Loading...
HomeMy WebLinkAboutAgenda Packet - Engineering & Operations Committee - 03/27/2023ENGINEERING & OPERATIONS COMMITTEE MARCH 27, 2023 East Valley Water District was formed in 1954 and provides water and wastewater services to 103,000 residents within the cities of San Bernardino and Highland, and portions of San Bernardino County. EVWD operates under the direction of a 5­member elected Board. COMMITTEE MEMBERS Phillip R. Goodrich Governing Board Member James Morales Jr. Governing Board Member Engineering & Operations Committee Meeting March 27, 2023 ­ 1:30 PM 31111 Greenspot Road, Highland, CA 92346 www.eastvalley.org PLEASE NOTE: Materials related to an item on this agenda submitted to the Board after distribution of the agenda packet are available for public inspection in the District’s office located at 31111 Greenspot Rd., Highland, during normal business hours. Also, such documents are available on the District’s website at eastvalley.org and are subject to staff’s ability to post the documents before the meeting. Pursuant to Government Code Section 54954.2(a), any request for a disability­related modification or accommodation, including auxiliary aids or services, that is sought in order to participate in the above agendized public meeting should be directed to the District Clerk at (909) 885­4900 at least 72 hours prior to said meeting. CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL OF BOARD MEMBERS PUBLIC COMMENTS Any person wishing to speak to the Board of Directors is asked to complete a Speaker Card and submit it to the District Clerk prior to the start of the meeting. Each speaker is limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State of California Brown Act, the Board of Directors is prohibited from discussing or taking action on any item not listed on the posted agenda. The matter will automatically be referred to staff for an appropriate response or action and may appear on the agenda at a future meeting. APPROVAL OF CONSENT CALENDAR All matters listed under the Consent Calendar are considered by the Board of Directors to be routine and will be enacted in one motion. There will be no discussion of these items prior to the time the board considers the motion unless members of the board, the administrative staff, or the public request specific items to be discussed and/or removed from the Consent Calendar. 1.Consider approval of the January 23, 2023 Engineering and Operations Committee Minutes INFORMATIONAL ITEMS 2.2013 Energy Efficiency Project Update 3.Total Dissolved Solids and Water Recycling REPORTS 4.Engineering Updates Water Supply Dashboard 5.Operations Update Sterling Main Leak ADJOURN ENGINEERING & OPERATIONS COMMITTEEMARCH 27, 2023East Valley Water District was formed in 1954 and provides water and wastewater services to103,000 residents within the cities of San Bernardino and Highland, and portions of SanBernardino County.EVWD operates under the direction of a 5­member elected Board.COMMITTEE MEMBERS Phillip R. Goodrich Governing Board Member James Morales Jr. Governing Board Member Engineering & Operations Committee Meeting March 27, 2023 ­ 1:30 PM 31111 Greenspot Road, Highland, CA 92346 www.eastvalley.org PLEASE NOTE: Materials related to an item on this agenda submitted to the Board after distribution of the agenda packet are available for public inspection in the District’s office located at 31111 Greenspot Rd., Highland, during normal business hours. Also, such documents are available on the District’s website at eastvalley.org and are subject to staff’s ability to post the documents before the meeting. Pursuant to Government Code Section 54954.2(a), any request for a disability­related modification or accommodation, including auxiliary aids or services, that is sought in order to participate in the above agendized public meeting should be directed to the District Clerk at (909) 885­4900 at least 72 hours prior to said meeting. CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL OF BOARD MEMBERS PUBLIC COMMENTS Any person wishing to speak to the Board of Directors is asked to complete a Speaker Card and submit it to the District Clerk prior to the start of the meeting. Each speaker is limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State of California Brown Act, the Board of Directors is prohibited from discussing or taking action on any item not listed on the posted agenda. The matter will automatically be referred to staff for an appropriate response or action and may appear on the agenda at a future meeting. APPROVAL OF CONSENT CALENDAR All matters listed under the Consent Calendar are considered by the Board of Directors to be routine and will be enacted in one motion. There will be no discussion of these items prior to the time the board considers the motion unless members of the board, the administrative staff, or the public request specific items to be discussed and/or removed from the Consent Calendar. 1.Consider approval of the January 23, 2023 Engineering and Operations Committee Minutes INFORMATIONAL ITEMS 2.2013 Energy Efficiency Project Update 3.Total Dissolved Solids and Water Recycling REPORTS 4.Engineering Updates Water Supply Dashboard 5.Operations Update Sterling Main Leak ADJOURN ENGINEERING & OPERATIONS COMMITTEEMARCH 27, 2023East Valley Water District was formed in 1954 and provides water and wastewater services to103,000 residents within the cities of San Bernardino and Highland, and portions of SanBernardino County.EVWD operates under the direction of a 5­member elected Board.COMMITTEE MEMBERSPhillip R. GoodrichGoverning Board Member James Morales Jr.Governing Board MemberEngineering & Operations Committee MeetingMarch 27, 2023 ­ 1:30 PM31111 Greenspot Road, Highland, CA 92346www.eastvalley.orgPLEASE NOTE:Materials related to an item on this agenda submitted to the Board after distribution of theagenda packet are available for public inspection in the District’s office located at 31111Greenspot Rd., Highland, during normal business hours. Also, such documents are availableon the District’s website at eastvalley.org and are subject to staff’s ability to post thedocuments before the meeting. Pursuant to Government Code Section 54954.2(a), any request for a disability­related modification or accommodation, including auxiliary aids or services, that is sought in order to participate in the above agendized public meeting should be directed to the District Clerk at (909) 885­4900 at least 72 hours prior to said meeting. CALL TO ORDER PLEDGE OF ALLEGIANCE ROLL CALL OF BOARD MEMBERS PUBLIC COMMENTS Any person wishing to speak to the Board of Directors is asked to complete a Speaker Card and submit it to the District Clerk prior to the start of the meeting. Each speaker is limited to three (3) minutes, unless waived by the Chairman of the Board. Under the State of California Brown Act, the Board of Directors is prohibited from discussing or taking action on any item not listed on the posted agenda. The matter will automatically be referred to staff for an appropriate response or action and may appear on the agenda at a future meeting. APPROVAL OF CONSENT CALENDAR All matters listed under the Consent Calendar are considered by the Board of Directors to be routine and will be enacted in one motion. There will be no discussion of these items prior to the time the board considers the motion unless members of the board, the administrative staff, or the public request specific items to be discussed and/or removed from the Consent Calendar. 1.Consider approval of the January 23, 2023 Engineering and Operations Committee Minutes INFORMATIONAL ITEMS 2.2013 Energy Efficiency Project Update 3.Total Dissolved Solids and Water Recycling REPORTS 4.Engineering Updates Water Supply Dashboard 5.Operations Update Sterling Main Leak ADJOURN Agenda Item #1 March 27, 20231 Meeting Date: March 27, 2023 Agenda Item #1 Consent Item Regular Meeting TO: Committee Members FROM: Director of Engineering & Operations SUBJECT: Consider approval of the January 23, 2023 Engineering and Operations Committee Minutes RECOMMENDATION That the Engineering & Operations Committee approve the January 23, 2023 meeting minutes. AGENCY GOALS AND OBJECTIVES II - Maintain a Commitment To Sustainability, Transparency, and Accountability A. Practice Transparent and Accountable Fiscal Management B. Utilize Effective Communication Methods FISCAL IMPACT There is no fiscal impact associated with this agenda item. Respectfully submitted: ________________ Jeff Noelte Director of Engineering and Operations ATTACHMENTS Draft January 23, 2023 minutes. P a g e | 1 Minutes 1/23/2023 bvm 9 1 2 DRAFT EAST VALLEY WATER DISTRICT January 23, 2023 ENGINEERING & OPERATIONS COMMITTEE MEETING MINUTES Ms. Van Meter called the meeting to order at 2:30 p.m., Director Morales led the flag salute. PRESENT: Directors: Goodrich, Morales ABSENT: None STAFF: Michael Moore, General Manager/CEO; Jeff Noelte, Director of Engineering and Operations: Patrick Milroy, Operations Manager; Rocky Welborn, Water Reclamation Manager; Brenda Van Meter, Administrative Assistant GUEST(s): None PUBLIC COMMENTS There being no written or verbal comments, the public participation section was closed. APPROVE THE NOVEMBER 28, 2022, ENGINEERING AND OPERATIONS COMMITTEE MEETING MINUTES Directors Goodrich and Morales recommended that the minutes be approved as submitted. 14TH STREET WATER MAIN PROJECT Mr. Milroy provided an update on 14th Street Water Main Project that was completed by Operations staff. Mr. Milroy stated that the water main was originally owned by Southern California Water Company, which was acquired by the District. The former water main was under-sized compared to current District standards with a four-inch main, which was replaced by a six- inch main. The District replaced the old main with 495 feet of new six-inch ductile iron pipe. In addition, they added two new gate valves to provide easier access for repairs and installed two new fire hydrants. Operations staff coordinated with the Public Affairs staff to notify the affected and nearby residents of work being completed in the area. Notifications were sent in both English and Spanish. Mr. Milroy noted that District staff has experience in these types of jobs, which allowed for the project to be accomplished in-house. He also stated that newer staff is being trained to P a g e | 2 Minutes 1/23/2023 bvm 9 1 2 capture the knowledge of the District’s more experienced staff. The District’s goal is to complete two to three main replacement jobs per year as the District identifies infrastructure that requires replacement. Directors Goodrich and Morales recommended that the 14th Street Water Main Project be presented to the Board for informational purposes. Michael Moore agreed and said the item would be placed in the February meeting schedule. STERLING NATURAL RESOURCES CENTER (SNRC) SUPPORT SERVICES UPDATE Mr. Welborn provided a presentation regarding SNRC and the plans in place for the plant to go online. He noted that third-party services will be needed to ensure proper management of the new facility. Existing service providers were considered as part of the planning process. Mr. Welborn reviewed the various chemicals that are required to ensure the plant functions as designed. He stated that for the plant to operate as designed, there are maintenance items for consideration. Heavy mechanical maintenance, specialty equipment maintenance, screenings disposal, solids residual management, source control inspections, control system support and high voltage electrical servicing will all be required to ensure the plant runs efficiently. The biosolids management services include hauling dewatered biosolids to Rialto for conversion to biochar. Also, contract services will manage delivery of up to 130,000 gallons per day of high strength organics to produce power from the on-site co-generation engines. In addition to the maintenance services, the plant will also require software support for source control program management and compliance reporting. The District plans to add to existing contracts in place for SCADA and contract with other existing vendors to manage these important aspects of software maintenance and reporting compliance. Mr. Welborn stated that the District estimates it will require approximately 2,000 laboratory tests annually for SNRC to comply with State regulations. The District identified several labs that have provided testing services in the past. An RFP will be established and sent to interested laboratories as the District approaches the time to acquire these services. Some of the services required for plant operations have been procured and approved by the Board, while other items will be presented to the Board for consideration, consistent with the District’s procurement policies. SET THE DATE AND TIME FOR HOLDING RECURRING MEETINGS Director Morales recommended that the calendar be set for meetings to be held on the fourth Monday of odd months of the year at 1:30 p.m. Director Goodrich agreed. Future meetings will be set as recommended, per the newly approved calendar. P a g e | 3 Minutes 1/23/2023 bvm 9 1 2 ENGINEERING UPDATE Mr. Noelte presented a water supply dashboard that was developed by Rocky Welborn and Public Affairs to track water sources and conditions and was developed using links to various data sources from local and state agencies. The charts and graphs contained within the dashboard show comparisons of current conditions to previous years for groundwater and State Water Project, along with the available capacity. The surface water includes a monthly flow average, while rainfall data is shown for Northern California 8 Station, Big Bear and Highland. The Colorado River Storage graphic shows the current condition for Lake Mead and Powell. Additionally, the dashboard shows the water shortage stage that applies to the District. It was noted that the water year is from October 1 to September 30. Mr. Noelte stated that although the Bunker Hill Basin is still healthy, the groundwater levels are at historical lows. Directors Goodrich and Morales recommended that the dashboard be updated for presentation at future committee meetings, and that staff consider adding a comparison in the surface water chart. OPERATIONS UPDATE Patrick Milroy provided an update regarding Operations activities. He stated the following: •The Granular Activated Carbon (GAC) project at plant 134 is in the final stages and the ribbon cutting for the plant improvements is March 1, 2023. •Tank rehabilitation at plant 108 is projected for completion prior to summer, possibly by the end of May 2023. •The stationary generator at Plant 101 that the District received a grant to purchase has been installed and should be completed soon. •The District is hosting a tour for Arroyo High School January 24, and January 26, 2023. Students will be provided with an opportunity see the District’s heavy equipment fleet, view SCADA operations, a presentation by Water Quality, Finance, IT, Engineering and Customer Service. ADJOURN The meeting adjourned at 4:09 p.m. Phillip R. Goodrich James Morales Governing Board Member Governing Board Member Agenda Item #2 March 27, 20231 Meeting Date: March 27, 2023 Agenda Item #2 Informational Item 9 1 5 Regular Meeting TO: Committee Members FROM: Operations Manager SUBJECT: 2013 Energy Efficiency Project Update RECOMMENDATION This agenda item is for informational purposes only, no action is required. BACKGROUND / ANALYSIS East Valley Water District (District) takes pride in enhancing and preserving the quality of life for the community we serve. Optimizing energy efficiencies and reducing costs to deliver water is an operational priority for the District. In November 2013, the District contracted Honeywell to identify and implement operational energy efficiency projects. After implementing the efficiency improvements, Honeywell would provide an annual report for ten years identifying the energy savings. Honeywell has completed their eighth annual report for the project. The project cost including financing interest is $4,500,000. The project included four energy efficiency measures: 1. SCADA upgrades to implement time-of-use pumping 2. Rehabilitate 12 inefficient pumps 3. Replacement of two 50-year-old switchgears 4. Piping upgrades to reduce pressure loss and improve reliability The Honeywell project offered guarantees in annual energy savings to offset the $4,500,000 investment over ten years. The eighth annual report from Honeywell was recently verified by the District and identified cumulative energy saving of $4,303,677 over the past 8 years. Changes in energy rates have made the increase more significant in recent years and will continue to provide the District energy savings. The District continues to monitor the success of the project and meets with Honeywell for the annual maintenance and verification inspections. The District is evaluating other energy efficiency projects to further improve operational efficiency. AGENCY GOALS AND OBJECTIVES IV - Promote Planning, Maintenance and Preservation of District Resources B. Enhance Planning Efforts that Respond to Future Demands Agenda Item #2 March 27, 20232 Meeting Date: March 27, 2023 Agenda Item #2 Informational Item 9 1 5 FISCAL IMPACT Maintenance and Verification of the Honeywell Project for fiscal year 2022-23 is $18,651. Respectfully submitted: ________________ Patrick Milroy Operations Manager ATTACHMENTS Energy Efficiency Update Presentation Honeywell Annual Reports Patrick Milroy, Operations Manager ENERGY EFFICIENCY UPDATE March 27, 2023 HONEYWELL ENERGY EFFICIENCY PROJECT 2 November 2012 a letter of intent was issued to conduct an Energy and Operational Efficiency Study. November 2013 an agreement with Honeywell was executed to complete the comprehensive Energy Efficiency Project. The District entered a Lease Purchase agreement with US Bank to finance the project. Total cost with interest was $4.6 million. The project financing is a 10-year agreement that guarantees an annual energy savings of $483,000 to make the loan payments. 3 HONEYWELL ENERGY EFFICIENCY PROJECT INCLUDED 4 CONSERVATION MEASURES SCADA Upgrades •Upgrade hardware to increase communication reliability and set up automatic programming to strategically pump water during off-peak electrical time of use Pump Upgrades •Replace 12 old inefficient pumps at 37- 2, 39-3, 56-1, 108-1, 125-1, 130-1, 11A, 125, 142, 146, 146A, and 147 to increase energy efficiency Switchgear Upgrades •Replace switchgear that is over 50 years old at plants 24 and 33 to ensure safety and operational reliability Piping Upgrades •Install pipe upgrades at plant 125 to increase water supply reliability 4 The old SCADA system called well and booster pumps on to fill reservoirs via the level Honeywell programed the SCADA system to avoid pumping during expensive electrical time of day Prior to 2019, the most expensive electrical cost was Monday thru Friday 12pm to 5pm Since the popularity of solar the most expensive electrical cost is 4 pm to 9pm 7 days a week. Avoiding 4pm to 9pm pumping results in $$$ savings. HONEYWELL ENERGY EFFICIENCY PROJECT 5 HONEYWELL ENERGY EFFICIENCY PROJECT 6 ANNUAL SAVINGS $0 $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 2015 2016 2017 2018 2019 2020 2021 2022 Savings Calculations Using Original Avoided Cost Rates $483,000 Total Excess Savings of $439,677 in 2015-2022 7 $- $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 $4,000,000 $4,500,000 $5,000,000 2015 2016 2017 2018 2019 2020 2021 2022 Guaranteed Savings Actual Savings ANNUAL CUMULATIVE SAVINGS YEARS 1-8 8 2015 $19,349 2016 $15,620 2017 $16,089 2018 $16,571 2019 $17,068 2020 $17,580 2021 $18,108 2022 $18,651 2023 $19,211 2024 $19,787 HONEYWELL MAINTENANCE & VERIFICATION SERVICES PLANT 125 9 PLANT 146 WELL MOTOR 10 PLANT 146 SCADA RADIOS 11 PLANT 130 BOOSTER #1 MOTOR 12 Plant 108 Drop Valve Piping Plant 108 Booster 1 Motor Plant 125 Switchgear Plant 125-1 Booster Motor 15 EVALUATING ENERGY EFFICIENCY PROGRAMS: NEXT STEPS •Solar •Work with consultant to establish a feasibility study and evaluate solar options at Headquarters, SNRC Administration building, and Treatment Plant 134 •Battery Storage •Tesla batteries are currently in operation at Headquarters and Plant 140 •In the planning stages for Tesla batteries at Treatment Plant 134 •Batteries are provided at no cost to the District •HVAC Improvements •Continue diligent HVAC maintenance program and pursue cost saving improvements when available •Pump and Motor Rehab •Continue rigorous maintenance program, wells and booster pumps rehabilitated every 10 years, and pursue cost saving opportunities when available DISCUSSION East Valley Water District Highland, CA Year 8 Annual Savings Report January 2022 Annual Savings Report – Year 8 East Valley Water District Page 2 Table of Contents I. Executive and Savings Summary 3 Annual Energy Savings 4 Annual Site Inspections 6 II. Contact Information 8 EVWD Personnel 8 Honeywell Personnel 8 III. Energy Conservation Measures (ECM) 9 ECM Description 9 Site Specific Measurement and Verification Objectives 10 Data Collection 10 Saving Methodology & Calculations 10 Conclusion – Observations & Notes 16 Appendices 18 1. Annual Site Inspections 18 2. Technical Appendix 18 3. Acceptance Document 18 4. Financials – Contract & DO Schedules 18 Annual Savings Report – Year 8 East Valley Water District Page 3 I. Executive and Savings Summary Honeywell International Inc. entered into a 10-year performance contract with the East Valley Water District (EVWD) to perform energy cost reduction measures (ECMs) at its facilities in Highland, California. Honeywell Building Solutions (HBS) is pleased to provide EVWD with Year 8 Annual Savings Report (ASR) assessing the energy savings for the project. This report was generated using utility bills, equipment data logging, and analysis. The final project acceptance document was signed on June 29, 2014, which establishes the first performance year as November 1, 2014 to October 31, 2015. This report covers Year 8 from November 1, 2021 to October 31, 2022. The Energy Conservation Measures (ECMs) implemented are as follows: ECM Category Energy Conservation Measures 1.1 Install an advanced SCADA control system and switch to Super Off Peak (SOP) Time of Use (TOU) Electrical rates. 2.1 Replace older well and booster pumps with new, more efficient pumps. 2.2 Replace well pump 125, replace the hole in the casing and install piping improvements. Table 1– Project Energy Conservation Measures Annual Savings Report – Year 8 East Valley Water District Page 4 The Federal Energy Management Protocol/International Performance Measurement and Verification Protocol (FEMP/IPMVP) Measurement and Verification (M&V) methodology approach for each ECM is listed below in Table 2. ECM Number ECM Title M&V Approach Years 1 & 10 1.1 Install an advanced SCADA control system and switch to Super Off Peak (SOP) Time of Use (TOU) Electrical rates. Option C 2.1 Replace older well and booster pumps with new, more efficient pumps. Option A 2.2 Replace well pump 125, replace the hole in the casing and install piping improvements. Option A Table 2– ECM M&V Options Although the original planned M&V options were C for ECM 1 and A for ECM 2, the savings analysis lent itself to a complete option C analysis which is to calculate savings from utility bills. This came about due to the fact that data from the SCADA system allowed for a complete analysis and captures savings from both ECMs within the same data set. Therefore, the savings presented in this report shows savings for the entire project and is not broken down into these two ECMs. Annual Energy Savings The estimated annual energy savings for Year 8 is summarized in Table 3 below. ECMs #ECM Electricity Energy Demand Savings* Total Energy Total Energy O&M ANNUAL DESCRIPTION Savings (kWh/yr) (kW) Savings (MBtu/Yr) Savings ($/Yr) Savings ($/Yr) SAVINGS 1.1 Install an advanced SCADA control system and switch to Super Off Peak (SOP) Time of Use (TOU) Electrical rates.1,444,412 445 4,930 456,654$ -$ 456,654$ 2.1 Replace older well and booster pumps with new, more efficient pumps.551,598 110 1,883 51,850$ -$ 51,850$ 2.2 Replace wellpump 125, replace the hole in the casing and install piping improvements. 37,688 12 129 3,543$ -$ 3,543$ TOTAL SAVINGS 2,033,698 445 6,941 512,047$ -$ 512,047$ Notes MBtu=106 Btu. *Annual electric demand savings (kW/yr) is the sum of the monthly demand savings. Table 3 – Estimated Year 8 Annual Energy Savings Annual Savings Report – Year 8 East Valley Water District Page 5 The verified annual energy savings for Year 8 is summarized in Table 4 below. ECMs #ECM Electricity Energy Total Energy Total Energy O&M ANNUAL DESCRIPTION Savings (kWh/yr) Savings (MBtu/Yr) Savings ($/Yr) Savings ($/Yr) SAVINGS 1.1 Install an advanced SCADA control system and switch to Super Off Peak (SOP) Time of Use (TOU) Electrical rates.2,751,889 9,392 1,980,287$ -$ 1,980,287$ 2.1 Replace older well and booster pumps with new, more efficient pumps.551,598 1,883 51,850$ -$ 51,850$ 2.2 Replace wellpump 125, replace the hole in the casing and install piping improvements. 37,688 129 3,543$ -$ 3,543$ TOTAL SAVINGS 3,341,175 11,403 2,035,680$ -$ 2,035,680$ Notes MBtu=106 Btu. *Annual electric demand savings (kW/yr) is the sum of the monthly demand savings. Table 4 – Verified Year 8 Annual Energy Savings ECMs 2.1 and 2.2 are based on option A and therefore the savings stay the same. ECM 1.1 is based on utility bills analysis and water production and Well’s depths measurements provided by EVWD. Savings for EVWD can be calculated in different ways to show the actual ground variables and avoided cost rates. The variables are referring to the fact that the original saving calculations at the time of project development were based on water production, Well depths and bills at the time. However, over time the water production has changed and so have the well depths and utility billing ra tes. As per the contract, Honeywell calculates the savings so as to report apple to apple comparison and using utility rates that are actually being paid by EVWD and what the savings are being realized compared to would-be cost if the project had not taken place at all. In Table 5 below, the top line (marked as USED) shows savings being realized by EVWD using the actual utility rates at the present being paid by EVWD. The savings are calculated adjusting for variables such as water production in the current year, well depths affects on pumping energy and EUI utilization adjustments. The Option 1 line shows savings being realized by EVWD using the actual utility rates at the present being paid by EVWD. The savings are calculated without any adjustments. The savings are more than option USED because in current year EVWD produced less water than in the base year and hence consumed less pumping energy and thereby higher savings. Annual Savings Report – Year 8 East Valley Water District Page 6 The Option 2 line shows savings being realized by EVWD using the expected utility rates EVWD was expected to pay in future years. The savings are calculated adjusting for variables such as water production in the current year, well depths affects on pumping energy and EUI utilization adjustments. The KWH savings are same as option USED but $ savings are much less because expected utility rates in the future were less than what they are at the current time. The Option 3 line shows savings being realized by EVWD using the expected utility rates EVWD was expected to pay in future years. The savings are calculated without any adjustments. The KWH savings are more than option 2 because in current year EVWD produced less water than in the base year and hence consumed less pumping energy and thereby higher KWH savings. The $ savings are much less than option 2 because expected utility rates in the future were way less than what they are at the current time. Baseline (kWh/yr) Post (kWh/yr) Savings (kWh/yr) Savings ($/Yr) USED Savings Calculated using Contracted Avoided Cost Rates, Actual Utility Bills with Adjustments based on Measured Water Production, Well Measurements and EUI index.19,786,465 17,034,576 2,751,889 $1,980,287 1 Savings Calculated using Contracted Avoided Cost Rates, Actual Utility Bills without any Adjustments.19,786,465 15,445,460 4,341,005 $2,134,066 2 Savings Calculated using Original Avoided Cost Rates, Actual Utility Bills with Adjustments based on Measured Water Production, Well Measurements and EUI index.19,786,465 17,034,576 2,751,889 $583,179 3 Savings Calculated using Original Avoided Cost Rates, Actual Utility Bills without any Adjustments.19,786,465 15,445,460 4,341,005 $736,958 Options Option Description Electricity Energy Table 5 – Various Annual Energy Savings Scenarios for ECM 1.11 Annual Site Inspections Mustafa Abbas of Honeywell visited a few sites on July 13, 2022. During the inspections, the team visited 10 pumping stations (11, 24, 39, 108, 125, 143, 146/A, 147 and 132). 8 of the stations were operational and 2 were off by SCADA system calling the well stations to be on or off based on demand. Well depths were noted for several wells. A review of the SCADA system showed that well water accounted for 80.7% of the water production while surface water accounted for 19.3% for the contract year for the wells under this contract. Below are a few pictures taken during inspections. 1 Option “USED” shows Verified savings based on higher of the actual or the contractual blended avoided cost as outlined in the contract. Agenda Item #3 March 27, 20231 Meeting Date: March 27, 2023 Agenda Item #3 Informational Item Regular Meeting TO: Committee Members FROM: Director of Engineering & Operations SUBJECT: Total Dissolved Solids and Water Recycling RECOMMENDATION This agenda item is for informational purposes only, no action is required. BACKGROUND / ANALYSIS At the March 8, 2023 meeting, the Board authorized a Memorandum of Understanding (MOU) between EVWD, San Bernardino Valley Municipal Water District (Valley District), San Bernardino Municipal Water Department and City of Redlands to establish total dissolved solids (TDS), or salt, mitigation commitments necessary for the Regional Board to issue permits for the discharge of recycled water by EVWD and the other parties for the purpose of recharging the groundwater basin. The impact of recycled water on TDS concentrations in groundwater is relevant because recycled water has higher TDS than the allowable level for the effected groundwater basin. The MOU contemplates a feasibility study to identify a sustainable and cost-effective strategy for managing the TDS in the groundwater basin, which may include a regional desalter to remove TDS from recycled water. The strategy would also include seeking grant funding to support TDS mitigation efforts. The regulations associated with TDS in groundwater are important for the District and regional water agencies that rely on the groundwater basin. A presentation will provide perspective on typical TDS levels in water, regulations on TDS, and mitigation options that will be evaluated. Staff will bring back to the Board the results of the study that will be performed over the next year. AGENCY GOALS AND OBJECTIVES I - Implement Effective Solutions Through Visionary Leadership A. Identify Opportunities to Optimize Natural Resources IV - Promote Planning, Maintenance and Preservation of District Resources A. Develop Projects and Programs to Ensure Safe and Reliable Services Agenda Item #3 March 27, 20232 Meeting Date: March 27, 2023 Agenda Item #3 Informational Item FISCAL IMPACT There is no fiscal impact associated with this agenda item. Respectfully submitted: ________________ Jeff Noelte Director of Engineering and Operations ATTACHMENTS Presentation Total Dissolved Solids & Water Recycling March 27, 2023 •Total Dissolved Solids (TDS), or salinity is the concentration of dissolved mineral salts in water •Typically in the form of: •Sources of Dissolved Solids •Natural weathering process in storm water runoff •Household uses discharged to sewer •Chemical addition at treatment plants •Specifically, chlorine in the form of sodium hypochlorite (bleach) •Self-regenerating water softeners 2 INTRODUCTION TO DISSOLVED SOLIDS 3 TDS OF VARIOUS WATERS Water Type Typical TDS (mg/L) Santa Ana River Water 140 -240 Imported Water 230 -330 Drinking Water 200 -500 EVWD Recycled Water (estimated)530 Brackish Water 500 –17,000 Sea Water 35,000 Reverse Osmosis Treated Water 25 -150 •EPA developed Maximum Containment Levels (MCLs) for drinking water to ensure public health 4 REGULATORY REQUIREMENTS FOR TDS Primary MCLs Secondary MCLs Primary MCLs are standards specifically for constituents that are immediately hazardous and selected to protect public health. Secondary MCLs are standards that contribute to a lack of trust in drinking water and have potential or have the potential to accumulate over long time periods. •Taste •Odor •Smell •Scaling/Corrosion TDS in EVWD Water Chemical Secondary MCL (mg/L)Detection Level Average Level Detected Unit of Measure Range of Detection Likely Source of Contamination Total Dissolved Solids (TDS)1000 5 296 mg/L 170-510 Runoff/ leaching from natural deposits •Indirect Potable Water Reuse (i.e., Groundwater Recharge) carries salt from daily uses into the ground water •State Water Resources Control Board regulates water quality for groundwater 5 GROUNDWATER IMPACTS -REGULATIONS Water Quality Objectives Bunker Hill A 310 mg/L Bunker Hill B 330 mg/L* 2018 Ambient Levels Note: Assimilative capacity is available Bunker Hill A 330 mg/L Bunker Hill B 280 mg/L* •Assimilative capacity allows the discharge of a contaminant at higher levels if the basin remains below the objective •Elevated TDS loading over time increases TDS of groundwater basin 6 GROUNDWATER IMPACTS –TDS INCREASES 7 GROUNDWATER IMPACTS –MODEL RESULTS •Modeled flow paths of recycled water from Weaver Basins Legend Active municipal well Inactive municipal well Monitoring well Private well, active Recycled Water Flow Paths 8 GROUNDWATER IMPACTS –MODEL RESULTS (CONTINUED) •Projected TDS Concentrations 500 550 450 400 350 300 250 1990 2010200520001995 2030202520202015 204520402035 TD S ( m g / L ) Treatment Technology Description Cost Pros Cons Reverse Osmosis Liquids are pushed under high pressure through a semipermeable membrane, reject particles are collected on the membrane and removed as a high strength waste Capital $ $ $ Ops $ $ $ Highly Effective At Removing TDS Proven Track Record High Energy Costs Includes A Reject Waste Stream Ion Exchange Liquid flows through a substrate that will exchange molecules that cause salinity with other non-salinity causing molecules Capital $ $ Ops $ $ $ Proven Technology Waste Resin Disposal Includes A Reject Waste Stream Frequent Media Change Outs 9 TREATMENT OPTIONS DISCUSSION Water Supply Update Northern California 8 Station 56.2 inches Updated 3/20/23 Big Bear 22.99 inches Updated 3/17/23 Annual Average: 18.5'' WATER YEAR Highland October 1- September 30 12.91 inches Updated 3/20/23 ACRONYMS CFS = cubic feet per second mAF = million Acre-Feet 35% Annual Average: 11.9'' 29% of Capacity STATE WATER PROJECT ALLOCATION WATER SHORTAGE STAGE STATE WATER PROJECT Lake Mead & Powell Updated 2/28/23 DISTRICT WATER SUPPLIES Annual Average: 53.2'' GROUNDWATER SURFACE COLORADO RIVER STORAGE OTHER INDICATORS RAINFALL Current Available CapacityAvailable Capacity Current 5.02 mAF 84% of Capacity Bunker Hill Basin 2.92 mAF 82% of Capacity Lake Oroville Updated 3/19/23 16.1 24.3 27.1 Santa Ana River (CFS) Updated 3/20/23 Last YearLast Year 15.5 mAF Historic Avg 2014-2022 Monthly Average 2023-Monthly Flow Average