HomeMy WebLinkAboutMinutes - EVWD Board of Directors - 06/13/1961EAST SAN B~NARDINO COUNTY WATER DIS~I~ICT
REGULAR MEETING JUNE 13, 1961
Directors Present: Botts, President, presiding; Brooks,
LeVesque, Littleton and Wall.
Di re~to~s Absent: None.
Others Present: General Manager-Secretary, Rickert; Auditor-
Treasurer, Bragg; Associate Er~ineer, Cole;
Engineers, Joe Rowe and Don Miller and East
Valley Times Editor, Jerry Boyd.
MINUTES Upon indication that each Board member present had read the
minutes of the May 23rd, 1961 meeting, and there were no
additions or corrections, the President declared the minutes
approved as written.
RI-]QUEST FOR BID The/~resident asked for extension of the date for bid
OPENING~ HIGHLAND openings on Water Main Extension and appurtenant fac~lities
AVENUE BOWLING for the Bowlin~ Alley at Highland Avenue and Del Rosa from
ALLEY - WATER MAIN June 13th to June 9-Tth, 1951 because of recent develo~nents
EXTENSION AND which alter the plans - a 19." tranm~ission mein in the ease-
FACILITIES. ment to serve development in its entirety.
MOTION Upon motion by Director Littleton, duly seconded by Director
LeVesque and carried unanimously, bids will be called for
and opened at the District office, 7337 Del Rosa Avenue at
7:30 p.m. on June 9.7, 1961 for the Main extension and
facilities in the easegaent from Del Rosa Avenue to the Del
Rosa Bowling Alley.
AUTHORIZATION TO The Secretary asked for authorization to call for and open
CALL FOR BIDS FOR bids for the installation of a water system and appurtenant
INSTALLATION OF facilities in Tract 4815 - the Northeast corner of Marshall
WATER SYSTEM AND Blvd. and Arden Avenue, on June 9.7, 1961 at the District
FACILITIES IN office.
TRACT 4815.
Upon motion by Director LeVesqlle, duly seconded by Director
MOTION Wall and carried unanimously, authorization was given to
call for and open bids for the installation of a water
system and facilities in Tract 4815 at the District office,
7337 Del Rosa Avenue at 7:30 p.m. on June 9.7, 1961.
AUTHORIZATION TO The Secretary asked for authorization to call for and open
CALL FOR BIDS FOR bids for theinstallation of a water system and appurtenant
INSTALLATION OF facilities - Foothill Drive and Palomar - Tracts 6236 and
WATER SYSTEM AND 69.98 on June 27, 1961.
FACILITIES IN
TRACTS 59.36 and Upon motion by Director LeVesque, duly seconded by Director
69.98. Wall and carried unanimously, authorization was given to
call for and open bids for the installation of a water
MOTION system and facilities in Tracts 6236 and 69.98, at the
District office, 7337 Del Rosa Avenue at 7:30 p.m. on June
9.7, 1961.
AUTHORIZATION TO The Secretary asked for authorization to call for and open
CALL FOR BIDS FOR bids for painting and coating exterior and interior of
PAINTING & COATING 900,000 gallon steel stor~e reservoir on Date Street on
DATE STREET June 9.7, 1961.
RES~VOIR.
Upon motion by Director LeVesque, duly seconded by
Director Littleton and carried unanimously, authorization
was given to call for and open bids for the coating of the
interior and painting of the exterior of the 900,000 gallon
steel storage reservoir on Date Street per District specifi-
cations prepared by W. P. Rowe & Son, at the District office,
7337 Del Rosa Avenue at 7:30 p.m. on June 27, 1961.
444
June 13, 1961
AUTHORIZATION TO &uthorization was requested for calling for and opening
CALL ~ BIDS ¥OR bids for the installation of Water System and appurtenant
INSTAI.IATION OF '.'TLT facilities in the Stubblefield Tract 6436, east of Arden
WATER SYSTEM AND Avenue between Highland Avenue and Pumalo - Homorama, on
FACILITIES IN June 27, 1961. This tract is 22 lots.
TRACT _6~$6.
Upon motion by Director Wall, duly seconded by Director
M(YI~ON LeVesque and carried unanimously, authorization was given
to call for and open bids for the water system and appur-
tenant facilities for the Stubblefield Tract 6436 at the
District office,7$37 Del Rosa Avenue at 7:30 p.m. on
June 9.7, 1961.
AUTHORIZATION TO The Secretary asked for authorization to call for and
CALL FOR BIDS FCR open bids for the installation of water system and ap-
INSTALLATION OF purtenant facilities in the H. W. Heers, Inc., Tract
WATER SYSTEM AND 6173, west of Palm between 9th and Cypress on June 27,
FACILITIES IN 1961. There are 9.4 lots in this tract.
TRACT 6173.
Upon motion by Director LeVesque, duly seconded by
MOTION Director Wall and carried unani$ously, authorization wes
given to call for and open bids for the water system and
appurtenant facilities in the H. W. Heers Tract 6173 at
the District office, 7337 Del Rosa Avenue at 7:30 p.m.
on June ~-7, 1961.
RESOI//TION NO. 366 A Certificate of Completion was filed by the Associate
CERTIFICATE OF Engineer, certifying to the completion of Job W-352,
COMPLETION JOB Tract 6375, on May 26, 1961 in accordance with plans
W-352, TRACT 6375. and specifications.
MOTION Upon motion by Director Littleton, duly seconded by
Director LeVesque and carried unanimously, Resolution
No. 366 accepti~ Job W-352 in Tract 6375 on May 26,
1961, Robert Simon, Contractor, was adopted and the
President and ~ecretary ordered to sign and file
Notice of Completion.
RESOLUTION NO. 367 A Certificate of Completion was filed by the Associate
CERTIFICATE OF Engineer certifying to the completion of Job W$341,
COMPLETION 3C~ installation of water distribution system in Tract 6344,
W-341, TRACT 6344. on June 8th,. 1961, in accordance with plans and
speci fi cations.
MOTION Upon motion by Director LeVesque, duly seconded by
Di~rector Littleton and carried unanimously, Resolution
No. 367, accepting Job W-341 in Tract 6344, Michael E.
Mize, contractor, was adopted and the President and
Secretary ordered to sign and file Notice of Completion.
RESOLUTION NO. 368 A Certificate of Completion was filed by the Associate
CERTIFICATE OF Engineer certifying to the completion of Job W-353,
COMPLETION JOB additions to the Water Distribution system, Citrus Street,
W-353. 12' main to Date Street Reservoir, Elmer W. Funkhouser,
contractor, on June 8th, 1961 in accordance with plans
and specifications.
MOTION Upon motion by Director Littleton, duly. seconded by
Director LeVesque and carried unanimously, Resolution
No. 368, accepting Job W-353, Elmer W. Funkhouser,
Contractor, was adopted and the President andSecretary
ordered to sign and file Notice of Completioh.
RESOI/ITION NO. 369 A Certificate of Comp~etion of Job W-350, was filed by
CERTIFICATE OF Engineer Joseph A. Rowe, certifying to its completion -
COMPLETION 3OB construction of the 900,000 gallon steel reservoir,
W-350. Pittsburgh-Des Moines Steel Company, contractor, on
June 8th, 1961 in accordance with plans and specifica-
tions.
MOTION Upon motion by Direc~tor Littleton, duly seconded by
Director Wall and carried unanimously, Resolution No.
369, accepting Job W-350, Pittsburgh-Des Moines Steel
une 13, 1961
Company0 contractor, was adopted and the President and
Secretar~ ordered to sign and file Notice of Completion.
RBCOMMENDATION The General Manager-Secretary reco~mnended a merit raise
MERIT RAISE FCR for Meter Reader, Charles F. Golden who was employed
CHARLES F. GOLDEN 12-5-60 at classification 25A, $1.88 per hour, to
Classification 25B at $1.97 per hour to be effective
June 1, 1961.
MOTION Upon motioh by Director LeVesgue, duly seconded by
Director Littleton and carried unanimously, the recommended
raise for Charles F. Golden from Classification 25A to
1.97 per hour to be effective as of June 1, 1961, was
approved.
APPOINTMENT OF The President asked for expressions from the Directors
AUDITING FIRM FOR regardirg the ap~ointment of an auditing firm to audit
FISCAL YEAR 1960- the records and funds of theDistrict for the fiscal
1951 AUDIT. year 1960-61. Director LeVesque feels the price paid
is high and possibly it could be done for less. There
can be no bids as that is against the ethics of that
profession. Eadie & Payne are f~mtliar with the
District's records and have done an excellent job.
MOI~ON Upon motion by Director LeVesq~e, duly seconded by
Director Brooks and carried unanim~usly, the accounting
firm of Eadie and Payne was recommended to conduct the
audit for the fiscal year 1960-61.
SEWER RE'(JRT AREA The Presideht called upon Engineer Don Miller for a sewer
B" HIGHLAND AREA report on Area "B" of the Highland Area Sewer Proj act -
SEWER PROJECT. Pacific and Victoria - which has been brought up to date.
He reported that two years ago there were 85 homes in this
area and now there are 108 with a possible $ or 8 additional
with short extensions. The total cost would be about
45,000.00 at $417 per connection including the entineering
costs. It seems to be a favorable project at this time.
A possible motion was discussed but abandoned as this
area is not a part of the District and annexation requests
would have to come from the residents of the area. The
fact may only be made known that the District is favorable
to this matter if approached with an annexation request.
The directors were unanimous in this feeling.
GENERAL SEWER The General Manager-Secretary reported that the Colich
DISCUSSION Construction Company has been paid except for one ite~
the damages to McDaniels Dairy - approximately ~329.50
which has been withheld from the final payment to Colich
until the differences are resolved.
The District is getting real good results from the Deed
and Agreement on Water Rights forms being sent out.
WARD STREET Director Brooks reported a problem which needs to be
RESIDENTS resolved regarding a portion of the District in the
CONNECTIONS Ward Street area whose residents were anxious to have
sewers at the time of the election when there was no
connection charge and the District could not supply
them with sewers at that time. Now they are to be
provided with sewers, but are being asked to pay $102.00.
Provision of sewers in that area at the time of the
bond issue was not economically feasible, but now it
is, due to the main outfall line having been built to
serve the Highland Area. It was felt that what few
residents of the District who would fall in this
category could be permitted to connect on the same
basis as they would have if sewer facilities were
installed originally.
June 13, 1961
TRAN$-WCRLD The General Manager-Secretary read a request frc~ the
SAVINGS & L(I%N Trans-World Savings & Loan for a release of lien against
R]-]QUF, ST. the property of Lucille Gerry at 7771 Lankersh/m, Highland,
with a demand for payment of the amount of the lien so
the proper title work can be handled before funds are
disbursed. Foreclusure would be the only alternative,
which would eliminate liens Junior to the deed of trust.
The directors expressed no objection to releasing the
lien and filing the demand as suggested.
REPRESENTATIVES W.P. Rowe & Son, Engineering firm, is to represent the
IN WATER b~JIT defendants in the water suit as engineering consultants
and Attorney Denslow Green is to represent the East San -
Bernardino County Water District only.
ADJ(NIRNMENT There being no further business, the President declared
the meetin~ adjourned at 9:55 p.m.
Harold G. ~ickert,~ecretary
Approved: Board of Directors
V~nn W. Botts, Pr~dent
EAST SAN BERNARDINO COUNTY 14ATER DISTRICT
REGULAR MEETING - JUNE 9.7, 1961
Directors Present: ~otts, President, presiding; Brooks,
LeVesque, Littleton and Wall.
Directors Absent: None.
Others Present: General Manager-Secretary, Rickert;
Associate Engineer, Cole; Auditor-Treasurer,
Bragg; Assistant Office Manager, Earl D.
Lyons; Engineer, 3oseph Rowe, and Editor
East Valley Times, 3erly Boyd, and two repre-
sentatives of Calblasco, Inc.
MINUTE~ Upon indication that each Board member present had read
the m~nutes of the June 13, 1961 meeting, a fill in of a
missiag line on page 3m oaragraog 6m was reqyested which
is as follows - "rich including the engineering costs. It
seems to be". Other than this correction, the m/mutes were
approved as written.
BIDS- WATER MAIN The President announced that this was the time and place to
AND APPURTENANT open bids for furnishing labor and equi~ent to install water
FACILITIES IN main and appurtenant facilities in the easement West of Del
EASEMENT TO SERVE Rosa Avenue and South of Highland Avenue to serve the Del
DEL RC~A BOWLING ~osa Bowling Alley, all in accordance with plans and
AT.;.~Y. specificat ions.
The following sealed bids were opened and read by the
Secretary:
Robert'Simon, Contractor $1,683.94
District's estimate $1,960.00
After reviewing the bid bonds and proposals, the Associate
Engineer recon~nended the acceptance of the bid su]~/tted
sUbject to the review of legal counsel.