specifics are as follows:
FOG program creation and management
Permitting inspections
BMP inspections
GRD inspections
Compliance inspections
CCTV source inspections
Enforcement project development and
management
FSE NPDES inspections and management
GIS creation and management
FSE database creation and management
Hotspot analysis
2.5 Irvine Ranch Water District: FOG Program Management and Inspection
Services
EEC conducted a FOG characterization study that included more than 800 FSE inspections within the Irvine
Ranch Water District’s (IRWD’s) service area and continues to support ongoing FOG program support,
including FSE inspection services. Where identified, GRDs are inspected to evaluate their size, operational
status, and structural condition. FOG program information and education is also provided to each FSE in
the IRWD’s service area. To enhance analysis of the data collected, EEC developed a GIS database. FSE
inspection data, including GRD data, was further analyzed to relate FSE data to SSOs and sewer hotspots.
GRD data was instrumental in developing IRWD’s FOG control program; analysis of the data provided a
basis for prioritizing FSE permitting and inspections as well as optimizing IRWD resources for the FOG
program. The project scope included the following elements:
Program creation and management
Permitting inspections
BMP inspections
GRD inspections
Compliance inspections
Non‐routine customer support
FSE plan submittal program development
and management
East Valley Water District FOG Inspection Services 7 November 9, 2023
Section 3.0 – Scope of Work and Approach
Task 1 Kick‐off Meeting
EEC will attend a kick‐off meeting to discuss the overall scope of the project with District Staff. The kick‐
off meeting will include the prioritization of FSE inspections. EEC will prepare a meeting agenda for the
District’s review and comment at least 5 days prior to the kick‐off meeting.
EEC will also attend regular status meetings with the District. The status meeting will discuss program
progress, items in need of modification, active code compliance cases, active violations, resolved
violations, pending violations, and any other matters pertinent to the success of the program.
Task 2 Pretreatment/FOG Program Management
EEC Manages FOG programs for six California Agencies, with varying levels of data management demands.
EEC has demonstrated the flexibility to adapt to these demands and facilitate efficient inspection
programs.
Task 2.1 Facility Data Management
EEC has worked with SwiftComply for multiple sewer agencies. Recently, EEC assisted the City of Tulare
with converting their FSE data to the SwiftComply database, helped to customize inspection forms, and
assisted with ongoing inspection frequencies and compliance. EEC will work with the District to ensure
the implementation of the SwiftComply database is as smooth as possible. Any inspections that prove to
be non‐ compliant will be reported to the Water and Wastewater Compliance Supervisor within 48 hours
with a detailed report of the violation(s).
Task 3 Food Service Establishment FOG Inspections
Task 3 consists of two subtasks to address grease‐removal device
(GRD) inspections and kitchen best management practice
inspections. EEC will utilize the same inspections forms EEC has
developed for the previous FOG inspection projects. The
inspection forms will adequately evaluate the FSE’s compliance
with the rules and regulations of the FOG Control Program.
Task 3.1 Grease‐Removal Equipment Inspections
EEC will conduct in‐depth inspections of GRDs at FSEs. EEC
understands that there are approximately 110 FSEs that will
require an inspection annually.
To determine compliance with the established 25% rule, EEC will
use a Dip‐Stick Pro sample collection tube to measure the level
of FOG and solids in gravity grease interceptors. EEC has
developed inspection tools to accurately measure FOG and
solids in smaller hydromechanical grease interceptors (also known as grease traps) as well. During the
Dip Stick Pro Grease
Interceptor Core Sample
East Valley Water District FOG Inspection Services 8 November 9, 2023
inspections, the EEC inspector will also request pumping records and will check appropriate GRD
connections. As necessary, EEC will collect representative discharge samples during the inspections. It is
anticipated that sampling will only be conducted when additional enforcement information is needed.
For any FSE identified as being non‐compliant during an inspection, EEC will schedule and conduct follow‐
up inspections for the non‐compliance. EEC anticipates approximately 20 follow‐up inspections being
required.
Task 3.2 Best Management Practice Inspections
Having conducted over 20,000 kitchen best management practice (BMP) inspections, EEC understands
the importance of educating FSEs on proper BMPs. EEC will perform BMP inspections for each FSE at the
time of the GRD inspection, and will provide BMP only inspections for each FSE that does not have a GRD.
The inspections will include providing BMP materials and necessary education.
FOG program education is a core component of efforts to reduce SSOs and FOG impacts to the sewer
system. EEC uses each FOG inspection as an opportunity to educate FSE staff about the importance of
following kitchen BMPs and proper GRD maintenance. EEC has developed public outreach efforts for FOG
programs that have included such items as door hangers, pot scrapers, FAQ sheets, and postcard mailers.
EEC has also helped agencies develop websites that administer FOG program information for both FSEs
and the general public.
Task 4 Additional As‐Needed Services
Task 4.1 Staff Training
EEC previously developed and conducted California’s only Grease Interceptor Inspector Training
Workshop for the California Water Environment Association. To date, EEC has trained over 300 FOG
inspectors Statewide. EEC will conduct training for the District personnel. The training will include
classroom‐based training session, and as‐needed field training. The training will include the procedures
for identifying and inspecting multiple types of grease control devices including gravity grease interceptors
and automatic grease removal devices. The training will also teach inspectors how to prioritize the
inspections to be completed, identify non‐compliances, and implement the proper enforcement actions.
Finally, the training will cover the use of the SwiftComply database and data entry.
Task 4.2 Plan/Project Review
EEC has expertise working with all types of GREs and currently performs plan review activities for three
clients. EEC served on the review committee during the development of the new sizing criteria in the 2006
Uniform Plumbing Code and has conducted multiple studies on the effectiveness of GREs and Automatic
Removal Devices. EEC engineers also routinely design industrial pretreatment systems for our industrial
clients and EEC staff is very familiar with the technical review of specifications for pretreatment processes.
Task 4.3 Environmental Compliance Support
EEC closely monitors regulatory developments to identify new or changing regulations for FOG programs,
the WDR, and SSMP requirements. EEC assists clients to proactively maintain compliance with evolving
East Valley Water District FOG Inspection Services 9 November 9, 2023
regulations. EEC has assisted such agencies as the City of Anaheim, Costa Mesa Sanitary District, City of El
Segundo, City of Santa Ana, and City of Buena Park with their SSMP and internal audits.
EEC currently manages Hazardous Materials Business Plans (HMBPs), Industrial General Permit (IGP), and
CUPA related compliance for multiple industrials facilities across California. EEC routinely works with local
CUPAs to ensure HMBPs are kept up to date and submitted on‐time. Additionally, EEC currently has three
Qualified Industrial Stormwater Practitioners (QISPs) on staff who routinely develop and review
Stormwater Pollution Prevention Plans (SWPPP)s, and conduct Elevated Response Action (ERA) Level 1
and 2 Reports. EEC has the staff expertise and experience to assist the District with any of these tasks as‐
needed.
Project Schedule
Following is a general schedule of tasks and milestones based on the scope of work. During the project
kick‐off meeting, the schedule will be reviewed with the District’s staff and revised as necessary.
Additionally, the schedule will be routinely updated as needed as tasks are completed and milestones are
reached.
East Valley Water District FOG Inspection Services 10 November 9, 2023
Section 4.0 – Client References
Table 4‐1, Client References
Client/Project Contact Address
City of Santa Ana
FOG Program Support
Mr. Cesar Barrera
Principal Civil Engineer
cbarrera@santa‐ana.org
(714) 647‐3387
220 S. Daisy Avenue
Santa Ana, CA 92703
City of Anaheim
FOG Program Support
Jonathan Heffernan
Operations Supervisor
(714) 765‐6860
jheffernan@anaheim.net
200 S. Anaheim Boulevard
Suite 276
Anaheim, CA 92805
Costa Mesa Sanitary District
FOG Program Inspections
Scott Carroll
General Manager
(949) 645‐8400
scarroll@cmsdca.gov
290 Paularino Ave.
Costa Mesa, CA 92626
City of El Segundo
Pretreatment/FOG Program Inspections
Mr. Lifan Xu
Principal Civil Engineer
lxu@elsegundo.org
(310) 524‐2368
350 Main Street,
El Segundo, CA 90245
“EEC has played a significant role in helping our City protect the environment and our citizens.”
Jake Wager, City Manager (former)
City of Stanton
East Valley Water District FOG Inspection Services November 9, 2023
Appendix A
Project Team Resumes
Assessment/Remediation
Wastewater/Stormwater
Litigation Support
Regulatory Compliance
Technology/GIS
Corporate Office – Tel: (714) 667-2300 | Fax: (714) 667-2310 | One City Boulevard West | Suite 1800 | Orange, CA 92868
Mid-Atlantic Office – Tel: (410) 263-2234 | Fax: (410) 266-8660 | 200 Harry S Truman Parkway | Suite 330 | Annapolis, MD 21401
eecenvironmental.com
JOSEPH JENKINS, QISP
Project Regulatory Specialist
Joseph has performed more than 4,000 inspections of food service establishments (FSEs)
for compliance with fats, oils, and grease (FOG) control programs, including those of the
Costa Mesa Sanitary District, City of Santa Ana, City of La Habra, City of Anaheim, and
Irvine Ranch Water District. Joseph has also conducted thousands of industrial
pretreatment and stormwater inspections of industrial and commercial facilities. Joseph
manages and schedules EEC’s FSE inspection programs and provides training and quality
control / quality assurance of EEC’s FOG inspectors.
Joseph is also EEC’s lead auditor for sewer system management plan (SSMP) audits. To date, Joseph has conducted
internal SSMP audits for the Costa Mesa Sanitary District, City of La Habra, City of Buena Park, City of Santa Ana,
and City of Anaheim. Joseph has assisted in the development of multiple stormwater programs for both industrial
and municipal clients.
As a QISP (Qualified Industrial Stormwater Practitioner), Joseph has conducted multiple ERA evaluations under
California’s Stormwater Industrial General Permit. Joseph assists industrial clients daily with developing their
stormwater monitoring programs, including sample location and parameter identification, training staff on
sampling techniques, and managing data on the Water Board’s SMARTS database. He has also conducted
thousands of stormwater inspections of industrial and commercial facilities for compliance with NPDES stormwater
discharge requirements. Joseph manages and schedules EEC’s inspection programs and provides training and
quality control/quality assurance of EEC’s inspectors.
Joseph holds a Bachelor of Science in Business Administration from York College in Nebraska; a certificate in
Environmental Management from the University of California, Irvine, Extension; a certificate as a Grade I
Environmental Compliance Inspector through the California Water Environment Association; and a certificate as a
QISP. Joseph also maintains certification in OSHA 40-hour HAZWOPER training and in the Pipeline Assessment and
Certification Program.
EXPERIENCE
FOG Inspector, FOG Inspection Programs for Multiple Cities and Sewer Agencies | Statewide, CA
• Serves as the lead FOG inspector in support of multiple cities and sewer districts including IRWD.
• Completed thousands of FSE inspections in support of agencies’ FOG control programs and has achieved a high rate of
compliance for those FSEs.
Senior Staff, FOG Control Consulting for Various Municipalities | Nationwide
• Assists EEC’s project managers to provide support for FOG control consulting services ranging from ordinance and permit
development, grease interceptor sizing and installation requirements, sewer line characterization, inspection and
enforcement procedures, sanitary sewer overflow response procedures, and database and GIS management.
Senior Staff, FOG Control Program Manual Development, Baltimore County | Baltimore, MD
• Developed the FOG Control Program Manual for the Baltimore County FOG Control Program.
• Manual included procedures for inspecting FSEs, requirements for installation of grease control devices, and FSE
educational materials that were created by EEC, including best management practices.
JOSEPH JENKINS, QISP
2
E N V I R O N M E N T A L
ASSESSMENT/REMEDIATION | WASTEWATER/STORMWATER | LITIGATION SUPPORT
REGULATORY COMPLIANCE | TECHNOLOGY/GIS
EXPERIENCE (CON.)
Lead Trainer, SSO Prevention and Response Program, City of San Gabriel | San Gabriel, CA
• Trained City of San Gabriel staff on prevention of and response to SSO.
• Training consisted of a classroom instruction session that reviewed State and City monitoring and reporting requirements,
proper response procedures, and proper volume calculation methods. Training also entailed field training sessions during
which varying volumes of water were spilled and trainees practices containing the spills, estimating the volume of spilled
water, and completing reporting forms.
Compliance Inspector, NPDES Inspections and Program Management, Cities of Santa Ana and Anaheim | Orange
County, CA
• Performed hundreds of NPDES inspections for the City of Anaheim and the City of Santa Ana.
• Currently manages the monthly NPDES inspection program and trains inspectors on the proper inspection procedures.
Compliance Inspector, NPDES Inspections and MS4 Program Management, Various California Cities, Southern
California
• Performed hundreds of NPDES inspections for the City of Anaheim, City of Santa Ana, City of El Segundo, and City of
Huntington Beach.
• Currently manages the monthly NPDES inspection program and trains inspectors on the proper inspection procedures.
Lead Auditor, SSMP Internal Audits for Various Municipalities | Nationwide
• Assists EEC’s project managers to provide support for conducting internal audits of SSMPs.
• Reviews SSMP-related documentation and conducts interviews of municipality staff members.
• Completes technical report documents specifying important findings and recommendations.
Stormwater Program Development, SWPPP Updates and Monitoring Plan Implementation, Hehr International | Los
Angeles, CA.
• Performed updates for the facility’s SWPPP
• Developed Stormwater Monitoring Plan
• Conducted training for stormwater sampling and BMP implementation
Hehr International, SWPPP and Site Map Revisions | Los Angeles, CA.
• Conducted a comprehensive review and update of the SWPPP to comply with the requirements of the 2015 Industrial
General Permit.
• Ensured that the monitoring and reporting requirements met the 2015 IGP, accurate storage of materials and
implemented BMPs were reflected, and that spill response and maintenance activities were documented.
• Revised the facility site map accurately to reflect storage of materials, sampling locations, flow directions, and
implemented structural BMPs.
• Assisted with uploading the SWPPP to the State’s SMARTS database. Conducted training for the employees on the SWPPP
elements and IGP requirements.
Elevated Response Actions (ERAs), Multiple Industrial Clients, Southern California
• Performed ERA Evaluations identifying NAL exceedances and sources.
• BMP implementation.
• SWPPP updates.
• SMARTS data management.
• Employee sample procedure training.
Small MS4 Permit Program Management, SWPPP Updates and Monitoring Plan Implementation, March Air Reserves
Base | Moreno Valley, CA.
• Conducted Storm Event Sampling
• Developed Stormwater Monitoring Plan
• Completed Required Reports per Permit Requirements
JOSEPH JENKINS, QISP
3
E N V I R O N M E N T A L
ASSESSMENT/REMEDIATION | WASTEWATER/STORMWATER | LITIGATION SUPPORT
REGULATORY COMPLIANCE | TECHNOLOGY/GIS
EXPERIENCE (CON.)
Project Manager/Lead Inspector, Industrial Pretreatment Program, City of El Segundo | El Segundo, CA
• Developed and implemented industrial pretreatment program for the City
• Permitted categorical industrial users
• Performed Industrial Waste Surveys
• Conducted inspections for industrial users
• Conducted and managed enforcement actions
• Completed Annual Pretreatment Program Reports for submittal to local Regional Water Quality Control Board
Wastewater/Stormwater
Litigation Support
Regulatory Compliance
Assessment/Remediation
Technology/GISENVIRONMENTAL
Corporate Office — Tel: (714) 667-2300 | Fax: (714) 667-2310 | One City Boulevard West | Suite 1800 | Orange, CA 92868
Mid-Atlantic Office — Tel: (410) 263-2234 | Fax: (410) 266-8660 | 200 Harry S. Truman Parkway, Suite 330 | Annapolis, MD 21401
eecenvironmental.com
JOHN SHAFFER CEO/Principal
John is the founder and president of EEC. John has more than 25 years’ experience managing
water resource projects and helping clients achieve compliance with their NPDES and other
wastewater and storm water discharge permits. He leads the EEC FOG team that is national-
ly recognized as a FOG control expert and has developed, implemented, and assessed more
than 14 FOG control programs. Under John’s direction, the EEC FOG team has conducted
FOG characterization studies for 15 cities and wastewater districts. When FOG was identi-
fied as a leading cause of sanitary sewer overflows (SSOs) and beach closures in California,
John was at the forefront of efforts to curb FOG discharges to the sewer system, serving as
the program manager in the largest FOG control study in the country conducted on behalf of
Orange County Sanitation District and its 26 member agencies. John holds a General Engineering Contractors License and
is a member of the Water Environment Federation, California Water Environment Association, and California Association of
Sewer Agencies.
EXPERIENCE
Program Manager, Sanitary Sewer Overflow Study | National
•Oversaw a $250,000 national research study for Orange County Sanitation District and County of Orange on the caus-
es of and solutions to SSOs. The study was conducted in response to the growing problem of beach closures in Orange
County, California.
•Evaluated the causes of grease blockages linked to wastewater discharge from restaurants and residences; grease
buildup creates sewer line blockages that result in SSOs and sewage flow to storm drains, creeks, and eventually
beaches.
Project Manager, 30 Industrial Stormwater Compliance Programs | Statewide
•Managed 30 separate industrial stormwater compliance programs throughout California and oversaw the following:
stormwater sampling, containment system design and installation, stormwater pollution prevention plans, stormwater
monitoring and reporting program preparation, and permitting with the California Regional Water Quality Control Board.
Project Manager, Sewer System Characterization | Orange County, CA
•Managed $1 million+ in sewer system characterization projects for cities and wastewater agencies in Orange County
and oversaw CCTV inspections, sewer mapping using GIS, and structural and sewer blockage source identification.
Project Manager, California Fats, Oils and Grease (CalFOG) Workgroup | CA
•Represented CalFOG in negotiations with the International Association of Plumbing and Mechanical Officials concern-
ing critical revisions to the Uniform Plumbing Code that would affect every sewering agency in California.
•CalFOG is a special workgroup within the Tri-TAC that focuses on the development of FOG control tools that may be
used throughout the State; Tri-TAC, which is jointly sponsored by the California Association of Sanitation Agencies,
California Water Environment Association, and League of California Cities, is a statewide technical advisory committee
comprising members from public agencies and other professionals responsible for wastewater treatment.
•The constituency base for Tri-TAC collects, treats, and reclaims 2 billion+ gallons for wastewater each day and serves
most of the sewered population in California.
ENVIRONMENTAL
Corporate Office — Tel: (714) 667-2300 | Fax: (714) 667-2310 | One City Boulevard West | Suite 1800 | Orange, CA 92868
Regional Offices: Oakland, CA | Annapolis, MD | Tampa, FL
eecenvironmental.com
Assessment/Remediation
Wastewater/Stormwater
Litigation Support
Regulatory Compliance
Technology/GIS
JIM KOLK
Senior Project Engineer
Jim is an industrial engineer with more than 20 years of project management experience.
He has extensive expertise in wastewater/sewer system program support, including fats,
oils, and grease (FOG) program development, industrial wastewater pretreatment program
development, sanitary sewer overflow (SSO) response and data management, stormwater
compliance, collection system characterization, and geographic information system (GIS) /
database integration. Jim routinely manages projects with complex regulatory compliance is-
sues related to state enforcement, consent decrees, and compliance audits. He has managed
multiple projects involving development and management of hundreds of permits, including
thousands of facility inspections and enforcement actions.
Jim holds a Bachelor of Science in Industrial Engineering from San Jose State University. He maintains professional certifi-
cation in Sanitary Sewer Overflow Reporting from the California Water Environment Association and in Pipeline Assessment
and Certification from the National Association of Sewer Service Companies.
EXPERIENCE
Project Manager / Technical Lead, FOG Control Consulting, Various Municipalities | Nationwide
• Provide expert FOG control consulting services, including ordinance and permit development, grease interceptor sizing
and installation, sewer line characterization, inspection and enforcement procedures, and database and GIS manage-
ment.
• Clients include Boston Water and Sewer, Seattle Public Utilities Commission, Orange County Sanitation District, Irvine
Ranch Water District, and City of Santa Ana.
Project Manager, Food Service Establishment Inspection Management Services, Various Municipalities | South-
ern CA
• Manages food service establishment inspection programs for five cities and sewer districts in support of FOG-control
programs.
• Has overseen 20,000+ inspections to date and issuance of 7,500+ notices of noncompliance or violation.
• Manages issuance of compliance enforcement measures and tracking of corrective actions.
Project Manager, Stormwater Management Services, Airgas Products | El Segundo, CA
• Managed the development and implementation of a stormwater pollution prevention plan and monitoring and reporting
program for the Airgas facility in Torrance, California.
• Managed the National Pollutant Discharge Elimination System compliance and training services provided by EEC.
Project Manager, Various Commercial and Industrial Wastewater Treatment/Stormwater Projects | CA
• Routinely hired by commercial and industrial clients to assess, design, and develop effective, economical solutions for
wastewater treatment systems.
• Projects include enhancements to aeration system to increase efficiency, digester systems to reduce sludge disposal
costs, and lift stations and interceptors to address odors.
ENVIRONMENTAL
ASSESSMENT/REMEDIATION | WASTEWATER/STORMWATER | LITIGATION SUPPORT
REGULATORY COMPLIANCE | TECHNOLOGY/GIS
EXPERIENCE (CON.)
Project Manager, Pretreatment Program Development and Implementation, Various Municipalities | Nationwide
• Pretreatment program assessment, development, and implementation of key program elements, including legal authority
review/development, industrial waste survey screening, and local limits development/implementation.
• Managed the preparation of program manuals and procedures/guidelines for industrial user inspection, sampling, and
enforcement activities.
Project Manager / Subject Matter Expert, SSO Consent Decree Support, Confidential Client | CA
• Managed all technical support activities related to an SSO consent decree response for a California sewer agency.
• Work involved detailed assessment of SSO-related programs, recommendation of program enhancements, development
and negotiation with the environmentalist group on behalf of the client for reasonable performance measures, and devel-
opment and implementation of critical program upgrades.
Technical Lead, Industrial Wastewater Pretreatment Audits, Multiple Clients | Nationwide
• Audited multiple industrial wastewater pretreatment programs involving categorical industrial user permit compliance,
slug discharge control plans, discharge monitoring, enforcement response, and program reporting.
JIM KOLK
2
Assessment/Remediation
Wastewater/Stormwater
Litigation Support
Regulatory Compliance
Technology/GIS
Corporate Office – Tel: (714) 667-2300 | Fax: (714) 667-2310 | One City Boulevard West | Suite 1800 | Orange, CA 92868
Mid-Atlantic Office – Tel: (410) 263-2234 | Fax: (410) 266-8660 | 200 Harry S Truman Parkway | Suite 330 | Annapolis, MD 21401
eecenvironmental.com
BALTAZAR MALDONADO
Compliance Inspector
Baltazar Maldonado, a graduate from California State University Long Beach, has
conducted thousands of FOG inspections at food service facilities, industrial pretreatment
inspections, NPDES stormwater inspections at industrial and commercial facilities, and SSO
emergency response and elevated enforcement actions. Baltazar has also worked with
industrial and commercial facilities on stormwater and FOG related BMP evaluations to
determine the proper BMPs that should be implemented and to resolve consistent
compliance issues. Baltazar is EEC lead responder for SSO occurrences. During these
events, Baltazar helps to determine the cause of the SSO and the necessary actions to
resolve the SSO cause. Following the SSO event, Baltazar determines the necessary
corrective actions to be conducted, and works with the facilities to ensure these actions
are followed to prevent future SSO occurrences.
Baltazar holds a Bachelor of Science from California State University Long Beach; he maintains a certification in OSHA
40-hour HAZWOPER training and is a bilingual English and Spanish speaker.
EXPERIENCE
Compliance Inspector, Industrial Pretreatment Program| El Segundo, CA
• Permitted industrial users
• Performed Industrial Waste Surveys
• Conducted inspections for industrial users
• Conducted and managed enforcement actions
FOG Inspector, FOG Inspection Programs for Multiple Cities and Sewer Agencies | Statewide, CA
• Serves as the lead FOG inspector in support of multiple cities and sewer districts including CMSD and IRWD.
• Completed thousands of FSE inspections in support of agencies’ FOG control programs and has achieved a high
rate of compliance for those FSEs.
Compliance Inspector, NPDES Inspections and MS4 Program Management, City of El Segundo | Las Angeles
County, CA
• Performed hundreds of NPDES inspections for the City of El Segundo
• Currently manages the monthly NPDES inspection program and trains inspectors on the proper inspection
procedures.
SSO Response for Various Municipalities | Nationwide
• Assists in the response and follow-up activities related to SSO events on behalf of agencies. During the SSO
response, the responsible party, cause of the SSO, and follow-up actions are identified. Baltazar then develops
enforcement letters and works with the responsible party to ensure future SSOs do not occur.
Assessment/Remediation
Wastewater/Stormwater
Litigation Support
Regulatory Compliance
Technology/GIS
Corporate Office – Tel: (714) 667-2300 | Fax: (714) 667-2310 | One City Boulevard West | Suite 1800 | Orange, CA 92868
Mid-Atlantic Office – Tel: (410) 263-2234 | Fax: (410) 266-8660 | 200 Harry S Truman Parkway | Suite 330 | Annapolis, MD 21401
eecenvironmental.com
JORDAN WASHBURN
Compliance Inspector
Jordan Washburn has conducted thousands of FOG inspections at food service facilities,
NPDES stormwater inspections at industrial and commercial facilities, and SSO
emergency response and elevated enforcement actions. Jordan has also worked with
industrial and commercial facilities on stormwater and FOG related BMP evaluations to
determine the proper BMPs that should be implemented and to resolve consistent
compliance issues. Jordan is also EEC’s lead investigator for odor related complaints.
Jordan has investigated multiple shopping centers and FSEs to identify causes of odors
which are typically related to grease interceptors and their ventilation system.
Jordan studied Information Technology and Programming at North Central Michigan College. Jordan also maintains
a California Water Distribution Level 1 Certification and an OSHA 40-Hour HAZPWOPER Certification.
EXPERIENCE
FOG Inspector, FOG Inspection Programs for Multiple Cities and Sewer Agencies | Statewide, CA
• Serves as the lead FOG inspector in support of multiple cities and sewer districts including CMSD and IRWD.
• Completed thousands of FSE inspections in support of agencies’ FOG control programs and has achieved a high rate of
compliance for those FSEs.
SSO Response for Various Municipalities | Nationwide
• Assists in the response and follow-up activities related to SSO events on behalf of agencies. During the SSO response, the
responsible party, cause of the SSO, and follow-up actions are identified. Baltazar then develops enforcement letters and
works with the responsible party to ensure future SSOs do not occur.
Grease Interceptor Odor Investigations for Various Municipalities | Nationwide
• lead investigator for odor related complaints. Jordan has investigated multiple shopping centers and FSEs to identify causes
of odors which are typically related to grease interceptors and their ventilation system.
• Conduct dye testing of sewer systems
• Hydrogen Sulfide monitoring and response
21
ATTACHMENT B – Proposal Forms
• Consultant Identification Form
• List of Subconsultants and References Form
• Exception Form(s)
• Waiver/Release of Liability Form
• Certificate(s) of Insurance or Letter of Compliance
• DIR Certification
• Proposal Fee Schedule
• Opinion of Probable Costs
22
CONSULTANT IDENTIFICATION FORM
1.Legal name of Consultant: _______________________________________________________
___________________________________________________________________________
2.Consultant's Street Address: _____________________________________________________
___________________________________________________________________________
3.Consultant’s Mailing Address:______________________________________________________
______________________________________________________________________________
4.Consultant’s Business Telephone:___________________________________________________
5.Consultant's Fax Number: ___________________________________________________________
6.Consultant’s E-mail Address [All requests will be sent to this location]:_______________________
7.Type of Organization:
Sole Proprietor Partnership Corporation Other
If corporation, indicate State where incorporated:
8.Consultant’s Federal Tax Identification Number: ______________________________________
9.Consultant’s Project Manager:_____________________________________________________
EEC Environmental
1 City Blvd. W. STE 1800
1 City Blvd. W. STE 1800, Orange, CA. 92868
(714) 667-2300
(714) 667-2310
jjenkins@eecenvironmental.com
X
33-0665828
Joseph Jenkins
23
SUBCONTRACTORS/SUBCONSULTANTS
List any subcontractors/subconsultants who may perform any services on this project.
(Use additional sheets if necessary)
FEDERAL TAX AREA OF
COMPANY ADDRESS ID NO. EXPERTISE
CONSULTANT REFERENCES
Information to whom relevant services have been provided in the past three (3) years by
the consultant. Reference at least three public agencies in the past three years where
these similar services have been provided for the selected project areas.
ORGANIZATION ADDRESS TELEPHONE NO. CONTACT TYPE OF WORK
No Subcontractors
City of Santa Ana 220 S Daisy Ave. Santa Ana, CA. (714) 647-3387 Cesar Barrera FOG Inspection Services
Costa Mesa Sanitary District 290 Paularino Ave. Costa Mesa, CA. (949) 645-8400 Scott Carroll FOG Inspection Services
City of El Segundo 350 Main St. El Segundo, CA. (310) 524-2368 Lifan Xu FOG Inspection Services
24
EXCEPTION FORM
Should your firm take exception to ANY of the terms and conditions or other contents provided in this
Request for Proposal, list the exceptions below. THIS COMPLETED FORM MUST BE SUBMITTED
WITH YOUR PROPOSAL. If no exception(s) are taken, enter "None" after item number one. (Make
additional copies of this form as necessary)
1.Page Number:Section Title: ____Paragraph Number: Exception Taken:
______
2.Page Number:Section Title: ______ Paragraph Number: Exception
Taken: ___
3.Page Number:Section Title: ____ Paragraph Number: Exception
Taken:__
4.Page Number:Section Title: ____ Paragraph Number: Exception
Taken
5.Page Number:Section Title: ____ Paragraph Number: Exception
Taken:__
None
27
PROPOSAL FEE SCHEDULE
Consultant shall complete this Proposal Price Schedule for positions required to complete work items
described in the proposal and return it with their proposal. All proposed prices and fees may be adjusted
annually, based on the CPI, the base pricing shall be held through the contract performance period and
shall include costs associated with all, equipment, materials, transportation, overhead, travel, profit,
insurance, sales and other taxes, licenses, incidentals, and all other related costs necessary to provide
the related services.
DESCRIPTION PROPOSED UNIT RATE (per hour)
1.Project/Program Manager $______
2.Inspector $_________
3.Other (Specify)_______________________________$___________
4.Other (Specify)_______________________________$___________
5.Other (Specify)_______________________________$___________
6.Other (Specify)_______________________________$___________
7.Subconsultant (Specify)_______________________________$___________
8.Subconsultant (Specify)_______________________________$___________
9.Subconsultant (Specify)_______________________________$___________
10.Subconsultant (Specify)_______________________________$___________
Please note any other fees which may be applicable to the services being provided
$210
$150
Principal $290
Project Assistant $125
28
OPINION OF PROBABLY COSTS (NOT BINDING)
Inspection Services
Provide the Opinion of Probable costs for routine inspection services which should include all
costs for planning, scheduling, executing and reporting inspections of the included dischargers.
The Proposal Price shall include all related activities necessary to complete the routine
inspection services. This information may be used for reference and comparison for the
Contract Amount during negotiations as well as budgeting purposes for the District. Assume that
all inspections are satisfactory, and no follow up inspections are required. If follow up
inspections are required, they will be performed on a Time and Materials basis, with the rates
from the Proposal Fee Schedule.
SUMMARY OF OPINION OF PROBABLY INSPECTION COSTS
(Annual)
COSTS
Inspection of all identified dischargers $
Sampling and Delivery to Local Laboratories $
Planning Coordination with District Staff (assume one 1-hour meeting
per month) $
Reporting and post inspection documentation $
Preparation of annual report $
Contract administration tasks (invoicing, etc.) $
Other (Specify) : _________________________________________ $
Other (Specify) : _________________________________________ $
Other (Specify) : _________________________________________ $
Other (Specify) : _________________________________________ $
$
ANNUAL TOTAL OPINION OF PROBALBE COSTS $
25,200
6,000
2,520
3,060
2,860
1,500
Staff Training 3,460
Plan and Pretreatment Process Review 1,420
Environmental Compliance Support 2,570
47,890
Agenda Item
#5f
December 13, 20231
Meeting Date: December 13, 2023
Agenda Item #5f
Discussion Item
9
3
8
Regular Board Meeting
TO: Governing Board Members
FROM: General Manager/CEO
SUBJECT: Consider Approval of Board Reorganization, appointment of Executive
Management Team and set the time, day and place for holding meetings
RECOMMENDATION
That the Board of Directors: A) Elect official officers for the positions of Board President
and Vice President, beginning January 1, 2024 B) Appointment of General
Manager/Chief Executive Officer, Board Secretary and Chief Financial Officer C) Set the
time, day and place for holding meetings.
BACKGROUND / ANALYSIS
The Board of Directors conducts their reorganization process at the first regular meeting
in December pursuant to California Water Code Section 30520, and shall take effect
January 1, 2024.
The Board reorganization ensures the efficient management of the District and reflects
a dedication to the highest standards of integrity and accountability so as to continue to
earn the trust and confidence of the public served by the District.
Staff is recommending that the District continue to hold regularly scheduled Board
meetings at 31111 Greenspot Road, Highland, CA, on the 2nd and 4th Wednesday of
each month at 5:30 p.m.
AGENCY GOALS AND OBJECTIVES
II - Maintain a Commitment To Sustainability, Transparency, and Accountability
A. Practice Transparent and Accountable Fiscal Management
REVIEW BY OTHERS
This agenda item has been reviewed by Administration and Legal Counsel.
FISCAL IMPACT
There is no fiscal impact associated with this agenda item.
Agenda Item
#5f
December 13, 20232
Meeting Date: December 13, 2023
Agenda Item #5f
Discussion Item
9
3
8
Recommended by:
________________
Michael Moore
General Manager/CEO
ATTACHMENTS
No attachments
Water Supply Update
Northern California 8 Station
1.7 inches Updated 11/14/2023
Big Bear
0.01 inches Updated 11/14/23
Annual Average: 16.8''
WATER YEAR
Highland October 1- September 30
0.94 inches Updated 11/14/23
ACRONYMS
CFS = cubic feet per second mAF = million Acre-Feet
100%
Annual Average: 11.9''
35% of Capacity
STATE WATER PROJECT
ALLOCATION
WATER SHORTAGE STAGE
STATE WATER PROJECT
Lake Mead & Powell Updated
11/13/23
DISTRICT WATER SUPPLIES
Annual Average: 53.2''
GROUNDWATER SURFACE
COLORADO RIVER STORAGE
OTHER INDICATORS
RAINFALL
Current Available CapacityAvailable Capacity Current
4.9 mAF
82% of Capacity
Bunker Hill Basin
2.37 mAF
67% of Capacity
Lake Oroville Updated 11/13/23
126.1
107.4
247.1
217.1
256.2
154.1
92.1
181.3 164.1
67.5
67.2
Santa Ana River (CFS) Total SAR Inflow
Updated 11/9/23
Last YearLast Year
17.5 mAF
Historic Avg
2010-2022 Monthly
Average
2023-Monthly Flow Average