HomeMy WebLinkAboutAgenda Packet - EVWD Board of Directors - 06/26/2013Proposed
Fiscal Year 2013/14 Budget
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
SECTION PAGE
TransmiƩal LeƩer 1
District Profile 3
District Officials 6
OrganizaƟonal Structure 8
Mission Statement 9
Strategic Plan 10
Financial Management 11
Budget Guide 15
Budget Overview 19
Authorized and Funded PosiƟons 21
Financial Summary 25
Water Fund 33
Wastewater Fund 41
Program Summaries
Board of Directors 49
General AdministraƟon 51
Human Resources 55
Public Affairs/ConservaƟon 59
Finance 63
InformaƟon Technology 67
Customer Service 71
Meter Service 75
Engineering 79
Water ProducƟon 83
Water Treatment 89
Water Quality 93
Water Maintenance 97
Wastewater Maintenance 101
FaciliƟes Maintenance 105
Fleet Maintenance 107
Capital Outlay 111
Capital Improvement Program 113
Glossary 157
TABLE OF CONTENTS
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
Honorable Board of Directors,
The Fiscal Year 2013‐14 Budget supports East Valley Water District’s (EVWD) commitment to
being stewards of rate payers dollars and conƟnued efforts to elevate the level of service we
provide to our customers. EVWD conƟnues to implement innovaƟve strategies and iniƟaƟves
for organizaƟonal opƟmizaƟon, while providing reliable, quality water and enhanced customer
service.
As a direct result of the leadership and vision of the Board of Directors, EVWD will begin the
year with a balanced budget while maintaining strong raƟngs in the bond and investment
markets. We approached the current budget process with a focus on maintaining core
services that are most criƟcal to customers, aligning resources with specific prioriƟes, and
idenƟfying sustainable savings that strengthen the District’s long‐term ability to effecƟvely
deliver services.
Using the Strategic Plan as a guiding principle, the District conƟnues to assess programs and
processes based on a value‐added method, with the end goal of achieving maximum efficiency
and producƟvity. By establishing concise goals with measurable results, EVWD operates as a
results‐oriented organizaƟon and has implemented a program‐based budget that allows for
unit cost breakdowns and accounts for spending through a transparent program budgeƟng
strategy. These enhancements will increase the value of each dollar received, improve
customer service, and focus on delivering sustainable outcomes for our customers.
EVWD has made great strides in its investment in technology to maximize exisƟng resources.
New soŌware and programs are assisƟng staff in balancing the need to maintain affordable
rates with the importance of sustaining infrastructure investments and a strong financial
posiƟon. With a focus on internal efficiency through the use of informaƟon technology best
pracƟces, we are capitalizing on the recent advancements and uƟlizing those to improve
efficiency and producƟvity.
In closing, I am pleased to submit the FY 2013‐14 Budget proposal for consideraƟon by the
TRANSMITTAL LETTER
1
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
Board of Directors, District employees, and the customers of East Valley Water District. EVWD
will conƟnue to enhance programs and explore opportuniƟes to deliver beƩer, faster, and
enhanced customer service by evaluaƟng and re‐evaluaƟng all aspects of District operaƟons.
The Budget will serve as a guide as we work to set new standards for public agency efficiency
and to deliver the highest quality service and value as affordably as possible to our customers.
Respecƞully SubmiƩed,
John J. Mura
General Manager/CEO
2
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
East Valley Water District (EVWD) is a California Special District that provides water and
wastewater service to residents within its 27.7 square mile service area and is governed by a
five member Board of Directors elected at‐large to four year terms by EVWD consƟtuents.
East Valley Water District is a 100% rate‐based organizaƟon that receives no tax‐related
revenue and operates in accordance with Division 12 of the California Water Code. The District
was formed on January 18, 1954, through an elecƟon of local residents, mostly citrus grove
operators, to have water service provided by a public water agency.
The District is located in the foothills of the San Bernardino Mountains, approximately 65 miles
east of Los Angeles in the County of San Bernardino. With a service area encompassing 27.7
square miles, the District provides water and service to approximately 93,500 residents within
the City of Highland, eastern porƟons of the City of San Bernardino, the San Manuel Band of
Mission Indians, and porƟons of unincorporated County of San Bernardino.
DISTRICT PROFILE
East Valley Water District Service Area
3
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
WATER SOURCES
EVWD uƟlizes a mix of groundwater from the Bunker Hill Groundwater Basin, surface water
from the Santa Ana River, and State Water Project. The District is heavily reliant on
groundwater which supplies approximately 87% of customer demand. Surface water is
treated and distributed from the Philip A. Disch Surface Water Treatment Plant (Plant 134). In
2013, the District completed an upgrade and expansion of Plant 134 to allow the treatment
and distribuƟon of up to 8 million gallons per day of water into the system using an ultra‐
filtraƟon membrane system, resulƟng in addiƟonal system capacity and supply reliability.
WASTEWATER COLLECTION & TREATMENT
The District is responsible for the collecƟon and conveyance of wastewater within the service
area. All wastewater is sent to the City of San Bernardino Municipal Water Department where
it is treated in accordance with a Joint Powers Agreement.
CUSTOMERS
The District serves a wide range of residenƟal and commercial customers in the area, in
addiƟon to the San Manuel Band of Mission Indians, San Manuel Indian Casino and Bingo, and
PaƩon State Hospital. A majority of customers are residenƟal (91%), with less than 2% of
customers classified as agricultural users.
WEATHER
The weather in Highland/San Bernardino varies throughout the year. During the summer
temperatures can reach over 115° F and as low as 40° F during the winter. This area typically
averages 18 inches of precipitaƟon annually, mostly during the months of January through
March.
The weather paƩern helps the District forecast water usage during the year. This informaƟon
is used to determine the best strategy to pump and distribute water to customers. Cost,
supply, and system constraints are also considered when determining the water supply mix.
ACTIVE SERVICES BY TYPE
CUSTOMER TYPE NUMBER OF CONNECTIONS
ResidenƟal 18,584
MulƟ‐Family 497
Commercial 1,268
IrrigaƟon 313
Fire Services 1,321
Total ConnecƟons 21,983
4
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
GOVERNMENT
The District is organized in a way that provides responsive and effecƟve service to the rate
payers. EVWD is governed by a five member Board of Directors elected by voters at‐large to
four year terms. The Board represents the public’s interest as policy makers with regard to
rates for service, assessments, policies, ordinances, and other overall maƩers related to the
management and operaƟon of the District. Appointed by the Board of Directors, the General
Manager/CEO is responsible for overseeing daily operaƟons and managing staff resources.
EDUCATION
Residents within East Valley Water District’s service area have access to award winning K‐12
schools through the Redlands and San Bernardino School Districts. Local colleges and
universiƟes include nearby California State University, San Bernardino, the University of
California at Riverside, the University of Redlands, Loma Linda University, and junior colleges
such as Riverside Community College, CraŌon Hills College, and San Bernardino Valley
Community College.
HOSPITAL AND MEDICAL FACILITIES
Hospital or medical faciliƟes located in or near the East Valley Water District service area
include Arrowhead Regional Medical Center, Loma Linda University Hospital, Kaiser
Permanente Hospital, Redlands Community Hospital, San Bernardino Community Hospital,
Veteran’s AdministraƟon, and St. Bernadine Medical Center.
HIGHLAND SAN BERNARDINO STATE OF CALIFORNIA
Median Income $45,100 $40,161 $61,632
Unemployment 14.9% 15.8% 10.4%
Median Home Value $303,300 $202,400 $421,600
Persons Below Poverty 17.6% 28.6% 14.4%
College EducaƟon 19.7% 12.7% 30.2%
2011 COMMUNITY STATISTICS
5
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
DISTRICT OFFICIALS
MaƩ LeVesque
Chairman
James Morales, Jr.
Vice Chairman
Ben Coleman
Board Member
Kip Sturgeon
Board Member
George E. “Skip” Wilson
Board Member
GOVERNING BOARD
6
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
John Mura
General Manager/CEO
Mike Maestas
Assistant General Manager
Kerrie Bryan
Human Resources/Risk and Safety Manager
JusƟne Hendricksen
AdministraƟve Manager
Brian Tompkins
Chief Financial Officer
Nemesciano Ochoa
Engineering Manager
Kelly Malloy
Public Affairs/ConservaƟon Officer
7
DISTRICT MANAGEMENT
EXECUTIVE TEAM
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
ORGANIZATIONAL STRUCTURE
Rate Payers
Board of
Directors
General Manager/
CEO
Assistant General
Manager
Chief Financial
Officer
Engineering
Customer Service Finance
InformaƟon
Technology
General
AdministraƟon
OperaƟons
Human Resources
Public Affairs/
ConservaƟon
Maintenance
Legal Counsel
8
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
MISSION STATEMENT
Our Mission at East Valley Water District is to provide our
customers with a safe and reliable water supply that is
delivered at a fair and cost‐effecƟve price.
9
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
I. PROVIDE SAFE AND RELIABLE WATER SUPPLY
A. Meet all regulatory requirements
B. IdenƟfy unit cost for delivery sources
C. Address system flexibility constraints
D. Develop cost‐effecƟve water supply mix
E. Transparent and efficient financial management
STRATEGIC PLAN
II. CREATE AN ENVIRONMENT MORE CONDUCIVE TO EFFICIENT & EFFECTIVE PUBLIC SERVICE
A. Improve organizaƟonal culture
B. Elevate staff capabiliƟes and employee reinvestment
C. Establish “Board Norms” and conduct board educaƟon program
D. Perform headquarters needs assessment
E. Deliver property opƟons to board and commence construcƟon
III. DISTRICT RESOURCE ENHANCEMENT EFFORTS
A. AƩract and retain quality employees
B. Establish key performance indicators
C. IniƟate staff development program
D. Enhance system redundancy (Emergency Prep)
E. System maintenance and modernizaƟon
IV. DISTRICT BRAND DEVELOPMENT & COMMUNITY INVOLVEMENT
A. Enhance community outreach, brand idenƟty, and web presence
B. Develop conservaƟon program and customer service iniƟaƟves
C. Engage regional and naƟonal water partners
D. Emergency prep and mutual aid agreements
E. LegislaƟve plaƞorm and strategic grant pursuit
The District’s Strategic Plan is a powerful tool for creaƟng an atmosphere for efficient decision
‐making, teamwork and communicaƟon It provides a clear foundaƟon for operaƟng as a
value‐added organizaƟon. The comprehensive Strategic Plan, developed with stakeholder
input through acƟve parƟcipaƟon of management and employees, has established the
framework to execute plans and achieve goals.
10
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
FINANCIAL POLICIES
The East Valley Water District financial management policies provide a basic framework for
the overall fiscal management of the District. The policies represent a foundaƟon for
addressing changing circumstances and condiƟons, and to assist in the decision‐making
process. Financial policies represent guidelines for evaluaƟng both current acƟviƟes and
proposals for future programs. They also reflect long‐standing principles and pracƟces, which
have enabled the District to maintain its financial stability. Policies are reviewed annually to
ensure the guidelines represent a realisƟc, current framework for policy decisions.
Balanced Budget
East Valley Water District shall prepare an itemized budget for each fund and each program
within those funds. The budgets will be balanced, with current revenues equal to or greater
than current expenditures/expenses using the following strategies: improve producƟvity; raise
fees to offset costs of providing services; use reserves if available.
Investment Policy
The District’s Investment Policy applies to the investment of short‐term operaƟng funds of the
District in excess of those funds required to meet current District expenditures. District policy
requires adherence to California Government Code secƟons 5921 and 5360 regarding
allowable investments. The policy also includes guidelines on Pooling of Funds, Safety,
Liquidity, Yield, Prudence, Ethical Standards, Risk, DiversificaƟon, and ReporƟng.
Reserve Policy
The District recognizes that fiscal responsibility requires anƟcipaƟng, and preparing for,
unforeseen events, in addiƟon to ensuring sufficient funding is available for current operaƟng,
capital, and debt service needs. To that end, the District has adopted a Designated Funds
(Reserve) Policy as part of prudent financial planning, and to ensure sufficient funding for
current and future needs. The Designated Funds Policy has established the following reserves
and reserve target levels:
OperaƟng Reserves – maintain 90 days of District’s budgeted total operaƟng
expenses
Rate StabilizaƟon Reserves – maintain 45 days of District’s budgeted total operaƟng
expenses
Capital Replacement Reserves – minimum of 100% of depreciaƟon expense for the
preceding year
FINANCIAL MANAGEMENT
11
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
Emergency Reserves – 2% of the total value of Plant and Equipment
Debt Policy
The District has adopted a policy regarding the uƟlizaƟon of debt. Standards established in
this policy require:
1. an equitable allocaƟon of capital costs/charges between current and future system
users, and
2. minimum rate volaƟlity.
In addiƟon, the District confines long‐term borrowing to capital improvements for projects
that cannot be financed from current revenues. When the District finances capital projects by
issuing bonds, it will pay back the bonds within a period not to exceed the esƟmated useful life
of the project. The District maintains good communicaƟon with bond raƟng agencies
regarding financial condiƟon and will follow a policy of full disclosure on every financial report.
BASIS OF ACCOUNTING AND BUDGETING
The District’s financial records are kept in accordance with Generally Accepted AccounƟng
Principles (GAAP) for governmental enterprise funds. The District follows the GAAP
requirement that enterprise funds use the full accrual basis of accounƟng. However, there are
excepƟons where the accrual basis is not conducive to effecƟve presentaƟon of the District’s
budget, in which case, GAAP is not followed. Those excepƟons are as follows:
Compensated absence liabiliƟes that are expected to be liquidated with current
expendable financial resources are accrued as earned by employees (GAAP
standard) as opposed to being expended when paid (budget procedure).
Principal payments on Long Term Debt are applied to the outstanding liability on a
GAAP basis, as opposed to being expended on a Budget basis.
Capital Outlay are capitalized on a GAAP basis, however, on a Budget basis, they
are treated as expenditures.
DepreciaƟon expense is recorded on a GAAP basis but is not contemplated on the
Budget basis.
Interest expenditures are capitalized during construcƟon on a GAAP basis, but are
reported as an expense on a Budget basis.
The acƟviƟes of enterprise funds closely resemble those of ongoing businesses in which the
purpose is to conserve and add to resources while meeƟng operaƟng expenses from current
12
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
revenues. Enterprise funds account for operaƟons that provide services on a conƟnuous basis
and, in the case of East Valley Water District, are enƟrely financed by revenues derived from
user charges. The District maintains a self‐balancing set of accounts established to record the
financial posiƟon and operaƟng results that pertain to each acƟvity.
BUDGET DEVELOPMENT & PROCESS
The budget reflects direcƟon from the Board of Directors as established by the Strategic Plan
and communicated to the District’s staff through various meeƟngs and workshops. The
purpose of this budget document is to provide staff with a road map for prioriƟzing Capital
Improvement Projects and fulfilling the District’s mission statement. The Fiscal Year 2013‐14
Budget represents guidelines established to address the District’s short‐term and long‐term
goals and objecƟves. This document also demonstrates the District’s ability to use capital
resources for compleƟng criƟcal capital projects for current and future customers as well as
the District’s commitment to meet its financial obligaƟons. Staff is confident that the financial
framework outlined in the FY 2013‐14 Budget will allow the District to deliver reliable, high‐
quality water and wastewater services to its customers in a prudent and sustainable manner.
Each year programs establish goals and objecƟves in support of the District’s guiding principles
that provide clear direcƟon to staff regarding District‐wide prioriƟes. Program Managers
idenƟfy accompanying measures and targets to track progress toward achieving and
communicaƟng the intent of the objecƟve against expected performance levels. Progress is
measured throughout the fiscal year and reported to the Board of Directors on a quarterly
basis.
Moreover, in developing the budget, staff used the Strategic Plan as a guide to provide the
foundaƟon for prioriƟzing efforts, acƟviƟes, needs, human resources, and financial resources.
Budget Adjustments
In January of each year, District management meets to analyze revenues and spending to
determine, if any, where transfers between budget line items are necessary in order to ensure
that budget limitaƟons are not exceeded. Managers and supervisors will submit requests for
transfers prior to the Mid‐Year budget review and authorized staff will review the requests
and submit them to the Board for approval. When possible, transfers have no net effect on
the original budget balance. However, if revenue shorƞalls or unanƟcipated costs are realized,
and transfers between line items cannot meet the projected deficit, projects are evaluated
and a determinaƟon of either projects deferral or draws on reserves is made to meet the
shorƞall. All proposed changes are presented to the Board of Directors at a Mid‐Year budget
review.
13
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
Budget Calendar
DATE TASK
June 12, 2013 FY 2013‐14 Budget AdopƟon
November 13, 2013 First Quarter Budget Review
December 16, 2013 Budget meeƟng to distribute worksheets to management staff
January 22, 2014 Mid‐Year Budget Review
February 10, 2014 Capital Outlay and Capital Improvement Program Planning MeeƟng
March 10, 2014 New PosiƟon Requests due to Finance
March 24, 2014 Capital Improvement Project Requests due to Finance
March 31, 2014 Program Budget Requests due to Finance
April 23, 2014 Third Quarter Budget Review
April 28, 2014 District‐wide Budget Review with managers and General Manager
May 5, 2014 Capital Outlay and CIP Budget Review with program managers and Gen‐
eral Manager
May 19, 2014 Budget complete with all revisions
May 28, 2014 Budget Workshop with Board of Directors
June 11, 2014 FY 2014‐15 Budget AdopƟon
May 28, 2013 FY 2013‐14 Budget Workshop
14
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
The budget document is EVWD’s annual financial plan prepared by District Management and
approved by the Board of Directors. The financial plan serves as a policy document,
operaƟons guide for programs, and as a communicaƟon device. The intended audience of the
budget document is ciƟzens, local businesses, debt holders and debt raƟng agencies, other
governmental agencies, and EVWD’s independent auditor.
Budget Document SecƟons
The budget document consists of 23 secƟons including:
Budget Overview
The Budget Overview secƟon includes the General Manager’s budget transmiƩal leƩer,
District Profile, Directory of Officials, District OrganizaƟonal Chart, Strategic Plan, Mission
Statement, and Financial Policies.
Financial Summary
This secƟon presents summary level informaƟon on Water and Wastewater fund balances,
reserves, and debt service.
Program Summary
This secƟon provides informaƟon for each program regarding their expenditures and staffing
to include Fiscal Year 2012‐13 accomplishments and Fiscal Year 2013‐14 goals and objecƟves.
Each program secƟon includes:
Program Personnel
This secƟon is the authorized personnel allocated to each program.
FuncƟon
This secƟon includes a basic descripƟon of the responsibiliƟes of each program.
Accomplishments
This secƟon includes highlights from Fiscal Year 2012‐13.
Goals & ObjecƟves
This secƟon idenƟfies specific goals and objecƟves for Fiscal Year 2013‐14.
BUDGET GUIDE
15
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
Key Performance Indicators
This secƟon idenƟfies measurable performance measures that occur year‐to‐year.
Program Budget Detail
This secƟon is a breakdown of the program expenditures by category or line item. The
Fiscal Year 2013‐14 Budget is organized into the following summary programs:
Board of Directors
General AdministraƟon
Human Resources
Public Affairs/ConservaƟon
Finance
InformaƟon Technology
Customer Service
Meter Service
Engineering
Water ProducƟon
Water Treatment
Water Quality
Water Maintenance
Wastewater Maintenance
FaciliƟes Maintenance
Fleet Maintenance
Capital Outlay
This secƟon presents in one secƟon the Capital Outlay purchases included in the Fiscal Year
2013‐14 Budget.
Capital Improvement Program
This secƟon presents in one secƟon the Capital Improvement Projects included in the Fiscal
Year 2013‐14 Budget.
Budget Financial InformaƟon
East Valley Water District operates on a fiscal year, or budget Ɵme period, that begins on July
1 and ends on June 30. For example, Fiscal Year 2013‐14 (FY 2013‐14 or FY 2014), means July
1, 2013 through June 30, 2014. In most secƟons of the budget document, three years of
informaƟon is provided, with two columns of informaƟon reflected for the current year (FY
2012‐13).
16
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
The columns typically presented are:
FY 2012 FY 2013 FY 2013 FY 2014 Prior Year
Actual Budget Projected Proposed % Change
FY 2012 Actual
Actual financial informaƟon for Fiscal Year 2011‐12 as reported in the Comprehensive
Annual Financial Report. The actual financial informaƟon is reported in the budget
document on a budgetary basis.
FY 2013 Budget
The FY 2012‐13 Budget as adopted by the Board of Directors on June 27, 2012.
FY 2013 Projected
The FY 2012‐13 Projected column reflects the FY 2012‐13 Budget in addiƟon to any budget
amendments approved by the Board of Directors during the fiscal year. The FY 2013
Projected column is also adjusted to reflect management’s esƟmate of what revenues and
expenditures will be at the end of the fiscal year.
FY 2014 Proposed
This column iniƟally reflects the FY 2013‐14 Proposed Budget submiƩed by the General
Manager/CEO. AŌer the Board of Directors reviews and approves the Fiscal Year 2013‐14
Budget, the informaƟon in the FY 2014 column changes, if necessary, to reflect the Board’s
acƟons.
Prior Year % Change
This column provides the percent change from the previous year’s budget to the newly
proposed budget.
17
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
18
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
The FY 2013‐14 Budget structure has changed from past EVWD budgets. The budget process
has moved from incremental increases to program‐based budgeƟng. Requested funds are
associated with expected results and performance is measured by indicators and reviewed on
a quarterly basis with the Board of Directors. This results oriented strategy provides the ability
to monitor expenses related to a parƟcular program or acƟvity and track measurable benefits.
Program‐based budgeƟng results can be used in cost‐benefit analyses, just as it would be in a
business environment to determine the value of decisions and enhance transparency.
The FY 2013‐14 budget has been restructured to address the changing expectaƟons and
provide easily accessible informaƟon as part of open public financial management. Through
program‐based budgeƟng, District staff has developed specific objecƟves to address goals
established in the Strategic Plan. Based on these goals and objecƟves, key performance
measures monitor progress towards meeƟng program objecƟves. Program‐based budgeƟng
also increases accountability and transparency. The rate payers and Board of Directors can
more easily see where dollars are invested, monitor the effecƟveness of programs, and
increase policy engagement.
BUDGET HIGHLIGHTS
Technology
EVWD has embraced the importance of modern technological capabiliƟes to assist in the
process of doing business. As with all aspects of operaƟons, EVWD is evaluaƟng available
technology to streamline operaƟons, enhance accuracy, and increase accountability.
A major technological effort currently underway is the transiƟon from manual to automated
radio‐read meters. With over 50% of the District’s meters beyond the accepted industry
standard of 10 years old, the accuracy of meters have dramaƟcally declined, and may be
misreading actual usage by as much as 10%. Since 2012, EVWD has been replacing all meters
to AMR in phases, to reduce meter reading labor and increase billing and consumpƟon
accuracy.
Community Involvement
As a government agency, EVWD is commiƩed to communicaƟng frequently with the
community and devoted to building a close relaƟonship with residents. AddiƟonally, EVWD
places great value in parƟcipaƟng in community events, providing water system tours, and
interacƟng with the public to encourage civic engagement, discuss environmental issues, and
provide overall informaƟonal updates.
BUDGET OVERVIEW
19
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
Projects
EVWD has a variety of service enhancing programs taking place in FY 2013‐14 designed to
opƟmize operaƟons and encourage customer engagement. Project highlights include:
Headquarters Project CompleƟon
Feasibility Assessment of Wastewater Treatment Facility
Conduct Successful Board ElecƟon
Enhanced and Improved District Policies
OpƟmizaƟon of Water Supply OperaƟons
Development of the Fleet Maintenance Replacement Program
Complete Cost of Service Analysis
New FaciliƟes Maintenance Program
CommunicaƟon Enhancements
ImplementaƟon of an Asset Management SoŌware
20
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
AUTHORIZED & FUNDED POSITIONS
POSITION
FY 2011‐12
ACTUAL
FY 2012‐13
ACTUAL
FY 2013‐14
PROPOSED
ADMINISTRATION
General Manager/CEO 1 1 1
Assistant General Manager 0 1 1
Human Resources/Risk Manager 1 1 1
Public Affairs/Water ConservaƟon Officer 0 1 1
AdministraƟve Manager 1 1 1
ExecuƟve Assistant 2 2 2
Department Sub‐total 5 7 7
As part of the Strategic Staffing Plan, the District reassessed the organizaƟonal structure to
maximize employee efficiencies and enhance the service levels provided to customers.
Through reƟrements and repurposing staff, the District was able to reduce the amount of
permanent, full‐Ɵme employees from 69 in FY 2011‐12 to 63 in FY 2012‐13 and FY 2013‐14.
Moreover, the District was able to add three addiƟonal posiƟons, a RecepƟonist, InformaƟon
Systems Technician, and a FaciliƟes Maintenance Coordinator, to enhance services while
maintaining the number of full‐Ɵme employees at 63. The reorganizaƟon of the District has
enabled staff to develop and enhance programs for daily operaƟons and maintenance of the
water and wastewater system.
The tables below provide a summary of Departmental staffing posiƟons in the District over the
past two years and the proposed staffing levels for FY 2013‐14. This new staffing plan has
reduced personnel costs by 4.7% from FY 12‐13. As vacancies occur, management will
conƟnue to review and evaluate the needs of the District prior to filling vacancies.
21
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
POSITION
FY 2011‐12
ACTUAL
FY 2012‐13
ACTUAL
FY 2013‐14
PROPOSED
FINANCE
Chief Financial Officer 1 1 1
Senior Management Analyst 0 0 1
Budget Analyst 0 1 0
AccounƟng Supervisor 1 1 1
AccounƟng Specialist 2 2 2
Lead Storekeeper/Buyer 1 1 0
Storekeeper/Buyer 1 1 1
Office Specialist II 0 1 1
Senior InformaƟon Systems Coordinator 1 0 0
Network Administrator 0 1 1
InformaƟon Systems Technician 1 0 1
Department Sub‐total 8 8 9
CUSTOMER SERVICE
Customer OperaƟons Supervisor 1 1 1
Senior Customer Service RepresentaƟve 2 1 1
Customer Service RepresentaƟve II 3 2 1
Customer Service RepresentaƟve I 1 2 3
RecepƟonist 0 0 1
Lead Field Service RepresentaƟve 0 1 1
Field Service RepresentaƟve II 0 3 2
Department Sub‐total 7 10 10
22
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
POSITION
FY 2011‐12
ACTUAL
FY 2012‐13
ACTUAL
FY 2013‐14
PROPOSED
ENGINEERING
District Engineer 1 0 0
Assistant District Engineer 1 0 0
Associate Engineer 1 0 0
Engineering Manager 0 1 1
Project Manager 0 1 1
Senior Engineering Technician 1 1 1
Engineering Technician II 3 2 1
Engineering Technician I 1 2 2
Engineering ExecuƟve Assistant 1 1 1
Office Specialist II 2 1 1
Department Sub‐total 11 9 8
OPERATIONS
Water ProducƟon Superintendent 1 1 1
Water ProducƟon Supervisor 1 1 1
Lead Water Treatment Plant Operator 1 1 1
Lead ProducƟon Operator 1 1 1
Water ProducƟon Operator II 3 3 3
Water ProducƟon Operator I 1 1 1
Water Quality Supervisor 1 0 0
Water Quality Coordinator 0 1 1
Water Quality Technician II 1 1 0
UƟliƟes Service Worker 0 0 1
Office Specialist I 0 1 1
Department Sub‐total 10 11 11
23
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
MAINTENANCE
Water Service Superintendent 1 1 1
Water Service Supervisor 1 1 1
FaciliƟes Maintenance Coordinator 0 0 1
Lead Water Service Worker 4 3 2
Heavy Equipment Operator 2 2 2
Water Service Worker II 5 7 6
Water Service Worker I 3 2 3
Lead Equipment Mechanic 1 1 1
Equipment Mechanic II 1 1 1
Meter Shop Supervisor 1 0 0
Lead Meter Service Worker 1 0 0
Meter Service Worker II 8 0 0
POSITION
FY 2011‐12
ACTUAL
FY 2012‐13
ACTUAL
FY 2013‐14
PROPOSED
Department Sub‐total 28 18 18
TOTAL DISTRICT EMPLOYEES 69 63 63
24
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
East Valley Water District strives to provide water and wastewater services as affordably as
possible while elevaƟng the level of service provided to customers and other stakeholders. A
criƟcal component to serving the community is ensuring that the District takes steps to
maintain a reliable and dependable water supply, through a balance of long‐term capital
improvements, preventaƟve maintenance, and effecƟve daily operaƟons. In 2012, the Board
of Directors adopted a Strategic Plan to establish a clear foundaƟon of District prioriƟes and
goals in order to focus efforts and facilitate an environment of effecƟve operaƟon. Fiscal
responsibility is a pillar of our Strategic Plan’s success. As stewards of ratepayers dollars, East
Valley Water District strives to use financial resources as efficiently as possible in all aspects of
the decision making process.
The goals and objecƟves of the Strategic Plan are reflected in the Fiscal Year 2013‐14 Budget,
allowing it to serve as a guiding document for District operaƟons. This document has been
developed as a program‐based budget, to maximize transparency and accountability for
stakeholders. The District conƟnues to evaluate projects and programs to opƟmize operaƟons
and minimize costs, without compromising system reliability.
REVENUES
The FY 2013‐14 OperaƟng Budget Revenue ProjecƟons are $30,665,181. This is an increase of
3.3% from the previous year’s budget. District revenues are projected to increase, as a result
of the consolidaƟon of Baseline Gardens which will add an addiƟonal 420 service connecƟons
to the District’s service area. The chart below illustrates the breakdown of each revenue
source, and highlights that East Valley Water District is a rate‐based organizaƟon.
FINANCIAL SUMMARY
25
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
Staff used an analyƟcal approach blending historical trends, current informaƟon and emerging
issues, constrained by conservaƟsm to develop revenue projecƟons that allow staff to
confidently commit resources throughout the fiscal year.
EXPENSES
The FY 2013‐14 OperaƟng Budget for all funds is $23,182,326. This is an increase of 1.1%
above the previous year’s budget. This increase can be aƩributed to the consumer price
index, increased material costs, and development of new programs. District expenses for
energy and construcƟon materials including, copper and brass, have been steadily increasing,
and are projected to conƟnue rising throughout the year. AddiƟonally, the District is
implemenƟng preventaƟve maintenance programs that require funds to operate, however
they are designed to miƟgate potenƟal costly repairs and replacements to the District’s aging
infrastructure system. The chart below illustrates the projected allocaƟon of operaƟng costs
for FY 2014‐15.
District expenses are distributed relaƟvely evenly across seven basic categories, as seen in the
figure below, including: treatment services, salaries, benefits, water supply, electricity,
contract services, and other expenses. Treatment services represent the largest expense
category with 34% of the total budget, however it also includes the City of San Bernardino
Municipal Water Department and Envirogen water treatment agreements.
26
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
As an infrastructure‐based organizaƟon, idenƟfying reserve funds is a criƟcal component of
fiscal responsibility. The District has prudently budgeted $403,455 for reserves in FY 2013‐14.
The District has an esƟmated total of $17.9 million in reserves for the anƟcipaƟon and
preparaƟon for unforeseen events. Moreover, the District is taking steps to ensure that
sufficient funds are available for current operaƟng, capital, and debt service needs .
CAPITAL OUTLAY
The Capital Outlay program has idenƟfied $363,400 for equipment purchases to enhance
programs and services provided to the rate payers. These items include technology upgrades
to beƩer idenƟfy, track, and manage faciliƟes and resources. Moreover, the District is striving
to incorporate an environmentally friendly and sustainable future by going paperless where
possible.
CAPITAL IMPROVEMENT PROGRAM
Capital Improvements are idenƟfied in the Water Master Plan, Sewer Master Plan, and
Strategic Plan. The Capital Improvement Program includes $27,246,000 for Wastewater,
Water, and General Projects. Capital Projects are funded through a mix of water and
wastewater funds, grants, loans, and bond proceeds.
DISTRICT EXPENSES PER DOLLAR
27
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
East Valley Water District’s FY 2013‐14 Budget is a balanced budget, with operaƟonal revenue
funding operaƟonal expenses, and reserve funds not being used to fund on‐going expenses.
As a result of the prudent fiscal planning and oversight by the Board of Directors, the District
will not increase rates during FY 2013‐14 while conƟnuing to provide the community with safe,
reliable, and quality water and wastewater services.
DEBT SERVICE
Several methods are available to finance capital improvement projects and other authorized
acƟviƟes. EVWD, like most governmental agencies, borrow money in order to acquire land
and equipment, construct buildings, and make renovaƟons and improvements. The costs of
these projects are typically financed by the issuance of debt obligaƟons which are then repaid
over several years along with the interest incurred on the borrowings. The District’s debt
service is the amount necessary to make the payments to meet all obligaƟons. This policy
enables the cost of these capital assets to be borne by the present and future rate payers
receiving the benefit of these enhancements.
The District‘s debt obligaƟons include the 2010 refund, state loans for the Plant 134 Upgrade,
and the 2013 bond issue for Headquarters Project are as follows:
DEBT SERVICE
Year Ending October 1 Total
2014 3,450,688
2015 3,460,088
2016 3,459,338
2017 3,459,138
2018 3,452,388
2019‐2020 6,875,776
2021‐2025 13,826,565
2026‐2030 12,184,065
2031‐2035 12,213,566
2041‐2043 5,162,950
Total $79,820,722
2036‐2040 12,276,160
28
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
ALLOCATIONS
General AdministraƟve costs incurred by each of the District’s departments are allocated to
the water and wastewater funds in accordance with the following percentages based on
assumed benefit of each service to each fund. The Benefit Assessment entailed the evaluaƟon
of each Department and the services provided through acƟvity based cosƟng. Fleet
Maintenance was determined by the number of vehicles in the fleet used for each service
operaƟon.
Department Water Fund Wastewater Fund
AdministraƟon 70% 30%
Finance 70% 30%
InformaƟon Technology 50% 50%
Customer Service 50% 50%
Meter Service 50% 50%
Engineering 70% 30%
Water ProducƟon 100% ‐
Water Treatment 100% ‐
Water Quality 100% ‐
Field Maintenance AdministraƟon 50% 50%
Water Maintenance 100% ‐
Wastewater Maintenance ‐ 100%
FaciliƟes Maintenance 65% 35%
Fleet Maintenance 70% 30%
GENERAL & ADMINISTRATIVE ALLOCATIONS BY DEPARTMENT
29
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
30
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
31
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
32
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
The Water Fund pays for all acƟviƟes related to the operaƟons and maintenance of the water
producƟon and distribuƟon system.
RATES
East Valley Water District bills all customers on a monthly basis for water usage using the
formula [(Usage Rate x Water Used) + System Charge = Monthly Water Bill]. The usage rate
(actual water usage) for all customer classificaƟons is $1.77 per 100 cubic feet. System
Charges (Fixed Service charge) are based on the connected meter size. The average residenƟal
customer has a ¾ inch meter. System charges are as follows:
REVENUES
Water revenues consist of water sales, meter charges, penalƟes, and other miscellaneous
charges such as new service charges and development charges. The District is projecƟng an
increase in revenues of 4% as a result of an increase of 420 service connecƟons from the
Baseline Gardens consolidaƟon. Moreover, with the use of FedEx to deliver all 48 hour Shutoff
NoƟces, revenues for other charges have increased to account for the increased penalty.
The District will provide water services through approximately 20,770 domesƟc connecƟons in
FY 2013‐14. In addiƟon, 1,315 fire services are connected to District water mains. This
customer count is based on the number of customers at the end of the previous fiscal year,
with a prorated adjustment for 420 new connecƟons in the Baseline Gardens area that will
connect to the District’s system in May 2014. Other significant developments within the
District’s east end are pushing forward, but are not expected to start connecƟng to the District
unƟl FY 2014‐15.
Water sales for FY 2013‐14 are projected to be $14,233,300, based on anƟcipated customer
WATER FUND
Meter Size Monthly Service Charge
3/4 Inch $13.71
1 Inch $20.87
1 1/2 Inch $38.60
2 Inch $88.48
3 Inch $163.25
4 Inch $270.06
6 Inch $537.09
8 Inch $857.52
33
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
demand for 21,730 Acre Feet. This esƟmated annual demand is the sum of monthly
projecƟons that were derived by reviewing monthly sales for the last five years, and then using
those historical sales to set a conservaƟve esƟmate of demand for each month of FY 2013‐14.
Each monthly esƟmate was set at, or below, a five year historical sale average for that month.
This very conservaƟve approach to projecƟng water sales is necessary as sales are influenced
by rate increases, weather condiƟons, and the economy, all of which influence customer
consumpƟon.
Meter Size Count Monthly Charge
5/8” – 3/4” 16,065 $ 13.71
1” 4,050 20.87
1.5” 245 38.60
2” 283 88.48
3” 80 163.25
4” 24 270.06
6” 14 537.09
8” 9 857.52
Fire Service 1,315 5.60
ANNUAL WATER PRODUCTION AND CONSUMPTION (AF)
Annual Water ProducƟon
SOURCE FY 2009‐10 FY 2010‐11 FY 2011‐12
FY 2012‐13
Projected
FY 2013‐14
Projected
Wells 19,095 18,278 18,354 18,500 18,351
Surface Treated 2,698 2,327 2,641 2,800 3,000
Total ProducƟon 21,793 20,605 20,995 21,300 21,351
Annual Water ConsumpƟon
CUSTOMER FY 2009‐10 FY 2010‐11 FY 2011‐12
FY 2012‐13
Projected
FY 2013‐14
Projected
ResidenƟal 12,197 11,528 11,945 12,800 13,000
Commercial 6,077 5,536 5,696 6,000 6,730
IrrigaƟon 1,780 1,597 2,009 1,895 2,000
Total Sales 20,055 18,661 19,650 20,695 21,730
34
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
EXPENSES
OperaƟng expenses remain the same for FY 2013‐14. District staff have been working to
strategically determine the best method of supplying and pumping water to meet customer
demands. As a result, staff anƟcipates that operaƟng costs should decrease, while increasing
prevenƟve maintenance programs to decrease future capital improvement repair costs.
AddiƟonally, with the restructuring of the budget, costs were realigned to the appropriate cost
center so that unit costs could be properly calculated and assist in the decision‐making
process. Most notably, Source of Supply costs have increased significantly while Pumping
costs have decreased. This is primarily due to idenƟfying well operaƟng and maintenance
costs and placing them in the appropriate cost center. In doing so, staff will be able to
accurately calculate the cost of water based on supply and uƟlize this informaƟon to make
strategic decisions for operaƟons.
CONCLUSION
Water Fund revenues have consistently exceeded operaƟng expenditures allowing the District
to maintain the 120% coverage to meet debt service requirements and conƟnue funding the
CIP. The chart below provides a historical overview of the water fund and its conƟnued
growth. Staff will conƟnue to monitor revenues and expenses and present the progress to the
Board of Directors on a quarterly basis.
35
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
36
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
37
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
38
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
39
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
40
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
The Wastewater Fund pays for all acƟviƟes related to the operaƟons and maintenance of the
wastewater collecƟon infrastructure as well as the treatment of wastewater. All treatment
charges collected from customers are passed through to the City of San Bernardino Municipal
Water Department.
RATES
ResidenƟal
East Valley Water District bills residenƟal customers on a monthly wastewater charge based
on the number of dwelling units, up to four units per property.
Commercial
East Valley Water District bills commercial customers on a monthly basis for wastewater usage
using the formula [(Usage Rate x Water Used) + Wastewater System Charge = Monthly
Wastewater Bill].
WASTEWATER FUND
ResidenƟal Customer
Wastewater Charge per
Equivalent Dwelling Unit (EDU)
West of City Creek 33.86 / month
East of City Creek $35.86 / month
MONTHLY COMMERCIAL WASTEWATER RATES
Commercial Customer
Monthly Rate
(West of City Creek)
Monthly Rate
(East of City Creek)
Commercial Wastewater Flat Rate $6.30 / month $6.30 / month
MulƟ‐Family $1.80 / hcf $1.89 / hcf
Commercial / Retail / Dry Cleaners $2.65 / hcf $2.74 / hcf
Restaurants / Hotels $3.25 / hcf $3.34 / hcf
Laundromats/Government $2.05 / hcf $2.14 / hcf
Schools / Churches $1.65 / hcf $1.74 / hcf
Convalescent Homes $1.90 / hcf $1.99 / hcf
Office Buildings / Motels $2.05 / hcf $2.14 / hcf
Auto Repair/Service / Carwash $1.85 / hcf $1.94 / hcf
hcf = hundred cubic feet
41
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
REVENUES
Wastewater revenues consist of collecƟon charges, treatment charges, and miscellaneous
revenues such as interest income and capacity charges for new services. Revenues are
projected to increase by 2.6% for FY 2013‐14. The District anƟcipates that the increase will be
a direct result of the City of San Bernardino raising their treatment rates.
Wastewater CollecƟon System Charges
Wastewater CollecƟon System Charges are projected at $4,464,700 for FY 2013‐14. These
revenues are the source of funds used by the District to maintain wastewater collecƟon lines.
ResidenƟal customers are billed a fixed monthly charge, while commercial customers pay a
reduced fixed charge plus a volumetric unit charge based on water consumpƟon. MulƟ‐family
residenƟal complexes with four or more units are billed as commercial customers.
Projected residenƟal revenues for FY 2013‐14 were calculated by mulƟplying the Single Family
ResidenƟal (SFR) count by the monthly flat charge for 12 months, taking into account that July
through September will be billed at rates that became effecƟve October 1, 2012. SFR billings
make up $3,400,700 of projected revenues. Projected commercial customer revenues are
$1,064,000, and were calculated by mulƟplying the number of commercial accounts by the
District’s monthly flat charge for 12 months, and then esƟmaƟng total water usage by
commercial customers, in HCF, and mulƟplying the total usage by a flat rate.
Wastewater Treatment Charges
Wastewater Treatment Charges are assessed in accordance with rates set by the City of San
Bernardino Municipal Water Department which treats all wastewater generated by District
customers. All Treatment Charges collected are remiƩed to the City and therefore have no
effect on the District’s operaƟons.
The rates that will be in effect during FY 2013‐14 are presented in the table below. Like the
District’s system charges, residenƟal customers are billed a fixed monthly charge, while
commercial customers pay a small fixed charge plus a volumetric charge that is based on
water consumpƟon.
WASTEWATER COLLECTION SYSTEM
Customer Type Count ConsumpƟon (HCF) Unit Charge
ResidenƟal 18,445 $ 15.36
MulƟ‐family 494 1,198,400 $ 3.90
Commercial 621 641,200 $ 3.90
42
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
EXPENSES
OperaƟng expenses have increased by 3% as a result of the 2.6% increase for treatment costs
by the City of San Bernardino. The remaining 0.4% increase is a result of the implementaƟon
of prevenƟve maintenance programs such as the use of sleeve technology for pipeline spot
repairs, that will decrease the need for future costly capital improvement projects.
CONCLUSION
Revenues are projected to conƟnue exceeding operaƟng expenditures and provide the
required funding to meet debt service obligaƟons while conƟnuing CIP funding as seen in the
chart below. EVWD will conƟnue to monitor the revenues and expenses and present the
progress to the Board of Directors quarterly.
WASTEWATER TREATMENT RATES
Customer Type Flat Charge/Month Commodity Charge/HCF
ResidenƟal $18.50 ‐
MulƟ‐family 2.40 1.25
Retail/Dry Cleaners 2.40 2.10
Restaurants/Hotels 2.40 2.70
Laundromats/Offices/Motels 2.40 1.50
Schools/Churches 2.40 1.10
Hospitals/Convalescent Homes 2.40 1.35
Auto Repair/Service StaƟons 2.40 1.30
43
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
44
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
45
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
46
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
47
FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
48
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
The Board of Directors is the legislaƟve body of the organizaƟon and is comprised of five
members elected at‐large to four year overlapping terms of office. Board members are
responsible for the development and adopƟon of all District policy. The Board of Directors
appoints the General Manager/CEO to be charged with the implementaƟon of adopted policy.
ReflecƟve of the experƟse and leadership of the Board, EVWD customers conƟnue to maintain
affordable rates and have a very reliable water supply.
ACCOMPLISHMENTS
1. Developed the District‐wide Strategic Plan, and adopted the LegislaƟve Plaƞorm, Grant
Strategy and Strategic CommunicaƟons Plan.
2. Approved a balanced budget which included contribuƟng $810,000 to the reserve fund.
3. Approved financing plan and construcƟon of consolidated Headquarters Facility.
4. Implemented aggressive community outreach efforts that increased web presence, print
materials, and District presence at various community events.
5. Approved a two‐year Labor Agreement for represented employees.
6. Increased the level of professionalism and improved the corporate culture of the District.
GOALS & OBJECTIVES
Develop and adopt a Board of Director’s Policy Handbook.
Conduct all acƟviƟes required for the 2013 Board of Directors ElecƟon.
ConƟnue to revise and adopt updated Personnel Rules & RegulaƟons.
Evaluate the feasibility of the District construcƟng a sewer/recycled water facility project.
Liquidate surplus property.
Complete an annual update of the LegislaƟve Plaƞorm and Strategic Plan.
Adopt a water conservaƟon program to meet the water use reducƟon requirements set
forth in SB x 7‐7.
ConƟnue to support policies that encourage an elevated level of professionalism and
corporate culture.
BOARD OF DIRECTORS
49
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
BOARD OF DIRECTORS
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor 71,050 88,000 77,589 80,000
Benefits 38,062 30,000 36,591 40,000
OPERATING EXPENSES
Contract Services ‐ ‐ ‐ 105,000
Professional Development 11,351 30,000 14,566 20,000
GENERAL ADMIN TOTAL $ 120,463 $ 148,000 $ 128,746 $ 245,000 65.5%
50
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
General Manager/CEO is responsible for overseeing day‐to‐day administraƟon and program
implementaƟon of District operaƟons. AdministraƟon is responsible for managing,
documenƟng, organizing, communicaƟng, and ensuring the implementaƟon and execuƟon of
the District’s Strategic Plan.
ACCOMPLISHMENTS
1. Aligned District operaƟons with Strategic Plan and provided public quarterly status
updates of key performance indicators.
2. Developed and maintained an effecƟve system for communicaƟon with the Board of
Directors and District staff.
3. Updated the North Fork By‐Laws to reflect changes in operaƟng procedures and legal
requirements that have taken place since adopƟon in 1950.
4. ConƟnued involvement in the Emergency Response Network of the Inland Empire
(ERNIE), and represents the District on the group Steering CommiƩee.
5. Established an Employee Events CommiƩee to encourage team building and enhanced
workplace morale.
PosiƟon FTE
General Manager/CEO 1
Assistant General Manager 1
AdministraƟve Manager 1
ExecuƟve Assistant 2
Total 5
PROGRAM PERSONNEL
ADMINISTRATION
51
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Respond to Public Records Act Requests within 10 days n/a 100% 100%
2. AdverƟse & complete Agenda distribuƟon on Ɵme n/a 100% 100%
3. Conduct Emergency Preparedness table top exercises and
evacuaƟon drills 0 0 2
4. Water Loss Management 7% 6% 5%
5. Number of Board/CommiƩee MeeƟngs conducted n/a 34 24
KEY PERFORMANCE INDICATOR
GOALS & OBJECTIVES
Complete the construcƟon of the District’s new Headquarters Building.
Update the Emergency Response Plan and Vulnerability Assessment.
Conduct all acƟviƟes required for the 2013 Board of Directors ElecƟon.
Develop and implement a paperless agenda process.
Facilitate the development of the Board of Director’s Handbook.
Facilitate the liquidaƟon of surplus property.
52
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
ADMINISTRATION
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor 600,310 744,000 762,542 602,000
OverƟme 2,858 10,000 5,985 5,000
Benefits 338,068 359,883 460,730 343,000
OPERATING EXPENSES
Materials & Supplies 72,156 84,900 67,000 10,000
Office Supplies 29,614 33,000 31,782 15,000
Contract Services 637,383 367,475 367,475 150,000
Legal Services 100,762 171,000 155,736 125,000
Rents & Leases 172,121 175,000 180,000 ‐
UƟliƟes 43,602 85,000 64,948 ‐
Telephone 41,168 ‐ 32,423 10,500
Fuel 2,685 2,300 1,974 ‐
Permits 22,621 25,000 10,487 ‐
Postage 24,871 15,000 16,712 1,000
General Insurance 213,280 180,000 188,489 ‐
Insurance Claims 10,576 ‐ 2,127 ‐
ADMIN TOTAL $ 2,281,439 $ 2,378,480 $ 2,486,597 $ 1,357,500 ‐43%
PROGRAM BUDGET DETAIL
EducaƟon Assistance ‐ ‐ ‐ 10,000
Professional Development 31,520 71,482 63,291 30,000
Memberships & Dues 33,621 54,440 72,545 56,000
53
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
54
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Human Resources plans, directs, manages, and oversees programs and operaƟons related to
personnel maƩers, including employee relaƟons, contract administraƟon, retenƟon,
recruitment and selecƟon of employees, administraƟon of health and welfare benefits, risk
management, administraƟon of safety regulaƟons, and professional development services.
Specific funcƟons include:
Personnel – conduct recruitments, labor negoƟaƟons, labor relaƟons and ensure
compliance with all state and federal laws, such as FLSA
Workers’ CompensaƟon – oversight of the District’s comprehensive Risk
Management Program
Employee Services – management and administraƟon of employee compensaƟon
and benefit plans as well as implement and monitor labor agreements
Safety – ensure a safe working environment that includes training and compliance
with all state and federal regulaƟons
ACCOMPLISHMENTS
1. ImplementaƟon of the AdministraƟve Professional’s Academy.
2. NegoƟated a 2‐year Employment Agreement.
3. Enhanced health care benefits for the employees at no extra cost to the District.
4. AddiƟon of Life Insurance for employees at a minimal cost to the District.
5. Created a new organizaƟonal structure which clearly defines employee/
PROGRAM PERSONNEL
PosiƟon FTE
Human Resources/Risk & Safety Manager 1
AdministraƟve Intern 0.5
Total 1.5
HUMAN RESOURCES/RISK MANAGEMENT
55
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Percentage of Performance Appraisal’s completed 56% 75% 100%
2. Number of District wide safety trainings conducted 24 26 30
3. Average number of days to fill a vacant posiƟon n/a 90 75
4. Turnover percentage 22% 15% <10%
management groups and their classificaƟons and benefits within the District.
6. ImplementaƟon of the District’s Strategic Staffing Plan.
7. CreaƟon of a fair and consistent recruitment process.
GOALS & OBJECTIVES
Update the District’s EducaƟon Assistance Program.
Assist in the development of the Board of Director’s Handbook.
Update the District’s Personnel Rules & RegulaƟons Handbook.
Create and implement a new Performance Appraisal Program.
Coordinate a Staff Development Program for managers, supervisors, and lead
employees.
56
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
HUMAN RESOURCES/RISK MANAGEMENT
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor ‐ ‐ ‐ 85,000
Temporary Labor ‐ ‐ ‐ 10,000
Benefits ‐ ‐ ‐ 48,500
OPERATING EXPENSES
Materials & Supplies ‐ ‐ ‐ 8,500
Office Supplies ‐ ‐ ‐ 1,500
Contract Services ‐ ‐ ‐ 50,000
PrinƟng & Publishing ‐ ‐ ‐ 500
Legal Services ‐ ‐ ‐ 25,000
Postage ‐ ‐ ‐ 1,000
Memberships & Dues ‐ ‐ ‐ 4,000
Professional Development ‐ ‐ ‐ 6,000
General Insurance ‐ ‐ ‐ 200,000
HR/RISK MGMT TOTAL $ ‐ $ ‐ $ ‐ $ 440,000
57
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
58
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Public Affairs is the primary outreach vehicle for increasing awareness of the District’s mission
and role in the local and regional community. Through media, community, and governmental
relaƟons, the District is able to provide effecƟve communicaƟons to various community
stakeholders. Specific funcƟons include:
Media contact and cooperaƟon
Crisis communicaƟons
ConservaƟon, Water EducaƟon & Rebate Programs
Community presentaƟons & Community MeeƟngs
ParƟcipaƟng in local community and business organizaƟons
Maintain working relaƟonships with federal, state, and local officials
Monitoring and managing different outreach methods gains favorable and fair reporƟng of key
District issues. Public Affairs staff has successfully maintained a presence in applicable poliƟcal
forums for informaƟon and acƟon on issues impacƟng the District. Public Affairs staff also
strives to provide consistent educaƟon to customers on programs, projects and issues
important to the District which also promotes water conservaƟon. Water ConservaƟon
programs are in the development stage to provide conservaƟon rebates, resources, training,
and materials to customers to allow them to conserve water.
ACCOMPLISHMENTS
1. AdopƟon of the LegislaƟve Plaƞorm, Grant Strategy and CommunicaƟon Strategy.
2. ProducƟon of “in‐house” press releases.
PROGRAM PERSONNEL
PosiƟon FTE
Public Affairs/Water ConservaƟon Officer 1
Total 1
PUBLIC AFFAIRS/WATER CONSERVATION
59
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Number of customers who parƟcipate in rebate programs n/a 0 50
2. Number of community presentaƟons 5 8 15
3. Number of community events aƩended 4 6 10
4. Daily per capita water use (gal/day) n/a 309 277
5. Number of website hits 35,000 50,000 65,000
6. Number of Water ConservaƟon school presentaƟons 2 4 8
3. Involved community in facility tours.
4. Developed community presentaƟons program.
5. Redesigned a new user‐friendly District website.
GOALS & OBJECTIVES
ParƟcipate in various community based organizaƟon acƟviƟes that reach a broad range
of stakeholders.
Host a community open house at the new headquarters office.
Launch Water ConservaƟon Rebate Programs for District residenƟal and commercial
customers.
Host water conservaƟon educaƟon events for customers to aƩend.
Complete a Water Use Efficiency Plan to establish prioriƟes for SBX 7‐7 compliance.
60
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PUBLIC AFFAIRS/WATER CONSERVATION
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor ‐ ‐ ‐ 78,000
Benefits ‐ ‐ ‐ 44,500
OPERATING EXPENSES
Materials & Supplies ‐ ‐ ‐ 70,000
Office Supplies ‐ ‐ ‐ 1,000
Contract Services ‐ ‐ ‐ 200,000
PrinƟng & Publishing ‐ ‐ ‐ 45,000
Postage ‐ ‐ ‐ 30,000
Memberships & Dues ‐ ‐ ‐ 2,500
Professional Development ‐ ‐ ‐ 5,000
PUB AFF/WTR CON TOTAL $ ‐ $ ‐ $ ‐ $ 476,000
61
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
62
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Finance oversees the financial operaƟons of the District in order to provide accountability and
adequate control over the use of District funds. Finance staff maintains the financial systems
and records in accordance with Generally Accepted AccounƟng Principles (GAAP) as well as
applicable laws, regulaƟons, and District policies. Specific funcƟons include:
PreparaƟon of monthly and annual financial reports
PreparaƟon of annual budget
Capital asset funding and accounƟng
Strategic and financial planning support
Issuance and administraƟon of District debt issues
AdministraƟon of Investment Porƞolio
RecordaƟon of all financial transacƟons
PROGRAM PERSONNEL
PosiƟon FTE
Chief Financial Officer 1
Senior Management Analyst 1
AccounƟng Supervisor 1
AccounƟng Specialist 2
Storekeeper/Buyer 1
Office Specialist II 1
Total 7
FINANCE
63
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Liquidity RaƟo 226% 210% 200%
2. Debt Level per Capita $546 $558 $810
3. Reserve at % of OperaƟng Expenditure Budget 51% 55% 59%
4. Debt Coverage RaƟo 154% 431% 150%
5. Electronic payments disbursed N/A 10% 50%
ACCOMPLISHMENTS
1. Completed and submiƩed the FY 2011‐12 Comprehensive Annual Financial Report
(CAFR).
2. Restructured the annual OperaƟng Budget to be program based.
3. Developed monthly expenditures status reports to help Departments monitor
spending.
4. Hired a Budget Analyst to review and idenƟfy potenƟal for operaƟonal efficiency
and program cost savings.
5. Completed 2013 Revenue Bond Issue to finance a porƟon of the new Headquarters
facility.
GOALS & OBJECTIVES
Implement new soŌware for accounƟng and uƟlity billing.
Implement new chart of accounts.
Begin processing payroll in‐house rather than through a service provider.
Begin using automated processes to track fixed assets and assessments.
Receive Governmental Finance Officers AssociaƟon (GFOA) Budget Award for Fiscal
Year 2013‐14 Budget.
Implement streamlined financial procedures District‐wide.
64
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FINANCE
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor 458,143 581,000 579,082 515,000
Benefits 203,768 288,718 283,133 256,500
OPERATING EXPENSES
Materials & Supplies 481 300 300 ‐
Office Supplies 5,241 7,250 6,877 7,000
Contract Services 182,609 181,290 140,796 85,000
Telephone 446 750 493 600
Fuel 3,045 600 1,978 ‐
Memberships & Dues 2,352 1,800 2,168 3,500
EducaƟon Assistance ‐ ‐ ‐ 5,500
FINANCE TOTAL $ 896,046 $ 1,096,173 $ 1,043,996 $ 939,400 ‐14%
Temporary Labor 16,813 ‐ ‐ ‐
Banking Services ‐ ‐ ‐ 40,000
OverƟme 4,331 7,000 3,939 3,000
Legal Services ‐ ‐ ‐ 15,000
Rents & Leases 10,357 11,750 11,259 ‐
Postage ‐ 100 131 300
Professional Development 8,460 15,615 13,840 8,000
65
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
66
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
InformaƟon Technology (IT) is responsible for system maintenance, network management,
systems support, updaƟng soŌware/hardware, and monitoring District needs for new
equipment. Specific system maintenance includes:
Network and telecommunicaƟons
Geographic InformaƟon System (GIS)
Enterprise Resource Planning (ERP)
Customer InformaƟon System and UƟlity Billing (CIS)
Supervisory Control and Data AcquisiƟon (SCADA)
Document Imaging System (Laserfische)
Computerized Maintenance Management System (CMMS)
ACCOMPLISHMENTS
1. Moved email to hosted server to take advantage of remote cloud‐based soluƟons.
2. Increased internet bandwidth to increase speed and improve reliability.
3. Hired a Network Administrator to administer the IT Program and InformaƟon
Systems Technician to assist with technical support.
4. Implemented Cityworks, a work order system, to improve asset management.
PROGRAM PERSONNEL
PosiƟon FTE
Network Administrator 1
InformaƟon Systems Technician 1
Total 2
INFORMATION TECHNOLOGY
67
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Percent of help desk support work orders completed n/a n/a 100%
2. Percent of help desk support work orders resolved within 3
days n/a n/a 100%
4. Percent of system availability during operaƟng hours n/a n/a 95%
3. Percent of PCs/Servers with outdated operaƟng systems 60% 32% 0%
GOALS & OBJECTIVES
Assist with the implementaƟon and administraƟon of a new accounƟng and billing
soŌware.
Decrease contract services and increase in‐house technical support.
Complete the IT Strategic Plan, including anƟcipated needs for the new
Headquarters facility.
Complete and maintain an inventory of all computer equipment in the District.
68
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
INFORMATION TECHNOLOGY
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor 58,291 ‐ 22,258 128,000
OverƟme 479 ‐ 1,536 5,000
Benefits 26,293 ‐ 3,774 73,000
OPERATING EXPENSES
Materials & Supplies 1,449 ‐ 2,005 10,000
Office Supplies 16,553 8,500 9,464 3,000
Contract Services 104,175 210,000 180,719 228,500
Rents & Leases 125 ‐ ‐ ‐
Telephone 193 200 80 3,000
Postage 63 ‐ 100 ‐
Memberships & Dues ‐ ‐ ‐ 500
Professional Development 1,169 ‐ ‐ 7,000
IT TOTAL $ 209,420 $ 218,700 $ 219,936 $ 458,000 109%
69
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
70
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Customer Service is responsible for responding to customer inquiries, establishing and
disconƟnuing service, preparing monthly bills, processing payments, and collecƟng
outstanding customer balances. Customer Service staff conƟnues to explore opportuniƟes to
provide convenient methods of payments and strives to resolve all customer concerns on a
daily basis.
ACCOMPLISHMENTS
1. ImplementaƟon of a more efficient method of delivering Shut‐Off NoƟces by
contracƟng with FedEx.
2. Increased the number of pay‐by‐phone lines from 4 to 8, reducing customer hold
Ɵmes.
3. Installed a drop box at the Del Rosa Yard for customers wanƟng to pay by check on
the southwest end of the District.
4. Added a RecepƟonist to answer main line phone calls and provide increased
personal contact with customers.
PROGRAM PERSONNEL
PosiƟon FTE
Customer OperaƟons Supervisor 1
Senior Customer Service RepresentaƟve 1
Customer Service RepresentaƟve II 1
Customer Service RepresentaƟve I 3
RecepƟonist 1
Total 7
CUSTOMER SERVICE
71
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Number of payments received from Del Rosa drop box n/a 100 150
2. Percent of payments received by automaƟon without staff
assistance n/a n/a 75%
3. Increase paperless billing usage n/a 4% 6%
4. Billing Accuracy n/a 95% 99%
GOALS & OBJECTIVES
Establish third party payment centers to provide more convenient locaƟons for
customers to make payments outside of the District main office.
Implement website soluƟon to allow customers to turn/off service without calling
the District Office.
Implement conƟnuous service agreements for establishing service for non‐owner
occupied houses and apartments.
Implement address change service in conjuncƟon with US Postal Service to ensure
up to date informaƟon for customer billing.
Establish a standard procedure for payment extensions, including a maximum
extension period for delinquent customers.
72
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
CUSTOMER SERVICE
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor 599,643 647,000 608,988 350,000
Temporary Labor 22,129 ‐ 23,925 ‐
OverƟme 49,365 60,000 65,123 20,000
Standby 1,250 ‐ 3,060 ‐
Benefits 298,651 372,512 307,061 198,400
OPERATING EXPENSES
Materials & Supplies 1,773 3,832 7,135 6,000
Office Supplies 12,099 15,100 11,461 3,000
Contract Services 229,163 309,400 457,366 314,500
Banking Services ‐ ‐ ‐ 175,000
Legal Services ‐ ‐ ‐ 5,000
Telephone 400 1,000 869 3,000
Fuel 13,181 42,000 32,650 ‐
Postage 109,306 106,500 125,964 110,000
Memberships & Dues 3,780 ‐ 2,520 ‐
Professional Development 886 10,150 5,529 5,000
Bad Debt 6,229 3,500 1,792 ‐
CUSTOMER SVC TOTAL $ 1,347,855 $ 1,570,994 $ 1,653,443 $1,189,900 ‐24%
73
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
74
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Meter Services serves as a field extension of Customer Service, and is responsible for
compleƟng all on‐site related customer requests such as turning water on/off, monthly meter
readings for billing, and assisƟng customers at their residence when requested. Meter
Services staff may also at Ɵmes assist the Meter Maintenance program by installing new
meters, tesƟng meters for accuracy, and repairing meter leaks.
ACCOMPLISHMENTS
1. Completed the installaƟon of 3,500 AMR meters.
2. ImplementaƟon of a large water meter tesƟng program.
3. Developed a Call Out Service to assist customers in reducing penalty charges for
delinquent payments and reconnecƟons
GOALS & OBJECTIVES
Complete Phase 2 of the Automated Meter Reading Replacement Program.
Partner with Public Affairs to increase water conservaƟon acƟviƟes such as audits
and educaƟon outreach.
Respond to all customer service requests for meter assistance and verificaƟon
within an acceptable
PROGRAM PERSONNEL
PosiƟon FTE
Lead Field Service RepresentaƟve 1
Field Service RepresentaƟve II 2
Total 3
METER SERVICE
75
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Conduct Water ConservaƟon Audits 0 10 20
2. Number of preventable re‐reads n/a 20 0
3. Reduce the number of reconnecƟons due to non‐payment n/a n/a 10%
4. Average Ɵme to respond to customer service request n/a n/a <24 hours
76
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
METER SERVICE
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor ‐ ‐ ‐ 175,000
OverƟme ‐ ‐ ‐ 20,000
Benefits ‐ ‐ ‐ 99,800
OPERATING EXPENSES
Materials & Supplies ‐ ‐ ‐ 3,000
Contract Services ‐ ‐ ‐ 30,000
Telephone ‐ ‐ ‐ 4,000
Professional Development ‐ ‐ ‐ 5,000
EducaƟon Assistance ‐ ‐ ‐ 500
METER SVC TOTAL $ ‐ $ ‐ $ ‐ $ 339,300
Tools ‐ ‐ ‐ 2,000
77
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
78
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Engineering is responsible for idenƟfying and implemenƟng expansion and improvement
infrastructure projects needed to provide safe and reliable water and sewer service to both
exisƟng and future customers. Engineering staff administers and manages the Capital
Improvement Program, assists developers in building new residenƟal and commercial
properƟes, and provides support in the maintenance and repair of water mains, reservoirs,
boosters, pressure reducing staƟons, wells, and the sewer system. Specific funcƟons include:
Conduct planning studies to evaluate exisƟng and future water and sewer system
improvement needs.
Establish and implement the District’s Capital Improvement Program (CIP).
Assist in ensuring the District complies with state and federal regulaƟons.
Maintain and update District’s Design Standards.
Maintain and update technical data by GIS.
PROGRAM PERSONNEL
PosiƟon FTE
Engineering Manager 1
Project Manager 1
Senior Engineering Technician 1
Engineering Technician II 1
Engineering ExecuƟve Assistant 1
Office Specialist II 1
Total 8
Engineering Technician I 2
ENGINEERING
79
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Percent project budget exceedence (of all CIP) 0% 3% 0%
2. Percent of Developer plan checks completed within 4 weeks 50% 100% 100%
3. Number of regional collaboraƟon projects 1 2 5
4. Number of projects to increase system reliability 1 3 14
5. Number of projects to increase system efficiency 0 2 9
ACCOMPLISHMENTS
1. Implemented a GIS to effecƟvely use District‐wide data.
2. Completed the construcƟon and permiƫng of Plant 134 Treatment Facility.
3. Revised the Sewer Master Plan to address future development potenƟal and
system needs.
4. Completed the Eastwood Farms ConsolidaƟon.
5. Complete the 3rd St. and Del Rosa Sewer Repair.
6. Updated the District Design Standards and ConstrucƟon Details in preparaƟon for
potenƟal development.
GOALS & OBJECTIVES
Complete an update of District‐wide connecƟon charges and development fees.
IdenƟfy and implement projects to opƟmize water resources and reduce overall
supply costs.
IdenƟfy and implement projects to increase system reliability.
Integrate technology (e.g. GIS) to increase efficiency and effecƟveness.
Establish Development Project Procedures.
80
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
ENGINEERING
PROGRAM BUDGET DETAIL
DescripƟon FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor 647,303 441,000 549,799 337,100
OverƟme 2,327 5,000 2,791 5,000
Benefits 316,478 279,479 295,362 192,200
OPERATING EXPENSES
Assessment 76,238 ‐ ‐ ‐
Materials & Supplies 538 ‐ 949 ‐
Tools ‐ ‐ ‐ 1,000
Office Supplies 5,821 25,000 14,125 9,000
Contract Services 212,398 199,920 134,840 200,000
Legal Services 35,388 ‐ 28,155 30,000
Telephone 1,170 4,000 2,957 3,500
Fuel 6,676 6,800 3,716 ‐
Permits ‐ 20,000 ‐ 100,000
Memberships & Dues 2,590 1,425 3,274 5,000
Professional Development 5,650 15,300 16,332 13,500
ENGINEERING TOTAL $ 1,312,724 $ 1,003,924 $ 1,054,336 $ 896,800 ‐11%
Postage 147 6,000 2,036 500
81
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[THIS PAGE LEFT BLANK INTENTIONALLY]
82
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Water ProducƟon is responsible for the daily monitoring and operaƟons of the enƟre water
producƟon system which includes 18 wells, 18 reservoirs and 24 booster staƟons. This
program also ensures the Ɵmely prevenƟve maintenance of all pumps and motors for wells
and boosters.
ACCOMPLISHMENTS
1. Implemented an energy efficient pumping strategy to maximize off peak hour
pumping when possible that takes advantage of favorable Southern California
Edison electricity rates.
2. Installed 7 new chlorine analyzers to increase automaƟon in residual monitoring to
comply with the California Department of Public Health mandates.
3. Enhanced personnel scheduling to meet producƟon demands while reducing
overƟme costs by 50%.
PROGRAM PERSONNEL
PosiƟon FTE
Water ProducƟon Superintendent 1
Water ProducƟon Supervisor 0.5
Lead ProducƟon Operator 1
Water ProducƟon Operator II 3
Water ProducƟon Operator I 0.5
Office Specialist II 0.5
Total 6.5
WATER PRODUCTION
83
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Number of Reservoirs dived and inspected n/a 0 3
2. Number of large Cla Vals serviced (78 total) n/a 0 50%
5. Cost per acre foot of groundwater produced n/a $195 $123
3. Number of Pressure Reducing StaƟons Serviced (12 total) n/a 3 12
4. Number of alƟtude valves services (6 total) n/a 0 6
GOALS & OBJECTIVES
Complete booster rehabilitaƟon at Plant 130 to increase the pumping efficiency by
15% and to receive energy incenƟves from Southern California Edison.
Increase SCADA reliability by enhancing and updaƟng Remote Terminal Units
(RTUs), the communicaƟon hardware at specific sites which will allow for more
accessibility when replacing and repairing these devices.
Develop a Reservoir PrevenƟve Maintenance Program to inspect and schedule
minor repairs where possible to minimize major and costly repairs in the future.
Develop an Annual Water ProducƟon Budget based on supply, costs, and demand
to meet consumpƟon needs.
Work to ensure the District complies with state and federal regulaƟons for meeƟng
drinking water standards.
84
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
WATER PRODUCTION ADMINISTRATION
PROGRAM BUDGET DETAIL
DescripƟon—Admin
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor ‐ ‐ 13,801 137,900
Standby 19,495 ‐ 15,313 11,000
Benefits 362,709 422,597 438,361 78,600
OPERATING EXPENSES
Materials & Supplies ‐ 143,765 58,091 ‐
Office Supplies 2,594 4,000 6,285 6,000
Contract Services ‐ 6,000 130,167 45,000
Rents & Leases 304 ‐ 200 ‐
Telephone 12,294 3,500 12,500 15,000
Fuel 40,099 35,000 37,608 ‐
Permits 15,391 15,000 16,430 ‐
Memberships & Dues 100 ‐ 1,167 7,000
Professional Development 9,498 9,500 7,554 15,000
WTR PROD ADMIN TOTAL $ 462,484 $ 639,362 $ 737,477 $ 315,500
85
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
SOURCE OF SUPPLY
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor 154,978 164,500 159,508 159,000
OverƟme 146 39,000 17,255 10,000
Benefits ‐ ‐ 2,721 90,700
OPERATING EXPENSES
Purchased Water 199,931 200,000 135,199 200,000
Groundwater Replenish 180,053 208,680 20,266 215,000
Assessments ‐ 102,640 102,640 205,000
Materials & Supplies 359 ‐ 10,286 30,000
Chemicals ‐ ‐ 124 100,000
Contract Services 123,014 166,600 151,253 75,000
Electric ‐ ‐ ‐ 1,350,000
SOURCE TOTAL $ 658,481 $ 881,420 $ 599,252 $ 2,434,700
86
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
BOOSTING & PUMPING
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor 518,068 544,800 552,264 167,000
OverƟme 33,104 18,000 21,742 10,000
Benefits ‐ ‐ 3,121 95,100
OPERATING EXPENSES
Materials & Supplies 27,992 18,000 26,959 40,000
Chemicals 156,743 168,000 198,048 ‐
Contract Services 130,227 165,200 130,733 100,000
Electric 1,946,337 2,100,000 1,922,185 750,000
Permits 724 ‐ 466 ‐
BOOSTER TOTAL $ 2,813,195 $ 3,014,000 $ 2,855,518 $ 1,162,100
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Previous
Yr % Chg
PERSONNEL EXPENSES
Labor ‐ ‐ ‐ 31,000
Benefits ‐ ‐ 2,721 17,000
OPERATING EXPENSES
Materials & Supplies 4,753 10,000 10,000 15,000
Chemicals ‐ 75,000
Contract Services 16,566 35,000 35,000 25,000
DISTRIBUTION TOTAL $ 21,319 $ 45,000 $ 47,721 $ 163,000
TRANSMISSION & DISTRIBUTION
87
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
88
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Water Treatment is responsible for the daily operaƟon of water treatment faciliƟes, namely
Plant 134, Plant 107, Plant 40, Plant 39, and Plant 28. Plant 134 is a Surface Water Treatment
Plant that takes in water from the Santa Ana River via the North Fork Canal and State Water
Project. Plants 107 and 40 are wells treated by Envirogen units that treat for nitrates,
uranium, and perchlorates. Plant 39 is a treatment plant that uƟlizes a blending plan for
fluoride. Lastly, Plant 28 uƟlizes Granular AcƟvated Carbon to treat for PCE.
ACCOMPLISHMENTS
1. Decreased the amount of water produced from Plants 107 and 40 by 50% over the
previous year.
2. Completed Operator Training for staff on the new technology at Plant 134 Surface
Water Treatment Plant.
3. Received permit approval to operate Plant 134 at full capacity.
GOALS & OBJECTIVES
Establish an opƟmum process to uƟlize new technology at Plant 134.
Increase intake of State Water Project water to enhance water supply reliability.
ConƟnue to meet all water quality standards for effluent discharge.
PROGRAM PERSONNEL
PosiƟon FTE
ProducƟon Supervisor 0.5
Lead Water Treatment Plant Operator 1
Total 1.5
WATER TREATMENT
89
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Number of Department of Public Health violaƟons 0 0 0
2. Cost per acre foot of water produced at Plant 134 $564 $425 $350
90
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
WATER TREATMENT
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor 84,994 150,200 107,646 129,000
OverƟme 15,653 18,000 18,261 5,000
Benefits ‐ ‐ 2,721 74,000
OPERATING EXPENSES
Materials & Supplies 110,700 42,000 32,894 30,000
Chemicals 32,329 357,000 161,252 250,000
Contract Services 8,549 209,000 111,958 250,000
Water Treatment 1,062,664 1,290,950 824,306 800,000
Telephone ‐ ‐ ‐ 3,000
Electric 97,628 250,000 171,613 200,000
Permits ‐ ‐ ‐ 10,000
WATER TRTMNT TOTAL $ 1,412,517 $ 2,317,150 $ 1,430,651 $1,751,000 ‐24%
91
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
92
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Water Quality is responsible for ensuring District compliance with state and federal drinking
water regulaƟons. This program also manages, supervises, and coordinates the acƟviƟes of
fire service backflow protecƟon devices, customer‐owned backflow protecƟon devices, water
sampling and tesƟng, fire hydrant flushing, and faciliƟes locaƟng services (dig‐alert).
ACCOMPLISHMENTS
1. Revised the Water Quality Sampling Plan to be more efficient while meeƟng state
and federal regulaƟons.
2. Developed a comprehensive Hydrant Flushing Program to improve water quality.
3. Improved the administraƟon of the Cross ConnecƟon Program to reduce staff Ɵme
while increasing producƟvity.
GOALS & OBJECTIVES
Update the Backflow Ordinance to ensure compliance with current legislaƟon.
Evaluate and update the water transmission and distribuƟon system to ensure
compliance with fire service related Plumbing Codes.
PROGRAM PERSONNEL
PosiƟon FTE
Water Quality Coordinator 1
Water ProducƟon Operator I 0.5
UƟliƟes Service Worker 1
Total 2.5
WATER QUALITY
93
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Number of above ground flush outs replaced 0 0 5
2. Annual backflow device tesƟng compliance 70% 96% 100%
3. Percent of hydrants flushed annually 20% 50% 100%
4. Number of water quality violaƟons from CDPH 1 0 0
5. Respond to all Underground Service Alert within 48 hours 100% 100% 100%
Implement a program to idenƟfy and eliminate cross connecƟons in the water
distribuƟon system to improve water quality.
Publish and distribute the Consumer Confidence Report (CCR) as mandated by the
California Department of Public Health (CDPH).
Prepare all monthly and annual water quality reports and submit them on Ɵme to
CDPH.
94
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
WATER QUALITY
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor ‐ ‐ ‐ 170,500
OverƟme ‐ ‐ ‐ 3,000
Benefits ‐ ‐ ‐ 97,200
OPERATING EXPENSES
Materials & Supplies ‐ ‐ ‐ 10,000
Tools ‐ ‐ ‐ 5,000
Contract Services ‐ ‐ ‐ 150,000
Postage ‐ ‐ ‐ 5,000
WATER QUALITY TOTAL $ ‐ $ ‐ $ ‐ $ 440,700
95
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
96
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Water Maintenance is responsible for the daily repair and maintenance of the District’s water
transmission, distribuƟon pipelines, and all related equipment including fire hydrants, meters,
valves, and meter vaults.
ACCOMPLISHMENTS
1. Conducted prevenƟve maintenance of pipelines, hydrants, meters and related
equipment that will enhance the life of the aging infrastructure.
2. Restructured maintenance crew to decrease response Ɵme to leak reports and
reduce water loss.
3. Implemented a cross training for Water Maintenance staff to read meters in the
field.
4. Developed a grid style valve exercising program that ensures all valves are
exercised at least once every four years.
PROGRAM PERSONNEL
PosiƟon FTE
Lead Water Service Worker 1
Heavy Equipment Operator 2
Water Service Worker II 5
Water Service Worker I 3
Total 13.5
Water Services Superintendent 1
Water Services Supervisor 1
Office Specialist I 0.5
WATER MAINTENANCE
97
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Percent of valves exercised (7,800 total) n/a 20% 25%
2. Percent of hydrants serviced (2,900 total) n/a 600 50%
3. Number of leaks per mile of pipeline n/a 2.88 1
4. Number of meter vaults serviced 0 0 25
5. Number of prevenƟve work orders completed vs. reacƟve n/a n/a 70%
5. Completed construcƟon of a drain line for Plant 24 A and B to eliminate the
flooding of Lynwood and Harrison when the well was pumping to discharge.
Goals & ObjecƟves
Develop addiƟonal prevenƟve maintenance programs for meter services such as
vault lids and meter boxes.
Reduce warehouse inventory by 30%.
ConƟnue cross training with the Meter Reading staff.
98
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
MAINTENANCE ADMINISTRATION
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor ‐ ‐ ‐ 201,200
Standby ‐ ‐ ‐ 22,000
Benefits ‐ ‐ ‐ 114,700
OPERATING EXPENSES
Office Supplies 678 5,550 ‐ 6,000
Telephone 18,984 28,000 ‐ 25,000
Fuel 58,335 62,900 ‐ ‐
Postage 211 ‐ ‐ ‐
Memberships & Dues 182 1,080 ‐ 2,000
Professional Development 5,937 9,185 ‐ 8,000
MAINT ADMIN TOTAL $ 84,327 $ 106,715 ‐ $ 378,900 ‐
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor 615,987 710,200 708,211 599,000
OverƟme 56,756 54,000 72,105 55,000
Benefits 377,794 405,113 410,761 341,400
OPERATING EXPENSES
Materials & Supplies 253,476 262,000 294,069 265,000
Tools 4,920 8,000 15,172 10,000
Contract Services 182,370 225,000 397,091 205,000
Permits 56,067 ‐ 24,930 50,000
WTR MAINT TOTAL $ 1,547,370 $ 1,644,313 $ 1,922,339 $ 1,525,400 ‐8%
WATER MAINTENANCE
99
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
100
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Wastewater Maintenance is responsible for the maintenance and repair of the 208 miles of
the wastewater conveyance system. Based on the Sewer System Maintenance Plan, crews
complete preventaƟve video monitoring, scheduled maintenance, system repairs, and
emergency repairs.
ACCOMPLISHMENTS
1. Cleaned all wastewater pipelines including all areas that require enhanced
maintenance.
2. Established PaƩon State Hospital Maintenance Service Agreement.
3. IdenƟfied pipeline in need of replacement, resulƟng in the prevenƟon of
compromised wastewater conveyance.
GOALS & OBJECTIVES
UƟlize sleeve technology for minor repairs of the wastewater pipelines by trained
District staff.
ConƟnue video monitoring wastewater conveyance system to minimize disrupƟon
in the pipeline system.
PROGRAM PERSONNEL
PosiƟon FTE
Lead Water Service Worker 1
Water Service Worker II 1
Total 2
WASTEWATER MAINTENANCE
101
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Miles of CCTV n/a 35 70
2. Number of preventable sanitary sewer overflows 0 0 0
3. Miles of sewer pipe cleaned n/a 200 208
102
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
WASTEWATER MAINTENANCE
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr %
Chg
PERSONNEL EXPENSES
Labor 241,622 240,300 235,000 125,500
OverƟme 1,997 11,000 5,824 5,000
Benefits 77,626 144,932 131,092 71,600
OPERATING EXPENSES
Materials & Supplies 25,769 36,000 22,731 50,000
Tools 517 ‐ 323 3,000
Contract Services 16,968 160,000 95,988 200,000
Treatment Services 6,800,369 6,776,908 6,776,908 6,958,676
Permits 1,182 ‐ 8,239 ‐
WSTEWTR MAINT TOTAL $ 7,166,050 $7,369,140 $ 7,267,866 $7,413,776 1%
103
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
104
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
FaciliƟes Maintenance is responsible for the complete maintenance and repair of all District
faciliƟes including the AdministraƟon Buildings, water faciliƟes, District owned vacant
properƟes and easements. FY 2013‐14 will be the first year that the District has designated a
program focused solely on the maintenance of faciliƟes.
GOALS & OBJECTIVES
Hire a FaciliƟes Maintenance Coordinator to oversee this program.
Establish a prevenƟve maintenance schedule for all District faciliƟes.
Centralize faciliƟes maintenance to delineate responsibiliƟes amongst OperaƟons
and Maintenance.
Work with General Contractor in the construcƟon and schemaƟc of the
AdministraƟve Headquarters.
PROGRAM PERSONNEL
PosiƟon FTE
FaciliƟes Maintenance Coordinator 1
Total 1
FACILITIES MAINTENANCE
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Percent of PrevenƟve Maintenance completed n/a n/a 100%
2. Average number of days to complete a work order n/a n/a 3
3. Percent of work order requests completed n/a n/a 95%
105
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FACILITIES MAINTENANCE
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor ‐ ‐ ‐ 65,000
Benefits ‐ ‐ ‐ 31,350
OPERATING EXPENSES
Materials & Supplies ‐ ‐ ‐ 40,000
Tools ‐ ‐ ‐ 1,500
Contract Services ‐ ‐ ‐ 250,000
Rents & Leases ‐ ‐ ‐ 187,000
UƟliƟes ‐ ‐ ‐ 3,000
Telephone ‐ ‐ ‐ 100,000
Electric ‐ ‐ ‐ 55,000
FACILITIES MAINT TOTAL $ ‐ $ ‐ $ ‐ $ 732,850
106
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FUNCTION
Fleet Maintenance is responsible for the maintenance and repair of the District’s fleet which
includes approximately 54 vehicles and 15 pieces of heavy equipment. Fleet maintenance is
also responsible for maintaining air quality regulaƟons, vehicle registraƟon, and transportaƟon
requirements.
ACCOMPLISHMENTS
1. Added a new vactor truck to the District fleet that meets new California emissions
requirements for diesel engines.
2. Added a gate‐valve machine to the fleet that increases the District’s ability to
exercise pipeline gate‐valves.
3. Successfully completed the annual review by the California Highway Patrol on‐site.
GOALS & OBJECTIVES
Establish a 10 year Equipment Replacement Schedule
Establish cost per mile baselines for all District vehicles
Develop a Fleet Maintenance Manual
PROGRAM PERSONNEL
PosiƟon FTE
Lead Equipment Mechanic 1
Equipment Mechanic II 1
Total 2
FLEET MAINTENANCE
107
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
KEY PERFORMANCE INDICATOR
Measure
FY 2012
Actual
FY 2013
Projected
FY 2014
Goal
1. Percent of labor spent on prevenƟve maintenance on
vehicles n/a n/a 50%
2. Average annual percentage of fleet in service n/a n/a 95%
3. Average fleet cost per mile n/a n/a $0.25
4. Fuel efficiency of fleet, average miles per gallon n/a n/a 15
5. Percent of vehicles exceeding replacement schedule n/a n/a 10%
108
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
FLEET MAINTENANCE
PROGRAM BUDGET DETAIL
DescripƟon
FY 2012
Actual
FY 2013
Budget
FY 2013
Projected
FY 2014
Proposed
Prior Yr
% Chg
PERSONNEL EXPENSES
Labor 132,403 130,000 130,000 130,000
OverƟme 472 3,000 1,000 3,000
Benefits 69,063 72,668 72,668 74,000
OPERATING EXPENSES
Materials & Supplies 59,927 75,000 60,000 60,000
Tools 19,504 ‐ 8,000 5,000
Office Supplies 667 450 500 500
Contract Services 62,401 109,000 80,000 80,000
Telephone 382 2,000 ‐ 1,000
Fuel 9,705 2,100 ‐ 165,000
Postage 132 ‐ ‐ ‐
Memberships & Dues 1,608 120 ‐ 2,000
Professional Development 276 3,755 500 2,000
General Insurance 82 ‐ ‐ ‐
FLEET MAINT TOTAL $ 356,622 $ 398,093 $ 352,668 $522,500 36%
109
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
110
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
The District defines Capital Outlay expenditures as an individually significant acquisiƟon of
capital assets (not involving construcƟon) that are expected to last more than 2 years and
have an individual cost of $5,000 or more. This threshold is applied at the individual asset
level. Group purchases of individual assets under $5,000 are not capitalized, even if the group
totals to more than $5,000. Each year as part of the budget process, the District’s various
departments compile and submit a list of capital outlay requests for consideraƟon. Then staff
reviews and prioriƟzes the list of equipment based on a needs assessment and the amount of
funding available. Items that benefit both the water and wastewater systems are allocated
accordingly.
The District has been making great strides to increase the use of technology to increase
efficiency and automaƟon and for electronic data collecƟon. This will provide the District with
informaƟon that will help make beƩer informed decisions on the condiƟon of the operaƟng
systems. FY 2013‐14 has 2 requests for tablets for both the Board and staff to uƟlize. Remote
access and convenience will increase usage of new technology and the soŌware currently
being implemented that will not only help staff work more efficiently, but will also reduce the
amount of paper being used, creaƟng a more sustainable future.
Moreover, staff is currently working to develop a 10 year equipment replacement schedule
that will balance the costs of replacing vehicles and equipment over a period of Ɵme. This will
alleviate any large capital expenditures in any parƟcular year. Moving the District towards
more proacƟve approaches to equipment replacement will allow the establishment of a
Capital Reserve Fund that will be designated specifically for the replacement and acquisiƟon of
capital equipment such as computer hardware/soŌware, vehicles and heavy equipment.
CAPITAL OUTLAY
111
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
CAPITAL OUTLAY
PROGRAM BUDGET DETAIL
Item DescripƟon
Water
Fund
Wastewater
Fund TOTAL
1. Paperless Technology– to enhance paperless
communicaƟons in the District for a more sustainable
future. Tablets will be purchased to facilitate this
transiƟon
10,000 10,000 20,000
2. Field Tablets, Equipment and Licensing – second
phase of GIS and work order system implementaƟon to
allow field employees to enter data remotely.
97,600 10,000 107,600
3. AutomaƟc Transfer Switch ‐ to be installed at a well
to ensure reliable power supply for conƟnued well
operaƟon during power outages or emergencies.
20,000 ‐ 20,000
4. Sewer Camera ‐ to enhance the sewer maintenance
prevenƟve maintenance program with a state of the art
camera to help staff idenƟfy potenƟal problemaƟc areas
in the wastewater conveyance system.
‐ 145,800 145,800
5. 2 Heavy Duty Trucks for Field Maintenance ‐
replacement of exisƟng vehicles in the District’s fleet
that have exceeded their expected useful life and will
cost more to repair than replace.
50,000 ‐ 50,000
6. Computer Hardware ‐ new servers are necessary to
support the new financial and billing soŌware that is
scheduled for implementaƟon in September 2013
10,000 10,000 20,000
CAPITAL OUTLAY TOTAL $ 187,600 $ 175,800 $ 363,400
112
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
A Capital Improvement Project expenditure is an individually significant construcƟon project
with a cost of $25,000 or more that creates a new capital asset, improves an exisƟng asset
(increases its service capacity, etc.), or significantly and unusually extends an asset’s operaƟng
life. The District’s Capital Improvement Program (CIP) is a 5 year budget. However, each year
projects are reviewed and evaluated based on the needs of the District. Therefore, some
projects may be omiƩed and other moved forward annually during the development of each
fiscal year budget.
Proposed Capital Improvement Projects for the budgeted fiscal years were submiƩed by the
Engineering, OperaƟons and Maintenance Departments in accordance with the anƟcipated
needs of the District as typically outlined in the Water and Sewer Master Plans. However, the
Water and Wastewater Master Plans are both in process of being updated during the
development of the FY 2013‐14 Budget.
Proposed Capital Improvement Projects were evaluated and prioriƟzed based on the following
criteria:
PreservaƟon of public health and water quality
Improvements required as a result of local, state or federal legislaƟon/mandates
ReducƟon of current maintenance expenditures and avoidance of costly future
rehabilitaƟon
PreservaƟon of exisƟng faciliƟes/infrastructure
PosiƟve impacts on customers
Grant/loan secured or leverage of funds or Grant/loan availability
As a result of the prudent fiscal planning and oversight by the Board of Directors, staff has
been able to increase the District’s capital investment to provide the community the water
and wastewater infrastructure that the customers expect and deserve. The FY 2013‐14 Capital
Improvement Program totals $28,071,000 with funding through revenues, bonds, reserves,
development fees and other sources.
CAPITAL IMPROVEMENT PROGRAM
113
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
[ THIS PAGE LEFT BLANK INTENTIONALLY ]
114
115 FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
11
6
[ TH
I
S
PA
G
E
LE
F
T
BL
A
N
K
IN
T
E
N
T
I
O
N
A
L
L
Y
]
FI
S
C
A
L
YE
A
R
20
1
3
‐14
EA
S
T
VA
L
L
E
Y
WA
T
E
R
DI
S
T
R
I
C
T
117 FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT
11
8
[ TH
I
S
PA
G
E
LE
F
T
BL
A
N
K
IN
T
E
N
T
I
O
N
A
L
L
Y
]
FI
S
C
A
L
YE
A
R
20
1
3
‐14
EA
S
T
VA
L
L
E
Y
WA
T
E
R
DI
S
T
R
I
C
T
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: ADMINISTRATION HEADQUARTERS
PÙʹã DÝÙ®Öã®ÊÄ
The Board of Directors awarded a Design‐Build contract for the construcƟon of the Headquarters in
September 2012. Design is nearly completed and will conƟnue as construcƟon of the building begins. The
total cost of the contract has been agreed upon to not exceed $17.5 Million.
PÙʹã D㮽Ý
Project Type: General/Other
LocaƟon: Greenspot Road
Project Manager: Mike Maestas
PÙʹã S«ç½
Start Date: July 2012
EsƟmated CompleƟon: April 2014
Capital Request Programmed:
FY 2012‐13
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $17,500,000
Prior Years Budget: $1,500,000
PÙʹã MÖ
119
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: A FaciliƟes Maintenance Coordinator will be hired to oversee all
maintenance for the new building. This cost has been included in the FY 2014 Budget.
2. Debt Service: N/A
3. Maintenance: N/A
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
ConstrucƟon (Contract) 16,000,000 ‐ ‐ ‐ ‐ 16,000,000
ANNUAL TOTAL $ 16,000,000 ‐ ‐ ‐ ‐ $ 16,000,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐
Reserve Transfer 3,500,000 ‐ ‐ ‐ ‐ 3,500,000
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds 12,000,000 ‐ ‐ ‐ ‐ 12,000,000
Development Fees 500,000 ‐ ‐ ‐ ‐ 500,000
ANNUAL TOTAL $ 16,000,000 ‐ ‐ ‐ ‐ $16,000,000
PROJECT FUNDING
120
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: DEL ROSA FACILITY UPGRADES
PÙʹã DÝÙ®Öã®ÊÄ
The Del Rosa Facility is in need of major repairs and renovaƟon to both the warehouse and the office building
to secure the facility. Once the new Headquarters is completed, the Del Rosa Yard will serve as a satellite
facility to house parts and materials perƟnent to the repair and maintenance of water faciliƟes on the west
side of the District. In Ɵmes of emergency, the facility will be designated as an alternate Emergency
OperaƟons Center. Plans also include the addiƟon of a customer service counter to enhance convenience to
help customers.
PÙʹã D㮽Ý
Project Type: General/Other
LocaƟon: Del Rosa Yard
Project Manager: Brian Tompkins
PÙʹã S«ç½
Start Date: July 2013
EsƟmated CompleƟon: April 2014
Capital Request Programmed:
New
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 1,000,000
Prior Years Budget: $ 0
PÙʹã MÖ
121
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: A FaciliƟes Maintenance Coordinator will be hired to oversee all
maintenance for the new building. This cost has been included in the FY 2014 Budget.
2. Debt Service: N/A
3. Maintenance: N/A
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
ConstrucƟon (Contract) 500,000 500,000 ‐ ‐ ‐ 1,000,000
ANNUAL TOTAL $ 500,000 $ 500,000 ‐ ‐ ‐ $ 1,000,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue 500,000 500,000 ‐ ‐ ‐ 1,000,000
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 500,000 $ 500,000 ‐ ‐ ‐ $ 1,000,000
PROJECT FUNDING
122
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: ERP SOFTWARE IMPLEMENTATION
PÙʹã DÝÙ®Öã®ÊÄ
In FY 2013, the Board approved the use of Tyler Technologies to be the District’s Enterprise Resource
Planning SoŌware. This project will entail the implementaƟon, data conversion, and training for the use of
the new soŌware for Finance, Customer Service, and Human Resources. The exisƟng financial and billing
soŌware is over 10 years old and does not provide sufficient support as the District conƟnues to grow and
move forward.
PÙʹã D㮽Ý
Project Type: General/Other
LocaƟon: AdministraƟon
Project Manager: Rosie Gaede
PÙʹã S«ç½
Start Date: July 2013
EsƟmated CompleƟon: Feb 2014
Capital Request Programmed:
FY 2012‐13
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 375,000
Prior Years Budget: $ 200,000
PÙʹã MÖ
123
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: Annual Maintenance support will amount to $50,000 and paid for out of the
OperaƟng and Maintenance Budget for Finance, Customer Service and Human Resources.
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
ConstrucƟon (Contract) 175,000 ‐ ‐ ‐ ‐ 175,000
ANNUAL TOTAL $ 175,000 ‐ ‐ ‐ ‐ $ 175,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue 175,000 ‐ ‐ ‐ ‐ 175,000
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 175,000 ‐ ‐ ‐ ‐ $ 175,000
PROJECT FUNDING
124
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: MULTI-YEAR RATE STUDY
PÙʹã DÝÙ®Öã®ÊÄ
In order to encourage water conservaƟon while providing water delivery services at a cost effecƟve rate, a
water rate study is necessary to evaluate the different billing opƟons available that comply with current
regulaƟons and ensure that the District is charging customers the true cost to deliver services. The rate study
will be designed to establish rates for the next 3‐5 years.
PÙʹã D㮽Ý
Project Type: General/Other
LocaƟon: AdministraƟon
Project Manager: Brian Tompkins
PÙʹã S«ç½
Start Date: January 2014
EsƟmated CompleƟon: April 2014
Capital Request Programmed:
New
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 65,000
Prior Years Budget: $ 65,000
PÙʹã MÖ
125
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: Annual Maintenance support will amount to $50,000 and paid for out of the
OperaƟng and Maintenance Budget for Finance, Customer Service and Human Resources.
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
ConstrucƟon (Contract) 65,000 ‐ ‐ ‐ ‐ 65,000
ANNUAL TOTAL $ 65,000 ‐ ‐ ‐ ‐ $ 65,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue 65,000 ‐ ‐ ‐ ‐ 65,000
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 65,000 ‐ ‐ ‐ ‐ $ 65,000
PROJECT FUNDING
126
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: ENERGY EFFICIENT UPGRADES
PÙʹã DÝÙ®Öã®ÊÄ
The District has been working with Honeywell to idenƟfy energy conservaƟon measures that will improve the
operaƟonal efficiency of the District and that will miƟgate conƟnually increasing electricity usage rates.
These projects will be guaranteed by Honeywell to provide savings that will amount to the total project cost
over a 12 year period. Projects include the various installaƟon and repair of valves, boosters, motors,
electrical panels, and wells.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: District‐wide
Project Manager: Sarah Kurth
PÙʹã S«ç½
Start Date: July 2013
EsƟmated CompleƟon: Sept 2014
Capital Request Programmed:
New
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 4,000,000
Prior Years Budget: $ 0
PÙʹã MÖ
127
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: Annual Maintenance of new water appurtenance such as valves and pressure
reducing staƟons will be including in the operaƟng costs, but will be offset by electricity savings.
4. UƟliƟes: Electricity costs should decline as a result of more efficient pumping operaƟons.
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
Planning & Design 500,000 ‐ ‐ ‐ ‐ 500,000
ConstrucƟon (Contract) 3,450,000 ‐ ‐ ‐ ‐ 3,450,000
AdministraƟon 50,000 ‐ ‐ ‐ ‐ 50,000
ANNUAL TOTAL $ 4,000,000 ‐ ‐ ‐ ‐ $ 4,000,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants 4,000,000 ‐ ‐ ‐ ‐ 4,000,000
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 4,000,000 ‐ ‐ ‐ ‐ $ 4,000,000
PROJECT FUNDING
128
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: WATER MASTER PLAN UPDATE
PÙʹã DÝÙ®Öã®ÊÄ
The current Water Master Plan was completed in 2008. Since then, the socio‐economic assumpƟons used to
forecast water demands have changed dramaƟcally. The Board approved an update to the Water Master
Plan at mid‐year for FY 2013. The project will entail development of a new comprehensive hydraulic model
uƟlizing the District’s Geographical InformaƟon System (GIS) to provide key informaƟon to idenƟfy water
infrastructure improvements that will ensure the District is capable of delivering high‐quality water to
exisƟng and future customers in a safe, reliable, and cost‐effecƟve manner.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: District‐wide
Project Manager: Leida Thomas
PÙʹã S«ç½
Start Date: March 2013
EsƟmated CompleƟon: Dec 2013
Capital Request Programmed:
FY 2012‐13
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 300,000
Prior Years Budget: $ 150,000
PÙʹã MÖ
129
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: Projects and repairs and maintenance recommendaƟons will either result in
increased operaƟonal costs or increased capital improvement projects to meet needs.
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
Planning & Design 120,000 ‐ ‐ ‐ ‐ 120,000
AdministraƟon 30,000 ‐ ‐ ‐ ‐ 30,000
ANNUAL TOTAL $ 150,000 ‐ ‐ ‐ ‐ $ 150,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue 150,000 ‐ ‐ ‐ ‐ 150,000
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 150,000 ‐ ‐ ‐ ‐ $ 150,000
PROJECT FUNDING
130
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: PLANT 134 BOOSTER UPGRADE
PÙʹã DÝÙ®Öã®ÊÄ
The booster staƟon at Plant 134 is sized to accommodate the plant’s prior treatment capacity of 4 million
gallons per day (MGD). With the new 8 MGD surface water treatment facility at Plant 134, the booster
staƟon need to be upgraded to maximize the full capacity of the plant. This project will increase pumping
capacity and upgrade downstream piping to increase the plant’s getaway capacity.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: Plant 134
Project Manager: JusƟn Parker
PÙʹã S«ç½
Start Date: July 2013
EsƟmated CompleƟon: Feb 2014
Capital Request Programmed:
FY 2010‐11
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 840,000
Prior Years Budget: $ 310,000
PÙʹã MÖ
131
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: Projects and repairs and maintenance recommendaƟons will either result in
increased operaƟonal costs or increased capital improvement projects to meet needs.
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
ConstrucƟon (Contract) 500,000 ‐ ‐ ‐ ‐ 500,000
AdministraƟon 30,000 ‐ ‐ ‐ ‐ 30,000
ANNUAL TOTAL $ 530,000 ‐ ‐ ‐ ‐ $ 530,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds 530,000 ‐ ‐ ‐ ‐ 530,000
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 530,000 ‐ ‐ ‐ ‐ $ 530,000
PROJECT FUNDING
132
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: PLANT 143 INTER TO UPPER ZONE
PÙʹã DÝÙ®Öã®ÊÄ
A 1 million gallon reservoir, ancillary piping, and a booster staƟon are being constructed at Plant 143 to
collect the water from Wells 146 and 147 that will allow entrapped air to dissipate in the reservoir therefore
alleviaƟng customer complaints about air in the water that is disrupƟve in their homes. ConstrucƟon
includes the construcƟon of a steel storage tank and ancillary piping to convey water. This will also require
the retrofiƫng of exisƟng equipment at Wells 146 and 147 to deliver water to Plant 143.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: Plant 143
Project Manager: Victor DeLeon
PÙʹã S«ç½
Start Date: September 2012
EsƟmated CompleƟon: Aug 2013
Capital Request Programmed:
FY 2012‐13
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 3,360,000
Prior Years Budget: $ 2,520,000
PÙʹã MÖ
133
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: There will be increased maintenance cost for new reservoir and booster staƟon
being constructed.
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
ConstrucƟon (Contract) 840,000 ‐ ‐ ‐ ‐ 840,000
ANNUAL TOTAL $ 840,000 ‐ ‐ ‐ ‐ $ 840,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds 840,000 ‐ ‐ ‐ ‐ 840,000
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 840,000 ‐ ‐ ‐ ‐ $ 840,000
PROJECT FUNDING
134
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: PLANT 134 UPGRADE TECHNOLOGY
PÙʹã DÝÙ®Öã®ÊÄ
AŌer compleƟon of the new 8 million gallons per day surface water treatment plant at Plant 134, the District
will need to demolish and remove the exisƟng Roberts Filter Tanks that were part of the previous treatment
process. The media within the tanks must be removed as soon as possible to prevent microbial growth. This
will comply with California Department of Public Health standards.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: Plant 134
Project Manager: JusƟn Parker
PÙʹã S«ç½
Start Date: July 2013
EsƟmated CompleƟon: Feb 2014
Capital Request Programmed:
FY 2010‐11
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 10,080,000
Prior Years Budget: $ 10,000,000
PÙʹã MÖ
135
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: N/A
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
AdministraƟon 10,000 ‐ ‐ ‐ ‐ 10,000
ANNUAL TOTAL $ 80,000 ‐ ‐ ‐ ‐ $ 80,000
ConstrucƟon (Contract) 70,000 ‐ ‐ ‐ ‐ 70,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds 80,000 ‐ ‐ ‐ ‐ 80,000
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 80,000 ‐ ‐ ‐ ‐ $ 80,000
PROJECT FUNDING
136
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: LIVE OAK MAIN REPLACEMENT
PÙʹã DÝÙ®Öã®ÊÄ
The facility appurtenances and downstream conveyance faciliƟes are anƟquated, undersized, and in need of
replacement. This project includes the replacement of approximately 2,000 linear feet of 4 and 6 inch
pipelines, retrofiƫng of Plant 137, and replace pipeline in a private driveway off Live Oak Rd. and Summit Dr.
There has been a significant amount of repair work completed at this locaƟon. At this Ɵme, staff has
determined that replacement of the aging infrastructure should resolve the maintenance issues at a more
cost effecƟve price.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: Live Oak Rd/Summit Dr.
Project Manager: Sarah Kurth
PÙʹã S«ç½
Start Date: Feb 2013
EsƟmated CompleƟon: Nov 2013
Capital Request Programmed:
FY 2011‐12
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 1,040,000
Prior Years Budget: $ 425,000
PÙʹã MÖ
137
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: Decreased maintenance cost as a result of the replacement of aging infrastructure
to reduce the amount of service calls.
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
AdministraƟon 30,000 ‐ ‐ ‐ ‐ 30,000
ANNUAL TOTAL $ 615,000 ‐ ‐ ‐ ‐ $ 615,000
Project Mgmt/Inspect 80,000 ‐ ‐ ‐ ‐ 80,000
ConstrucƟon (Contract) 505,000 ‐ ‐ ‐ ‐ 505,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds 615,000 ‐ ‐ ‐ ‐ 615,000
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 615,000 ‐ ‐ ‐ ‐ $ 615,000
PROJECT FUNDING
138
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: PLANT 40 BOOSTER
PÙʹã DÝÙ®Öã®ÊÄ
This project includes the construcƟon of a booster staƟon at this site. A booster at this plant will be key in
conveying water from the intermediate pressure zone to the upper pressure zone. Plant 40 is also a terminus
point for a future 30 inch pipeline that conveys water across the enƟre intermediate pressure zone. The
boosters will provide greater operaƟonal reliability and flexibility by delivering ground water to other
pressure zones.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: Plant 40
Project Manager: JusƟn Parker
PÙʹã S«ç½
Start Date: January 2014
EsƟmated CompleƟon: Feb 2015
Capital Request Programmed:
FY 2012‐13
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 840,000
Prior Years Budget: $ 620,000
PÙʹã MÖ
139
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: A new booster staƟon will require minimal prevenƟve maintenance to prolong the
life of the pumps and motors.
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
AdministraƟon 10,000 ‐ ‐ ‐ ‐ 10,000
ANNUAL TOTAL $ 220,000 ‐ ‐ ‐ ‐ $ 220,000
Project Mgmt/Inspect 62,000 ‐ ‐ ‐ ‐ 62,000
Planning & Design 93,000 ‐ ‐ ‐ ‐ 93,000
ConstrucƟon (Contract) 55,000 ‐ ‐ ‐ ‐ 55,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds 220,000 ‐ ‐ ‐ ‐ 220,000
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 220,000 ‐ ‐ ‐ ‐ $ 220,000
PROJECT FUNDING
140
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: ONSITE EMERGENCY GENERATORS
PÙʹã DÝÙ®Öã®ÊÄ
This project will locate, design, procure, and install two permanent on‐side emergency generators at certain
water faciliƟes located in the foothills. In order to maintain reliable service during unexpected power
outages as a result of a catastrophic event, the back‐up generators will be necessary at the plants located in
higher elevaƟons.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: Various
Project Manager: Sarah Kurth
PÙʹã S«ç½
Start Date: January 2014
EsƟmated CompleƟon: June 2015
Capital Request Programmed:
New
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 850,000
Prior Years Budget: $ 0
PÙʹã MÖ
141
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: Maintenance will be required annually to service and ensure the funcƟonality of
the generator during emergencies.
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
Planning & Design 65,000 65,000 65,000 ‐ ‐ 195,000
ConstrucƟon (Contract) 125,000 ‐ ‐ ‐ ‐ 625,000
AdministraƟon 10,000 ‐ ‐ ‐ ‐ 30,000
ANNUAL TOTAL $ 200,000 $225,000 $425,000 ‐ ‐ $ 850,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue 200,000 225,000 425,000 ‐ ‐ 850,000
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 850,000 ‐ ‐ ‐ ‐ $ 850,000
PROJECT FUNDING
142
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: PLANT 134 SPW TURNOUT/FEEDER
PÙʹã DÝÙ®Öã®ÊÄ
The District is partnering with San Bernardino Valley Municipal Water District (SBVMWD) on a regional
project to reconstruct the District’s State Project Water (SPW) turnout and install a new feeder line to Plant
134. The new feeder line and turnout will extend from SBVMWD’s Foothill Feeder (at City Creek) to Plant
134 intake vault. The new connecƟon will be a criƟcal facility in allowing the District to maximize its surface
water treatment capacity at Plant 134 and fully uƟlize SPW as an integral part of the District’s water supply
mix. The District’s exisƟng connecƟon is obsolete and cannot reliably supply SPW to Plant 134.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: Plant 134
Project Manager: JusƟn Parker
PÙʹã S«ç½
Start Date: July 2013
EsƟmated CompleƟon: Feb 2014
Capital Request Programmed:
New
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 1,090,000
Prior Years Budget: $ 0
PÙʹã MÖ
143
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: N/A
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
Planning & Design 120,000 ‐ ‐ ‐ ‐ 120,000
ConstrucƟon (Contract) 850,000 ‐ ‐ ‐ ‐ 850,000
AdministraƟon 40,000 ‐ ‐ ‐ ‐ 40,000
ANNUAL TOTAL $ 1,090,000 ‐ ‐ ‐ ‐ $ 1,090,000
Project Mgmt/Inspect 80,000 ‐ ‐ ‐ ‐ 80,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue 1,090,000 ‐ ‐ ‐ ‐ 1,090,000
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 1,090,000 ‐ ‐ ‐ ‐ $ 1,090,000
PROJECT FUNDING
144
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: HYDROELECTRIC FACILITY
PÙʹã DÝÙ®Öã®ÊÄ
The District and San Bernardino Valley Municipal Water District (SBVMWD) is partnering on a regional project
to install a hydroelectric generaƟon facility at Plan 134. A new turnout and feeder line from SBVMWD will
deliver State Project Water at high pressure and flow capable of generaƟng electricity sufficient to power
Plant 134 during operaƟon. The electricity generated by the facility will miƟgate electricity costs for water
treatment, therefore decreasing the cost per acre foot of water.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: Plant 134
Project Manager: JusƟn Parker
PÙʹã S«ç½
Start Date: January 2014
EsƟmated CompleƟon: Feb 2015
Capital Request Programmed:
New
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 1,600,000
Prior Years Budget: $ 0
PÙʹã MÖ
145
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: N/A
4. UƟliƟes: The facility should generate enough electricity to run Plant 134 during operaƟon,
therefore decreasing electrical costs.
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
AdministraƟon 100,000 ‐ ‐ ‐ ‐ 100,000
ANNUAL TOTAL $ 1,600,000 ‐ ‐ ‐ ‐ $ 1,600,000
Project Mgmt/Inspect 200,000 ‐ ‐ ‐ ‐ 200,000
Planning & Design 300,000 ‐ ‐ ‐ ‐ 300,000
ConstrucƟon (Contract) 1,000,000 ‐ ‐ ‐ ‐ 1,000,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants 1,600,000 ‐ ‐ ‐ ‐ 1,600,000
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 1,600,000 ‐ ‐ ‐ ‐ $ 1,600,000
PROJECT FUNDING
146
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: WATER QUALITY RETROFITS
PÙʹã DÝÙ®Öã®ÊÄ
As part of the backflow prevenƟon program, the District must replace all single check fire services and
underground flushouts in the water system. These two appurtenances are backflow hazards and need to be
replaced to comply with water quality standards. There are approximately 150 single check fire services and
200 flushouts that need to be replaced.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: District‐wide
Project Manager: Andrew Theisen
PÙʹã S«ç½
Start Date: July 2013
EsƟmated CompleƟon: June 2018
Capital Request Programmed:
New
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 500,000
Prior Years Budget: $ 0
PÙʹã MÖ
147
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: N/A
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
ConstrucƟon (Contract) 75,000 75,000 75,000 75,000 75,000 375,000
Project Mgmt/Inspect 15,000 15,000 15,000 15,000 15,000 75,000
AdministraƟon 10,000 10,000 10,000 10,000 10,000 50,000
ANNUAL TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue 100,000 100,000 100,000 100,000 100,000 500,000
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
PROJECT FUNDING
148
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: WELL & BOOSTER REHABS
PÙʹã DÝÙ®Öã®ÊÄ
Every year, District staff works with Southern California Edison to conduct efficiency tests on all pumps for
wells and boosters at all water faciliƟes. The results of the tests idenƟfy inefficient pumps that costs
thousands of dollars in wasted energy. Staff prioriƟzes the need for each pump to be refurbished or replaced
as the soluƟon to improve efficiency. Ideally, pumps should operate at 75% efficiency. Staff does not
consider rehabs unƟl the efficiency has dropped below 60%. Rehabs are a cost efficient soluƟon to reduce
annual energy consumpƟon, improve system reliability and lower maintenance costs.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: District‐wide
Project Manager: Mike Henderson
PÙʹã S«ç½
Start Date: July 2013
EsƟmated CompleƟon: June 2014
Capital Request Programmed:
New
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 500,000
Prior Years Budget: $ 0
PÙʹã MÖ
149
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: Rehabs will help lower maintenance costs and prolong the life of the equipment.
4. UƟliƟes: With improved efficiency, electricity costs should decrease slightly.
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
ConstrucƟon (Contract) 100,000 100,000 100,000 100,000 100,000 500,000
ANNUAL TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue 100,000 100,000 100,000 100,000 100,000 500,000
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000
PROJECT FUNDING
150
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: AMR METER REPLACEMENT
PÙʹã DÝÙ®Öã®ÊÄ
More than half of the meters in the District are over 10 years old. In order to receive accurate meter reads in
a efficient manner, the meters are being changed to radio read to alleviate the labor intensive task.
Currently, meter readers walk the streets and manually read each meter, Automated Meter Reading (AMR)
will allow for the radio transmission of reads as the employee drives by. Eventually, it is this technology that
will allow the District to move to an Automated Meter Infrastructure that will allow real Ɵme monitoring of
water usage for customers.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: District‐wide
Project Manager: Carol Cales
PÙʹã S«ç½
Start Date: July 2012
EsƟmated CompleƟon: June 2017
Capital Request Programmed:
FY 2011‐12
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 3,980,000
Prior Years Budget: $ 980,000
PÙʹã MÖ
151
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: N/A
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
ConstrucƟon (Contract) 750,000 750,000 750,000 750,000 ‐ 3,000,000
ANNUAL TOTAL $ 750,000 $ 750,000 $ 750,000 $ 750,000 ‐ $ 3,000,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue 750,000 750,000 750,000 750,000 750,000 3,000,000
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 750,000 $ 750,000 $ 750,000 $ 750,000 $ 750,000 $ 3,000,000
PROJECT FUNDING
152
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: FACILITIES RELOCATION
PÙʹã DÝÙ®Öã®ÊÄ
Replacement and relocaƟon of District faciliƟes and appurtenances for development as required by the City
of Highland, City of San Bernardino, County of San Bernardino, and other agencies. This project may entail
the relocaƟon of fire hydrants, main lines, and service connecƟons where other agencies may be developing
homes, businesses or public infrastructure improvements.
PÙʹã D㮽Ý
Project Type: Water
LocaƟon: District‐wide
Project Manager: JusƟn Parker
PÙʹã S«ç½
Start Date: July 2013
EsƟmated CompleƟon: June 2015
Capital Request Programmed:
FY 2010‐11, ongoing
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 675,000
Prior Years Budget: $ 0
PÙʹã MÖ
153
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: N/A
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
ConstrucƟon (Contract) 30,000 105,000 105,000 105,000 105,000 450,000
Project Mgmt/Inspect 30,000 30,000 30,000 30,000 30,000 150,000
AdministraƟon 15,000 15,000 15,000 15,000 15,000 75,000
ANNUAL TOTAL $ 75,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 675,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue 75,000 150,000 150,000 150,000 150,000 675,000
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 75,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 675,000
PROJECT FUNDING
154
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
PROJECT TITLE: SEWER REPLACEMENT
PÙʹã DÝÙ®Öã®ÊÄ
The 2013 Sewer Master Plan idenƟfied over 5,500 linear feet of sewer main that need replacement based on
pipe age and condiƟon. The need for replacement was confirmed by field inspecƟon using CCTV. It is
important to replace secƟons of old piping on a regular basis to avoid major sanitary sewer overflows or large
replacement project costs in the future.
PÙʹã D㮽Ý
Project Type: Sewer
LocaƟon: District‐wide
Project Manager: Leida Thomas
PÙʹã S«ç½
Start Date: July 2014
EsƟmated CompleƟon: June 2015
Capital Request Programmed:
New
PÙʹã CÊÝã OòÙò®ó
Total Project Cost: $ 780,000
Prior Years Budget: $ 0
PÙʹã MÖ
155
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
OÖÙã®Ä¦ Bç¦ã IÃÖã SããÃÄã
1. AddiƟonal Staff Salaries: N/A
2. Debt Service: N/A
3. Maintenance: N/A
4. UƟliƟes: N/A
PROJECT COST
EsƟmated Cost
ItemizaƟon
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
ConstrucƟon (Contract) 120,000 120,000 120,000 120,000 120,000 600,000
Project Mgmt/Inspect 12,000 12,000 12,000 12,000 12,000 60,000
AdministraƟon 6,000 6,000 6,000 6,000 6,000 30,000
ANNUAL TOTAL $ 156,000 $ 156,000 $ 156,000 $ 156,000 $ 156,000 $ 780,000
Planning & Design 18,000 18,000 18,000 18,000 18,000 90,000
Financing Source
FY 2013‐14
Year 1
FY 2014‐15
Year 2
FY 2015‐16
Year 3
FY 2016‐17
Year 4
FY 2017‐18
Year 5 Total
OperaƟng Revenue 156,000 156,000 156,000 156,000 156,000 780,000
Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐
Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐
Development Fees ‐ ‐ ‐ ‐ ‐ ‐
ANNUAL TOTAL $ 156,000 $ 156,000 $ 156,000 $ 156,000 $ 156,000 $ 780,000
PROJECT FUNDING
156
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
GLOSSARY
Acre Foot (AF) ‐ water measurement equal to 325,851 gallons.
Enterprise Fund ‐ a fund established to account for operaƟons that are financed and operated
in a manner similar to business enterprises where the intent of the governing body is that
costs of providing goods and services to the general public on a conƟnuing basis be financed
or recovered primarily through user charges.
Fees ‐ charges for service that are based upon the cost of providing the service.
Fiscal Year (FY) ‐ the Ɵme frame in which the budget applies. This period is from July 1
through June 30.
Full‐Time Equivalent (FTE) ‐ a measure of effecƟve authorized posiƟons, indicaƟng the
percentage of Ɵme a posiƟon or group of posiƟons is funded. It is calculated by equaƟng
2,080 hours of work per year with the full‐Ɵme equivalent of one posiƟon; thus, one posiƟon
would have an FTE of 1.
Fund ‐ an independent fiscal and accounƟng enƟty with a self‐balancing set of accounts
recording cash and/or other resources together with all related liabiliƟes, obligaƟons,
reserves, and equiƟes which are segregated for the purpose of carrying on specific acƟviƟes or
aƩaining certain objecƟves.
Fund Balance ‐ the excess of an enƟty’s assets over its liabiliƟes. A negaƟve fund balance is
someƟmes called a deficit.
Generally Accepted AccounƟng Principles (GAAP) ‐ Uniform minimum standards of, and
guidelines for external financial accounƟng and reporƟng. They govern the form and content
of the basic financial statements of an enƟty. GAAP encompasses the convenƟons, rules and
procedures necessary to define accepted accounƟng pracƟces at a parƟcular Ɵme. They
include not only broad guidelines of general applicaƟon, but also detailed pracƟces and
procedures. The primary authoritaƟve statements on the applicaƟon of GAAP to state and
local governments are Government AccounƟng Standards Board (GASB) pronouncements and
Financial AccounƟng Standards Board (FASB) pronouncements. GAAP provides a standard by
which to measure financial presentaƟons.
General ObligaƟon Bonds ‐ bonds, the payment for which, the full faith and credit of the
issuing government are pledged.
157
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
Geographic InformaƟon System (GIS) ‐ an organized collecƟon of computer hardware,
soŌware and geographic data designed to efficiently capture, store, update, manipulate,
analyze, and display all forms of geographically referenced informaƟon.
Hundred Cubic Feet (HCF) ‐ water billing measurement equal to 748 gallons.
Interfund Transfers ‐ budgeted amounts transferred from one governmental accounƟng fund
to another for work or services provided.
Internal Control ‐ a plan of organizaƟon for purchasing, accounƟng, and financial acƟviƟes
which, among other things, provides that:
The duƟes of employees are subdivided so that no single employee handles a
financial transacƟon from beginning to end,
Proper authorizaƟons from specific responsible officials are obtained before key
steps in the processing of transacƟons are completed, and
Records and procedures are arranged appropriately to facilitate effecƟve control.
MGD ‐ Million Gallons Per Day.
Purchase Order ‐ a document issued to authorize a vendor or consultant to deliver specified
merchandise or render a specified service for a stated esƟmated price.
Revenue ‐ income generated by assessments, investments, connecƟon fees, stand‐by fees,
and user charges.
Reserve ‐ an account used to indicate that a porƟon of fund equity or (Fund Balance) is legally
restricted for a specific purpose or not available for appropriaƟon and subsequent spending.
SCADA ‐ Supervisory Control and Data AcquisiƟon.
158
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
CHART OF ACCOUNTS
Labor ‐ regular salaries and wages for permanent full‐Ɵme and part‐Ɵme employees.
Temporary Labor ‐ costs for labor not permanently employed by the District.
OverƟme ‐ for employees that work more than their regular 40 hours per week.
Standby ‐ employees that are on call for emergencies aŌer hours, weekends, and holidays.
Benefits ‐ medical, dental, vision, reƟrement, and related benefits offered by the District.
Purchased Water ‐ cost to purchase surface water.
Groundwater Replenishment ‐ cost to pump groundwater from the basin.
Water Stock Assessment ‐ cost of water shares directly related to North Fork.
Materials & Supplies ‐ items used in daily operaƟons, repair, and maintenance.
Tools ‐ items used to perform repair and maintenance acƟviƟes.
Office Supplies ‐ items such as pens, paper and other related desk accessories.
Chemicals ‐ chemicals used for the treatment of water and wastewater.
Contract Services ‐ services rendered by consultants and contractors.
PrinƟng & Publishing ‐ costs for prinƟng and producing District publicaƟons.
Banking Services ‐ services and fees charged by the District’s banks.
Legal Services ‐ cost for legal advice, consultaƟon, contract review, and liƟgaƟon.
Treatment Services ‐ outside treatment services for water and wastewater such as the City of
San Bernardino.
Rents & Leases ‐ rental and lease costs for buildings and equipment that are not owned by the
District.
UƟliƟes ‐ cable, gas, and other uƟliƟes not including telephone and electricity.
Telephone ‐ land lines, cellular phones, and internet services.
Electric ‐ electricity usage costs.
Fuel ‐ fuel costs for vehicles and generators.
Permits ‐ permit costs required by federal, state, and local regulatory agencies.
Postage ‐ costs for mailing bills, publicaƟons, and special deliveries.
159
EAST VALLEY WATER DISTRICT FISCAL YEAR 2013‐14
Memberships & Dues ‐ subscripƟons and memberships for associaƟons and special groups.
Professional Development ‐ seminars, conferences and travel costs for employee
development.
EducaƟon Assistance ‐ tuiƟon reimbursement for those employees who aƩend school for a
degree or cerƟficate.
Insurance/Claims ‐ general liability insurance for the District’s faciliƟes and infrastructure.
160
CONTACT US
District Offices
3654 E. Highland Avenue, Suite 18
Highland, CA 92346
Phone
909-889-9501
Website
www.eastvalley.org