Loading...
HomeMy WebLinkAboutAgenda Packet - Engineering & Operations Committee - 05/22/2017EN G IN EERIN G A N D O PERAT IO N S C O MMIT T EE May 22, 2017 - 2:30 P M 31111 Greenspot Road, Highland C A 92346 AGE N D A C A LL TO O RD ER PLED G E O F A LLEG IA N C E PUBLIC C O MMEN T S N E W B U SI N E SS 1.Approve the March 28, 2017 Engineering & Operations C ommittee meeting minutes 2.Operations & Maintenance Update 3.C apital Improvement Program Update AD J OU RN P LEAS E NO T E: P urs uant to G o vernment C ode S ec tion 54954.2(a), any reques t for a dis ability-related mo d ific atio n o r ac commodatio n, inc luding auxiliary aid s or s ervic es , that is s o ught in order to partic ip ate in the above-agend ized p ublic meeting sho uld b e direc ted to the Dis tric t C lerk at (909) 885-4900 at leas t 72 ho urs p rio r to s aid meeting. 1 Minutes 03/28/2017 bvm Subject to Approval EAST VALLEY WATER DISRICT March 28, 2017 ENGINEERING AND OPERATIONS COMMITTEE MEETING MINUTES Ms. Duran called the meeting to order at 2:00 p.m. and Mr. Milroy led the flag salute. PRESENT: Directors: Coats, Shelton ABSENT: None STAFF: Steve Nix, Director of Engineering and Operations; Patrick Milroy, Operations Manager; Martha Duran, Sr. Administrative Assistant GUEST(s): None PUBLIC COMMENTS The Sr. Administrative Assistant declared the public participation section of the meeting open at 2:00 p.m. There being no written or verbal comments, the public participation section was closed. APPROVE THE JANUARY 23, 2017 ENGINEERING AND OPERATIONS COMMITTEE MEETING MINUTES AS SUBMITTED Director Coats motioned that the minutes be approved and Director Shelton seconded the motion. The minutes were approved unanimously. OPERATIONS & MAINTENANCE UPDATE The Operations Manager presented an update on maintenance and production activity for the month of February 2017. He reviewed charts that represent various activities related to district operations and maintenance. He noted that February was the most wet month in seven years, and due to the amount of rainfall, the District was not required to purchase water in this period. Director Shelton asked about the wastewater cleaning noted in the maintenance portion of the report. The Operations Manager explained that the goal is to complete cleaning throughout our system within a year, and to complete video of the entire system within three to five years. STANDARD SPECIFICATIONS FOR THE FURNISHING OF MATERIALS AND THE CONSTRUCTION OF WATER AND SEWER FACILITIES The Engineering & Operations Manager presented updated specifications for construction of water and wastewater facilities. He explained that the standardized drawings are 2 Minutes 03/28/2017 bvm designed to provide people an idea of how to put things together and the specifications tell you what to use to put things together. He stated that the specifications have been out of date for some time and that the specifications for water and wastewater facilities were separate. These specifications are now combined, as many things within the specifications work for either water or wastewater. He further noted, that the old specifications included materials that are no longer available and are not current with engineering standards. Those items have been replaced with materials that meet today’s engineering standards. Testing methods were also addressed and installation processes were updated. Director Coats asked if we have a schedule to review the specifications again. The Engineering & Operations Manager stated that the goal is to revisit this item every five years. ADJOURN The meeting adjourned at 2:22 p.m. Ronald L. Coats Nanette Shelton Governing Board Member Governing Board Member S TAF F R E P ORT Agenda Item #2. Meeting Date: May 22, 2017 Dis c ussion Item To: ENG I NEE R I NG AND O P ER AT I O NS C O MMI T T E E From: G eneral Manager/C E O S ubject: O perations & Maintenanc e Update R E C O MM E N D AT IO N: T his rep ort is p rovid ed to the Engineering and O perations C o mmittee fo r its info rmatio n o nly. B AC KG R O UN D / AN ALYS IS : T he O p eratio ns Department us es a variety of to o ls and metho d s to monitor and trac k all maintenanc e ac tivities that oc c ur within the dep artment. T he attached mo nthly report pro vides the p revio us year average and the c urrent ac tivity o f the mos t c ritic al items . T he tracking o f these items helps ens ure that the d ep artment achieves the go als and o b jec tives determined to b e imp ortant for eac h year. A few imp o rtant items ro utinely trac ked is water p roduction, water s o urc e, and energy us age. By comp aring the present year to the p rio r year average on thes e items gives us key information regarding water us age, cons ervation effo rts , how efficient energy is us ed within the Dis trict as well as provid ing valuable info rmation used to develop the next years ’ op erating bud get. A number of maintenance ac tivities are als o trac ked and mo nitored s uch as leak repair, valve and fire hyd rant maintenance, s ewer main line c leaning and s ewer main line camera. Mos t o f the ac tivities are ro utine and p reventative maintenanc e that is perfo rmed every d ay to maintain and ens ure that the Dis tric ts infrastruc ture is in top s hap e. F ire hydrant flus hing has inc reased to better c irculate and d ec reas e the age o f water as p art o f our p lan to reduce To tal Trihalomethanes (T T HM). Every year maintenance ac tivities are p ro grammed fo r c o mp letio n and the monthly monito ring ens ures the goals are met. Leak repair is a reactive activity and us ually assoc iated with aging water p ipes. Trac king leak rep airs provid es valuab le ins ight into the areas that are in most need of c o nsidering a C apital Improvement P rojec t. AGE N C Y ID E ALS AN D E N DE AVO R S: Id eals and Endeavor I - Enc o urage Inno vative Investments To P romote S ustainab le Benefits (D) – Ded icate effo rt to ward sys tem maintenance and mod ernization Id eals and Endeavor I V - F ully Unders tand C hallenges To C ultivate Effec tive S o lutio ns (A)- S upp o rt o ngoing bus ines s proc ess improvements R E VIE W B Y O T HE R S : R ec o mmend ed b y: S teve Nix Direc tor, Engineering & O p eratio ns R espec tfully s ubmitted: P atrick K. Milro y O p erations Manager T his agenda item has been reviewed by the executive management team. F IS C AL IMPAC T : T here is no fis c al impact ass ociated with this agenda item. ATTAC H M E NTS: Description Type Operations & M aintenance Report -P roduction Backup Material Operations & M aintenance Report - Maintenance Backup Material Water Supply (Acre-Feet) YTD Groundwater = 3,472 AF / Surface Water = 738 AF / State Water = 193 AF Water Demand Trend 2016 vs. 2017 (AF) Energy Cost Trend 90% 10%Groundwater Surface Water State Water PRODUCTION OPERATIONS REPORT APRIL 2017 1370 139 0 1509 0 200 400 600 800 1000 1200 1400 1600 Groundwater Surface Water State Water Total Water Source 532 571 999 1370 129 212 258 139193 0 0 0 0 200 400 600 800 1000 1200 1400 1600 January February March April Ground Surface State Water 0 500 1000 1500 2000 2500 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Water Demand Trend 2016 2017 $- $50,000.00 $100,000.00 $150,000.00 $200,000.00 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Energy Cost Trend 2016 2017 Water Production by Month Distribution System Water Leaks YTD Hydrants Flushed = Total 98 YTD Valves Exercised = 89 YTD Hydrants Serviced (Repaired, Replaced, Painted) = 12 YTD After Hours Call-Outs = 383 YTD Miles of Sewer Video = 18 YTD Miles of Sewer Main Cleaned = 38 6 3 4 6 5 0 1 2 3 4 5 6 7 AVG 2016 JAN FEB MAR APR 18 10 7 10 11 0 5 10 15 20 AVG 2016 JAN FEB MAR APR 116 0 36 0 53 0 20 40 60 80 100 120 140 AVG 2016 JAN FEB MAR APR 22 31 22 0 45 0 10 20 30 40 50 AVG 2016 JAN FEB MAR APR 11 16 6 15 20 0 5 10 15 20 25 AVG 2016 JAN FEB MAR APR Leaks Detected & Repaired 30% 70% Total Leaks (YTD) = 57 Main Leaks Service Leaks 160 5 0 4 3 0 50 100 150 200 AVG 2016 JAN FEB MAR APR 101 118 55 106 104 0 20 40 60 80 100 120 140 AVG 2016 JAN FEB MAR APR FIELD OPERATIONS REPORT APRIL 2017 Total for April Service Leaks = 14 Main Leaks = 6 S TAF F R E P O RT Agend a Item #3. Meeting Date: May 22, 2017 To: ENG I NEER I NG AND O P ER AT IO NS C O MMI T T E E F rom: G eneral Manager/C E O Subject: C apital Imp ro vement P ro gram Update R E C O MME N D AT IO N: T his report is provid ed to the Engineering and O p erations C ommittee fo r its informatio n o nly. B AC KG R OUN D / AN ALYS IS : T he C ap ital Improvement P ro gram inc lud ed in the adopted Annual Budget for F is cal Year 2016/17 inc ludes 22 water and wastewater p ro jec ts with a total bud geted cost of $70,236,000. A s ignificant portio n o f the F Y 16/17 C I P program relates to projec ts as s o ciated with the S terling Natural R es ource C enter (S N R C ). T he S NR C p ro ject is still wo rking its way thro ugh the p ermitting proc es s and therefo re no ac tivity has o cc urred. T his update will fo c us on the remaining ten (10) projec ts that are c urrently in various levels of activity. O f thes e ten ac tive p ro jects , 4 are in cons truc tion, 4 are in d es ign and 2 are s till in planning s tages . T he ad o p ted b udget for thes e projec ts totals $5,171,000. AG E N C Y ID E ALS AN D E N D E AVO R S : R E VIE W B Y OT HE R S : R es p ectfully sub mitted: S teve, Nix Directo r of Engineering & O p erations ATTAC H M EN TS: Description Type C IP P resentation 2 01 7 P resentation AMI METER RETROFIT Facility Type:Water FY 16/17 Budget:$2,011,000 (Grant) Project Budget:$8,011,000 Completion Date:August 2017 First year of a Multi-year capital project to install Advanced Metering Infrastructure (AMI) hardware, Software and meters for more efficient and accurate meter reads. AMR Meter Replacement Project No. W2169 Construct. Nearly Complete MA Y JU N JU L AU G SE P OC T NO V DE C JA N FE B MA R AP R MA Y JU N JU L AU G SE P OC T Project Timeline Design Completion Percent Project Complete Construction Completion Grant Closeout SCHEDULE DESIGN CONSTRUCTION 20172016 85% CANAL ZONE STORAGE RESERVOIR Facility Type:Water FY 16/17 Budget:$410,000 Project Budget:$3,075,000 Completion Date:January 2019 This project includes design, property acquisition and construction of a 2.5 million gallon reservoir within the Canal 3 pressure zone. Current funding for design and property acquisition only Canal Zone Storage Reservoir Project No. W2168 In Preliminary Design AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N Project Timeline Siting Study Complete Design Completion Construction Completion CONSTRUCTION 2019201820172016SCHEDULE DESIGN UPPER ZONE BOOSTER STATION Facility Type:Water FY 16/17 Budget:$250,000 Project Budget:$1,495,000 Completion Date:January 2019 This project is will provide additional pumping Capabilities to be used in conjunction with the proposed Canal Zone Storage Reservoir project. Upper Zone Booster Station Project No. W2172 In Preliminary Design AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N Project Timeline Siting Study Complete Design Completion Construction Completion CONSTRUCTION 2019201820172016SCHEDULE DESIGN PLANT 134 TO UPPER ZONE –TRANSMISSION LINE Facility Type:Water FY 16/17 Budget:$860,000 Project Budget:$1,325,000 Completion Date:April, 2018 This project will install approximately 8,600 l.f. of 16” water transmission mains to distribute water to the upper zone providing increased reliability PLANT 134 TO UPPER ZONE –Transmission Line Project No. W2171 Design In Progress JA N FE B MA R AP R MA Y JU N JU L AU G SE P OC T N O V DE C JA N FE B MA R AP R MA Y JU N Project Timeline Design Completion Construction Completion Percent Project Complete SCHEDULE DESIGN CONSTRUCTION 2017 2018 15% NORTHFORK PIPELINE REPLACEMENT Facility Type:Water FY 16/17 Budget:$125,000 Completion Date:June 2017 This project will replace a section of the 30” Northfork water pipeline at the Santa Ana River Crossing that has been subject to numerous leaks. NORTHFORK Pipeline Replacement Project No. W2164 Const. Contract Awarded AP R MA Y JU N JU L AU G SE P OC T N O V DE C JA N FE B MA R AP R MA Y JU N JU L AU G SE P Project Timeline Design Completion Percent Project Complete Construction Completion 20172016SCHEDULE DESIGN CONSTRUCTION 85% PLANT 101 HYDRO TANK REPLACEMENT Facility Type:Water FY 16/17 Budget:$150,000 Completion Date:November 2017 This project will replace the existing 3,500 gallon hydro-pneumatic tank. The existing tank is deteriorated and out of compliance with current state regulations. Plant 101 Hydro Tank Replacement Project No. W2173 In Design JU L AU G SE P OC T N O V DE C JA N FE B MA R AP R MA Y JU N JU L AU G SE P OC T N O V DE C Project Timeline Design Completion Percent Project Complete Construction Completion SCHEDULE DESIGN CONSTRUCTION 2016 2017 PALOMA ROAD SEWER MAIN REPLACEMENT Facility Type:Sewer Fy 16/17 Budget:$160,000 Completion Date:June 2017 Repair of existing 8-inch VCP Sewer Main with Cured In Place Lining (C.I.P.P). The existing 8-inch pipe has numerous cracks and fractures but no structural damage. Paloma Sewer Main Replacement Project No. S3170 Const. Contract Awarded JA N FE B MA R AP R MA Y JU N JU L AU G SE P OC T N O V DE C JA N FE B MA R AP R MA Y JU N Project Timeline Design Completion Percent Project Complete Construction Completion SCHEDULE 2017 2018 DESIGN CONSTRUCTION 4TH STREET SEWER MAIN REPLACEMENT Facility Type:Sewer FY 16/17 Budget:$200,000 Completion Date:August 2018 Replace approximately 810 lineal feet of 6-inch VCP Sewer pipe with new 8-inch VCP sewer. Exist 6” main has numerous cracks and fractures. 4th Street Sewer Main Replacement Project No. S3172 Design In Progress AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N AU G OC T DE C JA N FE B MA R Project Timeline Design Completion Percent Project Complete Construction Completion CONSTRUCTION SCHEDULE DESIGN 2016 2017 2018 2019 ORANGE STREET SEWER MAIN REPLACEMENT Facility Type:Sewer Project Budget:$75,000 Completion Date:June 2018 Replacement of 200 lineal feet of 8-inch VCP Sewer Main due to cracking and structural defects. Existing sewer is located between two single family homes from Orange Street and Holly Circle Drive. Orange Street Sewer Main Replacement Project No. S3171 Design In Progress AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N AU G OC T DE C JA N FE B MA R Project Timeline Design Completion Percent Project Complete Construction Completion SCHEDULE 2016 2017 2018 2019 DESIGN CONSTRUCTION CITY CREEK MANHOLE RELOCATION Facility Type:Sewer FY 16/17 Budget:$100,000 Completion Date:September 2017 An existing sewer manhole within the streambed of City Creek is subject to erosion. This project will provide structural protection to minimize potential scour issues. City Creek Manhole Relocation Project No. S3155 In Permit Process SE P OC T N O V DE C JA N FE B MA R AP R MA Y JU N JU L AU G SE P OC T N O V DE C JA N FE B Project Timeline Design Completion Percent Project Complete Construction Completion SCHEDULE DESIGN CONSTRUCTION 201820172016