Loading...
HomeMy WebLinkAboutAgenda Packet - Engineering & Operations Committee - 11/27/2017EN G IN EERIN G A N D O PERAT IO N S C O MMIT T EE November 27, 2017 - 2:30 P M 31111 Greenspot Road, Highland C A 92346 AGE N D A C A LL TO O RD ER PLED G E O F A LLEG IA N C E PUBLIC C O MMEN T S N E W B U SI N E SS 1.Approve the September 25, 2017 Engineering & Operations Committee meeting minutes 2.Valve Replacement at Plant 56 3.Operations Report October 2017 4.C apital Improvement Program Update AD J OU RN P LEAS E NO T E: P urs uant to G o vernment C ode S ec tion 54954.2(a), any reques t for a dis ability-related mo d ific atio n o r ac commodatio n, inc luding auxiliary aid s or s ervic es , that is s o ught in order to partic ip ate in the above-agend ized p ublic meeting sho uld b e direc ted to the Dis tric t C lerk at (909) 885-4900 at leas t 72 ho urs p rio r to s aid meeting. 1 Minutes 9/25/2017 bvm Subject to Approval EAST VALLEY WATER DISRICT SEPTEMBER 25, 2017 ENGINEERING AND OPERATIONS COMMITTEE MEETING MINUTES Ms. Duran called the meeting to order at 2:30 p.m. and Mr. Milroy led the flag salute. PRESENT: Directors: Coats, Shelton ABSENT: None STAFF: Steve Nix, Director of Engineering and Operations; Patrick Milroy, Operations Manager; Martha Duran, Sr. Administrative Assistant; Brenda Van Meter, Administrative Assistant GUEST(s): Wayne Brown PUBLIC COMMENTS The Sr. Administrative Assistant declared the public participation section of the meeting open at 2:30 p.m. There being no written or verbal comments, the public participation section was closed. APPROVE THE JULY 24, 2017 ENGINEERING AND OPERATIONS COMMITTEE MEETING MINUTES Director Coats motioned that the minutes be approved as submitted and Director Shelton seconded the motion. The minutes were approved. OPERATIONS & MAINTENANCE UPDATE The Operations Manager presented an update on maintenance and production activity for the month of August 2017; he reviewed charts that represent various activities related to district operations and maintenance including the District’s preventative maintenance program. He stated the District experienced a spike in leaks due to increased water usage associated with warmer weather. The Operations Manager stated that water production reports showed a decrease in water usage from July to August; and the District operated using 80% groundwater and 20% surface water, and did not purchase any State Water during the month of August. 2 Minutes 9/25/2017 bvm WATER SYSTEM RELIABILITY The Director of Engineering and Operations stated that in March, the District exceeded its fourth quarter average for TTHM’s at Plant 134. The District notified all customers of the violation, and held a public information workshop to address any customer concerns as well as posting weekly water sample information on the District’s website. During the six-month period following the exceedance, the District implemented measures that successfully reduced the TTHM levels, and is expected to be within compliance during the next reporting quarter. ADJOURN The meeting adjourned at 3:00 p.m. Ronald L. Coats Nanette Shelton Governing Board Member Governing Board Member S TAF F R E P ORT Agenda Item #2. Meeting Date: November 27, 2017 Dis c ussion Item To: ENG I NEE R I NG AND O P ER AT I O NS C O MMI T T E E From: O perations Manager S ubject: Valve R eplacement at P lant 56 R E C O MM E N D AT IO N: T his rep ort is p rovid ed to the Engineering and O perations C o mmittee fo r its info rmatio n o nly. B AC KG R O UN D / AN ALYS IS : T he Distric t maintains 15 different s torage fac ilities thro ugho ut the s ervice area. A c ritic al comp o nent o f thes e s ites is the ab ility to c ontrol incoming and outgoing water flo ws . R ecently, p ro d uctio n s taff identified a d amaged 10-inch is o latio n gate valve in need o f rep lac ement at P lant 56. T his locatio n is a 500,000 gallon water s torage reservo ir o n S has ta Drive no rth o f the S an Manuel C asino . T his valve at P lant 56 is c ritical in allowing water to flo w from the F o o thill zo ne into the s torage res ervo ir. Water from the res ervo ir is s ent through b ooster p umps to the C anal zo ne. T his is an important p art of o ur distrib ution s ys tem bec aus e it allows us to sup p ly water at a variety of elevatio ns. T he identified valve wo rks in c o njunctio n with ano ther valve to allow o perato rs to ad jus t an altitude control valve whic h determines the water level o f the reservo ir at P lant 56. Due to the d amaged gate valve, o perato rs were unable to perform the req uired maintenanc e on the important contro l valve and will not have the ab ility to ad just the water levels in the reservo ir at P lant 56. To replac e the d amaged gate valve s taff identified two o p tions. O p tion one, we c o uld comp letely drain the tank and s imply rep lac e the 10-inch valve. Draining of the tank is a time-cons uming p ro c es s whic h requires c areful p lanning to ens ure water sup p ly reliability and very s p ecific s amp ling req uirements to allo w the tank to be p lac ed b ac k o nline. O p tio n two , wo uld b e to hire a c ertified S C UBA tank d iver to temp o rarily plug the p ip e ins ide the reservo ir which wo uld allo w the tank to remain full of water and in s ervice, while o ur crews s afely rep lace the need ed valve. S taff evaluated the two o p tions and determined it would be bes t to keep the res ervo ir in s ervice. AGE N C Y ID E ALS AN D E N DE AVO R S: Id eals and Endeavor I - Enc o urage Inno vative Investments To P romote S ustainab le Benefits (A) - Develop projec ts and pro grams to ens ure safe and reliab le s ervic es (D) - D edicate effort toward system maintenance and modernization R ec o mmend ed b y: P atrick Milroy O p eratio ns Manager R E VIE W B Y O T HE R S : T his agenda item has been reviewed by the executive management team. F IS C AL IMPAC T : T his item was inc luded in the F isc al Year 2017/18 O perations Bud get. ATTAC H M E NTS: Description Type P lant 56 P resentation P resentation Plant 56 Valve Replacement November 27, 2017 Plant 56 -500,000 Gallon Reservoir –Exterior View E A S T V A L L E Y W A T E R D I S T R I C T Reservoir Interior View Plant 56 -Drawing E A S T V A L L E Y W A T E R D I S T R I C T Reservoir Exterior Top View E A S T V A L L E Y W A T E R D I S T R I C T Reservoir Access Hatch Scuba Diver Entering Reservoir E A S T V A L L E Y W A T E R D I S T R I C T Floating Level Device E A S T V A L L E Y W A T E R D I S T R I C T Inlet pipe on the floor of the Reservoir E A S T V A L L E Y W A T E R D I S T R I C T Removing the old 10” Gate Valve E A S T V A L L E Y W A T E R D I S T R I C T Installing the new 10” Gate Valve S TAF F R E P ORT Agenda Item #3. Meeting Date: November 27, 2017 Dis c ussion Item To: ENG I NEE R I NG AND O P ER AT I O NS C O MMI T T E E From: O perations Manager S ubject: O perations R ep o rt O cto ber 2017 R E C O MM E N D AT IO N: T his rep ort is p rovid ed to the Engineering and O perations C o mmittee fo r its info rmatio n o nly. B AC KG R O UN D / AN ALYS IS : T he O p eratio ns Department us es a variety of to o ls and metho d s to monitor and trac k all maintenanc e ac tivities that oc c ur within the d ep artment. T he attac hed report p ro vides monthly data fo r the c alend ar year. Monito ring these items ens ures that the d ep artment is on track to ac hieve the goals and objec tives for each year and to d evelo p his toric al rec ord s fo r imp o rtant items inc luding water pro d uc tio n, water s o urce, and energy us age. By c o mp aring the p resent year to the prior year average we have a fac t bas ed und ers tanding of water us age, c o nservatio n efforts , and ho w effic ient energy is used within the Dis tric t whic h assists us in d evelo p ing the next years ’ op erating bud get. A number of maintenance ac tivities are als o trac ked and mo nitored s uch as leak repair, valve and fire hyd rant maintenance, s ewer main line cleaning and sewer main line camera. T hes e are impo rtant indic ato rs o f our reac tive vers us proac tive efforts and are us ed in the d evelop ment o f capital imp ro vement p ro jec ts. Most o f the ac tivities are ro utine and p reventative maintenanc e p erfo rmed every day to ensure that the District’s infras tructure is in to p s hap e. Every year maintenanc e ac tivities are sc hed uled and the monthly mo nitoring ens ures thes e go als are met. Leak rep air is a reac tive ac tivity and us ually ass ociated with aging water pip es . Tracking leak rep airs p ro vid es valuable ins ight into the areas that are in mo st need o f c o ns id ering a C apital Impro vement P roject. AGE N C Y ID E ALS AN D E N DE AVO R S: Id eals and Endeavor I - Enc o urage Inno vative Investments To P romote S ustainab le Benefits (D) - Ded icate effo rt toward s ys tem maintenance and modernization Id eals and Endeavor I V - F ully Unders tand C hallenges To C ultivate Effec tive S o lutio ns (A) - S upport ongo ing b usiness p ro c es s imp ro vement R E VIE W B Y O T HE R S : R ec o mmend ed b y: P atrick Milroy O p eratio ns Manager T his agenda item has been reviewed by the executive management team. F IS C AL IMPAC T : T here is no fis c al impact ass ociated with this agenda item. ATTAC H M E NTS: Description Type Operations & M aintenance Charts October 20 17 Backup Material Distribution System Water Leaks YTD Hydrants Flushed = Total 394 YTD Valves Exercised = 617 YTD Hydrants Serviced (Repaired, Replaced, Painted) = 305 YTD After Hours Call-Outs = 1081 YTD Miles of Sewer Video = 48 YTD Miles of Sewer Main Cleaned = 144 3 4 6 5 6 5 3 6 55 0 1 2 3 4 5 6 7 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT 10 7 10 11 8 9 12 29 25 23 0 5 10 15 20 25 30 35 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT 0 36 0 53 48 78 116 102 52 132 0 20 40 60 80 100 120 140 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT 16 6 15 20 17 22 19 37 40 24 0 10 20 30 40 50 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT Leaks Detected & Repaired 21% 79% Total Leaks (YTD) = 216 Main Leaks Service Leaks 5 0 4 3 22 22 97 69 101 0 20 40 60 80 100 120 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT 118 55 106 104 101 100 117 116 150 114 0 20 40 60 80 100 120 140 160 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT FIELD OPERATIONS REPORT OCTOBER 2017 Total for OCTOBER Service Leaks = 19 Main Leaks = 5 31 22 0 45 58 59 41 63 36 39 0 10 20 30 40 50 60 70 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT Water Supply (Acre-Feet) YTD Groundwater = 12,945 AF / Surface Water = 2,608 AF / State Water = 234 AF Water Demand Trend 2016 vs. 2017 (AF) Energy Cost Trend PRODUCTION OPERATIONS REPORT OCTOBER 2017 532 571 999 1370 1558 1710 1853 1601 1415 1336 129 212 258 139 159 212 320 377 373 429 193 000037 0004 0 200 400 600 800 1000 1200 1400 1600 1800 2000 January February March April May June July August September October Ground Surface State Water 0 500 1000 1500 2000 2500 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Water Demand Trend 2016 2017  $‐  $50,000.00  $100,000.00  $150,000.00  $200,000.00 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Energy Cost Trend 2016 2017 Water Production by Month 75.52% 24.25% .226%Groundwater Surface Water State Water 1336 429 4 1769 0 200 400 600 800 1000 1200 1400 1600 1800 2000 Groundwater Surface Water State Water Total Water Source S TAF F R E P ORT Agenda Item #4. Meeting Date: November 27, 2017 To: ENG I NEE R I NG AND O P ER AT I O NS C O MMI T T E E From: Direc tor o f Engineering & O perations S ubject: C apital Improvement P rogram Up d ate R E C O MM E N D AT IO N: T his rep ort is p rovid ed to the Engineering and O perations C o mmittee fo r its info rmatio n o nly. B AC KG R O UN D / AN ALYS IS : T he C apital Improvement P ro gram inc luded in the ad o p ted Annual Bud get fo r F isc al Year 2017/18 includ es 11 water and wastewater projects with a to tal b udgeted cos t of $6,105,000. S terling Natural R es o urce C enter (S NR C ) is o n-go ing and will b e fo r the next three years , the Dis tric t is expec ted to c o me to an agreement with the C ity of S an Bernard ino b y the end o f the year. T his upd ate will fo c us o n the remaining ten p ro jec ts that are c urrently in vario us levels of ac tivity. O f thes e ten ac tive p rojec ts , three are in c o nstruc tio n, fo ur are in des ign and fo ur are still in p lanning s tages . T he adopted b udget for these p ro jec ts totals $4,605,000. AGE N C Y ID E ALS AN D E N DE AVO R S: Id eals and Endeavor I - Enc o urage Inno vative Investments To P romote S ustainab le Benefits (A) - D evelop projects and programs to ensure safe and reliable services Id eals and Endeavor I V - F ully Unders tand C hallenges To C ultivate Effec tive S o lutio ns (A) - S upport ongo ing b usiness p ro c es s imp ro vement F IS C AL IMPAC T : T his item was inc luded in the F isc al Year 2017-18 C apital Bud get Expenditures . R espectfully submitted: Eliseo O cho a, P.E. S enio r Engineer ATTAC H M E NTS: Description Type C IP P resentatio n 201 7-11271 7 P resentation AMI METER RETROFIT –PHASE 2 Facility Type:Water FY 17/18 Budget:$500,000 Completion Date:February 2018 Phase 2 is the second year of a multi-year capital project, to install Advanced Metering Infrastructure (AMI) hardware, software and meters for more efficient and accurate meter reads. AMR Meter Replacement Project No. W2169 Design Complete JA N FE B MA R AP R MA Y JU N JU L AU G SE P OC T N O V DE C JA N FE B MA R AP R MA Y JU N Project Timeline Design Completion Construction Completion 2017 2018SCHEDULE DESIGN CONSTRUCTION CANAL ZONE STORAGE RESERVOIR Facility Type:Water FY 17/18 Budget:$630,000 Project Budget:$3,075,000 Completion Date:January 2019 This project includes design, property acquisition and construction of a 2.5 million gallon reservoir within the Canal 3 Zone. Current funding is for design and property acquisition only. Canal Zone Storage Reservoir Project No. W2168 In Preliminary Design AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N Project Timeline Siting Study Complete Design Completion Construction Completion CONSTRUCTION 2019201820172016SCHEDULE DESIGN PLANT 134 TO UPPER ZONE –TRANSMISSION LINE Facility Type:Water FY 17/18 Budget:$2,085,000 Completion Date:July 2018 This project will install approximately 11,530 linear feet of 16-inch water transmission mains, to distribute water to the Upper Zone, providing increased reliability PLANT 134 TO UPPER ZONE –Transmission Line Project No. W2171 Design In Progress AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N Project Timeline Design Completion Construction Completion Percent Project Complete 2016 2017 2018 2019SCHEDULE DESIGN CONSTRUCTION 85% ORANGE STREET SEWER MAIN REPLACEMENT Facility Type:Sewer FY 17/18 Budget:$75,000 Completion Date:February 2018 Point Repair of 10 linear feet of 8-inch Vitrified Clay Pipe (VCP) sewer main due to cracking and structural defects. The existing sewer is located between two single family homes, from Orange Street and Holly Circle Drive. Orange Street Sewer Main Replacement Project No. S3171 Design Complete AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N AU G OC T DE C JA N FE B MA R Project Timeline Design Completion Construction Completion DESIGN CONSTRUCTION SCHEDULE 2016 2017 2018 2019 4TH STREET SEWER MAIN REPLACEMENT Facility Type:Sewer FY 17/18 Budget:$100,000 Completion Date:February 2018 Repair of existing 8-inch VCP Sewer Main with Cured In Place Lining (C.I.P.P). The existing 8-inch pipe has numerous cracks and fractures but no structural damage. 4th Street Sewer Main Replacement Project No. S3172 Design Complete AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N AU G OC T DE C JA N FE B MA R Project Timeline Design Completion Construction Completion DESIGN 2016 CONSTRUCTION 2017 2018 2019SCHEDULE PALOMA ROAD PHASE 2 SEWER MAIN REPLACEMENT Facility Type:Sewer FY 17/18 Budget:$105,000 Completion Date:July 2018 Replace existing 6-inch VCP sewer main with 8-inch VCP sewer pipe. The new pipe will correct a bottleneck created by an 8-inch pipe draining into a smaller 6-inch pipe. Paloma Sewer Main Replacement Project No. S3170 In Preliminary Design AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N AU G OC T DE C JA N FE B MA R Project Timeline Design Completion Construction Completion DESIGN CONSTRUCTION 2016 2017 2018 2019SCHEDULE 7 FERNDALE AVE SEWER MAIN REPLACEMENT Facility Type:Sewer FY 17/18 Budget:$210,000 Completion Date:July 2018 Replace existing 6-inch VCP sewer main with 8-inch VCP sewer pipe. The new pipe will correct a bottleneck created by a larger 8-inch pipe draining into a smaller 6-inch pipe. In Preliminary Design Ferndale Ave Sewer Main Replacement Project No. S3180 AU G OC T DE C FE B AP R JU N AU G OC T DE C FE B AP R JU N AU G OC T DE C JA N FE B MA R Project Timeline Design Completion Construction Completion DESIGN CONSTRUCTION 2016 2017 2018 2019SCHEDULE CITY CREEK MANHOLE RELOCATION Facility Type:Sewer FY 17/18 Budget:$150,000 Completion Date:February 2018 An existing sewer manhole within the streambed of City Creek is subject to erosion. This project will provide structural protection to minimize potential scour issues. City Creek Manhole Relocation Project No. S3155 Design Complete SE P OC T N O V DE C JA N FE B MA R AP R MA Y JU N JU L AU G SE P OC T N O V DE C JA N FE B Project Timeline Design Completion Construction Completion CONSTRUCTION 201820172016SCHEDULE DESIGN