Loading...
HomeMy WebLinkAboutAgenda Packet - Engineering & Operations Committee - 06/27/2016ENGINEERING AND OPERATIONS COMMITTEE June 27, 2016 - 2:30 PM 31111 Greenspot Road, Highland, CA 92346 AGENDA CALL TO ORDER PLEDGE OF ALLEGIANCE PUBLIC COMMENTS NEW BUSINESS 1.May 23, 2016 Committee Meeting Minutes 2.Review City of Riverside Quitclaim Deed to East Valley Water District 3.Presentation of 2013 Wastewater Collection System Capital Improvement Plan ADJOURN PLEASE NOT E: Purs uant to Go vernment Co d e Sec tion 54954.2(a), any reques t for a dis ability-related mo d ific atio n o r ac commodatio n, inc luding auxiliary aid s or s ervic es , that is s o ught in order to partic ip ate in the above-agend ized p ublic meeting sho uld b e direc ted to the District Clerk at (909) 885-4900 at leas t 72 ho urs p rio r to s aid meeting. 1 Minutes 05/23/2016 etb Subject to approval EAST VALLEY WATER DISTRICT May 23, 2016 ENGINEERING AND OPERATIONS COMMITTEE MEETING MINUTES The District Clerk called the meeting to order at 2:30 p.m. and Mr. Jose Martinez led the flag salute. PRESENT: Directors: Coats, Shelton ABSENT: None STAFF: Martinez Jose, Assistant General Manager; Patrick Milroy, Operations Manager; Eileen Bateman, Sr. Administrative Assistant GUEST(s): District staff members. There were no members of the public present. PUBLIC COMMENTS Ms. Bateman declared the public participation section of the meeting open at 2:31 p.m. There being no written or verbal comments, the public participation section was closed. APPROVE THE APRIL 25, 2016 MEETING MINUTES The Assistant General Manager noted that a correction needed to be made to the minutes reflecting that the scheduled meeting time is at 2:30 p.m. The committee approved the April 25, 2016 meeting minutes with the noted change to the meeting time. PRESENTATION OF 2014 WATER SYSTEM MASTER PLAN The Assistant General Manager provided a brief overview of the District’s Water System Master Plan. A representative from MWH Engineering provided a detailed overview of the District’s 2014 Water System Master Plan including: goals, master planning approach, water demands, capital improvement program, study area, projected population of the district, model development and calibration, transmission and distribution analysis, supply analysis, pumping and storage analysis, cost analysis, proposed large development plans and water and wastewater collection system demands for the proposed projects. 2 Minutes 05/23/2016 etb ADJOURN The meeting adjourned at 3:26 p.m. Ronald L. Coats Nanette Shelton Governing Board Member Governing Board Member STAFF REPORT Agend a Item #2. Meeting Date: June 27, 2016 Dis cus s io n Item To: ENGINEERING AND OPERATIONS COMMITTEE Memb ers From: General Manager/CEO Subject: Review City of Riverside Quitc laim Deed to East Valley Water Dis tric t RECOMMENDATION: Staff rec o mmend s the Co mmittee review the Quitclaim Deed offered b y the City o f Riverside. T his s trip of land was known as Alamo Road and it lies within the Old District Headquarters site on Del Ros a Avenue. (S ee attac hed map) BACKGROUND / ANALYSIS: T he old headquarters site is uno cc up ied , b ut c o ntinues to ho us e field eq uipment and materials. It is still us ed to o perate the meter and weld ing s hops , the S CADA ro o m, and is a s taging area for projects on the west side. In 2014, the Dis tric t entered into an agreement with Parson’s to assess the s ite fo r p ossible renovatio n, modific atio n or sale. The research and survey p erformed by Pars o n’s uncovered fo ur imp o rtant land and title is sues . T he first revealed an internal parcel o n the s ite is owned by the City of Riverside, which mus t b e q uitclaimed to the Dis trict. Another is s ue add res s es Dis tric t title to p o rtions of the ad jacent flo o d c o ntro l c hannel. The s urveyo r unc overed inac curate rec ord ed parc el bound aries c reated between the o ld floo d c o ntro l alignment and the exis ting flo o d contro l b o undary. In addition to thes e individ ual p ieces of land, the Old Head q uarters site is made up of eight separate lo ts . Thes e is s ues c o uld limit any future use, if no t addres s ed firs t. Staff is reques ting the Bo ard ac c ep t a Q uitc laim Deed o ffered by the City o f R ivers id e for the s trip o f land lying within the site. By ac cepting title to this land, the Dis tric t will ho ld clear title to all parc els north o f the flo o d c o ntro l channel. Other related topic s s ubject to future Board ac tio n, are als o sho wn o n the attac hed map. One d is cus s ion will b e to o ffer Quitc laim Deed s to the San Bernard ino County Flood C ontrol District (SBCF CD) for the strip s of land within the Flood Co ntro l area. Eas t Valley Water Dis trict c an avo id liab ility c o nnec ted to thes e parc els, by releasing Dis tric t land interes ts in all of the flo o d c hannel pro p erties . Before thes e Quitclaims can be p rep ared, the flo o d c o ntrol pro p erties mus t b e s eparated from the District p arc els . Staff will recommend the Dis tric t file a lot line ad justment/lo t merger to create thes e divisions . The lot lines will b e c reated between the Flood Co ntrol channel and Dis trict property. The lo t merger will comb ine all eight remaining lots on the eas t s id e o f Del Ro s a Avenue into one parc el, and all the p ieces o f the floo d c ontro l p roperty will als o be jo ined . T he final task will inc lud e a b oundary s urvey and filing a Record of Survey map d o cumenting these c hanges . AGENCY IDEALS AND ENDEAVORS: Ideals and Endeavor I - Enc o urage Innovative Investments To Pro mo te Sustainab le Benefits (A) - Develop p rojec ts and pro grams to ens ure safe and reliab le s ervic es Ideals and Endeavor IV - Fully Unders tand Challenges To Cultivate Effective So lutio ns (A) - Support ongo ing b usiness p ro c es s imp ro vement REVIEW BY OTHERS: T his agend a item has b een reviewed b y Engineering and F inanc e Departments . FISCAL IMPACT : T here is no fis c al imp ac t as s o c iated with this agenda item. ATTACHMENTS: Description Type Map Backup Material Quitclaim Deed Backup Material PARKING LOT OL DHEADQUARTERSFACILITY FLOOD BASELINE ROAD CONTROL P R O P E R T I E SDEL ROSA AVENUE ALAMO ROAD DEL ROSA DRIVE FUTURE LOT L INE FUTURE LOT L INE CITY OF RIVERSIDE QUITCLAIM DEED DEL ROSA AVENUE - OLD HEAD QUARTERS SITE µ DISTRICT TO QUITCLAIMTO PROPERTY OWNER STAFF REPORT Agenda Item #3. Meeting Date: June 27, 2016 Disc ussion Item To: ENGINEERING AND OPERAT IONS C OMMITTEE Members From: G eneral Manager/CEO Subject: Pres entatio n o f 2013 Was tewater C o llectio n Sys tem Capital Imp ro vement Plan RECOMMENDATION: This is an informatio n item o nly. BACKGROUND / ANALYSIS: In January 2013, the Dis tric t completed a Wastewater Collec tion S ystem Master Plan (Master Plan) whic h p ro vided a comprehensive review and evaluation of the Dis tric t’s was tewater collec tio n, conveyanc e, and capac ity requirements und er exis ting and projec ted future cond itions . The projec tions were based on the ad o p ted General Plans of the C ity of Highland, City o f San Bernardino and the County of San Bernardino , for the land areas within the service area of the Dis tric t. Bas ed on the find ing, the Mas ter Plans recommended fac ility improvement and capital c o s t req uirements to ensure that aging infras tructure remains s ervic eab le and to allow fo r the continued build -o ut o f the Distric t. One o f the main objec tives of the Master Plan was to c o nduct this evaluation of the s ewer collec tion sys tem in order to d evelop a 20-year capital improvement pro gram. The purp o s e of this p res entation is to pro vide the Engineering & Op erations Committee a comprehensive and d etailed assessment of the District’s Was tewater Co llectio n S ys tem, inc lud ing defic ienc ies in the exis ting s ystem identified in the 2013 Masterp lan Plan and Capital Improvement Program. AGENCY IDEALS AND ENDEAVORS: Id eals and End eavor I - Encourage Inno vative Inves tments To P ro mo te Sus tainable Benefits (A) - Develop projec ts and p ro grams to ensure s afe and reliable s ervic es (B) - Manage and id entify metho d s to c o nserve natural res o urc es (E) - Ac tively s eek alternative s upply resourc es ATTACHMENTS: Description Type Presentation 20 13 Wastewater Collection Syste m P resentation Ju n e 2 7 , 2 0 1 6 2013 WASTEWATER COLLECTION SYSTEM CAPITAL IMPROVEMENT PLAN UPDATE EVWD COMMITTEE PRESENTATION AGENDA Background 2013 Master Plan CIP Adjusted CIP due to WRP 2 BACKGROUND 3 BA C K G R O U N D •Objectives •Identify improvements needs of the existing system •Condition Assessment •Hydraulic Capacity •Identify improvement needs to support projected flows •Develop Capital Improvement through 2035 •Key Finding •Major infrastructure projects are needed to support: •Maintain desired level of service •Existing and projected flows MASTER PLAN OVERVIEW 4 BA C K G R O U N D BOUNDARIES & REGIONAL FACILITIES 5 Ea s t T r u n k S e w e r San Bernardino Water Reclamation Plant 2013 MASTER PLAN CAPITAL IMPROVEMENT PLAN & RECOMMENDATIONS 6 20 9 1 3 M A S T E R P L A N C I P 2013 MASTER PLAN CIP 7 Highland Ave Base Line St. Greenspot East 21,000 feet of parallel 12-inch Development Driven Greenspot WestReplace 15,400 feet of 21 to 24-inch with 30-inchDevelopmentDriven East Trunk Sewer –6th Street Replace 5,500 feet of 27 to 39-inchwith 36 to 48-inchDevelopmentDriven Victoria AveReplace 3,000 feet of 8-inch with 10-inchDevelopmentDriven North East Trunk Sewer Replace 7,500 feet of 21 to 30-inchwith 30 to 36-inchDevelopmentDriven 20 9 1 3 M A S T E R P L A N C I P 2013 CIP SUMMARY 8 Project (completion date)Budget ($2013) CIP related studies & assessments •Financial Study •Condition Assessment •Master Plans (every 5 years) •Flow monitoring (w/Master Plans) Total = $3M Capacity (EVWD) (2017/2018) •Greenspot East •Victoria •Greenspot West Total = $21M Capacity (Regional) (2017) •East Trunk Sewer (6th St.) •East Trunk Sewer (North) Total = $14M Replacements (EVWD) (over 20 years) •Category 4 and 5 Defects •Future replacements (replace/rehab) Total = $45M Replacements East Trunk Sewer (to be confirmed with condition assessment) Total = $24M Proposed CIP ($83M) Potential CIP ($127M) ADJUSTMENTS DUE TO NEW WATER RECLAMATION PLANT SITING CAPITAL IMPROVEMENT PLAN & RECOMMENDATIONS 9 AD J U S T E D C I P WRP ADJUSTMENTS TO WASTEWATER SYSTEM 10 Current Wastewater Flow New diversion to send wastewater to Water Reclamation Plant Victoria Ave Greenspot East Greenspot West North East Trunk Sewer East Trunk Sewer –6th Street AD J U S T E D CI P DIVERSION PROJECTS SUMMARY 11 E 5th St 3rd St Base Line St 9th St 6th St Ti p p e c a n o e S t Wa t e r m a n A v e Pe d l e y R d Sterling Natural Resource Center Lift Station C Lift Station D AD J U S T E D CI P DIVERSION A PROJECT DETAILS 12 5th StE 5th St A Sterling Natural Resource Center Diversion A diverts flow from 5th Street to Sterling Natural Resource Center.This helps avoid the Greenspot West CIP. AD J U S T E D CI P DIVERSION B PROJECT DETAILS 13 9th St Base Line St Sterling Natural Resource Center Diversions B1, B2, and B3 divert flow south from Base Line St, 9th St, and 6th St, respectively, to the Sterling Natural Resource Center. This helps avoid the North ETS CIP. 6th St N D e l R o s a D r B3 B2 B1 AD J U S T E D CI P DIVERSION C PROJECT DETAILS 14 Sterling Natural Resource Center Diversion C diverts flow east from near the 6th St & Pedley Rd intersection to the Sterling Natural Resource Center. This proposed diversion project includes a lift station and piggybacks on Diversion B project facilities. This helps avoid the ETS-6th Street CIP. 6th St Pe d l e y R d PS Lift Station C B3C DIVERSION D PROJECT DETAILS 15 Sterling Natural Resource Center Diversion D diverts flow from near the 3rd St & Waterman Ave intersection to the Sterling Natural Resource Center. This proposed diversion project includes a lift station and piggybacks on Diversion B and C project facilities. This diversion captures the last portions of flow in the SW section of the District. 3rd St Pe d l e y R d C Lift Station D B3 PS D PS 6th St AD J U S T E D CI P DIVERSION E PROJECT DETAILS 16 Sterling Natural Resource Center Diversion E1, E2, and E3 divert flow south along Waterman Ave from 5th St, Monterey Ave, and 4th St, respectively, to the Sterling Natural Resource Center. This proposed diversion project piggybacks on Diversion B, C, and D project facilities. This diversion captures District flows from sewers connecting to the ETS along Waterman Ave. 3rd St Pe d l e y R d C B3 D PS 6th St E1E2E3 5th StMonterey Ave 4th St PS AD J U S T E D CI P AD J U S T E D CI P WRP ADJUSTMENTS TO WASTEWATER SYSTEM 17 CIP Eliminated CIP Downsized Victoria Ave Greenspot EastGreenspotWest (reduced) North East Trunk Sewer East Trunk Sewer –6th Street UP D A T E D C I P RE C O M M E N D A T I O N S WRP DIVERSION COSTS 18 Project (completion date)($2013) Diversion A (5th Street and Victoria Avenue)$4.7M Diversion B (Del Rosa Drive, Ninth Street, and Sixth Street)$3.3M Diversion C (6th Street and Pedley Road)$13.4M Diversion D (3rd Street and Waterman Avenue)$4.1M Diversion E (Waterman Avenue at Fifth Street, Monterey Avenue, and Fourth Street) $0.3M Total $26M All costs are presented in 2013 dollars for comparative purposes. UP D A T E D C I P RE C O M M E N D A T I O N S UPDATED CIP COSTS 19 Project Updated Budget ($2013)Previous Budget ($2013) CIP related studies & assessments •Financial Study •Condition Assessment •Master Plans (every 5 years) •Flow monitoring (w/ Master Plans) Total = $3M Total = $3M No change Capacity (EVWD) (2017/2018) •Greenspot East •Victoria •Greenspot West Total = $9M $7.0M $0.8M $1.5M Total = $21M No change No change Previously $12.8M Capacity (Regional) (2017) •East Trunk Sewer (6th St.) •East Trunk Sewer (North) Total = $0M Regional projects eliminated Total = $14M Previously $6.9M Previously $6.9M New CIPs for Diversions (A through E) to WRP Total = $26M Total = $0M Diversion projects not included in previous CIP Replacements (EVWD) (over 20 years) •Category 4 and 5 Defects •Future replacements (replace/rehab) Total = $45M Total = $45M No change Replacements East Trunk Sewer (to be confirmed with condition assessment) Total = $0M Total = $24M Pending Condition Assessment Total $83M $83 to $127M All costs are presented in 2013 dollars for comparative purposes. 20 21