HomeMy WebLinkAboutAgenda Packet - EVWD Board of Directors - 06/26/2013Proposed Fiscal Year 2013/14 Budget   FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  SECTION        PAGE  TransmiƩal LeƩer             1  District Profile              3  District  Officials             6  OrganizaƟonal Structure            8  Mission Statement             9  Strategic Plan            10  Financial Management          11  Budget Guide            15  Budget Overview           19   Authorized and Funded PosiƟons            21  Financial Summary           25   Water Fund           33   Wastewater Fund          41  Program Summaries   Board of Directors          49   General AdministraƟon         51   Human Resources          55   Public Affairs/ConservaƟon          59   Finance           63   InformaƟon Technology         67   Customer Service          71   Meter Service           75   Engineering           79   Water ProducƟon          83   Water Treatment          89   Water Quality           93   Water Maintenance          97   Wastewater Maintenance       101   FaciliƟes Maintenance       105   Fleet Maintenance        107  Capital Outlay          111  Capital Improvement Program       113  Glossary          157  TABLE OF CONTENTS   FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  Honorable Board of Directors,  The Fiscal Year 2013‐14 Budget supports East Valley Water District’s (EVWD) commitment to  being stewards of rate payers dollars and conƟnued efforts to elevate the level of service we  provide to our customers.  EVWD conƟnues to implement innovaƟve strategies and iniƟaƟves  for organizaƟonal opƟmizaƟon, while providing reliable, quality water and enhanced customer  service.  As a direct result of the leadership and vision of the Board of Directors, EVWD will begin the  year with a balanced budget while maintaining strong raƟngs in the bond and investment  markets.  We approached the current budget process with a focus on maintaining core  services that are most criƟcal to customers, aligning resources with specific prioriƟes, and  idenƟfying sustainable savings that strengthen the District’s long‐term ability to effecƟvely  deliver services.  Using the Strategic Plan as a guiding principle, the District conƟnues to assess programs and  processes based on a value‐added method, with the end goal of achieving maximum efficiency  and producƟvity.  By establishing concise goals with measurable results, EVWD operates as a  results‐oriented organizaƟon and has implemented a program‐based budget that allows for  unit cost breakdowns and accounts for spending through a transparent program budgeƟng  strategy.  These enhancements will increase the value of each dollar received, improve  customer service, and focus on delivering sustainable outcomes for  our customers.  EVWD has made great strides in its investment in technology to maximize exisƟng resources.   New soŌware and programs are assisƟng staff in balancing the need to maintain affordable  rates with the importance of sustaining infrastructure investments and a strong financial  posiƟon.  With a focus on internal efficiency through the use of informaƟon technology best  pracƟces, we are capitalizing on the recent advancements and uƟlizing those to improve  efficiency and producƟvity.  In closing, I am pleased to submit the FY 2013‐14 Budget proposal for consideraƟon by the  TRANSMITTAL LETTER 1    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  Board of Directors, District employees, and the customers of East Valley Water District.  EVWD  will conƟnue to enhance programs and explore opportuniƟes to deliver beƩer, faster, and  enhanced customer service by evaluaƟng and re‐evaluaƟng all aspects of District operaƟons.   The Budget will serve as a guide as we work to set new standards for public agency efficiency  and to deliver the highest quality service and value as affordably as possible to our customers.    Respecƞully SubmiƩed,        John J. Mura  General Manager/CEO   2    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  East Valley Water District (EVWD) is a California Special District that provides water and  wastewater service to residents within its 27.7 square mile service area and is governed by a  five member Board of Directors elected at‐large to four year terms by EVWD consƟtuents.   East Valley Water District is a 100% rate‐based organizaƟon that receives no tax‐related  revenue and operates in accordance with Division 12 of the California Water Code. The District  was formed on January 18, 1954, through an elecƟon of local residents, mostly citrus grove  operators, to have water service provided by a public water agency.   The District is located in the foothills of the San Bernardino Mountains, approximately 65 miles  east of Los Angeles in the County of San Bernardino.  With a service area encompassing 27.7  square miles, the District provides water and service to approximately 93,500 residents within  the City of Highland, eastern porƟons of the City of San Bernardino, the San Manuel Band of  Mission Indians, and porƟons of unincorporated County of San Bernardino. DISTRICT PROFILE East Valley Water District Service Area  3    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  WATER  SOURCES  EVWD uƟlizes a mix of groundwater from the Bunker Hill Groundwater Basin, surface water  from the Santa Ana River, and State Water Project.  The District is heavily reliant on  groundwater which supplies approximately 87% of customer demand.  Surface water is  treated and distributed from the Philip A. Disch Surface Water Treatment Plant (Plant 134).  In  2013, the District completed an upgrade and expansion of Plant 134 to allow the treatment  and distribuƟon of up to 8 million gallons per day of water into the system using an ultra‐ filtraƟon membrane system, resulƟng in addiƟonal system capacity and supply reliability.    WASTEWATER  COLLECTION & TREATMENT  The District is responsible for the collecƟon and conveyance of wastewater within the service  area.  All wastewater is sent to the City of San Bernardino Municipal Water Department where  it is treated in accordance with a Joint Powers Agreement.    CUSTOMERS  The District serves a wide range of residenƟal and commercial customers in the area, in  addiƟon to the San Manuel Band of Mission Indians, San Manuel Indian Casino and Bingo, and  PaƩon State Hospital.  A majority of customers are residenƟal (91%), with less than 2% of  customers classified as agricultural users.          WEATHER  The weather in Highland/San Bernardino varies throughout the year. During the summer  temperatures can reach over 115° F and as low as 40° F during the winter.  This area typically  averages 18 inches of precipitaƟon annually, mostly during the months of January through  March.  The weather paƩern helps the District forecast water usage during the year.  This informaƟon  is used to determine the best strategy to pump and distribute water to customers.  Cost,  supply, and system constraints are also considered when determining the water supply mix.  ACTIVE SERVICES BY TYPE  CUSTOMER TYPE NUMBER OF CONNECTIONS  ResidenƟal 18,584  MulƟ‐Family 497  Commercial 1,268  IrrigaƟon 313  Fire Services 1,321  Total ConnecƟons 21,983  4    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  GOVERNMENT  The District is organized in a way that provides responsive and effecƟve service to the rate  payers. EVWD is governed by a five member Board of Directors elected by voters at‐large to  four year terms.  The Board represents the public’s interest as policy makers with regard to  rates for service, assessments, policies, ordinances, and other overall maƩers  related to the  management and operaƟon of the District.  Appointed by the Board of Directors, the General  Manager/CEO is responsible for overseeing daily operaƟons and managing staff resources.  EDUCATION  Residents within East Valley Water District’s service area have access to award winning K‐12  schools through the Redlands and San Bernardino School Districts.  Local colleges and  universiƟes include nearby California State University, San Bernardino, the University of  California at Riverside, the University of Redlands, Loma Linda University, and junior colleges  such as Riverside Community College, CraŌon Hills College, and San Bernardino Valley  Community College.  HOSPITAL AND MEDICAL FACILITIES   Hospital or medical faciliƟes located in or near the East Valley Water District service area  include Arrowhead Regional Medical Center, Loma Linda University Hospital, Kaiser  Permanente Hospital, Redlands Community Hospital, San Bernardino Community Hospital,  Veteran’s AdministraƟon, and St. Bernadine Medical Center.     HIGHLAND SAN BERNARDINO STATE OF CALIFORNIA  Median Income $45,100 $40,161 $61,632  Unemployment 14.9% 15.8% 10.4%  Median Home Value $303,300 $202,400 $421,600  Persons Below Poverty 17.6% 28.6% 14.4%  College EducaƟon 19.7% 12.7% 30.2%  2011 COMMUNITY STATISTICS    5    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  DISTRICT OFFICIALS MaƩ LeVesque  Chairman  James Morales, Jr.  Vice Chairman  Ben Coleman  Board Member  Kip Sturgeon  Board Member  George E. “Skip” Wilson  Board Member  GOVERNING BOARD  6    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  John Mura  General Manager/CEO  Mike Maestas  Assistant General Manager  Kerrie Bryan       Human Resources/Risk and Safety Manager  JusƟne Hendricksen  AdministraƟve Manager            Brian Tompkins  Chief Financial Officer  Nemesciano Ochoa  Engineering Manager    Kelly Malloy  Public Affairs/ConservaƟon Officer  7  DISTRICT MANAGEMENT EXECUTIVE TEAM    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  ORGANIZATIONAL STRUCTURE Rate Payers  Board of  Directors  General Manager/  CEO  Assistant General  Manager  Chief Financial  Officer  Engineering  Customer Service Finance  InformaƟon  Technology  General  AdministraƟon  OperaƟons  Human Resources  Public Affairs/  ConservaƟon  Maintenance  Legal Counsel  8    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  MISSION STATEMENT   Our Mission at East Valley Water  District is to provide our  customers with a safe and reliable water supply that is  delivered at a fair and cost‐effecƟve price.  9    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  I.  PROVIDE SAFE AND RELIABLE WATER SUPPLY       A.  Meet all regulatory requirements       B.  IdenƟfy unit cost for delivery sources       C.  Address system flexibility constraints       D.  Develop cost‐effecƟve water supply mix       E.  Transparent and efficient financial management  STRATEGIC PLAN II.  CREATE AN ENVIRONMENT MORE CONDUCIVE TO EFFICIENT & EFFECTIVE PUBLIC SERVICE       A.  Improve organizaƟonal culture       B.  Elevate staff capabiliƟes and employee reinvestment       C.  Establish “Board Norms” and conduct board educaƟon program       D.  Perform headquarters needs assessment       E.  Deliver property opƟons to board and commence construcƟon  III.  DISTRICT RESOURCE ENHANCEMENT EFFORTS       A.  AƩract and retain quality employees       B.  Establish key performance indicators       C.  IniƟate staff development program       D.  Enhance system redundancy (Emergency Prep)       E.  System maintenance and modernizaƟon  IV.  DISTRICT BRAND DEVELOPMENT & COMMUNITY INVOLVEMENT       A.  Enhance community outreach, brand idenƟty, and web presence       B.  Develop conservaƟon program and customer service iniƟaƟves       C.  Engage regional and naƟonal water partners       D.  Emergency prep and mutual aid agreements       E.  LegislaƟve plaƞorm and strategic grant pursuit  The District’s Strategic Plan is a powerful tool for creaƟng an atmosphere for efficient decision ‐making, teamwork and communicaƟon  It provides a clear foundaƟon for operaƟng as a  value‐added organizaƟon.  The comprehensive Strategic Plan, developed with stakeholder  input through acƟve parƟcipaƟon of management and employees, has established the  framework to execute plans and achieve goals.  10    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  FINANCIAL POLICIES  The East Valley Water District financial management policies provide a basic framework for  the overall fiscal management of the District.  The policies represent a foundaƟon for  addressing changing circumstances and condiƟons, and to assist  in the decision‐making  process.  Financial policies represent guidelines for evaluaƟng both current acƟviƟes and  proposals for future programs.  They also reflect long‐standing principles and pracƟces, which  have enabled the District to maintain its financial stability.  Policies are reviewed annually to  ensure the guidelines represent a realisƟc, current framework for policy decisions.  Balanced Budget  East Valley Water District shall prepare an itemized budget for each fund and each program  within those funds.  The budgets will be balanced, with current revenues equal to or greater  than current expenditures/expenses using the following strategies: improve producƟvity; raise  fees to offset costs of providing services; use reserves if available.  Investment Policy  The District’s Investment Policy applies to the investment of short‐term operaƟng funds of the  District in excess of those funds required to meet current District expenditures.  District policy  requires adherence to California Government Code secƟons 5921 and 5360 regarding  allowable investments.  The policy also includes guidelines on Pooling of Funds, Safety,  Liquidity, Yield, Prudence, Ethical Standards, Risk, DiversificaƟon, and ReporƟng.  Reserve Policy  The District recognizes that fiscal responsibility requires anƟcipaƟng, and preparing for,  unforeseen events, in addiƟon to ensuring sufficient funding is available for current operaƟng,  capital, and debt service needs.  To that end, the District has adopted a Designated Funds  (Reserve) Policy as part of prudent financial planning, and to ensure sufficient funding for  current and future needs.  The Designated Funds Policy has established the following reserves  and reserve target levels:  OperaƟng Reserves – maintain 90 days of District’s budgeted total operaƟng  expenses  Rate StabilizaƟon Reserves – maintain 45 days of District’s budgeted total operaƟng  expenses  Capital Replacement Reserves – minimum of 100% of depreciaƟon expense for the  preceding year FINANCIAL MANAGEMENT 11    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  Emergency Reserves – 2% of the total value of Plant and Equipment  Debt Policy  The District has adopted a policy regarding the uƟlizaƟon of debt.  Standards established in  this policy require:  1. an equitable allocaƟon of capital costs/charges between current and future system  users, and   2. minimum rate volaƟlity.  In addiƟon, the District confines long‐term borrowing to capital improvements for projects  that cannot be financed from current revenues.  When the District finances capital projects by  issuing bonds, it will pay back the bonds within a period not to exceed the esƟmated useful life  of the project.  The District maintains good communicaƟon with bond raƟng agencies  regarding financial condiƟon and will follow a policy of full disclosure on every financial report.    BASIS OF ACCOUNTING AND BUDGETING  The District’s financial records are kept in accordance with Generally Accepted AccounƟng  Principles (GAAP) for governmental enterprise funds.  The District follows the GAAP  requirement that enterprise funds use the full accrual basis of accounƟng.  However, there are  excepƟons where the accrual basis is not conducive to effecƟve presentaƟon of the District’s  budget, in which case, GAAP is not followed.  Those excepƟons are as follows:  Compensated absence liabiliƟes that are expected to be liquidated with current  expendable financial resources are accrued as earned by employees (GAAP  standard) as opposed to being expended when paid (budget procedure).  Principal payments on Long Term Debt are applied to the outstanding liability on a  GAAP basis, as opposed to being expended on a Budget basis.  Capital Outlay are capitalized on a GAAP basis, however, on a Budget basis, they  are treated as expenditures.  DepreciaƟon expense is recorded on a GAAP basis but is not contemplated on the  Budget basis.  Interest expenditures are capitalized during construcƟon on a GAAP basis, but are  reported as an expense on a Budget basis.  The acƟviƟes of enterprise funds closely resemble those of ongoing businesses in which the  purpose is to conserve and add to resources while meeƟng operaƟng expenses from current  12    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  revenues.  Enterprise funds account for operaƟons that provide services on a conƟnuous basis  and, in the case of East Valley Water District, are enƟrely financed by revenues derived from  user charges.  The District maintains a self‐balancing set of accounts established to record the  financial posiƟon and operaƟng results that pertain to each acƟvity.    BUDGET DEVELOPMENT & PROCESS  The budget reflects direcƟon from the Board of Directors as established by the Strategic Plan  and communicated to the District’s staff through various meeƟngs and workshops.  The  purpose of this budget document is to provide staff with a road map for prioriƟzing Capital  Improvement Projects and fulfilling the District’s mission statement.  The Fiscal Year 2013‐14  Budget  represents guidelines established to address the District’s short‐term and long‐term  goals and objecƟves.  This document also demonstrates the District’s ability to use capital  resources for compleƟng criƟcal capital projects for current and future customers as well as  the District’s commitment to meet its financial obligaƟons.  Staff is confident that the financial  framework outlined in the FY 2013‐14 Budget will allow the District to deliver reliable, high‐ quality water and wastewater services to its customers in a prudent and sustainable manner.  Each year programs establish goals and objecƟves in support of the District’s guiding principles  that provide clear direcƟon to staff regarding District‐wide prioriƟes.  Program Managers  idenƟfy accompanying measures and targets to track progress toward achieving and  communicaƟng the intent of the objecƟve against expected performance levels.  Progress is  measured throughout the fiscal year and reported to the Board of Directors on a quarterly  basis.  Moreover, in developing the budget, staff used the Strategic Plan as a guide to provide the  foundaƟon for prioriƟzing efforts, acƟviƟes, needs, human resources, and financial resources.  Budget Adjustments  In January of each year, District management meets to analyze revenues and spending to  determine, if any, where transfers between budget line items are necessary in order to ensure  that budget limitaƟons are not exceeded.  Managers and supervisors will submit requests for  transfers prior to the Mid‐Year budget review and authorized staff will review the requests  and submit them to the Board for approval.  When possible, transfers have no net effect on  the original budget balance.  However, if revenue shorƞalls or unanƟcipated costs are realized,  and transfers between line items cannot meet the projected deficit, projects are evaluated  and a determinaƟon of either projects deferral or draws on reserves is made to meet the  shorƞall.  All proposed changes are presented to the Board of Directors at a Mid‐Year budget  review.  13    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  Budget Calendar  DATE TASK  June 12, 2013 FY 2013‐14 Budget AdopƟon  November 13, 2013 First Quarter Budget Review  December 16, 2013 Budget meeƟng to distribute worksheets to management staff  January 22, 2014 Mid‐Year Budget Review  February 10, 2014 Capital Outlay and Capital Improvement Program Planning MeeƟng  March 10, 2014 New PosiƟon Requests due to Finance  March 24, 2014 Capital Improvement Project Requests due to Finance  March 31, 2014 Program Budget Requests due to Finance  April 23, 2014 Third Quarter Budget Review  April 28, 2014 District‐wide Budget Review with managers and General Manager  May 5, 2014 Capital Outlay and CIP Budget Review with program managers and Gen‐ eral Manager  May 19, 2014 Budget complete with all revisions  May 28, 2014 Budget Workshop with Board of Directors  June 11, 2014 FY 2014‐15 Budget AdopƟon  May 28, 2013 FY 2013‐14 Budget Workshop  14    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT    The budget document is EVWD’s annual financial plan prepared by District Management and  approved by the Board of Directors.  The financial plan serves as a policy document,  operaƟons guide for programs, and as a communicaƟon device.  The intended audience of the  budget document is ciƟzens, local businesses, debt holders and debt raƟng agencies, other  governmental agencies, and EVWD’s independent auditor.    Budget Document SecƟons  The budget document consists of 23 secƟons including:  Budget Overview  The Budget Overview secƟon includes the General Manager’s budget transmiƩal leƩer,  District Profile, Directory of Officials, District OrganizaƟonal Chart, Strategic Plan, Mission  Statement, and Financial Policies.  Financial Summary  This secƟon presents summary level informaƟon on Water and Wastewater fund balances,  reserves, and debt service.  Program Summary  This secƟon provides informaƟon for each program regarding their expenditures and staffing  to include Fiscal Year 2012‐13 accomplishments and Fiscal Year 2013‐14 goals and objecƟves.   Each program secƟon includes:  Program Personnel  This secƟon is the authorized personnel allocated to each program.  FuncƟon  This secƟon includes a basic descripƟon of the responsibiliƟes of each program.  Accomplishments  This secƟon includes highlights from Fiscal Year 2012‐13.  Goals & ObjecƟves  This secƟon idenƟfies specific goals and objecƟves for Fiscal Year 2013‐14.    BUDGET GUIDE 15    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  Key Performance Indicators  This secƟon idenƟfies measurable performance measures that occur year‐to‐year.  Program Budget Detail  This secƟon is a breakdown of the program expenditures by category or line item.  The  Fiscal Year 2013‐14 Budget is organized into the following summary programs:  Board of Directors  General AdministraƟon  Human Resources  Public Affairs/ConservaƟon  Finance  InformaƟon Technology  Customer Service  Meter Service  Engineering  Water ProducƟon  Water Treatment  Water Quality  Water Maintenance  Wastewater Maintenance  FaciliƟes Maintenance  Fleet Maintenance    Capital Outlay  This secƟon presents in one secƟon the Capital Outlay purchases included in the Fiscal Year  2013‐14 Budget.  Capital Improvement Program  This secƟon presents in one secƟon the Capital Improvement Projects included in the Fiscal  Year 2013‐14 Budget.  Budget Financial InformaƟon  East Valley Water District operates on a fiscal year, or budget Ɵme period, that begins on July  1 and ends on June 30. For example, Fiscal Year 2013‐14 (FY 2013‐14 or FY 2014), means July  1, 2013 through June 30, 2014.  In most secƟons of the budget document, three years of  informaƟon is provided, with two columns of informaƟon reflected for the current year (FY  2012‐13).  16    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  The columns typically presented are:   FY 2012 FY 2013 FY 2013 FY 2014 Prior Year   Actual  Budget  Projected Proposed % Change    FY 2012 Actual  Actual financial informaƟon for Fiscal Year 2011‐12 as reported in the Comprehensive  Annual Financial Report. The actual financial informaƟon is reported in the budget  document on a budgetary basis.  FY 2013 Budget  The FY 2012‐13 Budget as adopted by the Board of Directors on June 27, 2012.  FY 2013 Projected  The FY 2012‐13 Projected column reflects the FY 2012‐13 Budget in addiƟon to any budget  amendments approved by the Board of Directors during the fiscal year.  The FY 2013  Projected column is also adjusted to reflect management’s esƟmate of what revenues and  expenditures will be at the end of the fiscal year.  FY 2014 Proposed  This column iniƟally reflects the FY 2013‐14 Proposed Budget submiƩed by the General  Manager/CEO.  AŌer the Board of Directors reviews and approves the Fiscal Year 2013‐14  Budget, the informaƟon in the FY 2014 column changes, if necessary, to reflect the Board’s  acƟons.  Prior Year % Change  This column provides the percent change from the previous year’s budget to the newly  proposed budget.    17    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  18    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  The FY 2013‐14 Budget structure has changed from past EVWD budgets.  The budget process  has moved from incremental increases to program‐based budgeƟng.  Requested funds are  associated with expected results and performance is measured by indicators and reviewed on  a quarterly basis with the Board of Directors.  This results oriented strategy provides the ability  to monitor expenses related to a parƟcular program or acƟvity and track measurable benefits.   Program‐based budgeƟng results can be used in cost‐benefit analyses, just as it would be in a  business environment to determine the value of decisions and enhance transparency.  The FY 2013‐14 budget has been restructured to address the changing expectaƟons and  provide easily accessible informaƟon as part of open public financial management.  Through  program‐based budgeƟng, District staff has developed specific objecƟves to address goals  established in the Strategic Plan.  Based on these goals and objecƟves, key performance  measures monitor progress towards meeƟng program objecƟves.  Program‐based budgeƟng  also increases accountability and transparency.  The rate payers and Board of Directors can  more easily see where dollars are invested, monitor the effecƟveness of programs, and  increase policy engagement.  BUDGET HIGHLIGHTS  Technology   EVWD has embraced the importance of modern technological capabiliƟes to assist in the  process of doing business.  As with all aspects of operaƟons, EVWD is evaluaƟng available  technology to streamline operaƟons, enhance accuracy, and increase accountability.  A major technological effort currently underway is the transiƟon from manual to automated  radio‐read meters.  With over 50% of the District’s meters beyond the accepted industry  standard of 10 years old, the accuracy of meters have dramaƟcally declined, and may be  misreading actual usage by as much as 10%.  Since 2012, EVWD has been replacing all meters  to AMR in phases, to reduce meter reading labor and increase billing and consumpƟon  accuracy.  Community Involvement  As a government agency, EVWD is commiƩed to communicaƟng frequently with the  community and devoted to building a close relaƟonship with residents.  AddiƟonally, EVWD  places great value in parƟcipaƟng in community events, providing water system tours, and  interacƟng with the public to encourage civic engagement, discuss environmental issues, and  provide overall informaƟonal updates.  BUDGET OVERVIEW 19    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  Projects  EVWD has a variety of service enhancing programs taking place in FY 2013‐14 designed to  opƟmize operaƟons and encourage customer engagement.  Project highlights include:  Headquarters Project CompleƟon  Feasibility Assessment of Wastewater Treatment Facility  Conduct Successful Board ElecƟon  Enhanced and Improved District Policies  OpƟmizaƟon of Water Supply OperaƟons  Development of the Fleet Maintenance Replacement Program  Complete Cost of Service Analysis   New FaciliƟes Maintenance Program  CommunicaƟon Enhancements  ImplementaƟon of an Asset Management SoŌware    20    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  AUTHORIZED & FUNDED POSITIONS POSITION  FY 2011‐12  ACTUAL  FY 2012‐13  ACTUAL  FY 2013‐14  PROPOSED  ADMINISTRATION     General Manager/CEO 1 1 1  Assistant General Manager 0 1 1  Human Resources/Risk Manager 1 1 1  Public Affairs/Water ConservaƟon Officer 0 1 1  AdministraƟve Manager 1 1 1  ExecuƟve Assistant 2 2 2  Department Sub‐total 5 7 7    As part of the Strategic Staffing Plan, the District reassessed the organizaƟonal structure to   maximize employee efficiencies and enhance the service levels provided to customers.   Through reƟrements and repurposing staff, the District was able to reduce the amount of  permanent, full‐Ɵme employees from 69 in FY 2011‐12 to 63 in FY 2012‐13 and FY 2013‐14.   Moreover, the District was able to add three addiƟonal posiƟons, a RecepƟonist, InformaƟon  Systems Technician, and a FaciliƟes Maintenance Coordinator, to enhance services while  maintaining the number of full‐Ɵme employees at 63.  The reorganizaƟon of the District has  enabled staff to develop and enhance programs for daily operaƟons and maintenance of the  water and wastewater system.  The tables below provide a summary of Departmental staffing posiƟons in the District over the  past two years and the proposed staffing levels for FY 2013‐14.  This new staffing plan has  reduced personnel costs by 4.7% from FY 12‐13.  As vacancies occur, management will  conƟnue to review and evaluate the needs of the District prior to filling vacancies.  21    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  POSITION  FY 2011‐12  ACTUAL  FY 2012‐13  ACTUAL  FY 2013‐14  PROPOSED  FINANCE     Chief Financial Officer 1 1 1  Senior Management Analyst 0 0 1  Budget Analyst 0 1 0  AccounƟng Supervisor 1 1 1  AccounƟng Specialist 2 2 2  Lead Storekeeper/Buyer 1 1 0  Storekeeper/Buyer 1 1 1  Office Specialist II 0 1 1  Senior InformaƟon Systems Coordinator 1 0 0  Network Administrator 0 1 1  InformaƟon Systems Technician 1 0 1  Department Sub‐total 8 8 9  CUSTOMER SERVICE     Customer OperaƟons Supervisor 1 1 1  Senior Customer Service RepresentaƟve 2 1 1  Customer Service RepresentaƟve II 3 2 1  Customer Service RepresentaƟve I 1 2 3  RecepƟonist 0 0 1  Lead Field Service RepresentaƟve 0 1 1  Field Service RepresentaƟve II 0 3 2  Department Sub‐total 7 10 10       22    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  POSITION  FY 2011‐12  ACTUAL  FY 2012‐13  ACTUAL  FY 2013‐14  PROPOSED  ENGINEERING     District Engineer 1 0 0  Assistant District Engineer 1 0 0  Associate Engineer 1 0 0  Engineering Manager 0 1 1  Project Manager 0 1 1  Senior Engineering Technician 1 1 1  Engineering Technician II 3 2 1  Engineering Technician I 1 2 2  Engineering ExecuƟve Assistant 1 1 1  Office Specialist II 2 1 1  Department Sub‐total 11 9 8  OPERATIONS     Water ProducƟon Superintendent 1 1 1  Water ProducƟon Supervisor 1 1 1  Lead Water Treatment Plant Operator 1 1 1  Lead ProducƟon Operator 1 1 1  Water ProducƟon Operator II 3 3 3  Water ProducƟon Operator I 1 1 1  Water Quality Supervisor 1 0 0  Water Quality Coordinator 0 1 1  Water Quality Technician II 1 1 0  UƟliƟes Service Worker 0 0 1  Office Specialist I 0 1 1  Department Sub‐total 10 11 11       23    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  MAINTENANCE     Water Service Superintendent 1 1 1  Water Service Supervisor 1 1 1  FaciliƟes Maintenance Coordinator 0 0 1  Lead Water Service Worker 4 3 2  Heavy Equipment Operator 2 2 2  Water Service Worker II 5 7 6  Water Service Worker I 3 2 3  Lead Equipment Mechanic 1 1 1  Equipment Mechanic II 1 1 1  Meter Shop Supervisor 1 0 0  Lead Meter Service Worker 1 0 0  Meter Service Worker II 8 0 0  POSITION  FY 2011‐12  ACTUAL  FY 2012‐13  ACTUAL  FY 2013‐14  PROPOSED  Department Sub‐total 28 18 18       TOTAL DISTRICT EMPLOYEES 69 63 63  24    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT    East Valley Water District strives to provide water and wastewater services as affordably as  possible while elevaƟng the level of service provided to customers and other stakeholders.  A  criƟcal component to serving the community is ensuring that the District takes steps to  maintain a reliable and dependable water supply, through a balance of long‐term capital  improvements, preventaƟve maintenance, and effecƟve daily operaƟons.  In 2012, the Board  of Directors adopted a Strategic Plan to establish a clear foundaƟon of District prioriƟes and  goals in order to focus efforts and facilitate an environment of effecƟve operaƟon.  Fiscal  responsibility is a pillar of our Strategic Plan’s success.  As stewards of ratepayers dollars, East  Valley Water District strives to use financial resources as efficiently as possible in all aspects of  the decision making process.  The goals and objecƟves of the Strategic Plan are reflected in the Fiscal Year 2013‐14 Budget,  allowing it to serve as a guiding document for District operaƟons.  This document has been  developed as a program‐based budget, to maximize transparency and accountability for  stakeholders.  The District conƟnues to evaluate projects and programs to opƟmize operaƟons  and minimize costs, without compromising system reliability.  REVENUES  The FY 2013‐14 OperaƟng Budget Revenue ProjecƟons are $30,665,181.  This is an increase of  3.3% from the previous year’s budget.  District revenues are projected to increase, as a result  of the consolidaƟon of Baseline Gardens which will add an addiƟonal 420 service connecƟons  to the District’s service area.  The chart below illustrates the breakdown of each revenue  source, and highlights that East Valley Water District is a rate‐based organizaƟon.  FINANCIAL SUMMARY 25    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  Staff used an analyƟcal approach blending historical trends, current informaƟon and emerging  issues, constrained by conservaƟsm to develop revenue projecƟons that allow staff to  confidently commit resources throughout the fiscal year. EXPENSES  The FY 2013‐14 OperaƟng Budget for all funds is $23,182,326. This is an increase of 1.1%  above the previous year’s budget.  This increase can be aƩributed to the consumer price  index, increased material costs, and development of new programs.  District expenses for  energy and construcƟon materials including, copper and brass, have been steadily increasing,  and are projected to conƟnue rising throughout the year.  AddiƟonally, the District is  implemenƟng preventaƟve maintenance programs that require funds to operate, however  they are designed to miƟgate potenƟal costly repairs and replacements to the District’s aging  infrastructure system.  The chart below illustrates the projected allocaƟon of operaƟng costs  for FY 2014‐15.  District expenses are distributed relaƟvely evenly across seven basic categories, as seen in the  figure below, including: treatment services, salaries, benefits, water supply, electricity,  contract services, and other expenses.  Treatment services represent the largest expense  category with 34% of the total budget, however it also includes the City of San Bernardino  Municipal Water Department and Envirogen water treatment agreements.  26    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  As an infrastructure‐based organizaƟon, idenƟfying reserve funds is a criƟcal component of  fiscal responsibility.  The District has prudently budgeted $403,455 for reserves in FY 2013‐14.   The District has an esƟmated total of $17.9 million in reserves for the anƟcipaƟon and  preparaƟon for unforeseen events.  Moreover, the District is taking steps to ensure that  sufficient funds are available for current operaƟng, capital, and debt service needs .    CAPITAL OUTLAY  The Capital Outlay program has idenƟfied $363,400 for equipment purchases to enhance  programs and services provided to the rate payers.  These items include technology upgrades  to beƩer idenƟfy, track, and manage faciliƟes and resources. Moreover, the District is striving  to incorporate an environmentally friendly and sustainable future by going paperless where  possible.    CAPITAL IMPROVEMENT PROGRAM  Capital Improvements are idenƟfied in the Water Master Plan, Sewer Master Plan, and  Strategic Plan.  The Capital Improvement Program includes $27,246,000 for Wastewater,  Water, and General Projects.  Capital Projects are funded through a mix of water and  wastewater funds, grants, loans, and bond proceeds.  DISTRICT EXPENSES PER DOLLAR  27    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  East Valley Water District’s FY 2013‐14 Budget is a balanced budget, with operaƟonal revenue  funding operaƟonal expenses, and reserve funds not being used to fund on‐going expenses.   As a result of the prudent fiscal planning and oversight by the Board of Directors, the District  will not increase rates during FY 2013‐14 while conƟnuing to provide the community with safe,  reliable, and quality water and wastewater services.  DEBT SERVICE  Several methods are available to finance capital improvement projects and other authorized  acƟviƟes.  EVWD, like most governmental agencies, borrow money in order to acquire land  and equipment, construct buildings, and make renovaƟons and improvements.  The costs of  these projects are typically financed by the issuance of debt obligaƟons which are then repaid  over several years along with the interest incurred on the borrowings.  The District’s debt  service is the amount necessary to make the payments to meet all obligaƟons.  This policy  enables the cost of these capital assets to be borne by the present and future rate payers  receiving the benefit of these enhancements.  The District‘s debt obligaƟons include the 2010 refund, state loans for the Plant 134 Upgrade,  and the 2013 bond issue for Headquarters Project are as follows:    DEBT SERVICE  Year Ending October 1  Total  2014  3,450,688  2015  3,460,088  2016  3,459,338  2017  3,459,138  2018  3,452,388  2019‐2020  6,875,776  2021‐2025  13,826,565  2026‐2030  12,184,065  2031‐2035  12,213,566  2041‐2043  5,162,950  Total  $79,820,722  2036‐2040  12,276,160                            28    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  ALLOCATIONS  General AdministraƟve costs incurred by each of the District’s departments are allocated to  the water and wastewater funds in accordance with the following percentages based on  assumed benefit of each service to each fund.  The Benefit Assessment entailed the evaluaƟon  of each  Department and the services provided through acƟvity based cosƟng.  Fleet  Maintenance was determined by the number of vehicles in the fleet used for each service  operaƟon.  Department Water Fund  Wastewater Fund  AdministraƟon 70%  30%  Finance 70%    30%        InformaƟon Technology 50%  50%  Customer Service 50%  50%       Meter Service 50%  50%  Engineering 70%    30%   Water ProducƟon 100%    ‐       Water Treatment 100%    ‐       Water Quality 100%    ‐  Field Maintenance AdministraƟon 50%  50%       Water Maintenance 100%    ‐       Wastewater Maintenance  ‐  100%       FaciliƟes Maintenance 65%    35%        Fleet Maintenance 70%    30%   GENERAL & ADMINISTRATIVE ALLOCATIONS BY DEPARTMENT  29    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  30    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  31    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  32    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  The Water Fund pays for all acƟviƟes related to the operaƟons and maintenance of the water  producƟon and distribuƟon system.    RATES  East Valley Water District bills all customers on a monthly basis for water usage using the  formula [(Usage Rate x Water Used) + System Charge = Monthly Water Bill].  The usage rate  (actual water usage) for all customer classificaƟons is $1.77 per 100 cubic feet.  System  Charges (Fixed Service charge) are based on the connected meter size.  The average residenƟal  customer has a ¾ inch meter.  System charges are as follows:  REVENUES  Water revenues consist of water sales, meter charges, penalƟes, and other miscellaneous  charges such as new service charges and development charges.  The District is projecƟng an  increase in revenues of 4% as a result of an increase of 420 service connecƟons from the  Baseline Gardens consolidaƟon.  Moreover, with the use of FedEx to deliver all 48 hour Shutoff  NoƟces, revenues for other charges have increased to account for the increased penalty.  The District will provide water services through approximately 20,770 domesƟc connecƟons in  FY 2013‐14.  In addiƟon, 1,315 fire services are connected to District water mains.  This  customer count is based on the number of customers at the end of the previous fiscal year,  with a prorated adjustment for 420 new connecƟons in the Baseline Gardens area that will  connect to the District’s system in May 2014.  Other significant developments within the  District’s east end are pushing forward, but are not expected to start connecƟng to the District  unƟl FY 2014‐15.  Water sales for FY 2013‐14 are projected to be $14,233,300, based on anƟcipated customer  WATER FUND Meter Size Monthly Service Charge  3/4 Inch $13.71   1 Inch $20.87   1 1/2 Inch $38.60   2 Inch $88.48   3 Inch $163.25   4 Inch $270.06   6 Inch $537.09   8 Inch $857.52   33    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  demand for 21,730 Acre Feet.  This esƟmated annual demand is the sum of monthly  projecƟons that were derived by reviewing monthly sales for the last five years, and then using  those historical sales to set a conservaƟve esƟmate of demand for each month of FY 2013‐14.  Each monthly esƟmate was set at, or below, a five year historical sale average for that month.   This very conservaƟve approach to projecƟng water sales is necessary as sales are influenced  by rate increases, weather condiƟons, and the economy, all of which influence customer  consumpƟon.      Meter Size Count Monthly Charge  5/8” – 3/4” 16,065     $  13.71  1” 4,050       20.87  1.5” 245       38.60  2” 283       88.48  3” 80     163.25  4” 24     270.06  6” 14     537.09  8” 9     857.52  Fire Service 1,315         5.60  ANNUAL WATER PRODUCTION AND CONSUMPTION (AF)  Annual Water ProducƟon      SOURCE FY 2009‐10 FY 2010‐11 FY 2011‐12  FY 2012‐13  Projected  FY 2013‐14  Projected  Wells 19,095 18,278 18,354 18,500 18,351  Surface Treated 2,698 2,327 2,641 2,800 3,000  Total ProducƟon 21,793 20,605 20,995 21,300 21,351  Annual Water ConsumpƟon           CUSTOMER FY 2009‐10 FY 2010‐11 FY 2011‐12  FY 2012‐13  Projected  FY 2013‐14  Projected  ResidenƟal 12,197 11,528 11,945 12,800 13,000  Commercial 6,077 5,536 5,696 6,000 6,730  IrrigaƟon 1,780 1,597 2,009 1,895 2,000  Total Sales 20,055 18,661 19,650 20,695 21,730  34    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  EXPENSES  OperaƟng expenses remain the same for FY 2013‐14.  District staff have been working to  strategically determine the best method of supplying and pumping water to meet customer  demands.  As a result, staff anƟcipates that operaƟng costs should decrease, while increasing  prevenƟve maintenance programs to decrease future capital improvement repair costs.   AddiƟonally, with the restructuring of the budget, costs were realigned to the appropriate cost  center so that unit costs could be properly calculated and assist in the decision‐making  process.  Most notably, Source of Supply costs have increased significantly while Pumping  costs have decreased.  This is primarily due to idenƟfying well operaƟng and maintenance  costs and placing them in the appropriate cost center.  In doing so, staff will be able to  accurately calculate the cost of water based on supply and uƟlize this informaƟon to make  strategic decisions for operaƟons.     CONCLUSION  Water Fund revenues have consistently exceeded operaƟng expenditures allowing the District  to maintain the 120% coverage to meet debt service requirements and conƟnue funding the  CIP.  The chart below provides a historical overview of the water fund and its conƟnued  growth.  Staff will conƟnue to monitor revenues and expenses and present the progress to the  Board of Directors on a quarterly basis.    35    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  36    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  37    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  38    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  39    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  40    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  The Wastewater Fund pays for all acƟviƟes related to the operaƟons and maintenance of the  wastewater collecƟon infrastructure as well as the treatment of wastewater.  All treatment  charges collected from customers are passed through to the City of San Bernardino Municipal  Water Department.    RATES  ResidenƟal  East Valley Water District bills residenƟal customers on a monthly wastewater charge based  on the number of dwelling units, up to four units per property.  Commercial  East Valley Water District bills commercial customers on a monthly basis for wastewater usage  using the formula [(Usage Rate x Water Used) + Wastewater System Charge = Monthly  Wastewater Bill].   WASTEWATER FUND ResidenƟal Customer  Wastewater Charge per   Equivalent Dwelling Unit (EDU)  West of City Creek 33.86 / month  East of City Creek $35.86 / month  MONTHLY COMMERCIAL WASTEWATER RATES  Commercial Customer  Monthly Rate   (West of City Creek)  Monthly Rate   (East of City Creek)  Commercial Wastewater Flat Rate $6.30 / month $6.30 / month  MulƟ‐Family $1.80 / hcf $1.89 / hcf  Commercial / Retail / Dry Cleaners $2.65 / hcf $2.74 / hcf  Restaurants / Hotels $3.25 / hcf $3.34 / hcf  Laundromats/Government $2.05 / hcf $2.14 / hcf  Schools / Churches $1.65 / hcf $1.74 / hcf  Convalescent Homes $1.90 / hcf $1.99 / hcf  Office Buildings / Motels $2.05  / hcf $2.14 / hcf  Auto Repair/Service / Carwash $1.85 / hcf $1.94 / hcf  hcf = hundred cubic feet    41    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  REVENUES  Wastewater revenues consist of collecƟon charges, treatment charges, and miscellaneous  revenues such as interest income and capacity charges for new services.  Revenues are  projected to increase by 2.6% for FY 2013‐14.  The District anƟcipates that the increase will be  a direct result of the City of San Bernardino raising their treatment rates.    Wastewater CollecƟon System Charges  Wastewater CollecƟon System Charges are projected at $4,464,700 for FY 2013‐14.  These  revenues are the source of funds used by the District to maintain wastewater collecƟon lines.   ResidenƟal customers are billed a fixed monthly charge, while commercial customers pay a  reduced fixed charge plus a volumetric unit charge based on water consumpƟon.  MulƟ‐family  residenƟal complexes with four or more units are billed as commercial customers.  Projected residenƟal revenues for FY 2013‐14 were calculated by mulƟplying the Single Family  ResidenƟal (SFR) count by the monthly flat charge for 12 months, taking into account that July  through September will be billed at rates that became effecƟve October 1, 2012.  SFR billings  make up $3,400,700 of projected revenues.  Projected commercial customer revenues are  $1,064,000, and were calculated by mulƟplying the number of commercial accounts by the  District’s monthly flat charge for 12 months, and then esƟmaƟng total water usage by  commercial customers, in HCF, and mulƟplying the total usage by a flat rate.    Wastewater Treatment Charges  Wastewater Treatment Charges are assessed in accordance with rates set by the City of San  Bernardino Municipal Water Department which treats all wastewater generated by District  customers.  All Treatment Charges collected are remiƩed to the City and therefore have no  effect on the District’s operaƟons.    The rates that will be in effect during FY 2013‐14 are presented in the table below.  Like the  District’s system charges, residenƟal customers are billed a fixed monthly charge, while  commercial customers pay a small fixed charge plus a volumetric charge that is based on  water consumpƟon.  WASTEWATER COLLECTION SYSTEM Customer Type Count ConsumpƟon (HCF) Unit Charge ResidenƟal 18,445 $     15.36 MulƟ‐family 494 1,198,400 $       3.90 Commercial 621 641,200 $       3.90 42    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  EXPENSES  OperaƟng expenses have increased by 3% as a result of the 2.6% increase for treatment costs  by the City of San Bernardino.  The remaining 0.4% increase is a result of the implementaƟon  of prevenƟve maintenance programs such as the use of sleeve technology for pipeline spot  repairs, that will decrease the need for future costly capital improvement projects.     CONCLUSION  Revenues are projected to conƟnue exceeding operaƟng expenditures and provide the  required funding to meet debt service obligaƟons while conƟnuing CIP funding as seen in the  chart below. EVWD will conƟnue to monitor the revenues and expenses and present the  progress to the Board of Directors quarterly.    WASTEWATER TREATMENT RATES Customer Type Flat Charge/Month Commodity Charge/HCF           ResidenƟal $18.50 ‐           MulƟ‐family 2.40 1.25           Retail/Dry Cleaners 2.40 2.10           Restaurants/Hotels 2.40 2.70           Laundromats/Offices/Motels 2.40 1.50           Schools/Churches 2.40 1.10           Hospitals/Convalescent Homes 2.40 1.35           Auto Repair/Service StaƟons 2.40 1.30 43    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  44    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  45    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  46    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  47    FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  48    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FUNCTION  The Board of Directors is the legislaƟve body of the organizaƟon and is comprised of five  members elected at‐large to four year overlapping terms of office. Board members are  responsible for the development and adopƟon of all District policy. The Board of Directors  appoints the General Manager/CEO to be charged with the implementaƟon of adopted policy.  ReflecƟve of the experƟse and leadership of the Board, EVWD customers conƟnue to maintain  affordable rates and have a very reliable water supply.     ACCOMPLISHMENTS  1. Developed the District‐wide Strategic Plan, and adopted the LegislaƟve Plaƞorm, Grant  Strategy and Strategic CommunicaƟons Plan.  2. Approved a balanced budget which included contribuƟng $810,000 to the reserve fund.  3. Approved financing plan and construcƟon of consolidated Headquarters Facility.  4. Implemented aggressive community outreach efforts that increased web presence, print  materials, and District presence at various community events.  5. Approved a two‐year Labor Agreement for represented employees.  6. Increased the level of professionalism and improved the corporate culture of the District.    GOALS & OBJECTIVES  Develop and adopt a Board of Director’s Policy Handbook.  Conduct all acƟviƟes required for the 2013 Board of Directors ElecƟon.  ConƟnue to revise and adopt updated Personnel Rules & RegulaƟons.  Evaluate the feasibility of the District construcƟng a sewer/recycled water facility project.  Liquidate surplus property.  Complete an annual update of the LegislaƟve Plaƞorm and Strategic Plan.  Adopt a water conservaƟon program to meet the water use reducƟon requirements set  forth in SB x 7‐7.  ConƟnue to support policies that encourage an elevated level of professionalism and  corporate culture.  BOARD OF DIRECTORS 49    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  BOARD OF DIRECTORS  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor 71,050 88,000 77,589         80,000    Benefits 38,062 30,000 36,591 40,000   OPERATING EXPENSES       Contract Services ‐ ‐ ‐ 105,000   Professional Development 11,351 30,000 14,566 20,000   GENERAL ADMIN TOTAL $    120,463 $    148,000 $    128,746 $    245,000 65.5%  50    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FUNCTION  General Manager/CEO is responsible for overseeing day‐to‐day administraƟon and program  implementaƟon of District operaƟons. AdministraƟon is responsible for managing,  documenƟng, organizing, communicaƟng, and ensuring the implementaƟon and execuƟon of  the District’s Strategic Plan.    ACCOMPLISHMENTS  1. Aligned District operaƟons with Strategic Plan and provided public quarterly status  updates of key performance indicators.  2. Developed and maintained an effecƟve system for communicaƟon with the Board of  Directors and District staff.  3. Updated the North Fork By‐Laws to reflect changes in operaƟng procedures and legal  requirements that have taken place since adopƟon in 1950.  4. ConƟnued involvement in the Emergency Response Network of the Inland Empire  (ERNIE), and represents the District on the group Steering CommiƩee.  5. Established an Employee Events CommiƩee to encourage team building and enhanced  workplace morale.      PosiƟon FTE  General Manager/CEO 1  Assistant General Manager 1  AdministraƟve Manager 1  ExecuƟve Assistant 2  Total   5  PROGRAM PERSONNEL   ADMINISTRATION 51    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  Measure  FY 2012  Actual  FY 2013  Projected  FY 2014  Goal  1.  Respond to Public Records Act Requests within 10 days n/a 100% 100%  2.  AdverƟse & complete Agenda distribuƟon on Ɵme n/a 100% 100%  3. Conduct Emergency Preparedness table top exercises and  evacuaƟon drills 0 0 2  4.  Water Loss Management 7% 6% 5%  5.  Number of Board/CommiƩee MeeƟngs conducted n/a 34 24  KEY PERFORMANCE INDICATOR   GOALS & OBJECTIVES  Complete the construcƟon of the District’s new Headquarters Building.  Update the Emergency Response Plan and Vulnerability Assessment.   Conduct all acƟviƟes required for the 2013 Board of Directors ElecƟon.  Develop and implement a paperless agenda process.  Facilitate the development of the Board of Director’s Handbook.  Facilitate the liquidaƟon of surplus property.  52    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  ADMINISTRATION  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor         600,310          744,000          762,542          602,000    OverƟme            2,858           10,000             5,985             5,000    Benefits         338,068          359,883          460,730          343,000    OPERATING EXPENSES       Materials & Supplies          72,156           84,900           67,000           10,000    Office Supplies          29,614           33,000           31,782           15,000    Contract Services         637,383          367,475          367,475          150,000    Legal Services         100,762          171,000          155,736          125,000    Rents & Leases         172,121          175,000          180,000                    ‐    UƟliƟes          43,602           85,000           64,948                    ‐    Telephone          41,168                    ‐           32,423           10,500    Fuel          2,685  2,300          1,974                    ‐    Permits          22,621           25,000           10,487                    ‐    Postage          24,871           15,000           16,712             1,000    General Insurance 213,280 180,000 188,489 ‐   Insurance Claims 10,576 ‐ 2,127 ‐   ADMIN TOTAL  $  2,281,439   $  2,378,480   $  2,486,597  $  1,357,500  ‐43%  PROGRAM BUDGET DETAIL  EducaƟon Assistance ‐ ‐ ‐ 10,000    Professional Development          31,520           71,482           63,291           30,000    Memberships & Dues          33,621           54,440           72,545           56,000    53    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  54    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FUNCTION  Human Resources plans, directs, manages, and oversees programs and operaƟons related to  personnel maƩers, including employee relaƟons, contract administraƟon, retenƟon,  recruitment and selecƟon of employees, administraƟon of health and welfare benefits, risk  management, administraƟon of safety regulaƟons, and professional development services.   Specific funcƟons include:  Personnel – conduct recruitments, labor negoƟaƟons, labor relaƟons and ensure  compliance with all state and federal laws, such as FLSA  Workers’ CompensaƟon – oversight of the District’s comprehensive Risk  Management Program  Employee Services – management and administraƟon of employee compensaƟon  and benefit plans as well as implement and monitor labor agreements  Safety – ensure a safe working environment that includes training and compliance  with all state and federal regulaƟons    ACCOMPLISHMENTS  1. ImplementaƟon of the AdministraƟve Professional’s Academy.  2. NegoƟated a 2‐year Employment Agreement.  3. Enhanced health care benefits for the employees at no extra cost to the District.  4. AddiƟon of Life Insurance for employees at a minimal cost to the District.  5. Created a new organizaƟonal structure which clearly defines employee/  PROGRAM PERSONNEL   PosiƟon FTE  Human Resources/Risk & Safety Manager 1  AdministraƟve Intern 0.5  Total   1.5  HUMAN RESOURCES/RISK MANAGEMENT 55    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012  Actual  FY 2013  Projected  FY 2014  Goal  1.  Percentage of Performance Appraisal’s completed 56% 75% 100%  2.  Number of District wide safety trainings conducted 24 26 30  3. Average number of days to fill a vacant posiƟon n/a 90 75  4.  Turnover percentage 22% 15% <10%  management groups and their classificaƟons and benefits within the District.  6. ImplementaƟon of the District’s Strategic Staffing Plan.  7.   CreaƟon of a fair and consistent recruitment process.      GOALS & OBJECTIVES  Update the District’s EducaƟon Assistance Program.  Assist in the development of the Board of Director’s Handbook.  Update the District’s Personnel Rules & RegulaƟons Handbook.  Create and implement a new Performance Appraisal Program.  Coordinate a Staff Development Program for managers, supervisors, and lead  employees.  56    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  HUMAN RESOURCES/RISK MANAGEMENT  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr  % Chg   PERSONNEL EXPENSES       Labor                   ‐                    ‐                    ‐         85,000     Temporary Labor                   ‐                    ‐                    ‐             10,000    Benefits                   ‐                    ‐                    ‐          48,500    OPERATING EXPENSES       Materials & Supplies                   ‐                    ‐                    ‐           8,500    Office Supplies                   ‐                    ‐                    ‐           1,500    Contract Services                   ‐                    ‐                    ‐          50,000    PrinƟng & Publishing                   ‐                    ‐                    ‐                   500    Legal Services                   ‐                    ‐                    ‐             25,000    Postage                   ‐                    ‐                    ‐           1,000    Memberships & Dues                   ‐                    ‐                    ‐           4,000    Professional Development                   ‐                    ‐                    ‐           6,000    General Insurance                   ‐                    ‐                    ‐           200,000    HR/RISK MGMT TOTAL $               ‐  $                ‐  $                ‐  $      440,000    57    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  58    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FUNCTION  Public Affairs is the primary outreach vehicle for increasing awareness of the District’s mission  and role in the local and regional community.  Through media, community, and governmental  relaƟons, the District is able to provide effecƟve communicaƟons to various community  stakeholders.   Specific funcƟons include:  Media contact and cooperaƟon  Crisis communicaƟons  ConservaƟon, Water EducaƟon & Rebate Programs  Community presentaƟons & Community MeeƟngs  ParƟcipaƟng in local community and business organizaƟons  Maintain working relaƟonships with federal, state, and local officials  Monitoring and managing different outreach methods gains favorable and fair reporƟng of key  District issues.  Public Affairs staff has successfully maintained a presence in applicable poliƟcal  forums for informaƟon and acƟon on issues impacƟng the District.  Public Affairs staff also  strives to provide consistent educaƟon to customers on programs, projects and issues  important to the District which also promotes water conservaƟon.  Water ConservaƟon  programs are in the development stage to provide conservaƟon rebates, resources, training,  and materials to customers to allow them to conserve water.      ACCOMPLISHMENTS  1. AdopƟon of the LegislaƟve Plaƞorm, Grant Strategy and CommunicaƟon Strategy.  2. ProducƟon of “in‐house” press releases.  PROGRAM PERSONNEL   PosiƟon FTE  Public Affairs/Water ConservaƟon Officer 1  Total   1  PUBLIC AFFAIRS/WATER CONSERVATION 59    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Number of customers who parƟcipate in rebate programs n/a 0 50  2.  Number of community presentaƟons 5 8 15  3.  Number of community events aƩended 4 6 10  4.  Daily per capita water use (gal/day) n/a 309 277  5.  Number of website hits 35,000 50,000 65,000  6.  Number of Water ConservaƟon school presentaƟons 2 4 8  3. Involved community in facility tours.  4. Developed community presentaƟons program.  5.   Redesigned a new user‐friendly District website.      GOALS & OBJECTIVES  ParƟcipate in various community based organizaƟon acƟviƟes that reach a broad range  of stakeholders.  Host a community open house at the new headquarters office.  Launch Water ConservaƟon Rebate Programs for District residenƟal and commercial  customers.  Host water conservaƟon educaƟon events for customers to aƩend.  Complete a Water Use Efficiency Plan to establish prioriƟes for SBX 7‐7 compliance.    60    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PUBLIC AFFAIRS/WATER CONSERVATION  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor                   ‐                    ‐                    ‐         78,000     Benefits                   ‐                    ‐                    ‐          44,500    OPERATING EXPENSES       Materials & Supplies                   ‐                    ‐                    ‐           70,000    Office Supplies                   ‐                    ‐                    ‐           1,000    Contract Services                   ‐                    ‐                    ‐          200,000    PrinƟng & Publishing                   ‐                    ‐                    ‐           45,000    Postage                   ‐                    ‐                    ‐             30,000    Memberships & Dues                   ‐                    ‐                    ‐           2,500    Professional Development                   ‐                    ‐                    ‐           5,000    PUB AFF/WTR CON TOTAL $               ‐  $                ‐  $                ‐  $      476,000    61    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  62    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14    FUNCTION  Finance oversees the financial operaƟons of the District in order to provide accountability and  adequate control over the use of District funds.  Finance staff maintains the financial systems  and records in accordance with Generally Accepted AccounƟng Principles (GAAP) as well as  applicable laws, regulaƟons, and District policies.  Specific funcƟons include:  PreparaƟon of monthly and annual financial reports  PreparaƟon of annual budget  Capital asset funding and accounƟng  Strategic and financial planning support  Issuance and administraƟon of District debt issues  AdministraƟon of Investment Porƞolio  RecordaƟon of all financial transacƟons    PROGRAM PERSONNEL   PosiƟon FTE  Chief Financial Officer 1  Senior Management Analyst 1  AccounƟng Supervisor 1  AccounƟng Specialist 2  Storekeeper/Buyer 1  Office Specialist II 1  Total 7  FINANCE 63    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Liquidity RaƟo 226% 210% 200%  2.  Debt Level per Capita $546 $558 $810  3.  Reserve at % of OperaƟng Expenditure Budget 51% 55% 59%  4.  Debt Coverage RaƟo 154% 431% 150%  5.  Electronic payments disbursed N/A 10% 50%  ACCOMPLISHMENTS  1. Completed and submiƩed the FY 2011‐12 Comprehensive Annual Financial Report  (CAFR).  2. Restructured the annual OperaƟng Budget to be program based.  3. Developed monthly expenditures status reports to help Departments monitor  spending.  4. Hired a Budget Analyst to review and idenƟfy potenƟal for operaƟonal efficiency  and program cost savings.  5. Completed 2013 Revenue Bond Issue to finance a porƟon of the new Headquarters  facility.    GOALS & OBJECTIVES  Implement new soŌware for accounƟng and uƟlity billing.  Implement new chart of accounts.  Begin processing payroll in‐house rather than through a service provider.  Begin using automated processes to track fixed assets and assessments.    Receive Governmental Finance Officers AssociaƟon (GFOA) Budget Award for Fiscal  Year 2013‐14 Budget.  Implement streamlined financial procedures District‐wide.    64    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FINANCE  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor 458,143          581,000           579,082         515,000     Benefits          203,768           288,718  283,133 256,500   OPERATING EXPENSES       Materials & Supplies 481 300 300 ‐   Office Supplies 5,241 7,250 6,877 7,000   Contract Services 182,609 181,290 140,796 85,000   Telephone 446 750 493 600   Fuel 3,045 600 1,978 ‐   Memberships & Dues 2,352  1,800 2,168 3,500   EducaƟon Assistance ‐ ‐ ‐ 5,500   FINANCE TOTAL $       896,046  $   1,096,173  $   1,043,996 $      939,400  ‐14%  Temporary Labor 16,813                      ‐   ‐ ‐   Banking Services ‐ ‐ ‐ 40,000   OverƟme 4,331 7,000 3,939 3,000   Legal Services ‐ ‐ ‐ 15,000   Rents & Leases 10,357 11,750 11,259 ‐   Postage ‐ 100 131 300   Professional Development 8,460 15,615 13,840 8,000   65    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  66    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14    FUNCTION  InformaƟon Technology (IT) is responsible for system maintenance, network management,  systems support, updaƟng soŌware/hardware, and monitoring District needs for new  equipment.  Specific system maintenance includes:  Network and telecommunicaƟons  Geographic InformaƟon System (GIS)  Enterprise Resource Planning (ERP)  Customer InformaƟon System and UƟlity Billing (CIS)  Supervisory Control and Data AcquisiƟon (SCADA)  Document Imaging System (Laserfische)  Computerized Maintenance Management System (CMMS)    ACCOMPLISHMENTS  1. Moved email to hosted server to take advantage of remote cloud‐based soluƟons.  2. Increased internet bandwidth to increase speed and improve reliability.  3. Hired a Network Administrator to administer the IT Program and InformaƟon  Systems Technician to assist with technical support.  4. Implemented Cityworks, a work order system, to improve asset management.  PROGRAM PERSONNEL   PosiƟon FTE  Network Administrator 1  InformaƟon Systems Technician 1  Total 2  INFORMATION TECHNOLOGY 67    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012  Actual  FY 2013  Projected  FY 2014  Goal  1.  Percent of help desk support work orders completed n/a n/a 100%  2.  Percent of help desk support work orders resolved within 3  days n/a n/a 100%  4.  Percent of system availability during operaƟng hours n/a n/a 95%  3.  Percent of PCs/Servers with outdated operaƟng systems 60% 32% 0%    GOALS & OBJECTIVES  Assist with the implementaƟon and administraƟon of a new accounƟng and billing  soŌware.  Decrease contract services and increase in‐house technical support.      Complete the IT Strategic Plan, including anƟcipated needs for the new  Headquarters facility.  Complete and maintain an inventory of all computer equipment in the District.  68    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  INFORMATION TECHNOLOGY  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor 58,291 ‐ 22,258 128,000   OverƟme 479 ‐ 1,536 5,000   Benefits 26,293 ‐ 3,774 73,000   OPERATING EXPENSES       Materials & Supplies 1,449 ‐ 2,005 10,000   Office Supplies 16,553 8,500 9,464 3,000   Contract Services 104,175 210,000 180,719 228,500   Rents & Leases 125 ‐ ‐ ‐   Telephone 193 200 80 3,000   Postage 63 ‐ 100 ‐   Memberships & Dues ‐ ‐ ‐ 500   Professional Development 1,169 ‐ ‐ 7,000   IT TOTAL $     209,420  $   218,700  $   219,936 $     458,000  109%  69    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  70    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14    FUNCTION  Customer Service is responsible for responding to customer inquiries, establishing and  disconƟnuing service, preparing monthly bills, processing payments, and collecƟng  outstanding customer balances.  Customer Service staff conƟnues to explore opportuniƟes to  provide convenient methods of payments and strives to resolve all customer concerns on a  daily basis.    ACCOMPLISHMENTS  1. ImplementaƟon of a more efficient method of delivering Shut‐Off NoƟces by  contracƟng with FedEx.  2. Increased the number of pay‐by‐phone lines from 4 to 8, reducing customer hold  Ɵmes.  3. Installed a drop box at the Del Rosa Yard for customers wanƟng to pay by check on   the southwest end of the District.   4. Added a RecepƟonist to answer main line phone calls and provide increased  personal contact with customers.    PROGRAM PERSONNEL   PosiƟon FTE  Customer OperaƟons Supervisor 1  Senior Customer Service RepresentaƟve 1  Customer Service RepresentaƟve II 1  Customer Service RepresentaƟve I 3  RecepƟonist 1  Total 7  CUSTOMER SERVICE 71    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Number of payments received from Del Rosa drop box n/a 100 150  2.  Percent of payments received by automaƟon without staff  assistance n/a n/a 75%  3.  Increase paperless billing usage n/a 4% 6%  4.  Billing Accuracy n/a 95% 99%  GOALS & OBJECTIVES  Establish third party payment centers to provide more convenient locaƟons for  customers to make payments outside of the District main office.  Implement website soluƟon to allow customers to turn/off service without calling  the District Office.  Implement conƟnuous service agreements for establishing service for non‐owner  occupied houses and apartments.  Implement address change service in conjuncƟon with US Postal Service to ensure  up to date informaƟon for customer billing.  Establish a standard procedure for payment extensions, including a maximum  extension period for delinquent customers.  72    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  CUSTOMER SERVICE  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor 599,643 647,000 608,988 350,000   Temporary Labor 22,129 ‐ 23,925 ‐   OverƟme 49,365 60,000 65,123 20,000   Standby 1,250 ‐ 3,060 ‐   Benefits 298,651 372,512 307,061 198,400   OPERATING EXPENSES       Materials & Supplies 1,773 3,832 7,135 6,000   Office Supplies 12,099 15,100 11,461 3,000   Contract Services 229,163 309,400 457,366 314,500   Banking Services ‐ ‐ ‐ 175,000   Legal Services ‐ ‐ ‐ 5,000   Telephone 400 1,000 869 3,000   Fuel 13,181 42,000 32,650 ‐   Postage 109,306 106,500 125,964 110,000   Memberships & Dues 3,780 ‐ 2,520 ‐   Professional Development 886 10,150 5,529 5,000   Bad Debt 6,229 3,500 1,792 ‐   CUSTOMER SVC TOTAL $  1,347,855  $  1,570,994 $  1,653,443 $1,189,900 ‐24%  73    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  74    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14    FUNCTION  Meter Services serves as a field extension of Customer Service, and is responsible for  compleƟng all on‐site related customer requests such as turning water on/off, monthly meter  readings for billing, and assisƟng customers at their residence when requested.  Meter  Services staff may also at Ɵmes assist the Meter Maintenance program by installing new  meters, tesƟng meters for accuracy, and repairing meter leaks.    ACCOMPLISHMENTS  1. Completed the installaƟon of 3,500 AMR meters.  2. ImplementaƟon of a large water meter tesƟng program.  3. Developed a Call Out Service to assist customers in reducing penalty charges for  delinquent payments and reconnecƟons    GOALS & OBJECTIVES  Complete Phase 2 of the Automated Meter Reading Replacement Program.  Partner with Public Affairs to increase water conservaƟon acƟviƟes such as audits  and educaƟon outreach.  Respond to all customer service requests for meter assistance and verificaƟon  within an acceptable   PROGRAM PERSONNEL   PosiƟon FTE  Lead Field Service RepresentaƟve 1  Field Service RepresentaƟve II 2  Total 3  METER SERVICE 75    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Conduct Water ConservaƟon Audits 0 10 20  2.  Number of preventable re‐reads n/a 20 0  3.  Reduce the number of reconnecƟons due to non‐payment n/a n/a 10%  4.  Average Ɵme to respond to customer service request n/a n/a <24 hours  76    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  METER SERVICE  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor ‐ ‐ ‐ 175,000   OverƟme ‐ ‐ ‐ 20,000   Benefits ‐ ‐ ‐ 99,800   OPERATING EXPENSES       Materials & Supplies ‐ ‐ ‐ 3,000   Contract Services ‐ ‐ ‐ 30,000   Telephone ‐ ‐ ‐ 4,000   Professional Development ‐ ‐ ‐ 5,000   EducaƟon Assistance ‐ ‐ ‐ 500   METER SVC TOTAL $                   ‐ $                   ‐ $                   ‐ $   339,300   Tools ‐ ‐ ‐ 2,000   77    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  78    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FUNCTION  Engineering is responsible for idenƟfying and implemenƟng expansion and improvement  infrastructure projects needed to provide safe and reliable water and sewer service to both  exisƟng and future customers. Engineering staff administers and manages the Capital  Improvement Program, assists developers in building new residenƟal and commercial  properƟes, and provides support in the maintenance and repair of water mains, reservoirs,  boosters, pressure reducing staƟons, wells, and the sewer system.  Specific funcƟons include:  Conduct planning studies to evaluate exisƟng and future water and sewer system  improvement needs.  Establish and implement the District’s Capital Improvement Program (CIP).  Assist in ensuring the District complies with state and federal regulaƟons.  Maintain and update District’s Design Standards.  Maintain and update technical data by GIS.  PROGRAM PERSONNEL   PosiƟon FTE  Engineering Manager 1  Project Manager 1  Senior Engineering Technician 1  Engineering Technician II 1  Engineering ExecuƟve Assistant 1  Office Specialist II 1  Total 8  Engineering Technician I 2  ENGINEERING 79    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Percent project budget exceedence (of all CIP) 0% 3% 0%  2.  Percent of Developer plan checks completed within 4 weeks  50% 100% 100%  3.  Number of regional collaboraƟon projects 1 2 5  4.  Number of projects to increase system reliability 1 3 14  5.  Number of projects to increase system efficiency 0 2 9  ACCOMPLISHMENTS  1. Implemented a GIS to effecƟvely use District‐wide data.  2. Completed the construcƟon and permiƫng of Plant 134 Treatment Facility.  3. Revised the Sewer Master Plan to address future development potenƟal and  system needs.  4. Completed the Eastwood Farms ConsolidaƟon.  5. Complete the 3rd St. and Del Rosa Sewer Repair.  6. Updated the District Design Standards and ConstrucƟon Details in preparaƟon for  potenƟal development.    GOALS & OBJECTIVES  Complete an update of District‐wide connecƟon charges and development fees.  IdenƟfy and implement projects to opƟmize water resources and reduce overall  supply costs.  IdenƟfy and implement projects to increase system reliability.  Integrate technology (e.g. GIS) to increase efficiency and effecƟveness.  Establish Development Project Procedures.  80    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  ENGINEERING  PROGRAM BUDGET DETAIL  DescripƟon  FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor 647,303 441,000 549,799 337,100   OverƟme 2,327 5,000 2,791 5,000   Benefits 316,478 279,479 295,362 192,200   OPERATING EXPENSES       Assessment 76,238 ‐ ‐ ‐   Materials & Supplies 538 ‐ 949 ‐   Tools ‐ ‐ ‐ 1,000   Office Supplies 5,821 25,000 14,125 9,000   Contract Services 212,398 199,920 134,840 200,000   Legal Services 35,388 ‐ 28,155 30,000   Telephone 1,170 4,000 2,957 3,500   Fuel 6,676 6,800 3,716 ‐   Permits ‐ 20,000 ‐ 100,000   Memberships & Dues 2,590 1,425 3,274 5,000   Professional Development 5,650 15,300 16,332 13,500   ENGINEERING TOTAL $   1,312,724 $   1,003,924 $   1,054,336 $    896,800 ‐11%  Postage 147 6,000 2,036 500   81    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [THIS PAGE  LEFT BLANK INTENTIONALLY]  82    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FUNCTION  Water ProducƟon is responsible for the daily monitoring and operaƟons of the enƟre water  producƟon system which includes 18 wells, 18 reservoirs and 24 booster staƟons.  This  program also ensures the Ɵmely prevenƟve maintenance of all pumps and motors for wells  and boosters.    ACCOMPLISHMENTS  1. Implemented an energy efficient pumping strategy to maximize off peak hour  pumping when possible that takes advantage of favorable Southern California  Edison electricity rates.  2. Installed 7 new chlorine analyzers to increase automaƟon in residual monitoring to  comply with the California Department of Public Health mandates.  3. Enhanced personnel scheduling to meet producƟon demands while reducing  overƟme costs by 50%.  PROGRAM PERSONNEL   PosiƟon FTE  Water ProducƟon Superintendent 1  Water ProducƟon Supervisor 0.5  Lead ProducƟon Operator 1  Water ProducƟon Operator II 3  Water ProducƟon Operator I 0.5  Office Specialist II 0.5  Total 6.5  WATER PRODUCTION 83    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Number of Reservoirs dived and inspected n/a 0 3  2.  Number of large Cla Vals serviced (78 total) n/a 0 50%  5.  Cost per acre foot of groundwater produced n/a $195 $123  3.  Number of Pressure Reducing StaƟons Serviced (12 total) n/a 3 12  4.  Number of alƟtude valves services (6 total) n/a 0 6  GOALS & OBJECTIVES  Complete booster rehabilitaƟon at Plant 130 to increase the pumping efficiency by  15% and to receive energy incenƟves from Southern California Edison.  Increase SCADA reliability by enhancing and updaƟng Remote Terminal Units  (RTUs), the communicaƟon hardware at specific sites which will allow for more  accessibility when replacing and repairing these devices.  Develop a Reservoir PrevenƟve Maintenance Program to inspect and schedule  minor repairs where possible to minimize major and costly repairs in the future.  Develop an Annual Water ProducƟon Budget based on supply, costs, and demand  to meet consumpƟon needs.  Work to ensure the District complies with state and federal regulaƟons for meeƟng  drinking water standards.  84    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  WATER PRODUCTION ADMINISTRATION   PROGRAM BUDGET DETAIL  DescripƟon—Admin   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor ‐ ‐ 13,801 137,900   Standby 19,495 ‐ 15,313 11,000   Benefits 362,709 422,597 438,361 78,600   OPERATING EXPENSES       Materials & Supplies ‐ 143,765 58,091 ‐   Office Supplies 2,594 4,000 6,285 6,000   Contract Services ‐ 6,000 130,167 45,000   Rents & Leases 304 ‐ 200 ‐   Telephone 12,294 3,500 12,500 15,000   Fuel 40,099 35,000 37,608 ‐   Permits 15,391 15,000 16,430 ‐   Memberships & Dues 100 ‐ 1,167 7,000   Professional Development 9,498 9,500 7,554 15,000   WTR PROD ADMIN TOTAL $   462,484 $   639,362 $   737,477 $   315,500   85    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  SOURCE OF SUPPLY  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor 154,978 164,500 159,508 159,000   OverƟme 146 39,000 17,255 10,000   Benefits ‐ ‐ 2,721 90,700   OPERATING EXPENSES       Purchased Water 199,931 200,000 135,199 200,000   Groundwater Replenish 180,053 208,680 20,266 215,000   Assessments ‐ 102,640 102,640 205,000   Materials & Supplies 359 ‐ 10,286 30,000   Chemicals ‐ ‐ 124 100,000   Contract Services 123,014 166,600 151,253 75,000   Electric ‐ ‐ ‐ 1,350,000   SOURCE TOTAL $    658,481 $    881,420 $    599,252 $   2,434,700   86    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  BOOSTING & PUMPING  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor 518,068 544,800 552,264 167,000   OverƟme 33,104 18,000 21,742 10,000   Benefits ‐ ‐ 3,121 95,100   OPERATING EXPENSES       Materials & Supplies 27,992 18,000 26,959 40,000   Chemicals 156,743 168,000 198,048 ‐   Contract Services 130,227 165,200 130,733 100,000   Electric 1,946,337 2,100,000 1,922,185 750,000   Permits 724 ‐ 466 ‐   BOOSTER TOTAL $ 2,813,195 $  3,014,000 $  2,855,518 $ 1,162,100   PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Previous  Yr % Chg   PERSONNEL EXPENSES       Labor ‐ ‐ ‐ 31,000   Benefits ‐ ‐ 2,721 17,000   OPERATING EXPENSES       Materials & Supplies 4,753 10,000 10,000 15,000   Chemicals ‐   75,000   Contract Services 16,566 35,000 35,000 25,000   DISTRIBUTION TOTAL $    21,319 $    45,000 $   47,721 $    163,000   TRANSMISSION & DISTRIBUTION  87    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  88    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14    FUNCTION  Water Treatment is responsible for the daily operaƟon of water treatment faciliƟes, namely  Plant 134, Plant 107, Plant 40, Plant 39, and Plant 28.  Plant 134 is a Surface Water Treatment  Plant that takes in water from the Santa Ana River via the North Fork Canal and State Water  Project.  Plants 107 and 40 are wells treated by Envirogen units that treat for nitrates,  uranium, and perchlorates.  Plant 39 is a treatment plant that uƟlizes a blending plan for  fluoride.  Lastly, Plant 28 uƟlizes Granular AcƟvated Carbon to treat for PCE.      ACCOMPLISHMENTS  1. Decreased the amount of water produced from Plants 107 and 40 by 50% over the  previous year.  2. Completed Operator Training for staff on the new technology at Plant 134 Surface  Water Treatment Plant.  3. Received permit approval to operate Plant 134 at full capacity.    GOALS & OBJECTIVES  Establish an opƟmum process to uƟlize new technology at Plant 134.  Increase intake of State Water Project water to enhance water supply reliability.  ConƟnue to meet all water quality standards for effluent discharge.  PROGRAM PERSONNEL   PosiƟon FTE  ProducƟon Supervisor 0.5  Lead Water Treatment Plant Operator 1  Total 1.5  WATER TREATMENT 89    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Number of Department of Public Health violaƟons 0 0 0  2.  Cost per acre foot of water produced at Plant 134 $564 $425 $350  90    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  WATER TREATMENT  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor 84,994 150,200 107,646 129,000   OverƟme 15,653 18,000 18,261 5,000   Benefits ‐ ‐ 2,721 74,000   OPERATING EXPENSES       Materials & Supplies 110,700 42,000 32,894 30,000   Chemicals 32,329 357,000 161,252 250,000   Contract Services 8,549 209,000 111,958 250,000   Water Treatment 1,062,664 1,290,950 824,306 800,000   Telephone ‐ ‐ ‐ 3,000   Electric 97,628 250,000 171,613 200,000   Permits ‐ ‐ ‐ 10,000   WATER TRTMNT TOTAL $  1,412,517 $  2,317,150 $  1,430,651 $1,751,000 ‐24%  91    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  92    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14    FUNCTION  Water Quality is responsible for ensuring District compliance with state and federal drinking  water regulaƟons.  This program also manages, supervises, and coordinates the acƟviƟes of  fire service backflow protecƟon devices, customer‐owned backflow protecƟon devices, water  sampling and tesƟng, fire hydrant flushing, and faciliƟes locaƟng services (dig‐alert).    ACCOMPLISHMENTS  1. Revised the Water Quality Sampling Plan to be more efficient while meeƟng state  and federal regulaƟons.  2. Developed a comprehensive Hydrant Flushing Program to improve water quality.  3. Improved the administraƟon of the Cross ConnecƟon Program to reduce staff Ɵme  while increasing producƟvity.    GOALS & OBJECTIVES  Update the Backflow Ordinance to ensure compliance with current legislaƟon.  Evaluate and update the water transmission and distribuƟon system to ensure  compliance with fire service related Plumbing Codes.  PROGRAM PERSONNEL   PosiƟon FTE  Water Quality Coordinator 1  Water ProducƟon Operator I 0.5  UƟliƟes Service Worker  1  Total 2.5  WATER QUALITY 93    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Number of above ground flush outs replaced 0 0 5  2.  Annual backflow device tesƟng compliance 70% 96% 100%  3.  Percent of hydrants flushed annually 20% 50% 100%  4.  Number of water quality violaƟons from CDPH 1 0 0  5.  Respond to all Underground Service Alert within 48 hours 100% 100% 100%  Implement a program to idenƟfy and eliminate cross connecƟons in the water  distribuƟon system to improve water quality.      Publish and distribute the Consumer Confidence Report (CCR) as mandated by the  California Department of Public Health (CDPH).  Prepare all monthly and annual water quality reports and submit them on Ɵme to  CDPH.  94    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  WATER QUALITY  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor ‐ ‐ ‐ 170,500   OverƟme ‐ ‐ ‐ 3,000   Benefits ‐ ‐ ‐ 97,200   OPERATING EXPENSES       Materials & Supplies ‐ ‐ ‐ 10,000   Tools ‐ ‐ ‐ 5,000   Contract Services ‐ ‐ ‐ 150,000   Postage ‐ ‐ ‐ 5,000   WATER QUALITY TOTAL $     ‐ $    ‐ $    ‐ $   440,700   95    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  96    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FUNCTION  Water Maintenance is responsible for the daily repair and maintenance of the District’s water  transmission, distribuƟon pipelines, and all related equipment including fire hydrants, meters,  valves, and meter vaults.    ACCOMPLISHMENTS  1. Conducted prevenƟve maintenance of pipelines, hydrants, meters and related  equipment that will enhance the life of the aging infrastructure.  2. Restructured maintenance crew to decrease response Ɵme to leak reports and  reduce water loss.  3. Implemented a cross training for Water Maintenance staff to read meters in the  field.  4. Developed a grid style valve exercising program that ensures all valves are  exercised at least once every four years.  PROGRAM PERSONNEL   PosiƟon FTE  Lead Water Service Worker 1  Heavy Equipment Operator 2  Water Service Worker II 5  Water Service Worker I 3  Total 13.5  Water Services Superintendent 1  Water Services Supervisor 1  Office Specialist I 0.5  WATER MAINTENANCE 97    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Percent of valves exercised (7,800 total) n/a 20% 25%  2.  Percent of hydrants serviced (2,900 total) n/a 600 50%  3.  Number of leaks per mile of pipeline n/a 2.88 1  4.  Number of meter vaults serviced 0 0 25  5.  Number of prevenƟve work orders completed vs. reacƟve n/a n/a 70%  5. Completed construcƟon of a drain line for Plant 24 A and B to eliminate the  flooding of Lynwood and Harrison when the well was pumping to discharge.    Goals & ObjecƟves  Develop addiƟonal prevenƟve maintenance programs for meter services such as  vault lids and meter boxes.  Reduce warehouse inventory by 30%.   ConƟnue cross training with the Meter Reading staff.        98    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  MAINTENANCE ADMINISTRATION  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor ‐ ‐ ‐ 201,200   Standby ‐ ‐ ‐ 22,000   Benefits ‐ ‐ ‐ 114,700   OPERATING EXPENSES       Office Supplies 678 5,550 ‐ 6,000   Telephone 18,984 28,000 ‐ 25,000   Fuel 58,335 62,900 ‐ ‐   Postage 211 ‐ ‐ ‐   Memberships & Dues 182 1,080 ‐ 2,000   Professional Development 5,937 9,185 ‐ 8,000   MAINT ADMIN TOTAL $     84,327 $    106,715 ‐ $    378,900 ‐  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor 615,987 710,200 708,211 599,000   OverƟme 56,756 54,000 72,105 55,000   Benefits 377,794 405,113 410,761 341,400   OPERATING EXPENSES       Materials & Supplies 253,476 262,000 294,069 265,000   Tools 4,920 8,000 15,172 10,000   Contract Services 182,370 225,000 397,091 205,000   Permits 56,067 ‐ 24,930 50,000   WTR MAINT TOTAL $  1,547,370 $  1,644,313 $  1,922,339 $  1,525,400 ‐8%  WATER MAINTENANCE  99    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  100    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FUNCTION  Wastewater Maintenance is responsible for the maintenance and repair of the 208 miles of  the wastewater conveyance system.  Based on the Sewer System Maintenance Plan, crews  complete preventaƟve video monitoring, scheduled maintenance, system repairs, and  emergency repairs.    ACCOMPLISHMENTS  1. Cleaned all wastewater pipelines including all areas that require enhanced  maintenance.    2. Established PaƩon State Hospital Maintenance Service Agreement.  3. IdenƟfied pipeline in need of replacement, resulƟng in the prevenƟon of  compromised wastewater conveyance.    GOALS & OBJECTIVES  UƟlize sleeve technology for minor repairs of the wastewater pipelines by trained  District staff.  ConƟnue video monitoring wastewater conveyance system to minimize disrupƟon  in the pipeline system.  PROGRAM PERSONNEL   PosiƟon FTE  Lead Water Service Worker 1  Water Service Worker II 1  Total 2  WASTEWATER MAINTENANCE 101    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Miles of CCTV n/a 35 70  2.  Number of preventable sanitary sewer overflows 0 0 0  3.  Miles of sewer pipe cleaned n/a 200 208  102    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  WASTEWATER MAINTENANCE  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr %  Chg   PERSONNEL EXPENSES       Labor 241,622 240,300 235,000 125,500   OverƟme 1,997 11,000 5,824 5,000   Benefits 77,626 144,932 131,092 71,600   OPERATING EXPENSES       Materials & Supplies 25,769 36,000 22,731 50,000   Tools 517 ‐ 323 3,000   Contract Services 16,968 160,000 95,988 200,000   Treatment Services 6,800,369 6,776,908 6,776,908 6,958,676   Permits 1,182 ‐ 8,239 ‐   WSTEWTR MAINT TOTAL $  7,166,050 $7,369,140 $  7,267,866 $7,413,776 1%  103    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]   104    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FUNCTION  FaciliƟes Maintenance is responsible for the complete maintenance and repair of all District  faciliƟes including the AdministraƟon Buildings, water faciliƟes, District owned vacant  properƟes and easements.  FY 2013‐14 will be the first year that the District has designated a  program focused solely on the maintenance of faciliƟes.      GOALS & OBJECTIVES  Hire a FaciliƟes Maintenance Coordinator to oversee this program.  Establish a prevenƟve maintenance schedule for all District faciliƟes.  Centralize faciliƟes maintenance to delineate responsibiliƟes amongst OperaƟons  and Maintenance.  Work with General Contractor in the construcƟon and schemaƟc of the  AdministraƟve Headquarters.  PROGRAM PERSONNEL   PosiƟon FTE  FaciliƟes Maintenance Coordinator 1  Total 1  FACILITIES MAINTENANCE KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Percent of PrevenƟve Maintenance completed n/a n/a 100%  2.  Average number of days to complete a work order n/a n/a 3  3.  Percent of work order requests completed n/a n/a 95%  105    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FACILITIES MAINTENANCE  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor ‐ ‐ ‐ 65,000   Benefits ‐ ‐ ‐ 31,350   OPERATING EXPENSES       Materials & Supplies ‐ ‐ ‐ 40,000   Tools ‐ ‐ ‐ 1,500   Contract Services ‐ ‐ ‐ 250,000   Rents & Leases ‐ ‐ ‐ 187,000   UƟliƟes ‐ ‐ ‐ 3,000   Telephone ‐ ‐ ‐ 100,000   Electric ‐ ‐ ‐ 55,000   FACILITIES MAINT TOTAL $    ‐ $    ‐ $    ‐ $   732,850   106    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FUNCTION  Fleet Maintenance is responsible for the maintenance and repair of the District’s fleet which  includes approximately 54 vehicles and 15 pieces of heavy equipment.  Fleet maintenance is  also responsible for maintaining air quality regulaƟons, vehicle registraƟon, and transportaƟon  requirements.    ACCOMPLISHMENTS  1. Added a new vactor truck to the District fleet that meets new California emissions  requirements for diesel engines.  2. Added a gate‐valve machine to the fleet that increases the District’s ability to  exercise pipeline gate‐valves.  3. Successfully completed the annual review by the California Highway Patrol on‐site.    GOALS & OBJECTIVES  Establish a 10 year Equipment Replacement Schedule  Establish cost per mile baselines for all District vehicles  Develop a Fleet Maintenance Manual        PROGRAM PERSONNEL   PosiƟon FTE  Lead Equipment Mechanic 1  Equipment Mechanic II 1  Total 2  FLEET MAINTENANCE 107    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  KEY PERFORMANCE INDICATOR   Measure  FY 2012   Actual  FY 2013  Projected  FY 2014  Goal  1.  Percent of labor spent on prevenƟve maintenance on      vehicles n/a n/a 50%  2.  Average annual percentage of fleet in service n/a n/a 95%  3.  Average fleet cost per mile n/a n/a $0.25  4.  Fuel efficiency of fleet, average miles per gallon n/a n/a 15  5.  Percent of vehicles exceeding replacement schedule n/a n/a 10%  108    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  FLEET MAINTENANCE  PROGRAM BUDGET DETAIL  DescripƟon   FY 2012  Actual   FY 2013  Budget   FY 2013  Projected    FY 2014  Proposed   Prior Yr   % Chg   PERSONNEL EXPENSES       Labor 132,403 130,000 130,000 130,000   OverƟme 472 3,000 1,000 3,000   Benefits 69,063 72,668 72,668 74,000   OPERATING EXPENSES       Materials & Supplies 59,927 75,000 60,000 60,000   Tools 19,504 ‐ 8,000 5,000   Office Supplies 667 450 500 500   Contract Services 62,401 109,000 80,000 80,000   Telephone 382 2,000 ‐ 1,000   Fuel 9,705 2,100 ‐ 165,000   Postage 132 ‐ ‐ ‐   Memberships & Dues 1,608 120 ‐ 2,000   Professional Development 276 3,755 500 2,000   General Insurance 82 ‐ ‐ ‐   FLEET MAINT TOTAL $   356,622 $    398,093 $   352,668 $522,500 36%  109    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  110    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  The District defines Capital Outlay expenditures as an individually significant acquisiƟon of  capital assets (not involving construcƟon) that are expected to last more than 2 years and  have an individual cost of $5,000 or more.  This threshold is applied at the individual asset  level.  Group purchases of individual assets under $5,000 are not capitalized, even if the group  totals to more than $5,000.  Each year as part of the budget process, the District’s various  departments compile and submit a list of capital outlay requests for consideraƟon.  Then staff  reviews and prioriƟzes the list of equipment based on a needs assessment and the amount of  funding available.  Items that benefit both the water and wastewater systems are allocated  accordingly.      The District has been making great strides to increase the use of technology to increase  efficiency and automaƟon and for electronic data collecƟon.  This will provide the District with  informaƟon that will help make beƩer informed decisions on the condiƟon of the operaƟng  systems.  FY 2013‐14 has 2 requests for tablets for both the Board and staff to uƟlize.  Remote  access and convenience will increase usage of new technology and the soŌware currently  being implemented that will not only help staff work more efficiently, but will also reduce the  amount of paper being used, creaƟng a more sustainable future.    Moreover, staff is currently working to develop a 10 year equipment replacement schedule  that will balance the costs of replacing vehicles and equipment over a period of Ɵme.  This will  alleviate any large capital expenditures in any parƟcular year.  Moving the District towards  more proacƟve approaches to equipment replacement will allow the establishment of a  Capital Reserve Fund that will be designated specifically for the replacement and acquisiƟon of   capital equipment such as computer hardware/soŌware, vehicles and heavy equipment.        CAPITAL OUTLAY 111    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  CAPITAL OUTLAY  PROGRAM BUDGET DETAIL  Item DescripƟon   Water   Fund   Wastewater  Fund TOTAL  1.  Paperless Technology– to enhance paperless  communicaƟons in the District for a more sustainable  future.  Tablets will be purchased to facilitate this  transiƟon  10,000 10,000 20,000  2.  Field Tablets, Equipment and Licensing – second  phase of GIS and work order system implementaƟon to  allow field employees to enter data remotely.  97,600 10,000 107,600  3.  AutomaƟc Transfer Switch ‐ to be installed at a well  to ensure reliable power supply for conƟnued well  operaƟon during power outages or emergencies.  20,000 ‐ 20,000  4.  Sewer Camera ‐ to enhance the sewer maintenance  prevenƟve maintenance program with a state of the art  camera to help staff idenƟfy potenƟal problemaƟc areas  in the wastewater conveyance system.  ‐ 145,800 145,800  5.  2 Heavy Duty Trucks for Field Maintenance ‐  replacement of exisƟng vehicles in the District’s fleet  that have exceeded their expected useful life and will  cost more to repair than replace.  50,000 ‐ 50,000  6.  Computer Hardware ‐ new servers are necessary to  support the new financial and billing soŌware that is  scheduled for implementaƟon in September 2013  10,000 10,000 20,000  CAPITAL OUTLAY TOTAL $   187,600 $    175,800 $   363,400  112    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  A Capital Improvement Project expenditure is an individually significant construcƟon project  with a cost of $25,000 or more that creates a new capital asset, improves an exisƟng asset  (increases its service capacity, etc.), or significantly and unusually extends an asset’s operaƟng  life.  The District’s Capital Improvement Program (CIP) is a 5 year budget.  However, each year  projects are reviewed and evaluated based on the needs of the District.  Therefore, some  projects may be omiƩed and other moved forward annually during the development of each  fiscal year budget.  Proposed Capital Improvement Projects for the budgeted fiscal years were submiƩed by the  Engineering, OperaƟons and Maintenance Departments in accordance with the anƟcipated  needs of the District as typically outlined in the Water and Sewer Master Plans.  However, the  Water and Wastewater Master Plans are both in process of being updated during the  development of the FY 2013‐14 Budget.    Proposed Capital Improvement Projects were evaluated and prioriƟzed based on the following  criteria:  PreservaƟon of public health and water quality  Improvements required as a result of local, state or federal legislaƟon/mandates  ReducƟon of current maintenance expenditures and avoidance of costly future  rehabilitaƟon  PreservaƟon of exisƟng faciliƟes/infrastructure  PosiƟve impacts on customers  Grant/loan secured or leverage of funds or Grant/loan availability  As a result of the prudent fiscal planning and oversight by the Board of Directors, staff has  been able to increase the District’s capital investment to provide the community the water  and wastewater infrastructure that the customers expect and deserve.  The FY 2013‐14 Capital  Improvement Program totals $28,071,000 with funding through revenues, bonds, reserves,  development fees and other sources.        CAPITAL IMPROVEMENT PROGRAM 113    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  [ THIS PAGE  LEFT BLANK INTENTIONALLY ]  114      115 FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT       11 6   [ TH I S  PA G E  LE F T  BL A N K  IN T E N T I O N A L L Y  ]  FI S C A L  YE A R  20 1 3 ‐14   EA S T  VA L L E Y  WA T E R  DI S T R I C T       117 FISCAL YEAR 2013‐14 EAST VALLEY WATER DISTRICT       11 8   [ TH I S  PA G E  LE F T  BL A N K  IN T E N T I O N A L L Y  ]  FI S C A L  YE A R  20 1 3 ‐14   EA S T  VA L L E Y  WA T E R  DI S T R I C T     EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: ADMINISTRATION HEADQUARTERS PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  The Board of Directors awarded a Design‐Build contract for the construcƟon of the Headquarters in  September 2012.  Design is nearly completed and will conƟnue as construcƟon of the building begins.  The  total cost of the contract has been agreed upon to not exceed $17.5 Million.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: General/Other  LocaƟon: Greenspot Road  Project Manager: Mike Maestas      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2012  EsƟmated CompleƟon: April 2014  Capital Request Programmed:   FY 2012‐13   PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $17,500,000  Prior Years Budget: $1,500,000  PÙʹ›‘ã MƒÖ  119    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: A FaciliƟes Maintenance Coordinator will be hired to oversee all  maintenance for the new building.  This cost has been included in the FY 2014 Budget.  2. Debt Service: N/A           3. Maintenance: N/A      4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  ConstrucƟon (Contract) 16,000,000 ‐ ‐ ‐ ‐ 16,000,000  ANNUAL TOTAL $ 16,000,000 ‐ ‐ ‐ ‐ $ 16,000,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐  Reserve Transfer 3,500,000 ‐ ‐ ‐ ‐ 3,500,000  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds 12,000,000 ‐ ‐ ‐ ‐ 12,000,000  Development Fees 500,000 ‐ ‐ ‐ ‐ 500,000  ANNUAL TOTAL $ 16,000,000 ‐ ‐ ‐ ‐ $16,000,000  PROJECT FUNDING  120    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: DEL ROSA FACILITY UPGRADES PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  The Del Rosa Facility is in need of major repairs and renovaƟon to both the warehouse and the office building  to secure the facility.  Once the new Headquarters is completed, the Del Rosa Yard will  serve as a satellite  facility to house parts and materials perƟnent to the repair and maintenance of water faciliƟes on the west  side of the District.   In Ɵmes of emergency, the facility will be designated as an alternate Emergency  OperaƟons Center.  Plans also include the addiƟon of a customer service counter to enhance convenience to  help customers.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: General/Other  LocaƟon: Del Rosa Yard  Project Manager: Brian Tompkins      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2013  EsƟmated CompleƟon: April 2014  Capital Request Programmed:   New  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 1,000,000  Prior Years Budget: $ 0  PÙʹ›‘ã MƒÖ  121    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: A FaciliƟes Maintenance Coordinator will be hired to oversee all  maintenance for the new building.  This cost has been included in the FY 2014 Budget.  2. Debt Service: N/A           3. Maintenance: N/A      4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  ConstrucƟon (Contract) 500,000 500,000 ‐ ‐ ‐ 1,000,000  ANNUAL TOTAL $ 500,000 $ 500,000 ‐ ‐ ‐ $ 1,000,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue 500,000 500,000 ‐ ‐ ‐ 1,000,000  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL  $ 500,000 $ 500,000 ‐ ‐ ‐ $ 1,000,000  PROJECT FUNDING  122    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: ERP SOFTWARE IMPLEMENTATION PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  In FY 2013, the Board approved the use of Tyler Technologies to be the District’s Enterprise Resource  Planning SoŌware.  This project will entail the implementaƟon, data conversion, and training for the use of  the new soŌware for Finance, Customer Service, and Human Resources.  The exisƟng financial and billing  soŌware is over 10 years old and does not provide sufficient support as the District conƟnues to grow and  move forward.    PÙʹ›‘ã D›ãƒ®½Ý Project Type: General/Other  LocaƟon: AdministraƟon  Project Manager: Rosie Gaede      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2013  EsƟmated CompleƟon: Feb 2014  Capital Request Programmed:   FY 2012‐13  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 375,000  Prior Years Budget: $ 200,000  PÙʹ›‘ã MƒÖ  123    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance: Annual Maintenance support will amount to $50,000 and paid for out of the  OperaƟng and Maintenance Budget for Finance, Customer Service and Human Resources.  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  ConstrucƟon (Contract) 175,000 ‐ ‐ ‐ ‐ 175,000  ANNUAL TOTAL $ 175,000 ‐ ‐ ‐ ‐ $ 175,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue 175,000 ‐ ‐ ‐ ‐ 175,000  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 175,000 ‐ ‐ ‐ ‐ $ 175,000  PROJECT FUNDING  124    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: MULTI-YEAR RATE STUDY PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  In order to encourage water conservaƟon while providing water delivery services at a cost effecƟve rate, a  water rate study is necessary to evaluate the different billing opƟons available that comply with current  regulaƟons and ensure that the District is charging customers the true cost to deliver services.  The rate study  will be designed to establish rates for the next 3‐5 years.     PÙʹ›‘ã D›ãƒ®½Ý Project Type: General/Other  LocaƟon: AdministraƟon  Project Manager: Brian Tompkins      PÙʹ›‘ã S‘«›—ç½› Start Date: January 2014  EsƟmated CompleƟon: April 2014  Capital Request Programmed:   New  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 65,000  Prior Years Budget: $ 65,000  PÙʹ›‘ã MƒÖ  125    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance: Annual Maintenance support will amount to $50,000 and paid for out of the  OperaƟng and Maintenance Budget for Finance, Customer Service and Human Resources.  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  ConstrucƟon (Contract) 65,000 ‐ ‐ ‐ ‐ 65,000  ANNUAL TOTAL $ 65,000 ‐ ‐ ‐ ‐ $ 65,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue 65,000 ‐ ‐ ‐ ‐ 65,000  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 65,000 ‐ ‐ ‐ ‐ $ 65,000  PROJECT FUNDING  126    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: ENERGY EFFICIENT UPGRADES PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  The District has been working with Honeywell to idenƟfy energy conservaƟon measures that will improve the  operaƟonal efficiency of the District and that will miƟgate conƟnually increasing electricity usage rates.   These projects will be guaranteed by Honeywell to provide savings that will amount to the total project cost  over a 12 year period.  Projects include the various installaƟon and repair of valves, boosters, motors,  electrical panels, and wells.   PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: District‐wide  Project Manager: Sarah Kurth      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2013  EsƟmated CompleƟon: Sept 2014  Capital Request Programmed:   New  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 4,000,000  Prior Years Budget: $ 0  PÙʹ›‘ã MƒÖ  127    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance: Annual Maintenance of new water appurtenance such as valves and pressure  reducing staƟons will be including in the operaƟng costs, but will be offset by electricity savings.  4. UƟliƟes: Electricity costs should decline as a result of more efficient pumping operaƟons.   PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  Planning & Design 500,000 ‐ ‐ ‐ ‐ 500,000  ConstrucƟon (Contract) 3,450,000 ‐ ‐ ‐ ‐ 3,450,000  AdministraƟon 50,000 ‐ ‐ ‐ ‐ 50,000  ANNUAL TOTAL $ 4,000,000 ‐ ‐ ‐ ‐ $ 4,000,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants 4,000,000 ‐ ‐ ‐ ‐ 4,000,000  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 4,000,000 ‐ ‐ ‐ ‐ $ 4,000,000  PROJECT FUNDING  128    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: WATER MASTER PLAN UPDATE PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  The current Water Master Plan was completed in 2008.  Since then, the socio‐economic assumpƟons used to  forecast water demands have changed dramaƟcally.  The Board approved an update to the Water Master  Plan at mid‐year for FY 2013.  The project will entail development of a new comprehensive hydraulic model  uƟlizing the District’s Geographical InformaƟon System (GIS) to provide key informaƟon to idenƟfy water  infrastructure improvements that will ensure the District is capable of delivering high‐quality water to  exisƟng and future customers in a safe, reliable, and cost‐effecƟve manner.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: District‐wide  Project Manager: Leida Thomas      PÙʹ›‘ã S‘«›—ç½› Start Date: March 2013  EsƟmated CompleƟon: Dec 2013  Capital Request Programmed:   FY 2012‐13    PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 300,000  Prior Years Budget: $ 150,000  PÙʹ›‘ã MƒÖ  129    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance: Projects and repairs and maintenance recommendaƟons will either result in  increased operaƟonal costs or increased capital improvement projects to meet needs.  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  Planning & Design 120,000 ‐ ‐ ‐ ‐ 120,000  AdministraƟon 30,000 ‐ ‐ ‐ ‐ 30,000  ANNUAL TOTAL $ 150,000 ‐ ‐ ‐ ‐ $ 150,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue 150,000 ‐ ‐ ‐ ‐ 150,000  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 150,000 ‐ ‐ ‐ ‐ $ 150,000  PROJECT FUNDING  130    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: PLANT 134 BOOSTER UPGRADE PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  The booster staƟon at Plant 134 is sized to accommodate the plant’s prior treatment capacity of 4 million  gallons per day (MGD).   With the new 8 MGD surface water treatment facility at Plant 134, the booster  staƟon need to be upgraded to maximize the full capacity of the plant.  This project will increase pumping  capacity and upgrade downstream piping to increase the plant’s getaway capacity.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: Plant 134  Project Manager: JusƟn Parker      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2013  EsƟmated CompleƟon: Feb 2014  Capital Request Programmed:   FY 2010‐11  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 840,000  Prior Years Budget: $ 310,000  PÙʹ›‘ã MƒÖ  131    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance: Projects and repairs and maintenance recommendaƟons will either result in  increased operaƟonal costs or increased capital improvement projects to meet needs.  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  ConstrucƟon (Contract) 500,000 ‐ ‐ ‐ ‐ 500,000  AdministraƟon 30,000 ‐ ‐ ‐ ‐ 30,000  ANNUAL TOTAL $ 530,000 ‐ ‐ ‐ ‐ $ 530,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds 530,000 ‐ ‐ ‐ ‐ 530,000  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 530,000 ‐ ‐ ‐ ‐ $ 530,000  PROJECT FUNDING  132    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: PLANT 143 INTER TO UPPER ZONE PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  A 1 million gallon reservoir, ancillary piping, and a booster staƟon are being constructed at Plant 143 to  collect the water from Wells 146 and 147 that will allow entrapped air to dissipate in the reservoir therefore  alleviaƟng customer complaints about air in the water that is disrupƟve in their homes.  ConstrucƟon  includes the construcƟon of a steel storage tank and ancillary piping to convey water.  This will also require  the retrofiƫng of exisƟng equipment at Wells 146 and 147 to deliver water to Plant 143.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: Plant 143  Project Manager: Victor DeLeon      PÙʹ›‘ã S‘«›—ç½› Start Date: September 2012  EsƟmated CompleƟon: Aug 2013  Capital Request Programmed:   FY 2012‐13  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 3,360,000  Prior Years Budget: $ 2,520,000  PÙʹ›‘ã MƒÖ  133    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance: There will be increased maintenance cost for new reservoir and booster staƟon  being constructed.  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  ConstrucƟon (Contract) 840,000 ‐ ‐ ‐ ‐ 840,000  ANNUAL TOTAL $ 840,000 ‐ ‐ ‐ ‐ $ 840,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds 840,000 ‐ ‐ ‐ ‐ 840,000  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 840,000 ‐ ‐ ‐ ‐ $ 840,000  PROJECT FUNDING  134    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: PLANT 134 UPGRADE TECHNOLOGY PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  AŌer compleƟon of the new 8 million gallons per day surface water treatment plant at Plant 134, the District  will need to demolish and remove the exisƟng Roberts Filter Tanks that were part of the previous treatment  process.  The media within the tanks must be removed as soon as possible to prevent microbial growth.  This  will comply with California Department of Public Health standards.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: Plant 134  Project Manager: JusƟn Parker      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2013  EsƟmated CompleƟon: Feb 2014  Capital Request Programmed:   FY 2010‐11  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 10,080,000  Prior Years Budget: $ 10,000,000  PÙʹ›‘ã MƒÖ  135    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance: N/A  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  AdministraƟon 10,000 ‐ ‐ ‐ ‐ 10,000  ANNUAL TOTAL $ 80,000 ‐ ‐ ‐ ‐ $ 80,000  ConstrucƟon (Contract) 70,000 ‐ ‐ ‐ ‐ 70,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds 80,000 ‐ ‐ ‐ ‐ 80,000  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 80,000 ‐ ‐ ‐ ‐ $ 80,000  PROJECT FUNDING  136    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: LIVE OAK MAIN REPLACEMENT PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  The facility appurtenances and downstream conveyance faciliƟes are anƟquated, undersized, and in need of  replacement.  This project includes the replacement of approximately 2,000 linear feet of 4 and 6 inch  pipelines, retrofiƫng of Plant 137, and replace pipeline in a private driveway off Live Oak Rd. and Summit Dr.   There has been a significant amount of repair work completed at this locaƟon.  At this Ɵme, staff has  determined that replacement of the aging infrastructure should resolve the maintenance issues at a more  cost effecƟve price.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: Live Oak Rd/Summit Dr.  Project Manager: Sarah Kurth      PÙʹ›‘ã S‘«›—ç½› Start Date: Feb 2013  EsƟmated CompleƟon: Nov 2013  Capital Request Programmed:   FY 2011‐12  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 1,040,000  Prior Years Budget: $ 425,000  PÙʹ›‘ã MƒÖ  137    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance:  Decreased maintenance cost as a result of the replacement of aging infrastructure  to reduce the amount of service calls.  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  AdministraƟon 30,000 ‐ ‐ ‐ ‐ 30,000  ANNUAL TOTAL $ 615,000 ‐ ‐ ‐ ‐ $ 615,000  Project Mgmt/Inspect 80,000 ‐ ‐ ‐ ‐ 80,000  ConstrucƟon (Contract) 505,000 ‐ ‐ ‐ ‐ 505,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds 615,000 ‐ ‐ ‐ ‐ 615,000  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 615,000 ‐ ‐ ‐ ‐ $ 615,000  PROJECT FUNDING  138    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: PLANT 40 BOOSTER PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  This project includes the construcƟon of a booster staƟon at this site.  A booster at this plant will be key in  conveying water from the intermediate pressure zone to the upper pressure zone.  Plant 40 is also a terminus  point for a future 30 inch pipeline that conveys water across the enƟre intermediate pressure zone.  The  boosters will provide greater operaƟonal reliability and flexibility by delivering ground water to other  pressure zones.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: Plant 40  Project Manager: JusƟn Parker      PÙʹ›‘ã S‘«›—ç½› Start Date: January 2014  EsƟmated CompleƟon: Feb 2015  Capital Request Programmed:   FY 2012‐13  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 840,000  Prior Years Budget: $ 620,000  PÙʹ›‘ã MƒÖ  139    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance:  A new booster staƟon will require minimal prevenƟve maintenance to prolong the  life of the pumps and motors.  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  AdministraƟon 10,000 ‐ ‐ ‐ ‐ 10,000  ANNUAL TOTAL $ 220,000 ‐ ‐ ‐ ‐ $ 220,000  Project Mgmt/Inspect 62,000 ‐ ‐ ‐ ‐ 62,000  Planning & Design 93,000 ‐ ‐ ‐ ‐ 93,000  ConstrucƟon (Contract) 55,000 ‐ ‐ ‐ ‐ 55,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds 220,000 ‐ ‐ ‐ ‐ 220,000  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 220,000 ‐ ‐ ‐ ‐ $ 220,000  PROJECT FUNDING  140    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: ONSITE EMERGENCY GENERATORS PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  This project will locate, design, procure, and install two permanent on‐side emergency generators at certain  water faciliƟes located in the foothills.  In order to maintain reliable service during unexpected power  outages as a result of a catastrophic event, the back‐up generators will be necessary at the plants located in  higher elevaƟons.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: Various  Project Manager: Sarah Kurth      PÙʹ›‘ã S‘«›—ç½› Start Date: January 2014  EsƟmated CompleƟon: June 2015  Capital Request Programmed:   New  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 850,000  Prior Years Budget: $ 0  PÙʹ›‘ã MƒÖ  141    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance:  Maintenance will be required annually to service and ensure the funcƟonality of  the generator during emergencies.    4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  Planning & Design 65,000 65,000 65,000 ‐ ‐ 195,000  ConstrucƟon (Contract) 125,000 ‐ ‐ ‐ ‐ 625,000  AdministraƟon 10,000 ‐ ‐ ‐ ‐ 30,000  ANNUAL TOTAL $ 200,000 $225,000 $425,000 ‐ ‐ $ 850,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue 200,000 225,000 425,000 ‐ ‐ 850,000  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 850,000 ‐ ‐ ‐ ‐ $ 850,000  PROJECT FUNDING  142    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: PLANT 134 SPW TURNOUT/FEEDER PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  The District is partnering with San Bernardino Valley Municipal Water District (SBVMWD) on a regional  project to reconstruct the District’s State Project Water (SPW) turnout and install a new feeder line to Plant  134.  The new feeder line and turnout will extend from SBVMWD’s Foothill Feeder (at City Creek) to Plant  134 intake vault.  The new connecƟon will be a criƟcal facility in allowing the District to maximize its surface  water treatment capacity at Plant 134 and fully uƟlize SPW as an integral part of the District’s water supply  mix.  The District’s exisƟng connecƟon is obsolete and cannot reliably supply SPW to Plant 134.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: Plant 134  Project Manager: JusƟn Parker      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2013  EsƟmated CompleƟon: Feb 2014  Capital Request Programmed:   New  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 1,090,000  Prior Years Budget: $ 0  PÙʹ›‘ã MƒÖ  143    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance:  N/A  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  Planning & Design 120,000 ‐ ‐ ‐ ‐ 120,000  ConstrucƟon (Contract) 850,000 ‐ ‐ ‐ ‐ 850,000  AdministraƟon 40,000 ‐ ‐ ‐ ‐ 40,000  ANNUAL TOTAL $ 1,090,000 ‐ ‐ ‐ ‐ $ 1,090,000  Project Mgmt/Inspect 80,000 ‐ ‐ ‐ ‐ 80,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue 1,090,000 ‐ ‐ ‐ ‐ 1,090,000  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 1,090,000 ‐ ‐ ‐ ‐ $ 1,090,000  PROJECT FUNDING  144    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: HYDROELECTRIC FACILITY PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  The District and San Bernardino Valley Municipal Water District (SBVMWD) is partnering on a regional project  to install a hydroelectric generaƟon facility at Plan 134.  A new turnout and feeder line from SBVMWD will  deliver State Project Water at high pressure and flow capable of generaƟng electricity sufficient to power  Plant 134 during operaƟon.  The electricity generated by the facility will miƟgate electricity costs for water  treatment, therefore decreasing the cost per acre foot of water.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: Plant 134  Project Manager: JusƟn Parker      PÙʹ›‘ã S‘«›—ç½› Start Date: January 2014  EsƟmated CompleƟon: Feb 2015  Capital Request Programmed:   New  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 1,600,000  Prior Years Budget: $ 0  PÙʹ›‘ã MƒÖ  145    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance:  N/A  4. UƟliƟes: The facility should generate enough electricity to run Plant 134 during operaƟon,  therefore decreasing electrical costs.  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  AdministraƟon 100,000 ‐ ‐ ‐ ‐ 100,000  ANNUAL TOTAL $ 1,600,000 ‐ ‐ ‐ ‐ $ 1,600,000  Project Mgmt/Inspect 200,000 ‐ ‐ ‐ ‐ 200,000  Planning & Design 300,000 ‐ ‐ ‐ ‐ 300,000  ConstrucƟon (Contract) 1,000,000 ‐ ‐ ‐ ‐ 1,000,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue ‐ ‐ ‐ ‐ ‐ ‐  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants 1,600,000 ‐ ‐ ‐ ‐ 1,600,000  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 1,600,000 ‐ ‐ ‐ ‐ $ 1,600,000  PROJECT FUNDING  146    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: WATER QUALITY RETROFITS PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  As part of the backflow prevenƟon program, the District must replace all single check fire services and  underground flushouts in the water system.  These two appurtenances are backflow hazards and need to be  replaced to comply with water quality standards.  There are approximately 150 single check fire services and  200 flushouts that need to be replaced.    PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: District‐wide  Project Manager: Andrew Theisen      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2013  EsƟmated CompleƟon: June 2018  Capital Request Programmed:   New  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 500,000  Prior Years Budget: $ 0  PÙʹ›‘ã MƒÖ  147    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance:  N/A  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  ConstrucƟon (Contract) 75,000 75,000 75,000 75,000 75,000 375,000  Project Mgmt/Inspect 15,000 15,000 15,000 15,000 15,000 75,000  AdministraƟon 10,000 10,000 10,000 10,000 10,000 50,000  ANNUAL TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue 100,000 100,000 100,000 100,000 100,000 500,000  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000  PROJECT FUNDING  148    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: WELL & BOOSTER REHABS PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  Every year, District staff works with Southern California Edison to conduct efficiency tests on all pumps for  wells and boosters at all water faciliƟes.  The results of the tests idenƟfy inefficient pumps that costs  thousands of dollars in wasted energy.  Staff prioriƟzes the need for each pump to be refurbished or replaced  as the soluƟon to improve efficiency.  Ideally, pumps should operate at 75% efficiency.  Staff does not  consider rehabs unƟl the efficiency has dropped below 60%.  Rehabs are a cost efficient soluƟon to reduce  annual energy consumpƟon, improve system reliability and lower maintenance costs.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: District‐wide  Project Manager: Mike Henderson      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2013  EsƟmated CompleƟon: June 2014  Capital Request Programmed:   New  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 500,000  Prior Years Budget: $ 0  PÙʹ›‘ã MƒÖ  149    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance:  Rehabs will help lower maintenance costs and prolong the life of the equipment.  4. UƟliƟes: With improved efficiency, electricity costs should decrease slightly.  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  ConstrucƟon (Contract) 100,000 100,000 100,000 100,000 100,000 500,000  ANNUAL TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue 100,000 100,000 100,000 100,000 100,000 500,000  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000  PROJECT FUNDING  150    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: AMR METER REPLACEMENT PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  More than half of the meters in the District are over 10 years old.  In order to receive accurate meter reads in  a efficient manner, the meters are being changed to radio read to alleviate the labor intensive task.   Currently, meter readers walk the streets and manually read each meter, Automated Meter Reading (AMR)  will allow for the radio transmission of reads as the employee drives by.  Eventually, it is this technology that  will allow the District to move to an Automated Meter Infrastructure that will allow real Ɵme monitoring of  water usage for customers.    PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: District‐wide  Project Manager: Carol Cales      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2012  EsƟmated CompleƟon: June 2017  Capital Request Programmed:   FY 2011‐12  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 3,980,000  Prior Years Budget: $ 980,000  PÙʹ›‘ã MƒÖ  151    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance:  N/A  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  ConstrucƟon (Contract) 750,000 750,000 750,000 750,000 ‐ 3,000,000  ANNUAL TOTAL $ 750,000 $ 750,000 $ 750,000 $ 750,000 ‐ $ 3,000,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue 750,000 750,000 750,000 750,000 750,000 3,000,000  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 750,000 $ 750,000 $ 750,000 $ 750,000 $ 750,000 $ 3,000,000  PROJECT FUNDING  152    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: FACILITIES RELOCATION PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  Replacement and relocaƟon of District faciliƟes and appurtenances for development as required by the City  of Highland, City of San Bernardino, County of San Bernardino, and other agencies.  This project may entail  the relocaƟon of fire hydrants, main lines, and service connecƟons where other agencies may be developing  homes, businesses or public infrastructure improvements.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Water  LocaƟon: District‐wide  Project Manager: JusƟn Parker      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2013  EsƟmated CompleƟon: June 2015  Capital Request Programmed:   FY 2010‐11, ongoing  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 675,000  Prior Years Budget: $ 0  PÙʹ›‘ã MƒÖ  153    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance:  N/A  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  ConstrucƟon (Contract) 30,000 105,000 105,000 105,000 105,000 450,000  Project Mgmt/Inspect 30,000 30,000 30,000 30,000 30,000 150,000  AdministraƟon 15,000 15,000 15,000 15,000 15,000 75,000  ANNUAL TOTAL $ 75,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 675,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue 75,000 150,000 150,000 150,000 150,000 675,000  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 75,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 675,000  PROJECT FUNDING  154    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  PROJECT TITLE: SEWER REPLACEMENT PÙʹ›‘ã D›Ý‘Ù®Öã®ÊÄ  The 2013 Sewer Master Plan idenƟfied over 5,500 linear feet of sewer main that need replacement based on  pipe age and condiƟon.  The need for replacement was confirmed by field inspecƟon using CCTV.  It is  important to replace secƟons of old piping on a regular basis to avoid major sanitary sewer overflows or large  replacement project costs in the future.  PÙʹ›‘ã D›ãƒ®½Ý Project Type: Sewer  LocaƟon: District‐wide  Project Manager: Leida Thomas      PÙʹ›‘ã S‘«›—ç½› Start Date: July 2014  EsƟmated CompleƟon: June 2015  Capital Request Programmed:   New  PÙʹ›‘ã CÊÝã Oò›Ùò®›ó Total Project Cost: $ 780,000  Prior Years Budget: $ 0  PÙʹ›‘ã MƒÖ  155    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  O֛كã®Ä¦ B痦›ã IÃփ‘ã Sãƒã›Ã›Äã  1. AddiƟonal Staff Salaries: N/A  2. Debt Service: N/A           3. Maintenance:  N/A  4. UƟliƟes: N/A  PROJECT COST  EsƟmated Cost  ItemizaƟon   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  ConstrucƟon (Contract) 120,000 120,000 120,000 120,000 120,000 600,000  Project Mgmt/Inspect 12,000 12,000 12,000 12,000 12,000 60,000  AdministraƟon 6,000 6,000 6,000 6,000 6,000 30,000  ANNUAL TOTAL $ 156,000 $ 156,000 $ 156,000 $ 156,000 $ 156,000 $ 780,000  Planning & Design 18,000 18,000 18,000 18,000 18,000 90,000  Financing Source   FY 2013‐14  Year 1   FY 2014‐15  Year 2   FY 2015‐16  Year 3   FY 2016‐17  Year 4   FY 2017‐18  Year 5 Total  OperaƟng Revenue 156,000 156,000 156,000 156,000 156,000 780,000  Reserve Transfer ‐ ‐ ‐ ‐ ‐ ‐  Government Loans/Grants ‐ ‐ ‐ ‐ ‐ ‐  Bond Proceeds ‐ ‐ ‐ ‐ ‐ ‐  Development Fees ‐ ‐ ‐ ‐ ‐ ‐  ANNUAL TOTAL $ 156,000 $ 156,000 $ 156,000 $ 156,000 $ 156,000 $ 780,000  PROJECT FUNDING  156    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  GLOSSARY Acre Foot (AF) ‐ water measurement equal to 325,851 gallons.  Enterprise Fund ‐ a fund established to account for operaƟons that are financed and operated  in a manner similar to business enterprises where the intent of the governing body is that  costs of providing goods and services to the general public on a conƟnuing basis be financed  or recovered primarily through user charges.  Fees ‐ charges for service that are based upon the cost of providing the service.  Fiscal Year (FY) ‐ the Ɵme frame in which the budget applies.  This period is from July 1  through June 30.  Full‐Time Equivalent (FTE) ‐ a measure of effecƟve authorized posiƟons, indicaƟng the  percentage of Ɵme a posiƟon or group of posiƟons is funded.  It is calculated by equaƟng  2,080 hours of work per year with the full‐Ɵme equivalent of one posiƟon; thus, one posiƟon  would have an FTE of 1.  Fund ‐ an independent fiscal and accounƟng enƟty with a self‐balancing set of accounts  recording cash and/or other resources together with all related liabiliƟes, obligaƟons,  reserves, and equiƟes which are segregated for the purpose of carrying on specific acƟviƟes or  aƩaining certain objecƟves.  Fund Balance ‐ the excess of an enƟty’s assets over its liabiliƟes.  A negaƟve fund balance is  someƟmes called a deficit.  Generally Accepted AccounƟng Principles (GAAP) ‐ Uniform minimum standards of, and  guidelines for external financial accounƟng and reporƟng.  They govern the form and content  of the basic financial statements of an enƟty.  GAAP encompasses the convenƟons, rules and  procedures necessary to define accepted accounƟng pracƟces at a parƟcular Ɵme.   They  include not only broad guidelines of general applicaƟon, but also detailed pracƟces and  procedures.  The primary authoritaƟve statements on the applicaƟon of GAAP to state and  local governments are Government AccounƟng Standards Board (GASB) pronouncements and  Financial AccounƟng Standards Board (FASB) pronouncements.  GAAP provides a standard by  which to measure financial presentaƟons.  General ObligaƟon Bonds ‐ bonds, the payment for which, the full faith and credit of the  issuing government are pledged.  157    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  Geographic InformaƟon System (GIS) ‐ an organized collecƟon of computer hardware,  soŌware and geographic data designed to efficiently capture, store, update, manipulate,  analyze, and display all forms of geographically referenced informaƟon.  Hundred Cubic Feet (HCF) ‐ water billing measurement equal to 748 gallons.  Interfund Transfers ‐ budgeted amounts transferred from one governmental accounƟng fund  to another for work or services provided.    Internal Control ‐ a plan of organizaƟon for purchasing, accounƟng, and financial acƟviƟes  which, among other things, provides that:  The duƟes of employees are subdivided so that no single employee handles a  financial transacƟon from beginning to end,  Proper authorizaƟons from specific responsible officials are obtained before key  steps in the processing of transacƟons are completed, and   Records and procedures are arranged appropriately to facilitate effecƟve control.  MGD ‐ Million Gallons Per Day.  Purchase Order ‐ a document issued to authorize a vendor or consultant to deliver specified  merchandise or render a specified service for a stated esƟmated price.    Revenue ‐ income generated by assessments, investments, connecƟon fees, stand‐by fees,  and user charges.  Reserve ‐ an account used to indicate that a porƟon of fund equity or (Fund Balance) is legally  restricted for a specific purpose or not available for appropriaƟon and subsequent spending.  SCADA ‐ Supervisory Control and Data AcquisiƟon.  158    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  CHART OF ACCOUNTS  Labor ‐ regular salaries and wages for permanent full‐Ɵme and part‐Ɵme employees.  Temporary Labor ‐ costs for labor not permanently employed by the District.  OverƟme ‐ for employees that work more than their regular 40 hours per week.  Standby ‐ employees that are on call for emergencies aŌer hours, weekends, and holidays.  Benefits ‐ medical, dental, vision, reƟrement, and related benefits offered by the District.  Purchased Water ‐ cost to purchase surface water.  Groundwater Replenishment ‐ cost to pump groundwater from the basin.  Water Stock Assessment ‐ cost of water shares directly related to North Fork.  Materials & Supplies ‐ items used in daily operaƟons, repair, and maintenance.  Tools ‐ items used to perform repair and maintenance acƟviƟes.  Office Supplies ‐ items such as pens, paper and other related desk accessories.  Chemicals ‐ chemicals used for the treatment of water and wastewater.  Contract Services ‐ services rendered by consultants and contractors.  PrinƟng & Publishing ‐ costs for prinƟng and producing District publicaƟons.  Banking Services ‐ services and fees charged by the District’s banks.  Legal Services ‐ cost for legal advice, consultaƟon, contract review, and liƟgaƟon.  Treatment Services ‐ outside treatment services for water and wastewater such as the City of  San Bernardino.  Rents & Leases ‐ rental and lease costs for buildings and equipment that are not owned by the  District.  UƟliƟes ‐ cable, gas, and other uƟliƟes not including telephone and electricity.  Telephone ‐ land lines, cellular phones, and internet services.  Electric ‐ electricity usage costs.  Fuel ‐ fuel costs for vehicles and generators.  Permits ‐ permit costs required by federal, state, and local regulatory agencies.  Postage ‐ costs for mailing bills, publicaƟons, and special deliveries.  159    EAST VALLEY WATER DISTRICT                                                                                                                 FISCAL YEAR 2013‐14  Memberships & Dues ‐ subscripƟons and memberships for associaƟons and special groups.  Professional Development ‐ seminars, conferences and travel costs for employee  development.  EducaƟon Assistance ‐ tuiƟon reimbursement for those employees who aƩend school for a  degree or cerƟficate.  Insurance/Claims ‐ general liability insurance for the District’s faciliƟes and infrastructure.  160  CONTACT US District Offices 3654 E. Highland Avenue, Suite 18 Highland, CA 92346 Phone 909-889-9501 Website www.eastvalley.org