Loading...
HomeMy WebLinkAboutRes - 2016.01 - Certifying the Environmental Impact Report for the Sterling Natural Resource CenterRESOLUTION 2016.01 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE EAST VALLEY WATER DISTRICT CERTIFYING THE ENVIRONMENTAL IMPACT REPORT FOR THE STERLING NATURAL RESOURCE CENTER WHEREAS, the San Bernardino Valley Municipal Water District(Valley District) is the lead agency, pursuant to the California Environmental Quality Act (CEQA) (Public Resources Code §§ 21000 et seq.) and CEQA Guidelines (14 California Code of Regulations §§ 15000 et seq.), for the proposed Sterling Natural Resource Center(SNRC) Project; and WHEREAS, the East Valley Water District (EVWD) is a responsible agency, pursuant to the California Environmental Quality Act (CEQA) (Public Resources Code §§ 21000 et seq.) and CEQA Guidelines (14 California Code of Regulations §§ 15000 et seq.), for the proposed SNRC Project; and WHEREAS, the SNRC Project involves the construction of a wastewater treatment facility and associated facilities that will provide tertiary treatment of wastewater generated within the EVWD service area and make the treated water available for beneficial uses within the Upper Santa Ana River watershed; and WHEREAS, the SNRC Project includes five project components: construction of the SNRC Treatment Facility in the City of Highland, construction of a treated water conveyance system that will convey treated water to one of three groundwater recharge locations, modifications to wastewater collection facilities, rehabilitation and reuse of the existing Santa Ana River pipeline, and refurbishment of existing groundwater wells to potentially supply supplemental water to the Rialto Channel when needed for environmental benefits; and WHEREAS, in October 2014, as updated in March 2015, EVWD studied the feasibility of a recycled water project to treat wastewater generated within the EVWD service area; on April 8, 2015, the EVWD Board of Directors created an ad hoc committee comprised of two members of the Board of Directors for the purpose of working cooperatively with Valley District regarding such a recycled water project; on September 23, 2015, the EVWD Board of Directors approved a Framework Agreement with Valley District, which became effective on October 6, 2015, that outlined the terms of the cooperation between the parties and established Valley District as the lead agency for the SNRC Project; and WHEREAS, on October 16, 2015, Valley District issued a Notice of Preparation of an Environmental Impact Report (EIR) for the SNRC Project, which commenced a 30-day scoping period during which Valley District held public scoping meetings at Valley District on October 29, 2015 and at EVWD on November 5, 2015; and WHEREAS, on December 17, 2015, Valley District posted a Notice of Availability of the Draft EIR for the SNRC Project with the County Clerk of San Bernardino County, and made the Draft EIR available at three physical locations in San Bernardino County and at the SNRC Project website and to the Board of Directors of EVWD; and East Valley Water District Resolution 2016.01 Page 1 of 3 WHEREAS, during the public comment period for the Draft EIR, which ran from December 17, 2015 through February 1, 2016, Valley District held public meetings on the Draft EIR at Valley District on January 14, 2016, at EVWD on January 19, 2016, and thereafter received comments from approximately 23 organizations, individuals, and public agencies; and WHEREAS, on March 4, 2016, Valley District released the Final EIR for the Project SCH #2015101058) which consists of the Draft EIR, the comments on the Draft EIR and the identity of the commenters, the responses to comments on the Draft EIR, and corrections and revisions to the Draft EIR, and made it available at three physical locations in San Bernardino County and at the SNRC Project website and to the Board of Directors of EVWD; and WHEREAS, the Final EIR identified the significant adverse impacts of the SNRC Project, feasible mitigation measures to reduce most SNRC Project impacts to less-than- significant levels; and the SNRC Project impacts that cannot be mitigated to a less-than- significant level (including construction-related noise, construction-related air emissions, cumulative air emissions, biological resources, and removal of an obstacle to growth) and therefore remain significant and unavoidable; and WHEREAS, the Final EIR identified no new significant information or new significant impacts requiring recirculation; and WHEREAS, on March 15, 2016, Valley District approved a Resolution 1038 certifying the Environmental Impact Report for the Sterling Natural Resource Center Project (SCH 2015101058) and Resolution No. 1039 adopting CEQA Findings of Fact, a Statement of Overriding Considerations, and a Mitigation Monitoring and Reporting Program for the Sterling Natural Resource Center Project and approving the Sterling Natural Resource Center Project SCH#2015101058); and WHEREAS, EVWD's Board of Directors has reviewed and considered the information contained in the Final EIR, including without limitation the Draft EIR and all supporting documents in the possession or under the control of Valley District. All references to the EIR and FEIR hereafter shall include all documents referred to above. NOW, THEREFORE, BE IT RESOLVED AND CERTIFIED by the Board of Directors of East Valley Water District as follows: 1. The EIR was presented to the East Valley Water District Board of Directors on March 4, 2016 and considered by the Board of Directors at its regularly scheduled meeting of March 23, 2016, and has been independently reviewed and considered by the members of the Board of Directors prior to that meeting and prior to the Board of Directors taking any action to approve or disapprove the SNRC Project. 2.The EIR's evaluation of the SNRC Project reflects the Board of Directors' independent judgment and analysis based on the Board of Directors' review of the entirety of the administrative record, which record provides the information upon which this resolution is based. East Valley Water District Resolution 2016.01 Page 2 of 3 3. The EIR for the SNRC Project has been completed in compliance with the requirements of CEQA and the CEQA Guidelines and is adequate for EVWD's use as a responsible agency. PASSED, APPROVED and ADOPTED this 23rd day of March, 2016. ROLL CALL: Ayes: Directors: Carrillo, Coats, Morales, Shelton, Smith Noes: None Absent: None Abstain: None J Ronald Board President I HEREBY CERTIFY that the foregoing is a full, true and correct copy of Resolution 2016.01 adopted by the Board of Directors of East Valley Water District at its Regular Meeting held March 23, 2016. v 11/1 Udl AjA-, Jobn J. Mura Secretary, Board of Jectors East Valley Water District Resolution 2016.01 Page 3 of 3